You are on page 1of 13

GSU/Unit/Service/Auxiliary Transformer Schedule A&B

Item Description Units Schedule A: Schedule B:


User Requirement Guarantee values
AB.1 The Works
AB.1.1 Transformer delivered to Address Matimba Power Station
Lephalale
Nelson Mandela drive
South Africa
557
AB.1.2 Spares delivered to Address Matimba Power Station
Lephalale
Nelson Mandela drive
South Africa
557
AB.1.3 Number of units required No 1
AB1.4 Shipping:
FAS
AB1.4.1 Shipping responsibility Contractor
responsibility Contractor responsibility
AB.1.4.2 Port of Shipment Contractor
AB.1.4.3 Port of Shipment Contractor
AB.1.5 Road Transport Contractor
AB.1.5.1 Road Transport responsibility Contractor
AB.1.5.2 Company
AB.1.5.3 Type of vehicle
AB.1.5.4 Transport dimension limitations: (Rotran Info)
AB.1.5.4.1 Length m 12
AB.1.5.4.2 Width m 5
AB.1.5.4.3 Transport height m 4.9
Load height
AB.1.5.4.4 (Power lines and bridges) m < 5.7
AB.1.5.4.5 Clearance required between load and road in South Africa m <0.6
AB.1.5.4.6 Transport Weight Limitation Tons maximum 400
Contractor and to comply to
Eskom's peer review
AB.1.6.1 Installation responsibility Contractor / Employer documentation
Contractor and to comply to
Contractor / Employer Eskom's peer review
AB.1.6.2 To be off-loaded from transport vehicle documentation
Contractor and to comply to
Transformer to be transferred to intended storage or Contractor / Employer Eskom's peer review
AB.1.6.3 operating position documentation
Contractor and to comply to
AB.1.6.4 Sprinkler System responsibility Contractor / Employer Eskom's peer review
documentation
Contractor and to comply to
New Transformer Commissioning storage/operating Eskom's peer review
AB.1.6.5 Contractor / Employer
responsibility documentation
Time required to install and commission new transformer after
AB.1.6.6 Days 15 days
oil filing and assembly

AB.2 General Conditions:


AB.2.1 Out-of-doors / In-doors Out-of-doors / In-doors Out-of-doors Out-of-doors
AB.2.2 Altitude above sea level m 1800
AB.2.3 Ambient air temperatures: C 0-45
AB.2.3.1 Average Daily Maximum C 32
AB.2.3.2 Average Daily Minimum C 28
AB.2.3.3 Maximum for Year C 45
AB.2.3.4 Minimum for Year C -4
AB.2.3.5 Yearly average C 35
AB.2.3.6 Monthly average, of the hottest month C 30
Amount by which the temperature rise limits are reduced
AB.2.4 according to IEC60076-2, section 4.3.1. C 30 - 20 = 10

Note that this value excludes the height above sea level
reduction as stipulated in IEC60076-2. As per GGS1074
Additional amount by which the temperature rise limit is
reduced above the values stipulated in IEC60076-2, as per
AB.2.5 additional safety margin C 0

AB.2.6 Total amount by which the temperature rise limit is reduced C 10


Metal Temperatures in Oil Note
that this value excludes the height above sea level reduction
as stipulated in IEC60076-2. As per GGS1074 K 80-8 = 72
AB.2.7 Average humidity % 30 to 70
AB.2.8 Pollution (insulators) IEC 60815 Table 1 IV - Very Heavy
AB.2.9 Seismic IEC60068-3-3 Normal
AB.2.10 Geomagnetically Induced Currents Yes Yes
AB.2.10.1 Transformer design to cater for GIC storms. Yes/No Yes
Maximum duration of storm consisting of repeated pulses
AB.2.10.2 specified below: Hours 60
Magnitude of peak quasi-DC current flowing through the
AB.2.10.3 transformer Neutral during GIC storms. A 10
AB.2.10.4 Typical pulse duration of GIC activity. Min 30
Give Details of the GIC design. For example use of a 3-limb
versus a 5-limb core etc. Indicate change in Hot Spot
AB.2.10.5 temperature, increased magnetic forces and vibration. Yes/No Yes, please provide details
AB.2.10.6 Frequency of GIC storms in time between storms. Years 6 years

AB.3 Erection and oil filling


AB.3.1 Erected ready for service Yes / No Yes
AB.3.2 Erection completed not later than Date See Contract Data
AB.3.3 Supplied filled with new oil Yes / No Yes, virgin oil
AB.3.4 Type of oil to be used Make & Type As per Eskom Approved Oil List

AB.4 Site details


AB.4.1 Access to site Describe. Road
AB.4.2 Distance from off-loading position m 35
AB.4.3 Rise or fall to off-loading position m flat runaway
Yes, 3 + N + E, 400V at existing
AB.4.4 Construction supply available? Yes / No points Yes, 400V
AB.4.5 Interchangeably Yes / No Yes Yes
AB.4.6 Availability of cranes for off-loading auxiliary equipment Yes / No Contractor's responsibility Yes
AB.4.7 Availability of jacks & other tools for off-loading? Yes / No Contractor's responsibility Yes

Layout and Outline drawings for designing the Fire protection


AB.5 Systems, civils and other interfaces are required by: Date As per contract

AB.6 Transformer outer coating


AB.6.1 Corrosion Protection required Non Corrosive
High Corrosive Very High Corrosive Very High Corrosive
Very High Corrosive
AB.6.2 Main tank external final color coding BS 381 Code 367 367
Cloud grey (Manilla)
Yes. Final coating to be Yes
adequately protected against
abnormal high ultraviolet light
AB.6.3 Ultra violet special requirements Yes/No conditions

AB.7 Quality of Supply Transformer


AB.7.1 Base Frequency Hz 50 50
AB.7.2 Continuous operating range Hz 48.5 to 51.5 48.5 to 51.5
AB.7.3 Frequency deviation not more than 10 minute per incident Hz 48 to 52 48 to 52
AB.7.4 Frequency deviation not more than 1 minute per incident Hz 47.5 to 52.5 47.5 to 52.5
Total Harmonic Distortion (THD) of HV side Voltage and %
AB.7.5 even harmonics %/% 5/1 5/1
HV side Voltage symmetrical three phase supply voltages
AB.7.6 (negative and zero phase sequence voltages less than) % 2 2
AB.7.7 Continuous Overflux rating % 110% continuously 110%
(Note that this differs from IEC
60076-1-4.4)

AB.8 Active Part


Thermal constraints and considerations with regard to the
AB.8.1 paper insulation system:
Life expectancy at required operating and environmental
AB.8.1.1 conditions, designed to be for at least: Years 35
Thermally upgraded but
Thermally upgraded / transformer rated for normal
AB.8.1.2 Type of paper to be used: Normal Kraft paper paper (windings and leads)
AB.8.1.3 Type of wrap and board used:
AB.8.1.4 DP of new paper >1100
AB.8.1.5 Percentage moisture in paper after dry-out % < 0.5%
AB.8.1.6 DP after final dry-out in factory >900
5 blocks in position easily
accessible from top cover
manhole when arriving onsite.
Refer to specification 4.12.3.1. A
test block will be removed onsite,
prior to oil filling for moisture
assessment by the Contractor
Number and details of test blocks to be left in completed and the results to be presented to
AB.8.1.7 transformer the Employer
Yes, Test blocks to be provided
Details of test dry-out / heating blocks dimensions, for both coil heat, final dry-out
AB.8.1.8 positioning and testing during manufacture Yes/No and final tanking.

