You are on page 1of 6

RESUMÉ

PERSONAL INFORMATION

Name: Marcos Horacio Ugarte


Address: Echeverria 1200 – Talar del Lago I
Gral Pacheco – Buenos Aires
Argentina (CP 1617)
Home Number: (54-11) 4101- 4954
Cell Number: (54-9-11) 3212-4791

EDUCATION

• Graduated as Industrial Engineer from Instituto Tecnológico de Buenos Aires


(I.T.B.A.) (1993 - 1997).
• High School: Champagnat School (1988 – 1992).
• Primary School: Champagnat School (1981 – 1987).

FOREIGN LANGUAGES

• English advanced.

TRAINING AND OTHER COURSES

• Oracle Financials: E-Procurement (2001).


• Accelerated SAP Methodology and Toolset (2001).
• E-Commerce internal courses (Business to Business and Banking and Finance)
(2000).
• SAP R/3 Certificate: BC400 – ABAP Development Workbench, SAP Argentina
(1999).
• SAP Partner Academy SAP R/3: Planning and Production (PP) module Certificate
(1998).
• JDEdwards’ Commercial module courses (1998).

OTHER ACTIVITIES
• Mathematics, Physics and Chemistry Private Teacher (1988 – 1997).
• Marian National Mathematics Olympic winner in the years 1990, 1991 and 1992.
PROFESIONAL EXPERIENCE

Marcos is a professional with experience in data system development and application,


related to Business Process Reengineering in organizations of great magnitude, having
taken part in several project groups. Has sound knowledge in functional fields, specially
Production, Quality Management and Materials Management and experience in diverse
companies working on the different industrial, commercial and service fields:
Chemical/Pharmaceutical, Massive Consume/Food, Beverages and Retail and
Industrial/Fuels, Lubricants and Metallurgic. Marcos has graduated as Industrial
Engineer.

CONSULTING2B SRL (since March 2002)

• SCJohnson (since December 2009) . Massive Consume, located in Buenos Aires,


Argentina and Asia (Vietnam).
SAP ECC 5.0 and APO 5.0 – Senior Consultant, Process Team Leader for Asia
Region. Responsible for the implementation of the rollout of a Corporate Template
for the FTS Process (including PP, QM, MM, WM and APO-DP/SNP/PPDS).
Implementing a Global Template this Template is finishing the implementation
around the world, and one of the last Waves includes Vietnam, Philippines,
Singapore, Malaysia and Thailand. Work is done 30% on Site in Vietnam and 70%
Remotely from Argentina.
• Petrojam LTD (since February 2010) – Oil Company. Located in Kingston,
Jamaica: SAP Enterprise 4.7 – Consulting2b is responsible for supporting different
enhancements needed in PP and MM Modules.
We are also are working on the implementation of PM and QM Modules.
• GraceKennedy LTD (since July 2007). Massive Cosume, Located in Kingston,
Jamaica: SAP Enterprise 4.7 – Consulting2b is responsible for ongoing support and
system enhancement for the following modules: PP-PI, MM and WM.
We are also are working on the implementation of PM and QM Modules.
• Mobile solutions (since February 2007): I have started (together with an associate)
several projects of implementing Mobile Solution linked with SAP (Customer
Orders, POD, Mobile ticketing, etc).
• Sandoz (a Novartis Company) (July 2009 – November 2009): SAP ECC 6.0 –
Senior Consultant responsible for the ongoing support and system enhancement for
the following modules: PP, QM, MM and WM
• Sandoz (a Novartis Company) (January 2009 – July 2009): SAP ECC 6.0 –
Project Leader for Argentina Region. Responsible for the implementation of the
rollout of a Corporate Template for the Operations and SCM Processes (including
PP, QM, MM, WM, SD, PM and APO). The team included 10 consultants and a total
of 25 people in charge.
• Kimberley Clark Corporation (Since November 2005). Massive Consume/Home
and Personal Care, located in Buenos Aires City, Argentina.
SAP R/3 4.6C – Senior Consultant. These days I am giving Part-Time support for PP
and QM Module.
PM Implementation assessment: I reviewed the actual processes and delivered a
proposal for PM implementation. This project has started and I am working as QA
(1/2 day every two weeks).
• Fargo (Since October 2002). Massive Consume/Food Company owned by a
mayor investment group, located in Buenos Aires City, Argentina.
SAP R/3 4.0B / 4.7Enterprise – Senior Consultant, Project Leader. Responsible for
the implementation of QM and PM modules (QM in Procurement and Production,
Quality Notifications, Vendor evaluation, QM in Equipments, PM Notifications, PM
in general).
These days I am giving Part-Time support for PP, QM and PM Modules.
• SCJohnson (August 2003 – January 2009) . Massive Consume, located in Buenos
Aires, Argentina.
SAP R/3 4.6C – Senior Consultant, Process Team Leader for Americas Region.
Responsible for the implementation of the rollout of a Corporate Template for the
FTS Process (including PP, QM, MM, PM, WM and APO-DP).
Implementing a Global Template that was designed in North America. Already
concluded Pilot (Argentina, Chile, Uruguay, and Paraguay), Wave 2 (Mexico, Costa
Rica, and El Salvador), Wave 3 (Brazil), Wave 4 (Venezuela, Colombia, Peru and
Ecuador) and Wave 5 (Brazil Manaus new Plant). Each of these Waves were Full
Life Cycle projects.
Also member of the SAP Team that was in charge of the Currency Conversion
Project for Venezuela (2007) and for the SAP Upgrade from 4.6C to ECC 6.0
Release.
During the second semester of 2006 we implemented PM at the Argentinean
facilities. I was the consultant in charge (including a full life cycle implementation).
Global Center of Excellence Member: during the waves and after them, I have been
working as GCOE Member giving ongoing support for PP, MM, PM, WM and APO
modules
• SCJohnson UK (January 2007) . Massive Consume, located in Frimley, UK.
I performed a Global Template assessment during a 2 week stay. The modules that
were reviewed and for which I made improvement proposals were: PP, PM, MM,
QM, WM.
• HP Puerto Rico (June 2003 – August 2003). Hi-Technology, located in Aguadilla,
Puerto Rico.
SAP R/3 4.6C – Senior Consultant. Responsible for the implementation of ATP and
LTP functionalities in Production Execution.
• Ibg S.A. (January 2003 – October 2003). Massive Consume/ Textile Company
owned by a mayor investment group (Exxel Group), located in Buenos Aires City,
Argentina.
SAP R/3 4.0B – Senior Consultant and Project manager. Responsible for the
implementation of PP, MM and CO. Also, Senior Consultant responsible for PP
Module.
• Techint - Siderar (November 2002 – December 2002). Metallurgic
(Subcontracted – Accenture) located in Buenos Aires City, Argentina.
SAP R/3 4.6C – Responsible for the improvement of the Materials Management,
Production and Plant Maintenance Planning Processes.
• Kimberley Clark Corporation (April 2002 – October 2002) (Subcontracted -
KPMG). Adult/Feminine/Family Care and Paper Industry– Massive Consume,
multinational company.
SAP R/3 4.6C – Team Leader. Responsible for the implementation of PP module for
the FTS Team (Forecast To Stock) (Flexible SOP, MPS, MRP, CRP, REM). ABAP
Queries and Functional and Technical Specifications.

