You are on page 1of 15

PHILLIPS 66 SAN FRANCISCO REFINERY

1380 SAN PABLO AVENUE, RODEO, CALIFORNIA


EXTEND ALIGNMENT C REM EDIATION SYSTEM 1

SFE 16-019 /MOC M2016346-001


,.
,,~
.,_ ...
...:<..
't.("I
'J:

~~
I
<.
~
~
~~
~ .
t',.
':,;'
~~
t
I~
'l'
Jo

~~ .".., .<
~
,,
t ~
...,,
~

"
'
"
>,
'.. I

,t
""' j ,('.
/I
If
11 '\
'
\
' ''
SFR PROPERTY \' \ .
BOUNDARY '
\ ''
' \
'\ '' .
'' \,.
\
'
\
IMAGE SOURCE: WOOLLEY SURVEY AERIAL PHOTO 2007

SITE LOCATION 0 1,200'


200'
SHEET 1 PROJECT LOCATION 0
DRAWING NUMBER
NUMBER
TITLE REV SCALE: 1" =1,200'
UTIL-XY-16019-001--001 1OF15 TITLE SHEET 3 SCALE: 1" =200'
UTIL-XY-16019--001--002 20F 15 GENERAL NOTES AND SPECIFICATIONS 1
UTILAA-16019-001--001 30F 15 SITE PLAN 3
UTIL-AA-16019--001--002 40F15 DETAIL REFERENCE SHEET 3
UTIL-AA-16019--001--003 50F 15 ALIGNMENT DETAILS 1
UTIL-AA-16019--001--004 6OF15 GUARDRAIL DETAILS 0 TIE~N
SHEET NUMBER DESCRIPTION
NUMBER
UTIL-AA16019-001--005 70F 15 ALIGNMENT DETAILS 1
1 UTIL-H-16019-001--002 2" CONVEYANCE PIPING NEAR STATION 10 (R0014-2"-KXD8)
UTIL-AA-16019--001--006 80F15 ALIGNMENT DETAILS 2
UTIL-AA-16019--001--007 90F 15 ALIGNMENT DETAILS 1 2 UTIL-H-16019-001--002 1" AIR SUPPLY PIPING NEAR STATION 10 (LAU4-101-1")
UTIL-AA-16019--001--008 100F15 ALIGNMENT DETAILS 0 3 UTIL-H-16019-001--002 1/2" AIR SUPPLY MANIFOLD AT STATION 10 (LAU4-107-1 /2")
UTIL-AA-16019--001--009
UTIL-H-16019-001--001
UTIL-H-16019--001-002
UTIL-YD-16019-001-001
11 OF15
120F15
130F 15
140F15
WELL COMPLETION DETAILS
PIPING DETAILS
PIPING DETAILS
PROJECT PIPING & INSTRUMENTATION DIAGRAM
2
2
1
2

