MUNICIPIO DE LA JAGUA DE IBIRICO

SECRETARIA DE PLANEACIN MUNICIPAL

CONSTRUCCIN DE UN HOGAR DE PASO PARA LA TERCERA EDAD EN EL CORREGIMIENTO DE LA VICTORIA DE SAN ISIDRO,
MUNICIPIO DE LA JAGUA DE IBIRICO - DEPARTAMENTO DEL CESAR

MEMORIAS DE CANTIDADES DE OBRA

1 DESMONTES Y DEMOLICIONES

1.00 #REF! #REF! = 2.00

DESCRIPCION OBRA L (m) A (m) CANT TOTAL

Bao auxiliar 1 1.00


Bao principal 1 1.00
2.00

2.00 #REF! #REF! = 13.00

DESCRIPCION OBRA L (m) A (m) CANT TOTAL

Externas 3 3.00
Internas 8 8.00
Baos 2 2.00
13.00

3.00 #REF! #REF! = 14.00

DESCRIPCION OBRA L (m) A (m) CANT TOTAL

Externas 11 11.00
Internas 1 1.00
Baos 2 2.00
14.00

4.00 #REF! #REF! = 225.84

DESCRIPCION OBRA L (m) A (m) CANT AREA (m 2)

Segn autocad 225.84 225.84


225.84

5.00 #REF! #REF! = 396.96

DESCRIPCION OBRA L (m) A (m) CANT AREA (m 2)

Muro perimetral 72.9 2.4 1 174.96


Muros Internos 92.5 2.4 1 222.00
396.96

6.00 #REF! #REF! = 123.84

DESCRIPCION OBRA L (m) A (m) CANT AREA (m 2)

Muro perimetral 51.6 2.4 1 123.84


123.84

7.00 #REF! #REF! = 262.89


DESCRIPCION OBRA L (m) A (m) CANT AREA (m 2)

Porche 37.06 37.06


Area construida existente 225.83 225.83
262.89

2 CERRAMIENTO

16.00 #REF! #REF! = 42.00

DESCRIPCION OBRA L (m) A (m) CANT TOTAL

Perimetro Frontal 23.4 1 1 23.40


Perimetro Posterior 18.6 1 1 18.60
42.00

3 #REF!

19.00 #REF! #REF! = 1.00

DESCRIPCION OBRA L (m) A (m) CANT TOTAL

Campamento 1 1.00
1.00

21.00 #REF! #REF! = 1.00

DESCRIPCION OBRA L (m) A (m) CANT TOTAL

Caseta 1 1.00
1.00

22.00 #REF! #REF! = 1.00

DESCRIPCION OBRA L (m) A (m) CANT TOTAL

Caseta 1 1.00
1.00

25.00 #REF! #REF! = 1.00

DESCRIPCION OBRA L (m) A (m) CANT TOTAL

Caseta 1 1.00
1.00

26.00 #REF! #REF! = 1.00

DESCRIPCION OBRA L (m) A (m) CANT TOTAL

Caseta 1 1.00
1.00

27.00 #REF! #REF! = 1.00

DESCRIPCION OBRA L (m) A (m) CANT TOTAL

Caseta 1 1.00
1.00
4 #REF!

28.00 #REF! #REF! = 687.63

DESCRIPCION OBRA L (m) A (m) CANT AREA (m 2)

Area total del lote 687.63 1 1 687.63


0.00
687.63

5 EXCAVACION, EXPLANACION Y RELLENO

30.00 EXPLANACION MECANICA = 14.84

DESCRIPCION OBRA A (m2) h (m) VOLUMEN (m3)

Area de habitacion 74.22 1 0.2 14.84


0.00
14.84

31.00 #REF! #REF! = 56.46

DESCRIPCION OBRA A (m2) H (m) VOLUMEN (m3)

Area edificacion existente 225.83 1 0.25 56.46


0.00
56.46

6 #REF!

35.00 #REF! #REF! = 22.98

DESCRIPCION OBRA A (m2) H (m) VOLUMEN (m3)

Area de jardin 114.90 1 0.2 22.98


0.00
22.98

7 #REF!

42.00 #REF! = 9.60

DESCRIPCION OBRA A (m2) H (m) VOLUMEN (m3)

tanque subterraneo 4.00 2 1.2 9.60


0.00
9.60
8 CONCRETOS

50.00 #REF! #REF! = 17.45

DESCRIPCION OBRA L (m) A (m) H (m) CANT VOLUMEN (m3)

Eje 1 (B-G) 25.00 0.25 0.25 1.50 2.34


Eje 2 (A-G) 30.20 0.25 0.25 1.50 2.83
Eje 3 (A-B) 5.30 0.25 0.25 1.50 0.50
Eje 4 (A-B) 5.30 0.25 0.25 1.50 0.50
Eje 5 (B-E) 16.70 0.25 0.25 1.50 1.57
Eje A (2-4) 9.40 0.25 0.25 1.50 0.88
Eje B (1-5) 20.20 0.25 0.25 1.50 1.89
Eje C (1-5) 20.20 0.25 0.25 1.50 1.89
Eje D (1-5) 20.20 0.25 0.25 1.50 1.89
Eje E (1-5) 20.20 0.25 0.25 1.50 1.89
Eje F (1-2) 6.70 0.25 0.25 1.50 0.63
Eje G (1-2) 6.70 0.25 0.25 1.50 0.63

17.45

58.01 CONCRETO CICLOPEO ML = 3.33

DESCRIPCION OBRA L (m) A (m) H (m) CANT VOLUMEN (m3)

Eje 3-C 0.80 0.8 1.3 1.00 0.83


Eje 3-E 0.80 0.8 1.3 1.00 0.83
Eje 4-C 0.80 0.8 1.3 1.00 0.83
Eje 4-E 0.80 0.8 1.3 1.00 0.83
0.00
3.33

9 #REF!

60.00 CAJA DE INSPECCION DE 60x60x90 cm UND = 16.00

DESCRIPCION - UBICACIN OBRA N L1 (m) CANT PARCIAL

Red sanitaria 8 8.00


Red pluvial 8 8.00
16.00

10 MAMPOSTERIA

85.00 MURO EN BLOQUE ESTRUCTURAL M2 = 33.12

DESCRIPCION OBRA L (m) H (m) CANT DESCUENTO AREA (m 2)


Bao oficina 2.10 4.50 1 9.45
Comedor 0.60 4.00 2 4.80
Bao Hombres 1.10 2.50 1 2.75
Planta electrica 6.20 2.60 1 16.12

33.12

87.00 #REF! #REF! = 849.45

DESCRIPCION OBRA L (m) H (m) CANT DESCUENTO AREA (m 2)

Eje 1 (A-G) 29.90 4.80 1 4.8 138.72


Eje 1' (A-G) 3.80 4.40 1 2 14.72
Eje 2 (A-G) 16.60 6.30 1 6 98.58
Eje 2' (D-D') 3.90 4.00 1 2 13.60
Eje 3 (A-B) 4.00 2.60 1 2 8.40
Eje 3' (D-D') 3.90 3.60 1 0 14.04
Eje 4 (A-B) 4.00 4.50 1 0 18.00
Eje 4 (D-D') 3.90 4.00 1 0 15.60
Eje 4' (D-E) 5.60 4.00 1 2 20.40
Eje 5 (A-B) 4.80 3.50 1 0 16.80
Eje 5 (B-E) 16.00 6.40 1 2.56 99.84
Eje 5 (E-G) 10.66 3.50 1 0 37.31
Eje A (2-3) 3.20 4.50 1 0 14.40
Eje A (3-4) 4.80 4.50 1 2.45 19.15
Eje B (1-2) 5.40 4.80 1 6.45 19.47
Eje B (3-4) 4.80 6.30 1 5.76 24.48
Eje B (4-5) 6.00 6.30 1 0 37.80
Eje C' (1-2) 5.50 4.80 1 2.75 23.65
Eje D (2'-5) 11.30 6.30 1 0 71.19
Eje D' (1-2) 5.70 4.80 1 3 24.36
Eje D' (4') 0.60 5.20 1 0 3.12
Eje D'' (2'-4) 6.40 5.20 1 2.9 30.38
Eje E (1-2) 5.30 5.20 1 0 27.56
Eje E (4-5) 2.90 4.00 1 2.5 9.10
Eje G (1-2) 5.30 4.80 1 0 25.44
Muros Cerramiento 3.20 2.50 3 0.66 23.34

849.45

11 #REF!

91.00 #REF! #REF! = 1.20

DESCRIPCION OBRA L (m) A (m) CANT TOTAL

Puerta bao oficina 1.20 1 1 1.20

1.20

92.00 #REF! #REF! = 18.00

DESCRIPCION OBRA L (m) A (m) CANT TOTAL

Sala de espera 1.40 1 1 1.40


Cocina 1.40 1 2 2.80
Deposito 1.40 1 2 2.80
Ropas 1.40 1 1 1.40
Enfermeria 1.40 1 1 1.40
Bao mujeres 1.40 1 1 1.40
Bao discapacitados 1.40 1 1 1.40
Bao hombres 1.40 1 1 1.40
Habitacion 1.40 1 1 1.40
Comedor 2.60 1 1 2.60

18.00

12 #REF!

98.00 #REF! #REF! = 162.40

DESCRIPCION OBRA L (m) A (m) CANT TOTAL

Salon multiple 48.50 1 1 48.50


Comedor - cocina - ropas 44.80 1 1 44.80
Habitacion 29.60 1 1 29.60
Baos 19.40 1 1 19.40
Acceso - lobby - oficina 20.10 1 1 20.10

162.40

13 #REF!

100.00 #REF! #REF! = 1,536.94

DESCRIPCION OBRA L (m) H (m) CANT DESCUENTO AREA (m 2)

Bao oficina 2.10 4.50 2 18.90


Comedor 0.60 4.00 4 9.60
Bao Hombres 1.10 2.50 2 5.50
Planta electrica 6.20 2.60 2 32.24
Eje 1 (A-G) 29.90 4.80 1 4.8 138.72
Eje 1' (A-G) 3.80 4.40 2 2 31.44
Eje 2 (A-G) 16.60 6.30 2 6 203.16
Eje 2' (D-D') 3.90 4.00 2 2 29.20
Eje 3 (A-B) 4.00 2.60 2 2 18.80
Eje 3' (D-D') 3.90 3.60 2 0 28.08
Eje 4 (A-B) 4.00 4.50 2 0 36.00
Eje 4 (D-D') 3.90 4.00 2 0 31.20
Eje 4' (D-E) 5.60 4.00 2 2 42.80
Eje 5 (A-B) 4.80 3.50 1 0 16.80
Eje 5 (B-E) 16.00 6.40 1 2.56 99.84
Eje 5 (E-G) 10.66 3.50 1 0 37.31
Eje A (2-3) 3.20 4.50 2 0 28.80
Eje A (3-4) 4.80 4.50 2 2.45 40.75
Eje B (1-2) 5.40 4.80 2 6.45 45.39
Eje B (3-4) 4.80 6.30 2 5.76 54.72
Eje B (4-5) 6.00 6.30 2 0 75.60
Eje C' (1-2) 5.50 4.80 2 2.75 50.05
Eje D (2'-5) 11.30 6.30 2 0 142.38
Eje D' (1-2) 5.70 4.80 2 3 51.72
Eje D' (4') 0.60 5.20 2 0 6.24
Eje D'' (2'-4) 6.40 5.20 2 2.9 63.66
Eje E (1-2) 5.30 5.20 2 0 55.12
Eje E (4-5) 2.90 4.00 2 2.5 20.70
Eje G (1-2) 5.30 4.80 2 0 50.88
Muros Cerramiento 3.20 2.50 9 0.66 71.34

1,536.94

102.00 #REF! #REF! = 71.50

DESCRIPCION OBRA L (m) H (m) CANT DESCUENTO AREA (m 2)

Ropas 11.00 3.50 1 3 38.50


Tanque subterraneo 10.00 1.80 1 0 18.00
Tanque aereo 10.00 1.50 1 0 15.00

71.50

103.00 #REF! #REF! = 376.90

DESCRIPCION OBRA L (m) A (m) CANT TOTAL

Hall de acceso 2.50 3 1 7.50


lobby 2.50 6 1 15.00
Oficina 2.50 5 1 12.50
Salon multiple 6.10 9 1 54.90
Comedor 3.50 21 1 73.50
Cocina 3.50 16 1 56.00
Ropas 3.50 3 1 10.50
Habitacion 3.50 19 1 66.50
Baos 3.50 23 1 80.50

376.90

110.00 #REF! #REF! = 48.09

DESCRIPCION OBRA L (m) H (m) CANT DESCUENTO AREA (m 2)

Hall de acceso 4.20 2.90 1 0 12.18


Lobby 4.20 3.35 1 0 14.07
Oficina 4.20 5.20 1 0 21.84

48.09

14 #REF!

123.00 #REF! #REF! = 41.64

DESCRIPCION OBRA L (m) A (m) H (m) CANT VOLUMEN (m3)

ZT 1 1.00 1 1.5 12 18.00


ZT 2 1.50 0.8 1.5 11 19.80
Muerto en ciclopeo 0.80 0.8 1.5 4 3.84
0.00
41.64

124.00 #REF! #REF! = 186.10

DESCRIPCION OBRA L (m) A (m) CANT TOTAL


Eje 1 (B-G) 25.00 1 1 25.00
Eje 2 (A-G) 30.20 1 1 30.20
Eje 3 (A-B) 5.30 1 1 5.30
Eje 4 (A-B) 5.30 1 1 5.30
Eje 5 (B-E) 16.70 1 1 16.70
Eje A (2-4) 9.40 1 1 9.40
Eje B (1-5) 20.20 1 1 20.20
Eje C (1-5) 20.20 1 1 20.20
Eje D (1-5) 20.20 1 1 20.20
Eje E (1-5) 20.20 1 1 20.20
Eje F (1-2) 6.70 1 1 6.70
Eje G (1-2) 6.70 1 1 6.70

186.10

126.00 #REF! #REF! = 46.53

DESCRIPCION OBRA L (m) A (m) CANT AREA (m 2)

Eje 1 (B-G) 25.00 0.25 1 6.25


Eje 2 (A-G) 30.20 0.25 1 7.55
Eje 3 (A-B) 5.30 0.25 1 1.33
Eje 4 (A-B) 5.30 0.25 1 1.33
Eje 5 (B-E) 16.70 0.25 1 4.18
Eje A (2-4) 9.40 0.25 1 2.35
Eje B (1-5) 20.20 0.25 1 5.05
Eje C (1-5) 20.20 0.25 1 5.05
Eje D (1-5) 20.20 0.25 1 5.05
Eje E (1-5) 20.20 0.25 1 5.05
Eje F (1-2) 6.70 0.25 1 1.68
Eje G (1-2) 6.70 0.25 1 1.68

46.53

15 #REF!

129.00 #REF! #REF! = 15.12

DESCRIPCION OBRA L (m) A (m) H (m) CANT VOLUMEN (m3)

ZT 1 1.00 1 0.6 12 7.20


ZT 2 1.50 0.8 0.6 11 7.92
0.00
15.12

16 #REF!

133.00 #REF! #REF! = 15.98

DESCRIPCION OBRA L (m) A (m) H (m) DESPERD VOLUMEN (m3)

Eje 1 (B-G) 25.00 0.25 0.30 1 1.88


Eje 2 (A-G) 30.20 0.25 0.30 1 2.27
Eje 3 (A-B) 5.30 0.25 0.30 1 0.40
Eje 4 (A-B) 5.30 0.25 0.30 1 0.40
Eje 5 (B-E) 16.70 0.25 0.30 1 1.25
Eje A (2-4) 9.40 0.25 0.30 1 0.71
Eje B (1-5) 20.20 0.25 0.30 1 1.52
Eje C (1-5) 20.20 0.25 0.30 1 1.52
Eje D (1-5) 20.20 0.25 0.30 1 1.52
Eje E (1-5) 20.20 0.25 0.70 1 3.54
Eje F (1-2) 6.70 0.25 0.30 1 0.50
Eje G (1-2) 6.70 0.25 0.30 1 0.50
0.00
15.98

20 #REF!

151.00 #REF! #REF! = 0.48

DESCRIPCION OBRA L (m) A (m) H (m) CANT VOLUMEN (m3)

Tanque subterraneo 2.00 2.00 0.12 1 0.48

0.48

152.00 #REF! #REF! = 0.48

DESCRIPCION OBRA L (m) A (m) H (m) CANT VOLUMEN (m3)

Tanque subterraneo 2.00 2.00 0.12 1 0.48

0.48

153.00 #REF! #REF! = 1.44

DESCRIPCION OBRA P (m) A (m) H (m) CANT VOLUMEN (m3)

Tanque subterraneo 8.00 1.50 0.12 1 1.44

1.44

154.00 #REF! #REF! = 2.40

DESCRIPCION OBRA L (m) A (m) H (m) CANT VOLUMEN (m3)

Tapa 2.00 2.00 0.12 1 0.48


Fondo 2.00 2.00 0.12 1 0.48
Muro 8.00 1.50 0.12 1 1.44

2.40

158.01 CONCRETO CICLOPEO #REF! = 2.40

DESCRIPCION OBRA L (m) A (m) H (m) CANT VOLUMEN (m3)

Tapa 2.00 2.00 0.12 1 0.48


Fondo 2.00 2.00 0.12 1 0.48
Muro 8.00 1.50 0.12 1 1.44

2.40
21 #REF!

160.00 #REF! #REF! = 58.28

DESCRIPCION OBRA L (m) H (m) CANT DESCUENTO AREA (m 2)

Hall de acceso - Lobby - Oficina 4.60 11.80 1 54.28


placa tanque de almacenamiento 2 2 1 4.00
58.28

22 #REF!

170.00 #REF! #REF! = 8.89

DESCRIPCION OBRA L (m) A (m) H (m) CANT VOLUMEN (m3)

Columna C1 6.40 0.25 0.25 1.00 0.40


Columna C2 6.40 0.25 0.25 2.00 0.80
Columna C3 6.40 0.25 0.25 3.00 1.20
Columna C4 6.00 0.25 0.25 5.00 1.88
Columna C5 6.00 0.25 0.25 6.00 2.25
Columna C6 6.30 0.25 0.25 4.00 1.58
Columna C7 6.30 0.25 0.25 1.00 0.39
Columna C8 6.40 0.25 0.25 1.00 0.40

8.89

23 #REF!