AB.8.2 Winding design:

Provide a cross-sectional diagram of the windings showing


relative position to the core, dimensioned to indicate inner and
outer diameters and axial length of each coil. (Separate
AB.8.2.1 sheet with information may be required) Yes / No Yes

For the HV-coil indicate the following:


Note: that the information must be supplied for each HV
AB.8.3 winding including tap windings
Type (i.e. multilayer helix, centre fed, number of disks or
AB.8.3.1 divisions)
AB.8.3.2 Number of turns
AB.8.3.3 Inner diameter mm
AB.8.3.4 Outer diameter mm
AB.8.3.5 Radial build mm
AB.8.3.6 Electrical height mm
AB.8.3.7 Mechanical height mm

AB.8.3.8 Current density A/mm2


AB.8.3.9 Conductor size, number and configuration.
AB.8.3.10 Number and width of support spacers per turn no / mm
AB.8.3.11 Total copper mass kg
AB.8.3.12 Paper wrap thickness and number (Epoxy thickness) mm / no

For the LV- coil indicate the following:


Note: that the information must be supplied for each LV
AB.8.4 winding including any special tap windings.
Type (i.e. multilayer helix or disk, centre fed, number of disks
AB.8.4.1 or divisions)
AB.8.4.2 Number of turns no
AB.8.4.3 Inner diameter mm
AB.8.4.4 Outer diameter mm
AB.8.4.5 Radial build mm
AB.8.4.6 Electrical height mm
AB.8.4.7 Mechanical height mm
AB.8.4.8 Current density A/mm2
AB.8.4.9 Conductor size, number and configuration.
AB.8.4.10 Number and width of support spacers per turn no / mm
AB.8.4.11 Total copper mass kg
AB.8.4.12 Paper wrap thickness and number (Epoxy thickness) mm / no
AB.8.5 Processing:

Give details of the processing of the active part (core &


windings) making reference to Temperatures, Time, Vacuum
levels and clamping pressures. Include sizing of windings as
AB.8.5.1 part of the processing. (Separate sheet may be required) Yes / No Yes

AB.8.6 Core design:


AB.8.6.1 Manufacturer of core steel
AB.8.6.2 Type of material
AB.8.6.3 Grade of steel
AB.8.6.4 Method used for joints
AB.8.6.5 Core Weight kg
AB.8.6.6 Thickness of core steel mm
AB.8.6.7 Number and length of limbs no / mm
AB.8.6.8 Core diameter mm

AB.8.7 Cross sectional area of:


AB.8.7.1 Wound limbs mm
AB.8.7.2 Yoke mm
AB.8.7.2 Unwound limbs mm
AB.8.7.3 Distance between core limb centers mm
AB.8.7.4 Total core mass kg

The design flux density at 1.00 x Um & 1 x Base Frequency


AB.8.8 for:
AB.8.8.1 Yoke T < 1.73
AB.8.8.2 Wound limbs T < 1.73
AB.8.8.3 Unwound limbs T < 1.73

AB.8.9 Volts per turn at the above flux densities. V/t

AB.9 Maximum three-phase fault levels of the network rms.


Note these are calculated for the network without the
transformer to be supplied in circuit. (Current limited by
network impedance only as per IEC 60076-5)
AB.9.1 HV kA rms
AB.9.2 LV
Transformer(s) to be designed to be Self Protected kA rms
(Note: If the transformer is to be designed to be self protected Item
AB.9.1 and AB 9.2 are not applicable) "Self
AB.9.3 Protected" : means that the HV supply has an infinitely low (zero) Yes/No Yes
impedance meaning that the transformer impedance must to the
current limiting

Provide details of design limits used by the specific


factory from which the Employers transformers will be
sourced (Reasons as to why these limits are used is to
AB.10 be supplied.)
2
AB.10.1 HV winding current densities A/mm
AB.10.2 LV Winding current densities A/mm2
AB.10.3 Core flux density T
AB.10.4 Volt per Turn V/T
AB.10.5 Stray Losses outside of main Winding Block kW
AB.10.6 Specific Radial Short Circuit forces HV/LV N/mm
AB.10.7 Specific Axial Short Circuit forces N/mm
AB.10.8 Main Insulation Gap HV-LV mm

AB.11 Short circuit design


AB.11.1 Transformer three-phase designed fault level value, rms:
AB.11.1.1 HV kA rms
AB.11.1.2 LV kA rms

AB.11.2 Transformer three -phase designed fault level value, peak:


AB.11.2.1 HV kA peak
AB.11.2.2 LV kA peak

AB.11.3 Transformer single-phase designed fault level value, rms:


AB.11.3.1 HV kA rms
AB.11.3.2 LV kA rms

Transformer single-phase designed fault level design value,


AB.11.4 peak:
AB.11.4.1 HV kA peak
AB.11.4.2 LV kA peak

AB.11.5 Designed number of through faults in transformer life time:


AB.11.5.1 HV
AB.11.5.2 LV
Transformer is designed to withstand a full 3 phase short
AB.11.5.3 circuit on the LV terminals and supplied from the HV side. Yes / No Yes

Total fault clearing times for through faults for main and
AB.12 backup protection operations, seconds
AB.12.1 HV side Breaker s 250ms
AB.12.2 LV side s 200ms

AB.13 Type of switching device


AB.13.1 HV side
One 3 phase air insulated type
AB.13.2 LV side Circuit breaker

AB.14 Protective relay devices supplied by Employer


Dedicated to
AB.14.1 Differential relay transformer or Overall Overall
AB.14.2 Restricted earth fault protection HV / LV Side HV side only
AB.14.3 Backup earth fault protection HV / LV Side HV & LV side
AB.14.4 Earth fault protection HV / LV Side HV side
AB.14.5 Over current protection LV side HV & LV side
AB.14.6 Sensitive earth protection LV side LV side only

AB.15 Surge Protection


AB.15.1 HV side type of arrester Make and size Available
Distance from HV bushing terminal to arrester T-off and
AB.15.2 length of T-off: m/m 3m to 4m
AB.15.3 LV side type of arrester N/A
Distance from LV terminal to arrester "T" off and length of "T"
AB.15.4 off: m/m N/A
1, equipped with 10mm copper
pipes leading down the
transformer, to facilitate sampling
and bleeding from ground level
(gate valves at sample points).
AB.15.5 Bucholtz relay Make and size With 2 trip and 2 alarm contacts
AB.15.6

AB.16 Power System Earthing Method


AB.16.1 HV Side Solidly earthed
AB.16.2 LV side Ultra high resistive earth

AB.17 Application
Generator Step-up,
AB.17.1 Used as Aux, Unit, etc Station Auxiliary Transformer
Base Load, Load Base load
AB.17.2 Operating mode following, 2 shifting
Maximum load (100%) during
peak periods, twice daily,
minimum load (60%) during
AB.17.3 Load Cycling evening and weekends
Interim Outage every 2 years

