You are on page 1of 3

68158 Federal Register / Vol. 67, No.

217 / Friday, November 8, 2002 / Notices

Conc ID No. Concessioner name Park

GLBA039–99 ........... Alaska Sightseeing/Cruise West ........................................... Glacier Bay National Park and Preserve.
GLBA041–98 ........... Glacier Bay National Park and Preserve Park Concessions Glacier Bay National Park and Preserve.
GLBA044–98 ........... Glacier Bay National Park and Preserve Adventures ........... Glacier Bay National Park and Preserve.
GLBA901–98 ........... Gray, Gary C., Reg. Guide .................................................... Glacier Bay National Park and Preserve.
GLBA902–98 ........... Latham, John H., Reg. Guide ............................................... Glacier Bay National Park and Preserve.
NOAT901–98 ........... Philip E. and Carol M. Driver ................................................ Noatak National Preserve.
NOAT906–98 ........... David Leonard ....................................................................... Noatak National Preserve.
NOAT904–98 ........... Jake & Patricia Jacobson ...................................................... Noatak National Preserve.
KATM005–98 ........... Branch River Air Service ....................................................... Katmai National Park.
KATM006–98 ........... Bristol Bay Sportfishing ......................................................... Katmai National Park.
KATM002–98 ........... No See Um Lodge ................................................................. Katmai National Park.
KATM007–98 ........... Mike Cusack’s King Salmon Lodge ...................................... Katmai National Park.
KATM004–98 ........... Shaska Ventures ................................................................... Katmai National Park.

EFFECTIVE DATE: January 2, 2003. DEPARTMENT OF THE INTERIOR SUPPLEMENTARY INFORMATION: The
permits listed below have been
FOR FURTHER INFORMATION CONTACT:
National Park Service extended to the maximum allowable
Cynthia Orlando, Concession Program under 36 CFR 51.23. Under the
Manager, National Park Service, Concession Contracts and Permits: provisions of current concession
Washington, DC, 20240, Telephone 202/ Expiring Contracts; Extension for up to permits, with one exception, and
513–7156. One Year pending the development and public
Dated: October 24, 2002. solicitation of a prospectus for a new
AGENCY: National Park Service, Interior. concession permit, the National Park
Richard G. Ring,
Associate Director, Administration, Business
ACTION: Public notice. Service authorizes continuation of
Practices and Workforce Development. visitor services under a temporary
SUMMARY: Pursuant to the terms of concession contract for a period of up to
[FR Doc. 02–28514 Filed 11–7–02; 8:45 am]
existing concession permits, with the one year from the expiration of the
BILLING CODE 4310–70–M
exception of construction on National current concession permit. The
Park Service lands, public notice is exception precludes construction on
hereby given that the National Park National Park Service lands, regardless
Service intends to provide visitor of whether the current permit authorizes
services under the authority of a such activity. The temporary contract
temporary concession contract with a does not affect any rights with respect
term of up to one year from the date of to selection for award of a new
permit expirations. concession contract.

Conc ID No. Concessioner name Park

ANIA904–98 ............ King Guiding Service ............................................................. Aniakchak National Monument.


ANIA903–98 ............ Katmai Guide Service ............................................................ Aniakchak National Monument.
ANIA906–98 ............ Cinder River Lodge ............................................................... Aniakchak National Monument.
LACL901–96 ............ Northward Bound ................................................................... Lake Clark National Park.
LACL902–95 ............ Alaska Wilderness Trips ........................................................ Lake Clark National Park.
GAAR001–95 .......... Richard A. Guthrie ................................................................. Gates of the Arctic National Preserve.
GAAR002–96 .......... Rob Holt ................................................................................. Gates of the Arctic National Preserve.

