You are on page 1of 1

Heavy load fabricators, inc.

manufactures 200 custom-designed trailers as job 901 to meet design


requirement specified by the customer haul it rentals corporation. Costs charged to job 901 are:

Materials 100,000

Labor ( P10 per hour x 2,000 hours) 20,000

Applied factory overhead (P40 per direct labor hour) 80,000

Total cost charged to job 901 200,000

Before the trailers are shipped, the customer decides

You might also like