LTD
DXL House,Plot No.A-399,Mahape MIDC,Near Antony Motors,Navi Mumbai-400710
Owner
Mumbai-JNPT Port Road Company Ltd.(SVP of NHAI)
Contractor
J.Kumar-J.M.Mhatre(JV)
Authority Engineer
AECOM Asia Company Ltd.
Project
Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B & from KM 5.300 to Km 7.422 of
NH-348 (OLD SH54)) and connectivity to proposed 4TH terminal of JNPT
Title
Design of Pile foundation and Pier for Free/Expansion Joint pier r P250 & P253 (Group No. 405) of Ramp 1 -
Section -2.
NOS:- 162
This note is the property of STRUCTCON DESIGNS PVT.LTD it should not be used copied or reproduced
without their written permission.
INDEX
1.0 Introduction
11.0 Conclusion
12.0 Pilecap Design
12.1 Transverse Design of Pilecap
12.2 Longitudinal Design of Pilecap
12.3 Check for Punching Shear
Annexure
1.0 Preamble
It is proposed to widen the existing NH4B & NH348 (Old SH-54) to Six/Eight lane on the
boundaries of proposed Navi Mumbai international Airport. This project has been awarded for
execution to M/S J.Kumar and J.M. Mhatre JV by the owner 'Mumbai-JNPT Road Company'.
The structural design of the Flyovers and bridges in this project has been carried out by
Structcon Designs Pvt.Ltd'.
Overall Layout
Page 4
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Entire stretch of package 1 has been divided into various zones. Those zones are as below:-
Zone Area
A1 NH4B - LHS (Karal Interchange to Pagote )
A2 NH4B -LHS (Karal Interchange to JNPT stn.)
A3 NH4B -RHS (Karal Interchange to JNPT stn.)
B SH54 LHS -RHS
C1 Ramp 1 (Section 2)
C2 Ramp 2 (Section 2)
C3 Ramp 1
C4 Ramp 2
C5 Ramp 3
C6 Ramp 4
D1 Loop 1
D2 Loop 2
D3 Loop 3
D4 Loop 4
E1 8 LANE 4th TERMINAL (LHS)
E2 8 LANE 4th TERMINAL (RHS)
E3 4 LANE ROAD TO PROPOSED 4TH TERMINAL
E4 KARAL BRIDGE BYPASS ROAD
E5 ROAD-2
The structural design of the flyovers and ROB have been taken up by grouping the spans based
on width of carriagway, structural system adopted and elevation.
Design reports for every group shall be presented separately.
Page 5
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Page 6
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
This reports presents, " Design of Pile Foundation and Pier for P250 & P253 ( Free/Expansion Jt. Pier)
Group -405", covers
1 Pile Load Calculation and Adequacy Check
2 Design for Pilecap
3 Design for Pile
4 Design for Pier
- Reference Codes-
1 IRC 6:2014 Loads and stress
2 IRC 112:2011 Code of Practice for Concrete Road Bridges:
Limit State Design
3 IRC SP:105-2015 Explantory handbook to IRC:112
Page 7
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
32.0
TOC of piercap
9.875 m
Pilecap top
1.666 m
Pilecap bottom
0.166 m
Material Density
3
Concrete = 25 kN/m
5
Wearing Coat = 20 kN/m
4
Soil = 18 kN/m
4
Steel = 78.5 kN/m
Page 8
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Maxm. compression = 500 tons Including Selfweight of Pile i.e bottom of pile
Capacity As per Geo tech reco.
= 422 tons Excluding Selfweight of Pile i.e top of pile.
socketing in rock = 2.5 D of pile in soft rock under Fixed head condition
..(As per bore log detail and recommendations of Geotech)
Lateral capacity 21.25 tons
2
Applied as a Pressure load = 12.5 kN/m
Page 9
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
- Thickness variation due to deck slab slope (a) = 2.5 x 7500 = 187.5 mm
100
Page 10
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Page 11
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
P250 P253
Page 12
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Page 13
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Substructure under consideration has been designed for reactions R1+R2 from the adjecent spans
R1 R2
Ex. Jt. Pier Free Pier Fixed Pier Free Pier Ex. Jt. Pier
Page 14
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Piercap weight
= 41.395 x 25 = 1034.88 kN
volume
Pier Weight
= 1.8 x 2.8 x 7.029 x 25 = 885.65 kN
Selfweight of the deck slab has been accounted with selfweight command in STAAD.
Soil on Pilecap
Top of pilecap below GL = 0.75 m
Soil Density = 18 kN/cum
Hence Soil Load = 0.75 x 18.00
= 13.50 kN/sqm
Page 15
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Wearing coat
Thickness = 75 mm thk
Considered overlaying = 50 mm thk
Total thickness = 125 mm thk
Density of wearing coat = 22 KN/cum
= (125/1000)X22
= 2.75 kN/sqm
2
However,applied as 3 kN/m on carriageway width conservatively.
Applied as a Pressure on full plate for a carriageway width in STAAD.
The viaduct superstructure has been supported on the piercap through five bearings on each side of
pier. The superstructure has been analysed for the loads defined above in load case 3 to 6.
The reactions at bearing locations for those load cases are then applied on piercap top at
appropriate bearing locations.
Page 16
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Page 17
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Page 18
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
5.0 Evaluation of Live Load reactions on Piercap :- (As per cl. 204 of IRC:6-2014.)
Live loads reactions for substructure design have been determined from a separate model.
The analysis model consists of 2 adjecent spans of flyovers 24m + 32m. These span are separated
by a gap of 40mm.Main longitudinal Girders, cross diaphragms are defined as line elements.
Supports are defined at bearing locations.
Page 19
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
i) Vehicles Considered
Type-I Class-A
Type-II 70R(Wheeled)
Type-III Special Vehicle
Vehicle loads are referred from clause:204 of IRC:6
Type-I Class-A
The basic load data as given in IRC is as below:-
The above loads are modified with congestion factor and then applied in STAAD.
Page 20
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Type-II 70R(Wheeled)
The basic load data as given in IRC is as below:-
The above loads are modified with congestion factor and then applied in STAAD.
Page 21
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Page 22
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
1) All relevant live loads combinations as per IRC 6 have been defined.
2) Impact factor, congestion factor and distance between two successive trains longitudinally
are kept as per IRC:6:2014.For details refer section:4.0,section ii & iii.
3) Above load positions are placed transversely at such eccentricity so as to get critical effect
on the substructure.
4) These set of live load trains are moved along the longitudinal direction using moving load
command in STAAD.
5) A single position from the generated load cases is identified such as to get maximum
total vertical reaction on the pier for a particular load case.
6) Another set of load position is identified which will give maximum longitudinal
moment on the pier.
Following are the load cases onsidered for Live load calculations
LL1 Class A - 1 lane near crash barrier both span loaded
LL2 Class A - 2 lane near crash barrier both span loaded Maximum
LL3 Class 70RW - 1 lane near crash barrier both span loaded Vertical Load
LL4 Special Vehicle - 1 lane 0.3m eccentric to carriageway both span loaded
LL5 Class A - 1 lane near crash barrier single span loaded
Maximum
LL6 Class A - 2 lane near crash barrier single span loaded
Longitudinal
LL7 Class A - 3 lane near crash barrier single span loaded
Moment
LL8 Class A - 1 lane + Class 70RW - 1 lane single crash barrier both span loaded
Page 23
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
LL3 Class 70RW - 1 lane near crash barrier both span loaded
LL7 Class 70RW - 1 lane near crash barrier single span loaded
LL4 Special Vehicle - 1 lane 0.3m eccentric to carriageway both span loaded
LL8 Special Vehicle - 1 lane 0.3m eccentric to carriageway single span loaded
Page 24
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Page 25
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
T = 4.69
F
F = 45.79 KN
Page 26
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Page 27
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
T = 4.69
F
F = 47.33 KN
Page 28
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
The total logitudinal seismic forces are given in the following table:-
Trans. Moment
Sr. Horizontal Lever Arm Upto
Item Mass of the Structure Total Mass Upto Piercap
No. Force Piercap C.G
C.G
For Foundation
Design
1 Piercap 1034.9 1034.9 89.2 - -
2 Pier 885.7 885.7 76.3 acting at pier centre
Page 29
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
33000 22000
10000
Page 30
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Obstructed area:-
Height of Solid barrier above Roadway = 1.50 m
Height of Superstructure(Girder+Slab etc) = 2.00 m
Total exposed height 3.50 m
b/d = (27.5/3.5) = 7.86 (As per clause 209.3.6)
Gust Factor G= = 2.00
Drag Coe Cd= = 1.95
As per table 5 of Cl. 209 of IRC:6, for 10m height of structure, and for basic wind speed of 44 m/s,
and terrain category as Plain Terrain
the vz = 29.2 m/s for 33 m/sec
In mumbai region the basic wind speed = 44 m/sec
Hence vz = 38.93 m/s
Page 31
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Force = Pz x A x G x Cd
= 0.78 x 96.3 x 2 x 1.95 +
0.78 x 41.3 x 2 x 1.20
= 368.87 KN
This being a free pier, wind load on superstructure in longitudinal direction shall be transferred
to fixed pier. Hence no wind from superstructure in longitudinal direction is applied.