EFFECTIVE DATE: January 2, 2003. DEPARTMENT OF THE INTERIOR facility improvements to the roadway
network between U.S. Highway 101 (at
FOR FURTHER INFORMATION CONTACT:
National Park Service the U.S. Highway 101-State Highway 1
Cynthia Orlando, Concession Program interchange) and Stinson Beach (Pacific
Manager, National Park Service, Golden Gate National Recreation Area; Ocean). This roadway network is one of
Washington, DC 20240, Telephone, 202/ Comprehensive Transportation the principal travel corridors connecting
513–7156. Management Plan; Marin County, CA; the urban centers of Marin, San
Dated: October 24, 2002. Notice of Intent To Prepare an Francisco and the East Bay with
Richard G. Ring, Environmental Impact Statement National Park sites in southwest Marin
County and the State Park site of Mount
Associate Director, Administration, Business Summary: In accord with § 102(2)(C) Tamalpais (the national park sites
Practices and Workforce Development.
of the National Environmental Policy include the Muir Woods National
[FR Doc. 02–28515 Filed 11–7–02; 8:45 am] Act (42 U.S.C. 4321 et seq.), the Monument, Muir Beach, Stinson Beach,
BILLING CODE 4310–70–M National Park Service—and in and Tennessee Valley). The
coordination with Marin County Comprehensive Transportation
(California) and the California Management Plan Environmental
Department of Transportation—is Impact Statement (EIS) will assess
initiating a conservation planning and alternatives for improving access to and
environmental impact analysis process between various park sites to reduce
regarding transportation access and automobile impacts. A key objective

VerDate 0ct<31>2002 17:16 Nov 07, 2002 Jkt 200001 PO 00000 Frm 00073 Fmt 4703 Sfmt 4703 E:\FR\FM\08NON1.SGM 08NON1
Federal Register / Vol. 67, No. 217 / Friday, November 8, 2002 / Notices 68159

will be to identify options to reduce • Identify and design transportation, community meetings adjacent to the
traffic congestion and lower negative access, and facility improvements that study areas such as Stinson Beach and
effects of existing transportation protect park resources; Muir Beach through September 2002, in
infrastructure on priority ecological • Improve alternative access and addition to a presentation to the GGNRA
systems. Notice is hereby given that a circulation for visitors and residents Advisory Commission meeting in July
public scoping process has been within the project area; 2002. Five public scoping workshops
initiated with the purpose of eliciting • Reduce traffic congestion in the are then planned for Fall 2002. These
public comment regarding the full project area, and on roadways to and include workshops at the GGNRA
spectrum of issues and concerns, between national and state park sites; Advisory Commission, Stinson Beach,
including a suitable range of • Improve the quality of the visitor Muir Beach, Tamalpais Valley, and in
alternatives, the nature and extent of experience, including trip travel, while the city of Berkeley (in the East Bay).
potential environmental impacts and ensuring that access remains safe, GGNRA and Marin County will
appropriate mitigation strategies, and dependable and affordable; develop conceptual approaches to
• Improve the health of the ecological identifying action alternatives for the
perceived ecological benefits that
resources and systems adversely public scoping workshops. Following
should be addressed in drafting the
affected by transportation infrastructure the scoping phase, a full range of
forthcoming EIS.
within the project area; preliminary action alternatives will be
Background: The project area • Improve/enhance design elements developed and evaluated. The GGNRA
comprises a network of roads, bridges, for efficient and effective transit access and Marin County will then host
trails and parking areas providing access to park sites in the project area; workshops to review these proposed
to Muir Woods, Muir Beach, Tennessee • Implement effective transportation action alternatives with the public.
Valley and Stinson Beach. Some of the links with clean technologies to access GGNRA and Marin County anticipate
key connecting roads include California park sites; that approximately three action
Highway 1, Panoramic Highway, and • Provide for an effective transit alternatives will be formulated, in
Muir Woods, Frank Valley, and intercept facility for visitors to Marin addition to the No Action Alternative.
Tennessee Valley Roads. Peak-hour national and state park lands (Note: An Comments and Public Scoping: As
