You are on page 1of 6

BSG HOTEL

Calculation for Lift Lobby Pressurisation System (Fire Lift)

Estimation of Air Volume Flowing Past Doors when Doors are Closed
i) Design criteria based on MS1472
ii) Leakage Area Calculation
Based on 50 Pa pressure differential and interpolation of data from Table 3 and 4
(MS1472)

Leakage Per Door


Type of Door Size (CMH)
Single leaf opening into a pressurised
Case A 2.0m (H) 0.8m (W) 210
space
Single leaf opening outwards from a
Case B 2.0m (H) 0.8m (W) 420
pressurised space
Double leaf opening into a pressurised
Case C 2.0m (H) 1.6m (W) 630
space
Refer Section 5.3.2.3
Case D Lift landing door 2.0m (H) 2.0m (H) 2.0m (W) (MS1472)

No. of single leaf doors opening into a pressurised area 29


No. of single leaf doors opening outwards from a pressurised area 1
No. of double leaf opening into a pressurised space 0
No. of opened single leaf doors 3 Min 2 Opened Single Leaf Doors
No. of lift landing doors 30

Calculation of Air Leakage through Closed Lobby Doors

Leakage Per Door Air Leakage through


No of Door Closed Lobby Doors
(CMH) (CMH)
(Case A) 210 29 6090 (A)
(Case B) 420 1 420 (B)
(Case C) 630 0 0 (C )

Calculation of Air Leakage through Closed Lift Landing Doors (Case D)

Refer to Equation (14) of sub-section 5.3.2.3 of MS1472


Equation : Qd = (Qc x F) / n
where,
Qd is the air leakage from one lobby past one lift door,
Qc is the air leakage for an isolated lift door (value taken from Table 4 or derived from
Qc = 0.0496 x (PE) where PE is the pressurisation level for the lobby,
F is the factor depending on vent size in lift shaft and taken from the appropriate column
of Table 6 (MS1472)
N is the number of pressurised lobby openings into the lift shaft
Hence, when applied to;

Qc 0.35
F 2.66
n 30
Qd (CMS) 0.03 (assume lift shaft vent size = 0.16 sqr.m)
Qd (CMH) 111.95

Number of Lift(s) 1
Total Air Leakage through Closed Lift Landing Doors 3359 (D)

Table 6 (MS1472)
Value of F (vent size)
No. of Pressurised lobbies opening into the lift shaft (=n)
0.1sqr.m 0.16sqr.m
1 0.86 0.94
2 1.28 1.6
3 1.46 1.99
4 1.54 2.22
5 1.58 2.35
6 1.61 2.44
7 1.62 2.49
8 1.63 2.53
9 1.64 2.56
10 1.645 2.58
12 1.65 2.6
14 1.655 2.62
16 1.66 2.63
Above 16 1.66 2.66

Calculation of Total Air Leakage

Total air leakage (A)+(B)+(C )+(D) 9869 (X)

Estimation of Air Leakage through Opened Doors

i) The size of the door is 2.0m (H) x 0.8m (W)


ii) Therefore area of door is 1.60 sqr.m
iii) Based on design criteria of 1 m/s air flow through door when the door is opened,
the air quantity is 5760 CMH (1.60 sqr.m x 1.0 m/s x 60 sec x 60 min)

Air Air Flow Past


No of opened
quantity Opened Doors
single leaf doors
(CMH) (CMH)
5760 3 17280 (Y)

Selection of Pressurisation Fan Capacity

The minimum air volume required (X + Y) (CMH) 27149


Add 10% leakage factor ( G.I. Duct) 29863
Number of Presurrisation Fan 1
The air flow of fans selected (CMH) 29863
ened Single Leaf Doors
720 PENANG MARRIOTT HOTEL MIXED USE DEVELOPMENT

Lift Lobby Presurrisation System ( Pressurrisation Shaft Dimension )

The air flow of fans The air flow of fans Pressurrisation Shaft
Lift Lobby selected (CMH) selected (CFM) Dimension (W x D)
1 29863 17578 1950X650
STAIRCASE Lift Lobby
A B C D 5 6 7 1

39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22 Pressurrisation Fan Location
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
B2
B1