Name of work :- Construction of Additional Work of Sub District Rural Hospital Building Manchar Tal. Ambegaon Dist.

Pune
(Rain Harvesting)
SCHEDULE -A
Schedule showing (approximately)the materials to be supplied from the Public Works Stores for work contracted to be
executed and preliminary and Ancillary works and the Rates at which they are to be charged for.
Sr.No. Particulars Quantity Unit Rates at which the material will be charged to Place of Delivery
In Figure the contractor
In Words
1 2 3 4 5 6 7

Nil

Assistant Engineer (Gr.I) Executive Engineer


P.W.Sub Division No.1 ,Ghodegaon P.W. (North) Division, Pune
Name of work :- Construction of Additional Work of Sub District Rural Hospital Building Manchar Tal.
Ambegaon Dist.Pune (Rain Harvesting)
SCHEDULE - B
Sr. Quantity Item of Work Estimated Rate Unit Amount Standard Specifications
No. Estimate Per according to as per specification book
In figures In Words Item No. Page No.
d but estimated published by Govt.of
may be quantity Maharashtra in 1979 and
more 1981 Edition.
1 2 3 4 5 6 7 8 9
1 174.00 Providing and fixing P.V.C. Rain water pipes of 462.00 Rupees One 80,388.00
Running 110milimetre outer diameter and having wall Four Hundred Running
Meter thickness of 2.2 to 2.7 milimetre confirming to I.S. Sixty two and Meter
13592-1992 including proper rainwater receiving paise nil only.
recess with P.V.C. plug, bend, necessary fittings, such
as, offsets, shoes, inluding fixing the pipe on wall
using approved wooden cleats projecting 25milimetre
to 40milimetre from face of wall a fixing with clips
of approved quality and number ,filing the joint using
rubber gasket with solvent cement and properly
resting the shoe of pipes on Cement Concrete or
masonry blocks, including necessary scaffolding and
maintenance for 3 yrs for any leakages or
dislocations of pipes. All the P.V.C. fittings and
additional 2 piece socket clips shall be got approved
from engineer in charge etc. complete. (The
contractor shall give 3 yrs guarantee bond for
payment)
2 2.00 Providing and constructing Brick Masonry Inspection 5720.00 Rupees Five One 11,440.00 Bd.V.43 574
Number Chamber 90 centimetre x 45 centimetre x 90 centimetre Thousand Number
including 1:4:8 cement concrete foundation 1:2:4 cement Seven Hundred
concrete channels half round G.S.W.pipes, Brick Twenty and
Masonry,plastering from inside and with frame fixed in paise nil only.
cement concrete with Reinforced Cement Concrete cover.

3 9.00 Providing and constructing Brick Masonry 5170.00 Rupees Five One 46,530.00 Bd.V.43 574
Number Inspection Chamber 60 centimetre x 45 centimetre x Thousand One Number
90 centimetre including 1:4:8 cement concrete Hundred
foundation 1:2:4 cement concrete channels half round Seventy and
G.S.W.pipes, Brick Masonry,plastering from inside paise nil only.
and with frame fixed in cement concrete with
Reinforced Cement Concrete cover.
4 42.92 Excavation for foundation By Mechanical Means in 135.30 Rupees One One 5,807.07 BdA-2 259
Cubic hard murum, including removing the excavated Hundred Thirty Cubic
Metre material up to a distance of 50 metre beyond the five and paise Metre
work area and stacking and spreading as Thirty only.
directed,dewatering preparing the bed for the
foundation and necessary back filling,
ramming,watering including shoring and strutting
5 etc.complete. and laying in situ cement 4,252.25
9.93 Providing Rupees One 42,224.84 Bd.E.1 287
Cubic concrete Mix- 10 of trap metal for Four Cubic
Metre foundation and bedding including bailing Thousand Metre
out water, formwork, compacting and curing Two Hundred
complete,using Ordinary Concrete
Fifty two
mixer,with natural sand.
and paise
Twenty five
6 66.20 Providing and Fixing heavy duty inter locking 652.40 Rupees Six One 43,188.88 As 0
Square concrete coloured Paving blocks of 60 millimeter Hundred Fifty Square directed
Metre thickness of having a strength of 300 two and paise Metre by
kilogram./Sq.mt. of approved quality and shape on a Forty only. Engineer
bed of crushed sand of 25 to 30 millimeter thick in
including striking joints cleaning etc. complete charge.
7 63.00 Providing and fixing on walls/ceiling/floors,25 349.80 Rupees One 22,037.40 Bd.V.5 551
Running milimetre diameter heavy grade having embossed as Three Hundred Running
Meter ISI Mark galvanised iron pipes of 3.01Kg/metre with Forty nine and Meter
necessary fitting,remaking good the demolished paise Eighty
portion and applying primer of anti corrosive oil only.
paint in 2 coats etc.complete.
8 20.00 Providing and fixing on walls / ceiling / floor 40 385.00 Rupees One 7,700.00 Bd.V.5 0
Running millimetre diameter metre C Poly Venyl Chloride Three Hundred Running and As
Meter pipe with necessary fittings, remaking good the Eighty five and Meter directed
demolished portion etc. complete. paise nil only. by
Engineer
in
charge.
9 10.00 Providing and fixing on walls / ceiling / floor 15 181.50 Rupees One One 1,815.00 Bd.V.5 0
Running millimetre diameter metre C Poly Venyl Chloride Hundred Running and As
Meter pipe with necessary fittings, remaking good the Eighty one and Meter directed
demolished portion etc. complete. paise Fifty by
only. Engineer
in
charge.
10 25.00 Providing and laying in trenches 50 605.00 Rupees One 15,125.00 Bd.V.5 0
Running millimetre diameter metre C Poly Venyl Six Hundred Runnin and As
Meter Chloride pipe with necessary excavation, Five and g directe
fittings, refilling trenches etc. complete. paise nil Meter d by
Enginee
only.
r in
charge.