congestion and failing levels of service intercept facility is a parking area or noted, scoping meetings will be held
on some of these roads have become structure providing visitor support during Fall 2002. The locations, dates
concerns for local jurisdictions and services, where visitors may leave their and time of scoping meetings will be
communities as well as the National automobiles and travel to park sites via announced through a direct mailing, a
Park Service (NPS). Also of particular an alternate system such as buses or weblink with both GGNRA and Marin
concern is the fact that certain features shuttle systems—rather than driving on County websites, and via local and
of the existing transportation system congested roadways). regional media. All interested
encroaches upon and impact natural Public Process to Date: Preliminary individuals, organizations and agencies
systems within the park lands. These public and agency planning meetings are encouraged to attend these meetings
include effects on wetlands, floodplains, for the Comprehensive Transportation to comment orally and/or provide
and riparian corridors. Significant Management Plan were begun in 1999. written comments or suggestions.
ecological systems within the project The GGNRA, with the assistance of the Interested persons may also refer to
area include the fresh water streams and regional Metropolitan Transportation GGNRA web site www.nps.gov/goga/
riparian areas of the Redwood Creek Commission, convened an interagency admin/planning/index.htm for more
watershed, Coyote Creek, and Easkoot group of transportation and resource information on this project.
Creek. agencies in the San Francisco Bay Area A scoping background document will
to develop plans for reducing traffic also be available at the above Web site,
The Golden Gate National Recreation
congestion on the regional roadway and also can be obtained by writing or
Area (GGNRA) is partnering with Marin
system serving park lands. The Park telephoning as noted below. Comments,
County to prepare a combined
Lands Transportation Taskforce suggestions, or relevant information (or
Environmental Impact Statement— requests to be added to the project
(Taskforce) membership includes
Environmental Impact Report. The mailing list) should be sent to: Golden
GGNRA, Marin County, Federal
GGNRA and Marin County are co-lead Gate National Recreation Area, CTMP
Highway Administration, California
agencies for the environmental review EIS, Attn: Stephen Laughlin, Building
Department of Transportation, City of
under the National Environmental 201, Fort Mason, San Francisco, CA
Sausalito, California State Parks, and the
Policy Act (NEPA) and the California 94123 [telephone (415) 561–4941]
Golden Gate Bridge and Highway
Environmental Quality Act (CEQA), All written comments for the scoping
Transportation District among other
respectively. phase of the ElS must be postmarked no
regional agencies.
The project alternatives will identify Under the supervision of the later than 60 days following the
actions that improve modes of Taskforce, a public research project was publication of this notice in the Federal
transportation for accessing the national conducted in the project area during Register. If individuals submitting
and state park sites in the project study 2001–2002, and a public survey of comments request that their name or/
area. Alternative transportation modes persons visiting park sites polled and address be withheld from public
could include public transit, or shuttles. approximately 4,000 individuals at five disclosure, it will be honored to the
Reservation systems and paid parking park sites during peak, shoulder, and extent allowable by law. Such requests
also will be considered. Another key off-peak seasons. Information collected must be stated prominently in the
component of the project will be to included visitor origin and destination, beginning of the comments. There also
identify improvements that either area of residence by park site visited, may be circumstances wherein the NPS
reduce or eliminate existing impacts of degree of perceived traffic congestion, will withhold a respondent’s identity as
transportation infrastructure (such as and the purpose or recreation activity allowable by law. As always: NPS will
roads, parking lots and drainage related to park visits. make available to public inspection all
structures) on ecological systems. Key The GGNRA and Marin County plan submissions from organizations or
goals and objectives for the project are: to make informal presentations at businesses and from persons identifying