178.00 #REF! #REF! = 14.31

DESCRIPCION OBRA L (m) A (m) H (m) CANT VOLUMEN (m3)

Eje 1 (B-G) 25.00 0.25 0.30 1.15 2.16


Eje 1' (A-B) curva 7.40 0.25 0.30 1.15 0.64
Eje 2 (A-G) 30.20 0.25 0.30 1.15 2.60
Eje 3 (A-B) 5.30 0.25 0.30 1.15 0.46
Eje 4 (A-B) 5.30 0.25 0.30 1.15 0.46
Eje 5 (B-E) 16.70 0.25 0.30 1.15 1.44
Eje A (2-4) 9.40 0.25 0.30 1.15 0.81
Eje B (1-5) 20.20 0.25 0.30 1.15 1.74
Eje C (1-2) 6.40 0.25 0.30 1.15 0.55
Eje D (1-5) 20.20 0.25 0.30 1.15 1.74
Eje E (1-2) 6.40 0.25 0.30 1.15 0.55
Eje F (1-2) 6.70 0.25 0.30 1.15 0.58
Eje G (1-2) 6.70 0.25 0.30 1.15 0.58
0.00
14.31

24 ACEROS

183 ACERO REFUERZO 60000 PSI KG = 10,674.95

CANT.
DESCRIPCION L (m) PESO (Kg) CANT ELEMENTO
TRALAPO (m) PARCIAL (Kg)

Zapata ZT 1 1.00 1.000 186.50 1 1.30 242.45


Zapata ZT 2 1.00 1.000 205.00 1 1.30 266.50
Columnas 1.00 1.000 1821.00 1 1.30 2367.30
Vigas 1.00 1.000 3872.00 1 1.30 5033.60
Mallas electrosoldadas contrapisos 1.00 1.000 1221.00 1 1.30 1587.30
Placa Maciza 1.00 1.000 906.00 1 1.30 1177.80
10,674.95

27 #REF!

#REF! #REF! = 392.98

DESCRIPCION OBRA L (m) H (m) CANT AREA (m 2)

Salon multiple 14.00 10.60 1 148.40


Comedor - cocina - deposito 16.40 5.50 1 90.20
Habitacion 9.30 5.50 1 51.15
Baos 13.30 5.50 1 73.15
Pasillo 15.04 2.00 1 30.08

392.98

28 CUBIERTAS

217.01 TEJA ARQUITECTONICA CURVA CAL 26 M2 = 378.70

DESCRIPCION OBRA L (m) H (m) CANT AREA (m 2)

Salon multiple 14.00 10.60 1 148.40


Comedor - cocina - ropas 16.40 5.50 1 90.20
Habitacion 9.30 5.50 1 51.15
Baos 13.30 5.50 1 73.15
Lobby 4.00 3.20 1 12.80
Planta electrica 2.00 1.50 1 3.00
378.70

217.02 ESTRUCTURA METALICA SEGN DISEO ESTRUCTU KG = 59.66

DESCRIPCION OBRA L (m) H (m) CANT TOTAL (ml)

Cercha tipo T1 14.47 1.00 1.00 14.47


Cercha tipo T2 14.74 1.00 1.00 14.74
Cercha tipo T3 15.09 1.00 1.00 15.09
Cercha tipo T4 15.37 1.00 1.00 15.37

59.66

217.03 #REF! #REF! = 352.99

DESCRIPCION OBRA L (m) H (m) CANT TOTAL (ml)

Salon Multiple 11.66 1.00 12.00 139.92


Comedor - cocina - habitacion 27.83 1.00 5.00 139.15
Baos - enfermeria 6.16 1.00 12.00 73.92

352.99

217.04 #REF! #REF! = 230.78

DESCRIPCION OBRA L (m) H (m) CANT TOTAL (ml)

Salon Multiple 10.78 1.00 8.00 86.24


Comedor - cocina - habitacion 10.23 1.00 10.00 102.30
Baos - enfermeria 10.56 1.00 4.00 42.24

230.78

29 #REF!

222.10 #REF! #REF! = 33.97

DESCRIPCION OBRA L (m) A (m) CANT AREA (m 2)

Hall de acceso 4.30 2.90 1 12.47


Oficina 4.30 5.00 1 21.50

33.97

30 #REF!

224.00 #REF! #REF! = 65.95

DESCRIPCION OBRA L (m) A (m2) H (m) CANT VOLUMEN (m3)

Areas construidas 1.00 439.65 0.15 1 65.95


65.95

225.00 #REF! #REF! = 439.65

DESCRIPCION OBRA L (m) A (m2) CANT AREA (m 2)

Areas construidas 1.00 439.65 1 439.65

439.65

240.00 #REF! #REF! = 195.50

DESCRIPCION OBRA L (m) A (m2) CANT AREA (m 2)

Hall de acceso - Lobby - Oficina - Salon Multiple 1.00 195.50 1 195.50

195.50

242.00 #REF! #REF! = 244.13

DESCRIPCION OBRA L (m) A (m2) CANT AREA (m 2)

Comedor - Cocina - Habitacion - Baos - Enfermeria 1.00 244.13 1 244.13

244.13

248.00 #REF! #REF! = 439.65

DESCRIPCION OBRA L (m) A (m2) CANT AREA (m 2)

Areas construidas 1.00 439.65 1 439.65

439.65

254.00 #REF! #REF! = 122.53

DESCRIPCION OBRA L (m) A (m2) CANT AREA (m 2)

Peatonal principal 58.25


Peatonal posterior 64.28

122.53

BORDILLO EN CONCRETO 0,1*0,2m #REF! = 39.20

DESCRIPCION OBRA L (m) A (m2) CANT AREA (m 2)

Peatonal principal 20.70 1.00 1 20.70


Peatonal posterior 18.50 1.00 1 18.50

39.20

31 #REF!

264.00 #REF! #REF! = 163.80

DESCRIPCION OBRA L (m) H (m) CANT TOTAL (ml)

Comedor 27.40 1.00 1.00 27.40


Cocina 18.30 1.00 1.00 18.30
Patio de Ropas 11.50 1.00 1.00 11.50
Deposito 13.80 1.00 1.00 13.80
Pasillo 23.10 1.00 1.00 23.10
Baos 40.10 1.00 1.00 40.10
Alcoba 29.60 1.00 1.00 29.60

163.80

266.00 #REF! #REF! = 93.90

DESCRIPCION OBRA L (m) H (m) CANT TOTAL (ml)

Halll de acceso 18.40 1.00 1.00 18.40


Lobby 11.90 1.00 1.00 11.90
Oficina 18.30 1.00 1.00 18.30
Salon Multiple 45.30 1.00 1.00 45.30

93.90

32 #REF!

274.00 #REF! #REF! = 174.40

DESCRIPCION OBRA L (m) A (m) CANT AREA (m 2)

Cocina 15.80 2.00 1 31.60


Deposito 11.00 2.00 1 22.00
Patio de ropas 10.20 2.00 1 20.40
Enfermeria 10.60 2.00 1 21.20
Bao mujeres 14.00 2.00 1 28.00
Bao discapacitados 7.20 2.00 1 14.40
Bao hombres 18.40 2.00 1 36.80

174.40

33 #REF!

278.00 #REF! #REF! = 1.85

DESCRIPCION OBRA L (m) H (m) CANT TOTAL (ml)

Tramo 23-24 0.18 1.00 1.00 0.18


Tramo 25-26 0.18 1.00 1.00 0.18
Tramo 13-27 0.36 1.00 1.00 0.36
Tramo 27-28 0.17 1.00 1.00 0.17
Tramo 27-29 0.63 1.00 1.00 0.63
Tramo 29-30 0.17 1.00 1.00 0.17
Tramo 33-34 0.16 1.00 1.00 0.16

1.85
50 #REF!

390.00 #REF! #REF! = 40.95

DESCRIPCION OBRA L (m) A (m) CANT AREA (m 2)

Portal de acceso 0.65 2.00 2 2.60


Recepcion 0.30 2.00 2 1.20
Oficina 7.50 0.70 1 5.25
Comedor 4.80 2.80 1 13.44
Patio de Ropas 0.60 1.10 1 0.66
Patio de Ropas 2.00 1.10 1 2.20
Enfermeria 1.00 2.00 1 2.00
Bao Mujeres 0.3 2 3 1.80
Bao Mujeres 1 2 1 2.00
Bao Hombres 0.3 2 2 1.20
Bao Hombres 1 2 1 2.00
Bao Discapacitados 0.3 2 1 0.60
Alcoba 1 2 3 6.00
40.95

52 #REF!

402.00 #REF! #REF! = 1,441.20

DESCRIPCION OBRA L (m) H (m) CANT DESCUENTO AREA (m 2)

Comedor 0.60 4.00 4 9.60


Planta electrica 6.20 2.60 2 32.24
Eje 1 (A-G) 29.90 4.80 1 4.8 138.72
Eje 1' (A-G) 3.80 4.40 2 2 31.44
Eje 2 (A-G) 16.60 6.30 2 6 203.16
Eje 2' (D-D') 3.90 4.00 2 2 29.20
Eje 3 (A-B) 4.00 2.60 2 2 18.80
Eje 3' (D-D') 3.90 3.60 2 0 28.08
Eje 4 (A-B) 4.00 4.50 2 0 36.00
Eje 4 (D-D') 3.90 4.00 2 0 31.20
Eje 4' (D-E) 5.60 4.00 2 2 42.80
Eje 5 (A-B) 4.80 3.50 1 0 16.80
Eje 5 (B-E) 16.00 6.40 1 2.56 99.84
Eje 5 (E-G) 10.66 3.50 1 0 37.31
Eje A (2-3) 3.20 4.50 2 0 28.80
Eje A (3-4) 4.80 4.50 2 2.45 40.75
Eje B (1-2) 5.40 4.80 2 6.45 45.39
Eje B (3-4) 4.80 6.30 2 5.76 54.72
Eje B (4-5) 6.00 6.30 2 0 75.60
Eje C' (1-2) 5.50 4.80 2 2.75 50.05
Eje D (2'-5) 11.30 6.30 2 0 142.38
Eje D' (1-2) 5.70 4.80 2 3 51.72
Eje D' (4') 0.60 5.20 2 0 6.24
Eje D'' (2'-4) 6.40 5.20 2 2.9 63.66
Eje E (1-2) 5.30 5.20 2 0 55.12
Eje E (4-5) 2.90 4.00 2 2.5 20.70
Eje G (1-2) 5.30 4.80 2 0 50.88
1,441.20

403.00 #REF! #REF! = 48.09

DESCRIPCION OBRA L (m) H (m) CANT DESCUENTO AREA (m 2)

Hall de acceso 4.20 2.90 1 0 12.18


Lobby 4.20 3.35 1 0 14.07
Oficina 4.20 5.20 1 0 21.84

48.09

53 #REF!

#REF! #REF! = 278.96

DESCRIPCION OBRA L (m) H (m) CANT DESCUENTO AREA (m 2)

Hall de acceso 4.90 2.80 1 13.72


Recepcion 6.50 3.00 1 19.50
Oficina 9.80 4.50 1 44.10
Salon Multiple 19.60 6.40 1 32.5 92.94
Bao hombres 5.10 4.50 1 22.95
Alcoba 24.50 3.50 1 85.75
0.00
278.96

#REF! #REF! = 58.50

DESCRIPCION OBRA L (m) H (m) CANT DESCUENTO AREA (m 2)

Muros de Cerramiento 6.50 3.00 3 58.50

58.50

#REF! #REF! = 70.20

DESCRIPCION OBRA L (m) H (m) CANT DESCUENTO AREA (m 2)

Oficina 9.80 4.50 1 44.10


Comedor 5.80 4.50 1 26.10
0.00
70.20

56 #REF!

#REF! #REF! = 45.80

DESCRIPCION OBRA L (m) H (m) CANT DESCUENTO AREA (m 2)

Hall de acceso 6.40 0.70 1 4.48


Oficina 5.20 0.70 1 3.64
Salon Multiple 11.80 1.20 2 28.32
Salon Multiple 7.80 1.20 1 9.36

45.80
MUNICIPIO DE EL MOLINO - GUAJIRA

SECRETATIA DE PLANEACION MUNICIPAL

SISTEMA DE PRESUPUESTO

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA EN EL BARRIO MANANTIAL


DEL MUNICIPIO EL MOLINO - GUAJIRA
VALOR
ITEM DESCRIPCION UND. CANT. VALOR PARCIAL
UNITARIO
1 PRELIMINARES
CERRAMIENTO PROVISIONAL CON LISTONES DE MADERA Y TELA
1.01 M2 300.00 16,334.00 4,900,200.00
VERDE DE PROPILENO
RETIRO DE ESCOMBROS Y DISPOSICIN FINAL EN BOTADERO
1.02 M3 49.00 39,291.00 1,925,259.00
AUTORIZADO
1.03 DESCAPOTE A MAQUINA H<0.30 M2 450.00 14,161.00 6,372,450.00
1.04 LOCALIZACION Y REPLANTEO CON EQUIPO DE TOPOGRAFIA M2 850.00 3,550.00 3,017,500.00
1.05 CONSTRUCCION DE CASETA EN MADERA PARA DEPOSITO UND 1.00 3,209,488.00 3,209,488.00
1.06 REMOCION Y PODA DE ARBOLES UND 1.00 99,269.00 99,269.00
1.07 ACOMETIDA PROVICIONAL ELECTRICA UND 1.00 1,217,771.00 1,217,771.00
1.08 ACOMETIDA PROVICIONAL ACUEDUCTO UND 1.00 882,723.00 882,723.00
SUB TOTAL 21,624,660.00

2 EXCAVACION, EXPLANACION Y RELLENO


2.01 EXPLANACION MECANICA M3 107.00 35,279.00 3,774,853.00
2.02 EXCAVACION MANUAL PARA ZAPATAS Y PROTECTOR DE ARBOL M3 50.00 29,252.00 1,462,600.00
2.03 EXCAVACION MANUAL PARA CICLOPEO Y VIGAS DE AMARRE ML 190.00 13,501.00 2,565,190.00
2.04 EXCAVACION MANUAL PARA BORDILLOS Y ANDENES ML 200.00 9,095.00 1,819,000.00
2.05 RELLENO BASE GRANULAR B-400 PROCTOR 95% M3 125.00 58,836.00 7,354,500.00
SUB TOTAL 16,976,143.00

3 CONCRETOS
3.01 CONCRETO CICLOPEO ML 85.00 74,406.00 6,324,510.00
3.02 SOLADOS CONCRETO 2500 PSI e=0,05 M2 65.00 25,244.00 1,640,860.00
3.03 CONCRETO DE 3500 PSI PARA ZAPATAS M3 32.40 501,447.00 16,246,882.80
3.04 CONCRETO DE 3500 PSI PARA VIGAS DE AMARRE ML 85.00 175,345.00 14,904,325.00
3.05 CONCRETO DE 4000 PSI PARA COLUMNA DE 0,60 X 0,60-1,20m ML 49.80 519,297.00 25,860,990.60
3.06 CONCRETO DE 3000 PSI PARA VIGAS AEREAS ML 54.00 218,779.00 11,814,066.00
3.07 CONCRETO DE 3000 PSI PARA CONTRAPISO e=0,10m M2 900.00 106,873.00 96,185,700.00
3.08 CONCRETO DE 3000 PSI PARA LOZA GRADERIA e=0,20m M2 42.06 136,820.00 5,754,649.20
3.09 DILATACIONES CON POLIESTILENO Y SELLO ELASTICO ML 20.80 8,256.00 171,724.80
3.10 CONCRETO DE 3000 PSI PARA GRADERIAS e=0,10m M2 58.40 100,123.00 5,847,183.20
3.11 CONCRETO DE 3000 PSI PARA ESCALERAS e=0,07m M2 19.98 88,056.00 1,759,358.88
3.12 CONCRETO DE 2500 PSI PARA CAUELAS 0,25 X 0,60m r=0,21m ML 66.00 88,875.00 5,865,750.00
3.13 CONCRETO DE 3000 PSI PARA MUROSPANTALLA e=0,15m M2 31.40 119,701.00 3,758,611.40
SUB TOTAL 196,134,611.88

4 MAMPOSTERIA
4.01 MURO EN BLOQUE ESTRUCTURAL M2 64.64 73,696.00 4,763,709.44
SUB TOTAL 4,763,709.44

5 ACEROS
5.01 ACERO REFUERZO 60000 PSI KG 10,900.00 6,212.00 67,710,800.00
5.02 MALLA ELECTROSOLDADA M2 830.00 15,734.00 13,059,220.00
SUB TOTAL 80,770,020.00
VALOR
ITEM DESCRIPCION UND. CANT. VALOR PARCIAL
UNITARIO
6 CUBIERTAS
6.01 TEJA ARQUITECTONICA CURVA CAL 26 M2 957.00 77,670.00 74,330,190.00
6.02 ESTRUCTURA METALICA SEGN DISEO ESTRUCTURAL KG 7,950.00 22,736.00 180,751,200.00
6.03 CORREAS TIPO PHR KG 6,100.00 20,088.00 122,536,800.00
6.04 CANAL GALVANIZADO CALIBRE 20 DESARROLLO 2,00-2,500m ML 59.00 116,089.00 6,849,251.00
SUB TOTAL 384,467,441.00

7 INSTALACIONES HIDROSANITARIAS
7.01 COLECTOR AGUAS LLUVIAS DE 6" PVC ML 45.00 77,260.00 3,476,700.00
7.02 BAJANTE AGUAS LLUVIAS EN 4" PVC ML 48.00 41,622.00 1,997,856.00
7.03 CAJA DE INSPECCION DE 60x60x90 cm UND 2.00 338,833.00 677,666.00
SUB TOTAL 6,152,222.00