AB.17.4 Maintenance Outages


AB.17.5 Utilization factor 100%
AB.17.6 Energizing rate 3 times per year
Connect to 132kV distribution
Line to supply 11kV Station
auxiliary supplies.
AB.17.7 Network to be connected to:
AB.17.8 Transformer Overload Requirements
N/A
AB.17.8.1 Maximum Percentage Overload %
N/A
AB.17.8.2 Duration Minutes
AB.17.8.3 Frequency Overloads / Year N/A

AB.18 Type of Transformer


AB.18.1 Insulation Dry / Mineral oil Mineral oil
AB.18.2 Vector Group and Neutral Designation As per station YNd1
AB.18.3 Type of Windings Separate / Auto Separate
AB.18.4 Number of Units per tank 3 Phases / 1 Phase 3 Phases
60% ONAN
ONAN / OFAF/ ODAF 100% ONAF
AB.18.5 Type of Cooling / etc
AB.18.6 HV Winding Connection Star / Delta Star, Neutral earthed
AB.18.7 LV Winding Connection Star / Delta Delta
AB.18.8 Manufacturer
AB.18.9 Place of manufacture
AB.18.10 Type of transformer Core / Shell Core
AB.18.11 Number of core limbs 2/3/5 3

MVA ratings, at all taps with nominal cooling but standby


AB.19 cooling off
AB.19.1 HV MVA 45
AB.19.2 LV MVA 45

AB.20 Short Time Ratings


Time that full load can be sustained in the event of a
AB.20.1 temporary loss of cooler supply Minutes

Nominal system voltage Un" and rated voltage on


AB.21 principal tapping at no load
AB.21.1 HV kV rms 132kV
AB.21.2 LV kV rms 11.5kV
AB.21.3 Transformer ratio turns / turns

AB.22 Winding Insulation

AB.22.1 Equipment "Um":


AB.22.1.1 HV kV rms
AB.22.1.2 LV kV rms

AB.22.2 Overvoltage:
AB.22.2.1 HV p.u / time 1.075 Um for 5 minutes;
1.4 Um for 5 seconds;
1.7 Um for 0.25 seconds
(Note that due to the high
resistive earthing on the LV-side,
the phase to earth voltages will
rise by 1.73 x Um during earth
faults for up to 10 seconds)
AB.22.2.2 LV kV rms / s

AB.22.3 Load rejection criteria applicable as per IEC 60076-8.3 Yes / No Yes

AB.22.4 Lightning impulse (1.2/50 us):


AB.22.4.1 HV kV peak As per IEC 60076-1 to 5
AB.22.4.2 LV kV peak As per IEC 60076-1 to 5
AB.22.4.3 Neutral kV peak As per IEC 60076-1 to 5

Rated short-duration power frequency withstand voltage (For


AB.22.5 design purposes only):
AB.22.5.1 HV* kV As per IEC 60076-1 to 5
AB.22.5.2 LV kV As per IEC 60076-1 to 5
AB.22.5.3 Neutral kV As per IEC 60076-1 to 5

AB.22.6 Switching impulse


AB.22.6.1 HV kV As per IEC 60076-1 to 5
AB.22.6.2 LV kV As per IEC 60076-1 to 5

*Note: For transformers with non-uniform insulation the short-duration power frequency test is to be done at the neutral voltage level in AB.22.5.3
AB.23 Tapchangers
Around core/ around
outer winding /
Between LV and HV
AB.23.1 Tapped winding position windings. Outer
On-load / Off-circuit
(Link Board or Tap
AB.23.2 Type of tap changer changer) On-Load Tap changer (vacuum)

AB.23.3 Tapchanger tank Separate / In main tank In main tank


AB.23.4 Operations per year No
HV/LV ratios provided by the tapping range, as a percentage
AB.23.5 of the principal tapping voltage. % +5% to -15%
AB.23.6 Number of approximately equal positions. 17
AB.23.7 Approximate change per step in percent of HV (Un) % 1.25%
AB.23.8 Controlled voltage HV / LV HV
AB.23.9 Separate tank for selector switch Separate / In main tank yes
AB.23.10 Manufacturer and type designation
AB.23.11 Precise electrical location of tappings
AB.23.12 Diagrammatic arrangement shown on Drawing No: Drawing number

AB.23.13 Nominal 50 Hz ratings of tap-changer:


AB.23.13.1 Voltage kV
AB.23.13.2 Current A
AB.23.13.3 Tap-Changer overrating required p.u N/A

AB.23.14 Insulation levels of tap changer

AB.23.15 Lightning impulse level (1,2/50 us full wave):


AB.23.15.1 phase to ground kV peak
AB.23.15.2 phase to phase kV peak

AB.23.16 Tap changer switching impulse level (1,2/50 us full wave):


AB.23.16.1 phase to ground kV peak
AB.23.16.2 phase to phase kV peak

AB.23.17 Tap changer 50 Hz withstand


AB.23.17.1 phase to ground kV rms
AB.23.17.2 phase to phase kV rms
AB.23.17.3 Nominal voltage and current rating of tap changer: kV / A

AB.23.18 Tapchanger Contacts


AB.23.18.1 Selector kV / A
AB.23.18.2 Selector switch kV / A
AB.23.18.3 Diverter switch kV / A

AB.23.19 Tap changer transition resistor kV / A

AB.23.20 Tap changer driving motor:


AB.23.20.1 Type of driving motor 1 or 3 Phase
AB.23.20.2 Power kW
AB.23.20.3 Current A

AB.23.21 Resulting no-load voltage appearing:


AB.23.21.1 On principal tapping kV 132 kV
AB.23.21.2 On extreme plus tapping kV 138.6 kV
AB.23.21.3 On extreme minus tapping kV 112.3 kV

AB.24 Tolerances: (these are technical tolerances" that is achieved and not "commercial tolerances" that determines penalties or fines.)

AB.24.1 Voltage Ratio As per IEC 60076-1 Table 1


AB.24.2 No-load losses * No plus tolerance
AB.24.3 Full load losses * No plus tolerance
AB.24.4 Total losses * No plus tolerance
AB.24.5 Short circuit impedance * 5%

* Note: That the tolerances specified here are lower than that specified in IEC60076. Also contrary to IEC60076 1 exceeding the loss tolerances specified in IEC 60076 Table 1 will
not be accepted. Exceeding the tolerances specified in AB 24.2 to AB 24.3 results in a penalty as described in IEC 60076 1. Where the tolerances specified in AB 24.2 to AB 24.3 are
exceeded, the contractor submits a written report explaining reasons and location of losses to the employer for approval.
AB.25 Main terminals
AB.25.1 Terminals dimensions required:

To fit existing configuration to be


clarified during detail design(see
AB.25.1.1 HV mm outline drawing)
To fit existing configuration to be
clarified during detail design(see
AB.25.1.2 LV outline drawing)

AB.25.2 Connection detail:


Bushings connected
via dropper / Bushings
housed in IPD
connected via flexibles Bushings connected to 132kV
AB.25.2.1 HV / Cable Box line droppers
Bushing connected via
dropper / Bushing
housed in IPD
connected via flexibles Bushings housed in IPD
AB.25.2.2 LV / Cable Box connected via flexibles
Bushing connected via
dropper / Bushing
housed in IPD
connected via flexibles
AB.25.2.3 Neutral / Cable Box Open bushing
AB.25.2.3.1 Core and Core clamp 2 separate bushings provided
AB.25.2.4 HV maximum enclosure temperature C <60
AB.25.2.5 LV maximum enclosure temperature C <60