Page 32
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
2.8
Page 33
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Page 34
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
- SLS Condition
Factored Value = 1.0 DL + 1.0 SIDL + 1.2 SSDL + 0.75 LL
Page 35
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
- ULS Condition
- Normal Case
Sr. Load Case Dead SIDL SSDL Live Load Long.
No. Load 1.5 * LL Force
1 LL1 5127.67 986.87 1516.39 811 422.10
2 LL2 5127.67 986.87 1516.39 1625 462.77
3 LL3 5127.67 986.87 1516.39 1526 457.84
4 LL4 5127.67 986.87 1516.39 0 381.55
5 LL5 5127.67 986.87 1516.39 702 416.66
6 LL6 5127.67 986.87 1516.39 1414 452.25
7 LL7 5127.67 986.87 1516.39 1486 455.82
8 LL8 5127.67 986.87 1516.39 0 381.55
- Seismic Case
Sr. Load Case Dead SIDL SSDL Live Load Long.
No. Load 1.5 * LL Force
1 LL1 5127.67 986.87 1516.39 162 389.66
2 LL2 5127.67 986.87 1516.39 325 397.79
3 LL3 5127.67 986.87 1516.39 305 396.81
4 LL4 5127.67 986.87 1516.39 0 381.55
5 LL5 5127.67 986.87 1516.39 140 388.57
6 LL6 5127.67 986.87 1516.39 283 395.69
7 LL7 5127.67 986.87 1516.39 297 396.40
8 LL8 5127.67 986.87 1516.39 0 381.55
Page 36
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Piles, pilecap and piers are checked for only one side loading i.e. Dead load, SIDL and SSIDL.
Primary cases are defined-Case-195 to 198-when only one side is dislodged.
For these cases only dead load,SIDL and SSDL on the span are considered.
In these cases due to loading only one side,the longitudinal moment on Pile will be maximum
and hence piles has also been checked for this case.
The centrifugal force acts at a height of 1.2m above the level of carriageway.
Hence the lever arm from centre of piercap = 4.893 m
Page 37
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Page 38
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Protection aroud pier upto a height of 1.5m has been considered and hence 50% of the max.
force as per IRC 6:2014 shall be considered.
Collision Force
Longitudinal Direction = 250 kN VCL as per clause 222.3.2 considered 50% load
Transverse Direction = 500 kN VCT
Collision load in transverse direction is not considered in design and analysis as the
magnitude of force in transverse seismic case is more. Only collision load in longitudinal
considered.
Page 39
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Page 40
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Page 41
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
111 Bearing Rigidity Force (ULS-Normal) for LL1 Non Seismic BRU1
112 Bearing Rigidity Force (ULS-Normal) for LL2 Non Seismic BRU2
113 Bearing Rigidity Force (ULS-Normal) for LL3 Non Seismic BRU3
114 Bearing Rigidity Force (ULS-Normal) for LL4 Non Seismic BRU4
115 Bearing Rigidity Force (ULS-Normal) for LL5 Non Seismic BRU5
116 Bearing Rigidity Force (ULS-Normal) for LL6 Non Seismic BRU6
117 Bearing Rigidity Force (ULS-Normal) for LL7 Non Seismic BRU7
118 Bearing Rigidity Force (ULS-Normal) for LL8 Non Seismic BRU8
Page 42
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Wind Case
181 Wind Load DL + SIDL +SSDL (Long. + Trans) WD
182 Wind Load DL + SIDL +SSDL + LL (Long. + Trans) WDL
Page 43
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
LOAD COMBINATION FOR DIFFERENT LOADS AND THEIR LOAD FACTORS (PILE CAPACITY CHECK)
combination DL,SIDL SSDL LL SESIMIC Permissible
stress
normal 1 1 1 1
seismic 1 1 0.2 1 1.5
Accidental
one span 1 1 1.33
wind 1 1 1 1.33
(As per . Amendment no. 2 IRC:6-2014/ august 2014.)
LOAD COMBINATION FOR DIFFERENT LOADS AND THEIR LOAD FACTORS (SLS CASE) FOR CRACK WIDTH CHECK
combination DL,SIDL SSDL LL WIND
Leading accompany Leading accompany
Crack width
check 1 1.2 0
Rare Comb. 1 1.2 1.0 0.6
stress check
Page 44
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
NORMAL COMBINATION
211 DL+SIDL+SSIDL+BRN
221 DL+SIDL+SSIDL+LL1+BR1+CF1
222 DL+SIDL+SSIDL+LL2+BR2+CF2
223 DL+SIDL+SSIDL+LL3+BR3+CF3
224 DL+SIDL+SSIDL+LL4+BR4+CF4
225 DL+SIDL+SSIDL+LL5+BR5+CF5
226 DL+SIDL+SSIDL+LL6+BR6+CF6
227 DL+SIDL+SSIDL+LL7+BR7+CF7
228 DL+SIDL+SSIDL+LL8+BR8+CF8
Note: 20% for seismic effect on live load bearing rigidity is already considered in calculation above.
Page 45
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Note: 20% for seismic effect on live load bearing rigidity is already considered in calculation above.
