Footing Design: Design Calculation Page 1 of 360

FOOTING DESIGN CALCULATIONS


Project Name : NICEFRUIT FOOTING DESIGN
Client Name : DEL MONTE PHILIPPINES, INC.
Engineer Name : JCLLAMBERTE
Analysis File : C:\Users\Superman\Desktop\NICE FRUIT Plant - Final Plan\STAAD
- Copy\NICEFRUITPLANT.std
Analysis Last Modified : 7/20/2017 5:42:27 AM

Definitions:
1. A = Plan area of footing base in sqmm
2. AstPrv = Area of tensile reinforcement provided in sqmm
3. Astrqd = Area of tensile reinforcement required in sqmm
4. Av = Area of shear reinforcement required in sqmm
5. AvPrv = Area of shear reinforcement provided in sqmm
6. A1 = Bearing area of footing at slope of 1:2 in sqmm
7. A2 = C/s Area of column in sqmm
8. B = Width of footing base in mm
9. Beff = Effective width of footing in mm
10. Boff = Footing offset along B in mm
11. BoffB = Footing offset along B above column in plan
12. BoffT = Footing offset along B below column in plan
13. B1 = Width of sloped footing at top in mm
14. ColOff = Column offset in sloped footing in mm
15. D = Depth of footing in mm
16. d = Effective Depth of footing in mm
17. Dfd = Depth of founding layer in m
18. Dw = Ground water level in m
19. Ec = Modulus of elasticity of concrete in N/sqmm
20. Es = Modulus of elasticity of steel in N/sqmm
21. Foss = Safety factor against sliding
22. Fosu = Safety factor against uplift
23. Fst = Stress in steel in N/sqmm
24. F'c = Characteristic strength of concrete in N/sqmm
25. L = Length of footing base in mm
26. Leff = Effective length of footing in mm
27. Loff = Footing offset along L in mm
28. LoffL = Footing offset along L on left side of column
29. LoffR = Footing offset along L on right side of column
30. L1 = Length of sloped footing at top in mm
31. Mx = Bending Moment along column D in kN-m
32. Mex = Eccentricity moment along column D
33. Mxx = Total Bending Moment along column D (Mx + Mex)

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 2 of 360

34. My = Bending Moment along column B in kN-m


35. Mey = Eccentricity moment along column B
36. Myy = Total Bending Moment along column B (My + Mey)
37. Muy = Factored moment along column B in kN-m
38. Mux = Factored moment along column D in kN-m
39. Netdown = Net downward load in kN
40. OB = Maximum permissible offset on bottom side of column
41. OL = Maximum permissible offset on left side of column
42. OR = Maximum permissible offset on right side of column
43. OT = Maximum permissible offset on top side of column
44. P = Axial load for footing sizing in kN
45. P1 = Soil pressure at corner 1 in kN/sqm
46. P2 = Soil pressure at corner 2 kN/sqm
47. P3 = Soil pressure at corner 3 kN/sqm
48. P4 = Soil pressure at corner 4 kN/sqm
49. Ntot = Design vertical load on footing in kN
50. q = Surcharge Load in kN/sqm
51. sp = Spacing Between bars at outer most layer in mm
52. SPu = Upward Soil Pressure in kN/sqm
53. SPuL = Upward Soil Pressure from left
54. SPuR = Upward Soil Pressure from right
55. SPuB = Upward Soil Pressure from bottom
56. SPuT = Upward Soil Pressure from top
57. Temp1 = Peak Hydration temperature in Degree
58. Temp2 = Seasonal Temperature Variations in Degree
59. Vud = Design shear force in kN
60. Vus = Strength of shear reinforcement in kN
61. Vx = Shear along major axis in kN
62. Vy = Shear along minor axis in kN
63. Waterpr = Upward water pressure in kN/sqm
64. Waterup = Upward force due to water in kN/sqm
65. WFoot = Add. Wt. due to difference in concrete and soil density in
kN
66. WFootc = Weight of footing and column with concrete density in
kN
67. WSoil = Weight of soil covering footing area in kN
68. Zx = Section modulus of footing base along L in mm3
69. Zy = Section modulus of footing base along B in mm3
70. Vs = Nominal shear strength provided by shear reinforcement,
in KN
71. Vc = Nominal shear strength provided by concrete in kN
72. Cx = Width of column in mm
73. Cy = Length of Column in mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 3 of 360

74. Pcr(axial) = Design pressure at the critical section kN/sqm


75. Pnb = Bearing strength of column in kN

Code References:
ACI 318M:2011
Sr.No. Item Clause / Table
1. Ptmax : 10.3.5
2. Ptmin : 7.12.2.1/10.5.4
3. Vc : 11.11.2.1
4. Av : 11.4.7.2
5. Max Stirrup Spacing : 11.4.5.1
6. Vs : 11.4.7.9

Design Code : ACI 318M - 2011


Footing No : FC1
Column No : C1 ( 600mm X 400mm)
Analysis No : 1

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2000mm X 1800mm X 300mm
Effective Self Weight = 27.00 KN

Offset Along L (Loff) = 700 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 4 of 360

Offset Along B (Boff) = 700 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 22
Combination
Critical Load Combination = [11] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pcomb = 51.32 kN
P = Pcomb + Effective Self Weight x 1.2
P = 83.72 kN
Mx = -23.54 kNm
My = 2.24 kNm
P/A = 23.26 kN/sqm
Mx/Zx = -19.61 kN/sqm
My/Zy = 2.07 kN/sqm
Maximum Soil Pressure = 44.94 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 22
Combination
Critical Load Combination = [11] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
8: WINDLOAD-Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 51.32 kN
P = Pcomb + Effective Self Weight x 1.2
P = 83.72 kN
Mx = -23.54 kNm
My = -23.54 kNm
P/A = 23.26 kN/sqm
Mx/Zx = -19.61 kN/sqm
My/Zy = 2.07 kN/sqm
Minimum Soil Pressure = 1.57 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 22
Combination
Critical Load Combination = [26] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 5 of 360

LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD


11: ROOFLIVELOAD)
Pu = 51.32 kN
Mux = -23.54 kNm
Muy = 2.24 kNm
P/A = 14.26 kN/sqm
Mx/Zx = -19.61 kN/sqm
My/Zy = 2.07 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 33.87 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 14.94 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 45.01 kN
Mux = -0.9 kNm
Muy = 10.81 kNm
P/A = 12.5 kN/sqm
Mx/Zx = -0.75 kN/sqm
My/Zy = 10.01 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 22.51 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 11.03 kNm
Ast Rqd (BM) = 1080 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 6 of 360

= 217 mm
Critical Analysis Load = 22
Combination
Critical Load Combination = [26] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 51.32 kN
Mux = -23.54 kNm
Muy = 2.24 kNm
P/A = 14.26 kN/sqm
Mx/Zx = -19.61 kN/sqm
My/Zy = 2.07 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 33.87 kN/sqm
Vu = SPu X (Loff - d) X B
= 29.45 kN
Vc = 361.19 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pu = 45.01 kN
Mux = -0.9 kNm
Muy = 10.81 kNm
P/A = 12.5 kN/sqm
Mx/Zx = -0.75 kN/sqm
My/Zy = 10.01 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 22.51 kN/sqm
Vu = SPu X (Boff - d) X L
= 22.47 kN
Vc = 337.66 kN
Vu < Vc

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 7 of 360

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 18


Combination
Critical Load Combination = [22] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 8:
WINDLOAD-Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 62.78 kN
Mux = -12.96 kNm
Muy = 3.35 kNm
P/A = 17.44 kN/sqm
Mx/Zx = -10.8 kN/sqm
My/Zy = 3.1 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 17.44 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 54.19 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 18
Combination
Critical Load Combination = [22] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
8: WINDLOAD-Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 62.78 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 3.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 8 of 360

Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area


= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC2
Column No : C2 ( 600mm X 400mm)
Analysis No : 4

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1400mm X 1200mm X 300mm
Effective Self Weight = 12.60 KN

Offset Along L (Loff) = 400 mm


Offset Along B (Boff) = 400 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 19
Combination
Critical Load Combination = [8] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 5: WINDLOAD+X) +0.5
(LOAD 11: ROOFLIVELOAD)
Pcomb = 142.51 kN
P = Pcomb + Effective Self Weight x 1.2

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 9 of 360

P = 157.63 kN
Mx = -3.19 kNm
My = -20.33 kNm
P/A = 93.83 kN/sqm
Mx/Zx = -8.13 kN/sqm
My/Zy = -60.51 kN/sqm
Maximum Soil Pressure = 162.47 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 23
Combination
Critical Load Combination = [12] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1:
SEISMICLOAD+X)
Pcomb = 129.31 kN
P = Pcomb + Effective Self Weight x 1.2
P = 144.43 kN
Mx = -0.32 kNm
My = -0.32 kNm
P/A = 85.97 kN/sqm
Mx/Zx = -0.81 kN/sqm
My/Zy = -67.08 kN/sqm
Minimum Soil Pressure = 18.09 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 144.94 kN
Mux = 16.03 kNm
Muy = -5.06 kNm
P/A = 86.27 kN/sqm
Mx/Zx = 40.89 kN/sqm
My/Zy = -15.05 kN/sqm

Deff = 217 mm
Beff = 1200 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 10 of 360

SPu = 127.17 kN/sqm


Mu = SPu X B X Loff X Loff / 2
= 12.21 kNm
Ast Rqd (BM) = 648 sqmm
Ast Prv = 7 - #19 @ 200
= 2006 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 15
Combination
Critical Load Combination = [19] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 5:
WINDLOAD+X) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 170.31 kN
Mux = -2.5 kNm
Muy = -15 kNm
P/A = 101.38 kN/sqm
Mx/Zx = -6.39 kN/sqm
My/Zy = -44.65 kN/sqm

Deff = 201 mm
Leff = 1400 mm
SPu = 146.03 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 16.35 kNm
Ast Rqd (BM) = 756 sqmm
Ast Prv = 8 - #19 @ 200
= 2292 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 144.94 kN
Mux = 16.03 kNm
Muy = -5.06 kNm
P/A = 86.27 kN/sqm
Mx/Zx = 40.89 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 11 of 360

My/Zy = -15.05 kN/sqm

Deff = 217 mm
Beff = 1200 mm
SPu = 127.17 kN/sqm
Vu = SPu X (Loff - d) X B
= 27.93 kN
Vc = 245.31 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 15
Combination
Critical Load Combination = [19] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
5: WINDLOAD+X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 170.31 kN
Mux = -2.5 kNm
Muy = -15 kNm
P/A = 101.38 kN/sqm
Mx/Zx = -6.39 kN/sqm
My/Zy = -44.65 kN/sqm

Deff = 201 mm
Leff = 1400 mm
SPu = 146.03 kN/sqm
Vu = SPu X (Boff - d) X L
= 40.68 kN
Vc = 226.53 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 18


Combination
Critical Load Combination = [22] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 8:
WINDLOAD-Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 172.59 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 12 of 360

Mux = -8.38 kNm


Muy = -6.9 kNm
P/A = 102.73 kN/sqm
Mx/Zx = -21.37 kN/sqm
My/Zy = -20.53 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 102.73 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 121.97 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 18
Combination
Critical Load Combination = [22] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
8: WINDLOAD-Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 172.59 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 1.68 sqm
A1 > Base Area
Thus, A1 = 1.68
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 2.6458
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC3
Column No : C3 ( 600mm X 400mm)

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 13 of 360

Analysis No : 11

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1400mm X 1200mm X 300mm
Effective Self Weight = 12.60 KN

Offset Along L (Loff) = 400 mm


Offset Along B (Boff) = 400 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 23
Combination
Critical Load Combination = [12] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pcomb = 126.02 kN
P = Pcomb + Effective Self Weight x 1.2
P = 141.14 kN
Mx = -4.89 kNm
My = -21.09 kNm
P/A = 84.01 kN/sqm
Mx/Zx = -12.47 kN/sqm
My/Zy = -62.78 kN/sqm
Maximum Soil Pressure = 159.26 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 14 of 360

Check For Minimum Soil Pressure:


Critical Analysis Load = 23
Combination
Critical Load Combination = [12] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1:
SEISMICLOAD+X)
Pcomb = 126.02 kN
P = Pcomb + Effective Self Weight x 1.2
P = 141.14 kN
Mx = -4.89 kNm
My = -4.89 kNm
P/A = 84.01 kN/sqm
Mx/Zx = -12.47 kN/sqm
My/Zy = -62.78 kN/sqm
Minimum Soil Pressure = 8.76 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 22
Combination
Critical Load Combination = [26] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 136.8 kN
Mux = -17.74 kNm
Muy = -5.48 kNm
P/A = 81.43 kN/sqm
Mx/Zx = -45.26 kN/sqm
My/Zy = -16.3 kN/sqm

Deff = 217 mm
Beff = 1200 mm
SPu = 126.69 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 12.16 kNm
Ast Rqd (BM) = 648 sqmm
Ast Prv = 7 - #19 @ 200
= 2006 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 15 of 360

Critical Analysis Load = 23


Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 126.02 kN
Mux = -4.89 kNm
Muy = -21.09 kNm
P/A = 75.01 kN/sqm
Mx/Zx = -12.47 kN/sqm
My/Zy = -62.78 kN/sqm

Deff = 201 mm
Leff = 1400 mm
SPu = 137.79 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 15.43 kNm
Ast Rqd (BM) = 756 sqmm
Ast Prv = 8 - #19 @ 200
= 2292 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 22
Combination
Critical Load Combination = [26] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 136.8 kN
Mux = -17.74 kNm
Muy = -5.48 kNm
P/A = 81.43 kN/sqm
Mx/Zx = -45.26 kN/sqm
My/Zy = -16.3 kN/sqm

Deff = 217 mm
Beff = 1200 mm
SPu = 126.69 kN/sqm
Vu = SPu X (Loff - d) X B
= 27.82 kN
Vc = 245.31 kN
Vu < Vc

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 16 of 360

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1:
SEISMICLOAD+X)
Pu = 126.02 kN
Mux = -4.89 kNm
Muy = -21.09 kNm
P/A = 75.01 kN/sqm
Mx/Zx = -12.47 kN/sqm
My/Zy = -62.78 kN/sqm

Deff = 201 mm
Leff = 1400 mm
SPu = 137.79 kN/sqm
Vu = SPu X (Boff - d) X L
= 38.39 kN
Vc = 226.53 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 151.9 kN
Mux = -3.93 kNm
Muy = -7.01 kNm
P/A = 90.42 kN/sqm
Mx/Zx = -10.03 kN/sqm
My/Zy = -20.86 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 17 of 360

= 90.42 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 107.35 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 151.9 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 1.68 sqm
A1 > Base Area
Thus, A1 = 1.68
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 2.6458
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC4
Column No : C4 ( 600mm X 400mm)
Analysis No : 18

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 18 of 360

Permissible SBC Increase for = 0 %


Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1400mm X 1200mm X 300mm
Effective Self Weight = 12.60 KN

Offset Along L (Loff) = 400 mm


Offset Along B (Boff) = 400 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 22
Combination
Critical Load Combination = [11] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pcomb = 131.95 kN
P = Pcomb + Effective Self Weight x 1.2
P = 147.07 kN
Mx = -31.4 kNm
My = 0.97 kNm
P/A = 87.54 kN/sqm
Mx/Zx = -80.1 kN/sqm
My/Zy = 2.89 kN/sqm
Maximum Soil Pressure = 170.53 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 22
Combination
Critical Load Combination = [11] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
8: WINDLOAD-Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 131.95 kN
P = Pcomb + Effective Self Weight x 1.2

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 19 of 360

P = 147.07 kN
Mx = -31.4 kNm
My = -31.4 kNm
P/A = 87.54 kN/sqm
Mx/Zx = -80.1 kN/sqm
My/Zy = 2.89 kN/sqm
Minimum Soil Pressure = 4.56 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 22
Combination
Critical Load Combination = [26] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 131.95 kN
Mux = -31.4 kNm
Muy = 0.97 kNm
P/A = 78.54 kN/sqm
Mx/Zx = -80.1 kN/sqm
My/Zy = 2.89 kN/sqm

Deff = 217 mm
Beff = 1200 mm
SPu = 158.64 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 15.23 kNm
Ast Rqd (BM) = 648 sqmm
Ast Prv = 7 - #19 @ 200
= 2006 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 124.24 kN
Mux = -13.11 kNm
Muy = 13.7 kNm
P/A = 73.95 kN/sqm
Mx/Zx = -33.44 kN/sqm
My/Zy = 40.78 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 20 of 360

Deff = 201 mm
Leff = 1400 mm
SPu = 114.73 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 12.85 kNm
Ast Rqd (BM) = 756 sqmm
Ast Prv = 8 - #19 @ 200
= 2292 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 22
Combination
Critical Load Combination = [26] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 131.95 kN
Mux = -31.4 kNm
Muy = 0.97 kNm
P/A = 78.54 kN/sqm
Mx/Zx = -80.1 kN/sqm
My/Zy = 2.89 kN/sqm

Deff = 217 mm
Beff = 1200 mm
SPu = 158.64 kN/sqm
Vu = SPu X (Loff - d) X B
= 34.84 kN
Vc = 245.31 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 21 of 360

SEISMICLOAD-X)
Pu = 124.24 kN
Mux = -13.11 kNm
Muy = 13.7 kNm
P/A = 73.95 kN/sqm
Mx/Zx = -33.44 kN/sqm
My/Zy = 40.78 kN/sqm

Deff = 201 mm
Leff = 1400 mm
SPu = 114.73 kN/sqm
Vu = SPu X (Boff - d) X L
= 31.96 kN
Vc = 226.53 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 145.14 kN
Mux = -15.41 kNm
Muy = 0.68 kNm
P/A = 86.39 kN/sqm
Mx/Zx = -39.31 kN/sqm
My/Zy = 2.02 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 86.39 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 102.57 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 22 of 360

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 145.14 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 1.68 sqm
A1 > Base Area
Thus, A1 = 1.68
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 2.6458
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC5
Column No : C5 ( 600mm X 400mm)
Analysis No : 21

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1600mm X 1400mm X 300mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 23 of 360

Effective Self Weight = 16.80 KN

Offset Along L (Loff) = 500 mm


Offset Along B (Boff) = 500 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 18
Combination
Critical Load Combination = [7] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 8:
WINDLOAD-Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pcomb = 153.41 kN
P = Pcomb + Effective Self Weight x 1.2
P = 173.57 kN
Mx = -36.06 kNm
My = 0.49 kNm
P/A = 77.49 kN/sqm
Mx/Zx = -60.37 kN/sqm
My/Zy = 0.93 kN/sqm
Maximum Soil Pressure = 138.78 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 22
Combination
Critical Load Combination = [11] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
8: WINDLOAD-Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 139.26 kN
P = Pcomb + Effective Self Weight x 1.2
P = 159.42 kN
Mx = -38.73 kNm
My = -38.73 kNm
P/A = 71.17 kN/sqm
Mx/Zx = -64.84 kN/sqm
My/Zy = 0.87 kN/sqm
Minimum Soil Pressure = 5.46 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 24 of 360

Critical Analysis Load = 18


Combination
Critical Load Combination = [22] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 8:
WINDLOAD-Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 153.41 kN
Mux = -36.06 kNm
Muy = 0.49 kNm
P/A = 68.49 kN/sqm
Mx/Zx = -60.37 kN/sqm
My/Zy = 0.93 kN/sqm

Deff = 217 mm
Beff = 1400 mm
SPu = 128.85 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 22.55 kNm
Ast Rqd (BM) = 756 sqmm
Ast Prv = 8 - #19 @ 200
= 2292 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 131.48 kN
Mux = -18.46 kNm
Muy = -13.25 kNm
P/A = 58.7 kN/sqm
Mx/Zx = -30.9 kN/sqm
My/Zy = -25.36 kN/sqm

Deff = 201 mm
Leff = 1600 mm
SPu = 84.05 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 16.81 kNm
Ast Rqd (BM) = 864 sqmm
Ast Prv = 9 - #19 @ 200
= 2579 sqmm
Distributed Across Total Length

Design For Shear:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 25 of 360

One Way Shear Along L:


Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 18
Combination
Critical Load Combination = [22] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 8:
WINDLOAD-Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 153.41 kN
Mux = -36.06 kNm
Muy = 0.49 kNm
P/A = 68.49 kN/sqm
Mx/Zx = -60.37 kN/sqm
My/Zy = 0.93 kN/sqm

Deff = 217 mm
Beff = 1400 mm
SPu = 128.85 kN/sqm
Vu = SPu X (Loff - d) X B
= 51.05 kN
Vc = 282.01 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1:
SEISMICLOAD+X)
Pu = 131.48 kN
Mux = -18.46 kNm
Muy = -13.25 kNm
P/A = 58.7 kN/sqm
Mx/Zx = -30.9 kN/sqm
My/Zy = -25.36 kN/sqm

Deff = 201 mm
Leff = 1600 mm
SPu = 84.05 kN/sqm
Vu = SPu X (Boff - d) X L
= 40.21 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 26 of 360

Vc = 263.48 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 18


Combination
Critical Load Combination = [22] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 8:
WINDLOAD-Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 153.41 kN
Mux = -36.06 kNm
Muy = 0.49 kNm
P/A = 68.49 kN/sqm
Mx/Zx = -60.37 kN/sqm
My/Zy = 0.93 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 68.49 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 119.67 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 18
Combination
Critical Load Combination = [22] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
8: WINDLOAD-Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 153.41 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 2.24 sqm
A1 > Base Area
Thus, A1 = 2.24

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 27 of 360

Modification Factor = SquareRoot(A1/A2) < = 2


SquareRoot(A1/A2) = 3.0551
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC6
Column No : C6 ( 600mm X 400mm)
Analysis No : 24

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1600mm X 1400mm X 300mm
Effective Self Weight = 16.80 KN

Offset Along L (Loff) = 500 mm


Offset Along B (Boff) = 500 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 18
Combination
Critical Load Combination = [7] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 8:
WINDLOAD-Z) +1.6 (LOAD 11: ROOFLIVELOAD)

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 28 of 360

Pcomb = 156.26 kN
P = Pcomb + Effective Self Weight x 1.2
P = 176.42 kN
Mx = -37.48 kNm
My = 0.5 kNm
P/A = 78.76 kN/sqm
Mx/Zx = -62.74 kN/sqm
My/Zy = 0.96 kN/sqm
Maximum Soil Pressure = 142.46 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 22
Combination
Critical Load Combination = [11] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
8: WINDLOAD-Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 141.74 kN
P = Pcomb + Effective Self Weight x 1.2
P = 161.9 kN
Mx = -40.12 kNm
My = -40.12 kNm
P/A = 72.28 kN/sqm
Mx/Zx = -67.16 kN/sqm
My/Zy = 0.88 kN/sqm
Minimum Soil Pressure = 4.23 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 18
Combination
Critical Load Combination = [22] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 8:
WINDLOAD-Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 156.26 kN
Mux = -37.48 kNm
Muy = 0.5 kNm
P/A = 69.76 kN/sqm
Mx/Zx = -62.74 kN/sqm
My/Zy = 0.96 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 29 of 360

Deff = 217 mm
Beff = 1400 mm
SPu = 132.5 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 23.19 kNm
Ast Rqd (BM) = 756 sqmm
Ast Prv = 8 - #19 @ 200
= 2292 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 143.5 kN
Mux = -19.18 kNm
Muy = 13.84 kNm
P/A = 64.06 kN/sqm
Mx/Zx = -32.1 kN/sqm
My/Zy = 26.47 kN/sqm

Deff = 201 mm
Leff = 1600 mm
SPu = 90.54 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 18.11 kNm
Ast Rqd (BM) = 864 sqmm
Ast Prv = 9 - #19 @ 200
= 2579 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 18
Combination
Critical Load Combination = [22] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 8:
WINDLOAD-Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 156.26 kN
Mux = -37.48 kNm
Muy = 0.5 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 30 of 360

P/A = 69.76 kN/sqm


Mx/Zx = -62.74 kN/sqm
My/Zy = 0.96 kN/sqm

Deff = 217 mm
Beff = 1400 mm
SPu = 132.5 kN/sqm
Vu = SPu X (Loff - d) X B
= 52.49 kN
Vc = 282.01 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pu = 143.5 kN
Mux = -19.18 kNm
Muy = 13.84 kNm
P/A = 64.06 kN/sqm
Mx/Zx = -32.1 kN/sqm
My/Zy = 26.47 kN/sqm

Deff = 201 mm
Leff = 1600 mm
SPu = 90.54 kN/sqm
Vu = SPu X (Boff - d) X L
= 43.31 kN
Vc = 263.48 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 17


Combination
Critical Load Combination = [21] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 7:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 31 of 360

WINDLOAD-X) +1.6 (LOAD 11: ROOFLIVELOAD)


Pu = 156.75 kN
Mux = -28.39 kNm
Muy = 2.64 kNm
P/A = 69.98 kN/sqm
Mx/Zx = -47.53 kN/sqm
My/Zy = 5.05 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 69.98 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 122.27 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 17
Combination
Critical Load Combination = [21] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
7: WINDLOAD-X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 156.75 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 2.24 sqm
A1 > Base Area
Thus, A1 = 2.24
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.0551
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 32 of 360

Footing No : FC7
Column No : C7 ( 600mm X 400mm)
Analysis No : 27

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1400mm X 1200mm X 300mm
Effective Self Weight = 12.60 KN

Offset Along L (Loff) = 400 mm


Offset Along B (Boff) = 400 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 26
Combination
Critical Load Combination = [15] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4: SEISMICLOAD-Z)
Pcomb = 161.00 kN
P = Pcomb + Effective Self Weight x 1.2
P = 176.12 kN
Mx = -20.99 kNm
My = -0.09 kNm
P/A = 104.83 kN/sqm
Mx/Zx = -53.54 kN/sqm
My/Zy = -0.28 kN/sqm
Maximum Soil Pressure = 158.66 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 33 of 360

Allowable Soil Pressure = 1 X 172.2 kN/sqm


= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 26
Combination
Critical Load Combination = [15] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4:
SEISMICLOAD-Z)
Pcomb = 161.00 kN
P = Pcomb + Effective Self Weight x 1.2
P = 176.12 kN
Mx = -20.99 kNm
My = -20.99 kNm
P/A = 104.83 kN/sqm
Mx/Zx = -53.54 kN/sqm
My/Zy = -0.28 kN/sqm
Minimum Soil Pressure = 51.01 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 26
Combination
Critical Load Combination = [30] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4: SEISMICLOAD-Z)
Pu = 161 kN
Mux = -20.99 kNm
Muy = -0.09 kNm
P/A = 95.83 kN/sqm
Mx/Zx = -53.54 kN/sqm
My/Zy = -0.28 kN/sqm

Deff = 217 mm
Beff = 1200 mm
SPu = 149.38 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 14.34 kNm
Ast Rqd (BM) = 648 sqmm
Ast Prv = 7 - #19 @ 200
= 2006 sqmm
Distributed Across Total Width

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 34 of 360

Bottom Reinforcement Along B:


Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 158.36 kN
Mux = -1.62 kNm
Muy = 12.63 kNm
P/A = 94.26 kN/sqm
Mx/Zx = -4.13 kN/sqm
My/Zy = 37.6 kN/sqm

Deff = 201 mm
Leff = 1400 mm
SPu = 131.86 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 14.77 kNm
Ast Rqd (BM) = 756 sqmm
Ast Prv = 8 - #19 @ 200
= 2292 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 26
Combination
Critical Load Combination = [30] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4: SEISMICLOAD-Z)
Pu = 161 kN
Mux = -20.99 kNm
Muy = -0.09 kNm
P/A = 95.83 kN/sqm
Mx/Zx = -53.54 kN/sqm
My/Zy = -0.28 kN/sqm

Deff = 217 mm
Beff = 1200 mm
SPu = 149.38 kN/sqm
Vu = SPu X (Loff - d) X B
= 32.80 kN
Vc = 245.31 kN
Vu < Vc

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 35 of 360

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pu = 158.36 kN
Mux = -1.62 kNm
Muy = 12.63 kNm
P/A = 94.26 kN/sqm
Mx/Zx = -4.13 kN/sqm
My/Zy = 37.6 kN/sqm

Deff = 201 mm
Leff = 1400 mm
SPu = 131.86 kN/sqm
Vu = SPu X (Boff - d) X L
= 36.74 kN
Vc = 226.53 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 184.63 kN
Mux = -3.11 kNm
Muy = -0.04 kNm
P/A = 109.9 kN/sqm
Mx/Zx = -7.93 kN/sqm
My/Zy = -0.12 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 36 of 360

= 109.9 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 130.48 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 184.63 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 1.68 sqm
A1 > Base Area
Thus, A1 = 1.68
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 2.6458
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC8
Column No : C8 ( 600mm X 400mm)
Analysis No : 33

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 37 of 360

Permissible SBC Increase for = 0 %


Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2200mm X 2000mm X 300mm
Effective Self Weight = 33.00 KN

Offset Along L (Loff) = 800 mm


Offset Along B (Boff) = 800 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pcomb = 153.00 kN
P = Pcomb + Effective Self Weight x 1.2
P = 192.60 kN
Mx = 62.26 kNm
My = 0.14 kNm
P/A = 43.77 kN/sqm
Mx/Zx = 38.59 kN/sqm
My/Zy = 0.09 kN/sqm
Maximum Soil Pressure = 82.45 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
6: WIND LOAD+Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 153.00 kN
P = Pcomb + Effective Self Weight x 1.2

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 38 of 360

P = 192.6 kN
Mx = 62.26 kNm
My = 62.26 kNm
P/A = 43.77 kN/sqm
Mx/Zx = 38.59 kN/sqm
My/Zy = 0.09 kN/sqm
Minimum Soil Pressure = 5.09 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 153 kN
Mux = 62.26 kNm
Muy = 0.14 kNm
P/A = 34.77 kN/sqm
Mx/Zx = 38.59 kN/sqm
My/Zy = 0.09 kN/sqm

Deff = 217 mm
Beff = 2000 mm
SPu = 73.36 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 46.95 kNm
Ast Rqd (BM) = 1080 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 142.28 kN
Mux = -11.13 kNm
Muy = -8.92 kNm
P/A = 32.34 kN/sqm
Mx/Zx = -6.9 kN/sqm
My/Zy = -6.08 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 39 of 360

Deff = 201 mm
Leff = 2200 mm
SPu = 38.42 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 27.04 kNm
Ast Rqd (BM) = 1188 sqmm
Ast Prv = 12 - #19 @ 200
= 3438 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 153 kN
Mux = 62.26 kNm
Muy = 0.14 kNm
P/A = 34.77 kN/sqm
Mx/Zx = 38.59 kN/sqm
My/Zy = 0.09 kN/sqm

Deff = 217 mm
Beff = 2000 mm
SPu = 73.36 kN/sqm
Vu = SPu X (Loff - d) X B
= 85.54 kN
Vc = 400.78 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 40 of 360

