Daily Report

Project Name: KBK Project


Project Code: 03 YG 00400 Report Date : 23-Jun-2017 Friday No. of Day 693 Report No. DPR-387
Project Start Date 2015-8-1 Contract Period 458 Calendar Day AM PM Fine
Weather
Estimate Completion Date 2016-10-31 Remain Period (235) Calendar Day 6~8 8~10 10 ~12 13~15 15~17 17~19 Rain
Work Force
M&E Site Office General Crane Crane
Trades PM PE SAE Site Engr QA/QC QS Admin Safety Security Surveyor Geotech Welder Steel Worker
engineer Store Staff Workers Operator Helper
Today 1 1 1 1 1 1 1 3 1 2 4 10
Helper Manson Steel
Trades M&E Operator (ACP) Manson Carpenter Total
(ACP) worker Supervisior
Today 1 2 30
Machine & Equipments onsite
Description previous Today Cum. Remarks Description previous Today Cum. Remarks Description previous Today Cum. Remarks
25 Ton Crane 1 1 1 1.5 Hp Submer; pump 4 4 4 19KW Welding Box 6 6 6
Sheet pile machine 0 0 0 1 Hp Motor pump 1 1 1 60 KVA generator 1 1 1
3"x3" Air Compressor 1 1 1 1.5 Hp Motor pump 1 1 1
165 KVA Generator 1 1 1 2Hp Pressure pump 0 0 0
Material Delivery On Site
Quantity Quantity Quantity
Description Unit Description Unit Description Unit Remarks
Today Total Today Total Today Total

FO-OP-01 REV-00 Page: 1/2


Daily Report

Project Name: KBK Project


QC - Test Sampling
Item Remarks

Test
Sample
Taken

LTI Free Day UA,UC Near Miss FAI MTC LTA Daily TBT
HSE Conducted By
Safety Officer
Works Carried out Details
Trades Of Work Location Remark
1 Install decking sheet at 1st floor At grid (B-C)
2 Install main beam at 2nd to 4th floor At grid (A)
3 Tightening bolt & nuts at 1st and 2nd Floor At grid (A-B)
4 Welding work at deck sheet at 1st floor At grid (B-C)
5 Pump water at passenger lift and car lift area
6 Removed unnecessary materials from site
7 Housekeeping work
8 25 Trace departed from site
Special Event

Visitors Site
Purpose
on site Instruction

Project Manager Project Engineer Prepare By: Site Engineer


Name U Khin Maung Myint Name Name Aye Wit Yee Soe
Signature Signature Signature

FO-OP-01 REV-00 Page: 2/2


KBK Project
Site Progress Photo
Date: 23.06.2017

Decking sheet installation work at 1st floor, grid B-C

Removed unnecessary materials from site


Steel structure installation work at 1st & 2nd floor, grid A-B