ecological cellulose produced from trees grown in production forests under responsible management, and selected recycled three-layer fibres.

France
Alstom Grid
Immeuble Le Galile

www.alstom.com
92907 La Dfense Cedex
51 esplanade du Gnral de Gaulle

think grid #11 Spring/summer 2013


SHARING
#11
& PRACTICES
INNOVATION
ALSTOM GRID

MAIN FEATURE p. 13

Substations
go fully digital
thinkgrid
Contents Dates for your diary

#11 Spring/Summer 2013

08
May 1317, 2013
Gothenburg, Sweden
Elfack 2013
13 12
This trade fair is the Nordic regions largest
meeting place for the entire electricity
industry. It brings together power companies,
decision-makers, politicians, installers,
June 1213, 2013
Manchester, UK
Offshore Wind 2013
This is the 11th annual offshore wind
conference and exhibition. Organised by
RenewableUK, the UKs leading renewable
energy trade association, it is expected
August 2530, 2013
Seoul, Korea
ISH 2013 25
The 2013 edition of the International
Symposium on High Voltage Engineering (ISH)
is a magnet for engineers, scientists, academics,
researchers and politicians to discuss the
Interview with distributors and more for five days of product
news, seminars, training and networking.
to attract over 3,000 delegates and some
200 exhibitors. The conference programme
industry challenges and issues. It is also a
platform to share technology advances and
Luis Alejandro The Power Forum is an opportunity will focus on planning for growth, financing, experience. Topics include HV testing and
Camargo Suan to learn more about smart networks, the
infrastructure of the future and alternative
policy and community, emerging markets,
the supply chain, as well as technology
measurement techniques, insulation materials,
asset management, smart grids, etc.
and Maria energy sources. and innovation.

Nohemi Arboleda
Arango

38 Smart products
& services
Synchrophasor solutions:
making the smart grid
even smarter

10 4
Vancouver, ranked as one of the most

06
The Stockholm waterfront. livable cities in the world. One of the five Grand Palaces in Seoul.

Alstom receives the Respecting June 1013, 2013 July 2125, 2013 September 47, 2013
2012 Frost & Sullivan the environment Stockholm, Sweden Vancouver, Canada Jakarta, Indonesia
Outstanding Technology CIRED 2013 IEEE Power & Energy Society Electric, Power & Renewable
Innovation Award Substations General Meeting Energy Indonesia 2013
go fully digital The biennial CIRED international electricity
conference and exhibition is a leading forum The theme of this years General Meeting is: This biennial exhibition reflects Indonesias
Dr Richard for the electricity distribution community. Shaping the future energy industry. phenomenal economic expansion

21
Charnah, This years event has as its theme: Electricity The conference will bring together power accompanied by equally rapid power
Publisher
distribution systems for a sustainable future. engineers and academics from across the demand. In parallel, the country has set
t hinkgrid SHARING ALSTOM GRID INNOVATION & PRACTICES Published by Alstom Grid
The three-day conference includes plenary
sessions with internationally recognised
world. The aim is to provide an international
forum for experts to discuss issues
aside substantial sums to develop its power
and energy infrastructure, hence the
51 esplanade du Gnral de Gaulle 92907 La Dfense Cedex France. www.alstom.com/grid Print run: keynote speakers, poster sessions, round and developments in electrical power importance of this three-part exhibition
15,000 copies (Chinese, English, French) Publisher: Richard Charnah Editor in chief: Vronique Chauvot tables, and research and innovation forums. engineering. Topics will include, among Power Indonesia, Renewable Energy
Editorial board: Stphan Lelaidier, Richard Charnah, Walter Dussaucy, Vronique Chauvot Concept and Design: others, transmission efficiency and Electric Indonesia.
BythewayCreacom 19 rue Galile, 75116 Paris France Tel.: +33 (0)1 53 57 60 60 www.bythewaycreacom.net and reliability, advances in protection,
Editorial executive: Henry Lewis Blount Publication manager: Valrie Barral Contributors: Henry Lewis Blount, automation and control.
Ken Kincaid, Patrick Love, Louis-Antoine Mallen, Manuel Relvas, Gordon Smith Copy editor: Ginny Hill
Art director: Katja Zimt Graphic designer: Sandie Herviou Computer graphics artist: Laurent Bouyer, Studio V2
Photo credits: Alstom, XM, Irish control center/Eirgrid, Friends of the Supergrid, Medgrid/Realisation and graphic
design: Regards Events, Rusty Rae, Shutterstock, Thinkstock Printing: HandiPrint. ISSN: 2102-0175. A special
thanks to the companies that kindly provided us with their illustrations. Alstom Grid///Spring/Summer 2013 51
5 Foreword
By Stphan Lelaidier:
R&D Vice-President,
Alstom Grid

6 PANORAMA
Alstom receives the 2012 Frost &
Sullivan Outstanding Technology
Innovation Award
Innovation
& performance 8 INTERVIEW WITH
Pushing GIS limits Luis Alejandro Camargo Suan,
CEO of XM, and Maria Nohemi
to new horizons Arboleda Arango, XM Manager
at the National Energy
Dispatch Centre

11 MAIN FEATURE
Pushing the frontiers
of electricity technology

12 Chapter I
Respecting the environment
Substations go fully digital

23 Chapter II
Innovation & performance
Pushing GIS limits to new horizons

38 Chapter III
Smart products & services
Synchrophasor solutions:
making the smart grid
even smarter

48 CROSS-PERSPECTIVES
Is there more to the cloud
than hot air?

Coming up in the next issue


A breakthrough for high voltage DC grids: 50 COMING UP

50
the circuit breaker IN THE NEXT ISSUE
A breakthrough for high voltage
DC grids: the circuit breaker

51 DATES FOR YOUR DIARY


Dont miss...
Think Grid

4 Alstom Grid///Spring/Summer 2013


Foreword By Stphan Lelaidier: R&D Vice-President, Alstom Grid

It is generally accepted that the coming decades will see major changes in the duties
that electricity networks will have to satisfy. The constraints on them such as urbanisation,
climate change or rather its minimisation the integration of renewable energy sources
on a large scale and the widespread adoption of smart grid technologies are well
documented.
This parcel of forces acts in different combinations and strengths in different regions
and touches all the stakeholders in the grid, whether operator, manufacturer, consumer
or whoever. We cannot predict all of these versions of the future but we can prepare
for them and this issue of Think Grid tackles some of the developments that will contribute
to that task.
Flexibility and interoperability will facilitate grid operation without compromising
commercial necessities. Environmentally responsible solutions addressing atmospheric
issues and the way we minimise the use of valuable land will help to ease the pressure
on our planets finite resources. And solutions are not just hardware. We must also
manage the way that we deliver power and even the associated services in order to be
able to respond to whichever version of the future arrives.
You will find examples of all these ways
of thinking in this issue of Think Grid. The
route goes from switchgear and drives that
address environmental issues through
to demand response management and
remote access training systems, and passes
through the digital substation. We expect
all of these to play their part.
Enjoy the journey.

Future vision with


an eye on the details


Alstom Grid///Spring/Summer 2013 5
Panorama

England December 2012 S al e s s n aps h o t s

Germany
Offshore wind farm connection
European transmission system operator TenneT has awarded Alstom the DolWin3 offshore project
connecting the North Sea wind farms to the mainland AC grid. Alstom will supply and construct
the onshore and offshore converter stations as well as the connecting cable systems for DolWin3.
The project will use 320 kV, 900 MW DC technology with voltage source converters to deliver
the energy generated at sea down an 83 km sub-sea cable to the German mainland. Alstom has
also been awarded a five-year service contract for the offshore converter station and platform and
the onshore converter system.

Brazil
Improved power transmission
Colin Davidson, Alstom Grid HVDC R&D Director, Alstom has been awarded a contract to enhance power transmission at two substations in Minas
receiving the Frost & Sullivan European Award for
Technology Innovation. Gerais, Brazil. Both solutions are based on Alstoms flexible AC transmission systems (FACTS).
For the Bom Despacho substation, Alstom will supply a static VAr compensator (SVC) with a power
rating of -200/+300 MVAr. For the So Gotardo substation, the equipment includes a shunt
Alstom receives the 2012 capacitor bank connected to the 345 kV network, with a nominal power of 150 MVAr.
Frost & Sullivan Outstanding
Technology Innovation Award
Alstom has been honoured with Frost &
USA
Sullivans 2012 European VSC HVDC Market management software
Transmission Technology Innovation Award
for its achievement in voltage source converter Alstom has recently implemented the latest version of its e-terramarket market management
(VSC) high voltage direct current (HVDC) platform enabling the PJM Interconnection, North Americas largest wholesale energy market,
transmission technology. to deploy fast-ramping energy resources more efficiently in response to surging demand
Alstom was commended for its latest generation
for electricity.
HVDC solution, the HVDC MaxSineTM (VSC).
This solution helps tackle the performance
and space issues generally associated with
classic line commutated converter (LCC) HVDC
solutions and the efficiency of VSC relative
Indonesia
to LCC, and thereby opens the door Fifty turnkey substations for Java and Sumatra
for many additional applications.
VSC has been identified by many industry PT PLN (Persero) has awarded the PT Alstom Grid and PT Multifabrindo Gemilang consortium
experts as a future technology that will connect six turnkey contracts. These projects are funded by the World Bank. The scope of supply includes
fluctuating renewable energy sources such as the construction of 150 kV, 275 kV and 500 kV substations on Java and Sumatra at around
wind power. Today, it is the best technology 50 locations over 18 months. This will allow PLN to increase the national power supply capacity
to handle multi-terminal interconnections,
by adding new transformer bays on to its network, including Alstoms state-of-the-art equipment
making it a strong competitor for the creation
of microgrids as well as continent-wide and power transformers from its subsidiary in Indonesia, PT Unindo.
Supergrids. Frost & Sullivan Best Practices
awards recognise companies in a variety of
regional and global markets for demonstrating
outstanding achievement and superior
India
performance in areas such as leadership, 800 kV UHVDC
technological innovation, customer service
and strategic product development. Alstom has been awarded a turnkey contract by Power Grid Corporation of India Limited to connect
This prestigious award was presented Champa (state of Chhattisgarh) in central India to Kurukshetra (state of Haryana) in northern
to Colin Davidson, HVDC R&D Director, at India, using 800 kV 3,000 MW ultra high voltage direct current (UHVDC) technology. Alstom
the 2012 Excellence in European Best Practices
will provide 800 kV UHVDC thyristor valves, 32 converter transformers, 400/220 kV gas- and
Awards Banquet on December 5 in London.
It follows the Alstom Innovation Award air-insulated switchgear and substation equipment, communication and supervisory control
which the same group received for and data acquisition systems (SCADA), as well as overall project management, design, engineering,
its 24 MW HVDC VSC demonstrator. civil works, testing and commissioning.

6 Alstom Grid///Spring/Summer 2013


i n F igur e s

Democratisation of energy (Source: Navigant Research)

9,000

8,000

7,000

6,000

5,000

MW

4,000

3,000

2,000

1,000

0
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Expected capacity of resCHP from single and multi-family dwellings, world markets: 2010-2022.

Distributed generation (DG), a key part A key application within this DG trend, of 26,568 MW between 2010 and 2022.
of the evolving smart energy sector, repre- and in the democratisation of energy, is However, it also comments that this fore-
sents in essence the democratisation of resCHP. With a basket of technology and cast could be on the low side.
energy, according to a white paper of size options, homeowners worldwide are The White Paper goes on to speculate that,
January 2013 from clean tech market increasingly able to produce power and sell in 2013, grid operators, seeing the growth
research firm Navigant Research. The avail- power from tens of watts up to a few of small producers wanting to feed load
ability of micro-generating equipment, kilowatts. They are changing from passive into the grid, will wish to exercise a certain
such as solar panels, small wind turbines, consumers to active micro-generators (also control. However, the adopters of resCHP
and residential combined heat and power called prosumers). systems may resist such control. So, in addi-
(resCHP) systems, enables people to pro- The chart above taken from the 2012 tion to the increased adoption of DG tech-
duce, and even sell, their own power. Navigant Research Residential Combined nologies in 2013 and the removal of
This process will take a while to gain Heat and Power report, shows the expected barriers to selling to the grid, the year could
momentum, and significant impact on the capacity of resCHP. Navigant Research be decisive in just how much democracy
energy market will not be seen immediately. estimates a cumulative installed capacity micro-producers are to be allowed.

Alstom Grid///Spring/Summer 2013 7


Interview with

XM has regional
and national plans to
minimise downtime and
restore the service.

Human factors
are fundamental.
8 Alstom Grid///Spring/Summer 2013
Luis Alejandro Camargo Suan,
CEO of XM
Maria Nohemi Arboleda Arango,
XM Manager at the National Energy
Dispatch Centre, Colombia
Mr Camargo and Mrs Arboleda give an overview of the responsibilities
and challenges of a power transmission operator in South/Central America.

Typical Colombian houses. View over Medellin, Colombia. Colombian coffee beans.