SEISMICLOAD+X)
Pu = 142.28 kN
Mux = -11.13 kNm
Muy = -8.92 kNm
P/A = 32.34 kN/sqm
Mx/Zx = -6.9 kN/sqm
My/Zy = -6.08 kN/sqm

Deff = 201 mm
Leff = 2200 mm
SPu = 38.42 kN/sqm
Vu = SPu X (Boff - d) X L
= 50.62 kN
Vc = 374.74 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 163.78 kN
Mux = -13.69 kNm
Muy = -0.04 kNm
P/A = 37.22 kN/sqm
Mx/Zx = -8.49 kN/sqm
My/Zy = -0.03 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 37.22 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 145.44 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 41 of 360

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 163.78 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 4.4 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC9
Column No : C9 ( 600mm X 400mm)
Analysis No : 38

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 3600mm X 3400mm X 300mm
Effective Self Weight = 91.80 KN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 42 of 360

Offset Along L (Loff) = 1500 mm


Offset Along B (Boff) = 1500 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pcomb = 144.91 kN
P = Pcomb + Effective Self Weight x 1.2
P = 255.07 kN
Mx = 137.16 kNm
My = 1.69 kNm
P/A = 20.84 kN/sqm
Mx/Zx = 18.68 kN/sqm
My/Zy = 0.24 kN/sqm
Maximum Soil Pressure = 39.76 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
6: WIND LOAD+Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 144.91 kN
P = Pcomb + Effective Self Weight x 1.2
P = 255.07 kN
Mx = 137.16 kNm
My = 137.16 kNm
P/A = 20.84 kN/sqm
Mx/Zx = 18.68 kN/sqm
My/Zy = 0.24 kN/sqm
Minimum Soil Pressure = 1.92 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 20

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 43 of 360

Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 144.91 kN
Mux = 137.16 kNm
Muy = 1.69 kNm
P/A = 11.84 kN/sqm
Mx/Zx = 18.68 kN/sqm
My/Zy = 0.24 kN/sqm

Deff = 217 mm
Beff = 3400 mm
SPu = 30.52 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 116.72 kNm
Ast Rqd (BM) = 1836 sqmm
Ast Prv = 18 - #19 @ 200
= 5157 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 17
Combination
Critical Load Combination = [21] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 7:
WINDLOAD-X) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 168.46 kN
Mux = -20.22 kNm
Muy = 3.41 kNm
P/A = 13.76 kN/sqm
Mx/Zx = -2.75 kN/sqm
My/Zy = 0.49 kN/sqm

Deff = 201 mm
Leff = 3600 mm
SPu = 14.26 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 57.73 kNm
Ast Rqd (BM) = 1944 sqmm
Ast Prv = 19 - #19 @ 200
= 5444 sqmm
Distributed Across Total Length

Design For Shear:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 44 of 360

One Way Shear Along L:


Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 144.91 kN
Mux = 137.16 kNm
Muy = 1.69 kNm
P/A = 11.84 kN/sqm
Mx/Zx = 18.68 kN/sqm
My/Zy = 0.24 kN/sqm

Deff = 217 mm
Beff = 3400 mm
SPu = 30.52 kN/sqm
Vu = SPu X (Loff - d) X B
= 133.11 kN
Vc = 677.92 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 17
Combination
Critical Load Combination = [21] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
7: WINDLOAD-X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 168.46 kN
Mux = -20.22 kNm
Muy = 3.41 kNm
P/A = 13.76 kN/sqm
Mx/Zx = -2.75 kN/sqm
My/Zy = 0.49 kN/sqm

Deff = 201 mm
Leff = 3600 mm
SPu = 14.26 kN/sqm
Vu = SPu X (Boff - d) X L

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 45 of 360

= 66.66 kN
Vc = 634.12 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 18


Combination
Critical Load Combination = [22] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 8:
WINDLOAD-Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 171.08 kN
Mux = -45.14 kNm
Muy = 1.7 kNm
P/A = 13.98 kN/sqm
Mx/Zx = -6.15 kN/sqm
My/Zy = 0.25 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 13.98 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 164.19 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 18
Combination
Critical Load Combination = [22] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
8: WINDLOAD-Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 171.08 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 12.24 sqm
A1 < Base Area

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 46 of 360

Modification Factor = SquareRoot(A1/A2) < = 2


SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC10
Column No : C10 ( 600mm X 400mm)
Analysis No : 43

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 3600mm X 3400mm X 300mm
Effective Self Weight = 91.80 KN

Offset Along L (Loff) = 1500 mm


Offset Along B (Boff) = 1500 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 47 of 360

(LOAD 11: ROOFLIVELOAD)


Pcomb = 147.39 kN
P = Pcomb + Effective Self Weight x 1.2
P = 257.55 kN
Mx = 143.05 kNm
My = -2.03 kNm
P/A = 21.04 kN/sqm
Mx/Zx = 19.48 kN/sqm
My/Zy = -0.29 kN/sqm
Maximum Soil Pressure = 40.81 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
6: WIND LOAD+Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 147.39 kN
P = Pcomb + Effective Self Weight x 1.2
P = 257.55 kN
Mx = 143.05 kNm
My = 143.05 kNm
P/A = 21.04 kN/sqm
Mx/Zx = 19.48 kN/sqm
My/Zy = -0.29 kN/sqm
Minimum Soil Pressure = 1.27 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 147.39 kN
Mux = 143.05 kNm
Muy = -2.03 kNm
P/A = 12.04 kN/sqm
Mx/Zx = 19.48 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 48 of 360

My/Zy = -0.29 kN/sqm

Deff = 217 mm
Beff = 3400 mm
SPu = 31.52 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 120.57 kNm
Ast Rqd (BM) = 1836 sqmm
Ast Prv = 18 - #19 @ 200
= 5157 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 15
Combination
Critical Load Combination = [19] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 5:
WINDLOAD+X) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 172.39 kN
Mux = -20.77 kNm
Muy = -4.76 kNm
P/A = 14.08 kN/sqm
Mx/Zx = -2.83 kN/sqm
My/Zy = -0.69 kN/sqm

Deff = 201 mm
Leff = 3600 mm
SPu = 14.77 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 59.82 kNm
Ast Rqd (BM) = 1944 sqmm
Ast Prv = 19 - #19 @ 200
= 5444 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 147.39 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 49 of 360

Mux = 143.05 kNm


Muy = -2.03 kNm
P/A = 12.04 kN/sqm
Mx/Zx = 19.48 kN/sqm
My/Zy = -0.29 kN/sqm

Deff = 217 mm
Beff = 3400 mm
SPu = 31.52 kN/sqm
Vu = SPu X (Loff - d) X B
= 137.50 kN
Vc = 677.92 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 15
Combination
Critical Load Combination = [19] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
5: WINDLOAD+X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 172.39 kN
Mux = -20.77 kNm
Muy = -4.76 kNm
P/A = 14.08 kN/sqm
Mx/Zx = -2.83 kN/sqm
My/Zy = -0.69 kN/sqm

Deff = 201 mm
Leff = 3600 mm
SPu = 14.77 kN/sqm
Vu = SPu X (Boff - d) X L
= 69.07 kN
Vc = 634.12 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 50 of 360

Critical Analysis Load = 18


Combination
Critical Load Combination = [22] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 8:
WINDLOAD-Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 174.8 kN
Mux = -48.19 kNm
Muy = -2.01 kNm
P/A = 14.28 kN/sqm
Mx/Zx = -6.56 kN/sqm
My/Zy = -0.29 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 14.28 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 167.77 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 18
Combination
Critical Load Combination = [22] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
8: WINDLOAD-Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 174.8 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 12.24 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 51 of 360

Design Code : ACI 318M - 2011


Footing No : FC11
Column No : C11 ( 600mm X 400mm)
Analysis No : 48

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2200mm X 2000mm X 300mm
Effective Self Weight = 33.00 KN

Offset Along L (Loff) = 800 mm


Offset Along B (Boff) = 800 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pcomb = 159.90 kN
P = Pcomb + Effective Self Weight x 1.2
P = 199.50 kN
Mx = 71.76 kNm
My = 0.62 kNm
P/A = 45.34 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 52 of 360

Mx/Zx = 44.48 kN/sqm


My/Zy = 0.43 kN/sqm
Maximum Soil Pressure = 90.25 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
6: WIND LOAD+Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 159.90 kN
P = Pcomb + Effective Self Weight x 1.2
P = 199.5 kN
Mx = 71.76 kNm
My = 71.76 kNm
P/A = 45.34 kN/sqm
Mx/Zx = 44.48 kN/sqm
My/Zy = 0.43 kN/sqm
Minimum Soil Pressure = 0.43 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 159.9 kN
Mux = 71.76 kNm
Muy = 0.62 kNm
P/A = 36.34 kN/sqm
Mx/Zx = 44.48 kN/sqm
My/Zy = 0.43 kN/sqm

Deff = 217 mm
Beff = 2000 mm
SPu = 80.82 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 51.73 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 53 of 360

Ast Rqd (BM) = 1080 sqmm


Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 158.61 kN
Mux = -11.85 kNm
Muy = 10.95 kNm
P/A = 36.05 kN/sqm
Mx/Zx = -7.35 kN/sqm
My/Zy = 7.46 kN/sqm

Deff = 201 mm
Leff = 2200 mm
SPu = 43.51 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 30.63 kNm
Ast Rqd (BM) = 1188 sqmm
Ast Prv = 12 - #19 @ 200
= 3438 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 159.9 kN
Mux = 71.76 kNm
Muy = 0.62 kNm
P/A = 36.34 kN/sqm
Mx/Zx = 44.48 kN/sqm
My/Zy = 0.43 kN/sqm

Deff = 217 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 54 of 360

Beff = 2000 mm
SPu = 80.82 kN/sqm
Vu = SPu X (Loff - d) X B
= 94.24 kN
Vc = 400.78 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pu = 158.61 kN
Mux = -11.85 kNm
Muy = 10.95 kNm
P/A = 36.05 kN/sqm
Mx/Zx = -7.35 kN/sqm
My/Zy = 7.46 kN/sqm

Deff = 201 mm
Leff = 2200 mm
SPu = 43.51 kN/sqm
Vu = SPu X (Boff - d) X L
= 57.34 kN
Vc = 374.74 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 16


Combination
Critical Load Combination = [20] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 6:
WIND LOAD+Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 169.88 kN
Mux = 25.09 kNm
Muy = 0.6 kNm
P/A = 38.61 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 55 of 360

Mx/Zx = 15.55 kN/sqm


My/Zy = 0.41 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 38.61 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 150.86 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 16
Combination
Critical Load Combination = [20] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
6: WIND LOAD+Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 169.88 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 4.4 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC12
Column No : C12 ( 600mm X 400mm)
Analysis No : 53

Concrete Grade : C25


Steel Grade : Fy410

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 56 of 360

Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1600mm X 1400mm X 300mm
Effective Self Weight = 16.80 KN

Offset Along L (Loff) = 500 mm


Offset Along B (Boff) = 500 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pcomb = 135.29 kN
P = Pcomb + Effective Self Weight x 1.2
P = 155.45 kN
Mx = 38.61 kNm
My = 1.51 kNm
P/A = 69.4 kN/sqm
Mx/Zx = 64.63 kN/sqm
My/Zy = 2.89 kN/sqm
Maximum Soil Pressure = 136.92 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 20

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 57 of 360

Combination
Critical Load Combination = [9] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
6: WIND LOAD+Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 135.29 kN
P = Pcomb + Effective Self Weight x 1.2
P = 155.45 kN
Mx = 38.61 kNm
My = 38.61 kNm
P/A = 69.4 kN/sqm
Mx/Zx = 64.63 kN/sqm
My/Zy = 2.89 kN/sqm
Minimum Soil Pressure = 1.88 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 135.29 kN
Mux = 38.61 kNm
Muy = 1.51 kNm
P/A = 60.4 kN/sqm
Mx/Zx = 64.63 kN/sqm
My/Zy = 2.89 kN/sqm

Deff = 217 mm
Beff = 1400 mm
SPu = 125.03 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 21.88 kNm
Ast Rqd (BM) = 756 sqmm
Ast Prv = 8 - #19 @ 200
= 2292 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 25
Combination

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 58 of 360

Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:


LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 129.09 kN
Mux = 3.95 kNm
Muy = 11.03 kNm
P/A = 57.63 kN/sqm
Mx/Zx = 6.62 kN/sqm
My/Zy = 21.11 kN/sqm

Deff = 201 mm
Leff = 1600 mm
SPu = 78.74 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 15.75 kNm
Ast Rqd (BM) = 864 sqmm
Ast Prv = 9 - #19 @ 200
= 2579 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 135.29 kN
Mux = 38.61 kNm
Muy = 1.51 kNm
P/A = 60.4 kN/sqm
Mx/Zx = 64.63 kN/sqm
My/Zy = 2.89 kN/sqm

Deff = 217 mm
Beff = 1400 mm
SPu = 125.03 kN/sqm
Vu = SPu X (Loff - d) X B
= 49.54 kN
Vc = 282.01 kN
Vu < Vc

One Way Shear Along B:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 59 of 360

Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pu = 129.09 kN
Mux = 3.95 kNm
Muy = 11.03 kNm
P/A = 57.63 kN/sqm
Mx/Zx = 6.62 kN/sqm
My/Zy = 21.11 kN/sqm

Deff = 201 mm
Leff = 1600 mm
SPu = 78.74 kN/sqm
Vu = SPu X (Boff - d) X L
= 37.67 kN
Vc = 263.48 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 150.52 kN
Mux = 4.53 kNm
Muy = 1.83 kNm
P/A = 67.19 kN/sqm
Mx/Zx = 7.59 kN/sqm
My/Zy = 3.5 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 67.19 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 60 of 360

(Cy + d)]}
= 117.41 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 150.52 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 2.24 sqm
A1 > Base Area
Thus, A1 = 2.24
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.0551
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC13
Column No : C13 ( 600mm X 400mm)
Analysis No : 59

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 61 of 360

Live Load Reduction = 0 %


Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2000mm X 1800mm X 300mm
Effective Self Weight = 27.00 KN

Offset Along L (Loff) = 700 mm


Offset Along B (Boff) = 700 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 22
Combination
Critical Load Combination = [11] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pcomb = 155.58 kN
P = Pcomb + Effective Self Weight x 1.2
P = 187.98 kN
Mx = -60.35 kNm
My = -0.1 kNm
P/A = 52.22 kN/sqm
Mx/Zx = -50.29 kN/sqm
My/Zy = -0.09 kN/sqm
Maximum Soil Pressure = 102.61 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 22
Combination
Critical Load Combination = [11] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
8: WINDLOAD-Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 155.58 kN
P = Pcomb + Effective Self Weight x 1.2
P = 187.98 kN
Mx = -60.35 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 62 of 360

My = -60.35 kNm
P/A = 52.22 kN/sqm
Mx/Zx = -50.29 kN/sqm
My/Zy = -0.09 kN/sqm
Minimum Soil Pressure = 1.83 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 22
Combination
Critical Load Combination = [26] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 155.58 kN
Mux = -60.35 kNm
Muy = -0.1 kNm
P/A = 43.22 kN/sqm
Mx/Zx = -50.29 kN/sqm
My/Zy = -0.09 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 93.51 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 41.24 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 164.8 kN
Mux = -24.87 kNm
Muy = -8.62 kNm
P/A = 45.78 kN/sqm
Mx/Zx = -20.73 kN/sqm
My/Zy = -7.98 kN/sqm

Deff = 201 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 63 of 360

Leff = 2000 mm
SPu = 53.75 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 26.34 kNm
Ast Rqd (BM) = 1080 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 22
Combination
Critical Load Combination = [26] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 155.58 kN
Mux = -60.35 kNm
Muy = -0.1 kNm
P/A = 43.22 kN/sqm
Mx/Zx = -50.29 kN/sqm
My/Zy = -0.09 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 93.51 kN/sqm
Vu = SPu X (Loff - d) X B
= 81.30 kN
Vc = 361.19 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1:
SEISMICLOAD+X)
Pu = 164.8 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 64 of 360

Mux = -24.87 kNm


Muy = -8.62 kNm
P/A = 45.78 kN/sqm
Mx/Zx = -20.73 kN/sqm
My/Zy = -7.98 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 53.75 kN/sqm
Vu = SPu X (Boff - d) X L
= 53.65 kN
Vc = 337.66 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 15


Combination
Critical Load Combination = [19] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 5:
WINDLOAD+X) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 175.32 kN
Mux = -38.19 kNm
Muy = -1.57 kNm
P/A = 48.7 kN/sqm
Mx/Zx = -31.83 kN/sqm
My/Zy = -1.46 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 48.7 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 151.32 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 15

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 65 of 360

Combination
Critical Load Combination = [19] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
5: WINDLOAD+X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 175.32 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 3.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC14
Column No : C14 ( 600mm X 400mm)
Analysis No : 61

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 66 of 360

Footing Size (L x B x D) : 2000mm X 1800mm X 300mm


Effective Self Weight = 27.00 KN

Offset Along L (Loff) = 700 mm


Offset Along B (Boff) = 700 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 22
Combination
Critical Load Combination = [11] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pcomb = 153.90 kN
P = Pcomb + Effective Self Weight x 1.2
P = 186.30 kN
Mx = -60.99 kNm
My = 0.07 kNm
P/A = 51.75 kN/sqm
Mx/Zx = -50.83 kN/sqm
My/Zy = 0.06 kN/sqm
Maximum Soil Pressure = 102.64 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 22
Combination
Critical Load Combination = [11] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
8: WINDLOAD-Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 153.90 kN
P = Pcomb + Effective Self Weight x 1.2
P = 186.3 kN
Mx = -60.99 kNm
My = -60.99 kNm
P/A = 51.75 kN/sqm
Mx/Zx = -50.83 kN/sqm
My/Zy = 0.06 kN/sqm
Minimum Soil Pressure = 0.86 kN/sqm
> 0

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 67 of 360

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 22
Combination
Critical Load Combination = [26] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 153.9 kN
Mux = -60.99 kNm
Muy = 0.07 kNm
P/A = 42.75 kN/sqm
Mx/Zx = -50.83 kN/sqm
My/Zy = 0.06 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 93.58 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 41.27 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 17
Combination
Critical Load Combination = [21] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 7:
WINDLOAD-X) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 170.84 kN
Mux = -37.63 kNm
Muy = 1.98 kNm
P/A = 47.46 kN/sqm
Mx/Zx = -31.36 kN/sqm
My/Zy = 1.83 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 49.29 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 24.15 kNm
Ast Rqd (BM) = 1080 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 68 of 360

Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 22
Combination
Critical Load Combination = [26] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 153.9 kN
Mux = -60.99 kNm
Muy = 0.07 kNm
P/A = 42.75 kN/sqm
Mx/Zx = -50.83 kN/sqm
My/Zy = 0.06 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 93.58 kN/sqm
Vu = SPu X (Loff - d) X B
= 81.35 kN
Vc = 361.19 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 17
Combination
Critical Load Combination = [21] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
7: WINDLOAD-X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 170.84 kN
Mux = -37.63 kNm
Muy = 1.98 kNm
P/A = 47.46 kN/sqm
Mx/Zx = -31.36 kN/sqm
My/Zy = 1.83 kN/sqm

Deff = 201 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 69 of 360

Leff = 2000 mm
SPu = 49.29 kN/sqm
Vu = SPu X (Boff - d) X L
= 49.19 kN
Vc = 337.66 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 18


Combination
Critical Load Combination = [22] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 8:
WINDLOAD-Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 172.29 kN
Mux = -53.68 kNm
Muy = 0.16 kNm
P/A = 47.86 kN/sqm
Mx/Zx = -44.74 kN/sqm
My/Zy = 0.15 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 47.86 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 148.71 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 18
Combination
Critical Load Combination = [22] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
8: WINDLOAD-Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 172.29 kN
A2 = 0.24 sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 70 of 360

A1 = 2.88 sqm
Base Area = 3.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC15
Column No : C15 ( 600mm X 400mm)
Analysis No : 63

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2000mm X 1800mm X 300mm
Effective Self Weight = 27.00 KN

Offset Along L (Loff) = 700 mm


Offset Along B (Boff) = 700 mm

Check For Maximum Soil Pressure:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 71 of 360

Critical Analysis Load = 22


Combination
Critical Load Combination = [11] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pcomb = 149.95 kN
P = Pcomb + Effective Self Weight x 1.2
P = 182.35 kN
Mx = -58.84 kNm
My = 0.05 kNm
P/A = 50.65 kN/sqm
Mx/Zx = -49.03 kN/sqm
My/Zy = 0.05 kN/sqm
Maximum Soil Pressure = 99.73 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 22
Combination
Critical Load Combination = [11] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
8: WINDLOAD-Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 149.95 kN
P = Pcomb + Effective Self Weight x 1.2
P = 182.35 kN
Mx = -58.84 kNm
My = -58.84 kNm
P/A = 50.65 kN/sqm
Mx/Zx = -49.03 kN/sqm
My/Zy = 0.05 kN/sqm
Minimum Soil Pressure = 1.57 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 22
Combination
Critical Load Combination = [26] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 149.95 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 72 of 360

Mux = -58.84 kNm


Muy = 0.05 kNm
P/A = 41.65 kN/sqm
Mx/Zx = -49.03 kN/sqm
My/Zy = 0.05 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 90.68 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 39.99 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 17
Combination
Critical Load Combination = [21] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 7:
WINDLOAD-X) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 165.22 kN
Mux = -34.51 kNm
Muy = 1.99 kNm
P/A = 45.89 kN/sqm
Mx/Zx = -28.76 kN/sqm
My/Zy = 1.84 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 47.74 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 23.39 kNm
Ast Rqd (BM) = 1080 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 22
Combination

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 73 of 360

Critical Load Combination = [26] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 149.95 kN
Mux = -58.84 kNm
Muy = 0.05 kNm
P/A = 41.65 kN/sqm
Mx/Zx = -49.03 kN/sqm
My/Zy = 0.05 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 90.68 kN/sqm
Vu = SPu X (Loff - d) X B
= 78.84 kN
Vc = 361.19 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 17
Combination
Critical Load Combination = [21] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
7: WINDLOAD-X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 165.22 kN
Mux = -34.51 kNm
Muy = 1.99 kNm
P/A = 45.89 kN/sqm
Mx/Zx = -28.76 kN/sqm
My/Zy = 1.84 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 47.74 kN/sqm
Vu = SPu X (Boff - d) X L
= 47.64 kN
Vc = 337.66 kN
Vu < Vc

Design For Punching Shear:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 74 of 360

Critical Section @ d/2 from Column Face


= 104 mm

Critical Analysis Load = 18


Combination
Critical Load Combination = [22] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 8:
WINDLOAD-Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 166.81 kN
Mux = -50.61 kNm
Muy = 0.14 kNm
P/A = 46.34 kN/sqm
Mx/Zx = -42.18 kN/sqm
My/Zy = 0.13 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 46.34 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 143.98 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 18
Combination
Critical Load Combination = [22] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
8: WINDLOAD-Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 166.81 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 3.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 75 of 360

Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC16
Column No : C16 ( 600mm X 400mm)
Analysis No : 65

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2000mm X 1800mm X 300mm
Effective Self Weight = 27.00 KN

Offset Along L (Loff) = 700 mm


Offset Along B (Boff) = 700 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 22
Combination
Critical Load Combination = [11] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pcomb = 142.84 kN
P = Pcomb + Effective Self Weight x 1.2
P = 175.24 kN
Mx = -51.92 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 76 of 360

My = 0.1 kNm
P/A = 48.68 kN/sqm
Mx/Zx = -43.26 kN/sqm
My/Zy = 0.1 kN/sqm
Maximum Soil Pressure = 92.04 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 22
Combination
Critical Load Combination = [11] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
8: WINDLOAD-Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 142.84 kN
P = Pcomb + Effective Self Weight x 1.2
P = 175.24 kN
Mx = -51.92 kNm
My = -51.92 kNm
P/A = 48.68 kN/sqm
Mx/Zx = -43.26 kN/sqm
My/Zy = 0.1 kN/sqm
Minimum Soil Pressure = 5.32 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 22
Combination
Critical Load Combination = [26] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 142.84 kN
Mux = -51.92 kNm
Muy = 0.1 kNm
P/A = 39.68 kN/sqm
Mx/Zx = -43.26 kN/sqm
My/Zy = 0.1 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 82.94 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 77 of 360

Mu = SPu X B X Loff X Loff / 2


= 36.58 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 17
Combination
Critical Load Combination = [21] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 7:
WINDLOAD-X) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 155.98 kN
Mux = -27.8 kNm
Muy = 2.11 kNm
P/A = 43.33 kN/sqm
Mx/Zx = -23.17 kN/sqm
My/Zy = 1.96 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 45.28 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 22.19 kNm
Ast Rqd (BM) = 1080 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 22
Combination
Critical Load Combination = [26] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 142.84 kN
Mux = -51.92 kNm
Muy = 0.1 kNm
P/A = 39.68 kN/sqm
Mx/Zx = -43.26 kN/sqm
My/Zy = 0.1 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 78 of 360

Deff = 217 mm
Beff = 1800 mm
SPu = 82.94 kN/sqm
Vu = SPu X (Loff - d) X B
= 72.11 kN
Vc = 361.19 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 17
Combination
Critical Load Combination = [21] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
7: WINDLOAD-X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 155.98 kN
Mux = -27.8 kNm
Muy = 2.11 kNm
P/A = 43.33 kN/sqm
Mx/Zx = -23.17 kN/sqm
My/Zy = 1.96 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 45.28 kN/sqm
Vu = SPu X (Boff - d) X L
= 45.19 kN
Vc = 337.66 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 18


Combination
Critical Load Combination = [22] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 8:
WINDLOAD-Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 157.56 kN
Mux = -43.2 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 79 of 360

Muy = 0.2 kNm


P/A = 43.77 kN/sqm
Mx/Zx = -36 kN/sqm
My/Zy = 0.18 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 43.77 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 136 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 18
Combination
Critical Load Combination = [22] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
8: WINDLOAD-Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 157.56 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 3.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC17
Column No : C17 ( 600mm X 400mm)
Analysis No : 67

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 80 of 360

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1400mm X 1200mm X 300mm
Effective Self Weight = 12.60 KN

Offset Along L (Loff) = 400 mm


Offset Along B (Boff) = 400 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 21
Combination
Critical Load Combination = [10] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pcomb = 138.42 kN
P = Pcomb + Effective Self Weight x 1.2
P = 153.54 kN
Mx = -23.21 kNm
My = 2.38 kNm
P/A = 91.39 kN/sqm
Mx/Zx = -59.21 kN/sqm
My/Zy = 7.09 kN/sqm
Maximum Soil Pressure = 157.7 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 81 of 360

Check For Minimum Soil Pressure:


Critical Analysis Load = 21
Combination
Critical Load Combination = [10] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
7: WINDLOAD-X) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 138.42 kN
P = Pcomb + Effective Self Weight x 1.2
P = 153.54 kN
Mx = -23.21 kNm
My = -23.21 kNm
P/A = 91.39 kN/sqm
Mx/Zx = -59.21 kN/sqm
My/Zy = 7.09 kN/sqm
Minimum Soil Pressure = 25.09 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 17
Combination
Critical Load Combination = [21] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 7:
WINDLOAD-X) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 150.3 kN
Mux = -21.53 kNm
Muy = 1.04 kNm
P/A = 89.46 kN/sqm
Mx/Zx = -54.93 kN/sqm
My/Zy = 3.1 kN/sqm

Deff = 217 mm
Beff = 1200 mm
SPu = 144.39 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 13.86 kNm
Ast Rqd (BM) = 648 sqmm
Ast Prv = 7 - #19 @ 200
= 2006 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 25

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 82 of 360

Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 131.05 kN
Mux = -14.17 kNm
Muy = 8 kNm
P/A = 78 kN/sqm
Mx/Zx = -36.16 kN/sqm
My/Zy = 23.8 kN/sqm

Deff = 201 mm
Leff = 1400 mm
SPu = 101.81 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 11.4 kNm
Ast Rqd (BM) = 756 sqmm
Ast Prv = 8 - #19 @ 200
= 2292 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 17
Combination
Critical Load Combination = [21] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 7:
WINDLOAD-X) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 150.3 kN
Mux = -21.53 kNm
Muy = 1.04 kNm
P/A = 89.46 kN/sqm
Mx/Zx = -54.93 kN/sqm
My/Zy = 3.1 kN/sqm

Deff = 217 mm
Beff = 1200 mm
SPu = 144.39 kN/sqm
Vu = SPu X (Loff - d) X B
= 31.71 kN
Vc = 245.31 kN
Vu < Vc

One Way Shear Along B:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 83 of 360

Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pu = 131.05 kN
Mux = -14.17 kNm
Muy = 8 kNm
P/A = 78 kN/sqm
Mx/Zx = -36.16 kN/sqm
My/Zy = 23.8 kN/sqm

Deff = 201 mm
Leff = 1400 mm
SPu = 101.81 kN/sqm
Vu = SPu X (Boff - d) X L
= 28.36 kN
Vc = 226.53 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 17


Combination
Critical Load Combination = [21] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 7:
WINDLOAD-X) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 150.3 kN
Mux = -21.53 kNm
Muy = 1.04 kNm
P/A = 89.46 kN/sqm
Mx/Zx = -54.93 kN/sqm
My/Zy = 3.1 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 89.46 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 84 of 360

Vud = { N - Pcr(axial)[ (Cx + d) X


(Cy + d)]}
= 106.22 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 17
Combination
Critical Load Combination = [21] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
7: WINDLOAD-X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 150.3 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 1.68 sqm
A1 > Base Area
Thus, A1 = 1.68
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 2.6458
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC18
Column No : C18 ( 600mm X 400mm)
Analysis No : 70

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 85 of 360

Permissible SBC Increase for EQ = 0 %


Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2000mm X 1800mm X 300mm
Effective Self Weight = 27.00 KN

Offset Along L (Loff) = 700 mm


Offset Along B (Boff) = 700 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 21
Combination
Critical Load Combination = [10] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pcomb = 72.30 kN
P = Pcomb + Effective Self Weight x 1.2
P = 104.70 kN
Mx = 7.88 kNm
My = 22.85 kNm
P/A = 29.08 kN/sqm
Mx/Zx = 6.56 kN/sqm
My/Zy = 21.15 kN/sqm
Maximum Soil Pressure = 56.8 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
6: WIND LOAD+Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 47.32 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 86 of 360

P = Pcomb + Effective Self Weight x 1.2


P = 79.72 kN
Mx = 18.12 kNm
My = 18.12 kNm
P/A = 22.15 kN/sqm
Mx/Zx = 15.1 kN/sqm
My/Zy = 6.98 kN/sqm
Minimum Soil Pressure = 0.06 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 26
Combination
Critical Load Combination = [30] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4: SEISMICLOAD-Z)
Pu = 130.7 kN
Mux = -3.61 kNm
Muy = 6.97 kNm
P/A = 36.31 kN/sqm
Mx/Zx = -3.01 kN/sqm
My/Zy = 6.45 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 39.31 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 17.34 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 26
Combination
Critical Load Combination = [30] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4: SEISMICLOAD-Z)
Pu = 130.7 kN
Mux = -3.61 kNm
Muy = 6.97 kNm
P/A = 36.31 kN/sqm
Mx/Zx = -3.01 kN/sqm
My/Zy = 6.45 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 87 of 360

