Modderfontein: the last
available large development site
LinkswiththeCorridorsof
Freedomandsitswithin
theAirportCorridor
ComplieswithCoJs
emergingSpatial
DevelopmentFramework
Promotesdense
communitiesbuiltaround
public transit
publictransit
Provideaccesstoservices
andamenities
Modderfontein:
1600 ha site
Modderfontein Reserve
Heritage Buildings
Approveddevelopment
applications in place:
applicationsinplace:
Longlake
Westlake
FoundersHill
Pinelands
Highlands
K113NewRoad
MarlboroRoad
Extension
CentenaryRoad
Extension
REGENERATIONPROJECTS,
REGENERATION PROJECTS
LIKEMODDERFONTEIN,CREATE
OPPORTUNITIES
TO HELP FILL THESE NEEDS
TOHELPFILLTHESENEEDS.
THE PROCESS:
Masterplanning Explained: Whatthiskindofprojectentails
Cityof
Johannesburg
h b Transportation
Environment
Stakeholders
Infrastructure
What:presentations,feedback,andonthespotdesigntesting
When:Fromthebeginningoftheprojectallthewaythroughtodelivery
Where:alocationwhereallareasofinterestcancollaboratetogether onsite,inan
office or a convention centre
officeoraconventioncentre
Why:
Buildearlyconsensusandprojectmomentum
Engagewithkeystakeholders
Engage with key stakeholders
Recogniseinformationgaps
Identifyissues/problems
Establishobjectives(social/economic/environmental)
Clarifyopportunitiesandconstraints
Clarify opportunities and constraints
Developoptionstogether
WHATWEHAVEDONESOFAR:
EvolutionofthePlan
2015
Wemustthinkstrategicallyand
thatincludesGautengProvince.
Wecanbenefitfromeachother,
ifweworktogether.
EsteeCampher,GautengOffice
ofthePremier:Planning
Division
Modderfonteindoesnotjust
effectJohannesburg.Itisalsoa
criticalcomponentinthewider
region,includingGautengProvince
and Ekurhuleni Municipality
andEkurhuleniMunicipality.
MartinBekker,Ekurhuleni
Protectionof
environmental Resilient
Socialintegration iti iti
sensitivities resources
Safeplacesto
Safe places to
live,workand
play
Qualitypublic
Q yp
places
Jobcreation
Efficient
transportation
Designtheprojectprinciplesto
g p j p p
helpachievetheagreedgoals:
Modderfontein mustbea
place ofintense,productiveand
vibrantuseswithgoodsocial
integration.
LianaStrydom,COJ:
DevelopmentPlanning
Takingadvantageofthenatural
assetsonsiteallowthecreation
ofauniqueandbeautifulplace
g p
ANDthedesignoflowimpact
strategicscalesolutionstoissues
likefloodcontrolandpower
demand.
Modderfontein needsto
complimentthenaturalsystems
intherestofthecity.Holistic
designisimportant.Weneedto
thinkoutsidetheboxanduse
innovativesolutionstodealwith
environmental design
environmentaldesign.
JaneEagle,COJEISD
Beautifulandaccessibledesignthat
alsoeffectivelycontrolsurban
l ff ti l t l b
floodingandprovideseducational
facilitieswhereresidentscanlearn
aboutenvironmentalpractices.
Ourframeworkplanmustbe
flexibleandallowchanges
overthe2030yearsinwhich
y
developmentwilltakeplace.
Itisimpossibletopredictthe
bestdevelopmentchoices
that far in advance
thatfarinadvance.
Emannuel Sotomi,COJ
Housing
Buildingatsustainabledensities
allowthemostflexibility,better
accesstopublictransit,more
y
communityfacilitiesandnewurban
greenspaces.
Wastemanagement
strategiescanbelinkedtojob
creation.
Nozipho Maduse ,COJEISD
Responsibledevelopmentnolonger
e es o bus ess as usua esou ce
reliesonbusinessasusualresource
supplies.Theseverticalwindturbines
arequietandcreateauniquefeature
inpublicsettings.
Wecandobetter.
d b
Makesuretoconsiderwhat
smallbusinessesneedand
avoidshiftingdevelopment
fromthecity.Dontforgetto
considertheairport!
Istell Orton,GIBB
Publictransitisthemosteffective
waytoincreaseconnectivity from
theairporttothecitiescentres.
Whenthedevelopmentaround
publictransitnodesprovidesthe
amenitiesusersneed,small
businessesbenefitANDsafety
increases.