ISA, together with its subsidiaryXM, life and the efficiency and competitiveness How would you describe the
is recognised as a leading authority of their enterprises. physical/technical aspects, and the
throughout South/Central America. severity of the system disturbances
Please give our readers some Would you please tell us more about that you may have experienced
insights into your role. how XM is concerned specifically on your transmission systems?
Luis Alejandro Camargo Suan: ISA and its with power quality and LACS: Colombia is a country with huge water
companies are ranked among the largest sustainability of the electricity grid? resources in the centre and south of the coun-
international electrical energy transmission Maria Nohemi Arboleda Arango: Regula- try. Hydro plants generate 70 percent of the
companies in Latin America. Activities focus tions in Colombia establish clear responsi- countrys electricity, the rest being generated
on electric energy transmission, telecom- bilities in terms of quality, security and by thermal plants in the north.
munications transmission, road concessions, reliability of the Interconnected National Our main technical challenges are system
infrastructure projects and smart manage- System (INS) specifically assigned to the oscillations and blackouts. The main oscil-
ment of real-time systems. ISA operates and transmission owners, generators and retail- lation issues come from:
maintains high voltage energy transmission ers, as well as to the entity that coordinates the Colombia-Venezuela interconnection
systems in Colombia, Bolivia, Peru, Brazil operations, the National Dispatch Centre (0.22 Hz). This interconnection is weak, with
and Central America. (NDC) managed by XM. The law of 1994 a single 230 kV line from the north of Colom-
XM is a subsidiary of ISA operating in three established XM as the independent system bia. The problem is exacerbated when the
sectors: power, traffic and transport, and the operator in charge of maintaining secure 500 kV lines interconnecting Colombias north
financial sector. It is engaged in intelligent and reliable operations of the physical sys- and centre are subject to terrorist attack;
management of real-time systems and so tem. XM is responsible for the day-to-day the Colombia-Ecuador interconnection
contributes to the development of cities seek- operation of the electricity system and the (0.40.6 Hz). This is a strong interconnection
ing to improve their inhabitants quality of settlement of the market. composed of four 230 kV lines.

Alstom Grid///Spring/Summer 2013 9


Interview with

XM has
implemented
technology based on
phasor synchronised
measurement.
developed a special protocol, together with
the Ministry of Energy and Mining and the
utilities, to report on events.

Following the major blackout that


Colombia experienced in 2007, a
two-day CIGRE event was organised
in Colombia. What were the lessons
drawn from this initiative?
MNAA: We learned a number of lessons
from the CIGRE event:
human factors are fundamental. Operator
training and accreditation/certification are
also crucial. Furthermore, graphic repre-
sentation for situational awareness will
enable operators to make faster and better
City in the dark after blackout. decisions;
the processes of the operation in normal
and emergency states must be fully docu-
Centre-North (0.81.2 Hz). This power system starting in 2014. We are also mented so that operators adhere to the
happens when the interconnection between implementing a training centre for operators same criteria and procedures;
the north and the centre is weakened by using simulators (DTS and OTS) and accre- recovery plans are fundamental to achiev-
the unavailability of any of the 500 kV links; ditation/certification processes for operators. ing efficient processes and assuring service
low frequency (0.05 Hz). This occurs when XM has created a special group for protec- after events;
there is a high proportion of hydrogeneration tion analysis and control and is implementing appropriate software/hardware tools
(>90 percent) and the main hydro plants are a wide area measurement system (WAMS) are needed to provide quality information
operating at maximum. For this type of oscil- using synchrophasor measurement for for planning, coordination and operation
lation, XM has implemented technology supervision and control and situational of the INS in real time, as well as phasor
based on phasor synchronised measurement. awareness in the control room, plus post- synchronised measurement.
As for blackouts, we have had two critical operative analysis of system events.
power outages (1985 and 2007) and several What support can the industry provide
events affecting large sections of the INS. For the case where, despite the to you to reinforce the power system?
The causes vary: human error, equipment preventive measures, a major failure LACS: Industry can support us in various
overload, voltage or frequency stability does occur, what impact mitigation ways:
problems. Despite guerrilla attacks on the measures do you deploy? by research into new technologies and
infrastructure over the past 20 years, only LACS: XM has regional and national plans applications for anticipation and prevention
one caused a local blackout. Climatic phe- to minimise downtime and restore the ser- as well as situational awareness in real-time
nomena such as El Nio and La Nia can vice. In the past, the recovery time has operation;
also create particular problems. ranged between one and five hours. For the by developing tools and methodologies
blackout in 2007, the time needed to restore for risk monitoring; and
What preventive measures have service was four and a half hours. by offering state-of-the-art technologies
you taken? We have established an internal commu- to raise safety and reliability for the opera-
MNAA: XM is acquiring a new EMS and nication protocol with a view to providing tion centres, plus the appropriate operator
SCADA system to supervise and control the the public with information. We have also training.

10 Alstom Grid///Spring/Summer 2013


MAIn Feature

P
ushing
the frontiers of
electricity technology
12Chapter I
Respecting
the environment

23Chapter II
Innovation
and performance

38Chapter III
Smart products
and services


Alstom Grid///Spring/Summer 2013 11
Main feature chapter I Research with an eye on the future

Respecting
the environment
The IEC 61850 standard has paved the way for the fully digital substation. It offers enhanced
communication and interoperability and, with digital instrument transformers, greater accuracy.
Variable pumped storage enables utilities to integrate wind and solar energy better, to balance the
grid by matching supply to demand, and to raise the efficiency of energy production. High voltage
vacuum circuit breakers are gaining interest as an alternative to SF6-based equipment. Alstom is
one of the leading companies engaged in this development.

12 Alstom Grid///Spring/Summer 2013


Substations go fully digital
but stay compatible
The fully digital substation replaces the kilometres of copper hardwiring
and proprietary devices of conventional installations with a software-based solution
that builds interoperability today and tomorrow.

When asked to define innovation, most expectations become greater, and regula- substation-grade grid routers and switches
people think about inventing completely tions and standards get stricter. from Cisco. Enhanced communication and
new products. In the modern economy it is Substation solutions and components are cyber security functionality are designed
much more than that. Innovation can derive the perfect illustration of all these trends. in (see sidebar 2).
from seeing new ways to combine and Alstoms digital control system has been
improve things that exist already joining the most successful on the market for the Interoperability
computers to telephone networks to produce past 10 years, but it is already being super- DS Agile reconciles the multiple require-
the Internet, for example or new ways to seded by a new solution the companys ments of users, first by offering the most
organise the manufacturing and distribution cutting-edge DS Agile system for substation advanced solution available today without
of products, such as just-in-time manufac- automation. This enables valuable features the need to replace every piece of equip-
turing. And the cycle of innovation is getting like wide-area control, the IEC 61850 pro- ment and software along the whole energy
much shorter, as innovations in one domain cess bus and integrated condition monitor- chain; and second by ensuring that future
become quickly accessible elsewhere, client ing, together with a new range of ruggedised upgrades can be integrated smoothly.


Alstom Grid///Spring/Summer 2013 13
Main Feature chapter I Research with an eye on the future

As Simon Richards, Digital Substa-


tion Marketing Coordinator at Alstom,
explains, Many utilities that wanted to take
advantage of fully digital solutions hesitated
because of the complexity of reconciling
different protocols and the effort needed to
make proprietary systems communicate.
Today, the IEC 61850 standard we use in
DS Agile and all our intelligent electronic
devices (IEDs) and sensors means there are
no issues with proprietary approaches, and
this facilitates interoperability between dif-
ferent equipment and suppliers.
The IEC 61850 to which Richards refers is
a comprehensive standard for Ethernet-
based communication in substations, link-
ing components together and with the

DS Agile reconciles
the multiple require
ments of users.
operator interface. It is also designed to
deliver functionality not supported in legacy
communications protocols. IEC 61850
allows for the full digitisation of the signals
in a substation, which is necessary for the
large amount of data that has to be pro- The digital substation architecture
cessed and communicated for the real-time
management of smarter power grids.
Apart from interoperability of devices from a software-based design change, avoiding recorders, etc.). Third, the station control
different suppliers, IEC 61850 enables the the need for rewiring. level handles communication within the
solution to be engineered as a centralised substation and control system, coordination
scheme or as a decentralised scheme with Three-level architecture with the substation operational functions
dispersed logic. Since it is constantly being The digital substation architecture consists and station-level support.
revised and updated, this standard ensures of three levels. The first is the process level, Real-time operational measurements and
that any investment in bay solution designs interfacing with the primary equipment in other data are polled from sensors embedded
will be repaid by repeated deployments well the switchyard. Second is the protection within the primary system and communi-
into the future, thereby avoiding stranded and control level, including IEDs tradition- cated to the devices that must act on those
assets. Other savings are generated by the ally called secondary equipment (protec- measurements via a process bus. Smart
possibility to tune scheme responses with tion, measurement devices, bay controller, devices and systems within the substation

14 Alstom Grid///Spring/Summer 2013


The extensive self-
diagnosis capability of digital
devices maximises the
up-time of the substation.
can immediately process this data. By sub-
scribing as clients to this data flow over an
Ethernet process bus, the information from
the power system is distributed and com-
municated much more efficiently to the bay
level than in conventional hardwired schemes. Over 215,000
Alstom MiCOM
The DS Agile architecture can be set up as P40 relays
protect critical
a self-healing ring or as an IEC 62439 parallel infrastructures
redundancy protocol (PRP) redundant star, worldwide.
with numerous advantages as summarised
by Richards colleague, Denis Chatrefou, which permits troubleshooting The network can be
Digital Substation R&D Coordinator. The without the need for any primary local to the substation
extensive self-diagnosis capability of digital system outage. or can interconnect several dispersed sub-
devices maximises the up-time of the A typical DS Agile digital control system stations, and can be linked to the grid con-
substation. Any degradation in the perfor- (DCS) incorporates a range of IEDs, such as trol room. The process bus is the link by
mance of an asset is pinpointed in real time. protection relays, measurement devices and which the primary equipment information
Inherent redundancy in the system can monitoring equipment, as well as bay con- travels back to the substations relay room.
be employed to self-heal the operation, trollers, Ethernet switches and gateways. In a fully digital architecture, control

M o r e
Wide-area applications
The BRIC economies (Brazil, these long distances and to running a variety of on-line and
Russia, India, China) are prevent the propagation of off-line applications in systems
building or planning large disturbances requires real-time analysis and control. This
power plants far from their monitoring and the timely enables operators to optimise
main population and industrial implementation of the scheduling of transmission
centres, and wide-area countermeasures. Phasor capacity, to respond to
networks are developing in measurement units (PMU)(1) contingencies, and to preserve
other markets too, with several are at the heart of wide-area stability after disturbances.
countries in Europe planning monitoring, protection and The Alstom P847 PMU exceeds
large offshore wind farms, control. They collect highly the requirements of IEEE
for instance. This is placing time-synchronised data on C37.118 Level 1 with enhanced
an increasing strain on system parameters such as performance under off-nominal
transmission corridors, and voltage, current and frequency, and dynamic system conditions
operators may find themselves which they then report to the by means of an advanced
working ever closer to the PDC (phasor data concentrator) frequency-tracking algorithm.
limits of the networks. for visualisation, data storage (1) More on phasor measure-
To ensure system stability over and, most importantly, for ment in chapter III, article 1.
Andreas Procopiou

Alstom Grid///Spring/Summer 2013 15


Main Feature chapter I Research with an eye on the future

IEC 61850 is the international


standard for Ethernet-based communication
in substations.
commands (switchgear operator overfluxed, and by the connection of ana-
commands, protection trips) are also routed logue secondary circuits. In conventional
to the primary devices via the process bus, current transformers, it is a challenge to Denis Chatrefou
in the opposite direction. In a digital substa- achieve the accuracy at low signal levels
tion, thanks to IEC 61850, the IEDs interact and the dynamic range to satisfy both meas-
with the field via the process bus, and with urement and protection duties. Instead and qualimetering (metering of power
other peer devices in the bay, other bays, and of the iron core, the translation from primary quality). Another significant benefit is that
the digital control system via the station bus. to secondary measurement can use optical, the NCITs are compact and light in weight.
In the digital substation, the station bus is Rogowski or capacitive technology, with According to Chatrefou, improved safety is a
much more than a traditional SCADA bus. the optimum choice for AIS (air-insulated key advantage of the design. Insulating sec-
It permits many devices to exchange data, substations) and GIS (gas-insulated substa- ondary equipment from high voltages by using
supports peer-to-peer device communication, tions) driven by the respective digital device fibre optics means higher safety for substation
and links to wide-area control units (WACUs) size, which in turn permits size optimisation personnel. Removal of wired cross-site current
for wide-area communication between sub- of the switchgear. But whatever the technol transformer circuits reduces the risk of lethal
stations or between voltage levels. ogy, Alstoms COSI range of non-conven- injury due to inadvertent opening of the circuit.
tional instrument transformers (NCITs) offer And avoiding oil in instrument transformers
Even the instrument transformers similar benefits, including greater accuracy, reduces explosion risks too. Environmental
are digital repeatability and safety than conventional protection and natural resource usage are
Digital instrument transformers eliminate instrument transformers. also improved by eliminating oil in instrument
the inaccuracy of conventional instrument In addition, NCITs feature a high measure- transformers and by employing fibre optics
transformers caused by reliance upon an ment bandwidth for fundamental frequency, instead of copper. This has direct economic
iron core that has to be magnetised, but not harmonics, inter-harmonics, sub-harmonics, benefits too, given the 400 percent rise in the

M o r e
Cyber security
In order to offer new control systems to cyber in standards definition
applications, the digital attacks. As Jean-Pierre (for example IEC 61850 and
substation is integrating more Mennella, Software Solutions IEC 62351) and in energy
information technology, new Cyber Security Manager, sector cyber security activities
standards and new protocols explains: The main challenge such as the European
such as Ethernet. Integrated is to adapt cyber security Commissions Directorate-
cyber assets need to be solutions to the specific General for Energy M/490
protected from cyber threats, environment and constraints Mandate Smart Grid
which are growing rapidly of the digital substation. Information Security Working
and have become highly Alstoms approach is to ensure Group. Alstom is also
sophisticated. In 2010 the that both architecture and collaborating with leading-
discovery of the Stuxnet components are designed with edge partners such as Cisco to
worm publicly illustrated cyber security foremost in our offer and develop new, secure
the vulnerability of industrial thinking. Alstom is involved digital substation solutions.