Deff = 201 mm
Leff = 2000 mm
SPu = 42.76 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 20.95 kNm
Ast Rqd (BM) = 1080 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 26
Combination
Critical Load Combination = [30] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4: SEISMICLOAD-Z)
Pu = 130.7 kN
Mux = -3.61 kNm
Muy = 6.97 kNm
P/A = 36.31 kN/sqm
Mx/Zx = -3.01 kN/sqm
My/Zy = 6.45 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 39.31 kN/sqm
Vu = SPu X (Loff - d) X B
= 34.18 kN
Vc = 361.19 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 26
Combination
Critical Load Combination = [30] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4:
SEISMICLOAD-Z)

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 88 of 360

Pu = 130.7 kN
Mux = -3.61 kNm
Muy = 6.97 kNm
P/A = 36.31 kN/sqm
Mx/Zx = -3.01 kN/sqm
My/Zy = 6.45 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 42.76 kN/sqm
Vu = SPu X (Boff - d) X L
= 42.67 kN
Vc = 337.66 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 26


Combination
Critical Load Combination = [30] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4: SEISMICLOAD-Z)
Pu = 130.7 kN
Mux = -3.61 kNm
Muy = 6.97 kNm
P/A = 36.31 kN/sqm
Mx/Zx = -3.01 kN/sqm
My/Zy = 6.45 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 36.31 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 112.81 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 89 of 360

Critical Analysis Load = 26


Combination
Critical Load Combination = [30] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4:
SEISMICLOAD-Z)
Pu = 130.7 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 3.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC19
Column No : C19 ( 600mm X 400mm)
Analysis No : 5

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 90 of 360

Footing Size (L x B x D) : 3000mm X 2800mm X 300mm


Effective Self Weight = 63.00 KN

Offset Along L (Loff) = 1200 mm


Offset Along B (Boff) = 1200 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 19
Combination
Critical Load Combination = [8] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 5: WINDLOAD+X) +0.5
(LOAD 11: ROOFLIVELOAD)
Pcomb = 91.74 kN
P = Pcomb + Effective Self Weight x 1.2
P = 167.34 kN
Mx = -73.76 kNm
My = 0.44 kNm
P/A = 19.92 kN/sqm
Mx/Zx = -17.56 kN/sqm
My/Zy = 0.11 kN/sqm
Maximum Soil Pressure = 37.6 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 19
Combination
Critical Load Combination = [8] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
5: WINDLOAD+X) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 91.74 kN
P = Pcomb + Effective Self Weight x 1.2
P = 167.34 kN
Mx = -73.76 kNm
My = -73.76 kNm
P/A = 19.92 kN/sqm
Mx/Zx = -17.56 kN/sqm
My/Zy = 0.11 kN/sqm
Minimum Soil Pressure = 2.25 kN/sqm
> 0

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 91 of 360

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 19
Combination
Critical Load Combination = [23] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 5: WINDLOAD+X) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 91.74 kN
Mux = -73.76 kNm
Muy = 0.44 kNm
P/A = 10.92 kN/sqm
Mx/Zx = -17.56 kN/sqm
My/Zy = 0.11 kN/sqm

Deff = 217 mm
Beff = 2800 mm
SPu = 28.48 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 57.42 kNm
Ast Rqd (BM) = 1512 sqmm
Ast Prv = 15 - #19 @ 200
= 4298 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 104.23 kN
Mux = 0.64 kNm
Muy = 0.35 kNm
P/A = 12.41 kN/sqm
Mx/Zx = 0.15 kN/sqm
My/Zy = 0.09 kN/sqm

Deff = 201 mm
Leff = 3000 mm
SPu = 12.5 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 27 kNm
Ast Rqd (BM) = 1620 sqmm
Ast Prv = 16 - #19 @ 200
= 4584 sqmm
Distributed Across Total Length

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 92 of 360

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 19
Combination
Critical Load Combination = [23] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 5: WINDLOAD+X) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 91.74 kN
Mux = -73.76 kNm
Muy = 0.44 kNm
P/A = 10.92 kN/sqm
Mx/Zx = -17.56 kN/sqm
My/Zy = 0.11 kN/sqm

Deff = 217 mm
Beff = 2800 mm
SPu = 28.48 kN/sqm
Vu = SPu X (Loff - d) X B
= 78.40 kN
Vc = 559.14 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 104.23 kN
Mux = 0.64 kNm
Muy = 0.35 kNm
P/A = 12.41 kN/sqm
Mx/Zx = 0.15 kN/sqm
My/Zy = 0.09 kN/sqm

Deff = 201 mm
Leff = 3000 mm
SPu = 12.5 kN/sqm
Vu = SPu X (Boff - d) X L

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 93 of 360

= 37.46 kN
Vc = 522.98 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 104.23 kN
Mux = 0.64 kNm
Muy = 0.35 kNm
P/A = 12.41 kN/sqm
Mx/Zx = 0.15 kN/sqm
My/Zy = 0.09 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 12.41 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 98.12 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 104.23 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 8.4 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 94 of 360

Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area


= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC20
Column No : C20 ( 600mm X 400mm)
Analysis No : 12

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1200mm X 1000mm X 300mm
Effective Self Weight = 9.00 KN

Offset Along L (Loff) = 300 mm


Offset Along B (Boff) = 300 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 23
Combination
Critical Load Combination = [12] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pcomb = 91.26 kN
P = Pcomb + Effective Self Weight x 1.2
P = 102.06 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 95 of 360

Mx = -7.06 kNm
My = 0.97 kNm
P/A = 85.05 kN/sqm
Mx/Zx = -29.4 kN/sqm
My/Zy = 4.85 kN/sqm
Maximum Soil Pressure = 119.3 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 23
Combination
Critical Load Combination = [12] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1:
SEISMICLOAD+X)
Pcomb = 91.26 kN
P = Pcomb + Effective Self Weight x 1.2
P = 102.06 kN
Mx = -7.06 kNm
My = -7.06 kNm
P/A = 85.05 kN/sqm
Mx/Zx = -29.4 kN/sqm
My/Zy = 4.85 kN/sqm
Minimum Soil Pressure = 50.8 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 91.26 kN
Mux = -7.06 kNm
Muy = 0.97 kNm
P/A = 76.05 kN/sqm
Mx/Zx = -29.4 kN/sqm
My/Zy = 4.85 kN/sqm

Deff = 217 mm
Beff = 1000 mm
SPu = 105.45 kN/sqm
Mu = SPu X B X Loff X Loff / 2

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 96 of 360

= 4.75 kNm
Ast Rqd (BM) = 540 sqmm
Ast Prv = 6 - #19 @ 200
= 1719 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 18
Combination
Critical Load Combination = [22] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 8:
WINDLOAD-Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 100.5 kN
Mux = -0.53 kNm
Muy = 2.42 kNm
P/A = 83.75 kN/sqm
Mx/Zx = -2.22 kN/sqm
My/Zy = 12.1 kN/sqm

Deff = 201 mm
Leff = 1200 mm
SPu = 95.84 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 5.18 kNm
Ast Rqd (BM) = 648 sqmm
Ast Prv = 7 - #19 @ 200
= 2006 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 91.26 kN
Mux = -7.06 kNm
Muy = 0.97 kNm
P/A = 76.05 kN/sqm
Mx/Zx = -29.4 kN/sqm
My/Zy = 4.85 kN/sqm

Deff = 217 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 97 of 360

Beff = 1000 mm
SPu = 105.45 kN/sqm
Vu = SPu X (Loff - d) X B
= 8.75 kN
Vc = 215.88 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 18
Combination
Critical Load Combination = [22] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
8: WINDLOAD-Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 100.5 kN
Mux = -0.53 kNm
Muy = 2.42 kNm
P/A = 83.75 kN/sqm
Mx/Zx = -2.22 kN/sqm
My/Zy = 12.1 kN/sqm

Deff = 201 mm
Leff = 1200 mm
SPu = 95.84 kN/sqm
Vu = SPu X (Boff - d) X L
= 11.39 kN
Vc = 198.87 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 106.69 kN
Mux = -0.63 kNm
Muy = 0.84 kNm
P/A = 88.91 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 98 of 360

Mx/Zx = -2.62 kN/sqm


My/Zy = 4.2 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 88.91 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 62.89 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 106.69 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 1.2 sqm
A1 > Base Area
Thus, A1 = 1.2
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 2.2361
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC21
Column No : C21 ( 600mm X 400mm)
Analysis No : 29

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 99 of 360

Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 3400mm X 3200mm X 300mm
Effective Self Weight = 81.60 KN

Offset Along L (Loff) = 1400 mm


Offset Along B (Boff) = 1400 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 19
Combination
Critical Load Combination = [8] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 5: WINDLOAD+X) +0.5
(LOAD 11: ROOFLIVELOAD)
Pcomb = 111.99 kN
P = Pcomb + Effective Self Weight x 1.2
P = 209.91 kN
Mx = -117.98 kNm
My = -0.69 kNm
P/A = 19.29 kN/sqm
Mx/Zx = -19.14 kN/sqm
My/Zy = -0.12 kN/sqm
Maximum Soil Pressure = 38.55 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 19
Combination

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 100 of 360

Critical Load Combination = [8] : 1.2 (LOAD 9:


DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
5: WINDLOAD+X) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 111.99 kN
P = Pcomb + Effective Self Weight x 1.2
P = 209.91 kN
Mx = -117.98 kNm
My = -117.98 kNm
P/A = 19.29 kN/sqm
Mx/Zx = -19.14 kN/sqm
My/Zy = -0.12 kN/sqm
Minimum Soil Pressure = 0.04 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 19
Combination
Critical Load Combination = [23] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 5: WINDLOAD+X) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 111.99 kN
Mux = -117.98 kNm
Muy = -0.69 kNm
P/A = 10.29 kN/sqm
Mx/Zx = -19.14 kN/sqm
My/Zy = -0.12 kN/sqm

Deff = 217 mm
Beff = 3200 mm
SPu = 29.43 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 92.29 kNm
Ast Rqd (BM) = 1728 sqmm
Ast Prv = 17 - #19 @ 200
= 4871 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 101 of 360

Pu = 132.11 kN
Mux = -1.96 kNm
Muy = -0.73 kNm
P/A = 12.14 kN/sqm
Mx/Zx = -0.32 kN/sqm
My/Zy = -0.12 kN/sqm

Deff = 201 mm
Leff = 3400 mm
SPu = 12.27 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 40.87 kNm
Ast Rqd (BM) = 1836 sqmm
Ast Prv = 18 - #19 @ 200
= 5157 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 19
Combination
Critical Load Combination = [23] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 5: WINDLOAD+X) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 111.99 kN
Mux = -117.98 kNm
Muy = -0.69 kNm
P/A = 10.29 kN/sqm
Mx/Zx = -19.14 kN/sqm
My/Zy = -0.12 kN/sqm

Deff = 217 mm
Beff = 3200 mm
SPu = 29.43 kN/sqm
Vu = SPu X (Loff - d) X B
= 111.41 kN
Vc = 638.32 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 102 of 360

= 201 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 132.11 kN
Mux = -1.96 kNm
Muy = -0.73 kNm
P/A = 12.14 kN/sqm
Mx/Zx = -0.32 kN/sqm
My/Zy = -0.12 kN/sqm

Deff = 201 mm
Leff = 3400 mm
SPu = 12.27 kN/sqm
Vu = SPu X (Boff - d) X L
= 50.01 kN
Vc = 597.08 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 132.11 kN
Mux = -1.96 kNm
Muy = -0.73 kNm
P/A = 12.14 kN/sqm
Mx/Zx = -0.32 kN/sqm
My/Zy = -0.12 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 12.14 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 126.13 kN
Vn = 1481.81 kN
Vc = 977.995 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 103 of 360

No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 132.11 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 10.88 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC22
Column No : C22 ( 600mm X 400mm)
Analysis No : 58

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 104 of 360

Footing Type : Pad


Footing Size (L x B x D) : 2600mm X 2400mm X 300mm
Effective Self Weight = 46.80 KN

Offset Along L (Loff) = 1000 mm


Offset Along B (Boff) = 1000 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 21
Combination
Critical Load Combination = [10] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pcomb = 109.56 kN
P = Pcomb + Effective Self Weight x 1.2
P = 165.72 kN
Mx = 65.91 kNm
My = 0.2 kNm
P/A = 26.56 kN/sqm
Mx/Zx = 24.37 kN/sqm
My/Zy = 0.08 kN/sqm
Maximum Soil Pressure = 51.01 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 21
Combination
Critical Load Combination = [10] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
7: WINDLOAD-X) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 109.56 kN
P = Pcomb + Effective Self Weight x 1.2
P = 165.72 kN
Mx = 65.91 kNm
My = 65.91 kNm
P/A = 26.56 kN/sqm
Mx/Zx = 24.37 kN/sqm
My/Zy = 0.08 kN/sqm
Minimum Soil Pressure = 2.1 kN/sqm
> 0

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 105 of 360

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 21
Combination
Critical Load Combination = [25] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 109.56 kN
Mux = 65.91 kNm
Muy = 0.2 kNm
P/A = 17.56 kN/sqm
Mx/Zx = 24.37 kN/sqm
My/Zy = 0.08 kN/sqm

Deff = 217 mm
Beff = 2400 mm
SPu = 41.93 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 50.32 kNm
Ast Rqd (BM) = 1296 sqmm
Ast Prv = 13 - #19 @ 200
= 3725 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 124.37 kN
Mux = 1.42 kNm
Muy = 0.25 kNm
P/A = 19.93 kN/sqm
Mx/Zx = 0.52 kN/sqm
My/Zy = 0.1 kN/sqm

Deff = 201 mm
Leff = 2600 mm
SPu = 20.03 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 26.04 kNm
Ast Rqd (BM) = 1404 sqmm
Ast Prv = 14 - #19 @ 200
= 4011 sqmm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 106 of 360

Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 21
Combination
Critical Load Combination = [25] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 109.56 kN
Mux = 65.91 kNm
Muy = 0.2 kNm
P/A = 17.56 kN/sqm
Mx/Zx = 24.37 kN/sqm
My/Zy = 0.08 kN/sqm

Deff = 217 mm
Beff = 2400 mm
SPu = 41.93 kN/sqm
Vu = SPu X (Loff - d) X B
= 78.80 kN
Vc = 479.96 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 124.37 kN
Mux = 1.42 kNm
Muy = 0.25 kNm
P/A = 19.93 kN/sqm
Mx/Zx = 0.52 kN/sqm
My/Zy = 0.1 kN/sqm

Deff = 201 mm
Leff = 2600 mm
SPu = 20.03 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 107 of 360

Vu = SPu X (Boff - d) X L
= 41.61 kN
Vc = 448.87 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 124.37 kN
Mux = 1.42 kNm
Muy = 0.25 kNm
P/A = 19.93 kN/sqm
Mx/Zx = 0.52 kN/sqm
My/Zy = 0.1 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 19.93 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 114.55 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 124.37 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 6.24 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 108 of 360

Thus, Modification Factor = 2


Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC23
Column No : C23 ( 600mm X 400mm)
Analysis No : 72

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 3600mm X 3400mm X 300mm
Effective Self Weight = 91.80 KN

Offset Along L (Loff) = 1500 mm


Offset Along B (Boff) = 1500 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 21
Combination
Critical Load Combination = [10] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pcomb = 116.25 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 109 of 360

P = Pcomb + Effective Self Weight x 1.2


P = 226.41 kN
Mx = 131.92 kNm
My = -3.25 kNm
P/A = 18.5 kN/sqm
Mx/Zx = 17.96 kN/sqm
My/Zy = -0.47 kN/sqm
Maximum Soil Pressure = 36.93 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 21
Combination
Critical Load Combination = [10] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
7: WINDLOAD-X) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 116.25 kN
P = Pcomb + Effective Self Weight x 1.2
P = 226.41 kN
Mx = 131.92 kNm
My = 131.92 kNm
P/A = 18.5 kN/sqm
Mx/Zx = 17.96 kN/sqm
My/Zy = -0.47 kN/sqm
Minimum Soil Pressure = 0.07 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 21
Combination
Critical Load Combination = [25] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 116.25 kN
Mux = 131.92 kNm
Muy = -3.25 kNm
P/A = 9.5 kN/sqm
Mx/Zx = 17.96 kN/sqm
My/Zy = -0.47 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 110 of 360

Deff = 217 mm
Beff = 3400 mm
SPu = 27.46 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 105.04 kNm
Ast Rqd (BM) = 1836 sqmm
Ast Prv = 18 - #19 @ 200
= 5157 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 143.29 kN
Mux = -1 kNm
Muy = -7.51 kNm
P/A = 11.71 kN/sqm
Mx/Zx = -0.14 kN/sqm
My/Zy = -1.08 kN/sqm

Deff = 201 mm
Leff = 3600 mm
SPu = 12.79 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 51.8 kNm
Ast Rqd (BM) = 1944 sqmm
Ast Prv = 19 - #19 @ 200
= 5444 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 21
Combination
Critical Load Combination = [25] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 116.25 kN
Mux = 131.92 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 111 of 360

Muy = -3.25 kNm


P/A = 9.5 kN/sqm
Mx/Zx = 17.96 kN/sqm
My/Zy = -0.47 kN/sqm

Deff = 217 mm
Beff = 3400 mm
SPu = 27.46 kN/sqm
Vu = SPu X (Loff - d) X B
= 119.79 kN
Vc = 677.92 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
6: WIND LOAD+Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pu = 143.29 kN
Mux = -1 kNm
Muy = -7.51 kNm
P/A = 11.71 kN/sqm
Mx/Zx = -0.14 kN/sqm
My/Zy = -1.08 kN/sqm

Deff = 201 mm
Leff = 3600 mm
SPu = 12.79 kN/sqm
Vu = SPu X (Boff - d) X L
= 59.81 kN
Vc = 634.12 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 112 of 360

Critical Analysis Load = 20


Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 143.29 kN
Mux = -1 kNm
Muy = -7.51 kNm
P/A = 11.71 kN/sqm
Mx/Zx = -0.14 kN/sqm
My/Zy = -1.08 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 11.71 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 137.52 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
6: WIND LOAD+Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pu = 143.29 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 12.24 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 113 of 360

Design Code : ACI 318M - 2011


Footing No : FC24
Column No : C24 ( 600mm X 400mm)
Analysis No : 3

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2200mm X 2000mm X 300mm
Effective Self Weight = 33.00 KN

Offset Along L (Loff) = 800 mm


Offset Along B (Boff) = 800 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pcomb = 52.81 kN
P = Pcomb + Effective Self Weight x 1.2
P = 92.41 kN
Mx = 23.41 kNm
My = 8.33 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 114 of 360

P/A = 21 kN/sqm
Mx/Zx = 14.51 kN/sqm
My/Zy = 5.68 kN/sqm
Maximum Soil Pressure = 41.2 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
6: WIND LOAD+Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 52.81 kN
P = Pcomb + Effective Self Weight x 1.2
P = 92.41 kN
Mx = 23.41 kNm
My = 23.41 kNm
P/A = 21 kN/sqm
Mx/Zx = 14.51 kN/sqm
My/Zy = 5.68 kN/sqm
Minimum Soil Pressure = 0.81 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 52.81 kN
Mux = 23.41 kNm
Muy = 8.33 kNm
P/A = 12 kN/sqm
Mx/Zx = 14.51 kN/sqm
My/Zy = 5.68 kN/sqm

Deff = 217 mm
Beff = 2000 mm
SPu = 26.51 kN/sqm
Mu = SPu X B X Loff X Loff / 2

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 115 of 360

= 16.97 kNm
Ast Rqd (BM) = 1080 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 16
Combination
Critical Load Combination = [20] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 6:
WIND LOAD+Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 64.89 kN
Mux = 12.86 kNm
Muy = 12.04 kNm
P/A = 14.75 kN/sqm
Mx/Zx = 7.97 kN/sqm
My/Zy = 8.21 kN/sqm

Deff = 201 mm
Leff = 2200 mm
SPu = 22.96 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 16.16 kNm
Ast Rqd (BM) = 1188 sqmm
Ast Prv = 12 - #19 @ 200
= 3438 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 52.81 kN
Mux = 23.41 kNm
Muy = 8.33 kNm
P/A = 12 kN/sqm
Mx/Zx = 14.51 kN/sqm
My/Zy = 5.68 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 116 of 360

Deff = 217 mm
Beff = 2000 mm
SPu = 26.51 kN/sqm
Vu = SPu X (Loff - d) X B
= 30.91 kN
Vc = 400.78 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 16
Combination
Critical Load Combination = [20] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
6: WIND LOAD+Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 64.89 kN
Mux = 12.86 kNm
Muy = 12.04 kNm
P/A = 14.75 kN/sqm
Mx/Zx = 7.97 kN/sqm
My/Zy = 8.21 kN/sqm

Deff = 201 mm
Leff = 2200 mm
SPu = 22.96 kN/sqm
Vu = SPu X (Boff - d) X L
= 30.25 kN
Vc = 374.74 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 16


Combination
Critical Load Combination = [20] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 6:
WIND LOAD+Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 64.89 kN
Mux = 12.86 kNm
Muy = 12.04 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 117 of 360

P/A = 14.75 kN/sqm


Mx/Zx = 7.97 kN/sqm
My/Zy = 8.21 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 14.75 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 57.62 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 16
Combination
Critical Load Combination = [20] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
6: WIND LOAD+Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 64.89 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 4.4 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC25
Column No : C25 ( 600mm X 400mm)
Analysis No : 6

Concrete Grade : C25

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 118 of 360

Steel Grade : Fy410


Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2400mm X 2200mm X 300mm
Effective Self Weight = 39.60 KN

Offset Along L (Loff) = 900 mm


Offset Along B (Boff) = 900 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 19
Combination
Critical Load Combination = [8] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 5: WINDLOAD+X) +0.5
(LOAD 11: ROOFLIVELOAD)
Pcomb = 114.78 kN
P = Pcomb + Effective Self Weight x 1.2
P = 162.30 kN
Mx = -57.76 kNm
My = -0.12 kNm
P/A = 30.74 kN/sqm
Mx/Zx = -27.35 kN/sqm
My/Zy = -0.06 kN/sqm
Maximum Soil Pressure = 58.15 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 119 of 360

Critical Analysis Load = 19


Combination
Critical Load Combination = [8] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
5: WINDLOAD+X) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 114.78 kN
P = Pcomb + Effective Self Weight x 1.2
P = 162.3 kN
Mx = -57.76 kNm
My = -57.76 kNm
P/A = 30.74 kN/sqm
Mx/Zx = -27.35 kN/sqm
My/Zy = -0.06 kN/sqm
Minimum Soil Pressure = 3.33 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 19
Combination
Critical Load Combination = [23] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 5: WINDLOAD+X) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 114.78 kN
Mux = -57.76 kNm
Muy = -0.12 kNm
P/A = 21.74 kN/sqm
Mx/Zx = -27.35 kN/sqm
My/Zy = -0.06 kN/sqm

Deff = 217 mm
Beff = 2200 mm
SPu = 49.09 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 43.74 kNm
Ast Rqd (BM) = 1188 sqmm
Ast Prv = 12 - #19 @ 200
= 3438 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 16

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 120 of 360

Combination
Critical Load Combination = [20] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 6:
WIND LOAD+Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 129.57 kN
Mux = 21.92 kNm
Muy = -2.53 kNm
P/A = 24.54 kN/sqm
Mx/Zx = 10.38 kN/sqm
My/Zy = -1.31 kN/sqm

Deff = 201 mm
Leff = 2400 mm
SPu = 25.85 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 25.12 kNm
Ast Rqd (BM) = 1296 sqmm
Ast Prv = 13 - #19 @ 200
= 3725 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 19
Combination
Critical Load Combination = [23] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 5: WINDLOAD+X) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 114.78 kN
Mux = -57.76 kNm
Muy = -0.12 kNm
P/A = 21.74 kN/sqm
Mx/Zx = -27.35 kN/sqm
My/Zy = -0.06 kN/sqm

Deff = 217 mm
Beff = 2200 mm
SPu = 49.09 kN/sqm
Vu = SPu X (Loff - d) X B
= 73.76 kN
Vc = 440.37 kN
Vu < Vc

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 121 of 360

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 16
Combination
Critical Load Combination = [20] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
6: WIND LOAD+Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 129.57 kN
Mux = 21.92 kNm
Muy = -2.53 kNm
P/A = 24.54 kN/sqm
Mx/Zx = 10.38 kN/sqm
My/Zy = -1.31 kN/sqm

Deff = 201 mm
Leff = 2400 mm
SPu = 25.85 kN/sqm
Vu = SPu X (Boff - d) X L
= 43.36 kN
Vc = 411.80 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 15


Combination
Critical Load Combination = [19] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 5:
WINDLOAD+X) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 129.85 kN
Mux = -16.11 kNm
Muy = -0.37 kNm
P/A = 24.59 kN/sqm
Mx/Zx = -7.63 kN/sqm
My/Zy = -0.19 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 122 of 360

= 24.59 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 117.74 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 15
Combination
Critical Load Combination = [19] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
5: WINDLOAD+X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 129.85 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 5.28 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC26
Column No : C26 ( 600mm X 400mm)
Analysis No : 13

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 123 of 360

Permissible SBC Increase for EQ = 0 %


Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1400mm X 1200mm X 300mm
Effective Self Weight = 12.60 KN

Offset Along L (Loff) = 400 mm


Offset Along B (Boff) = 400 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 16
Combination
Critical Load Combination = [5] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 6:
WIND LOAD+Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pcomb = 180.56 kN
P = Pcomb + Effective Self Weight x 1.2
P = 195.68 kN
Mx = 0.51 kNm
My = -2.72 kNm
P/A = 116.48 kN/sqm
Mx/Zx = 1.31 kN/sqm
My/Zy = -8.1 kN/sqm
Maximum Soil Pressure = 125.89 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 25
Combination
Critical Load Combination = [14] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pcomb = 146.30 kN
P = Pcomb + Effective Self Weight x 1.2
P = 161.42 kN
Mx = 10.29 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 124 of 360

My = 10.29 kNm
P/A = 96.08 kN/sqm
Mx/Zx = 26.24 kN/sqm
My/Zy = -2.92 kN/sqm
Minimum Soil Pressure = 66.92 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 148.33 kN
Mux = -9.83 kNm
Muy = -0.52 kNm
P/A = 88.29 kN/sqm
Mx/Zx = -25.07 kN/sqm
My/Zy = -1.54 kN/sqm

Deff = 217 mm
Beff = 1200 mm
SPu = 113.37 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 10.88 kNm
Ast Rqd (BM) = 648 sqmm
Ast Prv = 7 - #19 @ 200
= 2006 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 16
Combination
Critical Load Combination = [20] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 6:
WIND LOAD+Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 180.56 kN
Mux = 0.51 kNm
Muy = -2.72 kNm
P/A = 107.48 kN/sqm
Mx/Zx = 1.31 kN/sqm
My/Zy = -8.1 kN/sqm

Deff = 201 mm
Leff = 1400 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 125 of 360

SPu = 115.58 kN/sqm


Mu = SPu X L X Boff X Boff / 2
= 12.94 kNm
Ast Rqd (BM) = 756 sqmm
Ast Prv = 8 - #19 @ 200
= 2292 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 148.33 kN
Mux = -9.83 kNm
Muy = -0.52 kNm
P/A = 88.29 kN/sqm
Mx/Zx = -25.07 kN/sqm
My/Zy = -1.54 kN/sqm

Deff = 217 mm
Beff = 1200 mm
SPu = 113.37 kN/sqm
Vu = SPu X (Loff - d) X B
= 24.90 kN
Vc = 245.31 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 16
Combination
Critical Load Combination = [20] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
6: WIND LOAD+Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 180.56 kN
Mux = 0.51 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 126 of 360

Muy = -2.72 kNm


P/A = 107.48 kN/sqm
Mx/Zx = 1.31 kN/sqm
My/Zy = -8.1 kN/sqm

Deff = 201 mm
Leff = 1400 mm
SPu = 115.58 kN/sqm
Vu = SPu X (Boff - d) X L
= 32.20 kN
Vc = 226.53 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 15


Combination
Critical Load Combination = [19] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 5:
WINDLOAD+X) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 181.46 kN
Mux = -1.64 kNm
Muy = -1.29 kNm
P/A = 108.01 kN/sqm
Mx/Zx = -4.19 kN/sqm
My/Zy = -3.84 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 108.01 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 128.25 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 15
Combination

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 127 of 360

Critical Load Combination = [19] : 1.2 (LOAD 9:


DEADLOAD) +0.5 (LOAD
5: WINDLOAD+X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 181.46 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 1.68 sqm
A1 > Base Area
Thus, A1 = 1.68
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 2.6458
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC27
Column No : C27 ( 600mm X 400mm)
Analysis No : 30

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 128 of 360

Footing Size (L x B x D) : 2000mm X 1800mm X 300mm


Effective Self Weight = 27.00 KN

Offset Along L (Loff) = 700 mm


Offset Along B (Boff) = 700 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 25
Combination
Critical Load Combination = [14] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pcomb = 263.35 kN
P = Pcomb + Effective Self Weight x 1.2
P = 295.75 kN
Mx = 67.41 kNm
My = -0.6 kNm
P/A = 82.15 kN/sqm
Mx/Zx = 56.18 kN/sqm
My/Zy = -0.56 kN/sqm
Maximum Soil Pressure = 138.89 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 25
Combination
Critical Load Combination = [14] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pcomb = 263.35 kN
P = Pcomb + Effective Self Weight x 1.2
P = 295.75 kN
Mx = 67.41 kNm
My = 67.41 kNm
P/A = 82.15 kN/sqm
Mx/Zx = 56.18 kN/sqm
My/Zy = -0.56 kN/sqm
Minimum Soil Pressure = 25.42 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 25

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 129 of 360

Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 263.35 kN
Mux = 67.41 kNm
Muy = -0.6 kNm
P/A = 73.15 kN/sqm
Mx/Zx = 56.18 kN/sqm
My/Zy = -0.56 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 129.33 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 57.03 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 286.88 kN
Mux = 17.69 kNm
Muy = -0.51 kNm
P/A = 79.69 kN/sqm
Mx/Zx = 14.74 kN/sqm
My/Zy = -0.47 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 80.16 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 39.28 kNm
Ast Rqd (BM) = 1080 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 130 of 360