8 INSTALACIONES ELECTRICAS
8.01 ACOMETIDAS ELECTRICAS
ACOMETIDA EN CONDUCTOR DE CU 2C # 8 + 1C #8 + 1C # 10 AWG
8,01,01 ML 40.00 90,433.00 3,617,320.00
THNW/THWN 1" PVC
8,01,02 ESTRUCTURA DE PROTECCIONES TRIFASICA UND 1.00 2,128,148.00 2,128,148.00
CAJAS DE REGISTRO .60 X .60 X .60 M EN MEDIDAS INTERNAS, CON
8,01,03 TAPA REFORZADA EN MARCO Y CONTRAMARCO METALICO EN ANGULOS UND 5.00 250,540.00 1,252,700.00
DE ACERO.
8.02 SALIDAS, LUMINARIAS Y OTROS
8,02,01 SALIDA TOMACORRIENTE DOBLE CON POLO A TIERRA 110 V UND 2.00 128,904.00 257,808.00
8,02,02 SALIDA PARA SONIDO UND 5.00 197,513.00 987,565.00
8,02,03 SALIDA ILUMINACION 110V UND 12.00 101,946.42 1,223,357.02
8,02,04 SALIDA PARA PULSADOR REMOTO UND 4.00 118,364.00 473,456.00
PROYECTOR JETA 6, METAL HALIDE 400W, INCLUYE KIT REACTOR Y
8,02,05 UND 12.00 617,895.00 7,414,740.00
BOMBILLO MH 400W TUBULAR BASE E40.
8.03 TABLEROS ELECTRICOS
8,03,01 TABLERO MINIPRAGMA DE 12 CIRCUITOS. UND 1.00 521,059.00 521,059.00
8,03,02 INTERRUPTOR BIPOLAR ENCHUFABLE DE 2X30A - 2X20A UND 4.00 83,658.00 334,632.00
INTERRUPTOR MONOPOLAR ENCHUFABLE BREAKER DE 1X20A - 1X15A
8,03,03 UND 6.00 56,515.00 339,090.00
- 1X10A ICC 10 KA.
8,03,04 CAJA MINIPRAGMA, DE INTERRUPTOR BOPOLAR DE 16A UND 4.00 224,686.00 898,744.00
8.04 SISTEMA DE APANTALLAMIENTO Y PUESTA A TIERRA
SISTEMA DE PUESTA A TIERRA EN 5 VARILLAS COPER WELL 5/8" X
8,04,01 UND 1.00 2,121,169.00 2,121,169.00
2.40M .
8,04,02 CABLE COBRE #8 PARA POLO A TIERRA ML 8.00 186,932.00 1,495,456.00
CABLE COBRE #2/0 DESNUDO PARA CONFIGURAR SISTEMA DE
8,04,03 ML 100.00 42,682.00 4,268,200.00
APANTALLAMIENTO, MALLA A TIERRA Y EQUIPOTENCIAR
8,04,04 BARRA CAPTORA PARA SISTEMA DE APANTALLAMIENTO UND 25.00 185,531.00 4,638,275.00
SOLDADURA TIPO CADWELD 120grs PARA EMPALMES
8,04,05 UND 15.00 40,784.00 611,760.00
APANTALLAMIENTO Y PUESTA A TIERRA
SUBTOTAL 32,583,479.02

9 DOTACION Y CARPINTERIA METALICA


9.01 ARCOS DE CANCHAS DE MICROFUTBOL UND 2.00 795,660.00 1,591,320.00
9.02 PARALES DE VOLEIBOL JGO 1.00 647,738.00 647,738.00
9.03 ESTRUCTURA DE BALONCESTO CON TABLERO Y CANASTA UND 2.00 1,616,544.00 3,233,088.00
9.04 CERRAMIENTO CONTRA IMPACTO h=5,00m ML 29.298 672,065.00 19,690,169.85
9.05 PASAMANOS METALICO ML 10.00 160,085.00 1,600,850.00
9.06 CINTA ANTIDESLIZANTE PARA ESCALERA ML 4.80 16,707.00 80,193.60
SUB TOTAL 26,843,359.45
VALOR
ITEM DESCRIPCION UND. CANT. VALOR PARCIAL
UNITARIO
10 PINTURA
10.01 DEMARCACION CANCHA DE MICROFUTBOL UND 1.00 225,019.00 225,019.00
10.02 DEMARCACION CANCHA DE BALONCESTO UND 1.00 215,051.00 215,051.00
10.03 DEMARCACION CANCHA DE VOLEIBOL UND 1.00 203,198.00 203,198.00
10.04 PINTURA PARA ESTRUCTURA METALICA ESMALTE TIPO I KG 14,050.00 561.00 7,882,050.00
SUB TOTAL 8,525,318.00

COSTO DIRECTO 778,840,964.00


Administracion 24% 186,921,831.00
Imprevistos 1% 7,788,410.00
Utilidad 5% 38,942,048.00
VALOR TOTAL DE LA OBRA $ 1,012,493,253
Interventoria 7% 70,874,528.00
VALOR TOTAL DEL PROYECTO (OBRA + INTERVENTORIA) $ 1,083,367,781

Elaboro:

Arq. RENE ALEXANDER VILLALBA GARCIA


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

CERRAMIENTO PROVISIONAL CON LISTONES DE MADERA Y


1.01 M2 16,334.00
TELA VERDE DE PROPILENO
1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 ALFAJIA DE 2" X 4" X 4,00 MTS MADERA ML 3,500.00 1.100 3,850.00
1.02 GRAPAS PARA CERRAMIENTO DE 1-1/4" PUMA KG 4,500.00 0.100 450.00
1.03 TELA VERDE DE POLIPROPILENO ML 2,320.00 1.000 2,320.00
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 6,620.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 8,621.32 5% 431.07
2.02 0% -
2.03 -
2.04 -
2.05 -
EQ. 431.07
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 6,620.00 10% 662.00
3.02 -
TTE. 662.00
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 0.40 0% 8,621.32
4.02 -
-
-
MAN. 8,621.32

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

RETIRO DE ESCOMBROS Y DISPOSICIN FINAL EN BOTADERO


1.02 M3 39,291.00
AUTORIZADO
1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 -
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT -
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 1,681.21 5% 84.06
2.02 EXCAVADORA SOBRE LLANTAS DIA 176,384.00 0.02 0% 3,527.68
2.03 VOLQUETA 5.5 M3 VIAJE 34,080.00 0.480 16,358.40
2.04 -
2.05 -
EQ. 19,970.14
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL M3-KM 980.00 18.00 17,640.00
3.02 -
TTE. 17,640.00
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 0.08 0% 1,681.21
4.02 -
MAN. 1,681.21

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

1.03 DESCAPOTE A MAQUINA H<0.30 M2 14,161.00

1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 -
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT -
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 214.30 5% 10.72
2.02 BULDOZER (DESMONTE) HORA 92,800.00 0.040 0% 3,712.00
2.03 VOLQUETA 5.5 M3 VIAJE 34,080.00 0.300 10,224.00
2.04 -
2.05 -
EQ. 13,946.72
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 -
3.02 -
TTE. -
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 0.010 0% 214.30
4.02 -
-
-
MAN. 214.30

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

1.04 LOCALIZACION Y REPLANTEO CON EQUIPO DE TOPOGRAFIA M2 3,550.00

1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 ESTACA DE MADERA UN 0.25 600 150.00
1.02 PUNTILLA CON CABEZA 2 LB 0.0027 2615.8 7.06
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 157.06
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 1,716.69 5% 85.83
2.02 EQUIPO DE TOPOGRAFA HORA 15,900.00 0.100 0% 1,590.00
2.03 -
2.04 -
2.05 -
EQ. 1,675.83
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 -
3.02 -
TTE. -
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 0.050 0% 1,071.52
4.02 TOPOGRAFO DIA 92,167.00 0.007 645.17
-
-
MAN. 1,716.69

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

1.05 CONSTRUCCION DE CASETA EN MADERA PARA DEPOSITO UND 3,209,488.00

1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 PUNTILLA CON CABEZA 2 LB 2,615.00 4.00 5% 10,983.00
1.02 TABLA 1''X12"X3.00MT ALGARROBILLO UN 9,800.00 35.00 5% 360,150.00
1.03 ALGARROBILLO 2"X2"X3.00MT UN 4,800.00 15.00 5% 75,600.00
1.04 ALAMBRE GALVANIZADO KG 6,500.00 5.00 5% 34,125.00
1.05 LAMINA ZINC ONDULADA CAL 34 UN 20,500.00 21.00 5.00 2,583,000.00
1.06 -
1.07 -
1.08 -
1.09 -
MAT 3,063,858.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 138,108.38 5% 6,905.42
2.02 ANDAMIO TUBULAR DE 1.50*1.5 (2 CUERPOS) DIA 2,025.00 0.100 202.50
2.03 TABLON DE ANDAMIOS DIA 1,033.00 0.400 413.20
2.04 -
2.05 -
EQ. 7,521.12
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 -
3.02 -
TTE. -
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 6.44 0% 138,108.38
4.02 -
-
-
MAN. 138,108.38

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

1.06 REMOCION Y PODA DE ARBOLES UND 99,269.00

1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 -
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT -
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 62,148.07 5% 3,107.40
2.02 VOLQUETA VJE 35,000.00 0.972 34,014.00
2.03 -
2.04 -
2.05 -
EQ. 37,121.40
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 -
3.02 -
TTE. -
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 2.90 0% 62,148.07
4.02 -
-
-
MAN. 62,148.07

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

1.07 ACOMETIDA PROVICIONAL ELECTRICA UND 1,217,771.00

1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CABLE THHN-THWN N 2 ML 12,500.00 45.00 5% 590,625.00
1.02 CABLE THHN-THWN N 6 ML 5,200.00 65.00 5% 354,900.00
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 945,525.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 258,695.11 5% 12,934.76
2.02 ANDAMIO TUBULAR DE 1.50*1.5 (2 CUERPOS) DIA 2,025.00 0.100 202.50
2.03 TABLON DE ANDAMIOS DIA 1,033.00 0.400 413.20
2.04 -
2.05 -
EQ. 13,550.46
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 -
3.02 -
TTE. -
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 10.9740 0% 258,695.11
4.02 -
-
-
MAN. 258,695.11

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

1.08 ACOMETIDA PROVICIONAL ACUEDUCTO UND 882,723.00

1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 TUBERIA 1/2" DR 13,5 ML 2,098.00 135.00 5% 297,391.50
1.02 CODO 1/2" UND 556.00 10.00 5,560.00
1.03 TEE DE 1/2" UND 556.00 2.00 1,112.00
1.04 UNION DE 1/2" UND 269.00 25.00 6,725.00
1.05 SOLDADURA LIQUIDA 1/4 gl. UND 52,747.96 1.00 5% 55,385.36
1.06 LIMPIADOR PVC 1/4 GL UND 15,600.00 1.00 5% 16,380.00
1.07 -
MAT 382,553.86
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 485,600.93 3% 14,568.03
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
EQ. 14,568.03
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01
3.02 -
TTE. -
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 20.60 0% 485,600.93
4.02 -
MAN. 485,600.93

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

2.01 EXPLANACION MECANICA M3 35,279.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 -
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT -
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 12,858.22 3% 385.55
2.02 BULDOZER FIAT 14C RIPPER HO 183,498.00 0.030 0% 5,504.94
2.03 MOTONIVELADORA HO 110,200.00 0.150 16,530.00
2.04 -
2.05 -
EQ. 22,420.49
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL - 5% -
3.02 -
TTE. -
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 0.60 0% 12,858.22
4.02 -
-
-
MAN. 12,858.22

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

EXCAVACION MANUAL PARA ZAPATAS Y PROTECTOR DE


2.02 M3 29,252.00
ARBOL
1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 -
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT -
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 27,859.48 5% 1,392.97
2.02 0% -
2.03 -
2.04 -
2.05 -
EQ. 1,392.97
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 -
3.02 -
TTE. -
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 1.30 0% 27,859.48
4.02 -
-
-
MAN. 27,859.48

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

2.03 EXCAVACION MANUAL PARA CICLOPEO Y VIGAS DE AMARRE ML 13,501.00

1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 -
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT -
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 12,858.22 5% 642.91
2.02 0% -
2.03 -
2.04 -
2.05 -
EQ. 642.91
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 -
3.02 -
TTE. -
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 0.60 0% 12,858.22
4.02 -
-
-
MAN. 12,858.22

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

2.04 EXCAVACION MANUAL PARA BORDILLOS Y ANDENES ML 9,095.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 -
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT -
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 8,830.27 3% 264.91
2.02 0% -
2.03 -
2.04 -
2.05 -
EQ. 264.91
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 -
3.02 -
TTE. -
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 0.41 0% 8,830.27
4.02 -
-
-
MAN. 8,830.27

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

2.05 RELLENO BASE GRANULAR B-400 PROCTOR 95% M3 58,836.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 RECEBO B-400 M3 28,000.00 1.00 5% 29,400.00
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 29,400.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 15,001.26 5% 750.06
2.02 VOLQUETA 5.5 M3 VIAJE 34,080.00 0.150 5,112.00
2.03 VIBROCOMPACTADORA DIA 85,729.00 0.100 - 8,572.90
2.04 -
2.05 -
EQ. 14,434.96
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 -
3.02 -
TTE. -
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 0.70 0% 15,001.26
4.02 -
-
-
MAN. 15,001.26

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

3.01 CONCRETO CICLOPEO ML 74,406.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CONCRETO 3000 PSI M3 348,243.00 0.10 5% 35,102.89
1.02 PIEDRA CIMIENTO M3 37,500.00 0.06 5 14,400.00
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 49,502.89
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 15,597.88 3% 467.94
2.02 MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.04 0% 3,886.68
2.03 -
2.04 -
2.05 -
EQ. 4,354.62
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 49,502.89 10% 4,950.29
3.02 -
TTE. 4,950.29
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 0.73 0% 15,597.88
4.02 -
-
-
MAN. 15,597.88

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

3.02 SOLADOS CONCRETO 2500 PSI e=0,05 M2 25,244.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CONCRETO 2.500 PSI OBRA TRITURADO M3 323,200.50 0.05 5% 16,968.03
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 16,968.03
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 3,000.25 3% 90.01
2.02 MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.04 0% 3,488.82
2.03 -
2.04 -
2.05 -
EQ. 3,578.83
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 16,968.03 10% 1,696.80
3.02 -
TTE. 1,696.80
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 0.14 0% 3,000.25
4.02 -
-
-
MAN. 3,000.25

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

3.03 CONCRETO DE 3500 PSI PARA ZAPATAS M3 501,447.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CONCRETO 3.500 PSI OBRA TRITURADO M3 385,533.75 1.00 5% 404,810.44
1.02 PUNTILLA CON CABEZA 2 LB 2,615.00 0.90 5% 2,471.18
1.03 TABLA 1''X12"X3.00MT ALGARROBILLO UN 14,000.00 0.05 5% 735.00
1.04 ALGARROBILLO 2"X2"X3.00MT UN 4,700.00 0.40 5% 1,974.00
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 409,990.61
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 36,431.63 3% 1,092.95
2.02 MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.090 0% 7,796.09
2.03 VIBRADOR ELCTRICO DE CONCRETO CON OPERADOR DIA 85,613.62 0.060 5,136.82
2.04 -
2.05 -
EQ. 14,025.86
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 409,990.61 10% 40,999.06
-
TTE. 40,999.06
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 1.70 0% 36,431.63
-
-
-
MAN. 36,431.63

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

3.04 CONCRETO DE 3500 PSI PARA VIGAS DE AMARRE ML 175,345.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CONCRETO 3.500 PSI OBRA TRITURADO M3 385,533.75 0.25 5% 101,202.61
1.02 PUNTILLA CON CABEZA 2 LB 2,615.00 0.90 5% 2,471.18
1.03 TABLA 1''X12"X3.00MT ALGARROBILLO UN 14,000.00 0.40 5% 5,880.00
1.04 ALGARROBILLO 2"X2"X3.00MT UN 4,700.00 0.40 5% 1,974.00
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 111,527.78
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 38,574.66 3% 1,157.24
2.02 MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.090 0% 7,796.09
2.03 VIBRADOR ELCTRICO DE CONCRETO CON OPERADOR DIA 85,613.62 0.060 5,136.82
2.04 -
2.05 -
EQ. 14,090.15
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 111,527.78 10% 11,152.78
-
TTE. 11,152.78
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 1.80 0% 38,574.66
-
-
-
MAN. 38,574.66

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

3.05 CONCRETO DE 4000 PSI PARA COLUMNA DE 0,60 X 0,60-1,20m ML 519,297.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CONCRETO 4.000 PSI OBRA TRITURADO M3 641,434.50 0.54 5% 363,693.36
1.02 BOCELES ML 6,500.00 4.00 5% 27,300.00
1.03 SIKADUR 32 PRIMER O EQUIVALENTE KG 43,000.00 0.10 5% 4,515.00
1.04 -
1.05 -
MAT 395,508.36
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 47,146.81 3% 1,414.40
2.02 MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.040 0% 3,464.93
2.03 VIBRADOR ELCTRICO DE CONCRETO CON OPERADOR DIA 85,613.62 0.040 3,424.54
2.04 FORMALETA CAJA COLUMNA UNIDAD 132,194.93 0.190 25,117.04
2.05 ANDAMIO TUBULAR DE 1.50*1.5 (2 CUERPOS) DIA 2,025.00 1.200 2,430.00
2.06 TABLON DE ANDAMIOS DIA 1,033.00 1.200 1,239.60
-
EQ. 37,090.51
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 395,508.36 10% 39,550.84
3.02 -
TTE. 39,550.84
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 2.20 0% 47,146.81
4.02 -
-
-
MAN. 47,146.81

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

3.06 CONCRETO DE 3000 PSI PARA VIGAS AEREAS ML 218,779.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CONCRETO 3.000 PSI OBRA TRITURADO M3 385,533.75 0.18 5% 72,865.88
1.02 PUNTILLA CON CABEZA 2 LB 2,615.00 0.23 5% 617.79
1.03 BOCELES ML 6,500.00 4.00 5% 27,300.00
1.04 SIKADUR 32 PRIMER O EQUIVALENTE KG 43,000.00 0.10 5% 4,515.00
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 105,298.67
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 55,718.96 3% 1,671.57
2.02 MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.040 3,464.93
2.03 VIBRADOR ELCTRICO DE CONCRETO CON OPERADOR DIA 85,613.62 0.040 3,424.54
2.04 FORMALETA CAJA UND 132,194.00 0.200 26,438.80
2.05 ANDAMIO TUBULAR DE 1.50*1.5 (2 CUERPOS) DIA 2,025.00 4.000 8,100.00
2.06 TABLON DE ANDAMIOS DIA 1,033.00 4.000 4,132.00
-

