You are on page 1of 6

STANDARD METHOD

EFFECTIVE WIND SPEED

Basic wind speed(Vb) = 26 m/s

wind pressure computation as per BS 6399-2:1997

Assumed site altitude in meters =


above MSL 10 m

1.01 from clasuse


Altitude factor(Sa) = 2.2.2.2(pg no:20)

from clause 2.2.2.3


Table 3-values of
1 direction factor
sd(pg no:27)
Direction factor(Sd) =
1 from clause
Seasonal factor(Ss) = 2.2.2.4(pg no:27)
1 from clause
Probability factor (Sp) = 2.2.2.5(pg no:27)

Site wind speed(Vs) = 26.26 m/s

Terrain and building factor(Sb) = 1.808 on interpolation

Effective wind speed(Ve) = 47.48 m/s

DYNAMIC PRESSURE(qs) = 1381.81 Pa3

EXTERNAL SURFACE PRESSURE(pe)


Pressure coefficient

Positive External pressure = 1381.805


Suction pressure = -1174.53

INTERNAL SURFACE PRESSURE(pi)


Positive internal pressure = 276.361
Suction = -414.542

Critical Wind presure Combintions

case 1 = 1105.444
case 2 = 1658.166
case 3 = -898.173
case 4 = -1589.08
STANDARD METHOD

Sa=1+0.001s

Vs = Vb x Sa x Sd x Ss x Sp formulae on clause 2.2.2.1

From table 4-factor for standard method


effective
height(He) =
Ve = Vs x Sb closest distant to
sea upwind =

on interpolation
of He and
distant sea
formulae on clause 2.2.3.1 upwind =
qs=0.613 Ve2 formulae on clause 2.1.2.1

pe = qs x Cpe x Ca
from table 7-pg no 35
External pressure coefficients(Cpe)
for circular plan buildings
qs x 1 from table 07 H =
qs x -0.85 from table 07 d =
H/d =
so H/d <=
positive coeff =
pi = qs x Cpi x Ca negative coeff =
Internal pressure coefficients(Cpi)
permeable =
impermeable =
tor for standard method

12 m

2 km

1.808

e coefficients(Cpe)

12 m
6.2 m
1.935484
2.5
1
-0.85
e coefficients(Cpi)
0.2
-0.3