Critical Section @ d from Column Face


= 217 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 263.35 kN
Mux = 67.41 kNm
Muy = -0.6 kNm
P/A = 73.15 kN/sqm
Mx/Zx = 56.18 kN/sqm
My/Zy = -0.56 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 129.33 kN/sqm
Vu = SPu X (Loff - d) X B
= 112.44 kN
Vc = 361.19 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 286.88 kN
Mux = 17.69 kNm
Muy = -0.51 kNm
P/A = 79.69 kN/sqm
Mx/Zx = 14.74 kN/sqm
My/Zy = -0.47 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 80.16 kN/sqm
Vu = SPu X (Boff - d) X L
= 80.00 kN
Vc = 337.66 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 131 of 360

Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 286.88 kN
Mux = 17.69 kNm
Muy = -0.51 kNm
P/A = 79.69 kN/sqm
Mx/Zx = 14.74 kN/sqm
My/Zy = -0.47 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 79.69 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 247.62 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 286.88 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 3.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 132 of 360

Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area


= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC28
Column No : C28 ( 600mm X 400mm)
Analysis No : 55

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2000mm X 1800mm X 300mm
Effective Self Weight = 27.00 KN

Offset Along L (Loff) = 700 mm


Offset Along B (Boff) = 700 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 23
Combination
Critical Load Combination = [12] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pcomb = 250.70 kN
P = Pcomb + Effective Self Weight x 1.2
P = 283.10 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 133 of 360

Mx = -65.64 kNm
My = 0.92 kNm
P/A = 78.64 kN/sqm
Mx/Zx = -54.7 kN/sqm
My/Zy = 0.85 kN/sqm
Maximum Soil Pressure = 134.2 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 23
Combination
Critical Load Combination = [12] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1:
SEISMICLOAD+X)
Pcomb = 250.70 kN
P = Pcomb + Effective Self Weight x 1.2
P = 283.1 kN
Mx = -65.64 kNm
My = -65.64 kNm
P/A = 78.64 kN/sqm
Mx/Zx = -54.7 kN/sqm
My/Zy = 0.85 kN/sqm
Minimum Soil Pressure = 23.09 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 250.7 kN
Mux = -65.64 kNm
Muy = 0.92 kNm
P/A = 69.64 kN/sqm
Mx/Zx = -54.7 kN/sqm
My/Zy = 0.85 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 124.34 kN/sqm
Mu = SPu X B X Loff X Loff / 2

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 134 of 360

= 54.84 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 272 kN
Mux = -16.37 kNm
Muy = 1.37 kNm
P/A = 75.56 kN/sqm
Mx/Zx = -13.64 kN/sqm
My/Zy = 1.26 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 76.82 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 37.64 kNm
Ast Rqd (BM) = 1080 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 250.7 kN
Mux = -65.64 kNm
Muy = 0.92 kNm
P/A = 69.64 kN/sqm
Mx/Zx = -54.7 kN/sqm
My/Zy = 0.85 kN/sqm

Deff = 217 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 135 of 360

Beff = 1800 mm
SPu = 124.34 kN/sqm
Vu = SPu X (Loff - d) X B
= 108.10 kN
Vc = 361.19 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 272 kN
Mux = -16.37 kNm
Muy = 1.37 kNm
P/A = 75.56 kN/sqm
Mx/Zx = -13.64 kN/sqm
My/Zy = 1.26 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 76.82 kN/sqm
Vu = SPu X (Boff - d) X L
= 76.67 kN
Vc = 337.66 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 272 kN
Mux = -16.37 kNm
Muy = 1.37 kNm
P/A = 75.56 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 136 of 360

Mx/Zx = -13.64 kN/sqm


My/Zy = 1.26 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 75.56 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 234.78 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 272 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 3.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC29
Column No : C29 ( 600mm X 400mm)
Analysis No : 73

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 137 of 360

Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 3200mm X 3000mm X 300mm
Effective Self Weight = 72.00 KN

Offset Along L (Loff) = 1300 mm


Offset Along B (Boff) = 1300 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 21
Combination
Critical Load Combination = [10] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pcomb = 113.29 kN
P = Pcomb + Effective Self Weight x 1.2
P = 199.69 kN
Mx = 101.28 kNm
My = -0.4 kNm
P/A = 20.8 kN/sqm
Mx/Zx = 19.78 kN/sqm
My/Zy = -0.08 kN/sqm
Maximum Soil Pressure = 40.67 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 21
Combination

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 138 of 360

Critical Load Combination = [10] : 1.2 (LOAD 9:


DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
7: WINDLOAD-X) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 113.29 kN
P = Pcomb + Effective Self Weight x 1.2
P = 199.69 kN
Mx = 101.28 kNm
My = 101.28 kNm
P/A = 20.8 kN/sqm
Mx/Zx = 19.78 kN/sqm
My/Zy = -0.08 kN/sqm
Minimum Soil Pressure = 0.94 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 21
Combination
Critical Load Combination = [25] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 113.29 kN
Mux = 101.28 kNm
Muy = -0.4 kNm
P/A = 11.8 kN/sqm
Mx/Zx = 19.78 kN/sqm
My/Zy = -0.08 kN/sqm

Deff = 217 mm
Beff = 3000 mm
SPu = 31.58 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 80.06 kNm
Ast Rqd (BM) = 1620 sqmm
Ast Prv = 16 - #19 @ 200
= 4584 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 139 of 360

Pu = 130.09 kN
Mux = -0.32 kNm
Muy = -0.55 kNm
P/A = 13.55 kN/sqm
Mx/Zx = -0.06 kN/sqm
My/Zy = -0.11 kN/sqm

Deff = 201 mm
Leff = 3200 mm
SPu = 13.67 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 36.95 kNm
Ast Rqd (BM) = 1728 sqmm
Ast Prv = 17 - #19 @ 200
= 4871 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 21
Combination
Critical Load Combination = [25] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 113.29 kN
Mux = 101.28 kNm
Muy = -0.4 kNm
P/A = 11.8 kN/sqm
Mx/Zx = 19.78 kN/sqm
My/Zy = -0.08 kN/sqm

Deff = 217 mm
Beff = 3000 mm
SPu = 31.58 kN/sqm
Vu = SPu X (Loff - d) X B
= 102.61 kN
Vc = 598.73 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 140 of 360

= 201 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 130.09 kN
Mux = -0.32 kNm
Muy = -0.55 kNm
P/A = 13.55 kN/sqm
Mx/Zx = -0.06 kN/sqm
My/Zy = -0.11 kN/sqm

Deff = 201 mm
Leff = 3200 mm
SPu = 13.67 kN/sqm
Vu = SPu X (Boff - d) X L
= 48.06 kN
Vc = 560.03 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 130.09 kN
Mux = -0.32 kNm
Muy = -0.55 kNm
P/A = 13.55 kN/sqm
Mx/Zx = -0.06 kN/sqm
My/Zy = -0.11 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 13.55 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 123.41 kN
Vn = 1481.81 kN
Vc = 977.995 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 141 of 360

No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 130.09 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 9.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC30
Column No : C30 ( 600mm X 400mm)
Analysis No : 7

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 142 of 360

Footing Type : Pad


Footing Size (L x B x D) : 2600mm X 2400mm X 300mm
Effective Self Weight = 46.80 KN

Offset Along L (Loff) = 1000 mm


Offset Along B (Boff) = 1000 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 19
Combination
Critical Load Combination = [8] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 5: WINDLOAD+X) +0.5
(LOAD 11: ROOFLIVELOAD)
Pcomb = 84.28 kN
P = Pcomb + Effective Self Weight x 1.2
P = 140.44 kN
Mx = -57.74 kNm
My = 0.87 kNm
P/A = 22.51 kN/sqm
Mx/Zx = -21.35 kN/sqm
My/Zy = 0.35 kN/sqm
Maximum Soil Pressure = 44.21 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 19
Combination
Critical Load Combination = [8] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
5: WINDLOAD+X) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 84.28 kN
P = Pcomb + Effective Self Weight x 1.2
P = 140.44 kN
Mx = -57.74 kNm
My = -57.74 kNm
P/A = 22.51 kN/sqm
Mx/Zx = -21.35 kN/sqm
My/Zy = 0.35 kN/sqm
Minimum Soil Pressure = 0.81 kN/sqm
> 0

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 143 of 360

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 19
Combination
Critical Load Combination = [23] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 5: WINDLOAD+X) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 84.28 kN
Mux = -57.74 kNm
Muy = 0.87 kNm
P/A = 13.51 kN/sqm
Mx/Zx = -21.35 kN/sqm
My/Zy = 0.35 kN/sqm

Deff = 217 mm
Beff = 2400 mm
SPu = 34.86 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 41.83 kNm
Ast Rqd (BM) = 1296 sqmm
Ast Prv = 13 - #19 @ 200
= 3725 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 101.96 kN
Mux = -0.01 kNm
Muy = 0.79 kNm
P/A = 16.34 kN/sqm
Mx/Zx = 0 kN/sqm
My/Zy = 0.32 kN/sqm

Deff = 201 mm
Leff = 2600 mm
SPu = 16.66 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 21.66 kNm
Ast Rqd (BM) = 1404 sqmm
Ast Prv = 14 - #19 @ 200
= 4011 sqmm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 144 of 360

Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 19
Combination
Critical Load Combination = [23] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 5: WINDLOAD+X) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 84.28 kN
Mux = -57.74 kNm
Muy = 0.87 kNm
P/A = 13.51 kN/sqm
Mx/Zx = -21.35 kN/sqm
My/Zy = 0.35 kN/sqm

Deff = 217 mm
Beff = 2400 mm
SPu = 34.86 kN/sqm
Vu = SPu X (Loff - d) X B
= 65.51 kN
Vc = 479.96 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 101.96 kN
Mux = -0.01 kNm
Muy = 0.79 kNm
P/A = 16.34 kN/sqm
Mx/Zx = 0 kN/sqm
My/Zy = 0.32 kN/sqm

Deff = 201 mm
Leff = 2600 mm
SPu = 16.66 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 145 of 360

Vu = SPu X (Boff - d) X L
= 34.61 kN
Vc = 448.87 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 101.96 kN
Mux = -0.01 kNm
Muy = 0.79 kNm
P/A = 16.34 kN/sqm
Mx/Zx = 0 kN/sqm
My/Zy = 0.32 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 16.34 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 93.91 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 101.96 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 6.24 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 146 of 360

Thus, Modification Factor = 2


Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC31
Column No : C31 ( 600mm X 400mm)
Analysis No : 14

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1400mm X 1200mm X 300mm
Effective Self Weight = 12.60 KN

Offset Along L (Loff) = 400 mm


Offset Along B (Boff) = 400 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 18
Combination
Critical Load Combination = [7] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 8:
WINDLOAD-Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pcomb = 181.17 kN
P = Pcomb + Effective Self Weight x 1.2

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 147 of 360

P = 196.29 kN
Mx = 0.9 kNm
My = 3.13 kNm
P/A = 116.84 kN/sqm
Mx/Zx = 2.3 kN/sqm
My/Zy = 9.32 kN/sqm
Maximum Soil Pressure = 128.46 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 25
Combination
Critical Load Combination = [14] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pcomb = 146.61 kN
P = Pcomb + Effective Self Weight x 1.2
P = 161.73 kN
Mx = 10.37 kNm
My = 10.37 kNm
P/A = 96.27 kN/sqm
Mx/Zx = 26.45 kN/sqm
My/Zy = 2.54 kN/sqm
Minimum Soil Pressure = 67.28 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 146.61 kN
Mux = 10.37 kNm
Muy = 0.85 kNm
P/A = 87.27 kN/sqm
Mx/Zx = 26.45 kN/sqm
My/Zy = 2.54 kN/sqm

Deff = 217 mm
Beff = 1200 mm
SPu = 113.71 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 148 of 360

Mu = SPu X B X Loff X Loff / 2


= 10.92 kNm
Ast Rqd (BM) = 648 sqmm
Ast Prv = 7 - #19 @ 200
= 2006 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 18
Combination
Critical Load Combination = [22] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 8:
WINDLOAD-Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 181.17 kN
Mux = 0.9 kNm
Muy = 3.13 kNm
P/A = 107.84 kN/sqm
Mx/Zx = 2.3 kN/sqm
My/Zy = 9.32 kN/sqm

Deff = 201 mm
Leff = 1400 mm
SPu = 117.16 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 13.12 kNm
Ast Rqd (BM) = 756 sqmm
Ast Prv = 8 - #19 @ 200
= 2292 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 146.61 kN
Mux = 10.37 kNm
Muy = 0.85 kNm
P/A = 87.27 kN/sqm
Mx/Zx = 26.45 kN/sqm
My/Zy = 2.54 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 149 of 360

Deff = 217 mm
Beff = 1200 mm
SPu = 113.71 kN/sqm
Vu = SPu X (Loff - d) X B
= 24.97 kN
Vc = 245.31 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 18
Combination
Critical Load Combination = [22] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
8: WINDLOAD-Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 181.17 kN
Mux = 0.9 kNm
Muy = 3.13 kNm
P/A = 107.84 kN/sqm
Mx/Zx = 2.3 kN/sqm
My/Zy = 9.32 kN/sqm

Deff = 201 mm
Leff = 1400 mm
SPu = 117.16 kN/sqm
Vu = SPu X (Boff - d) X L
= 32.64 kN
Vc = 226.53 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 15


Combination
Critical Load Combination = [19] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 5:
WINDLOAD+X) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 182.17 kN
Mux = -1.53 kNm
Muy = 1.38 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 150 of 360

P/A = 108.44 kN/sqm


Mx/Zx = -3.9 kN/sqm
My/Zy = 4.11 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 108.44 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 128.75 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 15
Combination
Critical Load Combination = [19] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
5: WINDLOAD+X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 182.17 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 1.68 sqm
A1 > Base Area
Thus, A1 = 1.68
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 2.6458
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC32
Column No : C32 ( 600mm X 400mm)
Analysis No : 31

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 151 of 360

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2200mm X 2000mm X 300mm
Effective Self Weight = 33.00 KN

Offset Along L (Loff) = 800 mm


Offset Along B (Boff) = 800 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 25
Combination
Critical Load Combination = [14] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pcomb = 402.90 kN
P = Pcomb + Effective Self Weight x 1.2
P = 442.50 kN
Mx = 91.77 kNm
My = 0.53 kNm
P/A = 100.57 kN/sqm
Mx/Zx = 56.89 kN/sqm
My/Zy = 0.36 kN/sqm
Maximum Soil Pressure = 157.81 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 152 of 360

Critical Analysis Load = 25


Combination
Critical Load Combination = [14] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pcomb = 402.90 kN
P = Pcomb + Effective Self Weight x 1.2
P = 442.5 kN
Mx = 91.77 kNm
My = 91.77 kNm
P/A = 100.57 kN/sqm
Mx/Zx = 56.89 kN/sqm
My/Zy = 0.36 kN/sqm
Minimum Soil Pressure = 43.32 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 402.9 kN
Mux = 91.77 kNm
Muy = 0.53 kNm
P/A = 91.57 kN/sqm
Mx/Zx = 56.89 kN/sqm
My/Zy = 0.36 kN/sqm

Deff = 217 mm
Beff = 2000 mm
SPu = 148.45 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 95.01 kNm
Ast Rqd (BM) = 1220 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 153 of 360

Pu = 448.46 kN
Mux = 31.69 kNm
Muy = 0.69 kNm
P/A = 101.92 kN/sqm
Mx/Zx = 19.65 kN/sqm
My/Zy = 0.47 kN/sqm

Deff = 201 mm
Leff = 2200 mm
SPu = 102.4 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 72.09 kNm
Ast Rqd (BM) = 1188 sqmm
Ast Prv = 12 - #19 @ 200
= 3438 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 402.9 kN
Mux = 91.77 kNm
Muy = 0.53 kNm
P/A = 91.57 kN/sqm
Mx/Zx = 56.89 kN/sqm
My/Zy = 0.36 kN/sqm

Deff = 217 mm
Beff = 2000 mm
SPu = 148.45 kN/sqm
Vu = SPu X (Loff - d) X B
= 173.10 kN
Vc = 400.78 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 154 of 360

= 201 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 448.46 kN
Mux = 31.69 kNm
Muy = 0.69 kNm
P/A = 101.92 kN/sqm
Mx/Zx = 19.65 kN/sqm
My/Zy = 0.47 kN/sqm

Deff = 201 mm
Leff = 2200 mm
SPu = 102.4 kN/sqm
Vu = SPu X (Boff - d) X L
= 134.94 kN
Vc = 374.74 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 448.46 kN
Mux = 31.69 kNm
Muy = 0.69 kNm
P/A = 101.92 kN/sqm
Mx/Zx = 19.65 kN/sqm
My/Zy = 0.47 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 101.92 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 398.25 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 155 of 360

Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 448.46 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 4.4 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC33
Column No : C33 ( 600mm X 400mm)
Analysis No : 56

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 156 of 360

Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2200mm X 2000mm X 300mm
Effective Self Weight = 33.00 KN

Offset Along L (Loff) = 800 mm


Offset Along B (Boff) = 800 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 23
Combination
Critical Load Combination = [12] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pcomb = 380.60 kN
P = Pcomb + Effective Self Weight x 1.2
P = 420.20 kN
Mx = -87.79 kNm
My = -0.64 kNm
P/A = 95.5 kN/sqm
Mx/Zx = -54.42 kN/sqm
My/Zy = -0.43 kN/sqm
Maximum Soil Pressure = 150.35 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 23
Combination
Critical Load Combination = [12] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1:
SEISMICLOAD+X)
Pcomb = 380.60 kN
P = Pcomb + Effective Self Weight x 1.2
P = 420.2 kN
Mx = -87.79 kNm
My = -87.79 kNm
P/A = 95.5 kN/sqm
Mx/Zx = -54.42 kN/sqm
My/Zy = -0.43 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 157 of 360

Minimum Soil Pressure = 40.65 kN/sqm


> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 380.6 kN
Mux = -87.79 kNm
Muy = -0.64 kNm
P/A = 86.5 kN/sqm
Mx/Zx = -54.42 kN/sqm
My/Zy = -0.43 kN/sqm

Deff = 217 mm
Beff = 2000 mm
SPu = 140.92 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 90.19 kNm
Ast Rqd (BM) = 1156 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 422.79 kN
Mux = -27.57 kNm
Muy = -0.62 kNm
P/A = 96.09 kN/sqm
Mx/Zx = -17.09 kN/sqm
My/Zy = -0.43 kN/sqm

Deff = 201 mm
Leff = 2200 mm
SPu = 96.51 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 67.95 kNm
Ast Rqd (BM) = 1188 sqmm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 158 of 360

Ast Prv = 12 - #19 @ 200


= 3438 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 380.6 kN
Mux = -87.79 kNm
Muy = -0.64 kNm
P/A = 86.5 kN/sqm
Mx/Zx = -54.42 kN/sqm
My/Zy = -0.43 kN/sqm

Deff = 217 mm
Beff = 2000 mm
SPu = 140.92 kN/sqm
Vu = SPu X (Loff - d) X B
= 164.31 kN
Vc = 400.78 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 422.79 kN
Mux = -27.57 kNm
Muy = -0.62 kNm
P/A = 96.09 kN/sqm
Mx/Zx = -17.09 kN/sqm
My/Zy = -0.43 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 159 of 360

Deff = 201 mm
Leff = 2200 mm
SPu = 96.51 kN/sqm
Vu = SPu X (Boff - d) X L
= 127.19 kN
Vc = 374.74 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 422.79 kN
Mux = -27.57 kNm
Muy = -0.62 kNm
P/A = 96.09 kN/sqm
Mx/Zx = -17.09 kN/sqm
My/Zy = -0.43 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 96.09 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 375.45 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 422.79 kN
A2 = 0.24 sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 160 of 360

A1 = 2.88 sqm
Base Area = 4.4 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC34
Column No : C34 ( 600mm X 400mm)
Analysis No : 74

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 3200mm X 3000mm X 300mm
Effective Self Weight = 72.00 KN

Offset Along L (Loff) = 1300 mm


Offset Along B (Boff) = 1300 mm

Check For Maximum Soil Pressure:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 161 of 360

Critical Analysis Load = 21


Combination
Critical Load Combination = [10] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pcomb = 111.52 kN
P = Pcomb + Effective Self Weight x 1.2
P = 197.92 kN
Mx = 101.26 kNm
My = -0.05 kNm
P/A = 20.62 kN/sqm
Mx/Zx = 19.78 kN/sqm
My/Zy = -0.01 kN/sqm
Maximum Soil Pressure = 40.4 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 21
Combination
Critical Load Combination = [10] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
7: WINDLOAD-X) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 111.52 kN
P = Pcomb + Effective Self Weight x 1.2
P = 197.92 kN
Mx = 101.26 kNm
My = 101.26 kNm
P/A = 20.62 kN/sqm
Mx/Zx = 19.78 kN/sqm
My/Zy = -0.01 kN/sqm
Minimum Soil Pressure = 0.83 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 21
Combination
Critical Load Combination = [25] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 111.52 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 162 of 360

Mux = 101.26 kNm


Muy = -0.05 kNm
P/A = 11.62 kN/sqm
Mx/Zx = 19.78 kN/sqm
My/Zy = -0.01 kN/sqm

Deff = 217 mm
Beff = 3000 mm
SPu = 31.39 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 79.59 kNm
Ast Rqd (BM) = 1620 sqmm
Ast Prv = 16 - #19 @ 200
= 4584 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 129.24 kN
Mux = -0.38 kNm
Muy = 0.02 kNm
P/A = 13.46 kN/sqm
Mx/Zx = -0.07 kN/sqm
My/Zy = 0 kN/sqm

Deff = 201 mm
Leff = 3200 mm
SPu = 13.47 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 36.42 kNm
Ast Rqd (BM) = 1728 sqmm
Ast Prv = 17 - #19 @ 200
= 4871 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 21
Combination

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 163 of 360

Critical Load Combination = [25] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 111.52 kN
Mux = 101.26 kNm
Muy = -0.05 kNm
P/A = 11.62 kN/sqm
Mx/Zx = 19.78 kN/sqm
My/Zy = -0.01 kN/sqm

Deff = 217 mm
Beff = 3000 mm
SPu = 31.39 kN/sqm
Vu = SPu X (Loff - d) X B
= 102.00 kN
Vc = 598.73 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 129.24 kN
Mux = -0.38 kNm
Muy = 0.02 kNm
P/A = 13.46 kN/sqm
Mx/Zx = -0.07 kN/sqm
My/Zy = 0 kN/sqm

Deff = 201 mm
Leff = 3200 mm
SPu = 13.47 kN/sqm
Vu = SPu X (Boff - d) X L
= 47.36 kN
Vc = 560.03 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 164 of 360

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 129.24 kN
Mux = -0.38 kNm
Muy = 0.02 kNm
P/A = 13.46 kN/sqm
Mx/Zx = -0.07 kN/sqm
My/Zy = 0 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 13.46 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 122.61 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 129.24 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 9.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 165 of 360

Footing No : FC35
Column No : C35 ( 600mm X 400mm)
Analysis No : 8

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2800mm X 2600mm X 300mm
Effective Self Weight = 54.60 KN

Offset Along L (Loff) = 1100 mm


Offset Along B (Boff) = 1100 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 19
Combination
Critical Load Combination = [8] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 5: WINDLOAD+X) +0.5
(LOAD 11: ROOFLIVELOAD)
Pcomb = 92.47 kN
P = Pcomb + Effective Self Weight x 1.2
P = 157.99 kN
Mx = -70.2 kNm
My = -0.25 kNm
P/A = 21.7 kN/sqm
Mx/Zx = -20.66 kN/sqm
My/Zy = -0.08 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 166 of 360

Maximum Soil Pressure = 42.44 kN/sqm


Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 19
Combination
Critical Load Combination = [8] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
5: WINDLOAD+X) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 92.47 kN
P = Pcomb + Effective Self Weight x 1.2
P = 157.99 kN
Mx = -70.2 kNm
My = -70.2 kNm
P/A = 21.7 kN/sqm
Mx/Zx = -20.66 kN/sqm
My/Zy = -0.08 kN/sqm
Minimum Soil Pressure = 0.96 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 19
Combination
Critical Load Combination = [23] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 5: WINDLOAD+X) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 92.47 kN
Mux = -70.2 kNm
Muy = -0.25 kNm
P/A = 12.7 kN/sqm
Mx/Zx = -20.66 kN/sqm
My/Zy = -0.08 kN/sqm

Deff = 217 mm
Beff = 2600 mm
SPu = 33.37 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 52.48 kNm
Ast Rqd (BM) = 1404 sqmm
Ast Prv = 14 - #19 @ 200

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 167 of 360

= 4011 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 106.57 kN
Mux = -0.78 kNm
Muy = -0.61 kNm
P/A = 14.64 kN/sqm
Mx/Zx = -0.23 kN/sqm
My/Zy = -0.19 kN/sqm

Deff = 201 mm
Leff = 2800 mm
SPu = 14.83 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 25.13 kNm
Ast Rqd (BM) = 1512 sqmm
Ast Prv = 15 - #19 @ 200
= 4298 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 19
Combination
Critical Load Combination = [23] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 5: WINDLOAD+X) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 92.47 kN
Mux = -70.2 kNm
Muy = -0.25 kNm
P/A = 12.7 kN/sqm
Mx/Zx = -20.66 kN/sqm
My/Zy = -0.08 kN/sqm

Deff = 217 mm
Beff = 2600 mm
SPu = 33.37 kN/sqm
Vu = SPu X (Loff - d) X B

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 168 of 360

= 76.60 kN
Vc = 519.55 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 106.57 kN
Mux = -0.78 kNm
Muy = -0.61 kNm
P/A = 14.64 kN/sqm
Mx/Zx = -0.23 kN/sqm
My/Zy = -0.19 kN/sqm

Deff = 201 mm
Leff = 2800 mm
SPu = 14.83 kN/sqm
Vu = SPu X (Boff - d) X L
= 37.34 kN
Vc = 485.92 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 106.57 kN
Mux = -0.78 kNm
Muy = -0.61 kNm
P/A = 14.64 kN/sqm
Mx/Zx = -0.23 kN/sqm
My/Zy = -0.19 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 169 of 360

SPu = Average Pressure


= 14.64 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 99.36 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 106.57 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 7.28 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC36
Column No : C36 ( 600mm X 400mm)
Analysis No : 15

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 170 of 360

Permissible SBC Increase for = 0 %


Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1200mm X 1000mm X 300mm
Effective Self Weight = 9.00 KN

Offset Along L (Loff) = 300 mm


Offset Along B (Boff) = 300 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 25
Combination
Critical Load Combination = [14] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pcomb = 94.49 kN
P = Pcomb + Effective Self Weight x 1.2
P = 105.29 kN
Mx = 8.18 kNm
My = -1.11 kNm
P/A = 87.74 kN/sqm
Mx/Zx = 34.09 kN/sqm
My/Zy = -5.53 kN/sqm
Maximum Soil Pressure = 127.36 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 25
Combination
Critical Load Combination = [14] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pcomb = 94.49 kN
P = Pcomb + Effective Self Weight x 1.2
P = 105.29 kN
Mx = 8.18 kNm
My = 8.18 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 171 of 360

P/A = 87.74 kN/sqm


Mx/Zx = 34.09 kN/sqm
My/Zy = -5.53 kN/sqm
Minimum Soil Pressure = 48.12 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 94.49 kN
Mux = 8.18 kNm
Muy = -1.11 kNm
P/A = 78.74 kN/sqm
Mx/Zx = 34.09 kN/sqm
My/Zy = -5.53 kN/sqm

Deff = 217 mm
Beff = 1000 mm
SPu = 112.83 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 5.08 kNm
Ast Rqd (BM) = 540 sqmm
Ast Prv = 6 - #19 @ 200
= 1719 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 98.29 kN
Mux = 0.34 kNm
Muy = -4.02 kNm
P/A = 81.91 kN/sqm
Mx/Zx = 1.43 kN/sqm
My/Zy = -20.11 kN/sqm

Deff = 201 mm
Leff = 1200 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 172 of 360

SPu = 102.02 kN/sqm


Mu = SPu X L X Boff X Boff / 2
= 5.51 kNm
Ast Rqd (BM) = 648 sqmm
Ast Prv = 7 - #19 @ 200
= 2006 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 94.49 kN
Mux = 8.18 kNm
Muy = -1.11 kNm
P/A = 78.74 kN/sqm
Mx/Zx = 34.09 kN/sqm
My/Zy = -5.53 kN/sqm

Deff = 217 mm
Beff = 1000 mm
SPu = 112.83 kN/sqm
Vu = SPu X (Loff - d) X B
= 9.37 kN
Vc = 215.88 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
6: WIND LOAD+Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pu = 98.29 kN
Mux = 0.34 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 173 of 360

Muy = -4.02 kNm


P/A = 81.91 kN/sqm
Mx/Zx = 1.43 kN/sqm
My/Zy = -20.11 kN/sqm

Deff = 201 mm
Leff = 1200 mm
SPu = 102.02 kN/sqm
Vu = SPu X (Boff - d) X L
= 12.12 kN
Vc = 198.87 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 110.15 kN
Mux = 0.4 kNm
Muy = -1.11 kNm
P/A = 91.79 kN/sqm
Mx/Zx = 1.65 kN/sqm
My/Zy = -5.53 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 91.79 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 64.93 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 174 of 360

DEADLOAD)
Pu = 110.15 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 1.2 sqm
A1 > Base Area
Thus, A1 = 1.2
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 2.2361
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC37
Column No : C37 ( 600mm X 400mm)
Analysis No : 32

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 3200mm X 3000mm X 300mm
Effective Self Weight = 72.00 KN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 175 of 360

Offset Along L (Loff) = 1300 mm


Offset Along B (Boff) = 1300 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 26
Combination
Critical Load Combination = [15] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4: SEISMICLOAD-Z)
Pcomb = 637.34 kN
P = Pcomb + Effective Self Weight x 1.2
P = 723.74 kN
Mx = 3.88 kNm
My = 38.83 kNm
P/A = 75.39 kN/sqm
Mx/Zx = 0.76 kN/sqm
My/Zy = 8.09 kN/sqm
Maximum Soil Pressure = 84.24 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 24
Combination
Critical Load Combination = [13] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2:
SEISMICLOAD-Z)
Pcomb = 22.52 kN
P = Pcomb + Effective Self Weight x 1.2
P = 108.92 kN
Mx = 5.64 kNm
My = 5.64 kNm
P/A = 11.35 kN/sqm
Mx/Zx = 1.1 kN/sqm
My/Zy = -8.48 kN/sqm
Minimum Soil Pressure = 1.76 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 26
Combination
Critical Load Combination = [30] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4: SEISMICLOAD-Z)

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 176 of 360

Pu = 637.34 kN
Mux = 3.88 kNm
Muy = 38.83 kNm
P/A = 66.39 kN/sqm
Mx/Zx = 0.76 kN/sqm
My/Zy = 8.09 kN/sqm