Jean-Pierre Mennella

16 Alstom Grid///Spring/Summer 2013


Example of a COSI-CT M o r e
(compact sensor intelligence).

Simon Richards

Performance evaluation
for digital substations
A state-of-the-art testing platform
has been developed by Alstom
in Villeurbanne, France, in order
to evaluate the performance of
protection for fully digital substations.
The platform was developed to check
all substation functionalities,
with a focus on measurement
accuracy of relays and circuit-breaker
trip delays. Various protection relays,
price of copper in the last 10 years. Likewise, for fast and precise detection of faults within digital configurations and many
substation single-line diagram
with a footprint 15 to 25 percent smaller the cables. The main reason for selecting arrangements can be analysed,
than conventional substations, there are cost NCITs was their low mass and slim-line con- as well as the interoperability of
savings on real estate, foundations, structures struction, allowing them to be mounted on IEDs (intelligent electronic devices)
and construction, and planning permission the same structures as the cable bushings. from different vendors.
can be easier. In the 110/220 kV substation in Russia, the For each type of protection connected
primary GIS equipment is supplied by a third- to the process bus, the platform can be
In the field used to explore all characteristics in
party vendor, equipped with conventional order to check for correct operation
Prototyping and trials have long since been instrument transformers. The analogue data and the results can then be compared
completed. The fact that the information is digitised at source using MU Agile analogue to conventional hardwired solutions.
acquisition, processing and output is per- merging units, and connected cross-site to The platform generates IED inputs
formed in real time through a digital archi- relays and bay controllers by an IEC 61850 conventional or digital
(IEC 61850-9-2 compliant) and
tecture means that extensive testing can be process bus. A full range of Alstom MiCOM
also monitors IED outputs, whether
done virtually, in the factory, without the same transmission relays protect the substation, analogue trip or digital trip (GOOSE).
need for the extensive (and expensive) testing as inherent components of the DS Agile It can also be used for customer factory
required on site for hardwired systems. digital control system. Trip and operational acceptance tests and for final testing
Alstoms digital substation will now prove its control of switchgear is secured using before despatch to a project or a
merits in the field, in differential protection DS Agile SCU switchgear control units with demonstration. The testing platform
serves to prove and optimise the
applications for Energinets transmission PRP redundancy, completing the full digital solution. Customers who have already
system in Denmark, and for FSK in Russia. acquisition and command chain. benefitted from the platform include
For Energinet, the protected circuits are Alstom remains a pioneer in digital substation Endesa (Spain), which tested its
hybrids, consisting of 400 kV lines and sub-sea development and a driving force in the elab- prototype architecture, and Energinet
cabled sections. The operational demands oration of the IEC 61850 standard that under- (Denmark), which attended the factory
are such that auto-reclosing is required lies todays designs. After more than 15 years acceptance test for its MiCOM P546
and COSI-CT system.
for faults on the overhead lines, but not for of advanced research and projects worldwide,
faults within the underground cable sections. Alstoms digital substations are now deliver-
Alstom MiCOM differential protection is used ing the full potential of this technology.


Alstom Grid///Spring/Summer 2013 17
Main Feature chapter I Research with an eye on the future

Aerial view of nant de drance pumped storage plant, Switzerland

Pumped storage: a keystone for the


booming growth of renewable energies
Variable speed pumped storage, the latest in large-scale storage technology,
enables grid operators to integrate extensive wind and solar capacity, match supply to demand
minute by minute and further enhance energy production efficiency throughout their fuel portfolio.

18 Alstom Grid///Spring/Summer 2013


M o r e

Double fed induction


at the heart of variable
speed technology
Double fed induction machines with
static frequency converters feeding the
rotor is the preferred architecture for
motor generators in variable speed
PSPs with unit outputs above 50 to
100 MW. The rotor design of double
In November 2006, 20 million European enables utilities to operate their other energy fed induction machines is significantly
households were left in the dark following sources at their most efficient levels, different from conventional
a power blackout. Within 20 minutes, Alpine allowing fossil-fired and renewable energy synchronous machines because the
dams were able to supply about 5 million sources to be run optimally. And it is precisely rotor of a double fed induction motor
homes with 5,000 MW, with the pumped this last point that explains the recent boost generator has a three-phase rotor
winding wound into a cylindrical rotor.
storage plant of GrandMaison, France, of interest in pumped storage as part of an By feeding the rotor with a low
accounting for up to 20 percent. This is a integrated solution to smooth out the fluc- frequency AC current, a magnetic field
prime example of how useful pumped stor- tuations inevitable with increasing penetra- rotating at the right speed is created to
age can be in balancing the grid during tion of intermittent energy sources such as compensate for the turbines speed
unplanned outages of other power plants. wind and solar power, since it can use their variation. As a result, it generates a
But that is not its only benefit. production at times of high output and low magnetic field rotating at a constant
speed a fraction of the grid frequency
demand. The real innovation at the heart in the stator. This means the turbine
PSP flexibility: attractive for grid of this growth comes from variable speed rotation speed can be adjusted to
operators pumped storage, says Olivier Teller, Alstom benefit from the flywheel effect to
Pumping water to store energy is not a Renewables PSP Product Director. The perform fast power output or input
new concept in itself. Pumped storage is the possibility of changing the pumping power variation or to optimise turbine or pump
efficiency and regulate pumping water.
largest and most cost-effective means of makes pumped storage plants much more
storing energy for electricity grids, far beyond flexible, which is very attractive for
compressed air, lithium-ion and other storage
technologies in use today. It is also an eco-
Pumped storage plant schematic
nomically and environmentally efficient way
of stabilising supply on a minute-to-minute
basis. When demand is low, a pumped Underground
storage plant (PSP) uses off-peak power plant

This has been Upper reservoir

done for decades


with growing Pump mode

efficiency.
(power storage)

electricity to pump water from a


lower reservoir to a higher reservoir.
Then, when demand is high, the
water is released and flows down to Lower reservoir
the lower reservoir through turbines Turbine mode
(power generation)
that, within seconds, generate elec-
tricity and feed it into the network.
This has been done for decades, with
growing efficiency: nowadays, up to
80 percent of the energy consumed
Energy transfer
during the storage cycle is recovered Maximum head water level Minimum level
and can be sold when demand Energy transfer
Minimum level Maximum head water level
peaks. In addition, pumped storage


Alstom Grid///Spring/Summer 2013 19
Main Feature chapter I Research with an eye on the future

M o r e

operators in balancing the grid. Extending the PSP


The grid always has to balance power operational envelope
generation and consumption precisely,
and this balancing is harder to obtain with With an installed base of 56 GW of pump
Thomas Kunz
intermittent power sources. So during turbines and motor generators, Alstom is
low demand periods, variable speed currently developing 6 GW of PSP projects
pumped storage may be viewed as a much worldwide. Three gigawatts are variable
An extra 1,000 MW
better alternative to bringing other flex- speed, and the other three are of the fixed
from a cavern under
ible assets, such as gas plants, on line justspeed type. Besides the flexibility benefit,
the Swiss Alps
to regulate the grid. To put it simply, some sites actually require variable speed,
Alstoms variable speed technology (see since a variable speed PSP can sustain a Switzerland, with its mountainous
sidebar) allows power plant owners to higher variation in the height (or head) landscape, is a very active producer of
hydroelectricity, which represents more
adjust the amount of energy they pump between the water in the two reservoirs. than half of the total energy produced
at night or when there is a light load, Challenging sites such as Nant de Drance in the country. The steep altitude
meaning that conventional thermal power in Switzerland and Tehri in India would have differences in the Swiss Alps create
plants that are operated for frequency been impossible to exploit without variable a particularly favourable environment
adjustment can be stopped. This helps speed pumps, says Teller. for the use of pumped storage power
plants. In 2009, Kraftwerk Linth-
utilities operate their fleets more eco- All Alstoms in-house products and technolo-
Limmern AG (KLL) decided to extend
nomically while reducing CO2 emissions. gies for hydraulic turbines are designed and its Linthal power plant in the Glarus
Load balancing can be achieved using a developed in the Global Technology Centre Canton of east-central Switzerland
clean, renewable energy source, replacing (GTC) in Grenoble, France. This centre man- by constructing a new underground
costly fossil fuels traditionally used for ages all the product development phases, pumped storage facility that will pump
peaking, Teller points out. from identification of customer need to after- water from Lake Limmern up to Lake
Mutt (which is 630 m higher, at an
sales service. In 2008, Alstom altitude of 2,474 m). The water is
CUTAWAY OF A PUMP TURBINE expanded the GTC, equipping its pumped through a pair of 1 km-long
AND MOTOR GENERATOR UNIT scale model test laboratory with penstocks inclined at 45, in order
two new test rigs, bringing the to reuse it for electricity production
total number of test rigs to six and when needed. Alstom will provide four
doubling the sites testing capac- new 250 MW variable speed pump
turbine and motor generator units.
ity. With a pumped storage mar- The facility, which is installed in a
ket expected to grow by 60 giant underground cavern, will have
percent over the next four years pump and turbine capacities of
(mostly in China and Europe), the 1,000 MW, boosting KLLs output from
GTC is now looking forward to the current 450 MW to 1,450 MW
and putting it, in terms of power
extending PSP operational enve- delivery, on a par with the Swiss
lopes towards more challenging Leibstadt nuclear power plant,
conditions(1) such as very high says Thomas Kunz, Alstoms Global
or very low head (>800 m and R&D Product Development Director.
<50 m), increased head range, Many innovative components had
underground and sea operation, to be developed for this project.
The first units are to be installed next
small decentralised PSPs, etc., as year, and Linthal commercial operation
well as enhancing flexibility and is due to begin in 2015.
It generates electricity and
operates as a motor pump power range.
in synchronisation with the
network frequency. (1) 40 percent of European PSPs
are expected to be variable speed.

20 Alstom Grid///Spring/Summer 2013


Cover plate
Ceramic
Shield
Vacuum interrupter layout

Cover plate

Fixed
contact rod

Ceramic Movable
contact rod

Replacing SF6
Arcing contacts
Bellows

in high voltage circuit breakers


While SF6 is widely used in power transmission, allowing manufacturers
to design reliable, safe and compact equipment, its CO2 equivalent factor is becoming more and more
of an issue. For this reason, some countries, such as Sweden or New Zealand, are increasingly focusing on
SF6-free solutions. Alstom already monitors SF6 throughout the production chain and the emissions of its
products are particularly low. On top of this, the company has taken the initiative of developing a new range
of 100 percent SF6-free circuit breakers based on vacuum technology, starting with the VL109 for 72.5 kV.