281 DL+SIDL+SSIDL+LL1+BR21+CF1+WDL
282 DL+SIDL+SSIDL+LL2+BR22+CF2+WDL
283 DL+SIDL+SSIDL+LL3+BR23+CF3+WDL
284 DL+SIDL+SSIDL+LL4+BR24+CF4+WDL
285 DL+SIDL+SSIDL+LL5+BR25+CF5+WDL
286 DL+SIDL+SSIDL+LL6+BR26+CF6+WDL
287 DL+SIDL+SSIDL+LL7+BR27+CF7+WDL
288 DL+SIDL+SSIDL+LL8+BR28+CF8+WDL
NORMAL COMBINATION
301 DL+SIDL+ 1.2*SSDL+BRS Quasi-Permanent Combination
Page 46
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Page 47
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
461 1.35*DL + 1.75*SIDL + 1.35*SSDL + 1.5*0.2*LL1 + BRU21 + UCFS1 + 1.5* LSPCP + 1.5*0.3*(TDL+TSIDL+TSSDL+LL1)
462 1.35*DL + 1.75*SIDL + 1.35*SSDL + 1.5*0.2*LL2 + BRU22 + UCFS2 + 1.5* LSPCP + 1.5*0.3*(TDL+TSIDL+TSSDL+LL2)
463 1.35*DL + 1.75*SIDL + 1.35*SSDL + 1.5*0.2*LL3 + BRU23 + UCFS3 + 1.5* LSPCP + 1.5*0.3*(TDL+TSIDL+TSSDL+LL3)
464 1.35*DL + 1.75*SIDL + 1.35*SSDL + 1.5*0.2*LL4 + BRU24 + UCFS4 + 1.5* LSPCP + 1.5*0.3*(TDL+TSIDL+TSSDL+LL4)
465 1.35*DL + 1.75*SIDL + 1.35*SSDL + 1.5*0.2*LL5 + BRU25 + UCFS5 + 1.5* LSPCP + 1.5*0.3*(TDL+TSIDL+TSSDL+LL5)
466 1.35*DL + 1.75*SIDL + 1.35*SSDL + 1.5*0.2*LL6 + BRU26 + UCFS6 + 1.5* LSPCP + 1.5*0.3*(TDL+TSIDL+TSSDL+LL6)
467 1.35*DL + 1.75*SIDL + 1.35*SSDL + 1.5*0.2*LL7 + BRU27 + UCFS7 + 1.5* LSPCP + 1.5*0.3*(TDL+TSIDL+TSSDL+LL7)
468 1.35*DL + 1.75*SIDL + 1.35*SSDL + 1.5*0.2*LL8 + BRU28 + UCFS8 + 1.5* LSPCP + 1.5*0.3*(TDL+TSIDL+TSSDL+LL8)
Page 48
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Page 49
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Page 50
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
Page 51
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
200 0 0 0 0
201 130 130 130 130
211 67 67 67 67
221 74 74 74 74
222 81 81 81 81
223 80 80 80 80
224 67 67 67 67
225 73 73 73 73
226 79 79 79 79
227 80 80 80 80
228 67 67 67 67
231 80 80 80 80
241 81 81 81 81
242 82 83 83 82
243 82 82 82 82
244 80 80 80 80
245 81 81 81 81
246 82 82 82 82
247 82 82 82 82
248 80 80 80 80
251 109 109 109 109
261 110 110 110 110
262 111 112 112 111
263 111 111 111 111
264 109 109 109 109
265 110 110 110 110
266 111 111 111 111
267 111 111 111 111
268 109 109 109 109
271 82 82 82 82
281 89 89 89 89
282 96 96 96 96
283 95 95 95 95
284 82 82 82 82
285 88 88 88 88
286 94 94 94 94
287 95 95 95 95
288 82 82 82 82
Page 52
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
200 0 0 0 0
201 0 0 0 0
211 0 0 0 0
221 7 7 7 7
222 14 15 15 14
223 13 14 14 13
224 1 1 1 1
225 6 6 6 6
226 12 13 13 12
227 13 13 13 13
228 0 1 1 0
231 155 155 155 155
241 159 159 159 159
242 162 163 163 162
243 162 162 162 162
244 168 168 168 168
245 158 158 158 158
246 161 162 162 161
247 162 162 162 162
248 165 165 165 165
251 46 47 47 46
261 49 49 49 49
262 51 51 51 51
263 50 51 51 50
264 50 51 51 50
265 48 48 48 48
266 50 50 50 50
267 50 51 51 50
268 50 50 50 50
271 94 94 94 94
281 108 108 108 108
282 115 115 115 115
283 114 114 114 114
284 101 101 101 101
285 107 107 107 107
286 113 113 113 113
287 114 114 114 114
288 101 101 101 101
Page 53
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
200 0 0 0 0
201 130 130 130 130
211 67 67 67 67
221 75 75 75 75
222 82 82 82 82
223 81 81 81 81
224 67 67 67 67
225 74 74 74 74
226 80 80 80 80
227 81 81 81 81
228 67 67 67 67
231 174 175 175 174
241 178 178 178 178
242 182 182 182 182
243 182 182 182 182
244 186 186 186 186
245 178 178 178 178
246 181 181 181 181
247 182 182 182 182
248 184 184 184 184
251 118 118 118 118
261 120 121 121 120
262 122 123 123 122
263 122 122 122 122
264 120 120 120 120
265 120 120 120 120
266 122 122 122 122
267 122 122 122 122
268 120 120 120 120
271 125 125 125 125
281 140 140 140 140
282 150 150 150 150
283 148 149 149 148
284 130 131 131 130
285 138 139 139 138
286 147 147 147 147
287 148 148 148 148
288 130 130 130 130
Page 54
NOTE NO. R
STRUCTCON DESIGNS Pvt. Ltd. SC/866-
0
S/C1/DN/6405
11.0 Conclusion:
Substructure for typical 24m span of viaduct has been analysed. All vertical, horizontal
and live loads as per IRC recommendations have been applied.
Adequacy of 4 pile group of 1200mm dia for free pier was checked.
Analysis results shows that the pile loads are within limits of their respective pile capacities
recommended in Geotechincal report in this area. Hence, specified number of piles can
be considered adequate for fixed pier in Ramp 1 -Section 2
Page 55
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
0.75 3
1 7 3
2.10 -ve
X 2.8 X
Y 4.2 0 0 5.7 CL of Bridge
Transverse Axis
2.10 1.8
+ve
2 8 4
0.75
Y
4.5
+ve Y -ve
X Longitudinal Axis cl of pile cap
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
No. of Piles = 8
X1 = -1.5 Y1 = -2.1
X2 = -1.5 Y2 = 2.1
X3 = 1.5 Y3 = -2.1
X4 = 1.5 Y4 = 2.1
X5 = 0 Y5 = 0
X6 = 0 Y6 = 0
SX 2
= 9 SY 2
= 18
Design constants:
As per IRC 112:2011 as per annexure A-2
Grade of steel Fe 500 = 1.0 For Concrete grade <M60
Grade of concrete M40 = 0.8 For Concrete grade <M60
Chara. Compressive Strength
= 40 N/sqmm xlim = 0.583
fc fcd = Design value of concrete compressive strength
= acc x fck /gm
lx Fc
= 0.67 x 40/1.5
= 17.9
fcd = 1 x 17.9
2
= 17.9 N/mm
Fs
z Fyk = 500
fyd = 500/1.15
2
= 435 N/mm
fctm = 3.0
x = 0.8x0.583
= 0.466
Page No. 54
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
Forces at the Top of Pilecap Additional Moment at Pilecap Bottom
Load Vertical Long. Trans. Load Long. Trans.