11 3.00 Providing and fixing white glazed earthenware Wash 3014.00 Rupees Three One 9,042.00 Bd.V.30 565
Number Hand Basin of 55centimetre x40 centimetre size Thousand Number
including cold water piller tap/cold and hot water Fourteen and
piller tap brackets,rubber plugs and brass chain,stop paise nil only.
tap and necessary pipe connections including lead
waste pipe and trap upto the outside face of the wall.
12 1.00 Testing Charges for conducting BASIC TEST OF 3000.00 Rupees Three Number 3,000.00
Number CEMENT.Standard Consistancy Fineness, Specific Thousand
Gravity, Setting Time ( Initial & Final ), and paise nil
Compressive Strength and Soundness test. only.
13 1.00 Testing Charges for conducting BASIC TEST OF 2100.00 Rupees Two Number 2,100.00
Number AGGREGATE. Water Absorption, Specific Thousand One
Gravity,Impact Value Crushing Value test. Hundred and
paise nil only.
14 2.00 Testing Charges for conducting CONCRETE 550.00 Rupees Five Number 1,100.00
Number Compressive Strength OF Cement Concrete Cube Hundred Fifty
15 3.00 (Set of 3 cubes)
Testing Chargestest.for conducting CONCRETE 2000.00 and paise Two
Rupees nil Number 6,000.00
Number PAVING BLOCKS Compressive Strength,Water Thousand
Absorption test (Set of 8 Blocks). and paise nil
only.
16 2.00 Testing Charges for conducting G.I. PIPES Test for 200.00 Rupees Two Number 400.00
Number Weight per running meter,Diameter of pipe & wall Hundred and
thickness of pipe. paise nil only.
17 2.00 Testing Charges for conducting G.I. PIPES Weight of 250.00 Rupees Two Number 500.00
Number Zinc coating per square metre test. Hundred Fifty
and paise nil Total 298,398.19
Say Rs. 298,398.00
(Rupees Two Lakh Ninety eight Thousand Three Hundred Ninety eight and paise nil only.)

Assistant Engineer (Gr.I) Executive Engineer


P.W.Sub Division No.1 ,Ghodegaon P.W. (North) Division, Pune
Name of work :- Construction of Additional Work of Sub District Rural Hospital Building Manchar Tal. Ambegaon
Dist.Pune (Rain Harvesting)
SCHEDULE - C
Memorandum showing the item of work to be carried out by the contractor.
Sr. No Item of Work Standard Specifications Additional Specification if any.
asItem
per specification
No. Page No. book
1 2 3 4 5
1 Providing and fixing P.V.C. Rain water pipes of 110milimetre As directed by Engineer in charge.
outer diameter and having wall thickness of 2.2 to 2.7 milimetre
confirming to I.S. 13592-1992 including proper rainwater
receiving recess with P.V.C. plug, bend, necessary fittings, such
as, offsets, shoes, inluding fixing the pipe on wall using approved
wooden cleats projecting 25milimetre to 40milimetre from face of
wall a fixing with clips of approved quality and number ,filing the
joint using rubber gasket with solvent cement and properly resting
the shoe of pipes on Cement Concrete or masonry blocks,
including necessary scaffolding and maintenance for 3 yrs for any
leakages or dislocations of pipes. All the P.V.C. fittings and
additional 2 piece socket clips shall be got approved from
engineer in charge etc. complete. (The contractor shall give 3 yrs
guarantee bond for payment)