0 INDEX OF SHEETS
TIE-IN SCHEDULE

UTIL-YD-16019-001-002 150F15 REFINERY P&ID (UTIL-YD--022--001) 0

DRAWING NUMBER REV

UTIL-XY-16019-001-001 3
1. GENERAL REQUIREMENTS: CONTRACTOR SHALL PROVIDE LABOR, EQUIPMENT AND 11. CONTRACTOR SHALL RESTORE SITE TO A CLEAN AND ORDERLY CONDITION. 23. CONTRACTOR SHALL SUBMIT DETAILED BONDING PROCEDURES FOR
MATERIALS FOR INSTALLATION OF THE EXTENSION OF MAIN INTERCEPTOR TRENCH PAVEMENT, FENCES, CURBS, ETC. SHALL BE REPLACED AND REPAIRED IN KIND. CEMENTING CPVC PIPING AND COMPONENTS FOR COMPANY APPROVAL PRIOR
ALIGNMENT C. THE WORK INCLUDES: INSTALLATION OF GROUNDWATER ASPHALT PAVING SHALL CONFORM TO SFR SP-00-7. TO STARTING FIELD WORK. CONTRACTOR SHALL PROVIDE AND DOCUMENT
EXTRACTION WELLS AND PIEZOMETERS, INSTALLATION OF PNEUMATIC PUMPS, HYDROSTATIC PRESSURE TESTING OF ALL CPVC PIPING FOLLOWING
GROUNDWATER CONVEYANCE PIPING AND PLANT AIR SUPPLY PIPING. 12. CONCRETE WHERE INDICATED ON THE DRAWINGS AS "CONCRETE'', SHALL INSTALLATION. CONTRACTOR TO ALSO SERVICE TEST GALVANIZED CARBON
CONFORM TO REQUIREMENTS FOR MINOR CONCRETE IN SECTION 90-2, 2010 STEEL AIR SUPPLY PIPING USING EXISTING PLANT AIR PRESSURE AND SOAPY
2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY AND HEALTH OF ITS CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) STANDARD WATER. CPVC PIPING SHALL BE TESTED TO A MAXIMUM PRESSURE OF 80 PSIG
WORKERS AND SUBCONTRACTORS. EACH EMPLOYEE OF CONTRACTOR AND SPECIFICATIONS. COMPRESSIVE STRENGTH SHALL BE 4,000 PSI MINIMUM . AND THE GALVANIZED CARBON STEEL AIR SUPPLY PIPING SHALL BE TESTED
SUBCONTRACTORS WHO ENTERS THE SITE EXCEPT FOR DELIVERY PERSONNEL, CONTRACTOR SHAL PROVIDE THIRD PARTY CONCRETE TESTING FOR ALL USING EXISTING PLANT AIR (APPROXIMATELY 120 PSIG).
SHALL HAVE VALID CERTIFICATION OF SAFETY AND HEALTH TRAINING, SHALL CONCRETE WORK ASSOCIATED WITH THIS PROJECT PER P66 REP 4-3-2 (SECTION
COMPLY WITH REQUIREMENTS AS SPECIFIED IN CCR TITLE 8, SECTION 5192, AND 6.5). 24. ALL STRUCTURAL STEEL TO BE EMBEDDED IN CONCRETE OR TO RECEIVE FIRE
CFR TITLE 40, PART 1910, SHALL COMPLY WITH THE COMPANY DRUG AND ALCOHOL PROOFING MATERIAL SHALL BE CLEAN AND FREE OF PAINT, OIL, OR DIRT.
POLICY, SHALL HAVE CURRENT VALID RSO OR DSOP TRAINING, AND SHALL 13. EXISTING MONITORING WELLS SHALL BE PRESERVED .
PARTICIPATE IN A REFINERY SAFETY ORIENTATION . CONTRACTOR SHALL SUBMIT A 25. ALL STRUCTURAL STEEL INCLUDING ANGLE BRACES GUSSET PLATES, ETC.
PROJECT-SPECIFIC HEALTH AND SAFETY PLAN TO COMPANY FOR APPROVAL A 14. REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60. FABRICATION SHALL BE GALVANIZED UNLESS SPECIFIED OTHERWISE. ANY WELDING ON
MINIMUM OF FIVE DAYS PRIOR TO STARTING FIELD WORK. AND PLACEMENT SHALL BE IN ACCORDANCE WITH CRSI MSP-1 "MANUAL OF GALVANIZED MATERIAL SHALL BE COLD GALVANIZED AFTER WELDING.
STANDARD PRACTICE" AND ACI 301 "SPECIFICATIONS FOR STRUCTURAL
3. ALL WRITTEN DIMENSIONS SUPERSEDE ALL SCALED DIMENSIONS. ALL DIMENSIONS CONCRETE BUILDINGS". 26. NO HOLES OTHER THAN THOSE SPECIFICALLY DETAILED SHALL BE ALLOWED
SHALL BE FIELD VERIFIED BY CONTRACTOR BEFORE FABRICATION. THROUGH STRUCTURAL STEEL MEMBERS. NO CUTTING OR BURNING OF
15. CONCRETE EXPANSION ANCHORS SHALL BE KWIK BOLT TZ STAINLESS STEEL STRUCTURAL STEEL WILL BE PERMITTED WITHOUT
4. CONTRACTOR SHALL IMMEDIATELY REPLACE AT ITS OWN COST ANY UTILITY CONCRETE ANCHORS MANUFACTURED BY HILTI, INC. TULSA OKLAHOMA, OR THE APPROVAL OF THE ENGINEER.
DISTURBED OR DESTROYED BY ITS ACTIONS, AFTER COMPANY IS NOTIFIED. APPROVED EQUAL. ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS AND ICC ESR-1917, LATEST ISSUE. SPECIAL 27. CONTRACTOR TO PURCHASE THE CUSTOM PRECAST SUBSURFACE TRENCH
5. CONTRACTOR SHALL MAINTAIN A MINIMUM 20 FOOT CLEARANCE BETWEEN INSPECTION IS REQUIRED. TORQUE ANCHORS TO MANUFACTURER'S FROM OLDCASTLE PRECAST AS SHOWN IN DETAILS. CONTRACTOR SHALL
OVERHEAD POWERLINES AND ITS CONSTRUCTION EQUIPMENT. INSTALLATION TORQUE. SUBMIT A DETAILED CUT SHEET FROM OLDCASTLE FOR APPROVAL PRIOR TO
ORDERING.
6. CONTRACTOR SHALL REMOVE ALL DEBRIS AND UNSUITABLE MATERIAL GENERATED 16. ALL CONVEYANCE PIPING AND VALVES SHALL BE SCHEDULE 80 CPVC IN
BY ITS OPERATION. ACCORDANCE WITH PHILLIPS 66 PIPING CLASS APDGZ. ALL CPVC PIPING SHALL BE
STENCILED AS CPVC PIPE AT 50-FOOT INCREMENTS. ABBREVIATIONS USED IN TH IS PLAN SET INCLUDE:
7. CONTRACTOR SHALL MAINTAIN AN UP-TO-DATE SET OF RECORD DRAWINGS. ACI = AMERICAN CONCRETE INSTITUTE
RECORD DRAWINGS SHALL REFLECT ALL CHANGES TO THE DESIGN DRAWINGS . 17. ALL AIR SUPPLY PIPING SHALL BE GALVANIZED CARBON STEEL IN ACCORDANCE ASTM =AMERICAN SOCIETY FOR TESTING AND MATERIALS
RECORD DRAWINGS SHALL BE KEPT CLEAN AND IN GOOD CONDITION, MARKED WITH PHILLIPS 66 PIPING CLASS TADGZ. AIR SUPPLY VALVES SMALLER THAN 1-1/2 CLEAR. = CLEARANCE
'AS-BUilT', AND TURNED OVER TO COMPANY AT THE COMPLETION OF THE PROJECT. INCHES SHALL BE BRONZE IN ACCORDANCE WITH SAN FRANCISCO REFINERY CPVC =CHLORINATED POLYVINYL CHLORIDE
ENGINEERING STANDARD S-50-003, MATERIAL SPECIFICATION AAU4 FOR CS= CARBON STEEL
8. CONTRACTOR SHALL NOT EXCAVATE BELOW LIMITS OF EXCAVATION INDICATED ON
THESE DRAWINGS DURING TRENCH CONSTRUCTION .
PLANT/INSTRUMENT AIR. DIA. = DIAMETER
DC= DOUBLE-CONTAINED
!.J'
~
18. ALL NEW CPVC CONVEYANCE PIPING AND VALVES SHALL BE PAINTED PER PHILLIPS EOP =EDGE OF PAVEMENT
9. CONTRACTOR SHALL CONTAINERIZE EXCAVATED MATERIALS IN ROLL-OFF BOXES 66 REP 10-3-1 . ESB := EFFLUENT SAFETY BASIN
AT THE DESIGNATED LAYDOWN AREA TO ALLOW FOR CHARACTERIZATION FPT = FEMALE PIPE THREAD
SAMPLING AND ANALYSIS BY OTHERS. AFTER CHARACTERIZATION, REMOVAL OF 19. STRUCTURAL STEEL SHAPES AND PLATES SHALL CONFORM TO ASTM A992 GRADE GALV. =GALVANIZED
SOIL IN ROLL-OFF BOXES WILL BE COORDINATED BY OTHERS. CONTRACTOR WILL 50 EXCEPT ANGLES SHALL CONFORM TO ASTM A36. STRUCTURAL STEEL PIPE LF = LINEAR FEET
BE RESPONSIBLE FOR FINAL CLEANUP AND RESTORATION OF LAYDOWN AREA. SHALL CONFORM TO ASTM A53 GRADE B. MAX. = MAXIMUM
MIN. = MINIMUM
10. MATERIAL USED FOR BACKFILL SHALL BE FREE OF LUMPS, WOOD, OR OTHER 20. ALL STRUCTUAL STEEL SHALL BE FABRICATED AND ERECTED IN CONFORMANCE MOC = MANAGEMENT OF CHANGE
DEGRADABLE MATTER AND SHALL BE OF A GRADING SUCH THAT THE REQUIRED WITH THE AISC MANUAL OF STEEL CONSTRUCTION, CURRENT EDITION. MPT = MALE PIPE THREAD
COMPACTION CAN BE CONSISTENTLY MET USING COMPACTION METHODS MW= MONITORING WELL
SELECTED BY THE CONTRACTOR. ALL IMPORTED MATERIALS SHALL BE SAMPLED 21. ALL BOLTS SHALL BE HIGH STRENGTH BOLTS CONFORMING TO ASTM A325-N Pl =PRESSURE INDICATOR
AND ANALYZED BY CONTRACTOR IN ACCORDANCE WITH THE DTSC GUIDANCE UNLESS OTHERWISE SHOWN. BOLTS INDICATED AS MACHINE BOLTS (MB) SHALL P&ID =PIPING AND INSTRUMENTATION DIAGRAM
DOCUMENT FOR CLEAN IMPORTED FILL MATERIAL (UNLESS VIRGIN QUARRIES CONFORM TO ASTM A307 FOR CARBON STEEL, A193 FOR STAINLESS STEEL AND PS = PROCESS SEWER
MATERIAL IS USED AND APPROVED BY P66 CLIENT). THE CONSTITUENTS OF A153 FOR GALVANIZED STEEL. ANCHOR BOLTS SHALL CONFORM TO ASTM A449 PSI = POUND PER SQUARE INCH
CONCERN (COCs) (THE ANAL YTES) CONTAINED WITHIN THE IMPORTED FILL CARBON STEEL. GALVANIZE ALL EXTERIOR BOLTS . ALL JOINT CONTACT SURFACES PVC= POLYVINYL CHLORIDE
MATERIAL SHALL HAVE CONCENTRATIONS LESS THAN COMPANY'S SOIL SHALL BE CLEAN AND FREE FROM OIL, DIRT, AND PAINT. PZ = PIEZOMETER
MANAGEMENT PLAN (SMP) RE-USE CRITERIA AND/OR THE APPROPRIATE RWQCB S =SOCKET
ENVIRONMENTAL SCREENING LEVELS (WHERE COCs ARE NOT INCLUDED IN THE 22. ALL WELDS SHALL BE PERFORMED BY AWS AND SAN FRANCISCO REFINERY SPIG =SPIGOT
SMP RE-USE CRITERIA). CONTRACTOR SHALL DEMONSTRATE THAT BACKFILL CERTIFIED WELDERS AND SHALL CONFORM TO AWS D1 .1, LATEST EDITION. SUBMIT SFR =SAN FRANCISCO REFINERY
MATERIALS ARE FREE OF CONTAMINATION BY SUBMITTING DOCUMENTED COPY OF ALL CERTIFICATIONS TO THE ENGINEER FOR ACCEPTANCE BY REFINERY. TP =TIE-IN POINT
ANALYTICAL RESULTS OF THE FOLLOWING: ANTIMONY, ARSENIC, BARIUM, ALL BUTT WELDS ARE FULL PENETRATION UNLESS INDICATED OTHERWISE . WELD TUBV =TRUE UNION BALL VALVE
BERYLLIUM, CADMIUM, CHROMIUM (TOTAL AND HEXAVALENT), COBALT, COPPER, FILLER METAL SHALL BE AWS A5.1 OR A5.5 E70XX ELECTRODES. ALL WELDS FOUND TYP. =TYPICAL
LEAD, MERCURY, MOLYBDENUM, NICKEL, SELENIUM, SILVER, THALLIUM, VANADIUM, DEFECTIVE SHALL BE REPAIRED AND/OR REPLACED AND RETESTED FOR UA =UTILITY AIR /VI\.. ~~
ZINC, BENZENE, TOLUENE, ETHYLBENZENE, TOTAL XYLENES AND TPH QUANTIFIED ADEQUACY AT THE CONTRACTOR'S EXPENSE. AT ALL FIELD WELDS, AT EMBED OFJ:,A\..\'i:O~
PLATES AND ANGLES, LOW HEAT AND INTERMITTENT WELDS SHALL BE UTILIZED TO
AS GASOLINE.
AVOID SPALLING OR CRACKING THE EXISTING CONCRETE . ~