Almost all modern high voltage circuit Alstom has worked on a solution to provide raising vacuum technology from medium
breakers running at transmission voltage a high voltage circuit breaker with no SF6. voltage to high voltage applications is
levels employ sulphur hexafluoride (SF6) The most promising approach is the use not that simple, says Dr Lutz Drews, R&D
as an arc-extinguishing medium for current of vacuum technology for interruption, Manager at Alstom Grid. For several reasons
interruption and for dielectric insulation already used in medium voltage applica- linked to the physics of vacuum and the non-
between the terminals. This is because of tions for decades and now almost univer- linear relationship between the inter-contact
the excellent interrupting capabilities of sal at that level. distance and the dielectric withstand, vacuum
SF6, combined with a high dielectric with- technology has only been applicable so far
stand. However, SF6 is a greenhouse gas Raising vacuum technology to distribution voltage levels not higher than
with high global warming potential. from MV to HV 52 kV. Some vacuum developments do
Several countries have initiated policies Vacuum combines nearly perfect isolating exist for high voltage levels (i.e. 72 kV or
to ban or limit its use Australia, for and interrupting characteristics: it has an higher), but they mainly address only a few
instance, has raised a tax of AUS$450 per kg excellent dielectric withstand and enables a niche markets the industrial sector in Japan
on imported SF6 and other countries are very fast re-establishment of its characteris for example and such circuit breakers com-
likely to follow. Anticipating this trend, tics after current extinction. However, monly suffer some disadvantages:

Alstom Grid///Spring/Summer 2013 21


Main Feature chapter I Research with an eye on the future

they are not truly 100 percent SF6-free Alstoms VL109 the current candlestick design so that it can
(still using SF6 for the dielectric insulation), vacuum circuit be fully interchangeable with existing 72 kV
they are mostly dedicated to dead-tank breaker SF6 circuit breakers; additionally, this solution
circuit breakers (whereas the world market is does not require grading capacitors and it
mainly live tank(1)), and they are not fully allows for higher mechanical reliability.
compatible with modern substation layouts.
Our objective was to design a 100 percent Pilot trials on the network
SF6-free high voltage circuit breaker suitable Tests were performed for current breaking
for the whole world market and easily inter- and switching at the KEMA high voltage
changeable with existing breakers; it would laboratory in Arnhem (Netherlands) and
use vacuum as the interrupting technology CERDA in Villeurbanne (France). For mecha
and dry air for insulation between the termi- nical lifetime, dielectric and environmental
nals, explains Drews. The project led to the performance, tests were done at the Alstom
design and construction of the VL109 circuit Grid laboratory in Kassel (Germany). The
breaker as a vacuum-type alternative to VL109 passed all tests successfully. The next
Alstoms SF6-type GL309 model, with ratings step is to test the VL109 on the network, says
of 72.5 kV/31.5 kA/2,000 A. Drews. The first pilot vacuum-type breaker
Several hurdles had to be overcome to get was installed at the end of 2012 on the French
there. Compared with existing vacuum
interrupters in the medium voltage range,
It uses vacuum network. A second pilot will follow in spring
2013 on the Transpower network in New
the interruption at high voltage required
an increased contact gap and a contact
as the interrupting Zealand. These pilot applications will
allow us to gain experience concerning the
configuration providing an axial magnetic technology and dry switchgear itself as well as the impact of the

air for insulation.


field. Furthermore, intensive investigations switchgear on the transmission networks; we
into contact materials were necessary to can collect evidence that the technology is
pass low current switching tests (e.g. for reliable for use in high voltage transmission
capacitive currents), and dielectric optimi- an optimisation of the mechanical chain was networks. Alstom has now initiated a pro-
sation was necessary to be able to use dry carried out, making it possible to keep Alstoms gramme to transfer this vacuum HV technol-
air for the insulation between the terminals established FK-type spring-operated mecha- ogy to dead-tank type circuit breakers and to
and to achieve similar dimensions to the nism. At the same time, different configurations gas-insulated switchgear, as well as to extend
GL309-type circuit breaker. To respect the were also investigated: two vacuum inter the technology to higher voltage ranges.
modified mechanical energy balance of the rupters in series, or one vacuum interrupter. (1) Circuit breakers are live tank when the enclosure
circuit breaker system itself and the lower We decided to choose the one vacuum cham- of the interrupting unit is at line potential, or dead
required stroke of the vacuum interrupter, ber solution, because it enables us to stick with tank when the enclosure is at earth potential.

M o r e
A new generation of HV circuit breakers:
environmentally friendly, sustainable, fully interchangeable
Curbing the greenhouse any greenhouse gas at all. and life-cycle analysis
effect is a major objective, Using vacuum as the has shown that the vacuum
but also a challenge interrupting technology and technology-based VL109,
for Alstom, as the dry air for insulation between compared to its SF6
Kyoto Protocol compels the terminals, the product equivalent, has a climate
manufacturers and users has a global warming change impact 24 percent
to reduce the amount of potential of zero. lower but with a higher
SF6 in equipment and to Moreover, the vacuum electrical and mechanical
reduce gas losses in service. interrupter is highly lifetime and reliability.
Alstoms new VL109 HV recyclable as mainly metals Last but not least, the VL109
circuit breaker goes much (steel, aluminium and is fully interchangeable
further than the regulatory copper) and ceramic with existing SF6 circuit
view since it does not contain are used. An environmental breakers.
Dr Lutz Drews

22 Alstom Grid///Spring/Summer 2013


Main feature chapter II Ahead of our time

Innovation and
performance
A breakthrough: the development of a double-motion interrupter allows single-break gas-
insulated substations up to 420 kV/63 kA to be made much more compact, reliable, safe and
environmentally friendly. A STATCOM can be used to ensure that wind turbines comply with
the increasingly stringent grid codes, particularly the requirement for low voltage ride-through.
With electricity demand rising rapidly, more effective ways of transmitting energy must be
found. One solution gaining momentum is the HVDC supergrid enhanced by interaction
between multi-terminal DC grids, a large-scale interconnected DC system of systems. To fulfil
the potential of (intermittent) wind and solar energy, one viable solution is a stable form of
large-scale electricity storage coupled with a voltage source converter.


Alstom Grid///Spring/Summer 2013 23
Main Feature chapter Ii Ahead of our time

Pushing GIS limits


to new horizons
To meet the tough duties
of 420 kV/63 kA gas-
insulated substations (GIS),
Alstom teams have developed a new
single-chamber, double-motion
circuit breaker. It demonstrates major
improvements in size, cost and
environmental impact.

High voltage circuit-breaker (CB) technol-


ogy has advanced greatly since its intro
duction. Several interrupting principles
have been developed to enhance perfor-
mance and reduce operating energy.
Among the various CB technologies
Alstom has in its portfolio, gas-insulated
substations (GIS) offer several advantages
compared with air-, oil- or vacuum-insu-
lated approaches. One is compactness,
which explains why GIS are often chosen The Alstom T155 gas-insulated
substation (GIS).
when space is limited and land is costly.
As this becomes more significant with
population growth and the trend of urban-
isation, equipment compactness has with high operating energy, explains higher voltages such as 420 kV, i.e. begin-
become a key factor. Jean-Baptiste Jourjon, Alstoms GIS R&D ning with two chambers in series and
When dealing with high voltages such group manager. Advances in design then then, to improve compactness, moving
as 245 kV, the solution was originally made possible the use of a single SF6 cham- to a single chamber via the ingenious
to use two breaking chambers in series, ber or single break, but with a low energy double-motion technology. This permits
each chamber taking half of the voltage. operating mechanism. Subsequently, a drastic reduction in the operating energy
Then we developed a single chamber, but the same principles were extended to even of the opening mechanism (see sidebar),

24 Alstom Grid///Spring/Summer 2013


One phase of the T155-CB3 420 kV / 63 kA single break, with its mechanism
and its grounded metallic pressure vessel, containing the HV interrupter.

of designing and constructing a new


class of interrupter that could accom-
modate the most demanding mecha
nical and dielectric constraints of the
420 kV/63 kA GIS duty cycle, yet be
compact, cost-effective, reliable, safer and
more environmentally friendly. However,
pushing the technology to increase both
the rated voltage and the short-circuit cur-
rent up to these targets seemed a very
serious challenge, especially in the context
of size limitations. We had to establish
new criteria, first to optimise the sizing
of the interrupter (dielectrics, mechanics,
pressure and thermal withstand, etc.),
and also because the known rules for lower
voltages did not work when applied to
420 kV, says Jourjon.

Designing and constructing Forty percent footprint reduction


After some years of simulations, model
a new class of interrupter optimisation and tests on full-scale proto-

that could accommodate the most types, the teams came up with a solution:
the T155-CB3 single-break (or single-
demanding constraints. chamber) interrupter, which is much
smaller than the existing single-motion,
double-break technology (two interrupters
allowing the adoption of a commonly used It was a very large puffer-type circuit in series) and which provides significant
spring mechanism. breaker with a high-energy hydraulic advantages:
mechanism, so it was too large and too - a 40 percent reduction in opening energy;
Getting up to 420 kV/63 kA costly for todays markets. Building on the - lower environmental impact with 40 per-
A single-break product rated up to self-blast double-motion technology that cent less SF6 mass;
420 kV had been developed previously, but already existed for the 245 kV/50 kA range, - a 38 percent mass reduction for one full
it was limited to 50 kA short-circuit current. Alstoms engineers rose to the challenge pole with mechanism;


Alstom Grid///Spring/Summer 2013 25
Main Feature chapter Ii Ahead of our time

- phase width reduced from 900 to Illustration of self-blast


Double-motion levers & double-motion principle
700 mm;
- a 34 percent height and 40 percent foot-
print reduction; and
- the possibility of a full three-phase bay 1
integration with common points and dis- Thermal volume
connectors in a single package.
With this single-chamber approach, the Compression volume
cost is dramatically reduced, as well as the
environmental impacts, says Jourjon.
These include reduction of mass, meaning
less use of material (aluminium), and SF6
reduction, which is important for global
CB opening

warming. In addition, complete bay ship-


ment reduces the carbon footprint of trans- 2
port to site.
Great interaction between
product lines
Throughout the five years of develop-
ment, the Alstom R&D departments
working in both gas- and air-insulated
switchgear product lines, in collaboration
with the Research Centre in Villeurbanne, 3
all worked closely together on this ambi-
tious technical project. The aim was to
maximise the knowledge-sharing of the
experts, conceive and compare various
technical options, and to benefit from
standardised solutions whenever pos-
sible. It also allowed us to incorporate
Arcing contacts
industrial aspects early in the develop-
ment process, to avoid the issue of a
sophisticated technical solution that
works but would not be cost-effective
Insulating nozzle

It also achieves a breaking time


below two cycles at 60 Hz. Piston and discharge valve

26 Alstom Grid///Spring/Summer 2013


M o r e

and would be difficult to manufacture in arrangement of the components (discon-


Jean-Baptiste Jourjon
volume, points out Jourjon. nectors, etc.) enabling complete bay
assembly at the factory and full bay ship-
A complete redesign of the whole GIS ment to site. This means that all major Single-break, double-
The T155-CB3 single-break interrupter components are tested (including optional motion principle
manages to reach 420 kV/63 kA switch- embedded low voltage control cabinet)
ing and breaking performance with and sealed at factory, a further guarantee AC short-circuit current interruption
involves blowing insulating gas
only one interrupting unit per phase for a high level of quality and customer through the electrical arc.
and with low-energy spring mechanism satisfaction. In addition, full bay shipment A piston moved by the operating
for both energy storage and actuation. reduces erection time by 30 percent. mechanism increases gas density
It also achieves a Jourjon stresses: and generates an overpressure
between the arcing contacts.
It has a premium
breaking time The T155-CB3 is
below two cycles designed for easy As a consequence, gas flows through
the arcing area, which cools down
at 60 Hz, which
means a higher performance. accessibility with
integrated gang-
the arc and prevents its reignition
after a current zero. The new Alstom
level of protection ways, and the spe- T155-CB3 circuit breaker uses SF6
for the equipment in case of fault cur- cific gas partitioning ensures maximum self-blast technology, where the arc
rents. Breaking performance covers availability in case of maintenance. So despite energy contributes to overpressure
generation without affecting the
420 kV systems globally, including its lower cost (and size), it has very much a
mechanisms operating energy.
60 Hz networks. The compactness of premium performance. It also offers com- At 63 kA, overpressure can reach up
this new circuit breaker led to a complete prehensive monitoring solutions and is ready to 120 bar, which a spring mechanism
redesign of the whole GIS, with a new for the full digital substation. could not withstand if the pressure
were applied directly to the moving
piston. For the 420 kV rating, very
fast moving contacts are needed to
withstand the recovery voltage
T155-CB3 single chamber 420 kV / 63 kA Interrupter: efficient, between terminals following current
compact and easily accessible interruption. To reduce operating
energy and allow the use of its
standard spring-driven FK3-6
mechanism, Alstom developed
a double-motion technique that
consists of displacing the two arcing
contacts in opposite directions using
a linkage lever system (see figure),
instead of displacing one contact
as in traditional designs. The speed
requirement from the operating
mechanism is therefore halved.
This means that the energy necessary
for the opening spring is reduced
by around 40 percent.


Alstom Grid///Spring/Summer 2013 27
Main Feature chapter Ii Ahead of our time

D-STATCOM SVC
MAXSINETM
Since the three-level
neutral-point clamped
voltage source converter
(3L-NPC VSC) had
demonstrated its
attractiveness as
a dynamic reactive
power source for
distribution networks,
it was chosen for
the D-STATCOM SVC
MaxSineTM system.
IGBTs (Insulated Gate
Bipolar Transistors)
are used as power
semiconductor
switches.

A STATCOM that helps wind


to meet grid codes
A suitable STATCOM can be used to ensure
that wind turbines comply with increasingly
tight grid codes, particularly the low voltage ride-through requirement.
It also needs to be compact and flexible.