Deff = 217 mm
Beff = 3000 mm
SPu = 67.15 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 170.22 kNm
Ast Rqd (BM) = 2197 sqmm
Ast Prv = 16 - #19 @ 200
= 4584 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 26
Combination
Critical Load Combination = [30] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4: SEISMICLOAD-Z)
Pu = 637.34 kN
Mux = 3.88 kNm
Muy = 38.83 kNm
P/A = 66.39 kN/sqm
Mx/Zx = 0.76 kN/sqm
My/Zy = 8.09 kN/sqm

Deff = 201 mm
Leff = 3200 mm
SPu = 74.48 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 201.39 kNm
Ast Rqd (BM) = 2836 sqmm
Ast Prv = 17 - #19 @ 200
= 4871 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 177 of 360

Critical Analysis Load = 26


Combination
Critical Load Combination = [30] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4: SEISMICLOAD-Z)
Pu = 637.34 kN
Mux = 3.88 kNm
Muy = 38.83 kNm
P/A = 66.39 kN/sqm
Mx/Zx = 0.76 kN/sqm
My/Zy = 8.09 kN/sqm

Deff = 217 mm
Beff = 3000 mm
SPu = 67.15 kN/sqm
Vu = SPu X (Loff - d) X B
= 218.16 kN
Vc = 598.73 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 26
Combination
Critical Load Combination = [30] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4:
SEISMICLOAD-Z)
Pu = 637.34 kN
Mux = 3.88 kNm
Muy = 38.83 kNm
P/A = 66.39 kN/sqm
Mx/Zx = 0.76 kN/sqm
My/Zy = 8.09 kN/sqm

Deff = 201 mm
Leff = 3200 mm
SPu = 74.48 kN/sqm
Vu = SPu X (Boff - d) X L
= 261.93 kN
Vc = 560.03 kN
Vu < Vc

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 178 of 360

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 26


Combination
Critical Load Combination = [30] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4: SEISMICLOAD-Z)
Pu = 637.34 kN
Mux = 3.88 kNm
Muy = 38.83 kNm
P/A = 66.39 kN/sqm
Mx/Zx = 0.76 kN/sqm
My/Zy = 8.09 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 66.39 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 604.63 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 26
Combination
Critical Load Combination = [30] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4:
SEISMICLOAD-Z)
Pu = 637.34 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 9.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 179 of 360

= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC38
Column No : C38 ( 600mm X 400mm)
Analysis No : 57

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 3600mm X 3400mm X 300mm
Effective Self Weight = 91.80 KN

Offset Along L (Loff) = 1500 mm


Offset Along B (Boff) = 1500 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 26
Combination
Critical Load Combination = [15] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4: SEISMICLOAD-Z)
Pcomb = 641.65 kN
P = Pcomb + Effective Self Weight x 1.2
P = 751.81 kN
Mx = -23.56 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 180 of 360

My = 44.41 kNm
P/A = 61.42 kN/sqm
Mx/Zx = -3.21 kN/sqm
My/Zy = 6.4 kN/sqm
Maximum Soil Pressure = 71.03 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 24
Combination
Critical Load Combination = [13] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2:
SEISMICLOAD-Z)
Pcomb = 18.00 kN
P = Pcomb + Effective Self Weight x 1.2
P = 128.16 kN
Mx = -25.16 kNm
My = -25.16 kNm
P/A = 10.47 kN/sqm
Mx/Zx = -3.43 kN/sqm
My/Zy = -6.15 kN/sqm
Minimum Soil Pressure = 0.89 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 26
Combination
Critical Load Combination = [30] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4: SEISMICLOAD-Z)
Pu = 641.65 kN
Mux = -23.56 kNm
Muy = 44.41 kNm
P/A = 52.42 kN/sqm
Mx/Zx = -3.21 kN/sqm
My/Zy = 6.4 kN/sqm

Deff = 217 mm
Beff = 3400 mm
SPu = 55.63 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 212.79 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 181 of 360

Ast Rqd (BM) = 2757 sqmm


Ast Prv = 18 - #19 @ 200
= 5157 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 26
Combination
Critical Load Combination = [30] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4: SEISMICLOAD-Z)
Pu = 641.65 kN
Mux = -23.56 kNm
Muy = 44.41 kNm
P/A = 52.42 kN/sqm
Mx/Zx = -3.21 kN/sqm
My/Zy = 6.4 kN/sqm

Deff = 201 mm
Leff = 3600 mm
SPu = 58.83 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 238.24 kNm
Ast Rqd (BM) = 3363 sqmm
Ast Prv = 19 - #19 @ 200
= 5444 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 26
Combination
Critical Load Combination = [30] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4: SEISMICLOAD-Z)
Pu = 641.65 kN
Mux = -23.56 kNm
Muy = 44.41 kNm
P/A = 52.42 kN/sqm
Mx/Zx = -3.21 kN/sqm
My/Zy = 6.4 kN/sqm

Deff = 217 mm
Beff = 3400 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 182 of 360

SPu = 55.63 kN/sqm


Vu = SPu X (Loff - d) X B
= 242.67 kN
Vc = 677.92 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 26
Combination
Critical Load Combination = [30] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4:
SEISMICLOAD-Z)
Pu = 641.65 kN
Mux = -23.56 kNm
Muy = 44.41 kNm
P/A = 52.42 kN/sqm
Mx/Zx = -3.21 kN/sqm
My/Zy = 6.4 kN/sqm

Deff = 201 mm
Leff = 3600 mm
SPu = 58.83 kN/sqm
Vu = SPu X (Boff - d) X L
= 275.09 kN
Vc = 634.12 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 26


Combination
Critical Load Combination = [30] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4: SEISMICLOAD-Z)
Pu = 641.65 kN
Mux = -23.56 kNm
Muy = 44.41 kNm
P/A = 52.42 kN/sqm
Mx/Zx = -3.21 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 183 of 360

My/Zy = 6.4 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 52.42 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 615.82 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 26
Combination
Critical Load Combination = [30] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4:
SEISMICLOAD-Z)
Pu = 641.65 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 12.24 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC39
Column No : C39 ( 600mm X 400mm)
Analysis No : 75

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 184 of 360

Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 3400mm X 3200mm X 300mm
Effective Self Weight = 81.60 KN

Offset Along L (Loff) = 1400 mm


Offset Along B (Boff) = 1400 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 21
Combination
Critical Load Combination = [10] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pcomb = 77.31 kN
P = Pcomb + Effective Self Weight x 1.2
P = 175.23 kN
Mx = 85.46 kNm
My = 3.37 kNm
P/A = 16.11 kN/sqm
Mx/Zx = 13.86 kN/sqm
My/Zy = 0.58 kN/sqm
Maximum Soil Pressure = 30.55 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 21
Combination
Critical Load Combination = [10] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 185 of 360

10: LIVELOAD) +(LOAD


7: WINDLOAD-X) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 77.31 kN
P = Pcomb + Effective Self Weight x 1.2
P = 175.23 kN
Mx = 85.46 kNm
My = 85.46 kNm
P/A = 16.11 kN/sqm
Mx/Zx = 13.86 kN/sqm
My/Zy = 0.58 kN/sqm
Minimum Soil Pressure = 1.66 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 21
Combination
Critical Load Combination = [25] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 77.31 kN
Mux = 85.46 kNm
Muy = 3.37 kNm
P/A = 7.11 kN/sqm
Mx/Zx = 13.86 kN/sqm
My/Zy = 0.58 kN/sqm

Deff = 217 mm
Beff = 3200 mm
SPu = 20.97 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 65.75 kNm
Ast Rqd (BM) = 1728 sqmm
Ast Prv = 17 - #19 @ 200
= 4871 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 90.8 kN
Mux = 0.66 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 186 of 360

Muy = 3.99 kNm


P/A = 8.35 kN/sqm
Mx/Zx = 0.11 kN/sqm
My/Zy = 0.69 kN/sqm

Deff = 201 mm
Leff = 3400 mm
SPu = 9.03 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 30.1 kNm
Ast Rqd (BM) = 1836 sqmm
Ast Prv = 18 - #19 @ 200
= 5157 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 21
Combination
Critical Load Combination = [25] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 77.31 kN
Mux = 85.46 kNm
Muy = 3.37 kNm
P/A = 7.11 kN/sqm
Mx/Zx = 13.86 kN/sqm
My/Zy = 0.58 kN/sqm

Deff = 217 mm
Beff = 3200 mm
SPu = 20.97 kN/sqm
Vu = SPu X (Loff - d) X B
= 79.37 kN
Vc = 638.32 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 12

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 187 of 360

Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 90.8 kN
Mux = 0.66 kNm
Muy = 3.99 kNm
P/A = 8.35 kN/sqm
Mx/Zx = 0.11 kN/sqm
My/Zy = 0.69 kN/sqm

Deff = 201 mm
Leff = 3400 mm
SPu = 9.03 kN/sqm
Vu = SPu X (Boff - d) X L
= 36.83 kN
Vc = 597.08 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 90.8 kN
Mux = 0.66 kNm
Muy = 3.99 kNm
P/A = 8.35 kN/sqm
Mx/Zx = 0.11 kN/sqm
My/Zy = 0.69 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 8.35 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 86.69 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 188 of 360

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 90.8 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 10.88 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC40
Column No : C40 ( 600mm X 400mm)
Analysis No : 69

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 189 of 360

Footing Size (L x B x D) : 2000mm X 1800mm X 300mm


Effective Self Weight = 27.00 KN

Offset Along L (Loff) = 700 mm


Offset Along B (Boff) = 700 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 23
Combination
Critical Load Combination = [12] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pcomb = 131.20 kN
P = Pcomb + Effective Self Weight x 1.2
P = 163.60 kN
Mx = -44.49 kNm
My = -2.6 kNm
P/A = 45.44 kN/sqm
Mx/Zx = -37.08 kN/sqm
My/Zy = -2.4 kN/sqm
Maximum Soil Pressure = 84.92 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 23
Combination
Critical Load Combination = [12] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1:
SEISMICLOAD+X)
Pcomb = 131.20 kN
P = Pcomb + Effective Self Weight x 1.2
P = 163.6 kN
Mx = -44.49 kNm
My = -44.49 kNm
P/A = 45.44 kN/sqm
Mx/Zx = -37.08 kN/sqm
My/Zy = -2.4 kN/sqm
Minimum Soil Pressure = 5.97 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 23

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 190 of 360

Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 131.2 kN
Mux = -44.49 kNm
Muy = -2.6 kNm
P/A = 36.44 kN/sqm
Mx/Zx = -37.08 kN/sqm
My/Zy = -2.4 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 73.52 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 32.42 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 17
Combination
Critical Load Combination = [21] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 7:
WINDLOAD-X) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 180.12 kN
Mux = 10.8 kNm
Muy = -2.03 kNm
P/A = 50.03 kN/sqm
Mx/Zx = 9 kN/sqm
My/Zy = -1.88 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 51.91 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 25.44 kNm
Ast Rqd (BM) = 1080 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 191 of 360

Critical Section @ d from Column Face


= 217 mm
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 131.2 kN
Mux = -44.49 kNm
Muy = -2.6 kNm
P/A = 36.44 kN/sqm
Mx/Zx = -37.08 kN/sqm
My/Zy = -2.4 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 73.52 kN/sqm
Vu = SPu X (Loff - d) X B
= 63.92 kN
Vc = 361.19 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 17
Combination
Critical Load Combination = [21] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
7: WINDLOAD-X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 180.12 kN
Mux = 10.8 kNm
Muy = -2.03 kNm
P/A = 50.03 kN/sqm
Mx/Zx = 9 kN/sqm
My/Zy = -1.88 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 51.91 kN/sqm
Vu = SPu X (Boff - d) X L
= 51.81 kN
Vc = 337.66 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 192 of 360

Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 17


Combination
Critical Load Combination = [21] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 7:
WINDLOAD-X) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 180.12 kN
Mux = 10.8 kNm
Muy = -2.03 kNm
P/A = 50.03 kN/sqm
Mx/Zx = 9 kN/sqm
My/Zy = -1.88 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 50.03 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 155.47 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 17
Combination
Critical Load Combination = [21] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
7: WINDLOAD-X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 180.12 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 3.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 193 of 360

Thus, Modification Factor = 2


Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC41
Column No : C41 ( 600mm X 400mm)
Analysis No : 71

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2400mm X 2200mm X 300mm
Effective Self Weight = 39.60 KN

Offset Along L (Loff) = 900 mm


Offset Along B (Boff) = 900 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 21
Combination
Critical Load Combination = [10] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pcomb = 82.50 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 194 of 360

P = Pcomb + Effective Self Weight x 1.2


P = 130.02 kN
Mx = 50.81 kNm
My = 0.28 kNm
P/A = 24.63 kN/sqm
Mx/Zx = 24.06 kN/sqm
My/Zy = 0.14 kN/sqm
Maximum Soil Pressure = 48.83 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 21
Combination
Critical Load Combination = [10] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
7: WINDLOAD-X) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 82.50 kN
P = Pcomb + Effective Self Weight x 1.2
P = 130.02 kN
Mx = 50.81 kNm
My = 50.81 kNm
P/A = 24.63 kN/sqm
Mx/Zx = 24.06 kN/sqm
My/Zy = 0.14 kN/sqm
Minimum Soil Pressure = 0.42 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 21
Combination
Critical Load Combination = [25] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 82.5 kN
Mux = 50.81 kNm
Muy = 0.28 kNm
P/A = 15.63 kN/sqm
Mx/Zx = 24.06 kN/sqm
My/Zy = 0.14 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 195 of 360

Deff = 217 mm
Beff = 2200 mm
SPu = 39.69 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 35.36 kNm
Ast Rqd (BM) = 1188 sqmm
Ast Prv = 12 - #19 @ 200
= 3438 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 98.37 kN
Mux = 7.08 kNm
Muy = 0.19 kNm
P/A = 18.63 kN/sqm
Mx/Zx = 3.35 kN/sqm
My/Zy = 0.1 kN/sqm

Deff = 201 mm
Leff = 2400 mm
SPu = 18.73 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 18.2 kNm
Ast Rqd (BM) = 1296 sqmm
Ast Prv = 13 - #19 @ 200
= 3725 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 21
Combination
Critical Load Combination = [25] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 7: WINDLOAD-X) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 82.5 kN
Mux = 50.81 kNm
Muy = 0.28 kNm
P/A = 15.63 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 196 of 360

Mx/Zx = 24.06 kN/sqm


My/Zy = 0.14 kN/sqm

Deff = 217 mm
Beff = 2200 mm
SPu = 39.69 kN/sqm
Vu = SPu X (Loff - d) X B
= 59.63 kN
Vc = 440.37 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 98.37 kN
Mux = 7.08 kNm
Muy = 0.19 kNm
P/A = 18.63 kN/sqm
Mx/Zx = 3.35 kN/sqm
My/Zy = 0.1 kN/sqm

Deff = 201 mm
Leff = 2400 mm
SPu = 18.73 kN/sqm
Vu = SPu X (Boff - d) X L
= 31.42 kN
Vc = 411.80 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 98.37 kN
Mux = 7.08 kNm
Muy = 0.19 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 197 of 360

P/A = 18.63 kN/sqm


Mx/Zx = 3.35 kN/sqm
My/Zy = 0.1 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 18.63 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 89.19 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 98.37 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 5.28 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC42
Column No : C42 ( 600mm X 400mm)
Analysis No : 9

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 198 of 360

Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 3200mm X 3000mm X 300mm
Effective Self Weight = 72.00 KN

Offset Along L (Loff) = 1300 mm


Offset Along B (Boff) = 1300 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 23
Combination
Critical Load Combination = [12] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pcomb = 86.54 kN
P = Pcomb + Effective Self Weight x 1.2
P = 172.94 kN
Mx = -75.1 kNm
My = 5.85 kNm
P/A = 18.01 kN/sqm
Mx/Zx = -14.67 kN/sqm
My/Zy = 1.22 kN/sqm
Maximum Soil Pressure = 33.9 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 23
Combination
Critical Load Combination = [12] : 1.2 (LOAD 9:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 199 of 360

DEADLOAD) +(LOAD 10:


LIVELOAD) +(LOAD 1:
SEISMICLOAD+X)
Pcomb = 86.54 kN
P = Pcomb + Effective Self Weight x 1.2
P = 172.94 kN
Mx = -75.1 kNm
My = -75.1 kNm
P/A = 18.01 kN/sqm
Mx/Zx = -14.67 kN/sqm
My/Zy = 1.22 kN/sqm
Minimum Soil Pressure = 2.13 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 86.54 kN
Mux = -75.1 kNm
Muy = 5.85 kNm
P/A = 9.01 kN/sqm
Mx/Zx = -14.67 kN/sqm
My/Zy = 1.22 kN/sqm

Deff = 217 mm
Beff = 3000 mm
SPu = 23.68 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 60.04 kNm
Ast Rqd (BM) = 1620 sqmm
Ast Prv = 16 - #19 @ 200
= 4584 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 122.28 kN
Mux = -19.72 kNm
Muy = 6.99 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 200 of 360

P/A = 12.74 kN/sqm


Mx/Zx = -3.85 kN/sqm
My/Zy = 1.46 kN/sqm

Deff = 201 mm
Leff = 3200 mm
SPu = 14.19 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 38.38 kNm
Ast Rqd (BM) = 1728 sqmm
Ast Prv = 17 - #19 @ 200
= 4871 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 86.54 kN
Mux = -75.1 kNm
Muy = 5.85 kNm
P/A = 9.01 kN/sqm
Mx/Zx = -14.67 kN/sqm
My/Zy = 1.22 kN/sqm

Deff = 217 mm
Beff = 3000 mm
SPu = 23.68 kN/sqm
Vu = SPu X (Loff - d) X B
= 76.95 kN
Vc = 598.73 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 201 of 360

DEADLOAD)
Pu = 122.28 kN
Mux = -19.72 kNm
Muy = 6.99 kNm
P/A = 12.74 kN/sqm
Mx/Zx = -3.85 kN/sqm
My/Zy = 1.46 kN/sqm

Deff = 201 mm
Leff = 3200 mm
SPu = 14.19 kN/sqm
Vu = SPu X (Boff - d) X L
= 49.91 kN
Vc = 560.03 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 25


Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 123.29 kN
Mux = 42 kNm
Muy = 6.15 kNm
P/A = 12.84 kN/sqm
Mx/Zx = 8.2 kN/sqm
My/Zy = 1.28 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 12.84 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 116.96 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 202 of 360

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pu = 123.29 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 9.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC43
Column No : C43 ( 600mm X 400mm)
Analysis No : 16

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 203 of 360

Footing Type : Pad


Footing Size (L x B x D) : 2600mm X 2400mm X 300mm
Effective Self Weight = 46.80 KN

Offset Along L (Loff) = 1000 mm


Offset Along B (Boff) = 1000 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 25
Combination
Critical Load Combination = [14] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pcomb = 130.72 kN
P = Pcomb + Effective Self Weight x 1.2
P = 186.88 kN
Mx = 68.27 kNm
My = 4.82 kNm
P/A = 29.95 kN/sqm
Mx/Zx = 25.25 kN/sqm
My/Zy = 1.93 kN/sqm
Maximum Soil Pressure = 57.13 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 25
Combination
Critical Load Combination = [14] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pcomb = 130.72 kN
P = Pcomb + Effective Self Weight x 1.2
P = 186.88 kN
Mx = 68.27 kNm
My = 68.27 kNm
P/A = 29.95 kN/sqm
Mx/Zx = 25.25 kN/sqm
My/Zy = 1.93 kN/sqm
Minimum Soil Pressure = 2.77 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 204 of 360

Critical Analysis Load = 25


Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 130.72 kN
Mux = 68.27 kNm
Muy = 4.82 kNm
P/A = 20.95 kN/sqm
Mx/Zx = 25.25 kN/sqm
My/Zy = 1.93 kN/sqm

Deff = 217 mm
Beff = 2400 mm
SPu = 46.19 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 55.43 kNm
Ast Rqd (BM) = 1296 sqmm
Ast Prv = 13 - #19 @ 200
= 3725 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 22
Combination
Critical Load Combination = [26] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 8: WINDLOAD-Z) +0.5 (LOAD
11: ROOFLIVELOAD)
Pu = 132.05 kN
Mux = 10.17 kNm
Muy = 15.45 kNm
P/A = 21.16 kN/sqm
Mx/Zx = 3.76 kN/sqm
My/Zy = 6.19 kN/sqm

Deff = 201 mm
Leff = 2600 mm
SPu = 27.35 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 35.56 kNm
Ast Rqd (BM) = 1404 sqmm
Ast Prv = 14 - #19 @ 200
= 4011 sqmm
Distributed Across Total Length

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 205 of 360

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 130.72 kN
Mux = 68.27 kNm
Muy = 4.82 kNm
P/A = 20.95 kN/sqm
Mx/Zx = 25.25 kN/sqm
My/Zy = 1.93 kN/sqm

Deff = 217 mm
Beff = 2400 mm
SPu = 46.19 kN/sqm
Vu = SPu X (Loff - d) X B
= 86.81 kN
Vc = 479.96 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 22
Combination
Critical Load Combination = [26] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
8: WINDLOAD-Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pu = 132.05 kN
Mux = 10.17 kNm
Muy = 15.45 kNm
P/A = 21.16 kN/sqm
Mx/Zx = 3.76 kN/sqm
My/Zy = 6.19 kN/sqm

Deff = 201 mm
Leff = 2600 mm
SPu = 27.35 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 206 of 360

Vu = SPu X (Boff - d) X L
= 56.82 kN
Vc = 448.87 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 153.36 kN
Mux = 11.5 kNm
Muy = 5.84 kNm
P/A = 24.58 kN/sqm
Mx/Zx = 4.25 kN/sqm
My/Zy = 2.34 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 24.58 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 141.25 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 153.36 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 6.24 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 207 of 360

Thus, Modification Factor = 2


Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC44
Column No : C44 ( 600mm X 400mm)
Analysis No : 19

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1600mm X 1400mm X 300mm
Effective Self Weight = 16.80 KN

Offset Along L (Loff) = 500 mm


Offset Along B (Boff) = 500 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pcomb = 127.88 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 208 of 360

P = Pcomb + Effective Self Weight x 1.2


P = 148.04 kN
Mx = 30.52 kNm
My = -0.25 kNm
P/A = 66.09 kN/sqm
Mx/Zx = 51.09 kN/sqm
My/Zy = -0.49 kN/sqm
Maximum Soil Pressure = 117.67 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 25
Combination
Critical Load Combination = [14] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pcomb = 113.06 kN
P = Pcomb + Effective Self Weight x 1.2
P = 133.22 kN
Mx = 12.69 kNm
My = 12.69 kNm
P/A = 59.47 kN/sqm
Mx/Zx = 21.24 kN/sqm
My/Zy = 29.1 kN/sqm
Minimum Soil Pressure = 9.14 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 127.88 kN
Mux = 30.52 kNm
Muy = -0.25 kNm
P/A = 57.09 kN/sqm
Mx/Zx = 51.09 kN/sqm
My/Zy = -0.49 kN/sqm

Deff = 217 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 209 of 360

Beff = 1400 mm
SPu = 108.18 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 18.93 kNm
Ast Rqd (BM) = 756 sqmm
Ast Prv = 8 - #19 @ 200
= 2292 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 126.99 kN
Mux = 12.6 kNm
Muy = -15.55 kNm
P/A = 56.69 kN/sqm
Mx/Zx = 21.09 kN/sqm
My/Zy = -29.75 kN/sqm

Deff = 201 mm
Leff = 1600 mm
SPu = 86.45 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 17.29 kNm
Ast Rqd (BM) = 864 sqmm
Ast Prv = 9 - #19 @ 200
= 2579 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 127.88 kN
Mux = 30.52 kNm
Muy = -0.25 kNm
P/A = 57.09 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 210 of 360

Mx/Zx = 51.09 kN/sqm


My/Zy = -0.49 kN/sqm

Deff = 217 mm
Beff = 1400 mm
SPu = 108.18 kN/sqm
Vu = SPu X (Loff - d) X B
= 42.86 kN
Vc = 282.01 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1:
SEISMICLOAD+X)
Pu = 126.99 kN
Mux = 12.6 kNm
Muy = -15.55 kNm
P/A = 56.69 kN/sqm
Mx/Zx = 21.09 kN/sqm
My/Zy = -29.75 kN/sqm

Deff = 201 mm
Leff = 1600 mm
SPu = 86.45 kN/sqm
Vu = SPu X (Boff - d) X L
= 41.36 kN
Vc = 263.48 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 140.05 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 211 of 360

Mux = 14.75 kNm


Muy = -0.31 kNm
P/A = 62.52 kN/sqm
Mx/Zx = 24.69 kN/sqm
My/Zy = -0.59 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 62.52 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 109.25 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 140.05 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 2.24 sqm
A1 > Base Area
Thus, A1 = 2.24
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.0551
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC45
Column No : C45 ( 600mm X 400mm)
Analysis No : 22

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 212 of 360

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1600mm X 1400mm X 300mm
Effective Self Weight = 16.80 KN

Offset Along L (Loff) = 500 mm


Offset Along B (Boff) = 500 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 16
Combination
Critical Load Combination = [5] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 6:
WIND LOAD+Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pcomb = 150.96 kN
P = Pcomb + Effective Self Weight x 1.2
P = 171.12 kN
Mx = 35.79 kNm
My = 0.09 kNm
P/A = 76.39 kN/sqm
Mx/Zx = 59.92 kN/sqm
My/Zy = 0.18 kN/sqm
Maximum Soil Pressure = 136.49 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 213 of 360

Critical Analysis Load = 25


Combination
Critical Load Combination = [14] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pcomb = 128.74 kN
P = Pcomb + Effective Self Weight x 1.2
P = 148.9 kN
Mx = 18.34 kNm
My = 18.34 kNm
P/A = 66.47 kN/sqm
Mx/Zx = 30.71 kN/sqm
My/Zy = 32.44 kN/sqm
Minimum Soil Pressure = 3.33 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 16
Combination
Critical Load Combination = [20] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 6:
WIND LOAD+Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 150.96 kN
Mux = 35.79 kNm
Muy = 0.09 kNm
P/A = 67.39 kN/sqm
Mx/Zx = 59.92 kN/sqm
My/Zy = 0.18 kN/sqm

Deff = 217 mm
Beff = 1400 mm
SPu = 127.31 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 22.28 kNm
Ast Rqd (BM) = 756 sqmm
Ast Prv = 8 - #19 @ 200
= 2292 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 214 of 360

Pu = 128.74 kN
Mux = 18.34 kNm
Muy = 16.95 kNm
P/A = 57.47 kN/sqm
Mx/Zx = 30.71 kN/sqm
My/Zy = 32.44 kN/sqm

Deff = 201 mm
Leff = 1600 mm
SPu = 89.91 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 17.98 kNm
Ast Rqd (BM) = 864 sqmm
Ast Prv = 9 - #19 @ 200
= 2579 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 16
Combination
Critical Load Combination = [20] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 6:
WIND LOAD+Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 150.96 kN
Mux = 35.79 kNm
Muy = 0.09 kNm
P/A = 67.39 kN/sqm
Mx/Zx = 59.92 kN/sqm
My/Zy = 0.18 kN/sqm

Deff = 217 mm
Beff = 1400 mm
SPu = 127.31 kN/sqm
Vu = SPu X (Loff - d) X B
= 50.44 kN
Vc = 282.01 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 215 of 360

= 201 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pu = 128.74 kN
Mux = 18.34 kNm
Muy = 16.95 kNm
P/A = 57.47 kN/sqm
Mx/Zx = 30.71 kN/sqm
My/Zy = 32.44 kN/sqm

Deff = 201 mm
Leff = 1600 mm
SPu = 89.91 kN/sqm
Vu = SPu X (Boff - d) X L
= 43.01 kN
Vc = 263.48 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 16


Combination
Critical Load Combination = [20] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 6:
WIND LOAD+Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 150.96 kN
Mux = 35.79 kNm
Muy = 0.09 kNm
P/A = 67.39 kN/sqm
Mx/Zx = 59.92 kN/sqm
My/Zy = 0.18 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 67.39 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 117.76 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 216 of 360

Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 16
Combination
Critical Load Combination = [20] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
6: WIND LOAD+Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 150.96 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 2.24 sqm
A1 > Base Area
Thus, A1 = 2.24
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.0551
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC46
Column No : C46 ( 600mm X 400mm)
Analysis No : 25

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 217 of 360

Live Load Reduction = 0 %


Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1800mm X 1600mm X 300mm
Effective Self Weight = 21.60 KN

Offset Along L (Loff) = 600 mm


Offset Along B (Boff) = 600 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 16
Combination
Critical Load Combination = [5] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 6:
WIND LOAD+Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pcomb = 148.81 kN
P = Pcomb + Effective Self Weight x 1.2
P = 174.73 kN
Mx = 37.59 kNm
My = 0.37 kNm
P/A = 60.67 kN/sqm
Mx/Zx = 43.51 kN/sqm
My/Zy = 0.49 kN/sqm
Maximum Soil Pressure = 104.66 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 23
Combination
Critical Load Combination = [12] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1:
SEISMICLOAD+X)
Pcomb = 107.29 kN
P = Pcomb + Effective Self Weight x 1.2
P = 133.21 kN
Mx = 19.29 kNm
My = 19.29 kNm
P/A = 46.25 kN/sqm
Mx/Zx = 22.32 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 218 of 360

My/Zy = -22.15 kN/sqm


Minimum Soil Pressure = 1.78 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 16
Combination
Critical Load Combination = [20] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 6:
WIND LOAD+Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 148.81 kN
Mux = 37.59 kNm
Muy = 0.37 kNm
P/A = 51.67 kN/sqm
Mx/Zx = 43.51 kN/sqm
My/Zy = 0.49 kN/sqm

Deff = 217 mm
Beff = 1600 mm
SPu = 95.17 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 27.41 kNm
Ast Rqd (BM) = 864 sqmm
Ast Prv = 9 - #19 @ 200
= 2579 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 132.01 kN
Mux = 19.57 kNm
Muy = 17.82 kNm
P/A = 45.84 kN/sqm
Mx/Zx = 22.66 kN/sqm
My/Zy = 23.21 kN/sqm

Deff = 201 mm
Leff = 1800 mm
SPu = 69.04 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 22.37 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 219 of 360

Ast Rqd (BM) = 972 sqmm


Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 16
Combination
Critical Load Combination = [20] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 6:
WIND LOAD+Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 148.81 kN
Mux = 37.59 kNm
Muy = 0.37 kNm
P/A = 51.67 kN/sqm
Mx/Zx = 43.51 kN/sqm
My/Zy = 0.49 kN/sqm

Deff = 217 mm
Beff = 1600 mm
SPu = 95.17 kN/sqm
Vu = SPu X (Loff - d) X B
= 58.32 kN
Vc = 321.60 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pu = 132.01 kN
Mux = 19.57 kNm
Muy = 17.82 kNm
P/A = 45.84 kN/sqm
Mx/Zx = 22.66 kN/sqm
My/Zy = 23.21 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 220 of 360