EQ. 47,231.84
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 105,298.67 10% 10,529.87
3.02 -
TTE. 10,529.87
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 2.60 0% 55,718.96
4.02 -
-
-
MAN. 55,718.96

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

#REF! #REF! #REF! 525,142.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CONCRETO 3.000 PSI OBRA TRITURADO M3 348,243.00 1.00 5% 365,655.15
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 365,655.15
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 75,006.29 3% 2,250.19
2.02 MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.15 12,993.48
2.03 VIBRADOR ELCTRICO DE CONCRETO CON OPERADOR DIA 85,613.62 0.15 12,842.04
2.04 FORMALETA CAJA COLUMNA UNIDAD 132,194.93 0.15 19,829.24
2.05 -
2.06 -
2.07 -
-

EQ. 47,914.95
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 365,655.15 10% 36,565.52
3.02 -
TTE. 36,565.52
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 3.50 0% 75,006.29
4.02 -
-
-
MAN. 75,006.29

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

3.07 CONCRETO DE 3000 PSI PARA CONTRAPISO e=0,10m M2 106,873.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CONCRETO 3.000 PSI OBRA TRITURADO M3 348,243.00 0.1000 5% 36,565.52
1.02 ENDURECEDOR KG 1,300.00 7.00 5% 9,555.00
1.03 ESMALTADOR KG 950.00 7.00 5% 6,982.50
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 53,103.02
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 25,716.44 3% 771.49
2.02 MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.05 4,331.16
2.03 VIBRADOR ELCTRICO DE CONCRETO CON OPERADOR DIA 85,613.62 0.05 4,280.68
2.04 FORMALETA UND 132,194.93 0.05 6,609.75
2.05 PALUSTRADORA MECANICA DIA 135,000.00 0.05 6,750.00
2.06 -
2.07 -
-

EQ. 22,743.08
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 53,103.02 10% 5,310.30
3.02 -
TTE. 5,310.30
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 1.20 0% 25,716.44
4.02 -
-
-
MAN. 25,716.44

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

3.08 CONCRETO DE 3000 PSI PARA LOZA GRADERIA e=0,20m M2 136,820.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CONCRETO 3.000 PSI OBRA TRITURADO M3 348,243.00 0.2200 5% 80,444.13
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 80,444.13
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 32,145.55 3% 964.37
2.02 MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.05 4,331.16
2.03 VIBRADOR ELCTRICO DE CONCRETO CON OPERADOR DIA 85,613.62 0.05 4,280.68
2.04 FORMALETA UND 132,194.93 0.05 6,609.75
2.05 -
2.06 -
2.07 -
-

EQ. 16,185.95
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 80,444.13 10% 8,044.41
3.02 -
TTE. 8,044.41
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 1.50 0% 32,145.55
4.02 -
-
-
MAN. 32,145.55

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

3.09 DILATACIONES CON POLIESTILENO Y SELLO ELASTICO ML 8,256.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 POLIESTILENO EXPANDIDO ML 2,350.00 1.00 5% 2,467.50
1.02 SELLADOR ELASTICO UND 28,500.00 0.10 5% 2,992.50
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 5,460.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 2,143.04 5% 107.15
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
-

EQ. 107.15
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 5,460.00 10% 546.00
3.02 -
TTE. 546.00
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 0.10 0% 2,143.04
4.02 -
-
-
MAN. 2,143.04

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

3.10 CONCRETO DE 3000 PSI PARA GRADERIAS e=0,10m M2 100,123.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CONCRETO 3.000 PSI OBRA TRITURADO M3 348,243.00 0.1000 5% 36,565.52
1.02 ENDURECEDOR KG 1,300.00 7.00 5% 9,555.00
1.03 ESMALTADOR KG 950.00 7.00 5% 6,982.50
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 53,103.02
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 25,716.44 3% 771.49
2.02 MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.05 4,331.16
2.03 VIBRADOR ELCTRICO DE CONCRETO CON OPERADOR DIA 85,613.62 0.05 4,280.68
2.04 FORMALETA UND 132,194.93 0.05 6,609.75
2.05 -
2.06 -
2.07 -
-

EQ. 15,993.08
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 53,103.02 10% 5,310.30
3.02 -
TTE. 5,310.30
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 1.20 0% 25,716.44
4.02 -
-
-
MAN. 25,716.44

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

3.11 CONCRETO DE 3000 PSI PARA ESCALERAS e=0,07m M2 88,056.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CONCRETO 3.000 PSI OBRA TRITURADO M3 348,243.00 0.0700 5% 25,595.86
1.02 ENDURECEDOR KG 1,300.00 7.00 5% 9,555.00
1.03 ESMALTADOR KG 950.00 7.00 5% 6,982.50
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 42,133.36
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 25,716.44 3% 771.49
2.02 MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.05 4,331.16
2.03 VIBRADOR ELCTRICO DE CONCRETO CON OPERADOR DIA 85,613.62 0.05 4,280.68
2.04 FORMALETA UND 132,194.93 0.05 6,609.75
2.05 -
2.06 -
2.07 -
-

EQ. 15,993.08
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 42,133.36 10% 4,213.34
3.02 -
TTE. 4,213.34
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 1.20 0% 25,716.44
4.02 -
-
-
MAN. 25,716.44

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

3.12 CONCRETO DE 2500 PSI PARA CAUELAS 0,25 X 0,60m r=0,21m ML 88,875.00

1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CONCRETO 2.500 PSI OBRA TRITURADO M3 323,200.50 0.1500 5% 50,904.08
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 50,904.08
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 17,144.30 3% 514.33
2.02 MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.05 4,331.16
2.03 VIBRADOR ELCTRICO DE CONCRETO CON OPERADOR DIA 85,613.62 0.05 4,280.68
2.04 FORMALETA UND 132,194.93 0.05 6,609.75
2.05 -
2.06 -
2.07 -
-

EQ. 15,735.92
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 50,904.08 10% 5,090.41
3.02 -
TTE. 5,090.41
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 0.80 0% 17,144.30
4.02 -
-
-
MAN. 17,144.30

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

3.13 CONCRETO DE 3000 PSI PARA MUROSPANTALLA e=0,15m M2 119,701.00

1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CONCRETO 3.000 PSI OBRA TRITURADO M3 348,243.00 0.1500 5% 54,848.27
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 54,848.27
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 42,860.74 3% 1,285.82
2.02 MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.05 4,331.16
2.03 VIBRADOR ELCTRICO DE CONCRETO CON OPERADOR DIA 85,613.62 0.05 4,280.68
2.04 FORMALETA UND 132,194.93 0.05 6,609.75
2.05 -
2.06 -
2.07 -
-

EQ. 16,507.41
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 54,848.27 10% 5,484.83
3.02 -
TTE. 5,484.83
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 2.00 0% 42,860.74
4.02 -
-
-
MAN. 42,860.74

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

4.01 MURO EN BLOQUE ESTRUCTURAL M2 73,696.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 MORTERO 1:4 M3 305,308.50 0.038 5% 12,181.81
1.02 BLOQUE DE CEMENTO LISO ESTRUCTURAL UND 2,150.00 13.00 5% 29,347.50
1.03 CONCRETO DOBELAS M3 323,200.50 0.025 5% 8,484.01
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 50,013.32
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 17,144.30 3% 514.33
2.02 ANDAMIO TUBULAR DE 1.50*1.5 (1 CUERPO) DIA 1,012.50 0.50 506.25
2.03 TABLON DE ANDAMIOS DIA 1,033.00 0.50 516.50
2.04 -
2.05 -
2.06 -
-

EQ. 1,537.08
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 50,013.32 10% 5,001.33
3.02 -
TTE. 5,001.33
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 0.80 0% 17,144.30
4.02 -
-
-
MAN. 17,144.30

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

5.01 ACERO REFUERZO 60000 PSI KG 6,212.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 ACERO DE 60.000 PSI KG 3,249.80 1.00 5% 3,412.29
1.02 MARCO DE ZEGUETA UN 15,767.16 0.01 3% 162.40
1.03 SEGUETA SANDWICK UN 2,889.75 0.05 3% 148.82
1.04 ALAMBRE NEGRO KG 5,850.00 0.140 10% 900.90
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 4,624.41
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 1,071.52 5% 53.58
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
-

EQ. 53.58
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 4,624.41 10% 462.44
3.02 -
TTE. 462.44
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 0.05 0% 1,071.52
4.02 -
-
-
MAN. 1,071.52

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

5.02 MALLA ELECTROSOLDADA M2 15,734.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 MALLA ELECTROSOLDADA M2 13,000.00 1.00 3% 13,390.00
1.02 MARCO DE ZEGUETA UN 15,767.16 0.01 3% 162.40
1.03 SEGUETA SANDWICK UN 2,889.75 0.05 3% 148.82
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 13,701.22
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 642.91 3% 19.29
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
-

EQ. 19.29
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 13,701.22 10% 1,370.12
3.02 -
TTE. 1,370.12
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 0.03 0% 642.91
4.02 -
-
-
MAN. 642.91

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

6.01 TEJA ARQUITECTONICA CURVA CAL 26 M2 77,670.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 TEJA GALVANIZADA CURVA CALIBRE 26 O SIMILAR M2 43,700.00 0.70 5% 32,119.50
1.02 TORNILLO FIJADOR UND 1,564.00 3.00 5% 4,926.60
1.03 CLIP ESPECIAL UND 2,530.00 2.00 5% 5,313.00
-
-
MAT 42,359.10
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 25,716.44 3% 771.49
2.02 ANDAMIO TUBULAR DE 1.50*1.5 (2 CUERPOS) DIA 2,025.00 1.500 3,037.50
2.03 TABLON DE ANDAMIOS DIA 1,033.00 1.500 1,549.50
2.04 -

EQ. 5,358.49
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 42,359.10 10% 4,235.91
3.02 -
TTE. 4,235.91
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 1.20 0% 25,716.44
4.02 -
-
-
MAN. 25,716.44

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

6.02 ESTRUCTURA METALICA SEGN DISEO ESTRUCTURAL KG 22,736.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 ANGULO DE 2"X 3/16" KG 5,820.00 0.15 5% 916.65
1.02 ANGULO DE 1,5"X 3/16" KG 5,820.00 0.15 5% 916.65
1.03 ANGULO DE 2"x1/4" KG 5,820.00 0.10 5% 611.10
1.04 ANGULO DE 1,5"x2"x3/16" KG 5,820.00 0.10 5% 611.10
1.05 ANGULO DE 4"x3/8" KG 5,820.00 0.05 5% 305.55
1.06 ANGULO DE 4"x1/4" KG 5,820.00 0.05 5% 305.55
1.07 PLATINA e=1,5mm. KG 5,820.00 0.05 5% 305.55
1.08 PLATINA 850X400X9,53 mm KG 5,820.00 0.05 5% 305.55
1.09 PLATINA 1165X450X16 mm KG 5,820.00 0.08 5% 488.88
1.09 SOLDADURA POR 5 KILOS KG 8,096.00 0.25 5% 2,125.20
1.10 VARILLA DE ACERO DE 1/2" KG 3,249.80 0.10 5% 341.23
1.11 TUERCAS, ARANDELAS Y PERNOS DE 5/8" UND 1,000.00 0.89 0% 893.50
1.12 -
1.13 -
1.14 -
MAT 8,126.51
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 10,608.03 3% 318.24
2.02 PULIDORA (8500 REV) DIA 17,226.00 0.020 344.52
2.03 EQUIPO DE SOLDADURA 250 AMP DIA 20,450.00 0.020 409.00
2.04 ANDAMIO TUBULAR DE 1.50*1.5 (2 CUERPOS) DIA 2,025.00 0.030 60.75
2.05 TABLON DE ANDAMIOS DIA 1,033.00 0.030 30.99
2.06 CAMION GRUA DIA 135,000.00 0.015 2,025.00

EQ. 3,188.50
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 8,126.51 10% 812.65
3.02 -
TTE. 812.65
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA CC HH 23,573.41 0.45 0% 10,608.03
4.02 -
-
MAN. 10,608.03

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

6.03 CORREAS TIPO PHR KG 20,088.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 PERFIL PHR-C 305x80-1,5mm. KG 7,200.00 1.00 5% 7,560.00
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
1.10 -
MAT 7,560.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 10,608.03 3% 318.24
2.02 PULIDORA (8500 REV) DIA 17,226.00 0.020 344.52
2.03 EQUIPO DE SOLDADURA 250 AMP DIA 20,450.00 0.020 409.00
2.04 ANDAMIO TUBULAR DE 1.50*1.5 (2 CUERPOS) DIA 2,025.00 0.030 60.75
2.05 TABLON DE ANDAMIOS DIA 1,033.00 0.030 30.99
2.06 -

EQ. 1,163.50
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 7,560.00 10% 756.00
3.02 -
TTE. 756.00
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA CC HH 23,573.41 0.45 0% 10,608.03
4.02 -
-
MAN. 10,608.03

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

6.04 CANAL GALVANIZADO CALIBRE 20 DESARROLLO 2,00-2,500m ML 116,089.00

1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 LAMINA CALIBRE 20 2.00 X 1.00 UN 60,000.00 0.40 5% 25,200.00
1.02 SOLDADURA POR 5 KILOS KG 8,096.00 0.40 5% 3,400.32
1.03 GANCHOS DE AMARRE PLATINA 1/2"X5/8" UN 6,500.00 1.00 5% 6,825.00
1.04 REMACHE POP UN 50.00 19.00 5% 997.50
1.05 PUENTES EN PLATINA 1/2"X5/8" UN 4,500.00 1.00 5% 4,725.00
1.06 ANTICORROSIVO ROJO GALON 27,854.90 0.01 5% 146.24
1.07 ESMALTE PARA EXTERIORES GAL 58,000.00 0.10 5% 6,090.00
1.08 WASHPRIMER GAL 150,000.00 0.25 5% 39,375.00
MAT 86,759.06
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 14,144.04 3% 424.32
2.02 PULIDORA (8500 REV) DIA 17,226.00 0.080 1,378.08
2.03 EQUIPO DE SOLDADURA 250 AMP DIA 20,450.00 0.080 1,636.00
2.04 ANDAMIO TUBULAR DE 1.50*1.5 (2 CUERPOS) DIA 2,025.00 0.050 101.25
2.05 TABLON DE ANDAMIOS DIA 1,033.00 0.100 103.30
2.06 EQUIPO DE PINTURA (COMPRESOR) DIA 26,500.00 0.108 2,867.30

EQ. 6,510.25
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 86,759.06 10% 8,675.91
3.02 -
TTE. 8,675.91
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA CC HH 23,573.41 0.60 0% 14,144.04
4.02 -
-
-
MAN. 14,144.04

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

7.01 COLECTOR AGUAS LLUVIAS DE 6" PVC ML 77,260.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 TUBO PVC SANITARIO 6 UN 40,293.00 1.00 5% 42,307.65
1.02 SOLDADURA LIQUIDA 1/4 GL. UN 52,747.96 0.04 5% 2,215.41
1.03 LIMPIADOR PVC 1/4 GL UND 15,600.00 0.04 5% 655.20
1.04 CODO 90 1/4 CXC SANITARIO 6" UND 71,330.00 0.01 713.30
1.05 UNION 6" UNIDAD 19,666.00 0.34 6,686.44
1.06 -
1.07 -
1.08 -
1.09 -
1.10 -

MAT 52,578.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 18,858.72 3% 565.76
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
EQ. 565.76
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 52,578.00 10% 5,257.80
3.02 -
TTE. 5,257.80
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 0.80 0% 18,858.72
4.02 -
MAN. 18,858.72

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

7.02 BAJANTE AGUAS LLUVIAS EN 4" PVC ML 41,622.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 TUBO PVC SANITARIO 4 UN 19,027.00 1.00 5% 19,978.35
1.02 SOLDADURA LIQUIDA 1/4 GL. UN 52,747.96 0.04 5% 2,215.41
1.03 LIMPIADOR PVC 1/4 GL UND 15,600.00 0.04 5% 655.20
1.04 CODO 90 1/4 CXC SANITARIO 4 UND 11,309.00 0.01 113.09
1.05 UNION 4" UNIDAD 4,800.00 0.34 1,632.00
1.06 -
1.07 -
1.08 -
1.09 -
1.10 -

MAT 24,594.05
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 14,144.04 3% 424.32
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
EQ. 424.32
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 24,594.05 10% 2,459.41
3.02 -
TTE. 2,459.41
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 0.60 0% 14,144.04
4.02 -
MAN. 14,144.04

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

7.03 CAJA DE INSPECCION DE 60x60x90 cm UND 338,833.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CONCRETO 2.500 PSI OBRA TRITURADO M3 323,200.50 0.09 5% 30,542.45
1.02 BLOQUE CEMENTO 20X20X40 UN 1,630.00 36.00 5% 61,614.00
1.03 MORTERO 1:4 M3 305,308.50 0.04 5% 11,220.09
1.04 ACERO DE 60.000 PSI KL 3,249.80 3.00 5% 10,236.86
1.05 ACERO DE 40.000 PSI KL 3,136.50 3.00 5% 9,879.97
1.06 -
1.07 -
1.08 -
1.09 -
1.10 -

MAT 123,493.36
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 192,873.32 3% 5,786.20
2.02 MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.05 4,331.16
2.03 -
2.04 -
2.05 -
2.06 -
EQ. 10,117.36
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 123,493.36 10% 12,349.34
3.02 -
TTE. 12,349.34
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 9.00 0% 192,873.32
4.02 -
MAN. 192,873.32

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

9.01 ARCOS DE CANCHAS DE MICROFUTBOL UND 795,660.00

1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 ARCOS METALICOS UND 350,000.00 1.00 5% 367,500.00
1.02 MALLA NYLON M2 15,000.00 7.00 5% 110,250.00
1.03 ANTICORROSIVO ROJO GALON 27,854.90 1.00 5% 29,247.65
1.04 ESMALTE GALON 48,446.45 0.80 5% 40,695.02
1.05 THINER X LITRO LT 3,500.00 2.00 5% 7,350.00
1.06 -
1.07 -
1.08 -
1.09 -
1.10 -