REV

1
\

\ \ \
\

\ CONTRACTOR PARKING LOT


\ \
\

\
\
\

, \ \
\

\ ~
_.MW-15A
<!> MW-158
~\
\

\ \

\
\

\ \

\ \
\

\ \
\

SWG-1

EXPLANATION
EFFLUENT SAFETY BASIN
MW-298 EXISTING A-ZONE GROUNDWATER EXISTING MAIN INTERCEPTOR TRENCH
MONITORING WELL AND DESIGNATION ALIGNMENTC

\ EXISTING A-ZONE WELL TO BE


USED FOR FLUID EXTRACTION
EXISTING 2-INCH DIAMETER PVC
CONVEYANCE AND 1-INCH DIAMETER

\r KINDER MORGAN PIPELINES NEW TOTAL FLUIDS EXTRACTION WELL


GAL V. STEEL AIR SUPPLY PIPING

/ . (4", 8 ", & 12")


NEW A-ZONE MONITORING WELL
EXISTING INTERCEPTOR TRENCH
EXISTING KINDER MORGAN PIPELINES
----------- EXISTING 4-INCH DIA. CARBON /j,. /j,.
EXTRACTION SUMP STEEL SUBSURFACE PIPE SLEEVE ffiili
EXISTING GROUNDWATER
EXTRACTION WELL
NEW DC (4"X2") CPVC CONVEYANCE AND
1-INCH GALV. STEEL AIR SUPPLY PIPING
(DASHED SUBSURFACE TRENCH)
0 EXISTING MANHOLE
NEW MIDWEST GUARDRAIL SYSTEM
~ EXISTING UNDERFLOW WEIR ALONG EDGE OF MAIN GATE ROAD
s- 12
e EXISTING STORM DRAIN CATCH BASIN NEW 4-INCH DIA. CS SUBSURFACE PIPE
SLEEVE (FOR DISCHARGE HOSE)
- - S T - - EXISTING STORM WATER DRAIN LINES
Pz-as - - Rall - - UNION PACIFIC RAILROAD
(UPRR) RIGHT OF WAY
_.__,.______~EV\'. FEN_fE (TQ !3EPLACE EXISTING)
DRAWN : JLP DATE 11/06/15
CRC DATE 11/06/15
3 7/20/16 ADD SUBSURFACE TRENCH CALLOUT TEC DATE 11/17115
2 7 /08/16 ADD DOUBLE-CONTAINED CALLOUTS PD DATE 02/29/16 1' = 60'
DRAWING NUMBER REV
5/27 /16 ADD SIGNAGE CALLOUTS EQUIPMENT NOS. NONE

UNIT NO. ACAD NO. 14a_TrenchC-Site-201506


UTIL-AA-16019-001-001 3
I
'
\ , \ \
''