AB.25.3 Minimum clearances on the HV side, phase to earth, in air mm As per IEC 60076-1 to 5.
Transformer bay requirements
take preference

AB.25.4 Minimum clearances on the HV side, phase to phase, in air mm As per IEC 60076-1 to 5.
Transformer bay requirements
take preference
As per IEC 60076-1 to 5.
Transformer bay requirements
AB.25.5 Minimum clearances on the LV side, phase to earth, in air mm take preference
As per IEC 60076-1 to 5.
Transformer bay requirements
AB.25.6 Minimum clearances on the LV side, phase to phase, in air mm take preference
As per IEC 60076-1 to 5.
Transformer bay requirements
AB.25.7 Minimum clearances between HV and LV terminals, in air mm take preference
Transformer bay requirements
take preference

AB.25.8 Main terminals minimum total creepage distance:


AB.25.8.1 HV mm/kV
AB.25.8.2 LV mm/kV

Positioning of transformer terminals when facing the


AB.25.9 transformer from the HV-side:
AB.25.9.1 LV Left to right YN-a-b-c

AB.25.9.2 HV Left to Right A-B-C

AB.25.10 Provide connection to Transmission network (Droppers) Yes / No N/A


AB.25.11 Provide connection to Generator busbars Yes / No Yes, to fit existing configuration
(i.e. flexibles, boxes)
* Note: Terminal positions are critical, to be re-verified during design review stage before proceeding.

AB.26 Type of bushings required


AB.26.1 HV:
AB.26.1.1 Colour Brown / Grey Grey

Porcelain / Silicon-
AB.26.1.2 Material rubber Silicon-rubber
AB.26.1.3 Insulation body OIP / RIP RIP
AB.26.1.4 Voltage test tap Normal / ANSI
AB.26.1.5 Voltage rating kV To suit rated Voltage
AB.26.1.6 Current rating A To suit rated current
AB.26.1.7 Lightning Impulse Withstand Voltage kV As per IEC 60076
AB.26.1.8 Switching Impulse Withstand Voltage kV As per IEC 60076
AB.26.1.9 Power Frequency Withstand Voltage for 60 seconds kV As per IEC 60076
AB.26.1.10 Manufacturer Make No preference
AB.26.1.11 Identification Part or Type Number Number
AB.26.1.12 Cantilever withstand load level Normal(I)/Heavy(II) Normal(I)
IEC 60137 Table 1

AB.26.2 LV:
AB.26.2.1 Colour Brown / Grey Any

Porcelain / Silicon-
AB.26.2.2 Material rubber Porcelain / Silicon-rubber
AB.26.2.3 Insulation body OIP / RIP RIP

AB.26.2.4 Voltage test tap Normal / ANSI


AB.26.2.5 Voltage rating kV To suit rated Voltage
AB.26.2.6 Current rating A To suit rated current
AB.26.2.7 Lightning Impulse Withstand Voltage kV As per IEC 60076
AB.26.2.8 Switching Impulse Withstand Voltage kV
AB.26.2.9 Power Frequency Withstand Voltage for 60 seconds kV As per IEC 60076
AB.26.2.10 Manufacturer Make Any
AB.26.2.11 Identification Part or Type Number Number
AB.26.2.12 Cantilever withstand load level Normal(I)/Heavy(II) Normal(I)
IEC 60137 Table 1
dB(A) 90 (Sound pressure level
AB.27 Maximum acoustic noise generated by Transformer: (LpA) according to IEC)

AB.28 Tests
(List cost in price schedule)
AB.28.1 Factory tests*:
Temperature rise test (Heat run per phase current injection /
AB.28.1.1 measuring) Yes / No Yes
AB.28.1.2 Short circuit test Yes / No No
AB.28.1.3 Lightning impulse test Yes / No Yes
AB.28.1.4 Chopped impulse test Yes / No Yes
AB.28.1.5 Acoustic noise level measurement Yes / No Yes
AB.28.1.6 Overload test Yes / No Yes
Long duration induced AC voltage test with partial discharge
AB.28.1.7 measurement Yes / No Yes
AB.28.1.9 Separate source AC Yes / No Yes
AB.28.1.10 Switching impulse Yes / No Yes
AB.28.1.11 Winding resistance test (Each winding separately) Yes / No Yes
AB.28.1.12 No load and full load loss measurements Yes / No Yes
AB.28.1.13 Winding insulation resistance measurement (Megger) Yes / No Yes
AB.28.1.14 Winding ratio tests on all taps and on all phases Yes / No Yes
AB.28.1.15 Polarity test (Vector Group) Yes / No Yes
AB.28.1.16 Tan delta on HV and LV Bushings Yes / No Yes
AB.28.1.17 Winding Tan delta measurement Yes / No Yes
AB.28.1.18 Contact resistance on the tap changer Yes / No Yes if applicable
AB.28.1.19 Sweep Frequency Response Analysis Yes / No Yes
AB.28.1.20 Moisture measurement Yes / No Yes
AB.28.1.21 Over flux test Yes / No Yes, 110% for 20 minutes
AB.28.1.22 Untanked Current Test Yes / No Yes
AB.28.1.23 Doble M 4000 TEST Yes / No Yes
AB.28.1.24 Special OD functional test (refer GGS 1074) Yes / No No
AB.28.1.25 Test Emergency cooling Capability (refer GGS 1074) Yes / No No
AB.28.1.26 HV and LV Winding resistance normalized at 75C Yes / No Yes
AB.28.1.27 Polarity test (Vector Group) Yes / No Yes
Measure positive an zero sequence impedance
AB.28.1.28 (Values also have to be given per phase) Yes / No Yes
AB.28.1.29 Measure harmonics of No-Load current Yes / No Yes
AB.28.1.29 Paper DP after final dryout Yes / No Yes, greater than 900

*The tolerances specified in IEC for the test wave shapes are for test deviations and at no point must test equipment be deliberately set to lower values than specified even if lower is
within the IEC tolerances. Test equipment must always be set to the specified test values.
AB.28.2 Site Tests:
Yes, in the presence of the
AB.28.2.1 Correct operation of the pumps and fans Yes / No Employer
Yes, in the presence of the
AB.28.2.2 Verification of all alarm and trip signals Yes / No Employer
Yes, in the presence of the
AB.28.2.3 Core and clamp insulation test Yes / No Employer
Yes, in the presence of the
AB.28.2.4 CT-Polarities, function and insulation Yes / No Employer
Yes, in the presence of the
AB.28.2.5 Three-phase 380V Magnetising currents Yes / No Employer
Yes, in the presence of the
AB.28.2.6 Control/Power cable insulation Yes / No Employer
AB.28.2.7 Tan delta on HV and LV Bushings Yes / No No
Yes, in the presence of the
AB.28.2.8 Winding Tan-Delta test Yes / No Employer
Correct operation and indication of tap changers and set to Yes, in the presence of the
AB.28.2.9 the correct voltage setting Yes / No Employer
Yes, in the presence of the
AB.28.2.10 Correct operation of monitoring equipment Yes / No Employer
Yes, in the presence of the
AB.28.2.11 Moisture measurement Yes / No Employer
Yes, once transformer is in
AB.28.2.12 Sweep Frequency Response Analysis Yes / No position
Yes, in the presence of the
AB.28.2.13 Polarity test (Vector Group) Yes / No Employer
Yes, in the presence of the
AB.28.2.14 Winding insulation resistance measurement (Megger) Yes / No Employer
Yes, in the presence of the
AB.28.2.15 Winding ratio tests on all taps and on all phases Yes / No Employer
Impedance test on all taps Yes, in the presence of the
AB.28.2.16 (Values also have to be given per phase) Yes / No Employer
Yes, in the presence of the
AB.28.2.17 Doble M4000 test Yes / No Employer
Yes, in the presence of the
AB.28.2.18 Test Earth continuity from transformer to Bay Earth-Mat Yes / No Employer
Yes, in the presence of the
AB.28.2.19 LV and HV Winding resistance normalized at 75C Yes / No Employer