Comb. Load Force Force Comb. Moment Moment
401 10019 349 0 401 698 0
411 10019 520 0 411 1040 0
421 10830 422 43.21 421 844 86
422 11644 463 86.54 422 926 173
423 11545 458 81.29 423 916 163
424 14676 382 3.88 424 763 8
425 10721 417 37.41 425 833 75
426 11433 452 75.33 426 905 151
427 11505 456 79.14 427 912 158
428 13615 382 3 428 763 6
431 10019 423 930 431 847 1861
441 10425 497 953 441 993 1906
442 10831 537 975 442 1074 1951
443 10782 532 973 443 1065 1945
444 12348 456 1010 444 912 2020
445 10370 491 950 445 982 1900
446 10726 527 970 446 1053 1939
447 10762 530 971 447 1061 1943
448 11817 456 992 448 912 1984
451 10019 597 279 451 1194 558
461 10425 670 292 461 1341 584
462 10831 711 305 462 1422 609
463 10782 706 303 463 1412 606
464 12348 630 304 464 1260 607
465 10370 665 290 465 1330 580
466 10726 700 301 466 1401 603
467 10762 704 303 467 1408 605
468 11817 630 298 468 1260 596
471 10019 402 338 471 805 675
481 10830 475 406 481 951 811
482 11644 516 449 482 1032 898
483 11545 511 444 483 1022 888
484 14676 435 366 484 870 733
485 10721 470 400 485 940 800
486 11433 506 438 486 1011 876
487 11505 509 442 487 1018 883
488 13615 435 365 488 870 731
491 10019 438 563 491 876 1126
501 10641 511 647 501 1022 1295
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
Page No. 56
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
Reaction at each pile location is as follows. ULS condition
Pile Reaction at Bottom of Pile
Load Pile 1 Pile 2 Pile 3 Pile 4 Pile 7 Pile 8
Comb kN kN kN kN kN kN
401 4792.25 5148.06 2935.48 3291.29
411 4796.41 5152.22 2931.32 3287.13
421 4728.03 5908.82 2580.28 3761.08
422 4934.71 6266.52 2629.27 3961.08
423 4897.02 6333.91 2512.60 3949.49
424 5773.56 6747.38 3664.79 4638.61
425 4792.81 5886.54 2548.11 3641.84
426 5020.94 6268.21 2522.33 3769.60
427 4932.64 6351.97 2474.33 3893.66
428 5744.68 6627.06 3254.21 4136.59
431 3393.23 6697.55 1385.98 4690.31
441 3437.98 7155.97 1130.35 4848.34
442 3583.81 7378.44 1111.22 4905.86
443 3559.83 7406.84 1058.18 4905.19
444 3769.37 7680.72 1567.13 5478.48
445 3464.67 7138.97 1120.12 4794.42
446 3615.92 7367.99 1069.05 4821.12
447 3575.52 7413.73 1041.19 4879.40
448 3788.90 7586.59 1395.81 5193.50
451 4600.75 5841.12 2242.42 3482.78
461 4663.96 6281.09 2005.23 3622.36
462 4828.29 6485.06 2004.60 3661.37
463 4802.06 6515.71 1949.31 3662.96
464 5082.82 6718.37 2529.49 4165.03
465 4688.17 6266.57 1992.52 3570.92
466 4855.61 6479.39 1957.64 3581.43
467 4816.85 6523.50 1931.42 3638.07
468 5078.21 6648.38 2334.02 3904.19
471 4297.28 5696.20 2387.34 3786.26
481 4193.12 6496.90 1992.20 4295.98
482 4399.80 6854.60 2041.19 4495.98
483 4362.11 6921.99 1924.52 4484.39
484 5238.65 7335.45 3076.72 5173.51
485 4257.90 6474.62 1960.04 4176.75
486 4486.03 6856.28 1934.26 4304.51
487 4397.74 6940.04 1886.26 4428.57
488 5209.77 7215.14 2666.13 4671.49
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
Page No. 58
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
Pile Reaction at top of Pile
Load Pile 1 Pile 2 Pile 3 Pile 4
Comb kN kN kN kN
401 4016.12 4371.93 2159.34 2515.16
411 4020.28 4376.09 2155.19 2511.00
421 3951.90 5132.69 1804.15 2984.94
422 4158.58 5490.39 1853.13 3184.95
423 4120.89 5557.78 1736.46 3173.36
424 4997.43 5971.25 2888.66 3862.48
425 4016.68 5110.41 1771.98 2865.71
426 4244.81 5492.08 1746.20 2993.47
427 4156.51 5575.84 1698.20 3117.53
428 4968.55 5850.93 2478.08 3360.46
431 2617.10 5921.42 609.85 3914.18
441 2661.85 6379.84 354.22 4072.21
442 2807.68 6602.31 335.08 4129.73
443 2783.70 6630.71 282.05 4129.06
444 2993.24 6904.59 791.00 4702.35
445 2688.54 6362.84 343.99 4018.29
446 2839.79 6591.86 292.92 4044.99
447 2799.39 6637.60 265.06 4103.27
448 3012.77 6810.46 619.68 4417.37
451 3824.62 5064.99 1466.28 2706.65
461 3887.83 5504.96 1229.10 2846.23
462 4052.16 5708.93 1228.47 2885.24
463 4025.93 5739.58 1173.18 2886.83
464 4306.69 5942.24 1753.35 3388.90
465 3912.04 5490.44 1216.39 2794.79
466 4079.48 5703.26 1181.51 2805.30
467 4040.72 5747.37 1155.29 2861.94
468 4302.08 5872.25 1557.89 3128.06
471 3521.15 4920.07 1611.21 3010.13
481 3416.99 5720.77 1216.07 3519.85
482 3623.67 6078.47 1265.06 3719.85
483 3585.98 6145.86 1148.39 3708.26
484 4462.52 6559.32 2300.58 4397.38
485 3481.77 5698.49 1183.90 3400.62
486 3709.90 6080.15 1158.13 3528.38
487 3621.61 6163.91 1110.13 3652.44
488 4433.64 6439.01 1890.00 3895.36
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
Pile Reaction at top of Pile
Load Pile 1 Pile 2 Pile 3 Pile 4
Comb kN kN kN kN
491 3191.17 5285.49 1245.78 3340.10
501 3091.46 5991.50 850.71 3750.75
502 3249.90 6305.94 848.06 3904.10
503 3221.01 6352.74 763.48 3895.21
504 3891.25 6596.10 1720.46 4425.31
505 3141.12 5969.03 831.43 3659.34
506 3316.01 6296.83 776.48 3757.30
507 3248.32 6364.59 736.14 3852.41
508 3869.51 6503.45 1406.09 4040.02
Page No. 60
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
12.1 Transverse Design of Pilecap
Ast reqd = M
fyd x z x d
= 9000 x 1000000
435 x 0.950 x 1867
= 11671 mm2 for total width
= 2594 mm2 PER METER
Page No. 62
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
b = av/ 2d
av = Distance between Pier face and Pile face 0.5 * d
= =0.7-(1.2/2) = 100 mm < 933.5 mm
Hence, b = =933.5 /(2x 1867) 0.25
Therefore VED = 11607 x 0.25 = 2902 kN
The design shear resistance of the member without shear reinforcement VRd.c is given by:
0.33
VRd.c = [ 0.12 K (801.fck) ] As per IRC 112-2011 Cl 10.3.2
=[ 0.12 x 1.33 ( 80 x 0.00239 x 40 )^0.33 ]
= 0.3117
3/2 1/2
min = 0.031.K fck
= 0.031 x 1.33 ^3/2 x 40 ^1/2
= 0.2998
VRd.c = [ min ] x bw.d
= 0.3117 x 4500 x 1867.0
= 2618.7 KN < 2901.7 KN
Evaluate Shear r/f as per eq. 10.7
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
= 2901.7 x 1000.0
5700 x 1773.7
= 0.2870
s = 4280.0 mm
Minimuma percentage of shear reinforcement
pmin = 0.072 x sqrt(fck) .eq.16.5
fyk
Page No. 64
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
Page No. 66
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
Bottom reinforcement
Moment @ the face of the pier due to piles 1+2+3 or 4+5+6 LC 636 governs
= 11022 x ( 0.60 + 0.075 )
= 7439.7 KN-m Additional "e" for pile tolerance
Note : Longitudinal reinforcement shall be evaluated for an additional bending moment
considering eccentricity due to tolerance permitted in pile location i.e 75 mm.
Ast reqd = M
fyd x z x d
= 7440 x 1000000
435 x 0.950 x 1902.5
2
= 9468 mm for total width
= 1661 mm2 PER METER
Minimum reinforcement Req.