MAT 555,042.66
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 94,293.62 5% 4,714.68
2.02 PULIDORA (8500 REV) DIA 17,226.00 0.200 3,445.20
2.03 TALADRO DIA 15,800.00 0.200 3,160.00
2.04 EQUIPO DE PINTURA (COMPRESOR) HORA 26,500.00 3.000 79,500.00
2.05 -
2.06 -
EQ. 90,819.88
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 555,042.66 10% 55,504.27
3.02 -
TTE. 55,504.27
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA CC HH 23,573.41 4.00 0% 94,293.62
4.02 -
MAN. 94,293.62

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

9.02 PARALES DE VOLEIBOL JGO 647,738.00

1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 PARALES METALICOS UND 35,000.00 2.00 70,000.00
1.02 DADOS UND 18,500.00 2.00 37,000.00
1.03 CAMISA DE FIJACION GLB 15,600.00 2.00 31,200.00
1.04 TAPA EN ACERO UN 9,500.00 2.00 19,000.00
1.05 MALLA NYLON M2 15,000.00 12.10 5% 190,575.00
1.06 ANTICORROSIVO ROJO GALON 27,854.90 1.00 5% 29,247.65
1.07 ESMALTE GALON 48,446.45 0.80 5% 40,695.02
1.08 THINER X LITRO LT 3,500.00 2.00 5% 7,350.00
1.09 -

MAT 425,067.66
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 89,578.94 5% 4,478.95
2.02 PULIDORA (8500 REV) DIA 17,226.00 0.200 3,445.20
2.03 TALADRO DIA 15,800.00 0.200 3,160.00
2.04 EQUIPO DE PINTURA (COMPRESOR) HORA 26,500.00 3.000 79,500.00
2.05 -
2.06 -
EQ. 90,584.15
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 425,067.66 10% 42,506.77
3.02 -
TTE. 42,506.77
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA CC HH 23,573.41 3.80 0% 89,578.94
4.02 -
MAN. 89,578.94

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

9.03 ESTRUCTURA DE BALONCESTO CON TABLERO Y CANASTA UND 1,616,544.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 ESTRUCTURA DE BALONCESTO UND 320,000.00 2.00 5% 672,000.00
1.02 TABLERO ANTIBANDALICO UND 220,000.00 2.00 5% 462,000.00
1.03 ANTICORROSIVO ROJO GALON 27,854.90 1.00 5% 29,247.65
1.04 ESMALTE GALON 48,446.45 0.80 5% 40,695.02
1.05 THINER X LITRO LT 3,500.00 2.00 5% 7,350.00
1.06 -
1.07 -
1.08 -
1.09 -

MAT 1,211,292.66
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 188,587.25 5% 9,429.36
2.02 PULIDORA (8500 REV) DIA 17,226.00 0.200 3,445.20
2.03 TALADRO DIA 15,800.00 0.200 3,160.00
2.04 EQUIPO DE PINTURA (COMPRESOR) HORA 26,500.00 3.000 79,500.00
2.05 -
2.06 -
EQ. 95,534.56
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 1,211,292.66 10% 121,129.27
3.02 -
TTE. 121,129.27
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA CC HH 23,573.41 8.00 0% 188,587.25
4.02 -
MAN. 188,587.25

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

9.04 CERRAMIENTO CONTRA IMPACTO h=5,00m ML 672,065.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 TUBO GALBANIZADO 3" e=3,81mm ASTM ML 23,500.00 7.00 5% 172,725.00
1.02 CAMISA DE REFUERZO 4" UN 8,500.00 2.00 5% 17,850.00
1.03 VARILLA REDONDA 3/4" ML 4,300.00 22.50 5% 101,587.50
1.04 MALLA ESLABONADA CAL 10 OJO 2 1/4" M2 9,600.00 2.80 5% 28,224.00
1.05 ANTICORROSIVO ROJO GALON 27,854.90 1.00 5% 29,247.65
1.06 ESMALTE GALON 48,446.45 0.80 5% 40,695.02
1.07 THINER X LITRO LT 3,500.00 2.00 5% 7,350.00
1.08 -
1.09 -

MAT 397,679.16
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 141,440.43 5% 7,072.02
2.02 PULIDORA (8500 REV) DIA 17,226.00 0.200 3,445.20
2.03 TALADRO DIA 15,800.00 0.200 3,160.00
2.04 EQUIPO DE PINTURA (COMPRESOR) HORA 26,500.00 3.000 79,500.00
2.05 -
2.06 -
EQ. 93,177.22
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 397,679.16 10% 39,767.92
3.02 -
TTE. 39,767.92
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA CC HH 23,573.41 6.00 0% 141,440.43
4.02 -
MAN. 141,440.43

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

9.05 PASAMANOS METALICO ML 160,085.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 TUBO GALBANIZADO 2" ML 19,500.00 1.80 5% 36,855.00
1.02 TUBO GALBANIZADO 1 1/2" ML 16,400.00 3.60 5% 61,992.00
1.03 -
1.04 -
1.05 ANTICORROSIVO ROJO GALON 27,854.90 0.20 5% 5,849.53
1.06 ESMALTE GALON 48,446.45 0.20 5% 10,173.75
1.07 THINER X LITRO LT 3,500.00 0.50 5% 1,837.50
1.08 -
1.09 -

MAT 116,707.78
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 18,858.72 5% 942.94
2.02 PULIDORA (8500 REV) DIA 17,226.00 0.200 3,445.20
2.03 TALADRO DIA 15,800.00 0.200 3,160.00
2.04 EQUIPO DE PINTURA (COMPRESOR) HORA 26,500.00 0.200 5,300.00
2.05 -
2.06 -
EQ. 12,848.14
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 116,707.78 10% 11,670.78
3.02 -
TTE. 11,670.78
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA CC HH 23,573.41 0.80 0% 18,858.72
4.02 -
MAN. 18,858.72

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

9.06 CINTA ANTIDESLIZANTE PARA ESCALERA ML 16,707.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CINTA ANTIDESLIZANTE 3M O SIMILAR ML 9,500.00 1.00 5% 9,975.00
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 THINER X LITRO LT 3,500.00 0.50 5% 1,837.50
1.08 -
1.09 -

MAT 11,812.50
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 3,536.01 5% 176.80
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
EQ. 176.80
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 11,812.50 10% 1,181.25
3.02 -
TTE. 1,181.25
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA CC HH 23,573.41 0.15 0% 3,536.01
4.02 -
MAN. 3,536.01

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

10.01 DEMARCACION CANCHA DE MICROFUTBOL UND 225,019.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 PINTURA TRAFICO ALTO GAL 86,300.00 1.00 5% 90,615.00
1.02 MOLDES UN 15,800.00 1.00 5% 16,590.00
1.03 THINER X LITRO LT 3,500.00 2.00 5% 7,350.00
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -

MAT 114,555.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 94,293.62 5% 4,714.68
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
EQ. 4,714.68
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 114,555.00 10% 11,455.50
3.02 -
TTE. 11,455.50
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA CC HH 23,573.41 4.00 0% 94,293.62
4.02 -
MAN. 94,293.62

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

10.02 DEMARCACION CANCHA DE BALONCESTO UND 215,051.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 PINTURA TRAFICO ALTO GAL 86,300.00 0.90 5% 81,553.50
1.02 MOLDES UN 15,800.00 1.00 5% 16,590.00
1.03 THINER X LITRO LT 3,500.00 2.00 5% 7,350.00
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -

MAT 105,493.50
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 94,293.62 5% 4,714.68
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
EQ. 4,714.68
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 105,493.50 10% 10,549.35
3.02 -
TTE. 10,549.35
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA CC HH 23,573.41 4.00 0% 94,293.62
4.02 -
MAN. 94,293.62

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

10.03 DEMARCACION CANCHA DE VOLEIBOL UND 203,198.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 PINTURA TRAFICO ALTO GAL 86,300.00 0.80 5% 72,492.00
1.02 MOLDES UN 15,800.00 1.00 5% 16,590.00
1.03 THINER X LITRO LT 3,500.00 2.00 5% 7,350.00
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 96,432.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 94,293.62 3% 2,828.81
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -

EQ. 2,828.81
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 96,432.00 10% 9,643.20
3.02 -
TTE. 9,643.20
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA CC HH 23,573.41 4.00 0% 94,293.62
4.02 -
-
MAN. 94,293.62

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA

EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

10.04 PINTURA PARA ESTRUCTURA METALICA ESMALTE TIPO I KG 561.00

1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 ANTICORROSIVO ROJO GALON 27,854.90 0.006 5% 175.49
1.02 ESMALTE GALON 48,446.45 0.001 5% 50.87
1.03 THINER X LITRO LT 3,500.00 0.005 5% 18.38
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -

MAT 244.73
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 165.01 5% 8.25
2.02 EQUIPO DE PINTURA (COMPRESOR) HORA 26,500.00 0.001 26.50
2.03 ANDAMIO TUBULAR DE 1.50*1.5 (2 CUERPOS) DIA 2,025.00 0.030 60.75
2.04 TABLON DE ANDAMIOS DIA 1,033.00 0.030 30.99
EQ. 126.49
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 244.73 10% 24.47
3.02 -
TTE. 24.47
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA CC HH 23,573.41 0.01 0% 165.01
4.02 -
MAN. 165.01

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA


EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

ACOMETIDA EN CONDUCTOR DE CU 2C # 8 + 1C #8 + 1C # 10 AWG


8,01,01 ML 90,433.00
THNW/THWN 1" PVC
1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CABLE THHN-THWN N 2 ML 12,900.00 4.00 5% 54,180.00
1.02 TUBO PVC DE 1" ML 5,590.00 1.03 5% 6,045.59
1.03 CURVA PVC DE 1" UN 49,798.86 0.20 5% 10,457.76
1.04 CINTA AISLANTE SCOTCH 20 UN 4,535.59 0.05 5% 238.12
1.05 SOLDADURA LIQUIDA 1/4 GL. UN 52,747.96 0.025 5% 1,384.63
1.06 LIMPIADOR GERFOR 1/4 UN 23,067.00 0.040 5% 968.81
1.07 CABLE THHN-THWN N 8 ML 2,500.00 1.05 5% 2,756.25
1.08 -
1.09 -
MAT 76,031.16
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 6,600.55 3% 198.02
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
2.07 -
2.08 -
EQ. 198.02
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA
VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 76,031.16 10% 7,603.12
3.02 -
TTE. 7,603.12
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 0.28 0% 6,600.55
4.02 -
MAN. 6,600.55

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA


EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

8,01,02 ESTRUCTURA DE PROTECCIONES TRIFASICA UND 2,128,148.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CAJA CORTACIRCUITOS DE 15KV-100A UN 221,400.00 3.00 5% 697,410.00
1.02 PARARRAYOS SINTETICO DE 12KV-10KA UN 146,100.00 3.00 5% 460,215.00
1.03 CRUCETA AUTOSOPORTADA DE 2,4M UN 185,000.00 1.00 5% 194,250.00
1.04 CABLE DE COBRE DESNUDO No 2 ML 10,800.00 25.00 5% 283,500.00
1.05 VARILLA DE COBRE DE 5/8"X2,4M UN 126,900.00 1.000 5% 133,245.00
1.06 CONECTOR AMOVIBLE UN 24,600.00 3.000 5% 77,490.00
1.07 ESTRIBO CON AMPA UN 28,000.00 3.00 5% 88,200.00
1.08 -
1.09 -
MAT 1,934,310.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 94,293.62 3% 2,828.81
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
2.07 -
2.08 -
EQ. 2,828.81
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA
VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 1,934,310.00 5% 96,715.50
3.02 -
TTE. 96,715.50
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 4.00 0% 94,293.62
4.02 -
MAN. 94,293.62

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA


EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

CAJAS DE REGISTRO .60 X .60 X .60 M EN MEDIDAS INTERNAS,


8,01,03 CON TAPA REFORZADA EN MARCO Y CONTRAMARCO METALICO EN UND 250,540.00
ANGULOS DE ACERO.
1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CONCRETO 2.500 PSI OBRA TRITURADO M3 323,200.50 0.09 5% 30,542.45
1.02 BLOQUE CEMENTO 20X20X40 UN 1,630.00 36.00 5% 61,614.00
1.03 MORTERO 1:4 M3 305,308.50 0.04 5% 11,220.09
1.04 ACERO DE 60.000 PSI KL 3,249.80 3.00 5% 10,236.86
1.05 ACERO DE 40.000 PSI KL 3,136.50 3.00 5% 9,879.97
1.06 -
1.07 -
1.08 -
1.09 -
MAT 123,493.36
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 107,151.84 3% 3,214.56
2.02 MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.05 4,331.16
2.03 -
2.04 -
2.05 -
2.06 -
2.07 -
2.08 -
EQ. 7,545.72
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA
VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 123,493.36 10% 12,349.34
3.02 -
TTE. 12,349.34
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA AA HH 21,430.37 5.00 0% 107,151.84
4.02 -
MAN. 107,151.84

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA


EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

8,02,01 SALIDA TOMACORRIENTE DOBLE CON POLO A TIERRA 110 V UND 128,904.00

1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 ALAMBRE AISLADO # 12 AWG ML 1,600.00 19.50 5% 32,760.00
1.02 TUBERIA CONDUIT 1/2" ML 1,240.53 5.00 5% 6,512.80
1.03 CURVA 90 X 1/2" UN 564.46 2.00 5% 1,185.37
1.04 ADAPTADOR CAJA 1 /2" UN 288.73 2.00 5% 606.34
1.05 TOMA DOBLE LUMINEX 303 UN 7,000.00 1.00 5% 7,350.00
1.06 CAJA RECTANGULAR 103X60 UN 1,578.84 1.00 5% 1,657.78
1.07 CINTA AISLANTE SCOTCH 20 UN 8,500.00 0.30 5% 2,677.50
1.08 SOLDADURA LIQUIDA 1/4 GL. UN 52,747.96 0.03 5% 1,661.56
1.09 LIMPIADOR GERFOR 1/4 UN 23,067.00 0.04 5% 968.81
MAT 55,380.16
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 66,005.54 3% 1,980.17
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
2.07 -
2.08 -
EQ. 1,980.17
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA
VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 55,380.16 10% 5,538.02
3.02 -
TTE. 5,538.02
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 2.80 0% 66,005.54
4.02 -
MAN. 66,005.54

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA


EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

8,02,02 SALIDA PARA SONIDO UND 197,513.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CABLE DUPLEX POLARIZADO 2X18 ML 1,600.00 26.00 5% 43,680.00
1.02 TUBERIA EMT 3/4" ML 3,860.00 20.00 5% 81,060.00
1.03 CURVA 90 EMT 3/4" UN 1,850.00 2.00 5% 3,885.00
1.04 ADAPTADOR CAJA 3/4" UN 1,560.00 2.00 5% 3,276.00
1.05 TOMA 220V PATA TRABADA - CODELCA UN 9,300.00 1.00 5% 9,765.00
1.06 CAJA RECTANGULAR 103X60 UN 1,578.84 1.00 5% 1,657.78
1.07 CINTA AISLANTE SCOTCH 20 UN 8,500.00 0.35 5% 3,123.75
1.08 -
1.09 -
1.10 -
MAT 146,447.53
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 35,360.11 3% 1,060.80
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
2.07 -
2.08 -
EQ. 1,060.80
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA
VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 146,447.53 10% 14,644.75
3.02 -
TTE. 14,644.75
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 1.50 0% 35,360.11
4.02 -
MAN. 35,360.11

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA


EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

8,02,03 SALIDA ILUMINACION 110V UND 101,946.42


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 ALAMBRE AISLADO # 12 AWG THHN ML 1,600.00 15.00 5% 25,200.00
1.02 TUBERIA EMT 3/4" ML 3,860.00 5.00 5% 20,265.00
1.03 CURVA 90 EMT 3/4" UN 1,850.00 2.00 5% 3,885.00
1.04 ADAPTADOR CAJA 3/4" UN 1,560.00 2.00 5% 3,276.00
1.05 CAJA OCTOGONAL UN 2,450.00 1.00 5% 2,572.50
1.06 CINTA AISLANTE SCOTCH 20 UN 8,500.00 0.30 5% 2,677.50
1.07 SOLDADURA LIQUIDA 1/4 GL. UN 52,747.96 0.03 5% 1,661.56
1.08 LIMPIADOR GERFOR 1/4 UN 23,067.00 0.04 5% 968.81
MAT 60,506.37
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 34,358.65 3% 1,030.76
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
2.07 -
2.08 -
EQ. 1,030.76
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA
VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 60,506.37 10% 6,050.64
3.02 -
TTE. 6,050.64
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 1.46 0% 34,358.65
4.02 -
MAN. 34,358.65

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA


EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

8,02,04 SALIDA PARA PULSADOR REMOTO UND 118,364.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CABLE DUPLEX 2X18 AGW ML 2,100.00 10.00 5% 22,050.00
1.02 TUBERIA EMT 3/4" ML 3,860.00 5.00 5% 20,265.00
1.03 CURVA 90 EMT 3/4" UN 1,850.00 2.00 5% 3,885.00
1.04 ADAPTADOR CAJA 3/4" UN 1,560.00 2.00 5% 3,276.00
1.05 INTERRUPTOR SENCILLO GALICA UN 6,000.00 1.00 5% 6,300.00
1.06 CAJA RECTANGULAR 103X60 UN 1,578.84 1.00 5% 1,657.78
1.07 CINTA AISLANTE SCOTCH 20 UN 8,500.00 0.30 5% 2,677.50
1.08 PULSADOR UN 15,800.00 1.00 5% 16,590.00
1.09 - 5% -
MAT 76,701.28
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 33,002.77 3% 990.08
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
2.07 -
2.08 -
EQ. 990.08
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA
VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 76,701.28 10% 7,670.13
3.02 -
TTE. 7,670.13
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 1.40 0% 33,002.77
4.02 -
MAN. 33,002.77