Rosebank,Johannesburg KingsCross,London
(shops,restaurants,postoffice,bar,hotel)
Landusesmustbe
plannedinsuchaway
thatpeoplecanlive
close to where they
closetowherethey
work.Economicscant
belookedatinavoid.
MoniqueGriffith,
COJIntegrated
RegionalEconomic
Development
Modderfonteincan
takepressureoffthe
surroundingareaby
providingvibrant,
integratedandhealthy
placesforpeopleto
liveworkandplay.
Remembertoconsiderhow
Modderfontein willinfluencethearea
aroundit.
Nkateko Shipalana,COJDevelopment
Planning
Reserveboundaryexample
Understandingenvironmentalsensitivities
allowstheframeworkplantoprovidethe
correctlevelofaccesstoopenspaceon
oursiteandbeyond.
Towncentreexample
EnvironmentProtectionandEnhancement
Environment
Environmental Conditions
EnvironmentalConditions
ZendaiLand:
Exotic(butvaluable)trees
y
Reeddominatedvalleybottomwetlands
Oryx(2007)EnvironmentalSensitivityReport
Exotictrees Graniteoutcrops
Plants
215plantspeciesrecorded
89%oftheareatransformed
naturalareasstillcontainedasignificant
p
numberofspecies
proposalsmadetoamendthe
ConservationAreaboundarytocapture
additionalsensitivevegetation
/ p y
exotic/alienplantcommunityatthesite
representsasubstantialthreattoits
ecology
ValleyBottomWetland Pasture/GreenSpace
EnvironmentProtectionandEnhancement
Environment
Summarisesmainopportunitiesandconstraints:
Wetlands+30m
Watercourses+32m
100yearFloodlines
Graniteoutcrops
yp
GypsumAreas
Modderfontein Reserve
PlacemakingandtheEnvironment
Placemakingisparamountinregenerationschemes
ArecentreportbySavillshas
highlightedthatredevelopmentat
KingsCrossandStratford(the2012
OlympicPark)arealreadycreating
vibrantnewcommunities,whilst
redevelopmentinPaddington
workedlesswellthankstolittle
earlyinvestmentinthewider
environment
Ourresearchhas
shownthatthe
featureshomeowners
value most about their
valuemostabouttheir
homearenot
necessarilyassociated
withthebuildingitself,
but more with the
butmorewiththe
environmentinwhich Camley Street Natural Park Kings Cross, London
itislocated.
http://www.savills.co.uk/research_articles/186866/1812370
Environmental Principles&Delivery
Environment
Thenaturalenvironment(naturalandsemi
The natural environment (natural and seminatural
naturalhabitats,includingrivers,wetlands,grasslandsandotherenvironmentalfeatures)willbe
habitats including rivers wetlands grasslands and other environmental features) will be
treatedasacorethemeofthedevelopment.
Highbiodiversityareaswillbeidentified&safeguarded
Openspacewillbeplanned,designedandmanagedtomaximiseitsvalue
Blue and green infrastructure will be given the same importance as more traditional infrastructure
Blueandgreeninfrastructurewillbegiventhesameimportanceasmoretraditionalinfrastructure
ToensurethattheseenvironmentalprinciplesareincorporatedwithinongoingplansanddesignsanOpenSpaceStrategyandPlan willbe
prepared.Thiswill:
take into account the Masterplanss requirementsforurban/infrastructuredevelopment;
takeintoaccounttheMasterplan requirements for urban/infrastructure development;
respondtoandintegratewiththeDeliveryStrategy;
requireuptodateecologysurveysandmapping;
setoutaphasedprogrammeofhabitatrestorationandlandscapedesign;
Result:EarlyphasesoftheModderfonteindevelopmenthaveanattractiveenvironmentastheyarecompleted
MASTERPLAN OPTIONS:
Optionsaretestedagainsttheagreedgoals.
p g g g
Thepreferredoption(1)deliversbestfor:
1. StartPinelands,FoundersHill,Longlake +bulk
electricalsubstation,towncentreplanning 5. 2.
2. Deliverhospital
3. ContinueWestlakedelivery
1.
4. Lightindustrialjobs 5.
5. Familystyleresidential 1.
4. 5.
MOVEMENT 5. 2
2.
1. Delivermajornorth/southconnectionK113 1.
2. Maximiseconnectionstotheairportandadjacentland
3. BegindesignoftheGautrainStation 2.
3.