Ast min = 0.26 x fctm x 1 x 1903
500
= 2967.9 mm2 per metre
Reinforcement Required
= 2967.9 mm2 per metre
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
The contribution of this shear force to shear force VED shall be multiplied by b
VED = Shear Force x b
b = av/ 2d
av = Distance between Pier face and Pile face 0.5 * d
= =0.6-(1.2/2) = 0 mm < 951.3 mm
Hence, b = 951.25 /(2x 1902.5)= 0.25
VRd.c = The design shear resistance of the member without shear reinforcement
fck = characteristic compressive cube strength of concrete at 28 days
b = breath of section
Asl = Area of the tensile reinforcement which extend not less than (lbd+d)
The design shear resistance of the member without shear reinforcement VRd.c is given by:
0.33
VRd.c = [ 0.12 K (801.fck) ] As per IRC 112-2011 Cl 10.3.2
=[ 0.12 x 1.32 ( 80 x 0.00215 x 40 )^0.33 ]
= 0.3003
Page No. 68
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
min = 0.031.K3/2fck1/2
= 0.031 x 1.32 ^3/2 x 40 ^1/2
= 0.2988
ULS condition
As Punching shear is evaluated as shear stress at
a.) At 2d distance
b.) Face of the loaded area,
c.) Along basic control perimeter
u0 = Perimeter of column face
VEd red = Applied shear force
ey = Eccentricity in longitudinal direction
ez = Eccentricity in transverse direction
= Factor accounting for effect of bending moment and axial load acting on
load acting in loaded area
ui = control perimeter under consideration
Page No. 70
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
0.75
1 7 3
1.8
0 0
2.8
5.7
4.2
3.7695
2 8 4
0.75
4.50
1.8
0 0
2.8
5.7
4.2
2 8 4
0.75
4.50
Perimeter of pile
u0 = x Dia of pile Pile Dia D= 1.2 m
= 3769.9 mm
net base pressure force
VEd = 0 KN ----Net upward force within the control perimeter from soil
within pile perimiter, hence no upwards force
Vertical force on pile
VEd = 6904.59 kn Considered max pile reaction L/C 546 PILE 3
VEd red = VEd - VEd (refer cl.10.4.5 )
VEd red = 6904.6 - 0.00
= 6904.6 KN
- STAAD Result from Pile Model
Moment-Y Moment-Z
Beam L/C Node Shear-Y kN Shear-Z kN
kNm kNm
101 42 4 -407.6 -58.7 -1635.7 0.5
4 407.6 58.7 1452.3 25.9
Page No. 72
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
= 1 + 0.6 e
D + 4d
= 1 + 1.885 0.2369
1200 + 7539
= 1.0 (refer cl.10.4.3 eq.10.28)
VRd.max = 1 .fcd
2
= 0.6 1 - fck
310
2
= 0.523 N/mm
0.75
1 7 3
1.8
0 0
2.8
5.7
4.2
2 8
wh 4
0.75
4.50
u0 = 4198.3 mm
net base pressure force
VEd = 6904.6 kn
VEd red = VEd - VEd (refer cl.10.4.5 )
VEd red = 6904.6 - 0.00 Conservatively
= 6904.6 KN
Page No. 74
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
K = 1 + 200
d
= 1.326
ly = Asw 0.02
b.d
= 4091
1000 x 1885
= 0.00217
lz = Asw 0.02
b.d
= 4462
1000 x 1867
= 0.00239
1 = ly lz (refer 10.4.4 eq10.35)
= 0.0023
= 0.228 %
VRd.c = 0.12 K(80.1fck)^(1/3) 2d/a
= 0.12 x 1.33 ( 80x 0.00228x 40 ) ^ x 3770
942
= 1.234 N/mm
= 1.234 > 0.953 SAFE
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
0.75
1 7 3
1.8
0 0
2.8
5.7
4.2
2 8 4
0.75
4.50
VEd = 0
VEd red = 10370.2 - 0.00
= 10370.2 KN
Page No. 76
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
ey/bz^2 = 0.0577
= 1.61 ez/by^2 = 0.0576
(refer cl.10.4.5 )
d = 1885 mm
VEd.max = x VEd red (refer cl 10.4.3 eq.10.24)
uid
= 1.61 x 10370213
9200 x 1885
= 0.96 N/mm
VRd.max = 1 .fcd
2
= 0.6 1 - fck
310
= 0.52
VRd.max = 0.5 x 0.52 x 17.87 Concrete strenght is consider at column face
= 4.668 > 0.96 Ved.max SAFE
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
0.93
1.8
0 0
2.8
5.7
4.2
2 8 4
0.75
4.50
u0 =
Perimeter of Pier = = 16.67
= 2[( 934 + 1800 + 934 )+( 934 + 2800 + 934 )]
= 16668 mm
Applied shear force = 10370.2
VEd = 10370.2 kn
VEd red = VEd - VEd (refer cl.10.4.5 )
VEd = 0
VEd red = 10370.2 - 0.00
= 10370.2 KN
Page No. 78
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
2-Jun-17
proposed 4TH terminal of JNPT (Phase-1)
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
ey/bz^2 = 0.058
= 1.61 ez/by^2 = 0.058
(refer cl.10.4.5 )
d = 1885
VEd.max = x VEd red (refer cl 10.4.3 eq.10.24)
uid
= 1.61 x 10370213
16668 x 1885
= 0.53 N/mm
VRd.max = 1 .fcd
2
= 0.6 1 - fck
310
= 0.52
VRd.max = 0.5 x 0.52 x 17.87 Concrete strenght is consider at column face
= 4.668 > 0.53 Ved.max SAFE
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
Page No. 80
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
Page No. 81
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
sm - cm =
Page No. 82
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
. .. m = 6.0
j = 1 - n = 0.948 <= 0.95
3
Stress in reinforcement provided
st = M
Ast j d
= 3539 x 1000000
20081 x 0.948 x 1867
= 99.54 N/mm2
Page No. 83
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
2
fct.eff = 3.00 N/mm
0.6x 99.54 = 0.6x99.54/200000 = 0.00030
Es
sm - cm =
= 0.00030
Page No. 84
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B & from KM DATE SHEET
5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to proposed 4TH terminal of
JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
This report presents design of pier. The substructure model comprising of pilecap, pier and
piercap has been analysed for relevant primary loads and their combinations as per IRC:6.
Analysis results from substructure analysis has been utilized for pier design in this report.
Superstructure has been supported through piercap on a single pier. Hence, the pier is basically a
Cantilevered column subjected to bia-axial moment. Therfore, design forces and moments at bottom of
pier has been extracted from design results and used in pier design further.
Note: As the Clause 218.9, IRC 6 - 2014 is not applicable to Pier, Moment are reduced by 35%.
Page No. 85
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B & from KM DATE SHEET
5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to proposed 4TH terminal of
JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
Page No. 86
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B & from KM DATE SHEET
5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to proposed 4TH terminal of
JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
Pier has been designed as per IRC guidelines. Based on propoerties of materials used,
design constants have been evaluated as below:-
Section Properties
The pier section and proposed percentage and configuration of reinoforcement has been checked for
all ULS load combinations.
Height of Pier from top of pilecap to top of piercap = 8.32 m
Trans Axis
Z
Y Y
2.80
Longitudinal axis
z
b = 1.8 m
1.8 D = 2.8 m
4
Iyy = 1.8x2.8^3 /12= 3.3 m
Traffic Direction
4
Izz = 2.8x1.8^3/12 = 1.4 m
Page No. 87
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B & from KM DATE SHEET
5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to proposed 4TH terminal of
JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
Clear cover = 50 mm
Assume Reinforcement Bar Size =
About z axis f = 32 mm About y axis f = 32 mm
32
d2/D = (50+16)/2800 = 0.024
d2/b = (50+16)/1800 = 0.037
Pier Length (l 0 ) = 8.32 m
Pier Size = 1.8m x 2.8 m
2
Gross Area Ag = 5040000 mm
Design Properties
Moment of Intertia
4
Iy = (1800 * 2800^3 ) / 12 = 3.29E+12 mm
4
Iz = (2800 * 1800^3 ) / 12 = 1.36E+12 mm
Radius of Gyration
ryy = Iy/A ( 3.29E+12 / 5040000 ) = 808.3 mm
rzz = Iz/A ( 1.36E+12 / 5040000 ) = 519.7 mm
fef=f( ,t 0) M0 EQP/M0ED
M0 EQP= BM in quasi-permaent load combinations = 5342 kNm
M0 ED= BM in ULS design load combinations = 10672 kNm
Page No. 88
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B & from KM DATE SHEET
5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to proposed 4TH terminal of
JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
M0 EQP/M0ED = 5342/10672.0496296296
= 0.501
fef= fxM0 EQP/M0ED
= 1.5 x 0.501 = 0.751
f( ,t 0) = 1.2
A = 1/ (1+0.2 x 1.2)= 0.87
B = ( 1 + 2w)
w= Reinforcement Ratio=
As fyd = 27489x434.8 = 0.133
Ac.fcd 5040000x 17.87
B = sqrt ( 1 + 2x0.133) 1.126
C = 1.7 - rm consider rm = 1 (conservatively)
= 1.7-1
= 0.7
n = N ED / (A c *f cd )
= 14676.362/ (5040000x17.87)
n = 0.163
lim = 20x0.87x1.126x0.7/SQRT(0.163)
= 33.97
M02y = My + eiy NED Where eiy & eiz are Eccentricities due to Imperfections
M02z = Mz + eiz NED
Trial Steel
For MT T 25 Nos 1 X 10 = 19635 sqmm Along 1.8 m widthi.e 0.39% @ Y-Y Axis
25 Nos 1 X 10
T 25 Nos 1 X 10
25 Nos 1 X 10
For ML T 25 Nos 1 X 18 = 25525 sqmm Along 2.8 m widthi.e 0.51% @ Z-Z Axis
25 Nos 1 X 8
T 25 Nos 1 X 18
25 Nos 1 X 8
Page No. 89
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B & from KM DATE SHEET
5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to proposed 4TH terminal of
JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
NED = 0.061
bhfck
Page No. 90
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B & from KM DATE SHEET
5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to proposed 4TH terminal of
JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
a a
Hence Interaction Ratio 10672 5569
1
22579 15604
= 0.466 + 0.351
= 0.817 < 1 Ok
Page No. 91
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B & from KM DATE SHEET
5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to proposed 4TH terminal of
JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
Page No. 92
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B & from KM DATE SHEET
5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to proposed 4TH terminal of
JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
Page No. 93
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B & from KM DATE SHEET
5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to proposed 4TH terminal of
JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
Page No. 94
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B & from KM DATE SHEET
5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to proposed 4TH terminal of
JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
Inter
case Pu/fck bd M T ML MuTcap MuL cap MT ML ratio
ML
Fck bd2 Fck bd2 MT CAP CAP
Page No. 95
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B & from KM DATE SHEET
5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to proposed 4TH terminal of
JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
Page No. 96
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B & from KM DATE SHEET
5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to proposed 4TH terminal of
JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
5951.7
3.0 Design constants: As per IRC 112:2011 as per annexure A-2
Pier has been designed as per IRC guidelines. Based on propoerties of materials used,
design constants have been evaluated as below:-
Page No. 97
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B & from KM DATE SHEET
5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to proposed 4TH terminal of
JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
Section Properties
The pier section and proposed percentage and configuration of reinoforcement has been checked for
all ULS load combinations.