VerDate 0ct<31>2002 16:24 Nov 07, 2002 Jkt 200001 PO 00000 Frm 00074 Fmt 4703 Sfmt 4703 E:\FR\FM\08NON1.SGM 08NON1
68160 Federal Register / Vol. 67, No. 217 / Friday, November 8, 2002 / Notices

themselves as representatives or 2. Approval of minutes of previous meeting Site, Walla Walla, WA. These human
officials of organizations and (September 27, 2002) remains were removed from a burial site
businesses; and, anonymous comments 3. Reports of Officers at Whitman Mission National Historic
4. Reports of Subcommittees
may not be considered. Site.
5. Superintendent’s Report
Decision Process: Availability of the This notice is published as part of the
Salt Pond Visitor Center
draft EIS for review and written Pheasant Program National Park Service’s administrative
comment will be announced in the Penniman House responsibilities under NAGPRA, 25
Federal Register notice, as well as local Highlands Center U.S.C. 3003, Sec. 5 (d)(3). The
and regional news media, GGNRA Restoration Projects determinations within this notice are
website, and via direct mailing to the a. Hatches Harbor the sole responsibility of the National
project mailing list. At this time, the b. East Harbor Park unit that has control of these
draft EIS is anticipated to be available c. Mary Chase Salt Marsh Native American human remains. The
for public review in the first quarter of Doane Road Manager, National NAGPRA Program is
Provincetown Municipal Airport
the year 2004. To ensure further not responsible for the determinations
Marconi Celebration
opportunity to comment on the draft EIS News from Washington within this notice.
after it is distributed, additional public 6. Old Business A detailed assessment of the human
meetings will be held (dates and Invasive Species remains was made by National Park
locations to be determined). Notice of 7. New Business Service and Oregon State Museum of
the availability of the final EIS likewise 8. Date and agenda for next meeting Anthropology professional staff and an
will be published in the Federal 9. Public comment and expert on aboriginal burial practices in
Register. As a delegated EIS, the official 10. Adjournment the Plateau culture area of North
responsible for the final NEPA decision The meeting is open to the public. It America in consultation with
is the Regional Director, Pacific West is expected that 15 persons will be able representatives of the Confederated
Region. Subsequently, the official to attend the meeting in addition to Tribes of the Umatilla Reservation,
responsible for implementing the Commission members. Oregon.
selected Plan would be the Interested persons may make oral/ In October 1960, human remains
Superintendent, Golden Gate National written presentations to the Commission representing a minimum of one
Recreation Area. during the business meeting or file individual were removed from a burial
Dated: August 21, 2002. written statements. Such requests at Whitman Mission National Historic
should be made to the park Site in Walla Walla, Washington during
Arthur E. Eck,
superintendent at least seven days prior legally authorized excavations by NPS
Acting Regional Director, Pacific West Region. archeologist Paul Schumacher. The
[FR Doc. 02–28519 Filed 11–7–02; 8:45 am]
to the meeting. Further information
concerning the meeting may be obtained human skeletal remains had been in a
BILLING CODE 4310–70–P
from the Superintendent, Cape Cod flexed position and were thought to be
National Seashore, 99 Marconi Site the remains of a Native American. They
Road, Wellfleet, MA 02667. were removed from the burial site at
DEPARTMENT OF THE INTERIOR Whitman Mission and delivered to
Dated: October 23, 2002. University of Oregon where they were
National Park Service Michael B. Murray, inspected and described by David L.
Cape Cod National Seashore, South Acting Superintendent. Cole in November 1960. The skeletal
Wellfleet, Massachusetts; Cape Cod [FR Doc. 02–28516 Filed 11–7–02; 8:45 am] remains were confirmed to be those of
National Seashore Advisory BILLING CODE 4310–70–P a Native American woman who had
Commission Two Hundred Thirty Ninth been between 50 and 60 years of age at
Meeting the time of death. No known individuals
DEPARTMENT OF THE INTERIOR were identified. No funerary objects are
Notice is hereby given in accordance present. To honor the request of the
with the Federal Advisory Committee National Park Service Confederated Tribes of the Umatilla
Act (Pub. L. 92–463, 86 Stat. 770, 5 Reservation, Oregon these human
U.S.C. App 1, section 10), that a meeting Notice of Inventory Completion: remains continue to be in the possession
of the Cape Cod National Seashore Oregon State Museum of of the Oregon State Museum of
Advisory Commission will be held on Anthropology, University of Oregon, Anthropology, University of Oregon.
Friday, November 22, 2002. Eugene, Oregon and U.S. Department All available documentation on the
The Commission was reestablished of the Interior, National Park Service, human remains from the NPS, including
pursuant to Public Law 87–126 as Whitman Mission National Historic an archival photograph of the skeletal
amended by Public Law 105–280. The Site, Walla Walla, WA remains in situ, and from the University
purpose of the Commission is to consult AGENCY: National Park Service, Interior. of Oregon was submitted to Professor
with the Secretary of the Interior, or his Roderick Sprague, an expert on
designee, with respect to matters ACTION: Notice.
aboriginal burial practices in the Plateau
relating to the development of Cape Cod Notice is here given in accordance culture area of North America with over
National Seashore, and with respect to with the Native American Graves 40 years of professional experience, for
carrying out the provisions of sections 4 Protection and Repatriation Act his review and assessment. On the basis
and 5 of the Act establishing the (NAGPRA), 25 U.S.C. 3003, Sec. 5, of of both the flexed position of the burial
Seashore. the completion of an inventory of and the absence of grave goods, Dr.
The Commission members will meet human remains in the possession of Sprague concluded that this set of
at 1 p.m. at Headquarters, Marconi Oregon State Museum of Anthropology, human remains dates to the
Station, Wellfleet, Massachusetts for the University of Oregon, Eugene, Oregon protohistoric period of from A.D. 1700–
regular business meeting to discuss the and in the control of U.S. Department of 1800.
following: the Interior, National Park Service, Whitman Mission National Historic
1. Adoption of Agenda Whitman Mission National Historic Site commemorates the history of a

VerDate 0ct<31>2002 16:24 Nov 07, 2002 Jkt 200001 PO 00000 Frm 00075 Fmt 4703 Sfmt 4703 E:\FR\FM\08NON1.SGM 08NON1

You might also like