Deff = 201 mm
Leff = 1800 mm
SPu = 69.04 kN/sqm
Vu = SPu X (Boff - d) X L
= 49.59 kN
Vc = 300.58 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 16


Combination
Critical Load Combination = [20] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 6:
WIND LOAD+Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 148.81 kN
Mux = 37.59 kNm
Muy = 0.37 kNm
P/A = 51.67 kN/sqm
Mx/Zx = 43.51 kN/sqm
My/Zy = 0.49 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 51.67 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 123.35 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 16
Combination
Critical Load Combination = [20] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
6: WIND LOAD+Z) +1.6
(LOAD 11:
ROOFLIVELOAD)

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 221 of 360

Pu = 148.81 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 2.88 sqm
A1 > Base Area
Thus, A1 = 2.88
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC47
Column No : C47 ( 600mm X 400mm)
Analysis No : 28

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 4400mm X 4200mm X 300mm
Effective Self Weight = 138.60 KN

Offset Along L (Loff) = 1900 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 222 of 360

Offset Along B (Boff) = 1900 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 24
Combination
Critical Load Combination = [13] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2: SEISMICLOAD-Z)
Pcomb = 593.07 kN
P = Pcomb + Effective Self Weight x 1.2
P = 759.39 kN
Mx = 71.42 kNm
My = -5.22 kNm
P/A = 41.09 kN/sqm
Mx/Zx = 5.27 kN/sqm
My/Zy = -0.4 kN/sqm
Maximum Soil Pressure = 46.77 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 26
Combination
Critical Load Combination = [15] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4:
SEISMICLOAD-Z)
Pcomb = -58.77 kN
P = Pcomb + Effective Self Weight x 1.2
P = 107.55 kN
Mx = -71.39 kNm
My = -71.39 kNm
P/A = 5.82 kN/sqm
Mx/Zx = -5.27 kN/sqm
My/Zy = -0.32 kN/sqm
Minimum Soil Pressure = 0.23 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 24
Combination
Critical Load Combination = [28] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2: SEISMICLOAD-Z)
Pu = 593.07 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 223 of 360

Mux = 71.42 kNm


Muy = -5.22 kNm
P/A = 32.09 kN/sqm
Mx/Zx = 5.27 kN/sqm
My/Zy = -0.4 kN/sqm

Deff = 217 mm
Beff = 4200 mm
SPu = 37.36 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 283.25 kNm
Ast Rqd (BM) = 3681 sqmm
Ast Prv = 22 - #19 @ 200
= 6303 sqmm
Distributed Across Total Width

Top Steel Along L:


Deff = 217 mm
Beff = 4200 mm
S/W + Soil + Surcharge Load = 54.3 kN/sqm
Mu = 493.98 kNm
Pt = 0.73 %
Maximum of following
Ast Rqd (BM) = 6635 sqmm
Ast = Min Pt for Top Reinforcement X D X B
= 0.13% X 300.00 X 4200
= 1638 sqmm
Max Ast = 6635 sqmm
Ast Prv = 24 - #19 @ 190 c/c
= 6805 sqmm

Bottom Reinforcement Along B:


Critical Analysis Load = 24
Combination
Critical Load Combination = [28] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2: SEISMICLOAD-Z)
Pu = 593.07 kN
Mux = 71.42 kNm
Muy = -5.22 kNm
P/A = 32.09 kN/sqm
Mx/Zx = 5.27 kN/sqm
My/Zy = -0.4 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 224 of 360

Deff = 201 mm
Leff = 4400 mm
SPu = 32.5 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 258.08 kNm
Ast Rqd (BM) = 3623 sqmm
Ast Prv = 23 - #19 @ 200
= 6590 sqmm
Distributed Across Total Length

Top Steel Along B:


Deff = 217 mm
Beff = 4200 mm
S/W + Soil + Surcharge Load = 54.3 kN/sqm
Mu = 493.98 kNm
Pt = 0.73 %
Maximum of following
Ast Rqd (BM) = 7609 sqmm
Ast = Min Pt for Top Reinforcement X D X B
= 0.13% X 300.00 X 4200
= 1638 sqmm
Max Ast = 7609 sqmm
Ast Prv = 27 - #19 @ 170 c/c
= 7655 sqmm
Design For Shear:
One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 24
Combination
Critical Load Combination = [28] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2: SEISMICLOAD-Z)
Pu = 593.07 kN
Mux = 71.42 kNm
Muy = -5.22 kNm
P/A = 32.09 kN/sqm
Mx/Zx = 5.27 kN/sqm
My/Zy = -0.4 kN/sqm

Deff = 217 mm
Beff = 4200 mm
SPu = 37.36 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 225 of 360

Vu = SPu X (Loff - d) X B
= 264.10 kN
Vc = 836.28 kN
Vu < Vc
One Way Shear Along L (Tension Case):
At face of column
Soil + Surcharge Load,q = 54.3 kN/sqm
Deff = 217 mm
Beff = 4200 mm
Vu = q x Loff X B X 1.2
= 519.98 kN
Vc = 841.92 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 24
Combination
Critical Load Combination = [28] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2:
SEISMICLOAD-Z)
Pu = 593.07 kN
Mux = 71.42 kNm
Muy = -5.22 kNm
P/A = 32.09 kN/sqm
Mx/Zx = 5.27 kN/sqm
My/Zy = -0.4 kN/sqm

Deff = 201 mm
Leff = 4400 mm
SPu = 32.5 kN/sqm
Vu = SPu X (Boff - d) X L
= 242.93 kN
Vc = 782.30 kN
Vu < Vc

One Way Shear Along B (Tension Case):


At face of Column
Soil + Surcharge Load,q = 54.3 kN/sqm
Deff = 201 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 226 of 360

Leff = 4400 mm
Vu = q x Boff X L X 1.2
= 544.74 kN
Vc = 836.87 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 24


Combination
Critical Load Combination = [28] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2: SEISMICLOAD-Z)
Pu = 593.07 kN
Mux = 71.42 kNm
Muy = -5.22 kNm
P/A = 32.09 kN/sqm
Mx/Zx = 5.27 kN/sqm
My/Zy = -0.4 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 32.09 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 577.26 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Design For Punching Shear (Tension Case):


At face of column
Soil + Surcharge Load,q = 54.3 kN/sqm
Deff = 209 mm
Leff = 600 mm
Beff = 400 mm
Vu = q x ((L X B)-(ColD X ColB)
= -58.77 kN
Vc = 1481.81 kN
Vu < Vc

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 227 of 360

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 24
Combination
Critical Load Combination = [28] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2:
SEISMICLOAD-Z)
Pu = 593.07 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 18.48 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC48
Column No : C48 ( 600mm X 400mm)
Analysis No : 34

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 228 of 360

Footing Type : Pad


Footing Size (L x B x D) : 1800mm X 1600mm X 300mm
Effective Self Weight = 21.60 KN

Offset Along L (Loff) = 600 mm


Offset Along B (Boff) = 600 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 24
Combination
Critical Load Combination = [13] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2: SEISMICLOAD-Z)
Pcomb = 365.21 kN
P = Pcomb + Effective Self Weight x 1.2
P = 391.13 kN
Mx = 20.68 kNm
My = 4.55 kNm
P/A = 135.81 kN/sqm
Mx/Zx = 23.94 kN/sqm
My/Zy = 5.93 kN/sqm
Maximum Soil Pressure = 165.67 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 18
Combination
Critical Load Combination = [7] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
8: WINDLOAD-Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 282.09 kN
P = Pcomb + Effective Self Weight x 1.2
P = 308.01 kN
Mx = -10.41 kNm
My = -10.41 kNm
P/A = 106.95 kN/sqm
Mx/Zx = -12.04 kN/sqm
My/Zy = 4.98 kN/sqm
Minimum Soil Pressure = 89.92 kN/sqm
> 0

Design For Bending:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 229 of 360

Bottom Reinforcement Along L:


Critical Analysis Load = 24
Combination
Critical Load Combination = [28] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2: SEISMICLOAD-Z)
Pu = 365.21 kN
Mux = 20.68 kNm
Muy = 4.55 kNm
P/A = 126.81 kN/sqm
Mx/Zx = 23.94 kN/sqm
My/Zy = 5.93 kN/sqm

Deff = 217 mm
Beff = 1600 mm
SPu = 150.74 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 43.41 kNm
Ast Rqd (BM) = 864 sqmm
Ast Prv = 9 - #19 @ 200
= 2579 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 423.77 kN
Mux = -0.65 kNm
Muy = 3.67 kNm
P/A = 147.14 kN/sqm
Mx/Zx = -0.75 kN/sqm
My/Zy = 4.77 kN/sqm

Deff = 201 mm
Leff = 1800 mm
SPu = 151.92 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 49.22 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Length

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 230 of 360

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 24
Combination
Critical Load Combination = [28] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2: SEISMICLOAD-Z)
Pu = 365.21 kN
Mux = 20.68 kNm
Muy = 4.55 kNm
P/A = 126.81 kN/sqm
Mx/Zx = 23.94 kN/sqm
My/Zy = 5.93 kN/sqm

Deff = 217 mm
Beff = 1600 mm
SPu = 150.74 kN/sqm
Vu = SPu X (Loff - d) X B
= 92.38 kN
Vc = 321.60 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 423.77 kN
Mux = -0.65 kNm
Muy = 3.67 kNm
P/A = 147.14 kN/sqm
Mx/Zx = -0.75 kN/sqm
My/Zy = 4.77 kN/sqm

Deff = 201 mm
Leff = 1800 mm
SPu = 151.92 kN/sqm
Vu = SPu X (Boff - d) X L

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 231 of 360

= 109.11 kN
Vc = 300.58 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 423.77 kN
Mux = -0.65 kNm
Muy = 3.67 kNm
P/A = 147.14 kN/sqm
Mx/Zx = -0.75 kN/sqm
My/Zy = 4.77 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 147.14 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 351.28 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 423.77 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 2.88 sqm
A1 > Base Area
Thus, A1 = 2.88

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 232 of 360

Modification Factor = SquareRoot(A1/A2) < = 2


SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC49
Column No : C49 ( 600mm X 400mm)
Analysis No : 39

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1800mm X 1600mm X 300mm
Effective Self Weight = 21.60 KN

Offset Along L (Loff) = 600 mm


Offset Along B (Boff) = 600 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 25
Combination
Critical Load Combination = [14] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 233 of 360

Pcomb = 339.38 kN
P = Pcomb + Effective Self Weight x 1.2
P = 365.30 kN
Mx = 2.74 kNm
My = 25.17 kNm
P/A = 126.84 kN/sqm
Mx/Zx = 3.17 kN/sqm
My/Zy = 32.77 kN/sqm
Maximum Soil Pressure = 162.78 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 23
Combination
Critical Load Combination = [12] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1:
SEISMICLOAD+X)
Pcomb = 302.86 kN
P = Pcomb + Effective Self Weight x 1.2
P = 328.78 kN
Mx = 2.57 kNm
My = 2.57 kNm
P/A = 114.16 kN/sqm
Mx/Zx = 2.98 kN/sqm
My/Zy = -31.64 kN/sqm
Minimum Soil Pressure = 79.54 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 383.77 kN
Mux = 3.36 kNm
Muy = 0.37 kNm
P/A = 133.25 kN/sqm
Mx/Zx = 3.89 kN/sqm
My/Zy = 0.48 kN/sqm

Deff = 217 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 234 of 360

Beff = 1600 mm
SPu = 137.14 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 39.5 kNm
Ast Rqd (BM) = 864 sqmm
Ast Prv = 9 - #19 @ 200
= 2579 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 339.38 kN
Mux = 2.74 kNm
Muy = 25.17 kNm
P/A = 117.84 kN/sqm
Mx/Zx = 3.17 kN/sqm
My/Zy = 32.77 kN/sqm

Deff = 201 mm
Leff = 1800 mm
SPu = 150.61 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 48.8 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 383.77 kN
Mux = 3.36 kNm
Muy = 0.37 kNm
P/A = 133.25 kN/sqm
Mx/Zx = 3.89 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 235 of 360

My/Zy = 0.48 kN/sqm

Deff = 217 mm
Beff = 1600 mm
SPu = 137.14 kN/sqm
Vu = SPu X (Loff - d) X B
= 84.04 kN
Vc = 321.60 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pu = 339.38 kN
Mux = 2.74 kNm
Muy = 25.17 kNm
P/A = 117.84 kN/sqm
Mx/Zx = 3.17 kN/sqm
My/Zy = 32.77 kN/sqm

Deff = 201 mm
Leff = 1800 mm
SPu = 150.61 kN/sqm
Vu = SPu X (Boff - d) X L
= 108.17 kN
Vc = 300.58 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 383.77 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 236 of 360

Mux = 3.36 kNm


Muy = 0.37 kNm
P/A = 133.25 kN/sqm
Mx/Zx = 3.89 kN/sqm
My/Zy = 0.48 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 133.25 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 318.12 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 383.77 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 2.88 sqm
A1 > Base Area
Thus, A1 = 2.88
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC50
Column No : C50 ( 600mm X 400mm)
Analysis No : 44

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 237 of 360

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1800mm X 1600mm X 300mm
Effective Self Weight = 21.60 KN

Offset Along L (Loff) = 600 mm


Offset Along B (Boff) = 600 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 23
Combination
Critical Load Combination = [12] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pcomb = 355.38 kN
P = Pcomb + Effective Self Weight x 1.2
P = 381.30 kN
Mx = 4.24 kNm
My = -24.23 kNm
P/A = 132.39 kN/sqm
Mx/Zx = 4.91 kN/sqm
My/Zy = -31.55 kN/sqm
Maximum Soil Pressure = 168.85 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 238 of 360

Check For Minimum Soil Pressure:


Critical Analysis Load = 25
Combination
Critical Load Combination = [14] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pcomb = 311.12 kN
P = Pcomb + Effective Self Weight x 1.2
P = 337.04 kN
Mx = 4.01 kNm
My = 4.01 kNm
P/A = 117.03 kN/sqm
Mx/Zx = 4.64 kN/sqm
My/Zy = 32.88 kN/sqm
Minimum Soil Pressure = 79.51 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 398.45 kN
Mux = 5.23 kNm
Muy = 1.22 kNm
P/A = 138.35 kN/sqm
Mx/Zx = 6.05 kN/sqm
My/Zy = 1.59 kN/sqm

Deff = 217 mm
Beff = 1600 mm
SPu = 144.4 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 41.59 kNm
Ast Rqd (BM) = 864 sqmm
Ast Prv = 9 - #19 @ 200
= 2579 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 23
Combination

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 239 of 360

Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:


LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 355.38 kN
Mux = 4.24 kNm
Muy = -24.23 kNm
P/A = 123.39 kN/sqm
Mx/Zx = 4.91 kN/sqm
My/Zy = -31.55 kN/sqm

Deff = 201 mm
Leff = 1800 mm
SPu = 154.94 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 50.2 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 398.45 kN
Mux = 5.23 kNm
Muy = 1.22 kNm
P/A = 138.35 kN/sqm
Mx/Zx = 6.05 kN/sqm
My/Zy = 1.59 kN/sqm

Deff = 217 mm
Beff = 1600 mm
SPu = 144.4 kN/sqm
Vu = SPu X (Loff - d) X B
= 88.49 kN
Vc = 321.60 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 240 of 360

= 201 mm
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1:
SEISMICLOAD+X)
Pu = 355.38 kN
Mux = 4.24 kNm
Muy = -24.23 kNm
P/A = 123.39 kN/sqm
Mx/Zx = 4.91 kN/sqm
My/Zy = -31.55 kN/sqm

Deff = 201 mm
Leff = 1800 mm
SPu = 154.94 kN/sqm
Vu = SPu X (Boff - d) X L
= 111.28 kN
Vc = 300.58 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 398.45 kN
Mux = 5.23 kNm
Muy = 1.22 kNm
P/A = 138.35 kN/sqm
Mx/Zx = 6.05 kN/sqm
My/Zy = 1.59 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 138.35 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 241 of 360

= 330.29 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 398.45 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 2.88 sqm
A1 > Base Area
Thus, A1 = 2.88
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC51
Column No : C51 ( 600mm X 400mm)
Analysis No : 49

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 242 of 360

Live Load Reduction = 0 %


Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1800mm X 1600mm X 300mm
Effective Self Weight = 21.60 KN

Offset Along L (Loff) = 600 mm


Offset Along B (Boff) = 600 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 24
Combination
Critical Load Combination = [13] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2: SEISMICLOAD-Z)
Pcomb = 374.41 kN
P = Pcomb + Effective Self Weight x 1.2
P = 400.33 kN
Mx = 25.15 kNm
My = 0.48 kNm
P/A = 139 kN/sqm
Mx/Zx = 29.11 kN/sqm
My/Zy = 0.63 kN/sqm
Maximum Soil Pressure = 168.74 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 18
Combination
Critical Load Combination = [7] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
8: WINDLOAD-Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 287.98 kN
P = Pcomb + Effective Self Weight x 1.2
P = 313.9 kN
Mx = -6.99 kNm
My = -6.99 kNm
P/A = 108.99 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 243 of 360

Mx/Zx = -8.09 kN/sqm


My/Zy = 0.74 kN/sqm
Minimum Soil Pressure = 100.16 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 24
Combination
Critical Load Combination = [28] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2: SEISMICLOAD-Z)
Pu = 374.41 kN
Mux = 25.15 kNm
Muy = 0.48 kNm
P/A = 130 kN/sqm
Mx/Zx = 29.11 kN/sqm
My/Zy = 0.63 kN/sqm

Deff = 217 mm
Beff = 1600 mm
SPu = 159.11 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 45.82 kNm
Ast Rqd (BM) = 864 sqmm
Ast Prv = 9 - #19 @ 200
= 2579 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 438.78 kN
Mux = 2.52 kNm
Muy = 0.89 kNm
P/A = 152.35 kN/sqm
Mx/Zx = 2.92 kN/sqm
My/Zy = 1.16 kN/sqm

Deff = 201 mm
Leff = 1800 mm
SPu = 153.51 kN/sqm
Mu = SPu X L X Boff X Boff / 2

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 244 of 360

= 49.74 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 24
Combination
Critical Load Combination = [28] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2: SEISMICLOAD-Z)
Pu = 374.41 kN
Mux = 25.15 kNm
Muy = 0.48 kNm
P/A = 130 kN/sqm
Mx/Zx = 29.11 kN/sqm
My/Zy = 0.63 kN/sqm

Deff = 217 mm
Beff = 1600 mm
SPu = 159.11 kN/sqm
Vu = SPu X (Loff - d) X B
= 97.50 kN
Vc = 321.60 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 438.78 kN
Mux = 2.52 kNm
Muy = 0.89 kNm
P/A = 152.35 kN/sqm
Mx/Zx = 2.92 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 245 of 360

My/Zy = 1.16 kN/sqm

Deff = 201 mm
Leff = 1800 mm
SPu = 153.51 kN/sqm
Vu = SPu X (Boff - d) X L
= 110.25 kN
Vc = 300.58 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 438.78 kN
Mux = 2.52 kNm
Muy = 0.89 kNm
P/A = 152.35 kN/sqm
Mx/Zx = 2.92 kN/sqm
My/Zy = 1.16 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 152.35 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 363.72 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 246 of 360

Pu = 438.78 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 2.88 sqm
A1 > Base Area
Thus, A1 = 2.88
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC52
Column No : C52 ( 600mm X 400mm)
Analysis No : 54

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 4800mm X 4600mm X 300mm
Effective Self Weight = 165.60 KN

Offset Along L (Loff) = 2100 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 247 of 360

Offset Along B (Boff) = 2100 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 24
Combination
Critical Load Combination = [13] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2: SEISMICLOAD-Z)
Pcomb = 564.25 kN
P = Pcomb + Effective Self Weight x 1.2
P = 762.97 kN
Mx = 77.14 kNm
My = -5.12 kNm
P/A = 34.55 kN/sqm
Mx/Zx = 4.37 kN/sqm
My/Zy = -0.3 kN/sqm
Maximum Soil Pressure = 39.22 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 26
Combination
Critical Load Combination = [15] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 4:
SEISMICLOAD-Z)
Pcomb = -97.74 kN
P = Pcomb + Effective Self Weight x 1.2
P = 100.98 kN
Mx = -73.38 kNm
My = -73.38 kNm
P/A = 4.57 kN/sqm
Mx/Zx = -4.15 kN/sqm
My/Zy = -0.32 kN/sqm
Minimum Soil Pressure = 0.1 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 24
Combination
Critical Load Combination = [28] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2: SEISMICLOAD-Z)
Pu = 564.25 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 248 of 360

Mux = 77.14 kNm


Muy = -5.12 kNm
P/A = 25.55 kN/sqm
Mx/Zx = 4.37 kN/sqm
My/Zy = -0.3 kN/sqm

Deff = 217 mm
Beff = 4600 mm
SPu = 29.92 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 303.5 kNm
Ast Rqd (BM) = 3940 sqmm
Ast Prv = 24 - #19 @ 200
= 6876 sqmm
Distributed Across Total Width

Top Steel Along L:


Deff = 217 mm
Beff = 4600 mm
S/W + Soil + Surcharge Load = 54.3 kN/sqm
Mu = 660.92 kNm
Pt = 0.91 %
Maximum of following
Ast Rqd (BM) = 9045 sqmm
Ast = Min Pt for Top Reinforcement X D X B
= 0.13% X 300.00 X 4600
= 1794 sqmm
Max Ast = 9045 sqmm
Ast Prv = 32 - #19 @ 150 c/c
= 9073 sqmm

Bottom Reinforcement Along B:


Critical Analysis Load = 24
Combination
Critical Load Combination = [28] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2: SEISMICLOAD-Z)
Pu = 564.25 kN
Mux = 77.14 kNm
Muy = -5.12 kNm
P/A = 25.55 kN/sqm
Mx/Zx = 4.37 kN/sqm
My/Zy = -0.3 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 249 of 360

Deff = 201 mm
Leff = 4800 mm
SPu = 25.86 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 273.67 kNm
Ast Rqd (BM) = 3837 sqmm
Ast Prv = 25 - #19 @ 200
= 7163 sqmm
Distributed Across Total Length

Top Steel Along B:


Deff = 217 mm
Beff = 4600 mm
S/W + Soil + Surcharge Load = 54.3 kN/sqm
Mu = 660.92 kNm
Pt = 0.91 %
Maximum of following
Ast Rqd (BM) = 10375 sqmm
Ast = Min Pt for Top Reinforcement X D X B
= 0.13% X 300.00 X 4600
= 1794 sqmm
Max Ast = 10375 sqmm
Ast Prv = 38 - #19 @ 130 c/c
= 10774 sqmm
Design For Shear:
One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 24
Combination
Critical Load Combination = [28] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2: SEISMICLOAD-Z)
Pu = 564.25 kN
Mux = 77.14 kNm
Muy = -5.12 kNm
P/A = 25.55 kN/sqm
Mx/Zx = 4.37 kN/sqm
My/Zy = -0.3 kN/sqm

Deff = 217 mm
Beff = 4600 mm
SPu = 29.92 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 250 of 360

Vu = SPu X (Loff - d) X B
= 259.18 kN
Vc = 915.46 kN
Vu < Vc
One Way Shear Along L (Tension Case):
At face of column
Soil + Surcharge Load,q = 54.3 kN/sqm
Deff = 217 mm
Beff = 4600 mm
Vu = q x Loff X B X 1.2
= 629.45 kN
Vc = 952.32 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 24
Combination
Critical Load Combination = [28] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2:
SEISMICLOAD-Z)
Pu = 564.25 kN
Mux = 77.14 kNm
Muy = -5.12 kNm
P/A = 25.55 kN/sqm
Mx/Zx = 4.37 kN/sqm
My/Zy = -0.3 kN/sqm

Deff = 201 mm
Leff = 4800 mm
SPu = 25.86 kN/sqm
Vu = SPu X (Boff - d) X L
= 235.70 kN
Vc = 856.38 kN
Vu < Vc

One Way Shear Along B (Tension Case):


At face of Column
Soil + Surcharge Load,q = 54.3 kN/sqm
Deff = 201 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 251 of 360

Leff = 4800 mm
Vu = q x Boff X L X 1.2
= 656.81 kN
Vc = 948.21 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 24


Combination
Critical Load Combination = [28] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2: SEISMICLOAD-Z)
Pu = 564.25 kN
Mux = 77.14 kNm
Muy = -5.12 kNm
P/A = 25.55 kN/sqm
Mx/Zx = 4.37 kN/sqm
My/Zy = -0.3 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 25.55 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 551.66 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Design For Punching Shear (Tension Case):


At face of column
Soil + Surcharge Load,q = 54.3 kN/sqm
Deff = 209 mm
Leff = 600 mm
Beff = 400 mm
Vu = q x ((L X B)-(ColD X ColB)
= -97.74 kN
Vc = 1481.81 kN
Vu < Vc

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 252 of 360

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 24
Combination
Critical Load Combination = [28] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 2:
SEISMICLOAD-Z)
Pu = 564.25 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 22.08 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC53
Column No : C53 ( 600mm X 400mm)
Analysis No : 60

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 253 of 360

Footing Type : Pad


Footing Size (L x B x D) : 2000mm X 1800mm X 300mm
Effective Self Weight = 27.00 KN

Offset Along L (Loff) = 700 mm


Offset Along B (Boff) = 700 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pcomb = 161.61 kN
P = Pcomb + Effective Self Weight x 1.2
P = 194.01 kN
Mx = 61.04 kNm
My = 1.62 kNm
P/A = 53.89 kN/sqm
Mx/Zx = 50.87 kN/sqm
My/Zy = 1.5 kN/sqm
Maximum Soil Pressure = 106.26 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
6: WIND LOAD+Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 161.61 kN
P = Pcomb + Effective Self Weight x 1.2
P = 194.01 kN
Mx = 61.04 kNm
My = 61.04 kNm
P/A = 53.89 kN/sqm
Mx/Zx = 50.87 kN/sqm
My/Zy = 1.5 kN/sqm
Minimum Soil Pressure = 1.52 kN/sqm
> 0

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 254 of 360

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 161.61 kN
Mux = 61.04 kNm
Muy = 1.62 kNm
P/A = 44.89 kN/sqm
Mx/Zx = 50.87 kN/sqm
My/Zy = 1.5 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 95.76 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 42.23 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 160.5 kN
Mux = 25.43 kNm
Muy = -6.64 kNm
P/A = 44.58 kN/sqm
Mx/Zx = 21.19 kN/sqm
My/Zy = -6.15 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 50.73 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 24.86 kNm
Ast Rqd (BM) = 1080 sqmm
Ast Prv = 11 - #19 @ 200

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 255 of 360

= 3152 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 161.61 kN
Mux = 61.04 kNm
Muy = 1.62 kNm
P/A = 44.89 kN/sqm
Mx/Zx = 50.87 kN/sqm
My/Zy = 1.5 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 95.76 kN/sqm
Vu = SPu X (Loff - d) X B
= 83.25 kN
Vc = 361.19 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1:
SEISMICLOAD+X)
Pu = 160.5 kN
Mux = 25.43 kNm
Muy = -6.64 kNm
P/A = 44.58 kN/sqm
Mx/Zx = 21.19 kN/sqm
My/Zy = -6.15 kN/sqm

Deff = 201 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 256 of 360

Leff = 2000 mm
SPu = 50.73 kN/sqm
Vu = SPu X (Boff - d) X L
= 50.63 kN
Vc = 337.66 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 16


Combination
Critical Load Combination = [20] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 6:
WIND LOAD+Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 178.71 kN
Mux = 54.23 kNm
Muy = 1.1 kNm
P/A = 49.64 kN/sqm
Mx/Zx = 45.19 kN/sqm
My/Zy = 1.02 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 49.64 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 154.26 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 16
Combination
Critical Load Combination = [20] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
6: WIND LOAD+Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 178.71 kN
A2 = 0.24 sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 257 of 360

A1 = 2.88 sqm
Base Area = 3.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC54
Column No : C54 ( 600mm X 400mm)
Analysis No : 62

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2000mm X 1800mm X 300mm
Effective Self Weight = 27.00 KN

Offset Along L (Loff) = 700 mm


Offset Along B (Boff) = 700 mm

Check For Maximum Soil Pressure:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 258 of 360

Critical Analysis Load = 20


Combination
Critical Load Combination = [9] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pcomb = 153.75 kN
P = Pcomb + Effective Self Weight x 1.2
P = 186.15 kN
Mx = 60.73 kNm
My = 1 kNm
P/A = 51.71 kN/sqm
Mx/Zx = 50.6 kN/sqm
My/Zy = 0.92 kN/sqm
Maximum Soil Pressure = 103.24 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
6: WIND LOAD+Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 153.75 kN
P = Pcomb + Effective Self Weight x 1.2
P = 186.15 kN
Mx = 60.73 kNm
My = 60.73 kNm
P/A = 51.71 kN/sqm
Mx/Zx = 50.6 kN/sqm
My/Zy = 0.92 kN/sqm
Minimum Soil Pressure = 0.18 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 153.75 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 259 of 360

Mux = 60.73 kNm


Muy = 1 kNm
P/A = 42.71 kN/sqm
Mx/Zx = 50.6 kN/sqm
My/Zy = 0.92 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 93.31 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 41.15 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 17
Combination
Critical Load Combination = [21] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 7:
WINDLOAD-X) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 171.76 kN
Mux = 37.36 kNm
Muy = 1.75 kNm
P/A = 47.71 kN/sqm
Mx/Zx = 31.13 kN/sqm
My/Zy = 1.62 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 49.33 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 24.17 kNm
Ast Rqd (BM) = 1080 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 20
Combination

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 260 of 360

Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 153.75 kN
Mux = 60.73 kNm
Muy = 1 kNm
P/A = 42.71 kN/sqm
Mx/Zx = 50.6 kN/sqm
My/Zy = 0.92 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 93.31 kN/sqm
Vu = SPu X (Loff - d) X B
= 81.13 kN
Vc = 361.19 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 17
Combination
Critical Load Combination = [21] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
7: WINDLOAD-X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 171.76 kN
Mux = 37.36 kNm
Muy = 1.75 kNm
P/A = 47.71 kN/sqm
Mx/Zx = 31.13 kN/sqm
My/Zy = 1.62 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 49.33 kN/sqm
Vu = SPu X (Boff - d) X L
= 49.23 kN
Vc = 337.66 kN
Vu < Vc

Design For Punching Shear:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 261 of 360

Critical Section @ d/2 from Column Face


= 104 mm

Critical Analysis Load = 16


Combination
Critical Load Combination = [20] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 6:
WIND LOAD+Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 172.79 kN
Mux = 53.43 kNm
Muy = 0.73 kNm
P/A = 48 kN/sqm
Mx/Zx = 44.52 kN/sqm
My/Zy = 0.68 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 48 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 149.14 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 16
Combination
Critical Load Combination = [20] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
6: WIND LOAD+Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 172.79 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 3.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 262 of 360

Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC55
Column No : C55 ( 600mm X 400mm)
Analysis No : 64