PRICEWATERHOUSECOOPERS. (July 1998 – February 2002):

• GlaxoSmithKline (February 2002). Chemical/Pharmaceutical Company,


manufactures health products, mayor English group subsidiary, situated in Buenos
Aires Province, Argentina.
SAP R/3 4.0B - Responsible for the Archiving of QM and PP Master Data and
Process Information.
• SAP 4.6c PP Module Internal Course (December 2001).
Trained another PWC Consultant in SAP PP module.
• British American Tobacco (June 2001 – November 2001), Massive
Consume/Tobacco Company, international company.
SAP R/3 4.6C – Project Leader. Responsible for the Outsourcing of the SAP
Support. Also acted as PP, PM and QM Consultant Specialist (Flexible SOP, MRP,
MPS, CRP, REM, SFC, QM in Procurement, Vendor Evaluation, Preventive and
Corrective PM). ABAP Queries and Functional and Technical Specifications.
• Unilever Latin America (April 2001), Massive Consume/Retail Company,
international company.
SAP R/3 4.6B - Team Leader. Responsible for the Blue Print Design for PP and QM
Modules.
• AmBev Group: Brahma (September 2000 – April 2001), Massive Consume /
Beverages Company, international company.
SAP R/3 4.5B – Team Leader. Leader de Modules PP and QM. Responsible for the
implementation of PP and QM modules. (Flexible SOP, MPS, MRP, SFC and REM;
QM in Procurement, Production and Sales; Certificates). ABAP Queries and
Functional and Technical Specifications. Some ABAP Programming.
• Fargo (April 2000 – August 2000). Massive Consume/Food Company owned by a
mayor investment group (Exxel Group), located in Buenos Aires City, Argentina.
SAP R/3 4.0B – Team Leader and occasionally Project Manager. Responsible for the
implementation of PP (SOP, MPS, MRP, CRP). ABAP Queries and Functional and
Technical Specifications. Some ABAP Programming.
• Templar Project (January 2000 – March 2000). Internal project. The idea of this
project was to create a template in SAP R/3 4.5B system in order to make its
implementation easier and faster. It included almost every SAP module.
SAP R/3 4.5B - Implemented QM module and tested the integration with the other
modules, simulating a fictitious company (QM in Procurement, Production and Sales;
Certificates, Quality Notifications, Vendor Evaluation).
• Fargo (August 1999 – January 2000). Massive Consume/Food Company owned
by a mayor investment group (Exxel Group), located in Buenos Aires City,
Argentina.
SAP R/3 4.0B – Team Leader. Responsible for the implementation of PP (SFC).
ABAP Queries and Functional and Technical Specifications. Some ABAP
Programming.
• GlaxoWellcome (November 1998 – August 1999). Chemical/Pharmaceutical
Company, manufactures health products, mayor English group subsidiary, situated in
Buenos Aires Province, Argentina.
SAP R/3 4.0B – Team Member. Responsible for the implementation of QM and PP-
PI module. ABAP Queries and Functional and Technical Specifications.
• REPSOL - YPF (August 1998 – October 1998). Oil Company in the lubricant
department, situated in Buenos Aires City, Argentina.
SAP R/3 3.1H – Responsible for the Post Implementation support of PP, MM and
QM modules.

APPLICATION SOFTWARE S.A. (May 1998 – July 1998).

• Metrored: (May 1998 – July 1998). Telecommunications, Data Transfer.


The project included the J.D.Edwards application of Sales and Distribution (SD)
modules in the company during a period of 2 months.

ADMINISTRACIÓN NACIONAL DE SEGURIDAD SOCIAL (ANSES) (January


1997 – July 1997).
Government entity in charge of the public retirement contributions.
- Process Reengineering.
- Area Coordination.
- Agreement negotiation between this entity and the National Bank of the Argentine
Republic.

You might also like