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA


EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

PROYECTOR JETA 6, METAL HALIDE 400W, INCLUYE KIT REACTOR


8,02,05 UND 617,895.00
Y BOMBILLO MH 400W TUBULAR BASE E40.
1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
PROYECTOR JETA 6, METAL HALIDE 400W, INCLUYE KIT REACTOR
1.01 (REACTANCIA, CONDENSADOR Y ARRANCADOR) Y BOMBILLO MH 400W UN 435,000.00 1.00 5% 456,750.00
TUBULAR BASE E40.
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 456,750.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 94,293.62 3% 2,828.81
2.02 ANDAMIO TUBULAR DE 1.50*1.5 (2 CUERPOS) DIA 2,025.00 6.000 12,150.00
2.03 TABLON DE ANDAMIOS DIA 1,033.00 6.000 6,198.00
2.04 -
2.05 -
2.06 -
2.07 -
2.08 -
EQ. 21,176.81
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA
VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 456,750.00 10% 45,675.00
3.02 -
TTE. 45,675.00
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 4.00 0% 94,293.62
4.02 -
MAN. 94,293.62

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA


EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

8,03,01 TABLERO MINIPRAGMA DE 12 CIRCUITOS. UND 521,059.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 TABLERO 12 CIRCUITOS UND 325,000.00 1.00 5% 341,250.00
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
MAT 341,250.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 141,440.43 3% 4,243.21
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
2.07 -
2.08 -
EQ. 4,243.21
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA
VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 341,250.00 10% 34,125.00
3.02 -
TTE. 34,125.00
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 6.00 0% 141,440.43
4.02 -
MAN. 141,440.43

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA


EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

8,03,02 INTERRUPTOR BIPOLAR ENCHUFABLE DE 2X30A - 2X20A UND 83,658.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 AUTOMATICOS 2x30 AMPS ENCHUFABLE LUMINEX UN 43,000.00 1.00 5% 45,150.00
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
MAT 45,150.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 33,002.77 3% 990.08
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
EQ. 990.08
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA
VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 45,150.00 10% 4,515.00
3.02 -
TTE. 4,515.00
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 1.40 0% 33,002.77
4.02 -
MAN. 33,002.77

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA


EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

INTERRUPTOR MONOPOLAR ENCHUFABLE BREAKER DE 1X20A -


8,03,03 UND 56,515.00
1X15A - 1X10A ICC 10 KA.
1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 AUTOMATICOS 1x20 AMPS ATORNILLABLE LUMINEX UN 19,500.00 1.00 5% 20,475.00
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
MAT 20,475.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 33,002.77 3% 990.08
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
EQ. 990.08
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA
VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 20,475.00 10% 2,047.50
3.02 -
TTE. 2,047.50
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 1.40 0% 33,002.77
4.02 -
MAN. 33,002.77

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA


EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

8,03,04 CAJA MINIPRAGMA, DE INTERRUPTOR BOPOLAR DE 16A UND 224,686.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CAJA MINIPRAGMA, DE INTERRUPTOR BOPOLAR DE 16A UN 163,000.00 1.00 5% 171,150.00
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
MAT 171,150.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 35,360.11 3% 1,060.80
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
EQ. 1,060.80
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA
VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 171,150.00 10% 17,115.00
3.02 -
TTE. 17,115.00
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 1.50 0% 35,360.11
4.02 -
MAN. 35,360.11

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA


EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

SISTEMA DE PUESTA A TIERRA EN 5 VARILLAS COPER WELL 5/8" X


8,04,01 UND 2,121,169.00
2.40M .
1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CABLE DE COBRE DESNUDO N 2/0 ML ML 17,000.00 15.00 5% 267,750.00
1.02 VARILLAS COBRE COBRE DE 5/8 X 2,4 MTS UN 137,000.00 5.00 5% 719,250.00
1.03 SOLDADURA EXOTERMICA 90 Gr UN 15,000.00 8.00 5% 126,000.00
1.04 HIDROSOLTA KG KG 4,500.00 40.00 5% 189,000.00
1.05 CABLE DE COBRE DESNUDO N 2 ML 11,300.00 10.00 5% 118,650.00
1.06 -
1.07 -
1.08 -
MAT 1,420,650.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 542,188.33 3% 16,265.65
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
2.07 -
2.08 -
EQ. 16,265.65
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA
VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 1,420,650.00 10% 142,065.00
3.02 -
TTE. 142,065.00
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 23.00 0% 542,188.33
4.02 -
MAN. 542,188.33

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA


EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

8,04,02 CABLE COBRE #8 PARA POLO A TIERRA ML 186,932.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CABLE DE COBRE THWN No 8 AWG Ml 4,850.00 28.00 5% 142,590.00
1.02 -
1.03 ADAPTADOR TERMINAL CONDUIT DE 3/4" Un 754.00 1.00 754.00
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
MAT 143,344.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 35,360.11 3% 1,060.80
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
EQ. 1,060.80
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA
VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 143,344.00 5% 7,167.20
3.02 -
TTE. 7,167.20
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 1.50 0% 35,360.11
4.02 -
MAN. 35,360.11

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA


EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

CABLE COBRE #2/0 DESNUDO PARA CONFIGURAR SISTEMA DE


8,04,03 ML 42,682.00
APANTALLAMIENTO, MALLA A TIERRA Y EQUIPOTENCIAR
1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 CABLE DE COBRE DESNUDO N 2/0 ML ML 17,000.00 1.50 5% 26,775.00
1.02 -
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
MAT 26,775.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 14,144.04 3% 424.32
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
EQ. 424.32
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA
VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 26,775.00 5% 1,338.75
3.02 -
TTE. 1,338.75
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 0.60 0% 14,144.04
4.02 -
MAN. 14,144.04

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA


EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

8,04,04 BARRA CAPTORA PARA SISTEMA DE APANTALLAMIENTO UND 185,531.00


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 BARRA CAPTORA UN 75,000.00 1.00 5% 78,750.00
1.02 AISLADOR UN 18,600.00 1.00 5% 19,530.00
1.03 SOPORTE UN 9,500.00 1.00 5% 9,975.00
1.04 ACCESORIOS DE FIJACION UN 6,500.00 4.00 5% 27,300.00
1.05 -
1.06 -
1.07 -
1.08 -
1.09 -
MAT 135,555.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 35,360.11 3% 1,060.80
2.02 -
2.03 -
2.04 -
2.05 -
2.06 -
2.07 -
EQ. 1,060.80
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA
VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 135,555.00 10% 13,555.50
3.02 -
TTE. 13,555.50
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 1.50 0% 35,360.11
4.02 -
MAN. 35,360.11

Arq. Ren Alexander Villalba Garca


ANALISIS DE PRECIOS UNITARIOS

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA


EN EL BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

SOLDADURA TIPO CADWELD 120grs PARA EMPALMES


8,04,05 UND 40,784.00
APANTALLAMIENTO Y PUESTA A TIERRA
1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
1.01 SOLDADURA TIPO CADWELD UN 19,500.00 1.00 5% 20,475.00
1.02 MOLDES UN 5,300.00 1.00 5% 5,565.00
1.03 -
1.04 -
1.05 -
1.06 -
1.07 -
1.08 -
MAT 26,040.00
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 11,786.70 3% 353.60
2.02 PINZAS -
2.03 ENCENDEDOR -
2.04 -
2.05 -
2.06 -
EQ. 353.60
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA
VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL 26,040.00 10% 2,604.00
3.02 -
TTE. 2,604.00
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 CUADRILLA BB HH 23,573.41 0.50 0% 11,786.70
4.02 -
MAN. 11,786.70

Arq. Ren Alexander Villalba Garca


ALCALDIA MUNICIPAL DE LA JAGUA DE IBIRICO - CESAR
SECRETARIA DE PLANEACIN MUNIPAL
ANALIS DE MANO DE OBRA

ANALISIS DE MANO DE OBRA

1 SALARIOS DE MANO DE OBRA


Por ley Auxilio Transporte mensual $ 83,140 Aux. Transp. Diario $ 2,771
Salario Minimo Mensual $ 737,717 Salario Min. Diario $ 24,591

2 JORNALES DIARIOS DE MANO DE OBRA


MAESTRO DE OBRA
Salario Pacto $ 71,434
Vestido y Calzado $ 156 Jornal Total $ 71,590

OFICIAL DE CONSTRUCCIN
Salario Pacto $ 44,221
Aux. Transporte $ 2,771
Desg herramientas $ 156 Jornal Total $ 47,149

AYUDANTE DE OBRA
Salario Pacto $ 24,591
Aux. Transporte $ 2,771
Desg herramientas $ 156 Jornal Total $ 27,518
3 CALCULO DE PRESTACIONES

Prestaciones Legales Aportes Patronales Otros Aportes


Cesantias por Ley 10.98% Caja de Compensacion 4.00% Horas extras
Intereses Sobre Cesantias 1.32% Aportes SENA 2.00% Vestidos y calzados 4.09%
Vacaciones Anuales 4.11% ICBF 3.00% Seguro colectivo 0.50%
Primas Anuales 9.20% Salud, Pensin, ARP 26.10%
Fondo ind. Construccin 1.80%

Subtotal 25.61% Subtotal 36.90% Subtotal 4.59%

4 CALCULO DE DESCANSOS REMUNERADOS

Tiempo pagado y no laborado 41.49%


Mayor valor prestacional por tiempo 25.61%
TOTAL DESCANSOS REMUNERADOS 67.10%

5 CALCULO DE VALORES DE CUADRILLAS

BASES DEL CALCULO CUADRILLA AA CUADRILLA BB CUADRILLA CC CUADRILLA DD


Jornal Diario Ayudante $ 27,518 $ 27,518 $ 27,518 $ 27,518
Jornal diario Oficial $ 47,149 $ 47,149 $ 47,149 $ 47,149
Jornal total diario base $ 74,667 $ 74,667 $ 74,667 $ 74,667
Prestaciones sociales 25.61% $ 19,122 25.61% $ 19,122 25.61% $ 19,122 25.61% $ 19,122
Aportes Patronales 36.90% $ 27,552 36.90% $ 27,552 36.90% $ 27,552 36.90% $ 27,552
Otros Aportes $0 0.00% $0 0.00% $0 0.00% $0
Descansos remunerados 67.10% $ 50,102 67.10% $ 50,102 67.10% $ 50,102 67.10% $ 50,102
Incremento variables 0.00% 10.00% $ 17,144 10.00% $ 17,144 15.00% $ 25,716
TOTAL CUADRILLA POR
$ 171,442.95 $ 188,587.25 $ 188,587.25 $ 197,159.39
DIA
TOTAL CUADRILLA
$ 21,430.37 $ 23,573.41 $ 23,573.41 $ 24,644.92
HORA - HOMBRE
ANALISIS DE PRECIOS UNITARIOS
MUNICIPIO DE LA JAGUA DE IBIRICO CESAR

ANALISIS UNITARIOS BASICOS DE OBRAS (EDIFICACIONES)

ACEROS EN OBRA

1 ITEM ACERO DE 40.000 PSI KL 3,851.23


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 ACERO 40000 PSI TON KG 2,750.00 1.00 3% 2,832.50
MAT.1 ALAMBRE RECOCIDO KG 2,950.00 0.04 3% 121.54
M.O. CUADRILLA AA HH 17,943.86 0.05 0% 897.19

2 ITEM ACERO DE 60.000 PSI KL 3,954.23


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 ACERO 60000 PSI TON KG 2,850.00 1.00 3% 2,935.50
MAT.1 ALAMBRE RECOCIDO KG 2,950.00 0.04 3% 121.54
M.O. CUADRILLA AA HH 17,943.86 0.05 0% 897.19

CONCRETOS EN OBRA

3 ITEM CONCRETO 1.500 PSI OBRA TRITURADO M3 250,120.50


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CEMENTO GRIS KG 600.00 175.00 5% 110,250.00
MAT.1 ARENA M3 48,500.00 0.56 5% 28,518.00
MAT.1 AGUA LT 70.00 185.00 5% 13,597.50
MAT.1 TRITURADO M3 95,000.00 0.98 5% 97,755.00

4 ITEM CONCRETO 2.000 PSI OBRA TRITURADO M3 265,324.50


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CEMENTO GRIS KG 600.00 200.00 5% 126,000.00
MAT.1 ARENA M3 48,500.00 0.50 5% 25,462.50
MAT.1 AGUA LT 70.00 192.00 5% 14,112.00
MAT.1 TRITURADO M3 95,000.00 1.00 5% 99,750.00

5 ITEM CONCRETO 2.500 PSI OBRA TRITURADO M3 323,200.50


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CEMENTO GRIS KG 600.00 300.00 5% 189,000.00
MAT.1 ARENA M3 48,500.00 0.48 5% 24,444.00
MAT.1 AGUA LT 70.00 204.00 5% 14,994.00
MAT.1 TRITURADO M3 95,000.00 0.95 5% 94,762.50

6 ITEM CONCRETO 3.000 PSI OBRA TRITURADO M3 348,243.00


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CEMENTO GRIS KG 600.00 350.00 5% 220,500.00
MAT.1 ARENA M3 48,500.00 0.56 5% 28,518.00
MAT.1 AGUA LT 70.00 210.00 5% 15,435.00
MAT.1 TRITURADO M3 95,000.00 0.84 5% 83,790.00

7 ITEM CONCRETO 3.500 PSI OBRA TRITURADO M3 385,533.75


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CEMENTO GRIS KG 600.00 425.00 5% 267,750.00
MAT.1 ARENA M3 48,500.00 0.67 5% 34,119.75
MAT.1 AGUA LT 70.00 229.00 5% 16,831.50
MAT.1 TRITURADO M3 95,000.00 0.67 5% 66,832.50

8 ITEM CONCRETO 4.000 PSI OBRA TRITURADO M3 416,524.50


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CEMENTO GRIS KG 600.00 490.00 5% 308,700.00
MAT.1 ARENA M3 48,500.00 0.78 5% 39,721.50
MAT.1 AGUA LT 70.00 248.00 5% 18,228.00
MAT.1 TRITURADO M3 95,000.00 0.50 5% 49,875.00

9 ITEM CONCRETO 4.000 PSI OBRA TRITURADO CLASE C M3 641,434.50


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CEMENTO GRIS KG 600.00 847.00 5% 533,610.00
MAT.1 ARENA M3 48,500.00 0.78 5% 39,721.50
MAT.1 AGUA LT 70.00 248.00 5% 18,228.00
MAT.1 TRITURADO M3 95,000.00 0.50 5% 49,875.00
MORTEROS EN OBRA

16 ITEM MORTERO 1:10 M3 185,361.75


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CEMENTO GRIS KG 600.00 166.00 5% 104,580.00
MAT.1 ARENA M3 48,500.00 1.25 5% 63,656.25
MAT.1 AGUA LT 70.00 233.00 5% 17,125.50

17 ITEM MORTERO 1:12 M3 172,131.75


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CEMENTO GRIS KG 600.00 145.00 5% 91,350.00
MAT.1 ARENA M3 48,500.00 1.25 5% 63,656.25
MAT.1 AGUA LT 70.00 233.00 5% 17,125.50

18 ITEM MORTERO 1:2 M3 462,845.25


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CEMENTO GRIS KG 600.00 625.00 5% 393,750.00
MAT.1 ARENA M3 48,500.00 0.97 5% 49,397.25
MAT.1 AGUA LT 70.00 268.00 5% 19,698.00

19 ITEM MORTERO 1:3 M3 357,530.25


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CEMENTO GRIS KG 600.00 450.00 5% 283,500.00
MAT.1 ARENA M3 48,500.00 1.09 5% 55,508.25
MAT.1 AGUA LT 70.00 252.00 5% 18,522.00

20 ITEM MORTERO 1:3 IMPERMEABLE M3 437,903.00


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CEMENTO GRIS KG 600.00 450.00 5% 283,500.00
MAT.1 ARENA M3 48,500.00 1.09 5% 55,508.25
MAT.1 AGUA LT 70.00 252.00 5% 18,522.00
MAT.1 SIKA 1 KG 6,798.00 11.26 5% 80,372.75

21 ITEM MORTERO 1:4 M3 305,308.50


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CEMENTO GRIS KG 600.00 362.50 5% 228,375.00
MAT.1 ARENA M3 48,500.00 1.16 5% 59,073.00
MAT.1 AGUA LT 70.00 243.00 5% 17,860.50

22 ITEM MORTERO 1:4 IMPERMEABLE M3 370,049.25


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CEMENTO GRIS KG 600.00 362.50 5% 228,375.00
MAT.1 ARENA M3 48,500.00 1.16 5% 59,073.00
MAT.1 AGUA LT 70.00 243.00 5% 17,860.50
MAT.1 SIKA 1 KG 6,798.00 9.07 5% 64,740.75

23 ITEM MORTERO 1:5 M3 267,529.50


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CEMENTO GRIS KG 600.00 300.00 5% 189,000.00
MAT.1 ARENA M3 48,500.00 1.20 5% 61,110.00
MAT.1 AGUA LT 70.00 237.00 5% 17,419.50

24 ITEM MORTERO 1:6 M3 267,529.50


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CEMENTO GRIS KG 600.00 300.00 5% 189,000.00
MAT.1 ARENA M3 48,500.00 1.20 5% 61,110.00
MAT.1 AGUA LT 70.00 237.00 5% 17,419.50

25 ITEM MORTERO 1:6 IMPERMEABLE M3 299,785.77


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CEMENTO GRIS KG 600.00 262.50 5% 165,375.00
MAT.1 ARENA M3 48,500.00 1.20 5% 61,110.00
MAT.1 AGUA LT 70.00 233.00 5% 17,125.50
MAT.1 SIKA 1 KG 6,798.00 7.87 5% 56,175.27

26 ITEM MORTERO 1:7 M3 224,421.75


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CEMENTO GRIS KG 600.00 228.00 5% 143,640.00
MAT.1 ARENA M3 48,500.00 1.25 5% 63,656.25
MAT.1 AGUA LT 70.00 233.00 5% 17,125.50

27 ITEM MORTERO 1:8 M3 208,671.75


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CEMENTO GRIS KG 600.00 203.00 5% 127,890.00
MAT.1 ARENA M3 48,500.00 1.25 5% 63,656.25
MAT.1 AGUA LT 70.00 233.00 5% 17,125.50
FORMALETAS

28 ITEM FORMALETA DE LOSA /M2 DIA 518.45


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 TACO METLICO UND 189.00 0.40 0% 75.60
MAT.1 VIGA O CERCHA METLICA UND 189.00 0.32 0% 60.48
MAT.1 CHAZA DE MADERA UND 276.00 1.15 0% 317.40
MAT.1 DIAGONAL LARGA / CORTA UND 89.00 0.73 0% 64.97