2 Providing and constructing Brick Masonry Inspection Chamber Bd.V.43 574 As directed by Engineer in charge.
90 centimetre x 45 centimetre x 90 centimetre including 1:4:8
cement concrete foundation 1:2:4 cement concrete channels half
round G.S.W.pipes, Brick Masonry,plastering from inside and
with frame fixed in cement concrete with Reinforced Cement
Concrete cover.
3 Providing and constructing Brick Masonry Inspection Chamber Bd.V.43 574 As directed by Engineer in charge.
60 centimetre x 45 centimetre x 90 centimetre including 1:4:8
cement concrete foundation 1:2:4 cement concrete channels half
round G.S.W.pipes, Brick Masonry,plastering from inside and
with frame fixed in cement concrete with Reinforced Cement
Concrete cover.
4 Excavation for foundation By Mechanical Means in hard murum, BdA-2 259 The useful excavated materials shall be
including removing the excavated material up to a distance of 50 utilised as directed by the Engineer In
metre beyond the work area and stacking and spreading as Charge.
directed,dewatering preparing the bed for the foundation and
necessary back filling, ramming,watering including shoring and
strutting etc.complete.
5 Providing and laying in situ cement concrete Mix- Bd.E.1 287 1.The appropriate mix design
10 of trap metal for foundation and bedding shall be got prepared from the
including bailing out water, formwork, compacting and approved government laboratory
curing complete,using Ordinary Concrete mixer,with well in advance and got approved
natural sand. from Engineer in charge before
starting the work.2. Cement from
the same stock sent for design
shall be used for concreting
work.3. The rate of consumption of
cement in mix design are
considered for the work as per
general practice in actual
design ,if the cement consumption
is less than that shown in
item,therate will be reduced
accordingly .If the rate as per
mix design for cement consumption
is more than that as per item ,the
extra cement will have to be
brought by the contractor at his
own cost.4. Before concreting
work,cement form each consignment
shall be got tested .if the
strength of fresh cement available
in stock and concreting work shall
be done accordingly to modified
mix design.5. The minimum strength
of reinforced cement concrete to
ensure durability shall as per In
diameter n standard as per IS 456-
2000 with latest ammendment .6.
For each consignment of cement a
sample should be got tested as per
norms and frequency of Vigilance
and Quality Control circle,Pune.It
6 Providing and Fixing heavy duty inter locking concrete coloured As 0 As directed by Engineer in charge. The
Paving blocks of 60 millimeter thickness of having a strength of directed heavy duty interlocked concrete block
300 kilogram./Sq.mt. of approved quality and shape on a bed of by shall be tested for required strength and
crushed sand of 25 to 30 millimeter thick including striking joints Engineer quality from the Quality Control
cleaning etc. complete in charge. Laboratory in required frequency.
7 Providing and fixing on walls/ceiling/floors,25 milimetre Bd.V.5 551 1. Galvanised iron pipe shall be of the type
diameter heavy grade having embossed as ISI Mark galvanised and the diameter specified in the wording
iron pipes of 3.01Kg/metre with necessary fitting,remaking good of the item and shall comply with In
the demolished portion and applying primer of anti corrosive oil diameter n Standards 1239-19732. The
paint in 2 coats etc.complete. specified diameter of the pipe shall refer
to the inside diameter of the pipe and the
fittings.3. Screws clips and galvanised iron
pipe fitting shall be of standard type to
8 Providing and fixing on walls / ceiling / floor 40 millimetre Bd.V.5 0 match the pipe.
As directed by Engineer in charge.
diameter metre C Poly Venyl Chloride pipe with necessary and As
fittings, remaking good the demolished portion etc. complete. directed
by
Engineer
9 Providing and fixing on walls / ceiling / floor 15 millimetre Bd.V.5 0 As directed by Engineer in charge.
diameter metre C Poly Venyl Chloride pipe with necessary and As
fittings, remaking good the demolished portion etc. complete. directed
by
Engineer
10 Providing and laying in trenches 50 millimetre Bd.V.5 0 As directed by Engineer in charge.
diameter metre C Poly Venyl Chloride pipe with and As
necessary excavation, fittings, refilling trenches directed
etc. complete. by
Engineer
in
charge.
11 Providing and fixing white glazed earthenware Wash Hand Basin Bd.V.30 565 1) The work shall be carried out as
of 55centimetre x40 centimetre size including cold water piller directed by Engineer in charge.2) Sample
tap/cold and hot water piller tap brackets,rubber plugs and brass of wash hand basin shall be got approved
chain,stop tap and necessary pipe connections including lead from the competent authority.
waste pipe and trap upto the outside face of the wall.
12 to 17Conducting prescribed tests for Quality Control. 1) The test shall be carried out in accordance
with the Clause " Samples & Testing of
Materials " give under "Additional General
Conditionas & Specification" of this tender
document.
2) The testing of materials shall be carried out
as per the frequency specified by the Vigilance
& Quality Control Circle , pune and shall be
the responsibility of contractor.
3)The material required for testing shall be
sent by the contractor to the specified
Laboratory at his own risk and cost.
4)In case the desired results are not obtained
during testing or the material is rejected due to
unsatisfactory results the testing charges shall
not be paid to the contractor.
5)It shall be obligatory on contractor to
produce the test result along with receipt of
payment made to the Laboratory, for releasing
payment towards Testing Charges.
6)In case additional testing of material found
necessary due to change in source,no seperate
payment shall be made and it shall be the
entire responsiblity of contractor.
7)Testing charges are mentioned in view of
the rates finalised by the Vigilance & Quality
Control Circle, Pune and it will be the
responsibility of contractor to pay the testing
charges to the concerned Laboratory in
accordance with the rates finaised. No
difference shall be payable to the contractor in
case testing charges are revised by the
Laboratory.
8)Material Testing shall be carried out as
17 Additional Royalty Charges As directed by Engineer in charge.

Assistant Engineer (Gr.I) Executive Engineer


P.W.Sub Division No.1 ,Ghodegaon P.W. (North) Division, Pune