Height of Pier from top of pilecap to top of piercap = 5.32 m
Trans Axis
Z
Y Y
2.2
Longitudinal axis
z
b = 1.8 m
1.8 D = 2.2 m
4
Iyy = 1.8x2.2^3 /12= 1.6 m
Traffic Direction
4
Izz = 2.2x1.8^3/12 = 1.1 m
Clear cover = 50 mm
Assume Reinforcement Bar Size =
About z axis f = 25 mm About y axis f = 25 mm
Design Properties
Moment of Intertia
4
Iy = (1800 * 2200^3 ) / 12 = 1.60E+12 mm
4
Iz = (2200 * 1800^3 ) / 12 = 1.07E+12 mm
Radius of Guyration
ryy = Iy/A ( 1.60E+12 / 3960000 ) = 635.1 mm
rzz = Iz/A ( 1.07E+12 / 3960000 ) = 519.7 mm
Page No. 98
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B & from KM DATE SHEET
5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to proposed 4TH terminal of
JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
le = 1.3 l0
fef=f( ,t 0) M0 EQP/M0ED
M0 EQP= BM in quasi-permaent load combinations = 5342 kNm
M0 ED= BM in ULS design load combinations = 8471 kNm
f( ,t 0) = 1.2
A = 1/ (1+0.2 x 1.2)= 0.841
B = ( 1 + 2w)
w= Reinforcement Ratio=
As fyd = 27489x434.8 = 0.107
Ac.fcd 6300000x 17.87
B = sqrt ( 1 + 2x0.107) 1.102
C = 1.7 - rm consider rm = 1 (conservatively)
= 1.7-1
= 0.7
n = N ED / (A c *f cd )
= 14283.299/ (6300000x17.87)
n = 0.127
Page No. 99
NOTE No. R
STRUCTCON DESIGNS PVT LTD. SC/866-S/C1/DN/6405 0
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B & from KM DATE SHEET
5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to proposed 4TH terminal of
JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG ABY
lim = 20x0.841x1.102x0.7/SQRT(0.127)
= 36.41
M02y = My + eiy NED Where eiy & eiz are Eccentricities due to Imperfections
M02z = Mz + eiz NED
Trial Steel
For MT T 25 Nos 1 X 10 = 9817 sqmm Along 1.8 m widthi.e 0.25% @ Y-Y Axis
T 25 Nos 1 X 10
For ML T 25 Nos 1 X 18 = 17671 sqmm Along 2.2 m widthi.e 0.45% @ Z-Z Axis
T 25 Nos 1 X 18
0.69%
Ac = 6300000 mm2
As = 27489.0 mm2
Asy = 9817.5 mm2
Asz = 17671.5 mm2
NED = 0.065
bhfck
Interaction Ratio
a a
MEDy MEDz
1
MRDy MRDz
a a
Hence Interaction Ratio 8471 4576
1
11151 11690
= 0.763 + 0.397
= 1.159 > 1 Please Redesign
Inter
case Pu/fck bd M T ML MuTcap MuL cap MT ML ratio
ML
Fck bd2 Fck bd2 MT CAP CAP
0.071 0.781
0.048
Ductile detailing has been carried out in pier as the structure is in seismic zone-III. IRC:112-
Section 17.2 has been refered.
AC = 2.8 x 1.8
2
= 5.04 m
fck = 40 Mpa
nk = = 14676.4 x 1000
5040000 x 40
= 0.027
=6091.7/1.35
4512.37
Not less than 80%
kN.m
=7029.4/1.35
5206.96 kN.m
Hence extent of confinement = 3000 mm from bottom towards center in the pier.
Reinforcement Provided
12 nos 32 dia for transverse mom
24 nos 25 dia each for long
Refer IRC 112 Table 12.4 Crack width less than 0.2 mm
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
1 1.50 - 4.50
Brownish gray coloured loose
2 4.50 - 7.50 9000 - 18000
soft marine to firm marine clay
3 7.50 - 11.10
4 11.10 - 12.50 Brownish coloured completely
30000 - 40000
5 12.50 - 15.00 weathered rock
6 15.00 - 18.00
7 18.00 - 21.00 Brownish coloured completely to
8 21.00 - 24.00 highly weathered amygdaloidal 50000 - 80000
9 24.00 - 27.00 basalt rock
10 27.00 - 30.50
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
0.00 m G.L
-0.75 m
Spring
Stiffness -2.75 m
Soil support in -3.20 m
Brownish Coloured completely to highly Brownish Gray coloured loose soft
Subgrade Modulus Range 9000 to
58119 -16.20 m
67320 -17.20 m
72705 -18.20 m
78091 -19.20 m
40000 kN/m3
83477 -20.20 m
88862 -21.20 m
94248 -22.20 m
99633 -23.20 m
105019 -24.20 m
110405 -25.20 m
115790 -26.20 m
75398 -27.20 m
Subgrade Modulus
Range 50000 to
amygdaloidal basalt
94248 -28.20 m
Coloured fractured
slightly weathered
Brownish/Greyish
80000 kN/m3
Socketin
g Length
rock
131947 -29.20 m
Fixed = 3.0 m
-30.20 m
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
4997 278
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
6905 279
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
2889 279
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
4702 278
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
governs for maximum vertical load.