AB.28.3 On Site Oil tests:


Yes, in the presence of the
AB.28.3.1 FTIR (Oil type Verification) as per Eskom's peer review Yes / No Employer
DGA (before, 48 Hrs after energising and weekly for the first Yes, in the presence of the
AB.28.3.2 month ) Yes / No Employer
Yes, in the presence of the
AB.28.3.3 Test for Silicone and other metal contaminants Yes / No Employer
Oil Quality Tests are performed in accordance with 32-406 &
240-56358900 Yes, in the presence of the
AB.28.3.4 Yes / No Employer
Yes, in the presence of the
AB.28.3.5 6 channel optic fiber temperature measuring equipment Yes / No Employer

AB.29 Optional spares


One HV, LV and 1 X HV Neutral bushings for one
AB.29.1 transformer. 1 x core testing bushing Yes / No Yes
AB.29.2 One circulating oil pump and motor Yes / No N/A
AB.29.3 One cooling fan and motor Yes / No Yes

AB.29.4 One three-phase set of tap changer transfer switch contacts Yes / No N/A
AB.29.5 One tap changer driving motor Yes / No N/A
AB.29.6 One set of contactors and relay of each type Yes / No Yes
AB.29.7 One Winding temperature instrument Yes / No Yes
AB.29.8 One Oil temperature instrument Yes / No Yes
AB.29.9 One Oil level Indication instrument Yes / No No, But provide prices
AB.29.10 One PRD (Pressure relief device) Yes / No Yes
AB.29.11 Oil Cooler inlet & outlet Temperature indicator Yes / No Yes
AB.29.12 Bucholtz Relay Yes / No Yes

AB.30 Oil preservation system

Desiccant breather / Bagged conservator tank with a


AB.30.1 Type bagged conservator silica gel desiccant breather
AB.30.2 Conservator colour colour White
Separate / On main
AB.30.3 Conservator mounting tank On Main tank

AB.31 Special requirements


Yes, suitable to accept the
AB.31.1 Padlocking valves Yes / No Employers standard padlock

Number per
AB.31.2 Number of sets of manuals required transformer 5 hard copies and 5 soft copies

a, b, c (GGS 1074: Method b:


AB.31.3 Storage Method section 4.13.5)
Fully erected, oil filled with
bagged conservator.

AB.31.4 Type of valves to use Gate / Butterfly Gate

Provision for Sergi Interface and


AB.31.5 Sudden flow oil valves (SERGI Type) Yes / No price full system as an option.

Provision made for inlet & outlet


AB.31.6 On-line 8 gas monitor and other monitors Yes / No valves
AB.31.6.1 Windows based human interface Yes / No No
AB.31.6.2 Data in SQL compatible format required Yes / No No
AB.31.6.3 Gasses trended separately Yes / No No

AB.31.6.4 Absolute value limits individually programmable for each gas Yes / No No
AB.31.6.5 Gas production rate individually programmable for each gas Yes / No No
AB.31.6.6. Bushing Monitoring Yes / No No
AB.31.6.7. Tapchanger Monitoring Yes / No No
AB.31.7 Marshalling kiosk: Yes Yes
Yes, to be finalised during
mechanical design review. All
circuits to be able to be isolated
as per Eskom 's plant safety
AB.31.7.1 Free-standing Yes / No regulations.
Constructed from corrosion resistant material. Details to be Yes / No Yes, 3CR12 or similar, IP65
AB.31.7.2 submitted.
AB.31.7.3 Padlocking facility on all doors Yes / No Yes
Responsibility for the connection of the 380V power Supply to
AB.31.7.4 the Marshalling Kiosk Contractor/Employer Employer

AB.31.8 Corrosion protection:

All external fasteners (nuts, studs, bolts and washers) shall be


AB.31.8.1 of corrosion resistant material. Details to be submitted Yes / No Yes Yes
The transformer shall be supplied with an under-base sealing
mat in order to prevent gross water intrusion and corrosion.
AB.31.8.2 Submit details for approval Yes / No Yes Yes

AB.31.9 HV Connections:
AB.31.9.1 Connected to Insulated Phase Ducts Yes / No Yes Yes
AB.31.9.2 Star connections inside main tank Yes / No Yes
% of normal full load
AB.31.9.3 LV exit leads over sizing design size 120%

To fit existing busbar


configuration, details to be
AB.31.9.4 Centre distances between phases R-W & W-B mm submitted during detail design

To fit existing busbar


configuration, details to be
AB.31.9.5 Connection height to top of LV bushing from ground level mm submitted during detail design

To fit existing busbar


configuration, details to be
AB.31.9.6 IPD Off-set with vertical Degrees submitted during detail design

To fit existing busbar


configuration, details to be
AB.31.9.7 IPD Diameter mm submitted during detail design

AB.31.10 Rails and Undercarriage:


AB.31.10.1 Undercarriage to be supplied Yes / No N/A

AB.31.10.2 Rail width (gauge) of rails parallel to long axis of transformer (ft) / mm N/A

AB.31.10.3 Rail width (gauge) of rails parallel to short axis of transformer (ft) / mm N/A

AB.31.11 Winding Temperature Indication:


AB.31.11.1 Quantity required Ea 1
AB.31.11.2 No of Micro switches required no 4(2 Alarm + 2 Trip)
4 20 mA Output available on terminals in the marshalling
AB.31.11.3 kiosk Yes / No Yes
AB.31.11.4 Calibration details required Yes / No Yes
Yes 6 working channels after
commissioning, wired to
AB.31.11.5 Direct measurement using fiber optic sensors required Yes / No Marshalling Kiosk

AB.31.12 Oil Temperature Indication:


AB.31.12.1 Quantity required, main tank Ea 1
AB.31.12.2 No of Micro switches required no 4(2 Alarm + 2 Trip)

indicator measuring the Inlet and


Outlet temperature of each
cooling unit separately in the
AB.31.12.3 Quantity required, cooler / radiator units Ea marshalling kiosk
Yes, local indication also
4 20 mA Output available on terminals in the marshalling required. For each measuring
AB.31.12.4 kiosk Yes / No point

AB.31.13 On-line drying unit required Yes / No No

Yes, Provision for Sergi Interface


SERGI Transformer Blast and Fire Protection system for and price full system as an
AB.31.14 each transformer Yes / No option.

