Development of Smart RBI program
for LNG Plant System
1
1. Background and Purposes of this Project
- Natural gas from gas wells is delivered by pipeline or distribution mains to the liquefaction plant
where it is changed into a liquid.
- The process equipment necessary to make the liquid, the plant also contains equipment to treat
or prepare the gas prior to liquefaction and tankage for storage of the LNG.
- Risk assessment and safety systems are critical to all gas plant. Therefore, the goal of this project is
how to use known risk assessment codes (API 581 581,, ISO etc) to address such safety analysis require
etc
ments for risk management in the LNG plant
plant..
terminal
treatment liquefaction
wells
LNG carrier
Cold Box 2
Institute of Gas Safety R&D
2
Institute of Gas Safety R&D
ASP Application
Supply Assessment Results
Risk Analysis SW
Inspection Scheduling SW Data Degradation Information
Repair Scheduling SW Application
Warehouse System for Materials
Cost-Benefit Analysis SW W S
Server
Safety Integrity Level (SIL) S/W Server Inspection Monitoring Data
Based on Web
PHA S/W
Financial Risk Analysis S/W
Internet
Based
Network
System
Decision Making Tool System
Management Information System Management
GUI Application & User Interface Server
Web
W b Base
B
Basic Engineering
Virtual Reality Based
on WEB System
3
2. Research plan [2008. 11 ~ 2014. 6]
1st Year 2nd year 3rd 4th 5th(2012~2013) 6th(2014.6.17)
Standard/code Material DB/ Risk assessment Safety management
Code, data survey Inspection Planning
analysis System design development Guide development
Review
R i Main
M i material
t i l
and guideline
Pre-reserch survey
Compare of Risk
Manual Writing
asessement technical
Check the Survey of Non destructive Design of material
Benchmark ing of LNG plant DB destructive
Research goals
Design of data management
Risk check of reuipment , In LNG plant system safety index design
Design
plant module
analysis module
LNG Plant NDE DB
Defined of RISK
in LNG plant Development of Management KGS -RBIM
tool of LNG NDE Reliability confirm For LNG plant
NDE system
Development of
Risk assessment
Development LNG RBI s/w
Web-based Platform
Written procedure
SAFETY Responsibility & authority
Incident investigation Safety policy
Engineering reliability
Meetings Written procedure
Audits and reviews Emergency planing
Permits to work
Human reliability in the operations Internal audits
SOCIAL ENVIRONMENT
(laws, economic pressure, public opinion)
Figure. Pyramid showing how different aspects of a management system affect the achievement
of a safety operation(based on Jessen, T. K. Systems for good management practices
in quantified risk analysis. Process Safety Prog., 12(3), 137) 2
5
4
1st Stage(2008 ~2009) 2nd Stage 3rd Stage
(2010~2011) (2012~2014)
Data
Component Pakage RAM based
Application
Server Warehouse
Server
Interface Internet
Based
Network
Application Program
System
Materials information
Management
Materials DB Equipment Server
component
components
Based on Risk Assessment
Codes
mming
Application
A li i
Consequence model
Database Biz Logic
23
virtual
plant
program
cording
SKKU
KICT (Sub joint)
(Core
Institute)
Institute
Gas Safety JSPS 180th
RBM
R&D Committee
in Japan
(Joint)
5
4. The research results
BS(British Standard)
BS 08/30183974DC, 2008 BS EN 31010. Risk management.
BS EN12308:1998 Installations and equipment for LNG
LNG.
BS EN710:1998 Safety requirements for foundry molding and
coremaking machinery and plant and associated equipment
BS ENISO17666:2003 Space systems. Risk management
BS PDISO/IECGUIDE73:2002 Risk management. Vocabulary.
Guidelines for use in standards
6
4. The research results of first year
Inlet Facilities
- Uncertainty of feed stock property
- Slug design basis
- Insufficient separation of gas & liquid
- Fouling
Liquefaction
- High temperature around gas turbine
- Large bore piping & piping support
- Vibration of large rotating machine
- Large liquid inventory
- Cracking of cryogenic component
Institute of Gas Safety R&D
7
Damage, Risk
Risk,, Hazard
reason,
Cause,
Factor?
Risk
Ri k can be formally defined
as the potential of loss(e.g.,
material, human, or
environment, losses) resulting
from exposure to a hazard.
Institute of Gas Safety R&D
()
Piping systems
Tanks
Reactors
Drums
Pumps/Comp.
H/E
/
Towers
Heaters/Boilers
Others/Unknown
0 5 10 15 20 25 30 35
Institute of Gas Safety R&D
8
What is the definition of ~~~ ?
Hazard : is considered as a source of danger
danger
but the concept does not contain any notion
of the likelihood with which that danger
will actually impact on people or
on the environment.