Plie 2 Maximum Vertical Load + Maximum Bending Moment
Sr. Pile 1 (Node 102) Pile 2 (Node 202) Pile 3 (Node 62)
No P HLong HTrans P HLong HTrans P HLong HTrans
1 3 5 7 9 11 13 15 17 19
431 2617 106 233 5921 106 233 282 133 243
441 2662 124 238 6380 124 238 791 114 253
442 2808 134 244 6602 134 244 344 123 238
443 2784 133 243 6631 133 243 293 132 243
444 2993 114 252 6905 114 253 265 133 243
445 2689 123 237 6363 123 238 620 114 248
446 2840 132 242 6592 132 243 1466 149 70
447 2799 132 243 6638 133 243 1229 168 73
448 3013 114 248 6810 114 248 178 76
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
Load Vertical Hlong Htrans Moment at Pile Moment at Pile Moment at Pile top
Comb. Load top top considering tilt & Resultant Moment
Shift
(Mlong) (Mtrans)
Load Vertical Hlong Htrans Moment at Pile Moment at Pile Moment at Pile top
Comb. Load top top considering tilt & Resultant Moment
Shift
(Mlong) (Mtrans)
431 6783 35 29 707 699 360 1354
441 7245 41 28 829 731 384 1489
442 7478 44 28 897 748 397 1564
443 7504 44 28 889 749 398 1560
444 7797 37 29 761 774 413 1499
445 7227 40 28 820 727 383 1479
446 7465 43 28 879 743 396 1547
447 7510 43 28 885 748 398 1557
448 7695 37 29 761 758 408 1482
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
- STAAD Results for pIle 2 at 14.5m from top of pile ( at Curtailment location)
Load Vertical Hlong Htrans Moment at Pile Moment at Pile Moment at Pile top
Comb. Load top top considering tilt & Resultant Moment
Shift
(Mlong) (Mtrans)
431 6981 61 81 126 207 370 612
441 7443 72 84 148 213 395 654
442 7676 78 86 160 218 407 677
443 7701 77 86 159 217 408 678
444 7995 66 89 136 225 424 687
445 7425 71 84 147 212 394 652
446 7663 76 85 157 216 406 674
447 7708 77 86 158 217 409 677
448 7893 66 87 136 221 419 678
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
Load Vertical Hlong Htrans Moment at Pile Moment at Pile Moment at Pile top
Comb. Load top top considering tilt & Resultant Moment
Shift
(Mlong) (Mtrans)
Load Vertical Hlong Htrans Moment at Pile Moment at Pile Moment at Pile top
Comb. Load top top considering tilt & Resultant Moment
Shift
(Mlong) (Mtrans)
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
- STAAD Results for pIle 3 at 14.5m from top of pile ( at Curtailment location)
Load Vertical Hlong Htrans Moment at Pile Moment at Pile Moment at Pile top
Comb. Load top top considering tilt & Resultant Moment
Shift
(Mlong) (Mtrans)
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
Grade of Concrete = M0
Grade of Steel = Fe500
Grade of Concrete = M0
Grade of Steel = Fe500
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
- Design constants
Fyk = 500
fyd = 500/1.15
= 435 N/mm2
fctm = 3
x = 0.8x0.583
= 0.467
- Section Properties
Diameter of Pile = 1.2 m
2
Z Area of Pile = 1.13097 m
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
Note: As the section is subjected to direct tension and bending for minimum axial load
ans maximum bending moment, hence considering equivalent square section for
calculating interaction ratio.
2
6 - 20 # Total Area of Column = 1.13097 mm
2
1.063 Total Area of Steel = 7539.82 mm
d' 95 0.09
= =
D 1063
6 - 20 #
1.063
6 - 20 #
6 - 20 #
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
Case 3: Check for Pile 2 at 14.50m from top of pile (at curtailment location)
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
Case 6: Check for Pile 3 at 14.50m from top of pile (at curtailment location)
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
0.33
VRd c = ( 0.12 x 1.43 x ( 80 x 0.003 x 40 ) + 0.15 x 6.71 )
x 1063 x 1063
= 1560 kN
AC = 1063 x 1063
2
= 1130973 m
fck = 40 Mpa
nk = 7680.72 x 1000
1130973 x 40
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
pw = 4 Asp
Dsp*SL
Pile Diameter (D) = 1200 mm
Diameter of Spiral or Hoop (Dsp) = 1030 mm
Spacing of Spiral Bars = 100 mm
Diameter of Spiral or Hoop bar (Dsp) = 10 mm
Area of Spiral or Hoop bar (Dsp) = 78.5398 mm2
pw = 4 x 78.54 = 0.003
1030 x 100
wwd.c Max(1.4ww.req;0.18)
Ac = 1130973 mm2
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
Load vertical Long. Trans. Resultan Load vertical Long. Trans. Resultan
Case Force Force Force t Case Force Force Force t
301 3581 70 0 70 301 2805 70 0 70
311 3735 130 0 130 311 2958 130 0 130
321 3516 75 5 75 321 2740 75 5 75
322 3620 80 11 80 322 2844 80 11 80
323 3601 79 10 80 323 2825 79 10 80
324 4037 70 0 70 324 3261 70 0 70
325 3548 74 5 74 325 2772 74 5 74
326 3663 78 9 79 326 2887 78 9 79
327 3619 79 10 80 327 2843 79 10 80
328 4023 70 0 70 328 3247 70 0 70
331 3054 84 94 126 331 2278 84 94 126
341 2946 89 106 139 341 2170 89 106 139
342 3051 95 111 146 342 2275 95 111 146
343 3032 94 111 145 343 2256 94 111 145
344 3468 84 101 132 344 2692 84 101 132
345 2979 89 105 138 345 2202 89 105 138
346 3094 93 110 144 346 2318 93 110 144
347 3050 94 110 145 347 2274 94 110 145
348 3453 84 101 132 348 2677 84 101 132
351 3265 78 56 97 351 2489 78 56 97
361 3152 84 66 106 361 2376 84 66 106
362 3291 89 71 114 362 2515 89 71 114
363 3266 88 70 113 363 2490 88 70 113
364 3849 78 61 99 364 3073 78 61 99
365 3195 83 65 105 365 2419 83 65 105
366 3348 87 70 112 366 2572 87 70 112
367 3289 88 70 112 367 2513 88 70 112
368 3829 78 61 99 368 3053 78 61 99
2170 146
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
Load vertical Long. Trans. Resultan Load vertical Long. Trans. Resultan
Case Force Force Force t Case Force Force Force t
301 3844 70 0 70 301 3068 70 0 70
311 3998 130 0 130 311 3222 130 0 130
321 4189 75 5 75 321 3413 75 5 75
322 4367 80 11 81 322 3590 80 11 81
323 4400 79 10 80 323 3624 79 10 80
324 4609 70 1 70 324 3833 70 1 70
325 4178 74 5 74 325 3402 74 5 74
326 4368 78 10 79 326 3592 78 10 79
327 4409 79 10 80 327 3633 79 10 80
328 4549 70 0 70 328 3773 70 0 70
331 4430 84 94 126 331 3654 84 94 126
341 4818 90 106 139 341 4041 90 106 139
342 4995 95 112 146 342 4219 95 112 146
343 5029 94 111 145 343 4253 94 111 145
344 5238 84 101 132 344 4462 84 101 132
345 4807 89 105 138 345 4030 89 105 138
346 4996 93 110 144 346 4220 93 110 144
347 5038 94 111 145 347 4262 94 111 145
348 5178 84 101 132 348 4402 84 101 132
351 4196 79 56 97 351 3420 79 56 97
361 4653 84 66 106 361 3877 84 66 106
362 4861 89 71 114 362 4085 89 71 114
363 4910 88 71 113 363 4134 88 71 113
364 5240 79 61 99 364 4464 79 61 99
365 4642 83 65 105 365 3866 83 65 105
366 4870 87 70 112 366 4094 87 70 112
367 4923 88 70 113 367 4147 88 70 113
368 5160 79 61 99 368 4384 79 61 99
3068 146
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
Load vertical Long. Trans. Resultan Load vertical Long. Trans. Resultan
Case Force Force Force t Case Force Force Force t
301 2122 70 0 70 301 1346 70 0 70
311 1968 130 0 130 311 1192 130 0 130
321 1980 75 5 75 321 1204 75 5 75
322 2006 80 11 81 322 1230 80 11 81
323 1947 79 10 80 323 1171 79 10 80
324 2521 70 1 70 324 1745 70 1 70
325 1964 74 5 74 325 1188 74 5 74
326 1952 78 10 79 326 1176 78 10 79
327 1928 79 10 80 327 1152 79 10 80
328 2316 70 0 70 328 1540 70 0 70
331 1536 84 94 126 331 760 84 94 126
341 1351 90 106 139 341 575 90 106 139
342 1377 95 112 146 342 601 95 112 146
343 1319 94 111 145 343 543 94 111 145
344 1892 84 101 132 344 1116 84 101 132
345 1335 89 105 138 345 559 89 105 138
346 1323 93 110 144 346 547 93 110 144
347 1300 94 111 145 347 523 94 111 145
348 1687 84 101 132 348 911 84 101 132
351 1770 79 56 97 351 994 79 56 97
361 1584 84 66 106 361 808 84 66 106
362 1646 89 71 114 362 870 89 71 114
363 1565 88 71 113 363 789 88 71 113
364 2278 79 61 99 364 1502 79 61 99
365 1558 83 65 105 365 782 83 65 105
366 1567 87 70 112 366 791 87 70 112
367 1538 88 70 113 367 762 88 70 113
368 2004 79 61 99 368 1228 79 61 99
523 146
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
Load vertical Long. Trans. Resultan Load vertical Long. Trans. Resultan
Case Force Force Force t Case Force Force Force t
301 2385 70 0 70 301 1609 70 0 70
311 2232 130 0 130 311 1455 130 0 130
321 2653 75 5 75 321 1877 75 5 75
322 2752 80 11 80 322 1976 80 11 80
323 2746 79 10 80 323 1970 79 10 80
324 3093 70 0 70 324 2317 70 0 70
325 2594 74 5 74 325 1818 74 5 74
326 2656 78 9 79 326 1880 78 9 79
327 2718 79 10 80 327 1942 79 10 80
328 2842 70 0 70 328 2066 70 0 70
331 2912 84 94 126 331 2136 84 94 126
341 3223 89 106 139 341 2446 89 106 139
342 3321 95 111 146 342 2545 95 111 146
343 3316 94 111 145 343 2540 94 111 145
344 3663 84 101 132 344 2886 84 101 132
345 3163 89 105 138 345 2387 89 105 138
346 3226 93 110 144 346 2450 93 110 144
347 3288 94 110 145 347 2512 94 110 145
348 3412 84 101 132 348 2635 84 101 132
351 2701 78 56 97 351 1925 78 56 97
361 3085 84 66 106 361 2308 84 66 106
362 3217 89 71 114 362 2440 89 71 114
363 3209 88 70 113 363 2433 88 70 113
364 3670 78 61 99 364 2893 78 61 99
365 3005 83 65 105 365 2229 83 65 105
366 3089 87 70 112 366 2313 87 70 112
367 3172 88 70 112 367 2396 88 70 112
368 3335 78 61 99 368 2559 78 61 99
1925 146
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
Load Vertical Hlong Htrans Moment at Pile Moment at Pile Moment at Pile top
Comb. Load top top considering tilt & Resultant Moment
(Mlong) (Mtrans) Shift
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
Load Vertical Hlong Htrans Moment at Pile Moment at Pile Moment at Pile top
Comb. Load top top considering tilt & Resultant Moment
(Mlong) (Mtrans) Shift
Load Vertical Hlong Htrans Moment at Pile Moment at Pile Moment at Pile top
Comb. Load top top considering tilt & Resultant Moment
Shift
(Mlong) (Mtrans)
Note: Maximum stress in concrete and steel has been checked by BT Program.