AB.31.15 Geomagnetic induced current detection Yes / No No

Yes, MS office or PDF file


drawings on Micro station v8 or
AB.31.16 Drawings and Manuals on software Yes / No AutoCAD DRG format

AB.31.17 Storage Procedures required Yes / No Yes


1, equipped with 10mm copper
pipes leading down the
transformer, to facilitate sampling
and bleeding from ground level
AB.31.18 Number of Buccholz relays required 1/2 (gate valves at sample points).
AB.31.19 No of Buccholz alarms and Trip contacts required no 2 Alarms and 2 trip
AB.31.20 6 channel optic fiber temperature measuring equipment Yes / No Yes
Transformer should be designed to enable transport on a rail
AB.31.21 system in a fully assemble state. Yes / No Yes
Transformer to be designed with additional shielding between
AB.31.22 the HV and LV windings to limit transient voltage transfer from Yes / No
HV to LV N/A
Electrical Certificate of compliance (COC) required for
AB.31.23 transformer Auxiliary system Yes / No Yes

AB.32 Maximum current density in windings


AB.32.1 HV A/mm
AB.32.2 LV A/mm

AB.33 Losses and other performance data


AB.33.1 No-load loss on principal tapping kW

AB.33.1.1 at 0,90 Ut kW
AB.33.1.2 at 1,00 Ut kW Evaluation formula in AB 33.4
AB.33.1.3 at 1,10 Ut. kW

Magnetizing current, at rated frequency, on principal tapping,


AB.33.2 in percent of rated current at maximum HV rating:
AB.33.2.1 at 0,90 Ut %
AB.33.2.2 at 1,00 Ut %
AB.33.2.3 at 1,10 Ut %

AB.33.3 Load Loss (IR + stray) at 75 C with HV and LV fully loaded:


AB.33.3.1 On principal tapping kW Evaluation formula in AB 33.4
AB.33.3.2 On extreme plus tapping kW
AB.33.3.3 On extreme minus tapping kW

AB.33.4 Evaluated Cost = P + [A * E] + [B * L]


Where: P = Transformer tender price
A = Evaluated Cost of No-load loss per kW
B = Evaluated Coast of Load loss per kW
E = No-load loss in kW
L = Load loss in kW
Note: AB 33.4 supersedes GGS1074 4.30.2

AB.33.4.1 No-load loss R / KW 63000


AB.33.4.2 Load Loss R / KW 14000
AB.33.4.3
AB.33.4.4 LF (Load Factor) Generation 0.6
LF (Load Factor) Pump N/A
AB.33.4.5 AF (Availability factor) 100%

AB.34 Coolers
Assume continuous maximum rating operation without
exceeding specified temperature limits without one cooler fan
AB.34.1 in service Yes / No No
AB.34.2 Automatic and manual control Manual / Automatic Manual and Automatic
High building approx 8m away on
AB.34.3 Cooling air flow restrictions 2 sides of the transformer.

Power consumption of cooling fans in service with Generator


AB.34.4 transformer at full load:
AB.34.4.1 Power kW
AB.34.4.2 Current A

Power consumption of oil pumps in service with Generator


AB.34.5 transformer at full load:
AB.34.5.1 Power kW
AB.34.5.2 Current A
Number of cooler units in service when the transformer is
AB.34.6 continuously loaded to rated MVA value.

AB.34.7 Number of standby cooler units N/A


AB.34.8 Number of fans per cooler unit 2
AB.34.9 Number of pumps per cooler unit
AB.34.10 Material of which cooler tubes are made
AB.34.11 Manufacturer of cooler unit
Separately mounted /
AB.34.12 Mounting position of Coolers Mounted on main tank Mounted on main tank

AB.35 Impedance
Impedance at 75 C and rated frequency based on maximum
AB.35.1 rated power of HV winding (HV/LV):
AB.35.1.1 On principal tapping % 7.04
AB.35.1.2 On extreme plus tapping % 7.36
AB.35.1.2 On extreme minus tapping % 7.00

AB.35.3 Zero sequence impedance in percent (HV/LV):


AB.35.3.1 On principal tapping %
AB.35.3.2 On extreme plus tapping %
AB.35.3.3 On extreme minus tapping %

AB.36 Auxiliary supplies


AB.36.1 Alarm signaling dc volts 220Vdc
AB.36.2 Tripping dc volts 220VdC
3-phase ac line volts /
AB.36.3 Rating of Feeder to transformer auxiliaries at 50 Hz amps 380 Vac + N / 125 A
1-phase dc line volts /
AB.36.4 Rating of dc available to transformer auxiliaries amps

AB.36.5 Auxiliaries quality of supply provided:


AB.36.5.1 Continuous AC Voltage amplitude variation % 5
AB.36.5.2 Short term AC Voltage amplitude deviations %/s 75 / 15
AB.36.5.3 Short Term Over voltage %/s 110 / 10
AB.36.5.4 Continuous frequency deviation % 2.5
3-phase voltage unbalance
Negative Phase Sequence component: % 2
AB.36.5.5 Zero Phase Sequence Component: % 1
AB.36.5.6 Total Harmonic
Lightning Impulsedistortion
withstand Phase to Phase and Phase to % 5
AB.36.5.7 Earth
Switching Impulse withstand Phase to Phase and Phase to
AB.36.5.8 Earth
AB.36.5.9 220 VDC amplitude variation % -15 to +10
AB.36.5.10 220VDC Ripple voltage V Peak to Peak 5% p-p

AB.37 Marshalling kiosk


AB.37.1 Provide the following alarm and feedback signals:
AB.37.1.1 Fan failure Yes / No Yes
AB.37.1.2 Pump failure Yes / No N/A
AB.37.1.3 Oil level low Yes / No Yes
AB.37.1.4 Oil level high Yes / No Yes
AB.37.1.5 Top oil temperature high Yes / No Yes
AB.37.1.6 Top winding temperature high Yes / No Yes
AB.37.1.7 Buchholz alarm Yes / No Yes
AB.37.1.8 Online gas analyzer gasses high Yes / No Yes
AB.37.1.9 Tap-change on Manual Yes / No N/A
AB.37.1.10 Tap-change not healthy Yes / No N/A
AB.37.1.11 Tap -change lockout Yes / No N/A
AB.37.1.12 Tap-change fail Yes / No N/A
AB.37.1.13 Tap-Change DC fail Yes / No N/A
AB.37.1.14 Tap-change VT fail Yes / No N/A
AB.37.1.15 Tap-change voltage abnormal Yes / No N/A
AB.37.1.16 Tap-change voltage high Yes / No N/A
AB.37.1.17 Tap-change voltage low Yes / No N/A
AB.37.1.18 Tap-change in progress Yes / No N/A
AB.37.1.19 Tap-change on manual control Yes / No N/A
AB.37.1.20 Tap-change motor drive trip Yes / No N/A

AB.37.2 Provide the following trip signals:


AB.37.2.1 Top oil temperature very high Yes / No Yes
AB.37.2.1 Top winding temperature very high Yes / No Yes
AB.37.2.3 PRD operation Yes / No Yes
AB.37.2.4 Buchholz high gasses operation Yes / No Yes

