Segn http://reliabilityanalyticstoolkit.appspot.com/weibull_analysis_solution
Equipo Modo de Falla con Muy CONFIABILIDAD
Crtico Alta Criticidad R(t=960)
Cinta Entorchamiento 1325.55 2.71 0 0.65894149
Transportad
ora Desalineacin 1110.26 2.4 0 0.49391399
Desajuste del Acople 1330.18 5.28 0 0.83634969
Unidad Rod. del Motor Daados 1458.25 6.16 0 0.92669086
Motriz
Rod. Tambor Motriz Da. 1258.16 4.99 0 0.77156897
Guinche Recalentamiento de Motor 1224.08 5 0 0.74327224
Elec. Tnsor Rod. del Motor Daados 1314.5 5.36 0 0.83066289
nidad Motriz Guinche Elctrico Tensor
Desajuste del Acople Flexible - Motor E. y Caja de Eng. Recalentamiento del Motor
TEF Fi TEF/100 Fi % i TEF Fi
921 0.109375 9.21 10.9375 1 861 0.109375
1026 0.265625 10.26 26.5625 2 960 0.265625
1191 0.421875 11.91 42.1875 3 1007 0.421875
1281 0.578125 12.81 57.8125 4 1126 0.578125
1360 0.734375 13.6 73.4375 5 1352 0.734375
1599 0.890625 15.99 89.0625 6 1456 0.890625
Rodamientos del Motor Totalmente Daados Rodamiento del Motor Totalmente Daado
TEF Fi TEF/100 Fi % i TEF Fi
1045 0.109375 10.45 10.9375 1 931 0.109375
1198 0.265625 11.98 26.5625 2 1022 0.265625
1291 0.421875 12.91 42.1875 3 1119 0.421875
1412 0.578125 14.12 57.8125 4 1271 0.578125
1571 0.734375 15.71 73.4375 5 1403 0.734375
1647 0.890625 16.47 89.0625 6 1551 0.890625
t para R=0,95
442.999987
322.069753
757.885691
900.380825
693.794708
675.805809
755.266555
amiento del Motor
TEF/100 Fi %
8.61 10.9375
9.6 26.5625
10.07 42.1875
11.26 57.8125
13.52 73.4375
14.56 89.0625
Segn http://reliabilityanalyticstoolkit.appspot.com/weibull_analysis_solution
CONFIABILIDAD
R(t=200) t para R=0,95
3314 1.89 0 0.99505229 688.406372
i TPR M'(t)
35 1 18 5.64516129
43 2 20 13.7096774
72 3 35 21.7741935
20 4 40 29.8387097
64 5 43 37.9032258
46 6 46 45.9677419
54 7 54 54.0322581
18 8 64 62.0967742
75 9 72 70.1612903
40 10 75 78.2258065
83 11 83 86.2903226
123 12 123 94.3548387
a M(t) t
50 0.04347826 0.99852997 200
TEF TFS
740 35
3535 43
4205 72
4050 20
3220 64
2733 46
3560 54
3800 18
1800 75
2276 40
3010 83
924 123
COSTO PREVENTIVO
TO TO/200h
(Suma de los Horas de estu 33180 165.9
Promedio 2765 13.825
Mnimo 705 3.525
Mximo 4133 20.665
COSTO CORRECTIVO
-35052000
TO
705
3492
4133
4030
3156
2687
3506
3782
1725
2236
2927
801
VENTIVO
Costo Preventivo 280000 t para R=0,95 t para R=0,9
46452000 688.406372 1007.51346
3871000
987000 48.1982756 32.9325625
5786200 Costo Prev. 13495517.2 9221117.49
RRECTIVO Diferencia
Costo Correctivo -2095517.2 2178882.51
11400000
33180
8760
3.78767123