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2000mm X 1800mm X 300mm
Effective Self Weight = 27.00 KN

Offset Along L (Loff) = 700 mm


Offset Along B (Boff) = 700 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pcomb = 151.59 kN
P = Pcomb + Effective Self Weight x 1.2
P = 183.99 kN
Mx = 58.51 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 263 of 360

My = 1.08 kNm
P/A = 51.11 kN/sqm
Mx/Zx = 48.76 kN/sqm
My/Zy = 1 kN/sqm
Maximum Soil Pressure = 100.86 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
6: WIND LOAD+Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 151.59 kN
P = Pcomb + Effective Self Weight x 1.2
P = 183.99 kN
Mx = 58.51 kNm
My = 58.51 kNm
P/A = 51.11 kN/sqm
Mx/Zx = 48.76 kN/sqm
My/Zy = 1 kN/sqm
Minimum Soil Pressure = 1.35 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 151.59 kN
Mux = 58.51 kNm
Muy = 1.08 kNm
P/A = 42.11 kN/sqm
Mx/Zx = 48.76 kN/sqm
My/Zy = 1 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 90.87 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 264 of 360

Mu = SPu X B X Loff X Loff / 2


= 40.07 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 139.74 kN
Mux = 22.71 kNm
Muy = 10.35 kNm
P/A = 38.82 kN/sqm
Mx/Zx = 18.92 kN/sqm
My/Zy = 9.59 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 48.4 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 23.72 kNm
Ast Rqd (BM) = 1080 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 151.59 kN
Mux = 58.51 kNm
Muy = 1.08 kNm
P/A = 42.11 kN/sqm
Mx/Zx = 48.76 kN/sqm
My/Zy = 1 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 265 of 360

Deff = 217 mm
Beff = 1800 mm
SPu = 90.87 kN/sqm
Vu = SPu X (Loff - d) X B
= 79.00 kN
Vc = 361.19 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pu = 139.74 kN
Mux = 22.71 kNm
Muy = 10.35 kNm
P/A = 38.82 kN/sqm
Mx/Zx = 18.92 kN/sqm
My/Zy = 9.59 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 48.4 kN/sqm
Vu = SPu X (Boff - d) X L
= 48.31 kN
Vc = 337.66 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 16


Combination
Critical Load Combination = [20] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 6:
WIND LOAD+Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 168.59 kN
Mux = 50.24 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 266 of 360

Muy = 0.8 kNm


P/A = 46.83 kN/sqm
Mx/Zx = 41.87 kN/sqm
My/Zy = 0.74 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 46.83 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 145.51 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 16
Combination
Critical Load Combination = [20] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
6: WIND LOAD+Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 168.59 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 3.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC56
Column No : C56 ( 600mm X 400mm)
Analysis No : 66

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 267 of 360

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2000mm X 1800mm X 300mm
Effective Self Weight = 27.00 KN

Offset Along L (Loff) = 700 mm


Offset Along B (Boff) = 700 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pcomb = 144.60 kN
P = Pcomb + Effective Self Weight x 1.2
P = 177.00 kN
Mx = 51.08 kNm
My = 0.57 kNm
P/A = 49.17 kN/sqm
Mx/Zx = 42.57 kN/sqm
My/Zy = 0.53 kN/sqm
Maximum Soil Pressure = 92.27 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 268 of 360

Check For Minimum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
6: WIND LOAD+Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 144.60 kN
P = Pcomb + Effective Self Weight x 1.2
P = 177 kN
Mx = 51.08 kNm
My = 51.08 kNm
P/A = 49.17 kN/sqm
Mx/Zx = 42.57 kN/sqm
My/Zy = 0.53 kN/sqm
Minimum Soil Pressure = 6.07 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 144.6 kN
Mux = 51.08 kNm
Muy = 0.57 kNm
P/A = 40.17 kN/sqm
Mx/Zx = 42.57 kN/sqm
My/Zy = 0.53 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 82.73 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 36.49 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 269 of 360

Critical Analysis Load = 25


Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 136.67 kN
Mux = 17.88 kNm
Muy = 9.57 kNm
P/A = 37.96 kN/sqm
Mx/Zx = 14.9 kN/sqm
My/Zy = 8.86 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 46.83 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 22.95 kNm
Ast Rqd (BM) = 1080 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 144.6 kN
Mux = 51.08 kNm
Muy = 0.57 kNm
P/A = 40.17 kN/sqm
Mx/Zx = 42.57 kN/sqm
My/Zy = 0.53 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 82.73 kN/sqm
Vu = SPu X (Loff - d) X B
= 71.93 kN
Vc = 361.19 kN
Vu < Vc

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 270 of 360

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pu = 136.67 kN
Mux = 17.88 kNm
Muy = 9.57 kNm
P/A = 37.96 kN/sqm
Mx/Zx = 14.9 kN/sqm
My/Zy = 8.86 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 46.83 kN/sqm
Vu = SPu X (Boff - d) X L
= 46.73 kN
Vc = 337.66 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 16


Combination
Critical Load Combination = [20] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 6:
WIND LOAD+Z) +1.6 (LOAD 11: ROOFLIVELOAD)
Pu = 158.89 kN
Mux = 42.71 kNm
Muy = 0.31 kNm
P/A = 44.14 kN/sqm
Mx/Zx = 35.59 kN/sqm
My/Zy = 0.29 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 271 of 360

SPu = Average Pressure


= 44.14 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 137.15 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 16
Combination
Critical Load Combination = [20] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
6: WIND LOAD+Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pu = 158.89 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 3.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC57
Column No : C57 ( 600mm X 400mm)
Analysis No : 68

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 272 of 360

Gross Bearing Capacity = 172.2 kN/sqm


Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2000mm X 1800mm X 300mm
Effective Self Weight = 27.00 KN

Offset Along L (Loff) = 700 mm


Offset Along B (Boff) = 700 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pcomb = 65.60 kN
P = Pcomb + Effective Self Weight x 1.2
P = 98.00 kN
Mx = 14.05 kNm
My = 7.28 kNm
P/A = 27.22 kN/sqm
Mx/Zx = 11.71 kN/sqm
My/Zy = 6.74 kN/sqm
Maximum Soil Pressure = 45.67 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 25
Combination
Critical Load Combination = [14] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pcomb = 46.46 kN
P = Pcomb + Effective Self Weight x 1.2

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 273 of 360

P = 78.86 kN
Mx = 1.67 kNm
My = 1.67 kNm
P/A = 21.91 kN/sqm
Mx/Zx = 1.39 kN/sqm
My/Zy = 18.36 kN/sqm
Minimum Soil Pressure = 2.16 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 65.6 kN
Mux = 14.05 kNm
Muy = 7.28 kNm
P/A = 18.22 kN/sqm
Mx/Zx = 11.71 kN/sqm
My/Zy = 6.74 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 29.93 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 13.2 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 46.46 kN
Mux = 1.67 kNm
Muy = 19.83 kNm
P/A = 12.91 kN/sqm
Mx/Zx = 1.39 kN/sqm
My/Zy = 18.36 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 274 of 360

Deff = 201 mm
Leff = 2000 mm
SPu = 31.26 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 15.32 kNm
Ast Rqd (BM) = 1080 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 20
Combination
Critical Load Combination = [24] : 1.2 (LOAD 9: DEADLOAD) +0.5 (LOAD 10:
LIVELOAD) +(LOAD 6: WIND LOAD+Z) +0.5
(LOAD 11: ROOFLIVELOAD)
Pu = 65.6 kN
Mux = 14.05 kNm
Muy = 7.28 kNm
P/A = 18.22 kN/sqm
Mx/Zx = 11.71 kN/sqm
My/Zy = 6.74 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 29.93 kN/sqm
Vu = SPu X (Loff - d) X B
= 26.02 kN
Vc = 361.19 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 275 of 360

SEISMICLOAD-X)
Pu = 46.46 kN
Mux = 1.67 kNm
Muy = 19.83 kNm
P/A = 12.91 kN/sqm
Mx/Zx = 1.39 kN/sqm
My/Zy = 18.36 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 31.26 kN/sqm
Vu = SPu X (Boff - d) X L
= 31.20 kN
Vc = 337.66 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 23


Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 69 kN
Mux = 4.67 kNm
Muy = -3.91 kNm
P/A = 19.17 kN/sqm
Mx/Zx = 3.89 kN/sqm
My/Zy = -3.62 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 19.17 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 59.55 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 276 of 360

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1:
SEISMICLOAD+X)
Pu = 69 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 3.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC58
Column No : C58 ( 600mm X 400mm)
Analysis No : 2

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 277 of 360

Footing Type : Pad


Footing Size (L x B x D) : 2000mm X 1800mm X 300mm
Effective Self Weight = 27.00 KN

Offset Along L (Loff) = 700 mm


Offset Along B (Boff) = 700 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 12
Combination
Critical Load Combination = [1] : 1.4 (LOAD 9: DEADLOAD)
Pcomb = 101.05 kN
P = Pcomb + Effective Self Weight x 1.4
P = 138.85 kN
Mx = 11.46 kNm
My = -26.03 kNm
P/A = 38.57 kN/sqm
Mx/Zx = 9.55 kN/sqm
My/Zy = -24.1 kN/sqm
Maximum Soil Pressure = 72.22 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 23
Combination
Critical Load Combination = [12] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1:
SEISMICLOAD+X)
Pcomb = 85.73 kN
P = Pcomb + Effective Self Weight x 1.2
P = 118.13 kN
Mx = 9.76 kNm
My = 9.76 kNm
P/A = 32.81 kN/sqm
Mx/Zx = 8.13 kN/sqm
My/Zy = -22.38 kN/sqm
Minimum Soil Pressure = 2.3 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 12

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 278 of 360

Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 101.05 kN
Mux = 11.46 kNm
Muy = -26.03 kNm
P/A = 28.07 kN/sqm
Mx/Zx = 9.55 kN/sqm
My/Zy = -24.1 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 37.62 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 16.59 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 101.05 kN
Mux = 11.46 kNm
Muy = -26.03 kNm
P/A = 28.07 kN/sqm
Mx/Zx = 9.55 kN/sqm
My/Zy = -24.1 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 52.17 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 25.56 kNm
Ast Rqd (BM) = 1080 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 279 of 360

= 217 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 101.05 kN
Mux = 11.46 kNm
Muy = -26.03 kNm
P/A = 28.07 kN/sqm
Mx/Zx = 9.55 kN/sqm
My/Zy = -24.1 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 37.62 kN/sqm
Vu = SPu X (Loff - d) X B
= 32.71 kN
Vc = 361.19 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 101.05 kN
Mux = 11.46 kNm
Muy = -26.03 kNm
P/A = 28.07 kN/sqm
Mx/Zx = 9.55 kN/sqm
My/Zy = -24.1 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 52.17 kN/sqm
Vu = SPu X (Boff - d) X L
= 52.06 kN
Vc = 337.66 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 280 of 360

= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 101.05 kN
Mux = 11.46 kNm
Muy = -26.03 kNm
P/A = 28.07 kN/sqm
Mx/Zx = 9.55 kN/sqm
My/Zy = -24.1 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 28.07 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 87.22 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 101.05 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 3.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 281 of 360

Design Code : ACI 318M - 2011


Footing No : FC59
Column No : C59 ( 600mm X 400mm)
Analysis No : 10

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1400mm X 1200mm X 300mm
Effective Self Weight = 12.60 KN

Offset Along L (Loff) = 400 mm


Offset Along B (Boff) = 400 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 12
Combination
Critical Load Combination = [1] : 1.4 (LOAD 9: DEADLOAD)
Pcomb = 129.40 kN
P = Pcomb + Effective Self Weight x 1.4
P = 147.04 kN
Mx = 11.11 kNm
My = 13.58 kNm
P/A = 87.52 kN/sqm
Mx/Zx = 28.35 kN/sqm
My/Zy = 40.4 kN/sqm
Maximum Soil Pressure = 156.28 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 282 of 360

Allowable Soil Pressure = 1 X 172.2 kN/sqm


= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 25
Combination
Critical Load Combination = [14] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pcomb = 110.78 kN
P = Pcomb + Effective Self Weight x 1.2
P = 125.9 kN
Mx = 9.48 kNm
My = 9.48 kNm
P/A = 74.94 kN/sqm
Mx/Zx = 24.17 kN/sqm
My/Zy = 37.6 kN/sqm
Minimum Soil Pressure = 13.17 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 129.4 kN
Mux = 11.11 kNm
Muy = 13.58 kNm
P/A = 77.02 kN/sqm
Mx/Zx = 28.35 kN/sqm
My/Zy = 40.4 kN/sqm

Deff = 217 mm
Beff = 1200 mm
SPu = 105.38 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 10.12 kNm
Ast Rqd (BM) = 648 sqmm
Ast Prv = 7 - #19 @ 200
= 2006 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 283 of 360

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 129.4 kN
Mux = 11.11 kNm
Muy = 13.58 kNm
P/A = 77.02 kN/sqm
Mx/Zx = 28.35 kN/sqm
My/Zy = 40.4 kN/sqm

Deff = 201 mm
Leff = 1400 mm
SPu = 117.43 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 13.15 kNm
Ast Rqd (BM) = 756 sqmm
Ast Prv = 8 - #19 @ 200
= 2292 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 129.4 kN
Mux = 11.11 kNm
Muy = 13.58 kNm
P/A = 77.02 kN/sqm
Mx/Zx = 28.35 kN/sqm
My/Zy = 40.4 kN/sqm

Deff = 217 mm
Beff = 1200 mm
SPu = 105.38 kN/sqm
Vu = SPu X (Loff - d) X B
= 23.14 kN
Vc = 245.31 kN
Vu < Vc

One Way Shear Along B:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 284 of 360

Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 129.4 kN
Mux = 11.11 kNm
Muy = 13.58 kNm
P/A = 77.02 kN/sqm
Mx/Zx = 28.35 kN/sqm
My/Zy = 40.4 kN/sqm

Deff = 201 mm
Leff = 1400 mm
SPu = 117.43 kN/sqm
Vu = SPu X (Boff - d) X L
= 32.72 kN
Vc = 226.53 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 129.4 kN
Mux = 11.11 kNm
Muy = 13.58 kNm
P/A = 77.02 kN/sqm
Mx/Zx = 28.35 kN/sqm
My/Zy = 40.4 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 77.02 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 91.45 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 285 of 360

Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 129.4 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 1.68 sqm
A1 > Base Area
Thus, A1 = 1.68
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 2.6458
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC60
Column No : C60 ( 600mm X 400mm)
Analysis No : 17

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 286 of 360

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1200mm X 1000mm X 300mm
Effective Self Weight = 9.00 KN

Offset Along L (Loff) = 300 mm


Offset Along B (Boff) = 300 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 12
Combination
Critical Load Combination = [1] : 1.4 (LOAD 9: DEADLOAD)
Pcomb = 79.59 kN
P = Pcomb + Effective Self Weight x 1.4
P = 92.19 kN
Mx = 0.11 kNm
My = -1.17 kNm
P/A = 76.82 kN/sqm
Mx/Zx = 0.47 kN/sqm
My/Zy = -5.87 kN/sqm
Maximum Soil Pressure = 83.16 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
6: WIND LOAD+Z) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 67.64 kN
P = Pcomb + Effective Self Weight x 1.2
P = 78.44 kN
Mx = 0.53 kNm
My = 0.53 kNm
P/A = 65.36 kN/sqm
Mx/Zx = 2.19 kN/sqm
My/Zy = -5.22 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 287 of 360

Minimum Soil Pressure = 57.95 kN/sqm


> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 79.59 kN
Mux = 0.11 kNm
Muy = -1.17 kNm
P/A = 66.32 kN/sqm
Mx/Zx = 0.47 kN/sqm
My/Zy = -5.87 kN/sqm

Deff = 217 mm
Beff = 1000 mm
SPu = 66.79 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 3.01 kNm
Ast Rqd (BM) = 540 sqmm
Ast Prv = 6 - #19 @ 200
= 1719 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 79.59 kN
Mux = 0.11 kNm
Muy = -1.17 kNm
P/A = 66.32 kN/sqm
Mx/Zx = 0.47 kN/sqm
My/Zy = -5.87 kN/sqm

Deff = 201 mm
Leff = 1200 mm
SPu = 72.19 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 3.9 kNm
Ast Rqd (BM) = 648 sqmm
Ast Prv = 7 - #19 @ 200

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 288 of 360

= 2006 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 79.59 kN
Mux = 0.11 kNm
Muy = -1.17 kNm
P/A = 66.32 kN/sqm
Mx/Zx = 0.47 kN/sqm
My/Zy = -5.87 kN/sqm

Deff = 217 mm
Beff = 1000 mm
SPu = 66.79 kN/sqm
Vu = SPu X (Loff - d) X B
= 5.54 kN
Vc = 215.88 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 79.59 kN
Mux = 0.11 kNm
Muy = -1.17 kNm
P/A = 66.32 kN/sqm
Mx/Zx = 0.47 kN/sqm
My/Zy = -5.87 kN/sqm

Deff = 201 mm
Leff = 1200 mm
SPu = 72.19 kN/sqm
Vu = SPu X (Boff - d) X L

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 289 of 360

= 8.58 kN
Vc = 198.87 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 79.59 kN
Mux = 0.11 kNm
Muy = -1.17 kNm
P/A = 66.32 kN/sqm
Mx/Zx = 0.47 kN/sqm
My/Zy = -5.87 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 66.32 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 46.91 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 79.59 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 1.2 sqm
A1 > Base Area
Thus, A1 = 1.2
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 2.2361

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 290 of 360

Thus, Modification Factor = 2


Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC61
Column No : C61 ( 600mm X 400mm)
Analysis No : 20

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1200mm X 1000mm X 300mm
Effective Self Weight = 9.00 KN

Offset Along L (Loff) = 300 mm


Offset Along B (Boff) = 300 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 12
Combination
Critical Load Combination = [1] : 1.4 (LOAD 9: DEADLOAD)
Pcomb = 81.17 kN
P = Pcomb + Effective Self Weight x 1.4
P = 93.77 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 291 of 360

Mx = 0.07 kNm
My = 0.31 kNm
P/A = 78.14 kN/sqm
Mx/Zx = 0.3 kN/sqm
My/Zy = 1.55 kN/sqm
Maximum Soil Pressure = 79.99 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 21
Combination
Critical Load Combination = [10] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
7: WINDLOAD-X) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 69.53 kN
P = Pcomb + Effective Self Weight x 1.2
P = 80.33 kN
Mx = 1.41 kNm
My = 1.41 kNm
P/A = 66.94 kN/sqm
Mx/Zx = 5.88 kN/sqm
My/Zy = 1.51 kN/sqm
Minimum Soil Pressure = 59.56 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 81.17 kN
Mux = 0.07 kNm
Muy = 0.31 kNm
P/A = 67.64 kN/sqm
Mx/Zx = 0.3 kN/sqm
My/Zy = 1.55 kN/sqm

Deff = 217 mm
Beff = 1000 mm
SPu = 67.94 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 292 of 360

Mu = SPu X B X Loff X Loff / 2


= 3.06 kNm
Ast Rqd (BM) = 540 sqmm
Ast Prv = 6 - #19 @ 200
= 1719 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 81.17 kN
Mux = 0.07 kNm
Muy = 0.31 kNm
P/A = 67.64 kN/sqm
Mx/Zx = 0.3 kN/sqm
My/Zy = 1.55 kN/sqm

Deff = 201 mm
Leff = 1200 mm
SPu = 69.19 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 3.74 kNm
Ast Rqd (BM) = 648 sqmm
Ast Prv = 7 - #19 @ 200
= 2006 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 81.17 kN
Mux = 0.07 kNm
Muy = 0.31 kNm
P/A = 67.64 kN/sqm
Mx/Zx = 0.3 kN/sqm
My/Zy = 1.55 kN/sqm

Deff = 217 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 293 of 360

Beff = 1000 mm
SPu = 67.94 kN/sqm
Vu = SPu X (Loff - d) X B
= 5.64 kN
Vc = 215.88 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 81.17 kN
Mux = 0.07 kNm
Muy = 0.31 kNm
P/A = 67.64 kN/sqm
Mx/Zx = 0.3 kN/sqm
My/Zy = 1.55 kN/sqm

Deff = 201 mm
Leff = 1200 mm
SPu = 69.19 kN/sqm
Vu = SPu X (Boff - d) X L
= 8.22 kN
Vc = 198.87 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 81.17 kN
Mux = 0.07 kNm
Muy = 0.31 kNm
P/A = 67.64 kN/sqm
Mx/Zx = 0.3 kN/sqm
My/Zy = 1.55 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 294 of 360

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 67.64 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 47.84 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 81.17 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 1.2 sqm
A1 > Base Area
Thus, A1 = 1.2
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 2.2361
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC62
Column No : C62 ( 600mm X 400mm)
Analysis No : 23

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 295 of 360

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1200mm X 1000mm X 300mm
Effective Self Weight = 9.00 KN

Offset Along L (Loff) = 300 mm


Offset Along B (Boff) = 300 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 12
Combination
Critical Load Combination = [1] : 1.4 (LOAD 9: DEADLOAD)
Pcomb = 81.94 kN
P = Pcomb + Effective Self Weight x 1.4
P = 94.54 kN
Mx = -0.55 kNm
My = -0.35 kNm
P/A = 78.78 kN/sqm
Mx/Zx = -2.27 kN/sqm
My/Zy = -1.75 kN/sqm
Maximum Soil Pressure = 82.81 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 20
Combination
Critical Load Combination = [9] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
6: WIND LOAD+Z) +0.5
(LOAD 11:
ROOFLIVELOAD)

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 296 of 360

Pcomb = 69.55 kN
P = Pcomb + Effective Self Weight x 1.2
P = 80.35 kN
Mx = -0.5 kNm
My = -0.5 kNm
P/A = 66.96 kN/sqm
Mx/Zx = -2.1 kN/sqm
My/Zy = -3.73 kN/sqm
Minimum Soil Pressure = 61.14 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 81.94 kN
Mux = -0.55 kNm
Muy = -0.35 kNm
P/A = 68.28 kN/sqm
Mx/Zx = -2.27 kN/sqm
My/Zy = -1.75 kN/sqm

Deff = 217 mm
Beff = 1000 mm
SPu = 70.55 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 3.17 kNm
Ast Rqd (BM) = 540 sqmm
Ast Prv = 6 - #19 @ 200
= 1719 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 81.94 kN
Mux = -0.55 kNm
Muy = -0.35 kNm
P/A = 68.28 kN/sqm
Mx/Zx = -2.27 kN/sqm
My/Zy = -1.75 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 297 of 360

Deff = 201 mm
Leff = 1200 mm
SPu = 70.03 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 3.78 kNm
Ast Rqd (BM) = 648 sqmm
Ast Prv = 7 - #19 @ 200
= 2006 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 81.94 kN
Mux = -0.55 kNm
Muy = -0.35 kNm
P/A = 68.28 kN/sqm
Mx/Zx = -2.27 kN/sqm
My/Zy = -1.75 kN/sqm

Deff = 217 mm
Beff = 1000 mm
SPu = 70.55 kN/sqm
Vu = SPu X (Loff - d) X B
= 5.86 kN
Vc = 215.88 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 81.94 kN
Mux = -0.55 kNm
Muy = -0.35 kNm
P/A = 68.28 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 298 of 360

Mx/Zx = -2.27 kN/sqm


My/Zy = -1.75 kN/sqm

Deff = 201 mm
Leff = 1200 mm
SPu = 70.03 kN/sqm
Vu = SPu X (Boff - d) X L
= 8.32 kN
Vc = 198.87 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 81.94 kN
Mux = -0.55 kNm
Muy = -0.35 kNm
P/A = 68.28 kN/sqm
Mx/Zx = -2.27 kN/sqm
My/Zy = -1.75 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 68.28 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 48.3 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 81.94 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 299 of 360

A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 1.2 sqm
A1 > Base Area
Thus, A1 = 1.2
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 2.2361
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC63
Column No : C63 ( 600mm X 400mm)
Analysis No : 26

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1600mm X 1400mm X 300mm
Effective Self Weight = 16.80 KN

Offset Along L (Loff) = 500 mm


Offset Along B (Boff) = 500 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 300 of 360

Check For Maximum Soil Pressure:


Critical Analysis Load = 12
Combination
Critical Load Combination = [1] : 1.4 (LOAD 9: DEADLOAD)
Pcomb = 77.99 kN
P = Pcomb + Effective Self Weight x 1.4
P = 101.51 kN
Mx = 10.46 kNm
My = -10.07 kNm
P/A = 45.32 kN/sqm
Mx/Zx = 17.52 kN/sqm
My/Zy = -19.27 kN/sqm
Maximum Soil Pressure = 82.1 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 21
Combination
Critical Load Combination = [10] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
10: LIVELOAD) +(LOAD
7: WINDLOAD-X) +0.5
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 65.77 kN
P = Pcomb + Effective Self Weight x 1.2
P = 85.93 kN
Mx = 10.75 kNm
My = 10.75 kNm
P/A = 38.36 kN/sqm
Mx/Zx = 17.99 kN/sqm
My/Zy = -16.5 kN/sqm
Minimum Soil Pressure = 3.87 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 77.99 kN
Mux = 10.46 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 301 of 360

Muy = -10.07 kNm


P/A = 34.82 kN/sqm
Mx/Zx = 17.52 kN/sqm
My/Zy = -19.27 kN/sqm

Deff = 217 mm
Beff = 1400 mm
SPu = 52.34 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 9.16 kNm
Ast Rqd (BM) = 756 sqmm
Ast Prv = 8 - #19 @ 200
= 2292 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)
Pu = 77.99 kN
Mux = 10.46 kNm
Muy = -10.07 kNm
P/A = 34.82 kN/sqm
Mx/Zx = 17.52 kN/sqm
My/Zy = -19.27 kN/sqm

Deff = 201 mm
Leff = 1600 mm
SPu = 54.08 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 10.82 kNm
Ast Rqd (BM) = 864 sqmm
Ast Prv = 9 - #19 @ 200
= 2579 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 302 of 360

Pu = 77.99 kN
Mux = 10.46 kNm
Muy = -10.07 kNm
P/A = 34.82 kN/sqm
Mx/Zx = 17.52 kN/sqm
My/Zy = -19.27 kN/sqm

Deff = 217 mm
Beff = 1400 mm
SPu = 52.34 kN/sqm
Vu = SPu X (Loff - d) X B
= 20.74 kN
Vc = 282.01 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 77.99 kN
Mux = 10.46 kNm
Muy = -10.07 kNm
P/A = 34.82 kN/sqm
Mx/Zx = 17.52 kN/sqm
My/Zy = -19.27 kN/sqm

Deff = 201 mm
Leff = 1600 mm
SPu = 54.08 kN/sqm
Vu = SPu X (Boff - d) X L
= 25.87 kN
Vc = 263.48 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 12


Combination

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 303 of 360

Critical Load Combination = [16] : 1.4 (LOAD 9: DEADLOAD)


Pu = 77.99 kN
Mux = 10.46 kNm
Muy = -10.07 kNm
P/A = 34.82 kN/sqm
Mx/Zx = 17.52 kN/sqm
My/Zy = -19.27 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 34.82 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 60.84 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 12
Combination
Critical Load Combination = [16] : 1.4 (LOAD 9:
DEADLOAD)
Pu = 77.99 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 2.24 sqm
A1 > Base Area
Thus, A1 = 2.24
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.0551
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC64
Column No : C64 ( 600mm X 400mm)

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 304 of 360

Analysis No : 35

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1600mm X 1400mm X 300mm
Effective Self Weight = 16.80 KN

Offset Along L (Loff) = 500 mm


Offset Along B (Boff) = 500 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 23
Combination
Critical Load Combination = [12] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pcomb = 210.72 kN
P = Pcomb + Effective Self Weight x 1.2
P = 230.88 kN
Mx = -23.14 kNm
My = 4.9 kNm
P/A = 103.07 kN/sqm
Mx/Zx = -38.73 kN/sqm
My/Zy = 9.37 kN/sqm
Maximum Soil Pressure = 151.17 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 305 of 360

Check For Minimum Soil Pressure:


Critical Analysis Load = 25
Combination
Critical Load Combination = [14] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pcomb = 192.15 kN
P = Pcomb + Effective Self Weight x 1.2
P = 212.31 kN
Mx = 20.05 kNm
My = 20.05 kNm
P/A = 94.78 kN/sqm
Mx/Zx = 33.56 kN/sqm
My/Zy = 9.09 kN/sqm
Minimum Soil Pressure = 52.13 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 210.72 kN
Mux = -23.14 kNm
Muy = 4.9 kNm
P/A = 94.07 kN/sqm
Mx/Zx = -38.73 kN/sqm
My/Zy = 9.37 kN/sqm

Deff = 217 mm
Beff = 1400 mm
SPu = 132.8 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 23.24 kNm
Ast Rqd (BM) = 756 sqmm
Ast Prv = 8 - #19 @ 200
= 2292 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 13

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 306 of 360

Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 247.52 kN
Mux = -1.91 kNm
Muy = 6.08 kNm
P/A = 110.5 kN/sqm
Mx/Zx = -3.2 kN/sqm
My/Zy = 11.63 kN/sqm

Deff = 201 mm
Leff = 1600 mm
SPu = 122.13 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 24.43 kNm
Ast Rqd (BM) = 864 sqmm
Ast Prv = 9 - #19 @ 200
= 2579 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 210.72 kN
Mux = -23.14 kNm
Muy = 4.9 kNm
P/A = 94.07 kN/sqm
Mx/Zx = -38.73 kN/sqm
My/Zy = 9.37 kN/sqm

Deff = 217 mm
Beff = 1400 mm
SPu = 132.8 kN/sqm
Vu = SPu X (Loff - d) X B
= 52.62 kN
Vc = 282.01 kN
Vu < Vc

One Way Shear Along B:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 307 of 360

Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 247.52 kN
Mux = -1.91 kNm
Muy = 6.08 kNm
P/A = 110.5 kN/sqm
Mx/Zx = -3.2 kN/sqm
My/Zy = 11.63 kN/sqm

Deff = 201 mm
Leff = 1600 mm
SPu = 122.13 kN/sqm
Vu = SPu X (Boff - d) X L
= 58.43 kN
Vc = 263.48 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 247.52 kN
Mux = -1.91 kNm
Muy = 6.08 kNm
P/A = 110.5 kN/sqm
Mx/Zx = -3.2 kN/sqm
My/Zy = 11.63 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 110.5 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 308 of 360

Vud = { N - Pcr(axial)[ (Cx + d) X


(Cy + d)]}
= 193.08 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 247.52 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 2.24 sqm
A1 > Base Area
Thus, A1 = 2.24
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.0551
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC65
Column No : C65 ( 600mm X 400mm)
Analysis No : 40

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 309 of 360

Permissible SBC Increase for = 0 %


Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1600mm X 1400mm X 300mm
Effective Self Weight = 16.80 KN