AB.37.3 Provide the following supply circuits:


AB.37.3.1 230 V (15 A) plug with earth leakage protection (30 mA) Yes / No Yes
Yes, All circuits to be isolated
seperatly with a fuse and to be
AB.37.3.2 5 x 6A MCB with earth leakage protection (30 mA) Yes / No able to lock the circuit

AB.37.4 Provide the following analogue outputs:


AB.37.4.1 Top oil temperature reading 4- 20mA Yes / No Yes
AB.37.4.2 Top winding temperature 4-20mA Yes / No Yes
AB.37.4.3 Combustible gas reading 4-20mA Yes / No No
Yes, wired to marshalling kiosk
AB.37.4.4 Temperature sensor on cooler in and outlet Yes / No with indicating instruments

AB.38 Current Transformers


AB.38.1 Current transformer no 1 : To match existing
AB.38.1.1 Location To be advised
AB.38.1.2 Application To be advised
AB.38.1.3 Number To be advised
AB.38.1.4 Ratio To be advised
AB.38.1.5 Burden VA (Vk-Im) To be advised
AB.38.1.6 Class To be advised

AB.38.2 Current transformer no 2 : To match existing


AB.38.2.1 Location To be advised
AB.38.2.2 Application To be advised
AB.38.2.3 Number To be advised
AB.38.2.4 Ratio To be advised
AB.38.2.5 Secondary internal impedance not exceed Ohms To be advised
Maximum rms value of total exciting current at 550 volts rms
AB.38.2.6 in mA To be advised
AB.38.2.7 Burden VA To be advised
AB.38.2.8 Class To be advised

AB.38.3 Current transformer no 3 : To match existing


AB.38.3.1 Location To be advised
AB.38.3.2 Application To be advised
AB.38.3.3 Number To be advised
AB.38.3.4 Ratio To be advised
AB.38.3.5 Burden VA To be advised
AB.38.3.6 Class To be advised
AB.38.4 Current transformer no 4 : To match existing
AB.38.4.1 Location To be advised
AB.38.4.2 Application To be advised
AB.38.4.3 Number To be advised
AB.38.4.4 Ratio To be advised
AB.38.4.5 Burden VA (Vk-Im) To be advised
AB.38.4.6 Class To be advised

AB.38.5 Current transformer no 5 : To match existing


AB.38.5.1 Location To be advised
AB.38.5.2 Application To be advised
AB.38.5.3 Number To be advised
AB.38.5.4 Ratio To be advised
AB.38.5.5 Burden VA To be advised
AB.38.5.6 Class To be advised

AB.38.6 Current transformer no 6: To match existing


AB.38.6.1 Location To be advised
AB.38.6.2 Application To be advised
AB.38.6.3 Number To be advised
AB.38.6.4 Ratio To be advised
AB.38.6.5 Burden VA To be advised
AB.38.6.6 Class To be advised

AB.38.7 Current transformer no 7: To match existing


AB.38.7.1 Location To be advised
AB.38.7.2 Application To be advised
AB.38.7.3 Number To be advised
AB.38.7.4 Ratio To be advised
AB.38.7.5 Burden VA To be advised
AB.38.7.6 Class To be advised

AB.39 Oil

AB.39.1 Type of oil to use for first impregnation Eskom approved oil
Test to be performed, with certificates, on oil used for first Yes, tests as per Eskom's
AB.39.2 impregnation, testing and final filling. Yes/No requirements 32-406
Preferably the same as first
impregnation. Must be oil used
as dedicated for testing and
impregnation purposes for new
transformers. Not oil which has
been in contact with old
AB.39.3 Type of oil to use for factory testing transformers.

AB.39.3 Oil quantities:


AB.39.3.1 Transformer tank
AB.39.3.2 Conservator
AB.39.3.3 Coolers
AB.39.3.4 Tap changer N/A
AB.39.3.5 Total

AB.40 Masses
AB.40.1 Mass of core and windings Ton
AB.40.2 Mass of core steel Ton
AB.40.3 Mass of winding copper (insulation excluded) Ton
AB.40.4 Mass of tank and fittings Ton
AB.40.5 Mass of coolers Ton
AB.40.6 Mass of oil Ton
AB.40.7 Total mass Ton
AB.40.8 Greatest transportation mass Ton

AB.41 Dimensions
AB.41.1 Overall dimensions of complete unit:
AB.41.1. height mm To be able to fit on plinth
AB.41.1.1 length mm To be able to fit on plinth
AB.41.1.2 breadth mm To be able to fit on plinth

AB.41.2 Overall dimensions of tank only:


AB.41.2.1 height mm
AB.41.2.2 length mm
AB.41.2.3 breadth mm

AB.41.3 Overall dimensions of coolers only:


AB.41.3.1 height mm
AB.41.3.2 length mm
AB.41.3.3 breadth mm

AB.41.4 Height over bushings:


to be able to fit current plant
AB.41.4.1 HV- bushings mm arrangement
to be able to fit current plant
AB.41.4.2 LV-bushings mm arrangement
AB.41.5 Transport Dimensions (Boxed):
AB.41.5.1 height mm
AB.41.5.2 length mm
AB.41.5.3 breadth mm

AB.42 Filling medium for transport Nitrogen / Dry air Dry Air (Safety reasons)

AB.43 Tank and material thickness


AB.43.1 Sides mm
AB.43.2 Bottom mm
AB.43.3 Top mm
AB.43.4 Conservator mm
AB.43.5 Cooler tubes mm
AB.43.6 Pressed-sheet radiators mm

AB.44 Safe withstand vacuum at sea level


AB.44.1 Coolers kPa
AB.44.2 Conservator tank kPa
AB.44.3 Main tank kPa

AB.45 Motors 380V supply


AB.45.1 Fans:
AB.45.1.1 Make
AB.45.1.2 Type

AB.45.2 Oil pumps:


AB.45.2.1 Make
AB.45.2.2 Type

Include detailed technical information and data sheets,


including all the relevant Type Test Certificates of the
following components (specify in which section of tender
AB.46 the information can be found):
AB.46.1 Bushings:
AB.46.1.1 HV:
A.B.46.1.1.1 Manufacturer Describe Yes, attach full details
A.B.46.1.1.2 Type number Describe Yes, attach full details
A.B.46.1.1.3 Part number Describe Yes, attach full details
A.B.46.1.1.4 Supplier, if not the same as the manufacturer Describe Yes, attach full details
A.B.46.1.1.5 Technical Data Yes / No Yes, attach full details
A.B.46.1.1.6 Type Test Certificates Yes / No Yes, attach full details

AB.46.1.2 LV:
A.B.46.1.2.1 Manufacturer Describe Yes, attach full details
AB.46.1.2.2 Type number Describe Yes, attach full details
AB.46.1.2.3 Part number Describe
AB.46.1.2.4 Supplier, if not the same as the manufacturer Describe
AB.46.1.2.5 Technical Data Yes / No Yes, attach full details
AB.46.1.2.6 Type Test Certificates Yes / No Yes, attach full details