29 ITEM FORMALETA CAJA COLUMNA UND 151,180.36


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
M.O. CUADRILLA AA HH 17,943.86 3.50 0% 62,803.50
MAT.1 TACO METLICO UND 189.00 32.00 0% 6,048.00
MAT.1 PUNTILLA 2 1/2"- 3 1/2" LB 2,168.15 3.00 5% 6,829.66
MAT.1 ABARCO 2X2X15 UND 11,600.00 3.00 5% 36,540.00
MAT.1 ABARCO 2X1X15 UND 5,104.00 1.00 5% 5,359.20
MAT.1 TABLA CATIVO 3/4" X 3.00 MTS UN 8,000.00 4.00 5% 33,600.00

30 ITEM FORMALETA VIGA /ML DIA 705.90


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 GUARDERAS EN MADERA UND 231.00 1.00 0% 231.00
MAT.1 TACO METLICO UND 189.00 0.66 0% 124.74
MAT.1 VIGA O CERCHA METLICA UND 189.00 0.66 0% 124.74
MAT.1 CHAZA DE MADERA UND 276.00 0.72 0% 198.72
MAT.1 DIAGONAL LARGA / CORTA UND 89.00 0.30 0% 26.70

31 ITEM FORMALETA MANHOLL M2 50,801.89


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
M.O. CUADRILLA AA HH 17,943.86 0.50 0% 8,971.93
MAT.1 PUNTILLA 2 1/2"- 3 1/2" LB 2,168.15 0.30 3% 669.96
MAT.1 ABARCO 2X2X15 UND 11,600.00 1.00 5% 12,180.00
MAT.1 ABARCO 4X2X15 UND 23,200.00 0.50 5% 12,180.00
MAT.1 TABLA CATIVO 3/4" X 3.00 MTS UN 8,000.00 2.00 5% 16,800.00

INSTALACIONES DE CAMPAMENTO

32 ITEM PUNTO SANITARIO 4" ECONOMICO UND 79,570.13


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 SOLDADURA LIQUIDA 1/4 GL. UN 52,747.96 0.08 5% 4,430.83
MAT.1 TUBERIA SANITARIA DE 4" ML 16,124.98 1.60 5% 27,089.97
MAT.1 CODO DE 90 X 4" CXC UN 8,164.62 1.00 5% 8,572.85
M.O. CUADRILLA BB HH 19,738.24 2.00 0% 39,476.49

33 ITEM PUNTO SANITARIO 2 ECONOMICO UND 66,776.47


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 SOLDADURA LIQUIDA 1/4 GL. UN 52,747.96 0.02 5% 1,107.71
MAT.1 TUBERIA SANITARIA DE 2" ML 7,053.21 1.50 5% 11,108.80
MAT.1 SIFON DE 2" UN 3,859.04 1.00 5% 4,051.99
MAT.1 YEE SANIT REDUCIDA 4X2 UN 14,265.84 1.00 5% 14,979.13
M.O. CUADRILLA BB HH 19,738.24 1.80 0% 35,528.84

34 ITEM PUNTO POTABLE 1/2" ECONOMICO UND 27,954.62


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 SOLDADURA LIQUIDA 1/4 GL. UN 52,747.96 0.01 5% 553.85
MAT.1 TUBERIA RDE 13.5 1/2" ML 1,515.41 2.00 5% 3,182.35
MAT.1 TEE DE 1/2" UN 449.83 0.50 5% 236.16
MAT.1 ADAPTADOR MACHO 1/2" UN 282.25 1.00 5% 296.37
M.O. CUADRILLA BB HH 19,738.24 1.20 0% 23,685.89

35 ITEM PUNTO ELECTRICO ECONOMICO UND 64,210.57


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 INTERRUPTOR SENCILLO ECONOMICO UND 5,033.08 1.00 5% 5,284.73
MAT.1 ALAMBRE AISLADO # 12 AWG ML 998.45 12.50 5% 13,104.70
MAT.1 CAJA SENCILLA 100X6 PVC UND 1,481.82 1.00 5% 1,555.91
MAT.1 CAJA OCTOGONAL 100X100 PVC UND 1,360.31 1.00 5% 1,428.32
MAT.1 SOPORTE LOZA PLAFOND UN 1,067.94 1.00 5% 1,121.34
MAT.1 TUBERIA CONDUIT 1/2" ML 1,240.53 3.00 5% 3,907.68
MAT.1 ADAPTADOR 1/2 UND 821.52 2.00 5% 1,725.19
MAT.1 SOLDADURA LIQUIDA 1/4 GL. UN 52,747.96 0.01 5% 553.85
M.O. CUADRILLA BB HH 19,738.24 1.80 0% 35,528.84

36 ITEM PUERTA ECONOMICA UND 191,221.44


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 PUERTA FORTEC I.S. 81-90 UN 54,050.68 1.00 5% 56,753.21
MAT.1 BISAGRAS 3" PALA ANCHA PAR 2,654.00 1.00 5% 2,786.70
MAT.1 MARCO DE PUERTA ECONOMICO UND 43,351.00 1.00 5% 45,518.55
MAT.1 CERRADURA NOVO A50 PD UN 25,665.00 1.00 5% 26,948.25
M.O. CUADRILLA BB HH 19,738.24 3.00 0% 59,214.73

37 ITEM JUEGO SANITARIO E. UND 333,457.93


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 LAVAMANOS ACUACER UN 87,715.00 1.00 5% 92,100.75
MAT.1 CEMENTO BLANCO KG 1,175.00 3.00 5% 3,701.25
MAT.1 SANITARIO ACUACER BCO UND 169,944.00 1.00 5% 178,441.20
M.O. CUADRILLA BB HH 19,738.24 3.00 0% 59,214.73

38 ITEM CUBIERTA BASICA M2 31,214.96


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 TEJA PLACA NO.4 UN 17,627.89 1.00 5% 18,509.29
MAT.1 GANCHO GALVANIZADO 150 UN 740.50 2.25 5% 1,749.43
MAT.1 PUNTILLA 2 1/2"- 3 1/2" LB 2,168.15 0.80 5% 1,821.24
MAT.1 ABARCO 2X2X15 UND 11,600.00 0.75 5% 9,135.00

CAPITULO CONCRETOS:

39 ITEM CONCRETO DE 3.000 PSI NORMAL M3 360,432.23


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CONCRETO 3.000 PSI OBRA TRITURADO M3 273,351.40 1.00 5% 287,018.97
EQ. CHAZA DE MADERA DIA 196.50 12.00 0% 2,358.00
EQ. VIBRADOR ELCTRICO DE CONCRETO CON OPERADOR DIA 85,613.62 0.10 0% 8,561.36
EQ. MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.10 0% 8,662.32
M.O. CUADRILLA AA HH 17,943.86 3.00 0% 53,831.57

40 ITEM CONCRETO DE 2.500 PSI NORMAL M3 338,400.23


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CONCRETO 2.500 PSI OBRA TRITURADO M3 252,368.55 1.00 5% 264,986.98
EQ. CHAZA DE MADERA DIA 196.50 12.00 0% 2,358.00
EQ. VIBRADOR ELCTRICO DE CONCRETO CON OPERADOR DIA 85,613.62 0.10 0% 8,561.36
EQ. MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.10 0% 8,662.32
M.O. CUADRILLA AA HH 17,943.86 3.00 0% 53,831.57

41 ITEM CONCRETO DE 3.500 PSI NORMAL M3 392,780.95


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CONCRETO 3.500 PSI OBRA TRITURADO M3 304,159.71 1.00 5% 319,367.70
EQ. CHAZA DE MADERA DIA 196.50 12.00 0% 2,358.00
EQ. VIBRADOR ELCTRICO DE CONCRETO CON OPERADOR DIA 85,613.62 0.10 0% 8,561.36
EQ. MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.10 0% 8,662.32
M.O. CUADRILLA AA HH 17,943.86 3.00 0% 53,831.57

42 ITEM CONCRETO CICLOPEO 70% 3.000 PSI NORMAL M3 282,945.02


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CONCRETO 3.000 PSI OBRA TRITURADO M3 273,351.40 0.70 5% 200,913.28
MAT.1 PIEDRA CIMIENTO M3 34,846.00 0.30 5% 10,976.49
EQ. VIBRADOR ELCTRICO DE CONCRETO CON OPERADOR DIA 85,613.62 0.10 0% 8,561.36
EQ. MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.10 0% 8,662.32
M.O. CUADRILLA AA HH 17,943.86 3.00 0% 53,831.57

43 ITEM CONCRETO CICLOPEO 30% 3.000 PSI NORMAL M3 182,772.76


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CONCRETO 3.000 PSI OBRA TRITURADO M3 273,351.40 0.30 5% 86,105.69
MAT.1 PIEDRA CIMIENTO M3 34,846.00 0.70 5% 25,611.81
EQ. VIBRADOR ELCTRICO DE CONCRETO CON OPERADOR DIA 85,613.62 0.10 0% 8,561.36
EQ. MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.10 0% 8,662.32
M.O. CUADRILLA AA HH 17,943.86 3.00 0% 53,831.57

45 ITEM CONCRETO CICLOPEO 50% 3.000 PSI NORMAL M3 232,858.89


CODIGO DESCRIPCION UND VALOR UNITARIO CANTIDAD D. % VALOR PARCIAL
MAT.1 CONCRETO 3.000 PSI OBRA TRITURADO M3 273,351.40 0.50 5% 143,509.49
MAT.1 PIEDRA CIMIENTO M3 34,846.00 0.50 5% 18,294.15
EQ. VIBRADOR ELCTRICO DE CONCRETO CON OPERADOR DIA 85,613.62 0.10 0% 8,561.36
EQ. MEZCLADORA CON OPER. 9 P3 DIA 86,623.21 0.10 0% 8,662.32
M.O. CUADRILLA AA HH 17,943.86 3.00 0% 53,831.57

46 ITEM CONCRETO PRE DE 4.000 PSI M3 462,625.68


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
MAT.1 TRITURADO M3 95,000.00 0.500 5% 49,875.00
#VALUE! AGUA (VIAS) LT 20.00 248.000 5% 5,208.00
#VALUE! ARENA DE TRITURACIN M3 32,118.00 0.780 5% 26,304.64
MAT.1 CEMENTO GRIS KG 600.00 490.000 5% 308,700.00
#VALUE! -
MAT 390,087.64
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 35,348.21 10.00% 3,534.82
2.02 MEZCLADORA DE CONCRETO 1 BULTO $/HORA 10,925.00 0.500 0% 5,462.50
2.03 -
2.04 -
2.05 -
2.06 -
EQ. 8,997.32
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL M3-KM 895.00 30.000 1.1 28,192.50
3.02 -
TTE. 28,192.50
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 OBRERO (10) DIA 488,928.57 0.063 0% 30,558.04
4.02 OFICIAL (1) DIA 76,642.86 0.063 0% 4,790.18
MAN. 35,348.21
47 ITEM CONCRETO PRE DE 3.500 PSI M3 424,457.11
1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
MAT.1 TRITURADO M3 95,000.00 0.670 5% 66,832.50
#VALUE! AGUA (VIAS) LT 20.00 229.000 5% 4,809.00
#VALUE! ARENA DE TRITURACIN M3 32,118.00 0.670 5% 22,595.01
MAT.1 CEMENTO GRIS KG 600.00 425.000 5% 267,750.00
#VALUE! -
MAT 361,986.51
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 26,196.00 10.00% 2,619.60
2.02 MEZCLADORA DE CONCRETO 1 BULTO $/HORA 10,925.00 0.500 0% 5,462.50
2.03 -
2.04 -
2.05 -
2.06 -
2.07 -
2.08 -
EQ. 8,082.10
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL M3-KM 895.00 30.000 1.1 28,192.50
3.02 -
TTE. 28,192.50
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 OBRERO (8) DIA 391,142.86 0.056 0% 21,904.00
4.02 OFICIAL (1) DIA 76,642.86 0.056 0% 4,292.00
MAN. 26,196.00

48 ITEM CONCRETO PRE DE 3.000 PSI M3 387,928.30


1.00 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
MAT.1 TRITURADO M3 95,000.00 0.840 2% 81,396.00
#VALUE! AGUA (VIAS) LT 20.00 210.000 2% 4,284.00
#VALUE! ARENA DE TRITURACIN M3 32,118.00 0.560 2% 18,345.80
MAT.1 CEMENTO GRIS KG 600.00 350.000 5% 220,500.00
#VALUE! -
MAT 324,525.80
2.00 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 18,500.00 10.00% 1,850.00
2.02 MEZCLADORA DE CONCRETO 1 BULTO $/HORA 10,925.00 0.500 0% 5,462.50
2.03 -
2.04 -
2.05 -
2.06 -
2.07 -
2.08 -
EQ. 7,312.50
3.00 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIA VOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL M3-KM 895.00 30.000 0.6 14,767.50
3.02 TARIFA DE TRANSPORTE (AGREGADOS PTREOS) M3-KM 895.00 30.000 0.85 22,822.50
TTE. 37,590.00
4.00 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 OBRERO (6) DIA 293,357.14 0.050 0% 14,667.86
4.02 OFICIAL (1) DIA 76,642.86 0.050 0% 3,832.14
MAN. 18,500.00

CODIGO CUADRILLA ELCTRICA EN CALIENTE HORA 118,750.00 98,750.00


1 MATERIALES UNIDAD VR. UNITARIO CANTIDAD VALOR PARCIAL
1.01 0
1.02 0
1.03 0
S.M. 0
2 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD VALOR PARCIAL
2.01
2.02
S.E. 0
3 MANO DE O BRA UNIDAD VR. UNITARIO CANTIDAD VALOR PARCIAL
3.01 ELECTRICISTA (LINIERO 1 - CUADRILLA EN CALIENTE ) HH 30,000.00 1.00 30,000.00
3.02 ELECTRICISTA (LINIERO 2 - CUADRILLA EN CALIENTE ) HH 25,000.00 1.00 25,000.00
3.03 CAPATAZ-TCNICO ELECTRICISTA HH 18,750.00 1.00 18,750.00
3.04 INGENIERO ELECTRICISTA HH 45,000.00 1.00 45,000.00
3.05 -
3.06 -
S.O. ###

CODIGO CUDRILLA DE REDES ELECTRICAS HORA 109,375.00 72,500.00


1 MATERIALES UNIDAD VR. UNITARIO CANTIDAD VALOR PARCIAL
1.01 -
1.02 -
1.03 -
S.M. -
2 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD VALOR PARCIAL
2.01
2.02
S.E. -
3 MAN O D E O B RA UNIDAD VR. UNITARIO CANTIDAD VALOR PARCIAL
3.01 ELECTRICISTA (LINIERO 1 - CUADRILLA EN CALIENTE ) HH 30,000.00 1.00 30,000.00
3.02 ELECTRICISTA (LINIERO 2 - CUADRILLA EN CALIENTE ) HH 25,000.00 1.00 25,000.00
3.03 CAPATAZ-TCNICO ELECTRICISTA HH 18,750.00 0.50 9,375.00
3.04 INGENIERO ELECTRICISTA HH 45,000.00 1.00 45,000.00
3.05 -
3.06 -
S.O. ###

ITEM CONCRETO CLASE F (140 kg/cm2 2000 PSI) VIAL M3 328,284.44


1 MATERIALES UNIDAD VR. UNITARIO CANTIDAD DESP. (%) VR. PARCIAL
MAT.1 TRITURADO M3 95,000.00 1.000 5% 99,750.00
1.02 AGUA (VIAS) LT 20.00 192.000 5% 4,032.00
1.03 ARENA LAVADA M3 27,976.00 0.500 5% 14,687.40
MAT.1 CEMENTO GRIS KG 600.00 200.000 5% 126,000.00
1.05 -
MAT 244,469.40
2 EQUIPOS UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
2.01 HERRAMIENTA MENOR % 35,348.21 0.10 3,534.82
2.02 MEZCLADORA DE CONCRETO 1 BULTO $/HORA 10,925.00 0.50 0 5,462.50
2.03 -
2.04 -
2.05 -
2.06 -
2.07 -
2.08 -
EQ. 8,997.32
3 TRANSPORTE DE MATERIAL, EQUIPOS UND TARIFA DISTANCIAVOL. PESO CANT. VALOR-UNIT.
3.01 TRANSPORTE DE MATERIAL M3-KM 895.00 30.00 0.84 22,554.00
3.02 TARIFA DE TRANSPORTE (AGREGADOS PTREOS) M3-KM 895.00 30.00 0.63 16,915.50
TTE. 39,469.50
4 MANO DE OBRA UNIDAD VR. UNITARIO CANTIDAD FACTOR (%) VR. PARCIAL
4.01 OBRERO (10) DIA 488,928.57 0.06 0 30,558.04
4.02 OFICIAL (1) DIA 76,642.86 0.06 0 4,790.18
MAN. 35,348.21
CANTIDADES DE OBRA

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA EN EL


BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

1 PRELIMINARES

CERRAMIENTO PROVISIONAL CON LISTONES DE MADERA Y


1,01 M2 = 300.00
TELA VERDE DE PROPILENO

DESCRIPCION L (X) L(Y) H AREA VOLUMEN


PERIMETRO DEL PROYECTO 120.00 1.00 2.50 300.00

RETIRO DE ESCOMBROS Y DISPOSICIN FINAL EN BOTADERO


1,02 M3 = 49.00
AUTORIZADO

DESCRIPCION CANT. M3 VOLUMEN


VOLQUETA DE 7M3 7.00 7.00 49.00

1,03 DESCAPOTE A MAQUINA H<0.30 M2 = 450.00

DESCRIPCION L (X) L(Y) H AREA VOLUMEN


GRAFICO ACAD 450.00 1.00 1.00 450.00

1,04 LOCALIZACION Y REPLANTEO CON EQUIPO DE TOPOGRAFIA M2 = 850.00

DESCRIPCION L (X) L(Y) H AREA VOLUMEN


GRAFICO ACAD 850.00 1.00 1.00 850.00
CANTIDADES DE OBRA

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA EN EL


BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

1,05 CONSTRUCCION DE CASETA EN MADERA PARA DEPOSITO UND = 1.00

DESCRIPCION CANT. TOTAL


CASETA 1.00 1.00

1,06 REMOCION Y PODA DE ARBOLES UND = 1.00

DESCRIPCION CANT. TOTAL


PODA DE ARBOLES 1.00 1.00

1,07 ACOMETIDA PROVICIONAL ELECTRICA UND = 1.00

DESCRIPCION CANT. TOTAL


ACOMETIDA PROVICIONAL ELECTRICA 1.00 1.00

1,08 ACOMETIDA PROVICIONAL ACUEDUCTO UND = 1.00

DESCRIPCION CANT. TOTAL


ACOMETIDA PROVICIONAL ACUEDUCTO 1.00 1.00

2 EXCAVACION, EXPLANACION Y RELLENO

2,01 EXPLANACION MECANICA M3 = 107.00

DESCRIPCION L (X) L(Y) H AREA VOLUMEN


EXPLANACION MECANICA 900.00 0.1188889 1.00 107.00

2,02 EXCAVACION MANUAL PARA ZAPATAS Y PROTECTOR DE ARBOL M3 = 50.00

DESCRIPCION L (X) L(Y) H CANT. VOLUMEN


ZAPATAS 3.00 3.00 0.6944444 8.00 50.00

2,03 EXCAVACION MANUAL PARA CICLOPEO Y VIGAS DE AMARRE ML = 190.00

DESCRIPCION L(X) CANT. TOTAL


VIGAS DE AMARRE 80.00 2.00 160.00
CICLOPEO 30.00 1.00 30.00

2,04 EXCAVACION MANUAL PARA BORDILLOS Y ANDENES ML = 200.00

DESCRIPCION L(X) CANT. TOTAL


BORDILLOS Y ANDENES 200.00 1.00 200.00

2,05 RELLENO BASE GRANULAR B-400 PROCTOR 95% M3 = 125.00


CANTIDADES DE OBRA

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA EN EL


BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

DESCRIPCION L (X) L(Y) H CANT. VOLUMEN


RELLENO BASE GRANULAR B-400 PROCTOR 95% 35.00 35.7143 0.10 1.00 125.00

3 CONCRETOS

3,01 CONCRETO CICLOPEO ML = 85.00

DESCRIPCION L (X) L(Y) H AREA LONG.