Over the last 20 years, wind power has used to generate it and, as more and more stator is directly connected to the grid while
asserted itself as an increasingly important renewable energies flow into the grid, grid the rotor is connected through a power
part of the energy production landscape. operators have grown concerned about electronic converter, which controls the
The 2011 World Wind Energy Report pro- stability. Accordingly, they are introducing generators speed and power factor. The
jected that by the end of that year, total ever more stringent grid codes to ensure converter is rated at around 30 percent of
capacity would be around 245,000 MW that grids can integrate renewable energy the turbines nominal capacity, which was
and meet 3 percent of global electricity smoothly. Not all wind turbine technologies ample for wind turbine applications until
demand. Since then, the Global Wind Energy can comply with such demanding strictures, grid codes required turbines to stay
Council states that by 2020, 8-12 percent however. One that cannot on its own is the connected to the network during voltage
of global electricity could be supplied by doubly fed induction generator (DFIG). Until drops to ensure low voltage ride-through
wind power. The rise of wind power has recently, DFIGs were the most widely used (LVRT).The drawback of DFIGs is that, in
emerged as a challenge to the technology variable-speed wind turbines. A DFIGs the eventof a voltage dip, the voltage of

28 Alstom Grid///Spring/Summer 2013


In the event of a sudden load
change or low voltage incident
like a short circuit in the grid,
a STATCOM responds fast.
the grid- thyristor-based static VAr compensator (SVC). explains Ralf Jessler, Managing Director of
connected But SVCs do not fit the requirements for the Alstom unit in Konstanz, Germany. It
stator changes (i) fast dynamic response, (ii) short overload feeds capacitive reactive power into the
suddenly. The rotor capability, or (iii) the ability to provide network, increasing voltage at the point
voltage is too low to com- maximum reactive output current during of common coupling (PCC), so helping the
pensate and so a disturbance sharp voltage drops. However, one dynamic DFIG to stay connected for as long as it
current flows through the stator reactive-power compensator that does deliver takes to isolate the short circuit.
and rotor, damaging the converter. The on all three counts, and so ensures ride- Once the fault has been cleared, however,
DFIGs original control strategy was to trip, through in the event of a network fault, is the the DFIG may experience the same
but grid codes now require generators to static synchronous compensator, or STATCOM. kind of difficulties as it did when the fault
ride through voltage drops and feed reac- occurred. The STATCOM must therefore
tive power into the network to stabilise it. How STATCOMS ensure ride-through once again stabilise the voltage at the PCC.
The only alternative is to enlist the support In the event of a sudden load change or This is no issue, adds Jessler, because
of a shunt-connected dynamic reactive low voltage incident like a short circuit in the STATCOM responds dynamically, in
power source. The most widely used is the the grid, a STATCOM responds fast, milliseconds, changing its reactive


Alstom Grid///Spring/Summer 2013 29
Main Feature chapter Ii Ahead of our time

M o r e

Control system block


diagram for SVC MaxSineTM

Jarmo Aho
power from capacitive to induc-
Hybrid compensator keeps tive. In sum, then, a STATCOM ensures
prices and flicker low low voltage ride-through because it can
continue to generate rated output or short-
Brief dips in line voltage, causing, for time overload current even at low system
instance, brief changes in lighting levels, voltages. Low voltage ride-through is
are known as flickers and are a sign
of poor power quality. They are typically doubtless the most important capability
caused by large loads whose active required of a STATCOM, as illustrated by a
and reactive power demand fluctuates. wind farm project in Dunneil, Ireland,
The technology of choice for reducing where the turbines were augmented by
flicker is the static VAr compensator Alstoms novel STATCOM, SVC MaxSineTM.
(SVC). SVCs are traditionally used for Without it, the genera-
reactive power compensation in such
heavy industry applications as electric
arc furnaces (EAF). However, the
tors would have fallen
short of the local grid We tailored
thyristors controlling the reactive power
do not have enough bandwidth
code for LRVT as they
failed to produce enough MaxSineTM to deliver
(i.e. they cannot respond quickly enough)
to respond to fast changes in the load.
reactive power to com- high overload for the 10 or
20 seconds it takes to
pensate the steep voltage
The result is as much as a half-cycle time
delay. Consequently, an SVC has at best drops. To help a DFIG ride
a flicker mitigation capability of just
65 percent and a flicker reduction factor load capability is crucial.isolate the short circuit.
through a fault event, over-

of 2, which is often inadequate. Most STATCOMS are


These figures stand in contrast to those installed for voltage drops caused by short is that it enables commutation at low
of VSC-based STATCOMs, which
continuously control the output current circuits, which seldom happens, explains voltages. It also improves the harmonics
and thus compensate load changes Jessler. So we tailored MaxSine TM spectrum and increases the quality
immediately. STATCOMS can achieve a to deliver high overload for the 10 or and quantity of output voltage, thereby
flicker reduction factor of 6, while SVCs 20 seconds it takes to isolate the short reducing the flicker level significantly in
are more cost-effective when compensation circuit. That way, we were able to make it the network.
power is high (above 20 MVAr). smaller. Whats more, an effective over- The patented control system is what
The ideal solution would appear to be an
SVC-STATCOM hybrid. Alstom R&D teams load capability helps reduce the STATCOMs enables SVC MaxSine TM to respond to
have developed a concept known as installed power capability, which reduces sudden network changes or resetting in a
Hybrid SVC that they have tested its cost. matter of milliseconds. It is key to the com-
with an electric arc furnace. pensators prime function ensuring the
The result is a highly reliable Low losses, small size, generators LVRT capability.
compensation system with a flicker high flexibility Second only to ride-through in wind power
reduction performance that is almost
as good as a STATCOMs. It is 20 percent At the heart of the SVC MaxSine TM is a applications is the importance of controlling
cheaper to install than a STATCOM and voltage source converter with a three-level power losses. SVC MaxSineTM considerably
costs 50 percent less to operate. neutral-point clamped topology (3L-NPC- reduces transmission line and reactive
VSC) and a patented control system. power losses, thus offsetting losses that
The main advantage of the 3L-NPC-VSC may occur through frequent switching of

30 Alstom Grid///Spring/Summer 2013


Pr rge
ch

e- ci
a
/D rcu
is- it SVC
Ma
conxSineTM

M
ai
trol ma

n
fu
syst ste
EM

se
em r

s
C fi
lte
r

Digital signals
Re
ac

(fibre optic)
to
rs
3-
Le
ve
lVS

SCA
C

MaC DA
con S slav
trol e
Pa sur
m
ea
ra em

ler
m e
et nt
er s
s/
Sla trol
co
n
ve er

powSVC Ma
Pa eas
ra ur
m
Se

m em

er m xSin T
tp

et e
oin

er nt
odu e M
s/ s
tv

MaC
alu

le #
con S mas
es

1 Modbus/TCP
#2 trol ter
ler
#3
Sy lta nts
ste ge
vo urre

m s/
c

#x
Analogue signals

Should one module malfunction or fail, other units


continue to operate, so avoiding downtime.
the converter. Also, because it is a medium SVC MaxSineTM interoperates with existing The modular design then contributes to its
voltage system, it requires fewer power network equipment and works with it to high operational availability. The power
electronic devices to be switched on than deliver compensation performance more electronic modules (each sealed in a steel
low voltage compensators, whose multiple effectively than a conventional STATCOM. container) are arranged in parallel, each
devices must all pass current and therefore Also its control system can be reconfigured acting as an amplifier and feeding current
generate losses. Flexibility is a key feature to meet applications ranging from wind into the network. It is a simple matter to
of the SVC MaxSineTM STATCOM solution. farms to power-hungry arc furnaces. add or remove them according to require-
Unlike conventional SVCs, which have to With its compact, modular power electron- ments. And should one module malfunction
be re-dimensioned according to the prevail- ics units housed in a container, SVC MaxSineTM or fail, other units continue to operate, so
ing network impedance and harmonics, the can be configured to meet varying needs. avoiding downtime.


Alstom Grid///Spring/Summer 2013 31
Main Feature chapter Ii Ahead of our time

DC system of systems
The future of power grids?
The complex systems observed in the social
organisations of the natural world could hold the key to stable
plug-and-play DC grids that use control functions on different timescales and system
levels to integrate the energy from wind and other renewable energy sources.

32 Alstom Grid///Spring/Summer 2013


AC networks are operating ever closer to their 4,000 TWh by 2030. Electricity AC Network & DC grid towards more RES
limits. The warning signs are there. In 2003, is the fastest rising demand up penetration
blackouts cost the US economy $6 billion. 58 percent by 2030 and account-
They were held responsible for four deaths ing for nearly 25 percent of the
in Italy. The power failures across Western total energy demand. Higher
Europe in 2006 caused by a transmission production will require stronger
line shutdown in Germany underlined the protection, particularly as more
risks of outages crossing national boundaries. and more renewable energy
During this latter event, the European trans- sources (RES) flow into the grid.
mission network was split into three islands Total gross RES power genera-
at different frequencies. In the two hours it tion under 500 TWh in 2009
took to resynchronise, some 15 million will reach almost 1,400 TWh
people were affected, and some 17,000 MW by 2030. Ultimately, only a grid
of power generation had to be curtailed (1). with a far higher power trans-
Yet a certain school of thought contends that mission capacity will be able to
blackouts are natural network behaviour. cope with burgeoning consump-
Its like a pyramid of sand that reaches a tion, production and protection.
certain height before it collapses, because DC networks use interconnections and rapid
thats the nature of sand, explains Smart With Supergrid, no need for grid support for variations in capacity: no need to
Grid Research Manager Dr Abdelkrim codes to be overprotective synchronise. Most significantly, a network
Benchaib. Can natural be good, though, For now, transmission system operators of interconnecting DC grids would carry
when the lights go out on livelihoods and (TSOs) ensure grid stability with grid codes. electricity thousands of miles from distant
economies? Wind power operators, for example, must sources wind farms in the North Sea, geo-
There have been serious attempts to develop comply with codes for anti-islanding, power thermal sources in Iceland, solar power in
blackout prevention strategies (2), but black- factor control, and no-trip low voltage the Sahara to areas of highest demand.
outs and brownouts still occur and will ride-through. However, more numerous Such is the concept developed by the Friends
continue to do so. Prevention is merely con- and tighter codes constrain the large-scale of the Supergrid (FOSG). In addition to the
tainment. Sooner or later the variety and grid integration of RES, and calls from top-down HVDC superhighway concept, the
complexity of loads and operations will breach the IEC for greater inertial response will transmission system would also incorporate
AC network limits, asserts Benchaib. compound matters. More efficient means bottom-up, consumer-driven MV smart grids
The European Commissions energy trends of transmitting energy must be used. for charging electric vehicles, public transport
show an exponential rise in energy demand One solution gathering momentum in the systems, data centres, etc. The DC grid would
from 2,800 TWh per year today to nearly R&D community is the HVDC Supergrid. overlay the existing AC grid, like a

OPERATING DIAGRAM
FOR TRANS-MEDITERRANEAN
LINES

Local
distribution

Transport
lines

Alstom Grid///Spring/Summer 2013 33


Main Feature chapter Ii Ahead of our time

M o r e

national motorway system connects 2030 transmission grid in which control will
to smaller local road systems. At the heart be distributed amongst the nodes. Distribu
of the thinking behind the HVDC Supergrid ted control will enable adjustments at differ-
is, precisely, the notion of system of sys- ent hierarchical levels and at different
tems, whereby a Europe-wide network timescales to take place across the entire
would link with national grids and so on, network. Indeed, a key component of systems
drilling down to the synchronous generators. of systems thinking is the notion of scale.
Flexibility comes from the ability to switch
Dr Oleg Bagleybter Systems of systems from long timescales and large space scales
Systems of systems were informally devel- to small ones, then back again. Again taking
Fault clearance speed: oped by AC grid engineers, explains Ben- the example of the school of fish, should one
a system-wide challenge chaib. Today were formalising the concept or more individual fish quit the school, there
to HVDC grids in DC grids. It is an active example of think- is no effect on the school or its pattern of
ing globally and acting locally. This brings movement. All of which points to the tanta-
Unlike AC networks, which have been around to mind the theory of complex systems. In a lising prospect of plug and play. It should
for over a hundred years, HVDC grid school of fish, for example, each fish keeps be possible to add a load to a system or to
technology is still in the making. Few of the
principal protection systems from AC grids a certain distance and follows the fish in front. remove it without destabilising the system
would work for DC grids, though the main The result is that each fish acts like the whole in the DC power network of 2030, states
requirements still hold. These are sensitivity school, while the whole school acts like an Benchaib. AC networks, of course, have
(detection of all faults), selectivity individual fish. Systems of systems are that plug-and-play capability, developed
(ability to isolate and trip only faulty parts), naturally occurring forms of organisation, piecemeal over the years. However, with
speed and reliability. states Benchaib. They will underpin the mass RES their control systems are unlikely
An issue that cuts system-wide across those
criteria is the circuit breaker (CB) speed. CBs
in AC systems typically clear a fault in 70-100
milliseconds (ms), including the fault detection Multi-terminal DC grid Primary & Secondary controls
time. However, DC networks have low
impedance, so faults go deeper and faster.
To be absolutely reliable, HVDC CBs should
have completely cleared the fault current
in less than 5 ms after the fault inception.
Communication speed is again a challenge
in current differential protection, an AC
protection system that is actually applicable
to DC grids. Alstom recently doubled the
speed of its differential protections
communication channel from 64 to a very
fast 128 kbps. It reduces the fault detection
time to less than 17 ms. However, thats still
far short of the 3-4 ms required to protect
HVDC grids, explains Dr Oleg Bagleybter,
Programme Manager (Networks).
Backup protection solutions, where there is
often an additional time lag, will demand even
higher CB speed, and without backup there
can be no reliability. New strategies are
needed to integrate fault detection,
discrimination and isolation for DC grids.
A possible future solution may be the Alstom
proposal of autonomous HVDC breaker
operation, minimising breaker duty while also
reducing the time the power interruption is
seen by the interconnected AC systems.