~\ \ \ \
PARKING LOT
'\

\ ~
VERTICAL
--=--.,EXPANSION
LOOP
' \

\ \

\'
MW-15A
~ MW- 1 5 8 '
\,
\
\

\ \

\ \
'
\
''

EXPLANATION
EFFLUENT SAFET:Y BASIN
MW-298 EXISTING A-ZONE GROUNDWATER EXISTING MAIN INTERCEPTOR TRENCH

~Zi-83
MONITORING WELL AN D DESIGNATI ON
EXISTING A-ZONE WELL TO BE
ALIGNMENTC
EXISTING 2-INCH DIAMETER PVC

v-
/ I
KINDER MORGAN PIPELINES
(4", 8", & 12")


USED FOR FLUID EXTRACTION
NEW TOTAL FLUIDS EXTRACTION WELL
NEW A-ZONE MONITORING WELL
EXISTING INTERCEPTOR TRENCH
CONVEYANCE AND 1-INCH DIAMETER
GALV. STEEL AIR SUPPLY PIPING
EXISTING KINDER MORGAN PIPELINES
----------- EXISTING 4-INCH DIA. CARBON /::!... /::!...
EXTRACTION SUMP STEEL SUBSURFACE PIPE SLEEVE iliili
EXISTING GROU NDWATER
EXTRACTION WELL
NEW DC (4"X2") CPVC CONVEYANCE AND
1-INCH GALV. STEEL AIR SUPPLY PIPING
(DASHED SUBSURFACE TRENCH)
8 EXISTING MANHOLE
NEW MIDWEST GUARDRAIL SYSTEM
~ EXISTING UNDERFLOW WEIR ALONG EDGE OF MAIN GATE ROAD
e

EXISTING STORM DRAIN CATCH BASIN NEW 4-INCH DIA. CS SUBSURFACE PIPE
SLEEVE (FOR DISCHARGE HOSE)
P.Z-4'7
- - sr- - EXI STING STORM WATER DRAIN LINES

~~ oliiiiiiiiiii~~iiiiiiiiiiiii_.60'
PZ-85* - RO'J - UNION PACIFIC RAILROAD
(UPRR) RIGHT OF WAY

- - - - - !'!f:Vl,I FE!'J(;E(Tq REPLA_fE EXISTING)

DATE PROJECT ENG.

03/ 01/2016 CRC


1' = 60'
DRAWING NUMBER REV
PHILLIPS 66
CO:MIPANY UTIL-AA- 1601 9-001-002 3
ACAD NO. 14a_ TrenchC-Site- 201506
REPLACE EXISTING
CHRISTY MODEL B1730BOX (PROVIDED
&
SEAL & DOUBLE-CONTAINED
BY DRILLING CONlRACTOR, FINAL ELEVATION
SET BY CML CONTRACTOR)
ASPHALT SURFACE
(ROADWAY SECTION ONLY)

HOSING (BY COMPANY) STEEL H-20 CHECKER PLATE (20"X33j REPLACE EXISTING SUBGRADE
(BY DRILLING CONTRACTOR) (ROADWAY SECTION ONLY)
1/4 LEVEL SENSOR HOSE 0'-8"
AND 1" FLUID HOSE (BY COMPANY) #4 REBAR,
EXISTING BASE COURSE OR SUBGRADE TO EVENLY SPACED
BE PROTECTED AND REMAIN UNDISTURBED ALL WAYS
TO PREVENT LOSS OF DENSITY (PLACED MIDWAY
I THROUGH SLAB)
o-1
CLASS II AGGREGATE BASE (COMPACTED TO
95~ MAX. DENSITY PER ASTM 1157D) ,.I
...

l
4 CARBON STEEL SCHEDULE
#4 REBAR - PLACE 1/3
FROM BOTTOM OF o-1 3'-4" L
/
,/ <(.
-1
< '.

L:
CONCRETE IN MIDDLE OF -1
L
L"
.. \
80 SLEEVE WITH POLYKEN APRON, ALL SIDES ..,..., '<'. '
L
0'-3"
826 (OR EQUAL) TAPE WRAP -1 ALL WAYS
(LENGTH VARIES) PEA GRAVEL 4 SCHEDULE 80 CARBON STEEL SLEEVE WITH t.
I < I
" t.
\
I < I - 1 ..
POLYKEN 826 (OR EQUAL) TAPE WRAP TO <

------<-ii
I
SEAL ANNULAR SPACE / ... L
WITH GROUT 4" PVC EXTRACTION WELL ENCASE CONVEYANCE/AIR HOSES
(BY DRILLING '""'- - - - 1'-6" MAX. /
2" PVC PIEZOMETER ' - - - - - - 2'-6" - - --.l
CONTRACTOR)
(BY DRILLING CONTRACTOR)
Ii- - - - - - 5'-o" ----ilf
WELL BOX COMPLETION
SCALE: NONE 2 TRENCH BETWEEN WELL BOX AND PUMP STATION DETAIL
SCALE: NONE
0 CONCRETE PUMP BOX PADS
SCALE: NONE

GALV. 5/8" HEX (HIGH


STRENGTH A325) (X2)

