Department of the Building Official

BUILDING PERMIT REQUIREMENTS (New or Renovation)


Application No:____________________________________________________________
Date of Application:__________________
FOR DUPLICATION
Documents to be submitted in 1 set fastened in a folder
I FOR SUBMISSION PRIOR TO RELEASE
(Mga dokumentong dapat ipasa na nakapaloob sa folder) OF PERMIT
A. Legal Documents Original
(1 set)
1 Transfer Cert.of Title (copy stamped w/ "Original Received" & initialed by
CPDO)
2 Tax Declaration of the property
3 If lot is not in the name of the applicant:
Deed of Absolute Sale
Award Notice and/or Lease Contract
Deed of Assignment or Donation
Others
4 For Corporation
Secretary's Certification Authorizing the Signatory
B. Clearances
FOLDERED DOCUMENTS

1 Locational Clearance with photocopy of Barangay Clearance Photocopy (1 copy)


2 Fire Safety Evaluation Clearance (FSEC) & other Fire Safety Clearances Photocopy (1 copy)

Supplemental Documents (if applicable)


3 MMDA, DPWH, DENR-ECC, CAAP (ATO), DOH-BHDT
4 QC Subdivision Admininistration Office (if townhouses or subdivisions)

5 Bldg. Permit &/or Certificate of Occupancy of all existing buildings within


the subject lot and one (1) complete set of approved building plans, if
application is renovation / addition or extension
6 Contractor's / City Tax (pre-requisite for fast track applications)
C. Technical Documents (application forms must be *duly
Original
accomplished, signed & sealed *by the professionals & signed **by
(1 set)
the owner/s)
1 Building Permit Form (NOTARIZED)
2 Sanitary/Plumbing Permit Form
3 Electrical Permit Form
4 Mechanical Permit Form
5 Electronics Permit Form
6 Photocopies of valid PRC IDs & current PTRs with dry-seal and 3
specimen signatures of the professionals
Original
D. Supplemental Documents (if applicable)
(1 set)
Notarized Authorization Letter (for applicant's representative)

Affidavit of Undertaking, Consent, etc. (if necessary)

QCG-DBO-CPC01-V02
Department of the Building Official
BUILDING PERMIT REQUIREMENTS (New or Renovation)
FOR DUPLICATION
Building Plans at minimum Scale 1 : 100 (signed by the owner, Original
II PRIOR TO RELEASE
signed & sealed by the professionals ) (2 sets)
OF PERMIT

1 Lot Plan (for new structure / signed & sealed by a Geodetic Engineer) Photocopy
(3 copies)
2 Architectural - 1 set must be stamped "GRANTED" by the City Planning Photocopy
& Development Office (3 copies)
BINDED PLANS

- 2 sets must be stamped approved by the Bureau of Fire


- BP 344 (Accessibility Law) compliance, if applicable

3 Structural Plans (with PRC ID & PTR of the Civil Engineer who signed Photocopy
the plans) (3 copies)
4 Sanitary/Plumbing Plans (w/ Isometric drawings of water, drainage & Photocopy
sewer lines) (3 copies)
5 Electrical Plans Photocopy
(3 copies)
6 Mechanical Plans (for details, refer to www.quezoncity.gov.ph under Photocopy
"Procedures") (3 copies)
7 Fire Protection Plans (for details, refer to www.quezoncity.gov.ph under Photocopy
"Procedures") (3 copies)
8 Electronics Plan Photocopy
(3 copies)
FOR DUPLICATION
BINDED DOCUMENTS

Supporting Documents (signed & sealed by the professionals & w/ Original


PRIOR TO RELEASE
clear photocopies of their PRC IDs & PTRs) (1 set)
OF PERMIT
1 Geotech Report/Soil Boring Test Report w/ photocopy of valid PRC Id of
Geotech Engineer (for 3 storey and above)

2 Project Specifications

3 Cost Estimate / Bill of Materials

4 Structural Analysis and Design Computation (if involving structural Photocopy (1 copy)
members) Design Criteria only

INCOMPLETE DOCUMENTS WILL NOT BE ACCEPTED


(HINDI TATANGAPIN ANG MGA DOKUMENTONG KULANG)

Evaluated by:

Signature over Printed Name/Date