34 Alstom Grid///Spring/Summer 2013


Offshore
wind farm
2030 vision: AC & DC Hybrid Power Network

600 kV
Bulk power import
400 kV
using UHVDC

150 kV 150 kV 150 kV 150 kV

132 kV 132 kV

50 kV 50 kV

Onshore
wind farm
11 kV 11 kV 11 kV

10 kV 10 kV 10 kV

STATCOM STATCOM

400 V 500 kV 400 V 500 kV 400 V

BESS Fuel cell


PHEV charging station Photovoltaic

to be able to cope. To enable plug-and-play depend only on the reactivity of the converter thinking globally, acting locally at work,
behaviour in a multi-terminal DC (MTDC) but also on the power injection ability of all stresses Benchaib.
system that integrates offshore wind farms, connected nodes (production, storage, loads, At a different and slower timescale, secondary
Benchaib and his research team are explor- etc.), which theoretically should be from a control regulates the voltage deviation across
ing primary, secondary and even tertiary few hundred milliseconds to a few seconds, the grid or the next system up in the system
control functions. They operate on different as for AC systems. Primary control is global of systems on a timescale of several seconds.
timescales and at different system levels to but distributed. A primary control strategy It uses master-slave strategies where one or
ensure grid stability. Primary control repre- that has proved itself in AC grids is the so- more converters act as a slack bus (provide
sents the variation of the power/current called droop control technique. This could be or absorb the power needed to achieve power
injection set-points caused by disturbances applied for MTDC power grids. In such net- balance within the DC grid), while other con-
in the system. This is different from the local works the distributed control will then employ verters control their power exchange between
controller of the (AC/DC) converter, the role the droop mechanism to regulate the DC the AC and DC systems. The work we have
of which is to track any set-points. In the voltages by adjusting the power (or current) put into formalising a system-of-systems
system of systems approach, a solution injections from the converters. approach for DC grids could usefully be applied
with different timescales has been adopted. The converters simultaneously and individu- to several other fields, says Benchaib. Its a
The time dynamic response of the primary ally inject the active power needed to restore whole philosophy.
control should therefore be slower (longer balance to the MTDC grid. Thus, for the same
(1) Source: Union for the Coordination of Transmission
timescale) than the controller of the converter, voltage deviation two converters could inject of Electricity (UCTE).
which is around a few milliseconds. This different amounts of power. Droop control (2) "Alstom presents the Blackout Team", Alstom
primary control time constant will not is in each node. This is another example of 360 Video, Issue 55, March 2012.

Alstom Grid///Spring/Summer 2013 35


Main Feature chapter II Ahead of our time

INSIDE VIEW OF PROOF OF CONCEPT CONTAINER

Multi-megawatt battery storage substations


Renewable energies are increasingly being integrated into transmission
grids as an important element of smart grids and, although there are still
some hurdles, there are also some innovative solutions.

The introduction of photovoltaic and wind intermittent nature so that they can be
turbine generation systems has been accel seamlessly integrated into the power grid.
erating around the world, and the case for One significant and viable solution is to
using renewable energy remains strong. couple a stable form of large-scale electricity
However, because of the intermittency of the storage to a voltage source converter (VSC)
renewable sources, the power generation with associated control and automation
level, or capacity factor, of these renewable equipment, explains Ludovic Gris, Power
energy systems is relatively low and the Electronics architect. The stored energy can
generation level is not fixed. Generation be accessed and injected into the grid when
capacity with these characteristics is some- power generation is low, or demand is high,
times termed non-dispatchable. In order to and it can be a self-sufficient solution for some
realise their potential, these technologies regions. Efficiency is a key weakness of VSC converter
for storage
must somehow overcome the hurdle of their storage solutions, with batteries delivering applications.

36 Alstom Grid///Spring/Summer 2013


M o r e

On-going
development
of Alstoms
battery energy
storage solution.

only 80 percent of the system stability and


energy input. But on a the overall power flow.
large scale, this solution This turnkey storage sub
Ludovic Gris
based on batteries and VSC can station solution includes trans
be more economical than others. formers, converters and complete
Community storage schemes could hierarchical control. The ultimate goal is Teaming up for energy
have mid-sized, decentralised storage to have a product with a storage capacity storage
facilities to manage fluctuations from of 1 to 20 MW and we already have all
renewable sources and to reduce the strain the control and automation functions that Alstom and the teams of the French
on conventional distribution grids. Operators will go with this solution, explains Gris. state-owned research entity CEA-INES
(Institut National de lnergie Solaire)
would need to strike a balance between have created a joint research and
the size of their investment and the potential Technology agnostic
development centre in Chambery
revenue streams larger investments The solutions discussed here for storage and in the French Alps. This joint laboratory
can enable the parallel provision of reserve integration are agnostic with respect to the is focused on developing advanced energy
capacity. storage technology deployed, which helps storage solutions and integrating
promote multi-technology solutions. The renewable energy farms into smart
Energy storage with power control overall installation increases the load-
transmission and distribution grids.
The CEA-INES brings its core expertise
Power supply instability and frequency fluc- carrying capacity of the network by reduc- in storage and solar applications,
tuations become more significant as the ing the voltage dip that follows a system as well as its existing testing capability
proportion of power generated by renewable disturbance and provides dynamic voltage across various ranges of solar and storage
energy and injected into electrical networks stability by reducing the load shedding technologies, while Alstom brings its
expertise in power electronics, power
increases. Any surplus or deficit in active or needed to manage under-frequency condi-
conversion and smart grid control room
reactive power must also be accommodated tions that occur during disturbances. integration. This partnership has been put
by the system. This difference in power Advanced software takes care of most of in place to develop advanced innovations
needs to be kept within a given band to keep the above issues, as well as the different to accelerate the deployment of embedded
the AC voltage within the desired tolerances. grid codes around the world. It also takes storage into smart grid systems and
The weaker the system, or the further away into account the different requirements and facilitate the integration of renewables
beyond the European target of 20 percent
one is from a generation source, the more qualification tests of battery manufacturers. of the energy mix by 2020. The teams will
responsive the power exchange must be to also investigate the potential use of direct
stay within the desired voltage tolerance. Smoothing power across the grid current (DC) applications in smart cities
The Alstom energy storage solution allows The power conversion system (PCS) and the projects. More in a forthcoming issue
smooth integration of renewable energy generic control unit in this system smooth of Think Grid.
into the grid, getting rid of power variability out the electricity before injecting it into the
due to weather hazards. grid. It can be associated with a wide range
The VSC is based on the association of a of leading battery solutions and is modular
DC/DC converter and an inverter. A precise enough to meet the specific requirements of are moving towards a world where virtually
and rapid-response power control keeps the particular sites, Gris specifies. The control continuous demand is expected to be met
voltages within the specified band, providing system also offers unparalleled flexibility for to a large extent by renewable sources
increased stability of the power system energy management as well as several oper- that are not themselves intrinsically con-
thanks to availability of the stored power. ating modes. The world is currently on the tinuous by nature. This challenge makes
VSC is a technology for todays meshed threshold of a new paradigm for electricity electricity storage critical in crossing the
network and that of the future. It permits generation, transmission and consumption; next frontier in electricity infrastructure, as
continuous and independent control of real historically, electricity generation was the march towards a fossil-free energy
and reactive power, thereby increasing designed to follow demand, but now we landscape gathers pace.

Alstom Grid///Spring/Summer 2013 37


Smart products
and services
Managing smart grids will require real-time monitoring of a complex
network composed of millions of devices. An energy management
system enhanced with synchrophasor solutions provides tools to do it.
e-terraDRBizNet is a state-of-the-art system for managing demand
response. It allows utilities to efficiently use consumer loads as a
controllable grid resource.The launch of ILOT, an Instructor Led Online
Training system, provides customers with a full-value training
experience without the need to travel to a technical institute.

38 Alstom Grid///Spring/Summer 2013


Main feature chapter IiI Making energy available to all, today and tomorrow

iPad display for shared, decentralised


decision-making. This display can be
used by neighbouring utility staff
members (operators, engineers and
managers) to jointly assess a
problem condition and synergistically
decide on the actions to take.

Synchrophasor solutions
Making the smart grid even smarter
Managing the smart grid will require real-time, sub-second
monitoring of a complex network composed of millions of devices, compounded by the unpredictable
ramifications of renewable energy generators and demand response programmes. Traditional
energy management systems (EMS) were not designed for such operating scenarios, but
Alstoms EMS enhanced with synchrophasor solutions provides tools to do this more effectively.

In 1991, George Owens, a past president communication between the utility and first elements of a smart grid solution were
of the Association of Energy Engineers, users devices; this is an element of todays already being used in the 1960s, with the
predicted that by 2001 the term energy smart grid. He was also right about the introduction of load frequency control (LFC)
management system (EMS) would no radical changes that digital computing to automatically match generation and
longer exist. He was thinking mainly about would bring. Early control centres were demand to maintain system frequency.
buildings. He was wrong regarding the hardwired analogue systems with meters Ever cheaper, more powerful digital com-
term itself, but he was right about the and switches, and operators used thumb- puting paved the way to the first major
trend. For a start, Owens foresaw two-way wheels to change settings. Even so, the advance in EMS and Supervisory


Alstom Grid///Spring/Summer 2013 39
Main feature chapter IiI Making energy available to all, today and tomorrow

An EMS operator in the early 1970s

Early
control
centres were
hardwired
analogue
systems with
meters and
switches, and
operators used
thumbwheels
to change
settings.

Control and Data Acquisition. transmission capacity even


SCADA lets the operator monitor grid con- more, and this can result
ditions (with 2-4 second updates) and in pushing the grid closer
intervene manually as needed. SCADA also to dynamic stability limits.
provides data for state estimation (SE) that So those limits need to
gives a best guess of conditions across the be updated in real time,
and to do this you need

Business
computationally intensive
applications that simulate

needs are driving grid dynamic behaviour in


the face of disturbances.
change, too. Synchronised
real-time monitoring
entire network. Results from SE are also Unfortunately, that cant
used to simulate incidents in counter- be done in real time using
factual or what-if studies for contingency traditional EMS solutions.
Synchrophasor angle-separation display indicating limit violation
analyses to predict what would happen alarms. The answer is synchropha-
if key grid components went offline unex- sor solutions. Jay explains
pectedly. that synchrophasor is
Business needs are driving change, too. Alstom Grid, points out, Spurred by shorthand for synchronised phasor meas
As Jay Giri, Director of Power Systems deregulation and electricity markets, urements. They provide a representation
Technology and Strategic Initiatives with operators want to maximise available of voltage and current waveforms that

40 Alstom Grid///Spring/Summer 2013


An EMS operator today Sudden alert Grid disturbances,
California, USA

shows a sinusoidal signal simply as a mag- model and without full observability. This EMS manually, and they are not changed
nitude and phase angle, with an associated approach is particularly valuable for large very often. This means that the margins
GPS time stamp. This provides unprece- interconnections in which individual oper- are necessarily pessimistically large and
dented synchronised real-time monitoring ators do not have full observability or mod- the network is operating well below its
of three-phase voltages and currents, as els of the entire system. potential; traditionally this would mean
well as frequency and rate of change of
frequency from multiple remote points on
the electrical grid. It also monitors fast Synchrophasor data will allow us
dynamic grid behaviour, which todays
SCADA does not. Synchrophasors are to operate the system closer to its
typically measured 25-60 times a second
by phasor measurement units (PMUs)
actual limit by intelligently updating
providing typically 12-16 measurements
per device up to 240 times the frequency
this limit in real time.
of traditional SCADA.
Wide-area management systems (WAMS) Major benefits that additional capacity would be needed,
that use synchronised measurement Potential benefits coming from the avail- so extra power lines would have to be
technologies generate very high volumes ability of PMU data range from improving built. Apart from the intrinsic expense of
of measurement data. This needs to be routine tasks to blackout prevention. For adding lines, this is also very time-
converted into useful, operator-actionable example, operational limits for transmis- consuming because of obstacles to obtain-
information. Today, analytics using synchro- sion corridors factor in a safety margin to ing rights of way, building permits and so
nised measurement data extract such infor- protect the grid against disturbances; on. As Giri goes on to say, having time-
mation independently without a system the operator enters these limits into the stamped, synchrophasor data will


Alstom Grid///Spring/Summer 2013 41
Main feature chapter IiI Making energy available to all, today and tomorrow

M o r e

allow us to operate the system closer minor event to grow into a more serious
to its actual limit by intelligently updating incident or even a blackout. One goal of
this limit in real time, while maintaining the US Department of Energys Smart
system integrity. This results in cost savings Grid initiative is to understand how Dr Jos Trehern
to the utility and in environmental benefits, to make synchrophasor measurements
since you dont need to invest in new lines trustworthy for fast early warnings and
and transmission pylons. smarter prompt decision PhasorPoint
T h e ke y d i ff e re n ce s
between a synchropha- Faster automation.
We are seeing one of the
The Psymetrix PhasorPoint system
is a state-of-the-art solution for
sor-based EMS and a
warnings and biggest changes in the wide-area real-time synchronised data
collection, management, analysis,
better antici
traditional EMS are industry since the intro-
visualisation and reporting.
faster warnings and bet- duction of affordable PhasorPoint was presented in
ter anticipation. At pres-
ent, operators typically pation. digital computers in the
70s, and for Jay Giri this
Think Grids Winter 2011 issue,
but since then PhasorPoint 6.0
initiate emergency deci- is just the beginning. has been released, offering two new
sion-making only after a disturbance Over the next five to 10 years, I see the applications: system disturbance
occurs. They need time to assimilate and promise of new technologies becoming a monitoring for detecting disturbances,
identifying locations and
analyse information about the disturbance reality. The Holy Grail of Smart Grid is not characterising their impact;
from SCADA data and other sources, just to monitor and visualise, but also to and system condition monitoring
including conversations with neighbour- control the grid automatically and this for wide-area visualisation of system
ing operators, and then need more is going to happen only after this initial stresses through deviations in voltage
time to decide on what to do. Experience phase of building confidence with syn- magnitude, voltage angle, and
frequency, explains Dr Jos Trehern,
shows that this lost time can allow a chronised measurement technology. CEO of Alstoms Psymetrix unit.
Operators can use PhasorPoint to help
optimise controller settings (to avoid
Oscillatory stability monitor, Iceland disagreements between controllers,
for example), to access data for
event analysis, and to improve grid
reliability. Customisable tools allow
the user to define views, calculations
and event management. Historical
information may be accessed through
an optimised SQL-compliant interface.
Scalability has been further improved
thanks to benchmarking with over
1,000 PMUs.