8"X4"X1/2" CONTINUOUS
GALV. ANGLE IRON WITH GALV. 0'-2"
U-BOLT f"OR 4"X2" DOUBLE ROUNDED CONCRETE TOP
&
CONTAINED CPVC DISCHARGE
PIPE EVERY 5'

0'-3"
THIN (13/16" WIDE) GALV.--...__ #3 VERTICAL
i - - - - - - 20-o- -- - - i
UNI-STRUT CHANNEL (WELDED ' t 2-0
REBAR
0'-4"
ON WT) WITH UNI-STRUT CLAMP
FOR 1" AIR SUPPLY PIPE r #3 REBAR
AROUND
PERIMETER
TYP. ANGLE IRON JOINT; FIELD
WELD & COLD GALVANIZE 4"-DIAMETER SCHEDULE 40
GALV. CARBON STEEL
4'-0"
PIPE SUPPORT
SPACING = 10 LF"""'-.. 1 PLAN YIEW
!--10-o -j BOLLARD WITH YELLOW
PLASTIC SAF"EIY SLEEVE

FINAL
(SEE DETAIL 5) ' __L
RA E o-2

!ii
#3 VERTICAL
REBAR

#3 REBAR
GALV. UNISTRUT CHANNEL
FOR AIR SUPPLY
j LATERAL GALV.
ANGLE IRON
SUPPORT
AROUND
PIPE SUPPORT
2I PERIMETER
FOOTING
SEE REBAR DETAIL
~ FOR PIPE SUPPORT 2- 0
0"-7" 3" CLEAR.

l
TO RIGHT ON REBAR (ALL
l_ ._________.__.
I
\!
u WAYS)
~

i f-o'-6" -l
~ PROFILE VIEW

I"'
~
GROUND PIPE SUPPORT TYPICAL PIPE SUPPORT SPACING PARKING BOLLARD
SCALE: NONE SCALE: NONE SCALE: NONE
~

~1-----------....-------------------.--
I!;
. . . .---.-----.---.. . . .-----.. . . --.,....---"""T'"-----------------T"'""-------------------
DRAWN : JLP DATE 11 / 06/15
-------------t
ALI GNMENT DETAILS
APPROVED FOR CONSTRUCTION
DESIGN : CRC DATE 11/06/15 PROJECT NO. DATE PROJECT ENG.
EXTEN D ALI GNM ENT C
CHECK : TEC DATE 11/17/15 Sf'E 16-019 03/01/2016 CRC

APP'D. : PD DATE 02/ 29/ 16 SCALE: NONE


REME DIATION SYSTEM
DRAWING NUMBER REV
7 /08/16 ADD DOUBLE'-CONTAINED CALLOUTS EQUIPMENT NOS. NONE PHILLIPS 66
REV DATE DESCRIPTION UNIT NO. ACAD NO. 14a_ TrenchC-Oetails-201506
COMPANY UTIL-AA- 16019-001 - 003 1
San Francisco Refinery SHEET 5 OF 15
1at crutd'l ROUTE

!;. f4" X 2Va'' BOLT


SLOT PArttAN IN
RAIL ELDIENT

I SEE NOTE 1-4

RAIL SPl..ICE ,_ ''-----,----------'==-===-="""-""'----"~..,..----------..!


RAIL ELEMENT t.E.NCTH " I 3'611"
SEE NOTE 13

--h
c. { SEE t40TE 14 1. ~l:;, d_:jfl1~ of teel po1t lnta11otlona, .ee StO'ldcrd
f'(!ST 6'3" 6'3" flt!ST
2. ~~ ~i=;~ 1':.!;o~'n~~. hOr"dwcr"e used to conetruct MGS,

.
L
I
.. 3. for' detolleof woad posts and wooCI block& used to con$truc:it
. SECTION THRU MGS, see StGl\d<lrd Plan An111,
RAIL ELEMENT 4, For addltlonol lnstol l<Jtlon d01"olla, no Stondar"d
flan A77NJ.
5, UGS post spoelng to llO 6'3" cantor to center,

tr
-~ "" { GltOONO LINE ()R SHOULDER
stMl"ACING UNDER RAIL ELEMENT tr
>.. -
except a otherwl se noted.
6. For 1105 nplcol la:tou+., - the A77P, 4nO and
A77R Serles of Stooire1 Plans.
T. If rolllng Is connected to tennlnol gyat.111 f!lcl tr-eatm.nt,
UH 31" nelaM tel"mlnal ayeten1 end tr"eat111ent.
ELEVATION TOP or RAIL
6" )( 12 )( I '-2'' a. ~fls~~"17~ detalra, sea standard Plona
BLOCK
MIDWEST GUARDRAIL SYSTEM WITH WOOD POST AND BLOCKS 'l/00!)
T01'1AJL WlTH 2-16<1 9, ~~~l~~o:' A~~t..~r"analtlon to llridlle roillng, Gee
Galv NAILS IN TOP OF &LOCK
SEE NOTE t!I 10. For oddltlonol detoll of MSG CCMactlcn to bridge rolllng,
aae Standard Plona A77UI I A77U2 an<! A'1lVI.
11. ~ ~=:rri~:i.m~~ to owtmenta one1 wa11e,