Institute of Gas Safety R&D
Institute of Gas Safety R&D
9
Risk Ranking of Equipment
80%
70%
Most of the total
60%
50% inspectable plant risk
~80% of all
40% is concentrated in a
equipment
30% small percentageitems
of yielding
20% the equipment items
~20% of total
10%
~20% of 0% risk
equipment 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
items yielding % of Equipment
~80% of total
risk
Institute of Gas Safety R&D
Institute of Gas Safety R&D
10
Managing Risk
a. Human error
b. Natural disasters
c. External events(e.g., collisions or falling objects)
d. Secondary effects from nearby units
e. Deliberate acts(e.g., sabotage)
f. Fundamental limitations of the inspection method
g. Design
D i error
Risk using RBI h. Previous unknown mechanisms of deterioration
Uninspectable risk
Inspection Activity
Institute of Gas Safety R&D
Inspection Planning
QIP
(Quality
Improvement Inspection Result
Process)
Inspection Updating
System Audit
Institute of Gas Safety R&D
11
Plant Database
User Level
Environmental Cleanup
Risk Area
Risk Ranking Matrix Risk Ranking Matrix
Financial Risks
Inspection Planning
Inspection Planning
22
Institute of Gas Safety R&D
Results of research(2008.11~2012.12)
Presentation Layer Algorism
LNG-RBI
LNG RBI Middle Ware NDE monitoring system
Joint to (VR
VR System)
System and Inspection Planning
Data Broker
Institute of Gas Safety R&D
12
Example of Presentation Layer with Risk
Assessment Model by using VR
Institute of Gas Safety R&D
Qualitative, quantitative,
ISO, BS, ANSI act. (Confirm of
semi-quantitative
Risk analysis method
Survey hazard factor
API 581 (Risk based inspection)
feedback in LNG plant Selection of
the Risk
assessment
method for
LNG plant
Survey of NDE tech. from System framework
the international and local Detailed Design of RBI s/w
codes algorism
Reliability Verification
13
6. Possibility of implementation
g
Monitoring
Condition
Monitoring System
Trouble
Monitoring
Virtual Reality
10
14
Main window
Linked in P&ID
29
3
1
13
15
Quantitative RBI (API RP 581)
16
Key Data for Damage Mechanism Assessment
Equipment In-
In-Service Inspection Data
Morphology and rate of known/existing damage
Previous inspections techniques Effectiveness at targeting
the particular mechanisms (pits vs. Cracks vs. general
thinning)
Supplementary monitoring or other warning system data
(probes)
17
Information on Damage Mechanisms Overview
API Publications
API 571 Damage Mechanisms
API 572 Inspection of Pressure Vessels
API 573 Inspection of Fired Heaters and Boilers
API 574 Inspection Piping Systems
API 575 Inspection of Atmospheric and Low Pressure Storage Tanks
API 581 RBI Base Resource
API 751 Sate Operations of HF Units
API 939A Wet H2S Cracking
API 939C Sulfidic Corrosion in Refineries
API 941 Hydrogen Attack
API 945 Environmental Cracking in Amine Units
Guide for Inspection of Refinery Equipment, Chapter 2 (old)
API Meeting Summaries
CRE Subcommittee on Corrosion & Materials and/or Inspection
Operating Practices Presentations
18
Information on Damage Mechanisms in NACE
38
19
LNG Plant Operation & Management System
Inspection Planning
39
Target Risk
Target Date.
Inspection
Performed
Next Inspection Date
2014 09
2014. 09. 12
40
20
NDE Reliability System
Probability of Detection for UT Equation of POD
PD ( s ) s( s ) ds
s
(s ) : The rate of detection
POD Grade (s ) : probability density function
1 Less than 0.6
2 0.6~0.7
Inspection effectiveness(API581)
3 0.7~0.75
4 0.75~0.82
Inspection Eff
Inspection
5 Over 0.82
ectiveness Cat NDE Inspection Example
Category
egory
1 2 3 4 5
Probability of detection(POD)
E Ineffective No inspection
41
P&ID No.
Inspection date Network
Inspector
Result
LNG-E-XX1 Steel pipe(2) E6358-XX1 E6001-XX1 2010/11/15 WJ KIM PASS *** HIGH DS101
LNG-E-XX2 Steel pipe(6) E6358-XX2 E6001-XX2 2010/11/16 WJ KIM FAIL *** MIDDLE DS102
LNG-E-XX3 Steel pipe(18) E6358-XX3 E6001-XX3 2010/11/17 WJ KIM REPAIR *** LOW DS103
42
21
20
PDIS
RDBMS
Admin.
User Edit
Risk Assessment Design(3D)
RBI Server Documentation User
Server
Procurement
DB Web Admin. Inspection User
Server Server User User Civil/Tech.
User
Admin Assistance
Admin.
Maintenance User User
Scanner Printer Plotter RCM/ CMMS
Server RTDB
DCS
DCS PLC
PLC Analyzer
Analyzer
21