42 Alstom Grid///Spring/Summer 2013


During the
summer in the
US, the electrical
MW grid is often
pushed to its
24,000 limits during the
day as industrial
and domestic
consumers
23,000 demand power for Load pickup stops and reverses direction
air conditioning
and other when load management is invoked
power-hungry
equipment. This
22,000 is when demand
response kicks in.

21,000

20,000

19,000

18,000

15:08 AEP Zone Long Lead Activated

19:05 AEP Zone Long Lead Released


13:08 AEP Zone Long Lead Notified

17,000

16,000

15,000

14,000
00:00 04:00 08:00 12:00 16:00 20:00 00:00
07/17/2012 07/17/2012 07/17/2012 07/17/2012 07/17/2012 07/17/2012 07/18/2012

A state-of- Managing the load


the-art system Demand response (DR) is a relatively sim- Automate: the utility usually provides the
for managing ple concept: utilities provide incentives to
electricity customers to reduce their con-
customer with a smart-grid device, such as a
smart meter or programmable thermostat,
demand response, sumption during periods of high prices or
peak demand. DR is another method for
which is capable of receiving a signal from
the utility and automatically reducing power
e-terraDRBizNet, allows utilities to manage grid reliability and the consumption.
utilities to efficiently use energy supply/demand balance. As DR Notify: when grid operators observe a short-
Product Manager Travis Rouillard notes, age of power in part of the grid, they send a
consumer loads as a its a greener and more economical alter- notification signal to the specific smart-grid
controllable grid resource. native to building new power plants or add- devices that will help ease the situation.
ing new grid capacity. Curtail: the smart-grid devices automatically
turn off non-critical electric loads or change ther-
How does it work? mostat set points for a few minutes or hours.
Demand response works in five basic steps: Settle: the utility verifies that the customers
Enrol: customers willing to participate actually reduced their consumption and
in demand response enrol into incentive calculates the amount of credit to appear on
programmes offered by their local utilities. their next bill.


Alstom Grid///Spring/Summer 2013 43
Main feature chapter IiI Making energy available to all, today and tomorrow

e-terra DRBizNet helps utilities heaters during cold winter mornings With the advances in smart-grid technology
efficiently perform these steps thousands of which can be a huge share of the peak and Internet communications penetrating
times, for each of the small customer load system demand. But it can also include almost every customer group, DR is gaining
changes it takes to be cumulatively equivalent approaches such as dimming lights in com- attention as a new way to provide emer-
to the output of a traditional generator. In mercial buildings or interrupting machines gency grid reliability services. Rouillard
addition, it provides operators with the tools in factories. DR can either curtail the load provides an example: If the grid is subject
to forecast how much customer load is avail- entirely or simply shift it to a problem such as
able at any time and which specific custom-
ers they should dispatch for how long.
a few hours earlier or
later when capacity is Reduce a generator fault or
transmission outage, it
Rouillard points out that, although the prin-
ciple is simple, execution is complex. Thats
less constrained.
When electricity supply
energy cost and needs to drop system
load quickly. Using
because of the scale involved to make lots of systems were deregu- improve grid e-terraDRBizNet, it can

reliability.
small distributed resources perform as if they lated in many areas, and automatically dispatch
were a single power plant. retail suppliers started DR to drop hundreds
to buy power for their or even thousands of
When is demand response used? customers in the open market, demand megawatts within minutes. This gives
Demand response is most often used as a response became an alternative to paying operators some breathing space to deal
way for utilities to reduce their peak system high spot prices. In some markets, hourly with the issue.
needs. Since the top 5 percent of transmission megawatt prices can easily jump 1,000 per-
or generation capacity may only be used a cent in the course of a few hours. Instead Challenges
few hours a year, it is often cheaper to reduce of paying those high prices, retailers can Despite decades of success in North
customer load for those few hours than to actually sell DR energy back to the market, America, utilities in other parts of the world
build new lines or plants. In the summer, earning a healthy return. Many retailers have been slow to adopt DR. The business
this usually means curtailing air conditioners share the savings with their customers as case for DR is certainly more difficult in
during the hottest afternoons or electric a way to encourage them to participate. regions with historically low energy costs

Demand Response
Process Overview

Identify Notify Curtail


During a time of peak capacity The operator notifies demand aggregators Customers usually shut off lights or use
or high prices, an operator identifies and customers of the amount, location an energy management system (EMS) to
the need for load curtailment. and duration of curtailment required. run pre-defined load control commands.

44 Alstom Grid///Spring/Summer 2013


M o r e

or low per-capita consumption. In many You cant provide a stable, balanced grid
areas, regulations simply do not allow without having some control over the
utilities to offer the incentives necessary to demand side.
attract participants. But this is changing
rapidly, for several reasons: The future is now
the worldwide increase in the demand for Demand response is allowing utilities to
power; fundamentally rethink how they view the
the challenge of building new plants or customer side of their business. e-terra Travis Rouillard
transmission assets near population centres DRBizNet gives utilities the ability either
where demand growth is fastest; to reduce load temporarily, or to shift it
more interest in phasing out nuclear- and to another time when supply is plentiful. PJM Interconnection
coal-based power; In some cases, it completely changes the The US regional transmission organisation
increased deployment of intermittent traditional relationship utilities have with PJM Interconnection is the largest grid
operator and electricity market in the world
resources such as wind and solar power; customers, who can now be paid incentives (after China), with a system load of over
advances in battery storage, which can for being flexible about when they use 150,000 MW during summer peaks.
act as a generator or a load; power. It was an early adopter of demand response
growth of smart-grid technologies and Alstom is deploying e-terraDRBizNet at as an alternative way to manage seasonal
Internet access everywhere. utilities to enable large-scale demand capacity and emergency reserve needs.
These factors are improving the business response programmes that reduce energy Since it started working with
e-terraDRBizNet in 2008, its demand
case and obliging regulators to review their costs and improve grid reliability. It sup- response portfolio has grown to over
positions on DR. Rouillard explains: Utilities ports the continued growth of renewable 15,000 MW, or roughly 10 percent of its
everywhere are struggling with how to deal energy resources by giving utilities more system load. e-terraDRBizNet helps PJM
with an increasing mix of intermittent gene- control over load to better match the avail- manage its six different programmes each
ration, while also supporting large new ability of supply. DR is a key component of with different participation rules and
incentive structures.
loads, from electric vehicles, for example. Alstoms smart grid solutions.
During a heat wave in July 2012, it had an
unusually high system load of 155,000 MW,
with 6,000 MW of generation offline.
Demand response helped PJM in two ways.
First, a large number of customers voluntarily
participated in demand response in exchange
for being paid the spot price for the energy,
just like generators.
This reduced system load by over 1,000 MW,
which was enough to suppress skyrocketing
energy spot prices. Second, operators called
on their emergency reserve demand response
customers to deliver another 1,500 MW in
one of their highly congested transmission
areas. This allowed them to avoid more
serious frequency problems or involuntary
customer interruptions.
Demand response is now a $500 million
market at PJM. There are over 1 million
end-customers participating directly and
indirectly everything from industrial
manufacturers to shopping malls to
homeowners. But all customers in the PJM
service territory benefit in the form of lower
Verify Restore electricity prices, more reliable supply, and
reduced environmental impact compared
The operator must verify the Operator releases resources with building new fossil fuel generators
expected load reduction is occurring and load returns to normal or transmission lines.
or call more resources. patterns.

Alstom Grid///Spring/Summer 2013 45


Main feature chapter IiI Making energy available to all, today and tomorrow

Attending
training
courses
without
being in a
classroom

Online training
brings added value
In response to
What the remote
The sessions cover everything from basic learner sees.
introductory programmes to intermediate
the increasing cost level courses on software training such as
Building a SCADA model with e-terra-
Rusty Rae, manager of the Technical
Institute in Redmond. The Instructor Led
of travel (and time) to attend source, and the most advanced courses, Online Training concept, using innovative
the Alstom Grid Technical such as programming in e-terrasource, technology, was developed in response
which requires connectivity between two to this situation.
Institute, the launch of workstations. ILOT uses webinar (web conferencing)
Instructor Led Online Training In the USA, over half of Alstoms custom- software such as WebEX to deliver the lec-
(ILOT) delivers a full Technical ers are located east of the Mississippi River. tures synchronously to the remote trainees
Many of them have to spend two days and incorporates cloud resources to give
Institute training experience on travelling (one day there, one day back) to them access to a training machine on
network management systems take part in training sessions at the Tech- which they practise what was learnt in the
nical Institute in Redmond, near Seattle, lectures. There is also a video feed that
without the travel on the west coast. At a time of cutbacks gives remote learners a view of the class-
constraints. in travel budgets, this inevitably resulted room, which is used when the instructor is
in declining numbers of attendees for writing on the whiteboard, notes Rae.
Alstom Grid training programmes, says The cloud application allows the instructor

46 Alstom Grid///Spring/Summer 2013


M o r e

to work with remote students as if they


were in the classroom and look over their They get a fully
shoulders in the practice sessions to ensure
that they are progressing on the assignment. comprehensive
And if a student is having a problem, the
instructor can give him or her hints or even
learning experience.
take control of their machine to show how
to continue, adds Rae, though that does
Rusty Rae
not happen often. their systems within an acceptable
The learning experience provided for those time frame.
attending ILOT training sessions is very simi- Rae adds, With ILOT, customers are able Training in your
lar to the experience of those attending the to gain the knowledge they require to man- pyjamas
same course, physically, at the institute itself. age their power transmission and distribu-
Rae admits that participat- tion systems in a timely manner. This in Its an interesting option. In fact,
ing in an ILOT session is not turn means that systems are running many learners actually prefer to do
their training sessions from home
exactly the same as attend- smoothly and, because the people are for several reasons. For example,
ing a course at the institute. trained and competent, there are fewer they do not have to handle any
This is because they do not inquiries to handle. As a result, the Alstom LAN and WAN firewall issues,
have the advantage of talk- support team can turn their attention to which corporate networks often
ing with other participants solving the next level of critical issues. impose. They may also have better
following the same course, connectivity and they can concentrate
nor do they have the oppor- The way ahead better without the distractions
of phone calls or interruptions
tunity of interacting with Plans are now under way to extend the from colleagues.
members of the Alstom ILOT programme to other technical insti- Since there is not yet a two-way
Technical Team. However, tutes delivering software training, begin- video link between the Redmond
they do get a fully compre- ning with Massy, near Paris, followed by Technical Institute and learners
workstations (although it will become
hensive learning experi- Noida, India. We still have to overcome
an option eventually), it is not
ence. And feedback from a number of technical challenges mainly possible to see how casually remote
remote learners has been concerned with bandwidth and latency of attendees are dressed. But in the end,
very positive. the communications networks, particularly of course, it doesnt matter because
if long distances are involved, says Rae. the bottom line is all about learning,
Additional benefits But once the programme is up and run- and feeling comfortable is always a
key aspect of really effective training.
During the initial rollout of the ILOT deliv- ning, it will give these institutes the oppor- News of the remote learning option
ery system, the Technical Institute in Red- tunity of meeting the training needs of is spreading. By early November
mond was able to restore the participation those customers who are inhibited from 2012, a total of 196 learners had
in training delivered by the institute to attending them by travel budget restrictions studied at the Alstom Grid Technical
former levels, and it is even increasing (or for any other reasons). Institute 105 of them remotely
slightly with time. Every course offered at The ILOT delivery system has also proved using the ILOT protocol (54%).
In July 2012, 25 people attended
the Alstom Technical Institute in Redmond to be a persuasive tool for the tendering courses via ILOT, compared with
is now offered with an ILOT option. team to use when submitting bids. Custom- four in person, while in June all
A further advantage is that numbers of ers (particularly the more price sensitive, 30 attendees preferred the ILOT system.
remote attendees invariably make it pos- often smaller, organisations) are quick to
sible to meet minimum student require- appreciate the advantages offered by this
ments for courses to be organised, thereby system, as it gives them the assurance that
avoiding the possibility that some courses their team will get the training it needs,
would be cancelled. This has enabled more when it needs it and without stretching
customers to be instructed in managing the budget.