12. For HPi<;OI ICGS dtl lneotlOll and dike positioning


Cletalla, &Sfe Standard Plan A77N4,

..
+;
13. Slotted hole for bolted conneotlon of roll elell'll!!ftt to block
ond post
14. Slotted holae for epllce bol+. to overlap ends of roll element.
GROUND LINE
OR SHOULDER
;;; 1s. Ac!Clltlonol hole In uppermoa-t portion of line post le
far potentlol future acl!Ulltmenta of n:il llng twlght.
SUAl'ACINC See Stondor"d Plan A77Nf.
UNDER RAILING

'Ir" x 1l'i" SLOTS, T1P


SEE NOTE 14
ELEYATION
BAIL ELEMENT SPLICE DETAIL
O) i::~ ~ OVet"IOPPed nd of tn. nill ele11ente 11itti
')i" " x t ~" button head 01101 al'IOUl'1r epllce boltll STATE <W CAUl'ORNIA
ineerted Into tne 'Iii" x 1 Ya" 11101a and bolted togettler DEPARTMEHT OF TIIAllSPOftTATION
wiff'I !Mi" Ill receSffel h9lC nuts. R-H of he>C nvt point
t-rif roll elemem, A total of 8 bolts ancl nute
<1re to be used at eGCh rall epl 1011 oonne<:tlon. Ml'DWEST GUARDRAIL SYSTEM
bl Tile end o, tile roll elHenta ar9 to be overlapped In the
direction of trofflc CsH detolle>. SECTION A-A
STANDARD RAILING SECTION
<WOOD POST WITH
cJirnere nd cop Is to be ottoched to the encl af o roll element,
a total of 'I of me oboll deacrlbed apllce bolts ond nuts ore
TYPICAL WQQO LINE WOOD BLOCK>
to be USllCI. POST INSTALLATION
sea Note 'I NO SCALE
A77L1
t:!Q!;.
- BACKFILL ANY SPACE AROUND THE WOOD POSTS WITH SELECTED EARTH THAT IS FREE OF ROCK. PLACE
THE EARTH IN 4-INCH-THICK LAYERS. MOISTEN AND THOROUGHLY COMPACT EACH LAYER.
- SEE SECTION 2.6.7.2 FOR WOOD GRADE AND SPECIES SPECIFICATION. MIDWEST GUARDRAIL SYSTEM DETAIL
- RAIL ELEMENTS, END CAPS, AND RETURN CAPS MUST COMPLY WITH AASHTO M 180 FOR CLASS A, TYPE I,
1 SCALE: NONE
W-BEAM GUARDRAIL. BOLTS, NUTS, AND OTHER FITTINGS MUST COMPLY WITH AASHTO M 180.
- CONTRACTOR TO INSTALL A ROUNDED END CAP ON EACH EXPOSED END SECTION.
-SEE 2015 CALTRANS STANDARD SPECIFICATIONS 83-2.02 FOR ADDITIONAL DETAILS.

..
DRAWN : JLP DATE 11/06/15 APPROVED FOR CONSTRUCTION
GUARDRAIL DETAILS
-........ DESICN : CRC DATE 11/06/15 PROJECT NO.
EXTEND ALIGNMENT c
DATE PROJECT ENG.

~ CHECK : TEC DATE 11/17/15 SFE 16-019 03/01/2016 CRC


REMEDIATION SYSTEM
i...T!!!!~dro
IE
~ ________________...
____________________________________________________________
SFE
APP'D. : PD
EQUIPMENT NOS. NONE
DATE 02/29/16 SCALE: NONE
PHILLIPS 66
DRAWING NUMBER

_.________________________________________________________________________........______________________________________________
COMPANY
REV

....,______________________0....
UTIL-AA-16019-001-004
~"' REV DATE DESCRIPTION
NO.
UNIT NO. ACAD NO. 14a_TrenchC-Detalls-201506 San Francisco Refinery SHEET 6 OF 15
6" CUTOUT j-2-o-j
FOR SUMP PIPE

SILICONE SEAL.ANT
AROUND ALL EDGES
T 2'X3' GALV.
STEEL CHECKER PLATE
(H-20 LOAD RATING)

-
1'-6"
CUT FINAL PLATE 2:1: MIN.
INTO 2 SECTIONS

BOUARD,
T\1'.
CUTOUT FOR AIR 1'-6" 1- 0
SILICONE AND FLUID PIPES
SEAL.ANT AROUND
ALL EDGES
r-------- I 6"- THICK CONCRETE
1 't. COUAR (1'-0" WIDE)
I WITH #4 REBAR
I EXISTING S-10 TRENCH WEST END SIEEL PLATE EASI END $TEEL PLATE 1/ J FROM BOTTOM
I
I 6" SCH. BO GALV. CS PIPE

~ls-o
L---------()--------------- (WELDED TO PLATE):
PLUG BY COMPANY CLASS II COMPACTED
CONCRETE PUMP AGGREGATE (95:1:)
PAD FOR SUMP
PRECAST CONCRETE VAULT TONGUE & GROOVE FACE WITH
PUMP RN103 RAM- NEK GASKET COIL
BOX (H-2D LOAD RATING);
SEALANT (OR EQUAL)
CUSTOM FROM OLD CASTLE

2" & 1" PIPES


IN SUBSURFACE ' ..
....
.
VAULT SUBSURFACE TRENCH DETAIL - - 46'-0" LONG
3 SCALE: NONE

---~---
------ - ---- --- ----

~
-DRAINAGE
1:1: MIN.