EJE A (1-4) 42.50 1.00 42.50
EJE B (1-4) 42.50 1.00 42.50

3,02 SOLADOS CONCRETO 2500 PSI e=0,05 M2 = 65.00

DESCRIPCION L (X) L(Y) H AREA VOLUMEN


EJE A (1-4) 40.00 0.05 1.00 2.00
EJE B (1-4) 40.00 0.05 1.00 2.00
EJE B (1-4) 7.00 8.7143 1.00 61.00

3,03 CONCRETO DE 3500 PSI PARA ZAPATAS M3 = 32.40

DESCRIPCION L (X) L(Y) H CANT. VOLUMEN


ZAPATA TIPO 3.00 3.00 0.45 8 32.40

3,04 CONCRETO DE 3500 PSI PARA VIGAS DE AMARRE ML = 85.00

DESCRIPCION L (X) L(Y) H AREA LONG.


EJE A (1-4) 42.50 1.00 42.50
EJE B (1-4) 42.50 1.00 42.50

3,05 CONCRETO DE 4000 PSI PARA COLUMNA DE 0,60 X 0,60-1,20m ML = 49.80

DESCRIPCION L (X) L(Y) H CANT. LONG.


COLUMNA TIPO 6.23 8 49.80

3,06 CONCRETO DE 3000 PSI PARA VIGAS AEREAS ML = 54.00

DESCRIPCION L (X) L(Y) H CANT. LONG.


EJE A (1-4) 27.00 1 27.00
EJE B (1-4) 27.00 1 27.00

3,07 CONCRETO DE 3000 PSI PARA CONTRAPISO e=0,10m M2 = 900.00

DESCRIPCION L (X) L(Y) H AREA VOLUMEN


AREA DE LA CANCHA 27.50 32.727273 900.00

3,08 CONCRETO DE 3000 PSI PARA LOZA GRADERIA e=0,20m M2 = 42.06

DESCRIPCION L (X) L(Y) H AREA VOLUMEN


AREA DE LA CANCHA 15.00 2.804 42.06
CANTIDADES DE OBRA

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA EN EL


BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

3,09 DILATACIONES CON POLIESTILENO Y SELLO ELASTICO ML = 20.80

DESCRIPCION L (X) L(Y) H CANT. LONG.


DILATACIONES 20.80 1 20.80

3,10 CONCRETO DE 3000 PSI PARA GRADERIAS e=0,10m M2 = 58.40

DESCRIPCION L (X) L(Y) H AREA VOLUMEN


AREA DE GRADERIAS 14.60 4.000 58.40

3,11 CONCRETO DE 3000 PSI PARA ESCALERAS e=0,07m M2 = 19.98

DESCRIPCION L (X) L(Y) H AREA VOLUMEN


AREA DE ESCALERAS 3.33 6.000 19.98

3,12 CONCRETO DE 2500 PSI PARA CAUELAS 0,25 X 0,60m r=0,21m ML = 66.00

DESCRIPCION L (X) L(Y) H CANT. LONG.


CAUELAS 66.00 1 66.00

3,13 CONCRETO DE 3000 PSI PARA MUROSPANTALLA e=0,15m M2 = 31.40

DESCRIPCION L (X) L(Y) H AREA VOLUMEN


MUROS PANTALLA 15.00 2.093 31.40

4 MAMPOSTERIA

4,01 MURO EN BLOQUE ESTRUCTURAL M2 = 64.64

DESCRIPCION L (X) L(Y) H AREA VOLUMEN


AREA DE GRADERIAS 1.60 40.400 64.64
CANTIDADES DE OBRA

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA EN EL


BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

5 ACEROS

5,01 ACERO REFUERZO 60000 PSI KG = 10900.00

BARRA DESCRIPCION L(X) CANT. MASA(kg/m) ELEMENTOS SUBTOTAL


#4 ZAPATAS TIPO 3.00 29.00 0.99 8 689.04
#5 ZAPATAS TIPO 3.00 29.00 1.55 8 1078.80

#3 VIGAS DE CIMENTACION - ESTRIBOS 72.00 0.85 0.56 2 68.54


#3 VIGAS DE CIMENTACION - ESTRIBOS 120.00 2.80 0.56 2 376.32
#6 VIGAS DE CIMENTACION - LONG. 6.00 28.00 2.24 2 752.64

#3 COLUMNAS - ESTRIBOS 3.20 29.00 0.56 8 415.74


#3 COLUMNAS - ESTRIBOS 0.6981 124.00 0.56 8 387.83
#3 COLUMNAS - ESTRIBOS 1.00 41.00 0.56 8 183.68
#5 COLUMNAS - LONGITUDINALES 6.865 17.00 1.55 8 1447.14
#6 COLUMNAS - LONGITUDINALES 6.865 21.00 2.24 8 2583.44

#3 VIGAS DE AEREA - ESTRIBOS 1.20 130.00 0.56 2 174.72


#5 VIGAS DE AEREA - LONGITUDINALES 25.00 6.00 1.55 2 465.00

#3 GRADERIAS - HORIZ. - ZIGZAG 4.00 22.00 0.56 4 197.12


#3 GRADERIAS - HORIZ. - LONG. 4.00 9.00 0.56 4 80.64
#3 GRADERIAS - HORIZ. - ESTRIBOS 1.12 23.00 0.56 4 57.70
#3 GRADERIAS - HORIZ. - ESTRIBOS 1.72 23.00 0.56 4 88.61
#4 GRADERIAS - HORIZ. - LONG. 4.50 6.00 0.99 4 106.92
#5 GRADERIAS - HORIZ. - LONG. 4.50 12.00 1.55 4 334.80
#4 GRADERIAS - VERTICALES - ESTRIBOS 1.45 3.00 0.99 4 17.23
#4 GRADERIAS - VERTICALES - ESTRIBOS 2.65 3.00 0.99 4 31.48
#4 GRADERIAS - VERTICALES - ESTRIBOS 2.65 2.00 0.99 4 20.99
#5 GRADERIAS - VERTICALES - LONG. 1.20 7.00 1.55 4 52.08
#3 GRADERIAS - BASE - LONGITUDINALES 5.20 21.00 0.56 4 244.61
#3 GRADERIAS - BASE - LONGITUDINALES 5.20 21.00 0.56 4 244.61
#4 GRADERIAS - BASE - LONGITUDINALES 3.35 13.00 0.99 4 172.46
#4 GRADERIAS - BASE - LONGITUDINALES 3.35 13.00 0.99 4 172.46
#4 GRADERIAS - DOBELAS 2.50 46.00 0.99 4 455.40
REPETICION DEL ELEMENTO

5,02 MALLA ELECTROSOLDADA M2 = 830.00

DESCRIPCION L (X) L(Y) H AREA VOLUMEN


AREA DE GRADERIAS 27.00 30.741 830.00
CANTIDADES DE OBRA

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA EN EL


BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

6 CUBIERTAS

6,01 TEJA ARQUITECTONICA CURVA CAL 26 M2 = 957.00

DESCRIPCION L (X) L(Y) H AREA VOLUMEN


TEJA ARQUITECTONICA CURVA CAL 26 29.00 33.000 957.00

6,02 ESTRUCTURA METALICA SEGN DISEO ESTRUCTURAL KG = 7950.01

DESCRIPCION L(X) CANT. MASA(kg/m) ELEMENTOS SUBTOTAL


CERCHA - ANGULO 4" x " 19.00 2.00 14.58 4 2216.16
CERCHA - ANGULO 4" x " 23.00 2.00 9.82 4 1806.88
CERCHA - ANGULO 3" x " 10.07 2.00 7.29 4 587.28
CERCHA - ANGULO 2" x " 104.50 1.00 3.63 4 1517.34

CELOSIA - ANGULO 2" x " 4.00 9.00 4.74 6 1023.84


CELOSIA - ANGULO 1" x " 16.40 2.00 2.68 6 527.42

TENSOR - VARILLA " 30.00 6.00 0.56 1 100.80

CORTAVIENTOS - VARILLA " 4.00 43.00 0.99 1 170.28


CANTIDADES DE OBRA

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA EN EL


BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

6.03 CORREAS TIPO PHR KG = 6100.00

DESCRIPCION L(X) CANT. MASA(kg/m) ELEMENTOS SUBTOTAL


PHR 305x80x1,5 32.52986 16.00 11.72 1 6100.00

6.04 CANAL GALVANIZADO CALIBRE 20 DESARROLLO 2,00-2,500m ML = 59.00

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


CANAL GALVANIZADO 59.00 1 59.00

7 INSTALACIONES HIDROSANITARIAS

7.01 COLECTOR AGUAS LLUVIAS DE 6" PVC ML = 45.00

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


COLECTOR AGUAS LLUVIAS DE 6" PVC 45.00 1 45.00

7.02 BAJANTE AGUAS LLUVIAS EN 4" PVC ML = 48.00

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


BAJANTE AGUAS LLUVIAS EN 4" PVC 48.00 1 48.00

7.03 CAJA DE INSPECCION DE 60x60x90 cm UND = 2.00

DESCRIPCION L (X) L(Y) H CANT. LONG.


CAJA DE INSPECCION DE 60x60x90 cm 2 2.00

8 INSTALACIONES ELECTRICAS
CANTIDADES DE OBRA

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA EN EL


BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

ACOMETIDA EN CONDUCTOR DE CU 2C # 8 + 1C #8 + 1C # 10
8,01,01 ML = 40.00
AWG THNW/THWN 1" PVC

DESCRIPCION L (X) L(Y) H CANT. LONG.


ACOMETIDA EN CONDUCTOR DE CU 2C # 8 + 1C #8 +
40.00 1 40.00
1C # 10 AWG THNW/THWN 1" PVC

8,01,02 ESTRUCTURA DE PROTECCIONES TRIFASICA UND = 1.00

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


ESTRUCTURA DE PROTECCIONES TRIFASICA 1 1.00

CAJAS DE REGISTRO .60 X .60 X .60 M EN MEDIDAS INTERNAS,


8,01,03 CON TAPA REFORZADA EN MARCO Y CONTRAMARCO METALICO UND = 5.00
EN ANGULOS DE ACERO.

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


CAJA DE REGISTRO 5 5.00

8,02,01 SALIDA TOMACORRIENTE DOBLE CON POLO A TIERRA 110 V UND = 2.00

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


SALIDA TOMACORRIENTE DOBLE CON POLO A
2 2.00
TIERRA 110 V

8,02,02 SALIDA PARA SONIDO UND = 5.00

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


SALIDA PARA SONIDO 5 5.00

8,02,03 SALIDA ILUMINACION 110V UND = 12.00

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


SALIDA ILUMINACION 110V 12 12.00

8,02,04 SALIDA PARA PULSADOR REMOTO UND = 4.00

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


SALIDA PARA PULSADOR REMOTO 4 4.00

PROYECTOR JETA 6, METAL HALIDE 400W, INCLUYE KIT


8,02,05 UND = 12.00
REACTOR Y BOMBILLO MH 400W TUBULAR BASE E40.

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


PROYECTOR JETA 12 12.00

8,03,01 TABLERO MINIPRAGMA DE 12 CIRCUITOS. UND = 1.00

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


TABLERO MINIPRAGMA DE 12 CIRCUITOS. 1 1.00
CANTIDADES DE OBRA

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA EN EL


BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

8,03,02 INTERRUPTOR BIPOLAR ENCHUFABLE DE 2X30A - 2X20A UND = 4.00

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


INTERRUPTOR BIPOLAR ENCHUFABLE DE 2X30A -
4 4.00
2X20A

INTERRUPTOR MONOPOLAR ENCHUFABLE BREAKER DE 1X20A -


8,03,03 UND = 6.00
1X15A - 1X10A ICC 10 KA.

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


INTERRUPTOR MONOPOLAR ENCHUFABLE
6 6.00
BREAKER DE 1X20A - 1X15A - 1X10A ICC 10 KA.

8,03,04 CAJA MINIPRAGMA, DE INTERRUPTOR BOPOLAR DE 16A UND = 4.00

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


CAJA MINIPRAGMA, DE INTERRUPTOR BOPOLAR DE
4 4.00
16A

SISTEMA DE PUESTA A TIERRA EN 5 VARILLAS COPER WELL 5/8"


8,04,01 UND = 1.00
X 2.40M .

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


SISTEMA DE PUESTA A TIERRA EN 5 VARILLAS
1 1.00
COPER WELL 5/8" X 2.40M .

8,04,02 CABLE COBRE #8 PARA POLO A TIERRA ML = 8.00

DESCRIPCION L (X) L(Y) H CANT. LONG.


CABLE COBRE #8 PARA POLO A TIERRA 8.00 1 8.00

CABLE COBRE #2/0 DESNUDO PARA CONFIGURAR SISTEMA DE


8,04,03 ML = 100.00
APANTALLAMIENTO, MALLA A TIERRA Y EQUIPOTENCIAR

DESCRIPCION L (X) L(Y) H CANT. LONG.


CABLE COBRE #2/0 DESNUDO PARA CONFIGURAR
SISTEMA DE APANTALLAMIENTO, MALLA A TIERRA Y 100.00 1 100.00
EQUIPOTENCIAR

8,04,04 PUNTA CAPTADORA PARA SISTEMA DE APANTALLAMIENTO UND = 25.00

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


PUNTA CAPTADORA PARA SISTEMA DE
25 25.00
APANTALLAMIENTO

SOLDADURA TIPO CADWELD 120grs PARA EMPALMES


8,04,05 UND = 15.00
APANTALLAMIENTO Y PUESTA A TIERRA
DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL
SOLDADURA TIPO CADWELD 120grs PARA
15 15.00
EMPALMES APANTALLAMIENTO Y PUESTA A TIERRA
CANTIDADES DE OBRA

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA EN EL


BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

9 DOTACION Y CARPINTERIA METALICA

9.01 ARCOS DE CANCHAS DE MICROFUTBOL UND = 2.00

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


ARCOS DE CANCHAS DE MICROFUTBOL 2 2.00

9.02 PARALES DE VOLEIBOL JGO = 1.00

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


PARALES DE VOLEIBOL 1 1.00

9.03 ESTRUCTURA DE BALONCESTO CON TABLERO Y CANASTA UND = 2.00

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


ESTRUCTURA DE BALONCESTO CON TABLERO Y
2 2.00
CANASTA

9.04 CERRAMIENTO CONTRA IMPACTO h=5,00m ML = 29.298

DESCRIPCION L (X) L(Y) H CANT. LONG.


COSTADO NORTE 14.65 1 14.65
COSTADO SUR 14.65 1 14.65

9.05 PASAMANOS METALICO ML = 10.00

DESCRIPCION L (X) L(Y) H CANT. LONG.


EN GRADERIAS 10.00 1 10.00
CANTIDADES DE OBRA

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA EN EL


BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

9.06 CINTA ANTIDESLIZANTE PARA ESCALERA ML = 4.80

DESCRIPCION L (X) L(Y) H CANT. LONG.


EN GRADERIAS 0.32000 15 4.80

10 PINTURA

10.01 DEMARCACION CANCHA DE MICROFUTBOL UND = 1.00

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


DEMARCACION CANCHA DE MICROFUTBOL 1 1.00

10.02 DEMARCACION CANCHA DE BALONCESTO UND = 1.00

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


DEMARCACION CANCHA DE BALONCESTO 1 1.00

10.03 DEMARCACION CANCHA DE VOLEIBOL UND = 1.00

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


DEMARCACION CANCHA DE VOLEIBOL 1 1.00

10.04 PINTURA PARA ESTRUCTURA METALICA ESMALTE TIPO I KG = 14050.00

DESCRIPCION L (X) L(Y) H CANT. SUBTOTAL


ESTRUCTURA METALICA SEGN DISEO
7950 7950.00
ESTRUCTURAL
CORREAS TIPO PHR 6100 6100.00
CANTIDADES DE OBRA

CONSTRUCCIN Y DOTACION DE PLACA POLIDEPORTIVA CUBIERTA EN EL


BARRIO MANANTIAL DEL MUNICIPIO EL MOLINO - GUAJIRA

Elaboro:

Arq. RENE ALEXANDER VILLALBA GARCIA