Alstom Grid///Spring/Summer 2013 47
Cross-perspectives

Is there more to the cloud


than hot air?
Our specialists explain how cloud computing is entering the power industry
Are there risks associated to the
move towards cloud computing?
The main risk is privacy. So trust is a priority.
Energy providers must be perceived as
trustworthy. Also, data privacy mechanisms
must be put in place, while consumers need
visibility and the ability to change data.

How should the grid data be hosted


in the cloud?
We have now the ability to store quasi-
infinite amounts of data. And the cloud
can apply massive computing power
to process this data and provide better
intelligence, faster decision-making or
enhanced visualisation, for example. More
data means better information and ulti-
mately new knowledge. This is the prom-
ise of big data. It will lead to a wave of
new services and will speed up the deploy-
ment of smart grids. Public data will also
smart-grid environment. The cloud makes be shared more openly and will enable new
that connection, without heavy investment smart energy ecosystems. It is up to the
It will lead in IT. It is more practical, less costly and super-
fast to run energy applications in the cloud.
service providers to leverage the potential
of big and open data.
to a wave So the cloud is a vector to accelerate the
of new services. development of smart-grid applications.

Marc Jalabert Electricity consumers are becoming

What is cloud computing?


more and more active. Does this
contribute to the move towards cloud
New applications
There are two ways to look at it. First, it is computing? can be rolled out
a low-cost way to store and access data.
Second, it is a programmable Internet a
Consumers are already interacting with the
cloud without even knowing it. They have
rapidly.
Laurent Schmitt
platform to write applications and run com- been using Hotmail for 15 years. Social
puting processes through a website. media, entertainment, communications all
come through the cloud today. But much What are the main trends pushing
What are the main trends pushing more will come. Smart homes, for instance, the power industry towards cloud
the power industry towards cloud with say, ones diary interfacing with computing?
computing? the smart car which charges up for the The smart grid requires new applications to
The energy industry needs computing power number of miles to be travelled next day. This be developed to enable consumers to interact
and skills to deliver new solutions in a type of application is not too far in the future. with grid infrastructures through Internet

48 Alstom Grid///Spring/Summer 2013


Microsoft Alstom Grid Stedin
Marc Jalabert, Laurent Schmitt, Milo Broekmans,
Marketing and Vice-President, Senior Enterprise
Strategy Director Strategy and Innovation Architect

connectivity. This implies the development infrastructures deployed around mission- And operations technology tends to lag IT
of new architectures to manage massive critical control centre environments. in using the cloud.
amounts of data, referred to as big data,
as well as new analytics to support energy Can you give any examples of new Are there risks associated to the
decisions. The idea is to re-use developments applications of cloud-based data move towards cloud computing?
from adjacent industries historically offered management for a power grid? Risks and challenges. Supplying the cloud
through the Internet. So far, new applications have mainly been itself with the electricity it needs is a chal-
developed in the area of demand response. lenge. Integrating so many different compe-
Electricity consumers are becoming In parallel, discussions have been set in tencies from partners who may not fully
more and more active. Does this motion to investigate the option of benefitting understand each others business can be
contribute to the move towards from big data through the next smart grid risky. For example, IT firms may not realise
cloud computing? scale-up. that in an energy grid, a local problem can
In effect, the key smart-grid applications cascade across the whole network if they
are first being implemented in the deregu- react too slowly. The cloud is innovative and
lated domain of the smart grid, as new future-oriented, but managing risk will
aggregators enter the sector by deploying still depend on traditional business values,
energy services in a public cloud through
the Internet to enable demand response in
More and more especially trust.

wholesale markets. Traditional utilities have data are being What are the expectations of transmis-
more recently moved in the same direction
by rolling out similar architectures in their
generated. sion and distribution system operators
from companies such as Alstom?
Milo Broekmans
own private cloud. That they understand our business and
propose solutions, cloud or not, that respect
Are there risks associated to the What are the main trends pushing the our operating and other constraints.
move towards cloud computing? power industry (and utilities in parti-
Cloud computing presents advantages and cular) towards cloud computing? Can you give any examples of new
risks. The major advantage is that new appli- Theres a technology push as more and applications of cloud-based data
cations can be rolled out rapidly, while assur- more data are being generated. Cloud management for a power grid?
ing high scalability once the service matures. computing both contributes to this expo- Data is the keyword here. The cloud makes
On the other hand, it requires that applica- nential growth and offers solutions for large quantities of data available at relatively
tions be hosted in outsourced environments managing it. On the demand side, the cloud little cost, and the most useful applications
connected through the Internet. This opens helps to cut time to market for services. will use these data to improve functions
up cyber security threats. we carry out already, like monitoring and
In our transmission and distribution predicting grid conditions, to detect outages
How should the grid data be hosted sector, consumers are becoming more or theft for example. But these data and
in the cloud? and more active. Does this contribute new applications could help us to propose
Smart-grid applications and their data can to the move towards cloud computing? more elaborate services, such as helping
either be located in a public cloud that Yes, since connectivity and reactivity consumers craft the most efficient energy-use
is, outsourced data centres for less critical can be improved. But its important to strategy.
applications such as customer information remember that the cloud doesnt solve
and demand response, or they can be located everything. SCADA, for instance, is unlikely
in a private cloud typically the intranet to move to the cloud in the short term.

Alstom Grid///Spring/Summer 2013 49


COMING UP IN THE NEXT ISSUE

A HANDSHAKE SEALS THE VALIDATION OF THE RESULTS


FOR ALSTOMS DIRECT CURRENT CIRCUIT BREAKER

PROTECTING MESHED GRIDS


Operators increasingly use direct current
A breakthrough for high
to carry power efficiently over long
distances in particular when cables
are used or to stabilise the grid as more
voltage DC grids:
intermittent energy sources have to be
integrated. Circuit breakers are not
necessary for point-to-point DC
the circuit breaker
transmission since isolating a fault on
the sole link is equivalent to a system
shutdown. However, breakers are vital On February 25, 2013 Alstom announced the positive
for protecting meshed grids where
several points are interconnected
test results achieved by its prototype high voltage direct current (HVDC)
especially when the time constant of the circuit breaker at its Technology Centre in Villeurbanne, France.
system is short, in other words, when
the grid is set up so that it responds
extremely quickly to any changes In less than 2.5 milliseconds, the Alstom European Commissions TWENTIES
in conditions (including faults, etc.).
The challenge is to avoid chain reactions
HVDC circuit breaker interrupted current research project. The aim of TWENTIES is to
and blackouts by breaking the current exceeding 3,000 amperes. This outcome can foster the integration of renewable energy,
in the malfunctioning section as fast as be regarded as a technological breakthrough especially wind energy, in Europes power
possible in order to isolate the fault from in this field. The tests were conducted jointly grid by 2020. To meet this challenge,
the rest of the grid. Alstoms new circuit with RTE, the French electricity transmission 26 partners from 10 member states are
breaker could pave the way for many system operator. They form part of RTEs networking their intelligence, and RTE
possibilities in DC grids.
development programme on the architecture has committed its R&D to supervise one

2.5
and technologies for DC power grids. The of the six demonstrators. The partners have
circuit breaker is the key element of power identified system components to protect the
milliseconds: network protection in the event of a short grid and have quantified the performance
the time it takes for the brain to circuit. Well known for alternating current required in various architectural schemes.
register an image from the eye. connections, the technology requires a For the HVDC circuit breaker, Alstoms
temporal performance 10 to 20 times faster results already largely respond to these

3,000
for use with direct current. The HVDC circuit requirements, in particular overcoming
breaker is a major technological element in major technical obstacles for the
Over building Supergrids, both onshore and development of HVDC networks. Even
amperes: the current cut by the offshore. It will help to increase the share of higher performances are expected to be
Alstom HVDC circuit breaker. renewable energy conveyed by the grid. demonstrated by the end of this summer.
Discover more about the Alstom HVDC
Partnering for the future circuit breaker in our next issue of Think Grid
The tests were conducted as part of the magazine.

50 Alstom Grid///Spring/Summer 2013


Contents Dates for your diary

#11 Spring/Summer 2013

08
May 1317, 2013
Gothenburg, Sweden
Elfack 2013
13 12
This trade fair is the Nordic regions largest
meeting place for the entire electricity
industry. It brings together power companies,
decision-makers, politicians, installers,
June 1213, 2013
Manchester, UK
Offshore Wind 2013
This is the 11th annual offshore wind
conference and exhibition. Organised by
RenewableUK, the UKs leading renewable
energy trade association, it is expected
August 2530, 2013
Seoul, Korea
ISH 2013 25
The 2013 edition of the International
Symposium on High Voltage Engineering (ISH)
is a magnet for engineers, scientists, academics,
researchers and politicians to discuss the
Interview with distributors and more for five days of product
news, seminars, training and networking.
to attract over 3,000 delegates and some
200 exhibitors. The conference programme
industry challenges and issues. It is also a
platform to share technology advances and
Luis Alejandro The Power Forum is an opportunity will focus on planning for growth, financing, experience. Topics include HV testing and
Camargo Suan to learn more about smart networks, the
infrastructure of the future and alternative
policy and community, emerging markets,
the supply chain, as well as technology
measurement techniques, insulation materials,
asset management, smart grids, etc.
and Maria energy sources. and innovation.

Nohemi Arboleda
Arango

38 Smart products
& services
Synchrophasor solutions:
making the smart grid
even smarter

10 4
Vancouver, ranked as one of the most

06
The Stockholm waterfront. livable cities in the world. One of the five Grand Palaces in Seoul.

Alstom receives the Respecting June 1013, 2013 July 2125, 2013 September 47, 2013
2012 Frost & Sullivan the environment Stockholm, Sweden Vancouver, Canada Jakarta, Indonesia
Outstanding Technology CIRED 2013 IEEE Power & Energy Society Electric, Power & Renewable
Innovation Award Substations General Meeting Energy Indonesia 2013
go fully digital The biennial CIRED international electricity
conference and exhibition is a leading forum The theme of this years General Meeting is: This biennial exhibition reflects Indonesias
Dr Richard for the electricity distribution community. Shaping the future energy industry. phenomenal economic expansion

21
Charnah, This years event has as its theme: Electricity The conference will bring together power accompanied by equally rapid power
Publisher
distribution systems for a sustainable future. engineers and academics from across the demand. In parallel, the country has set
t hinkgrid SHARING ALSTOM GRID INNOVATION & PRACTICES Published by Alstom Grid
The three-day conference includes plenary
sessions with internationally recognised
world. The aim is to provide an international
forum for experts to discuss issues
aside substantial sums to develop its power
and energy infrastructure, hence the
51 esplanade du Gnral de Gaulle 92907 La Dfense Cedex France. www.alstom.com/grid Print run: keynote speakers, poster sessions, round and developments in electrical power importance of this three-part exhibition
15,000 copies (Chinese, English, French) Publisher: Richard Charnah Editor in chief: Vronique Chauvot tables, and research and innovation forums. engineering. Topics will include, among Power Indonesia, Renewable Energy
Editorial board: Stphan Lelaidier, Richard Charnah, Walter Dussaucy, Vronique Chauvot Concept and Design: others, transmission efficiency and Electric Indonesia.
BythewayCreacom 19 rue Galile, 75116 Paris France Tel.: +33 (0)1 53 57 60 60 www.bythewaycreacom.net and reliability, advances in protection,
Editorial executive: Henry Lewis Blount Publication manager: Valrie Barral Contributors: Henry Lewis Blount, automation and control.
Ken Kincaid, Patrick Love, Louis-Antoine Mallen, Manuel Relvas, Gordon Smith Copy editor: Ginny Hill
Art director: Katja Zimt Graphic designer: Sandie Herviou Computer graphics artist: Laurent Bouyer, Studio V2
Photo credits: Alstom, XM, Irish control center/Eirgrid, Friends of the Supergrid, Medgrid/Realisation and graphic
design: Regards Events, Rusty Rae, Shutterstock, Thinkstock Printing: HandiPrint. ISSN: 2102-0175. A special
thanks to the companies that kindly provided us with their illustrations. Alstom Grid///Spring/Summer 2013 51
Grid-Sector-L1-Think_Grid_11-2934-2013_03-EN- ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend
on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Printed on paper made with pure ECF (Elemental Chlorine Free)
ecological cellulose produced from trees grown in production forests under responsible management, and selected recycled three-layer fibres.

France
Alstom Grid
Immeuble Le Galile

www.alstom.com
92907 La Dfense Cedex
51 esplanade du Gnral de Gaulle

think grid #11 Spring/summer 2013