NEW SUBSURFACE TRENCH


(-46' -o LONG)
EAST END SUMP /
TRENCH DETAIL

WEST END SUMP /TRENCH DETAIL

SUBSURFACE TRENCH DETAILS PLAN VIEW SUMP DETAIL AND STEEL PLATE CUTOUTS 5"XJ.5"XJ/ 8" CONTINUOUS GALV.
ANGLE IRON ( BOLTED TO GALV. WT)
SCALE: NONE SCALE: NONE WITH GALV. U-BOLT FOR 2" CPVC o- 2
DISCHARGE PIPE
3_
MW-258
FLUID MANIFOLD
,.......__5
7,,....... NEW ASPHM.T
SURf>CE
THIN (1 3/1 6" WIDE) GALV.
UNI-STRUT CHANNEL (WELDED
ON WT) WITH UNI-STRUT CLAMP
FOR 1" AIR SUPPLY PIPE f
0'-3"1 MATCH HEIGHT
OF CPVC PIPE
GALV. 1/2" DIA. TO EXISTING
ONCRETE ANCHOR TIE-IN
BOLTS

R0014-2" GROUT
~to-o EXISTING MW-258
CONCRETE PUMP
PAD AND PUMP
FINAL GRADE
..
. ~,_"" ."'.'." .
. .., .
. ,..,_. ..~~ . ~ . 1.:..
EXISTING S-1 0
EXISTING CURB CONCRETE PUMP PAD 1/ 2"X8" GALV. ANCHOR
(TO BE ABANDONED) BOLTS (X4); 4" MIN. EMBEDMENT
3-1/2" MIN. EMBEDMENT

SUBSURFACE TRENCH PIPE SUPPORT DETAIL


SCALE: NONE
ASHPALT CURB AROUND EXISTING
STATION 10 AND MW-258 PUMP BOXES
SCALE: NONE
ASHPALT CURB AROUND EXISTING
MW-258 PUMP BOXES (PLAN VIEW)
SCALE: NONE
PIPE SUPPORT NEAR TIE-INS
FOR CPVC AND AIR SUPPLY PIPE
SCALE: NONE

REV

1
.a:>

.,.._
Y2"0 BAR HANDLE
(2 REQ'D. - 180 APART)

NOTE:
EXAMPLE OF CHAIN LINK FENCE & ROLLING GATE MATCH EXISTING FENCE GATE CONSTRUCTION (PER REP 4-10-1)
1

~
SCALE: NONE

HIGH-POINT VENT: 1" 8"X4"X1/2" GALV. STEEL


CPVC BALL VALVE i - - - - - - 6' -4" - - - - - - < - - ! ANGLE IRON SUPPORT,
(FPTXFPT)
4 CPVC TEE (SXSXS)
i..i;;;i....~~~~~~~~~.....L..::L..~---..;lYPICAL~
.
~ ."'" .. ..
-~
:
4"X2" DOUBLE- CONC. FILLED

... ~I
b I
THIN (13/16" WIDE) GALV. "N
UNI-STRUT CHANNEL CONTAINED CPVC I
PIPE "N
WELDED ON WT WITH
UNI-STRUT CLAMP FOR 1" ~
~
AIR SUPPLY PIPE, TYPICAL 1" GAlV. STEEL ,z
0'-6" <O
AIR SUPPLY PIPE

GAlV. WT4X7i (MAX.



o'-6" s-o H-9'-Oj, lYPICAL
SPACER-leV4x540
(2 REO'D.)
6%"0xV4 END PLATE

t
2-0 i.-...--6'-0" - + - - - - - - ! POST SLEEVE
[1.5" TO TOP
l_
I I
I 11-e
_r --
-- - '"'""" __
SFR ENGINEERING STANDARD
LJ_j_ --
-- ...
REMOVABLE BARRIER POSTS

0 -10-109
CONCRETE
FOOTING,
TYPICAL
~2-o~ ..,,.,, NO. 0 - 10-109 SHct'T 1 Of I

PIPE SUPPORT

REMOVABLE BARRIER POST BOLLARDS


SCALE: NONE
#4s AT 12 MAX
O.C., TYPICAL PIPE SUPPORT FOR VERTICAL
EXPANSION LOOPS OVER SLIDING GATES
SCALE: NONE

DRAWING NUMBER REV

UTIL-AA-16019-001-006 2