PROJECT: Design and Consruction of Interchange (from KM 3.600 to KM 6.073 of NH-4B DATE SHEET
& from KM 5.300 to Km 7.422 of NH-348 (OLD SH54)) and connectivity to
proposed 4TH terminal of JNPT (Phase-1) 2-Jun-17
SUBJECT: Design of Pile foundation and Pier for Free/Expansion Joint pier BY CHKD
P250 & P253 (Group No. 404) of Ramp 1 - Section -2. BKG Dr.ABY
Maximum
Vertical Maximum Tensile
Load Combination Moment Compressive Remark
Load Stress in Steel
Stress in Concrete
in kN in kN.m N/mm2 N/mm2
41 4044 593 6.804 0.000 SAFE
Stress Check at top of Pile Stress Check at top of Pile
1 1.50 m to 4.50 m
2 4.50 m to 7.50 m Brownish gray colored loose soft to firm marine clay
(9000-18000 kN/m3)
3 7.50 m to 11.10 m
6 15.00 m to 18.00 m
7 18.00 m to 21.00 m
10 27.00 m to 30.50m
PRGR405
~~~~~~~
Analysis of Section under Bending + Thrust
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Input data Date : 2017.06.02
~~~~~~~~~~ ~~~~~~~~~~~~~~~~~
Concrete :Inst.Modulus,Ei = 3.334576E+07 KN/M
Deferred Modulus = 3.334576E+07 KN/M
Shrk.Strain,shr = 0 Allow.Tensile stress,ft = 0 KN/M
Rebars : Total nr = 92 Mod.of Elasticity,Er = 2E+08 KN/M
As/Ac = .89 %
Node coordinates : Ac = 5.04 M
~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Node# X(M) Y(M) Node# X(M) Y(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
1 0 0 2 0 2.8
3 1.8 2.8 4 1.8 0
5 0 0
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Reinforcement Details :
~~~~~~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Bar# X(M) Y(M) Area(M) Bar# X(M) Y(M) Area(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
R 1 .073 .073 .00049 R 11 .073 1.634 .00049
R 21 .546 2.728 .00049 R 31 1.728 2.415 .00049
R 41 1.728 .853 .00049 R 51 .971 .073 .00049
R 61 .123 1.59 .00049 R 71 1.678 .452 .00049
R 81 1.395 2.678 .00049 R 91 .405 .123 .00049
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Characteristics of Total Section :
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
At = 5.2653 M Xc = .9 M Yc = 1.4 M
Load case : 41
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 4044 593 -1 6810.616 725.376 1.223
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 6804.472 KN/M at Node# 75
Load case : 43
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 4635 679 -1 7801.378 830.959 1.223
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 7795.174 KN/M at Node# 75
Load case : 44
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 4666 675 -1 7805.377 831.382 1.231
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 7799.176 KN/M at Node# 75
Load case : 45
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 4859 651 -1 7835.365 834.559 1.281
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 7829.18 KN/M at Node# 75
Load case : 47
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 4634 674 -1 7772.341 827.863 1.228
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 7766.141 KN/M at Node# 75
Load case : 48
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 4674 675 -1 7812.227 832.112 1.232
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 7806.026 KN/M at Node# 75
Load case : 49
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 4799 650 -1 7778.353 828.486 1.274
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 7772.169 KN/M at Node# 75
Load case : 62
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 599 422 -1 5991.984 161.347 .383
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 5968.167 KN/M at Node# 75
Load case : 63
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 614 445 -1 6376.612 167.695 .377
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 6352.158 KN/M at Node# 75
Load case : 64
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 558 436 -1 6392.169 158.152 .364
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 6366.206 KN/M at Node# 75
Load case : 66
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 583 520 -1 7880.861 178.896 .344
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 7852.278 KN/M at Node# 75
Load case : 67
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 563 437 -1 6394.643 158.956 .365
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 6368.8 KN/M at Node# 75
Load case : 68
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 540 434 -1 6413.062 155.361 .359
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 6386.553 KN/M at Node# 75
Load case : 41
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 4255 857 -1 8591.326 887.549 1.033
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 8584.798 KN/M at Node# 75
Load case : 42
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 4657 93 -1 4517.381 480.929 5.171
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 4511.59 KN/M at Node# 75
Load case : 43
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 4845 980 -1 9810.496 1006.991 1.031
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 9803.84 KN/M at Node# 75
Load case : 45
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 5069 917 -1 9553.012 1007.662 1.098
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 9546.576 KN/M at Node# 75
Load case : 46
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 4646 926 -1 9313.7 960.826 1.04
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 9307.116 KN/M at Node# 75
Load case : 47
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 4844 969 -1 9734.392 1007.81 1.037
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 9727.796 KN/M at Node# 75
Load case : 49
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 5010 912 -1 9477.452 998.71 1.094
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 9471.014 KN/M at Node# 75
Load case : 61
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 1038 837 -1 12356.05 298.705 .358
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 12328.23 KN/M at Node# 75
Load case : 62
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 838 912 -1 14346.92 292.581 .321
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 14313.65 KN/M at Node# 75
Load case : 64
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 797 957 -1 15281.01 298.822 .312
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 15246.13 KN/M at Node# 75
Load case : 65
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 1387 898 -1 12344.26 359.447 .401
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 12321 KN/M at Node# 75
Load case : 66
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 822 906 -1 14282.26 289.483 .319
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 14248.81 KN/M at Node# 75
Load case : 68
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 779 955 -1 15296.42 292.691 .308
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 15260.82 KN/M at Node# 75
Load case : 69
~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(KN) Mx(KNM) My(KNM) f0(KN/M) Xn(M) Yn(M)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 1181 893 -1 12942.42 328.348 .369
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 12915.74 KN/M at Node# 75