4. CompleteCentenaryRoadextension
5 Buildmajoreast/westroadconnection
5. Build major east/west road connection
CONNECTINGTOTHEENVIRONMENT
1. Deliverpedestrianandcycleconnections 3.
2. ContinueModderfonteinReservemanagement 1.
3 PreparefullsiteOpenSpaceStrategyincludinghabitat
3. Prepare full site Open Space Strategy including habitat 1.
&wetlandrestoration,landscapedesignandphasing 3. 4.
4. Providegreencushionbetweenhousingandreserve
5. Deliverpublicparks
5.
5,300newhomes
7,000newjobs
Next10years
y
LIVINGANDWORKING 4.
1. Begindeliveringfirstphaseofthetowncentre 1.
2. Begindeliveringmixeduseneighbourhoods
1.
MOVEMENT 1.
1. Buildsecondmajoreast/westconnectingroad 1. 1.
4. 4.
2. Gautrainstationandassociateddevelopmentopens 2. 2.
(stationmaybeoperationalearlier) 3. 4.
5.
3. KemptonParkRoadiscompleted 2.
4. Highcapacitytransitstationsitesaresafeguarded
f 4.
5. ExtensionofMarlboroRoadisbuilt
CONNECTINGTOTHEENVIRONMENT
1. Deliverpublicparks(designedtosupportSUDS)
2 Expandpedestrianandcycleconnections
2. Expand pedestrian and cycle connections
3. Wetlandrestorationprogrammecontinues
partofSUDS 3.
4. ModderfonteinRiverCorridorRestorationstarts 2.
4. 1.
VIABILITY
1. Checkthemarket:Plotscouldbeeitherresidential
orlightindustrialdependingondemand
2. Newneighbourhoodsaredeliveredwhenthe
marketconfirmstheneed
14,000newhomes
35,000newjobs
2 newschools
Next10years
y
2.
LIVINGANDWORKING
1. Beginsecondpartofthetowncentre
2. Buildlandbridgeg toconnectthenorthandsouthparts
p 3.
ofthetowncentre
3. Begindeliveringthenextmixeduseneighbourhood
2.
MOVEMENT
1. Buildfirstnorth/southconnectingroad
2. Buildhighcapacitypublictransitlineandstations
wheredevelopmentispresent
CONNECTINGTOTHEENVIRONMENT 2.
1.
1. DelivermajorCentralPark(designedtosupportSUDS)
2 Connectpedestrians&
2. C t d ti & cyclestosouthsites
l t th it 1. 1.
VIABILITY 2.
2.
1. Checkmarketviabilityfor:
Landbridge 2.
14,500newhomes
37,000newjobs
2 newschools
Next10years
y
LIVINGANDWORKING 1.
1. Beginlastphaseoftowncentre
2.
2. Begindeliveringadditionalmixeduseneighbourhood
g g g
MOVEMENT
1. Buildadditionalhighcapacitypublictransitstations
2. Ifrequired,buildasupportingnorth/southroad
q , pp g /
CONNECTINGTOTHEENVIRONMENT 2.
1. CompleteCentralPark
2. Completepedestrianandcycleconnections
p p y
1.
VIABILITY 1.
1.
1. Checkpublictransitusageratesattimeofdelivery
inordertoassessnecessityofadditional 2.
north/south road
north/southroad
2. Checkmarketviabilitybeforestartingnextmixed
useneighbourhood
17,000newhomes
35,000newjobs
2 newschools
Next10years
y
LIVINGANDWORKING
1. Begintheremainingmixeduseneighbourhood
2.
1.
MOVEMENT 1.
1. Ifrequired,completedMarlboroRoad.
2. Buildadditionalhighcapacitypublictransitstations
1.
1. 2.
CONNECTINGTOTHEENVIRONMENT
1. Providegreencushionbetweenhousingand
reserve
VIABILITY
1. Investigatethepossibilityofincreasingcapacityof
alternativeeast/westconnectioninlieuof
completingMarlboroRoad.
17,000newhomes
35,000newjobs
2 newschools
Framework Masterplan Concept:Community
Framework Masterplan Concept:LandUse
Framework Masterplan Concept:Density
Framework Masterplan Concept:PublicTransit
PotentialRailStation
Framework Masterplan Concept:RoadHierarchy
Modderfontein is
NOTbusinessas
usual.
Modderfontein providesagenuineopportunity
toprovideplacepeoplewanttolive,workandplay
TODAY.
TODAY
Whathappens
What happens next:
o Integrate yourfeedback
o Finalize themasterplan
the masterplan
o Approve theframework
MODDERFONTEINREGENERATION
ModderfonteinMasterplan ProgressUpdate
Thankyou!
y