AB.46.2 Cooler units, motors and fans


AB.46.2.1 Cooler Units:
A.B.46.2.1.1 Manufacturer Describe
A.B.46.2.1.2 Type number Describe
A.B.46.2.1.3 Part number Describe
A.B.46.2.1.4 Supplier, if not the same as the manufacturer Describe
A.B.46.2.1.5 Technical Data Yes / No Yes, attach full details
A.B.46.2.1.6 Type Test Certificates Yes / No Yes, attach full details

AB.46.2.2 Fans:
AB.46.2.2.1 Manufacturer Describe
AB.46.2.2.2 Type number Describe
AB.46.2.2.3 Part number Describe
AB.46.2.2.4 Supplier, if not the same as the manufacturer Describe
AB.46.2.2.5 Technical Data Yes / No Yes, attach full details
AB.46.2.2.6 Type Test Certificates Yes / No Yes, attach full details

AB.46.3 Tap changer:


AB.46.3.1 Manufacturer Describe
AB.46.3.2 Type number Describe
AB.46.3.3 Part number Describe
AB.46.3.4 Supplier, if not the same as the manufacturer Describe
AB.46.3.5 Technical Data Yes / No Yes, attach full details
AB.46.3.6 Type Test Certificates Yes / No Yes, attach full details

AB.46.4 Buchholz Relays:


AB.46.4.1 Manufacturer Describe
AB.46.4.2 Type number Describe
AB.46.4.3 Part number Describe
AB.46.4.4 Supplier, if not the same as the manufacturer Describe
AB.46.4.5 Technical Data Yes / No Yes, attach full details
AB.46.4.6 Type Test Certificates Yes / No Yes, attach full details

The Prd must have a hood


covering the electrical
AB.46.5 Pressure Reducing Device: connections
AB.46.5.1 Manufacturer Describe
AB.46.5.2 Type number Describe
AB.46.5.3 Part number Describe
AB.46.5.4 Supplier, if not the same as the manufacturer Describe
AB.46.5.5 Technical Data Yes / No Yes, attach full details
AB.46.5.6 Type Test Certificates Yes / No Yes, attach full details

AB.46.6 Winding temperature measurement:


AB.46.6.1 Instrument:

AB.46.6.2 Manufacturer Describe MESSKO


AB.46.6.3 Type number Describe
AB.46.6.4 Part number Describe
AB.46.6.5 Supplier, if not the same as the manufacturer Describe
AB.46.6.6 Technical Data Yes / No Yes, attach full details
AB.46.6.7 Type Test Certificates Yes / No Yes, attach full details
AB.46.6.8 Measuring equipment, eg CT:
AB.46.6.8.1 Manufacturer Describe MESSKO
AB.46.6.8.2 Type number Describe
AB.46.6.8.3 Part number Describe
AB.46.6.8.4 Supplier, if not the same as the manufacturer Describe
AB.46.6.8.5 Technical Data Yes / No Yes, attach full details
AB.46.6.8.6 Type Test Certificates Yes / No Yes, attach full details

AB.46.7 Oil temperature measurement:


AB.46.7.1 Instrument:
AB.46.7.1.1 Manufacturer Describe MESSKO
AB.46.7.1.2 Type number Describe DIAL TYPE
AB.46.7.1.3 Part number Describe
AB.46.7.1.4 Supplier, if not the same as the manufacturer Describe
AB.46.7.1.5 Technical Data Yes / No Yes, attach full details
AB.46.7.1.6 Type Test Certificates Yes / No Yes, attach full details
AB.46.7.2 Measuring equipment, eg PT100s:
AB.46.7.2.1 Manufacturer Describe
AB.46.7.2.2 Type number Describe
AB.46.7.2.3 Part number Describe
AB.46.7.2.4 Supplier, if not the same as the manufacturer Describe
AB.46.7.2.5 Technical Data Yes / No Yes, attach full details
AB.46.7.2.6 Type Test Certificates Yes / No Yes, attach full details

AB.46.8 Tapchanger protection device:


AB.46.8.1 Manufacturer Describe
AB.46.8.2 Type number Describe
AB.46.8.3 Part number Describe
AB.46.8.4 Supplier, if not the same as the manufacturer Describe
AB.46.8.5 Technical Data Yes / No Yes, attach full details
AB.46.8.6 Type Test Certificates Yes / No Yes, attach full details

AB.46.9 Dehydrating breathers:


AB.46.9.1 Manufacturer Describe
AB.46.9.2 Type number Describe
AB.46.9.3 Part number Describe
AB.46.9.4 Supplier, if not the same as the manufacturer Describe
AB.46.9.5 Technical Data Yes / No Yes, attach full details
AB.46.9.6 Type Test Certificates Yes / No Yes, attach full details

AB.46.10 Conservator bag:


AB.46.10.1 Manufacturer Describe
AB.46.10.2 Type number Describe
AB.46.10.3 Part number Describe
AB.46.10.4 Supplier, if not the same as the manufacturer Describe
AB.46.10.5 Technical Data Yes / No Yes, attach full details
AB.46.10.6 Type Test Certificates Yes / No Yes, attach full details

AB.46.11 Oil level indicators:


AB.46.11.1 Manufacturer Describe
AB.46.11.2 Type number Describe
AB.46.11.3 Part number Describe
AB.46.11.4 Supplier, if not the same as the manufacturer Describe
AB.46.11.5 Technical Data Yes / No Yes, attach full details
AB.46.11.6 Type Test Certificates Yes / No Yes, attach full details

AB.47 Manufacturing Experience *


Number of 400 kV and above transformers and reactors
manufactured at the factory, from where the Employers Number of units in the
AB.47.1 transformers will be sourced. last 12 months N/A
Number of Generator transformers above 200 MVA Number of units
manufactured by the factory from where the Employers manufactured in the
AB.47.2 transformers will be sourced. last 5 years N/A
AB.47.3 Factory failure rate (5-years) as defined in section 4.31.1.1 % <=3
Where transformers above 20MVA form the sample group

AB.47.4 In service failure rate (5-years) as defined in section 4.31.1.4 % <=0.5


Where transformers above 20MVA form the sample group
Number of short circuit tests performed on Generator
transformers with an MVA rating above 100 MVA as defined Number of short circuit
AB.47.5 in IEC =60076-5. Provide details of tests done. tests done N/A

For a population of power transformers, reactors, HVDC


transformers, Phase shifters of 20MVA and 275kV and
AB.47.6 above. Manufactured in the last 3 years supply the following:
Day indicator
AB.47.6.1 (transformers delivered 1 to 6 days late) % <=5

Week indicator %
AB.47.6.2 (Transformers delivered 1 week, "7days" to 4 weeks, "28 days", late) <=10
Month indicator
AB.47.6.3 (Transformers delivered more than a month late, 29 days or more) % <=15

*Note: The manufacturing


experience details that
must be given here must
be those of the specific
factory from which the
Employers transformers
will be sourced. The
company group details
must not be entered.
Remark 1:
Average value for the last five reports (each report is done for a calendar year and covers transformers in previous 10 years)
Remark 2:
List of short circuit tested transformers attached 3 of the tested transformers were three phase regulating network transformers
rated power 100 MVA and above and one was a single phase generator step-up transformer 35 MVA which correspond to
105 MVA three phase rating. Other 5 tested transformers had lower rated power.