Working Day

Holidays
Disci. SL.NO SUBCONTRACTOR NAME Work Description Work Area No of Employees
24 25 26 27 28 Remark

Working Day Pipng, Structure Assembling & Erection, Support Installation & Farbrication Shop
1 GLOBAL IWI LIMITED - WGP: 26~28 June Mechanical Equipment, Installation, Grouting (WGP, KGP/21m PL) WGP Tank Area
- KGP/21km PL: 24~28 June 21 KM Pipeline & KGP

No Holidays in Fabrication works FABRICATION OF STEAM WORK AREA STEAM JACKETED


2 AYTB (Shop) WGP in BGP
only 25 June Eid Holidays JACKATED SPOOLS FABRICATION WORKS
KGP & 21km PL

BGP SITE ERECTION NON-LIVE


No Holidays in Fabrication works PLANT, BGP SITE ERECTION LIVE
3 AYTB (Field) only 25 June Eid Holidays in BGP ERECTION WORKS
PLANT

Mech
PIPE TECHNOLOGY SYSTEM LLC ERECT, INSTALL AND HYDRO No Work during
4 (PTS) 25, 26 & 27 Holidays TEST FOR RTR PIPING SYSTEM KGP SITE holidays. Bcz. WORK IS
99% COMPLETE

25 & 26 holidays and Work on 27 & WGP Tank, Sleeper & Loading
5 KAEFER SAUDI ARABIA CO. (Insulation) 28 June Insulation Shelter Insualtio work
25 & 26 holidays and Work on 27 &
6 KAEFER SAUDI ARABIA CO. (Scaffolding) 28 June Scaffolding WGP, KGP & BGP (if required)

WGP Tank, Sleeper & Loading


7 POSCO (Paint) No Holiday Painting Work Shelter Painting work

8 Arabian CBI Ltd. Almost All works finished, N/A N/A

Sulfur Raicar BGP : 30 (Fireproofing


1 KARRENA ARABIA CO. LTD. 25&26 Eid Holidays Fireproofing of Steel Structures Loading Shelter PID-1)

WGP : 5(HVAC PID-1)


Civil & 2 ZAMIL INDUSTRIAL NO HOLIDAYS , SUBSTATION Ductign Works BGP BGP : 15(HVAC PID-1)
Architect
ure
BGP-CARPENTRY, PAINTING, STEEL STRUCTURE WORKS WGP : 30 (CIVIL PID-1)
WGP- PUNCHLIST CLEARING BGP : 100(CIVIL PID-1
3 ALFA AL-KHALEEJ CONT. CO. 24,25,26 Eid Holidays BGP/WGP/KGP STRUCTURE PID-1_
KGP- EXCAVATION, BACKFILLING, FORMWORKS & REBAR WORKS
KGP : 40 (CIVIL PID-1)

Asyad International Co. Ltd. Elec'/Inst'/Comm' Works WGP Elec' : 25~28


Inst' : 25 ~ 28

WGP ALRASHED FOC Cable Splicing and Testing WGP Comm' : 25 ~ 26

Electrical POSCO E&C Fire Stop and Penetration Seals WGP


/Instrum
ent/Telec
ommunic Asyad International Co. Ltd. Electrical/Instrument Works BGP Area Elec' : 26~28
ation Inst' : 26~ 28
BGP
POSCO E&C HVAC Control Sys BGP Loading Shelter

SECT System Power Cable Pulling 21km Pipe Line &


KGP POSCO E&C 238S/S Cable Tray & Couduit KGP Live Plant Elec' : 27~28
Installation
Working Schedule during EID Holiday
Date
Discipline Work Area Positon Remark
24 25 26 27 28

MECHANICAL PAINTING SHOP QCI-COATING SHAHANAD SHAHANAD SHAHANAD


SCS/KAEFER (SCS) (KAEFER) (KAEFER)

MECHANICAL WGP QCI-COATING FAWAS FAWAS FAWAS FAWAS

MECHANICAL WGP QCI-INSULATION DARNEL DARNEL

MECHANICAL WGP QCS JOSEPH JOSEPH JOSEPH