Offset Along L (Loff) = 500 mm


Offset Along B (Boff) = 500 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 25
Combination
Critical Load Combination = [14] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pcomb = 199.37 kN
P = Pcomb + Effective Self Weight x 1.2
P = 219.53 kN
Mx = 20.03 kNm
My = 3.26 kNm
P/A = 98.01 kN/sqm
Mx/Zx = 33.54 kN/sqm
My/Zy = 6.25 kN/sqm
Maximum Soil Pressure = 137.79 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 15
Combination
Critical Load Combination = [4] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
5: WINDLOAD+X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 120.23 kN
P = Pcomb + Effective Self Weight x 1.2
P = 140.39 kN
Mx = -3.37 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 310 of 360

My = -3.37 kNm
P/A = 62.67 kN/sqm
Mx/Zx = -5.64 kN/sqm
My/Zy = 3.24 kN/sqm
Minimum Soil Pressure = 53.79 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 199.37 kN
Mux = 20.03 kNm
Muy = 3.26 kNm
P/A = 89.01 kN/sqm
Mx/Zx = 33.54 kN/sqm
My/Zy = 6.25 kN/sqm

Deff = 217 mm
Beff = 1400 mm
SPu = 122.54 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 21.44 kNm
Ast Rqd (BM) = 756 sqmm
Ast Prv = 8 - #19 @ 200
= 2292 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 241.34 kN
Mux = -0.26 kNm
Muy = 4.14 kNm
P/A = 107.74 kN/sqm
Mx/Zx = -0.43 kN/sqm
My/Zy = 7.92 kN/sqm

Deff = 201 mm
Leff = 1600 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 311 of 360

SPu = 115.66 kN/sqm


Mu = SPu X L X Boff X Boff / 2
= 23.13 kNm
Ast Rqd (BM) = 864 sqmm
Ast Prv = 9 - #19 @ 200
= 2579 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 199.37 kN
Mux = 20.03 kNm
Muy = 3.26 kNm
P/A = 89.01 kN/sqm
Mx/Zx = 33.54 kN/sqm
My/Zy = 6.25 kN/sqm

Deff = 217 mm
Beff = 1400 mm
SPu = 122.54 kN/sqm
Vu = SPu X (Loff - d) X B
= 48.55 kN
Vc = 282.01 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 241.34 kN
Mux = -0.26 kNm
Muy = 4.14 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 312 of 360

P/A = 107.74 kN/sqm


Mx/Zx = -0.43 kN/sqm
My/Zy = 7.92 kN/sqm

Deff = 201 mm
Leff = 1600 mm
SPu = 115.66 kN/sqm
Vu = SPu X (Boff - d) X L
= 55.33 kN
Vc = 263.48 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 241.34 kN
Mux = -0.26 kNm
Muy = 4.14 kNm
P/A = 107.74 kN/sqm
Mx/Zx = -0.43 kN/sqm
My/Zy = 7.92 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 107.74 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 188.26 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 313 of 360

DEADLOAD) +1.6 (LOAD


10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 241.34 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 2.24 sqm
A1 > Base Area
Thus, A1 = 2.24
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.0551
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC66
Column No : C66 ( 600mm X 400mm)
Analysis No : 45

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1600mm X 1400mm X 300mm
Effective Self Weight = 16.80 KN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 314 of 360

Offset Along L (Loff) = 500 mm


Offset Along B (Boff) = 500 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 23
Combination
Critical Load Combination = [12] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pcomb = 197.33 kN
P = Pcomb + Effective Self Weight x 1.2
P = 217.49 kN
Mx = -19.47 kNm
My = 4.42 kNm
P/A = 97.09 kN/sqm
Mx/Zx = -32.59 kN/sqm
My/Zy = 8.46 kN/sqm
Maximum Soil Pressure = 138.14 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 25
Combination
Critical Load Combination = [14] : 1.2 (LOAD 9:
DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3:
SEISMICLOAD-X)
Pcomb = 190.70 kN
P = Pcomb + Effective Self Weight x 1.2
P = 210.86 kN
Mx = 20.94 kNm
My = 20.94 kNm
P/A = 94.13 kN/sqm
Mx/Zx = 35.06 kN/sqm
My/Zy = 8.55 kN/sqm
Minimum Soil Pressure = 50.52 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 315 of 360

LIVELOAD) +(LOAD 1: SEISMICLOAD+X)


Pu = 197.33 kN
Mux = -19.47 kNm
Muy = 4.42 kNm
P/A = 88.09 kN/sqm
Mx/Zx = -32.59 kN/sqm
My/Zy = 8.46 kN/sqm

Deff = 217 mm
Beff = 1400 mm
SPu = 120.68 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 21.12 kNm
Ast Rqd (BM) = 756 sqmm
Ast Prv = 8 - #19 @ 200
= 2292 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 238.16 kN
Mux = 0.95 kNm
Muy = 5.6 kNm
P/A = 106.32 kN/sqm
Mx/Zx = 1.59 kN/sqm
My/Zy = 10.71 kN/sqm

Deff = 201 mm
Leff = 1600 mm
SPu = 117.03 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 23.41 kNm
Ast Rqd (BM) = 864 sqmm
Ast Prv = 9 - #19 @ 200
= 2579 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 316 of 360

= 217 mm
Critical Analysis Load = 23
Combination
Critical Load Combination = [27] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 1: SEISMICLOAD+X)
Pu = 197.33 kN
Mux = -19.47 kNm
Muy = 4.42 kNm
P/A = 88.09 kN/sqm
Mx/Zx = -32.59 kN/sqm
My/Zy = 8.46 kN/sqm

Deff = 217 mm
Beff = 1400 mm
SPu = 120.68 kN/sqm
Vu = SPu X (Loff - d) X B
= 47.81 kN
Vc = 282.01 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 238.16 kN
Mux = 0.95 kNm
Muy = 5.6 kNm
P/A = 106.32 kN/sqm
Mx/Zx = 1.59 kN/sqm
My/Zy = 10.71 kN/sqm

Deff = 201 mm
Leff = 1600 mm
SPu = 117.03 kN/sqm
Vu = SPu X (Boff - d) X L
= 55.99 kN
Vc = 263.48 kN
Vu < Vc

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 317 of 360

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 238.16 kN
Mux = 0.95 kNm
Muy = 5.6 kNm
P/A = 106.32 kN/sqm
Mx/Zx = 1.59 kN/sqm
My/Zy = 10.71 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 106.32 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 185.78 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 238.16 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 2.24 sqm
A1 > Base Area
Thus, A1 = 2.24
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.0551
Thus, Modification Factor = 2

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 318 of 360

Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area


= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC67
Column No : C67 ( 600mm X 400mm)
Analysis No : 50

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 1600mm X 1400mm X 300mm
Effective Self Weight = 16.80 KN

Offset Along L (Loff) = 500 mm


Offset Along B (Boff) = 500 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 25
Combination
Critical Load Combination = [14] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pcomb = 225.55 kN
P = Pcomb + Effective Self Weight x 1.2
P = 245.71 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 319 of 360

Mx = 22.05 kNm
My = 2.98 kNm
P/A = 109.69 kN/sqm
Mx/Zx = 36.91 kN/sqm
My/Zy = 5.7 kN/sqm
Maximum Soil Pressure = 152.3 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 15
Combination
Critical Load Combination = [4] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
5: WINDLOAD+X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 132.35 kN
P = Pcomb + Effective Self Weight x 1.2
P = 152.51 kN
Mx = -3.11 kNm
My = -3.11 kNm
P/A = 68.09 kN/sqm
Mx/Zx = -5.21 kN/sqm
My/Zy = 2.84 kN/sqm
Minimum Soil Pressure = 60.03 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 225.55 kN
Mux = 22.05 kNm
Muy = 2.98 kNm
P/A = 100.69 kN/sqm
Mx/Zx = 36.91 kN/sqm
My/Zy = 5.7 kN/sqm

Deff = 217 mm
Beff = 1400 mm
SPu = 137.6 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 320 of 360

Mu = SPu X B X Loff X Loff / 2


= 24.08 kNm
Ast Rqd (BM) = 756 sqmm
Ast Prv = 8 - #19 @ 200
= 2292 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 268 kN
Mux = 0.82 kNm
Muy = 3.65 kNm
P/A = 119.64 kN/sqm
Mx/Zx = 1.37 kN/sqm
My/Zy = 6.99 kN/sqm

Deff = 201 mm
Leff = 1600 mm
SPu = 126.63 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 25.33 kNm
Ast Rqd (BM) = 864 sqmm
Ast Prv = 9 - #19 @ 200
= 2579 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 25
Combination
Critical Load Combination = [29] : 1.2 (LOAD 9: DEADLOAD) +(LOAD 10:
LIVELOAD) +(LOAD 3: SEISMICLOAD-X)
Pu = 225.55 kN
Mux = 22.05 kNm
Muy = 2.98 kNm
P/A = 100.69 kN/sqm
Mx/Zx = 36.91 kN/sqm
My/Zy = 5.7 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 321 of 360

Deff = 217 mm
Beff = 1400 mm
SPu = 137.6 kN/sqm
Vu = SPu X (Loff - d) X B
= 54.52 kN
Vc = 282.01 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 268 kN
Mux = 0.82 kNm
Muy = 3.65 kNm
P/A = 119.64 kN/sqm
Mx/Zx = 1.37 kN/sqm
My/Zy = 6.99 kN/sqm

Deff = 201 mm
Leff = 1600 mm
SPu = 126.63 kN/sqm
Vu = SPu X (Boff - d) X L
= 60.58 kN
Vc = 263.48 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 268 kN
Mux = 0.82 kNm
Muy = 3.65 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 322 of 360

P/A = 119.64 kN/sqm


Mx/Zx = 1.37 kN/sqm
My/Zy = 6.99 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 119.64 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 209.05 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 268 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 2.24 sqm
A1 > Base Area
Thus, A1 = 2.24
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.0551
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC68
Column No : C68 ( 600mm X 400mm)
Analysis No : 36

Concrete Grade : C25

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 323 of 360

Steel Grade : Fy410


Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2200mm X 2000mm X 300mm
Effective Self Weight = 33.00 KN

Offset Along L (Loff) = 800 mm


Offset Along B (Boff) = 800 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 13
Combination
Critical Load Combination = [2] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pcomb = 667.14 kN
P = Pcomb + Effective Self Weight x 1.2
P = 706.74 kN
Mx = -0.08 kNm
My = -1.15 kNm
P/A = 160.62 kN/sqm
Mx/Zx = -0.05 kN/sqm
My/Zy = -0.78 kN/sqm
Maximum Soil Pressure = 161.45 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 17

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 324 of 360

Combination
Critical Load Combination = [6] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
7: WINDLOAD-X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 309.72 kN
P = Pcomb + Effective Self Weight x 1.2
P = 349.32 kN
Mx = 1.45 kNm
My = 1.45 kNm
P/A = 79.39 kN/sqm
Mx/Zx = 0.9 kN/sqm
My/Zy = -0.43 kN/sqm
Minimum Soil Pressure = 78.07 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 667.14 kN
Mux = -0.08 kNm
Muy = -1.15 kNm
P/A = 151.62 kN/sqm
Mx/Zx = -0.05 kN/sqm
My/Zy = -0.78 kN/sqm

Deff = 217 mm
Beff = 2000 mm
SPu = 151.67 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 97.07 kNm
Ast Rqd (BM) = 1247 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 325 of 360

Pu = 667.14 kN
Mux = -0.08 kNm
Muy = -1.15 kNm
P/A = 151.62 kN/sqm
Mx/Zx = -0.05 kN/sqm
My/Zy = -0.78 kN/sqm

Deff = 201 mm
Leff = 2200 mm
SPu = 152.41 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 107.29 kNm
Ast Rqd (BM) = 1495 sqmm
Ast Prv = 12 - #19 @ 200
= 3438 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 667.14 kN
Mux = -0.08 kNm
Muy = -1.15 kNm
P/A = 151.62 kN/sqm
Mx/Zx = -0.05 kN/sqm
My/Zy = -0.78 kN/sqm

Deff = 217 mm
Beff = 2000 mm
SPu = 151.67 kN/sqm
Vu = SPu X (Loff - d) X B
= 176.85 kN
Vc = 400.78 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 326 of 360

= 201 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 667.14 kN
Mux = -0.08 kNm
Muy = -1.15 kNm
P/A = 151.62 kN/sqm
Mx/Zx = -0.05 kN/sqm
My/Zy = -0.78 kN/sqm

Deff = 201 mm
Leff = 2200 mm
SPu = 152.41 kN/sqm
Vu = SPu X (Boff - d) X L
= 200.84 kN
Vc = 374.74 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 667.14 kN
Mux = -0.08 kNm
Muy = -1.15 kNm
P/A = 151.62 kN/sqm
Mx/Zx = -0.05 kN/sqm
My/Zy = -0.78 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 151.62 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 592.44 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 327 of 360

Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 667.14 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 4.4 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC69
Column No : C69 ( 600mm X 400mm)
Analysis No : 41

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 328 of 360

Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2200mm X 2000mm X 300mm
Effective Self Weight = 33.00 KN

Offset Along L (Loff) = 800 mm


Offset Along B (Boff) = 800 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 13
Combination
Critical Load Combination = [2] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pcomb = 590.16 kN
P = Pcomb + Effective Self Weight x 1.2
P = 629.76 kN
Mx = 0.28 kNm
My = -1.41 kNm
P/A = 143.13 kN/sqm
Mx/Zx = 0.17 kN/sqm
My/Zy = -0.96 kN/sqm
Maximum Soil Pressure = 144.26 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 15
Combination
Critical Load Combination = [4] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
5: WINDLOAD+X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 274.93 kN
P = Pcomb + Effective Self Weight x 1.2
P = 314.53 kN
Mx = -1.98 kNm
My = -1.98 kNm
P/A = 71.49 kN/sqm
Mx/Zx = -1.23 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 329 of 360

My/Zy = -0.47 kN/sqm


Minimum Soil Pressure = 69.79 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 590.16 kN
Mux = 0.28 kNm
Muy = -1.41 kNm
P/A = 134.13 kN/sqm
Mx/Zx = 0.17 kN/sqm
My/Zy = -0.96 kN/sqm

Deff = 217 mm
Beff = 2000 mm
SPu = 134.3 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 85.95 kNm
Ast Rqd (BM) = 1100 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 590.16 kN
Mux = 0.28 kNm
Muy = -1.41 kNm
P/A = 134.13 kN/sqm
Mx/Zx = 0.17 kN/sqm
My/Zy = -0.96 kN/sqm

Deff = 201 mm
Leff = 2200 mm
SPu = 135.09 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 95.1 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 330 of 360

Ast Rqd (BM) = 1320 sqmm


Ast Prv = 12 - #19 @ 200
= 3438 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 590.16 kN
Mux = 0.28 kNm
Muy = -1.41 kNm
P/A = 134.13 kN/sqm
Mx/Zx = 0.17 kN/sqm
My/Zy = -0.96 kN/sqm

Deff = 217 mm
Beff = 2000 mm
SPu = 134.3 kN/sqm
Vu = SPu X (Loff - d) X B
= 156.59 kN
Vc = 400.78 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 590.16 kN
Mux = 0.28 kNm
Muy = -1.41 kNm
P/A = 134.13 kN/sqm
Mx/Zx = 0.17 kN/sqm
My/Zy = -0.96 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 331 of 360

Deff = 201 mm
Leff = 2200 mm
SPu = 135.09 kN/sqm
Vu = SPu X (Boff - d) X L
= 178.02 kN
Vc = 374.74 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 590.16 kN
Mux = 0.28 kNm
Muy = -1.41 kNm
P/A = 134.13 kN/sqm
Mx/Zx = 0.17 kN/sqm
My/Zy = -0.96 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 134.13 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 524.08 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 590.16 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 332 of 360

A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 4.4 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC70
Column No : C70 ( 600mm X 400mm)
Analysis No : 46

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2200mm X 2000mm X 300mm
Effective Self Weight = 33.00 KN

Offset Along L (Loff) = 800 mm


Offset Along B (Boff) = 800 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 333 of 360

Check For Maximum Soil Pressure:


Critical Analysis Load = 13
Combination
Critical Load Combination = [2] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pcomb = 615.31 kN
P = Pcomb + Effective Self Weight x 1.2
P = 654.91 kN
Mx = 0.43 kNm
My = -0.95 kNm
P/A = 148.84 kN/sqm
Mx/Zx = 0.26 kN/sqm
My/Zy = -0.65 kN/sqm
Maximum Soil Pressure = 149.75 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 17
Combination
Critical Load Combination = [6] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
7: WINDLOAD-X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 288.83 kN
P = Pcomb + Effective Self Weight x 1.2
P = 328.43 kN
Mx = 1.65 kNm
My = 1.65 kNm
P/A = 74.64 kN/sqm
Mx/Zx = 1.02 kN/sqm
My/Zy = -0.34 kN/sqm
Minimum Soil Pressure = 73.28 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 615.31 kN
Mux = 0.43 kNm
Muy = -0.95 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 334 of 360

P/A = 139.84 kN/sqm


Mx/Zx = 0.26 kN/sqm
My/Zy = -0.65 kN/sqm

Deff = 217 mm
Beff = 2000 mm
SPu = 140.11 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 89.67 kNm
Ast Rqd (BM) = 1149 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 615.31 kN
Mux = 0.43 kNm
Muy = -0.95 kNm
P/A = 139.84 kN/sqm
Mx/Zx = 0.26 kN/sqm
My/Zy = -0.65 kN/sqm

Deff = 201 mm
Leff = 2200 mm
SPu = 140.49 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 98.91 kNm
Ast Rqd (BM) = 1375 sqmm
Ast Prv = 12 - #19 @ 200
= 3438 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 335 of 360

Pu = 615.31 kN
Mux = 0.43 kNm
Muy = -0.95 kNm
P/A = 139.84 kN/sqm
Mx/Zx = 0.26 kN/sqm
My/Zy = -0.65 kN/sqm

Deff = 217 mm
Beff = 2000 mm
SPu = 140.11 kN/sqm
Vu = SPu X (Loff - d) X B
= 163.37 kN
Vc = 400.78 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 615.31 kN
Mux = 0.43 kNm
Muy = -0.95 kNm
P/A = 139.84 kN/sqm
Mx/Zx = 0.26 kN/sqm
My/Zy = -0.65 kN/sqm

Deff = 201 mm
Leff = 2200 mm
SPu = 140.49 kN/sqm
Vu = SPu X (Boff - d) X L
= 185.14 kN
Vc = 374.74 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 336 of 360

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 615.31 kN
Mux = 0.43 kNm
Muy = -0.95 kNm
P/A = 139.84 kN/sqm
Mx/Zx = 0.26 kN/sqm
My/Zy = -0.65 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 139.84 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 546.41 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 615.31 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 4.4 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 337 of 360

Design Code : ACI 318M - 2011


Footing No : FC71
Column No : C71 ( 600mm X 400mm)
Analysis No : 51

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2400mm X 2200mm X 300mm
Effective Self Weight = 39.60 KN

Offset Along L (Loff) = 900 mm


Offset Along B (Boff) = 900 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 13
Combination
Critical Load Combination = [2] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pcomb = 746.34 kN
P = Pcomb + Effective Self Weight x 1.2
P = 793.86 kN
Mx = 0.28 kNm
My = -0.46 kNm
P/A = 150.35 kN/sqm
Mx/Zx = 0.13 kN/sqm
My/Zy = -0.24 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 338 of 360

Maximum Soil Pressure = 150.72 kN/sqm


Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 15
Combination
Critical Load Combination = [4] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
5: WINDLOAD+X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 343.15 kN
P = Pcomb + Effective Self Weight x 1.2
P = 390.67 kN
Mx = -2.01 kNm
My = -2.01 kNm
P/A = 73.99 kN/sqm
Mx/Zx = -0.95 kN/sqm
My/Zy = -0.16 kN/sqm
Minimum Soil Pressure = 72.88 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 746.34 kN
Mux = 0.28 kNm
Muy = -0.46 kNm
P/A = 141.35 kN/sqm
Mx/Zx = 0.13 kN/sqm
My/Zy = -0.24 kN/sqm

Deff = 217 mm
Beff = 2200 mm
SPu = 141.48 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 126.06 kNm
Ast Rqd (BM) = 1628 sqmm
Ast Prv = 12 - #19 @ 200
= 3438 sqmm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 339 of 360

Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 746.34 kN
Mux = 0.28 kNm
Muy = -0.46 kNm
P/A = 141.35 kN/sqm
Mx/Zx = 0.13 kN/sqm
My/Zy = -0.24 kN/sqm

Deff = 201 mm
Leff = 2400 mm
SPu = 141.59 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 137.63 kNm
Ast Rqd (BM) = 1930 sqmm
Ast Prv = 13 - #19 @ 200
= 3725 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 746.34 kN
Mux = 0.28 kNm
Muy = -0.46 kNm
P/A = 141.35 kN/sqm
Mx/Zx = 0.13 kN/sqm
My/Zy = -0.24 kN/sqm

Deff = 217 mm
Beff = 2200 mm
SPu = 141.48 kN/sqm
Vu = SPu X (Loff - d) X B
= 212.59 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 340 of 360

Vc = 440.37 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 746.34 kN
Mux = 0.28 kNm
Muy = -0.46 kNm
P/A = 141.35 kN/sqm
Mx/Zx = 0.13 kN/sqm
My/Zy = -0.24 kN/sqm

Deff = 201 mm
Leff = 2400 mm
SPu = 141.59 kN/sqm
Vu = SPu X (Boff - d) X L
= 237.53 kN
Vc = 411.80 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 746.34 kN
Mux = 0.28 kNm
Muy = -0.46 kNm
P/A = 141.35 kN/sqm
Mx/Zx = 0.13 kN/sqm
My/Zy = -0.24 kN/sqm

Deff = 209 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 341 of 360

Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 141.35 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 676.7 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 746.34 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 5.28 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC72
Column No : C72 ( 600mm X 400mm)
Analysis No : 37

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 342 of 360

Soil Bearing Capacity = 120 kN/sqm


Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2200mm X 2000mm X 300mm
Effective Self Weight = 33.00 KN

Offset Along L (Loff) = 800 mm


Offset Along B (Boff) = 800 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 13
Combination
Critical Load Combination = [2] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pcomb = 598.64 kN
P = Pcomb + Effective Self Weight x 1.2
P = 638.24 kN
Mx = 12.62 kNm
My = -3.74 kNm
P/A = 145.05 kN/sqm
Mx/Zx = 7.82 kN/sqm
My/Zy = -2.55 kN/sqm
Maximum Soil Pressure = 155.42 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 17
Combination
Critical Load Combination = [6] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
7: WINDLOAD-X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 292.55 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 343 of 360

P = Pcomb + Effective Self Weight x 1.2


P = 332.15 kN
Mx = 16.02 kNm
My = 16.02 kNm
P/A = 75.49 kN/sqm
Mx/Zx = 9.93 kN/sqm
My/Zy = -2.25 kN/sqm
Minimum Soil Pressure = 63.31 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 598.64 kN
Mux = 12.62 kNm
Muy = -3.74 kNm
P/A = 136.05 kN/sqm
Mx/Zx = 7.82 kN/sqm
My/Zy = -2.55 kN/sqm

Deff = 217 mm
Beff = 2000 mm
SPu = 143.88 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 92.08 kNm
Ast Rqd (BM) = 1181 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 598.64 kN
Mux = 12.62 kNm
Muy = -3.74 kNm
P/A = 136.05 kN/sqm
Mx/Zx = 7.82 kN/sqm
My/Zy = -2.55 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 344 of 360

Deff = 201 mm
Leff = 2200 mm
SPu = 138.6 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 97.58 kNm
Ast Rqd (BM) = 1356 sqmm
Ast Prv = 12 - #19 @ 200
= 3438 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 598.64 kN
Mux = 12.62 kNm
Muy = -3.74 kNm
P/A = 136.05 kN/sqm
Mx/Zx = 7.82 kN/sqm
My/Zy = -2.55 kN/sqm

Deff = 217 mm
Beff = 2000 mm
SPu = 143.88 kN/sqm
Vu = SPu X (Loff - d) X B
= 167.76 kN
Vc = 400.78 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 345 of 360

Pu = 598.64 kN
Mux = 12.62 kNm
Muy = -3.74 kNm
P/A = 136.05 kN/sqm
Mx/Zx = 7.82 kN/sqm
My/Zy = -2.55 kN/sqm

Deff = 201 mm
Leff = 2200 mm
SPu = 138.6 kN/sqm
Vu = SPu X (Boff - d) X L
= 182.65 kN
Vc = 374.74 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 598.64 kN
Mux = 12.62 kNm
Muy = -3.74 kNm
P/A = 136.05 kN/sqm
Mx/Zx = 7.82 kN/sqm
My/Zy = -2.55 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 136.05 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 531.61 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 346 of 360

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 598.64 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 4.4 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC73
Column No : C73 ( 600mm X 400mm)
Analysis No : 42

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 347 of 360

Footing Size (L x B x D) : 2000mm X 1800mm X 300mm


Effective Self Weight = 27.00 KN

Offset Along L (Loff) = 700 mm


Offset Along B (Boff) = 700 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 13
Combination
Critical Load Combination = [2] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pcomb = 558.76 kN
P = Pcomb + Effective Self Weight x 1.2
P = 591.16 kN
Mx = 0.3 kNm
My = 0.5 kNm
P/A = 164.21 kN/sqm
Mx/Zx = 0.25 kN/sqm
My/Zy = 0.47 kN/sqm
Maximum Soil Pressure = 164.92 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 15
Combination
Critical Load Combination = [4] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
5: WINDLOAD+X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 257.46 kN
P = Pcomb + Effective Self Weight x 1.2
P = 289.86 kN
Mx = -3.3 kNm
My = -3.3 kNm
P/A = 80.52 kN/sqm
Mx/Zx = -2.75 kN/sqm
My/Zy = 0 kN/sqm
Minimum Soil Pressure = 77.77 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 348 of 360

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 558.76 kN
Mux = 0.3 kNm
Muy = 0.5 kNm
P/A = 155.21 kN/sqm
Mx/Zx = 0.25 kN/sqm
My/Zy = 0.47 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 155.46 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 68.56 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 558.76 kN
Mux = 0.3 kNm
Muy = 0.5 kNm
P/A = 155.21 kN/sqm
Mx/Zx = 0.25 kN/sqm
My/Zy = 0.47 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 155.68 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 76.28 kNm
Ast Rqd (BM) = 1080 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Length

Design For Shear:

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 349 of 360

One Way Shear Along L:


Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 558.76 kN
Mux = 0.3 kNm
Muy = 0.5 kNm
P/A = 155.21 kN/sqm
Mx/Zx = 0.25 kN/sqm
My/Zy = 0.47 kN/sqm

Deff = 217 mm
Beff = 1800 mm
SPu = 155.46 kN/sqm
Vu = SPu X (Loff - d) X B
= 135.16 kN
Vc = 361.19 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 558.76 kN
Mux = 0.3 kNm
Muy = 0.5 kNm
P/A = 155.21 kN/sqm
Mx/Zx = 0.25 kN/sqm
My/Zy = 0.47 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 155.68 kN/sqm
Vu = SPu X (Boff - d) X L
= 155.36 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 350 of 360

Vc = 337.66 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 558.76 kN
Mux = 0.3 kNm
Muy = 0.5 kNm
P/A = 155.21 kN/sqm
Mx/Zx = 0.25 kN/sqm
My/Zy = 0.47 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 155.21 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 482.29 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 558.76 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 3.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 351 of 360

Thus, Modification Factor = 2


Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC74
Column No : C74 ( 600mm X 400mm)
Analysis No : 47

Concrete Grade : C25


Steel Grade : Fy410
Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2000mm X 1800mm X 300mm
Effective Self Weight = 27.00 KN

Offset Along L (Loff) = 700 mm


Offset Along B (Boff) = 700 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 13
Combination
Critical Load Combination = [2] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pcomb = 543.09 kN
P = Pcomb + Effective Self Weight x 1.2

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 352 of 360

P = 575.49 kN
Mx = 0.29 kNm
My = -0.24 kNm
P/A = 159.86 kN/sqm
Mx/Zx = 0.24 kN/sqm
My/Zy = -0.22 kN/sqm
Maximum Soil Pressure = 160.32 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 16
Combination
Critical Load Combination = [5] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
6: WIND LOAD+Z) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 245.89 kN
P = Pcomb + Effective Self Weight x 1.2
P = 278.29 kN
Mx = 0.11 kNm
My = 0.11 kNm
P/A = 77.3 kN/sqm
Mx/Zx = 0.09 kN/sqm
My/Zy = -1.41 kN/sqm
Minimum Soil Pressure = 75.81 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 543.09 kN
Mux = 0.29 kNm
Muy = -0.24 kNm
P/A = 150.86 kN/sqm
Mx/Zx = 0.24 kN/sqm
My/Zy = -0.22 kN/sqm

Deff = 217 mm
Beff = 1800 mm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 353 of 360

SPu = 151.1 kN/sqm


Mu = SPu X B X Loff X Loff / 2
= 66.63 kNm
Ast Rqd (BM) = 972 sqmm
Ast Prv = 10 - #19 @ 200
= 2865 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 543.09 kN
Mux = 0.29 kNm
Muy = -0.24 kNm
P/A = 150.86 kN/sqm
Mx/Zx = 0.24 kN/sqm
My/Zy = -0.22 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 151.08 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 74.03 kNm
Ast Rqd (BM) = 1080 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 543.09 kN
Mux = 0.29 kNm
Muy = -0.24 kNm
P/A = 150.86 kN/sqm
Mx/Zx = 0.24 kN/sqm
My/Zy = -0.22 kN/sqm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 354 of 360

Deff = 217 mm
Beff = 1800 mm
SPu = 151.1 kN/sqm
Vu = SPu X (Loff - d) X B
= 131.36 kN
Vc = 361.19 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

= 201 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 543.09 kN
Mux = 0.29 kNm
Muy = -0.24 kNm
P/A = 150.86 kN/sqm
Mx/Zx = 0.24 kN/sqm
My/Zy = -0.22 kN/sqm

Deff = 201 mm
Leff = 2000 mm
SPu = 151.08 kN/sqm
Vu = SPu X (Boff - d) X L
= 150.78 kN
Vc = 337.66 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 543.09 kN
Mux = 0.29 kNm

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 355 of 360

Muy = -0.24 kNm


P/A = 150.86 kN/sqm
Mx/Zx = 0.24 kN/sqm
My/Zy = -0.22 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 150.86 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 468.76 kN
Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 543.09 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 3.6 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.

Design Code : ACI 318M - 2011


Footing No : FC75
Column No : C75 ( 600mm X 400mm)
Analysis No : 52

Concrete Grade : C25

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 356 of 360

Steel Grade : Fy410


Clear Cover : 75 mm
Dfd : 2.9 M
Dw : 20 M

Density of Soil = 18 KN/cuM


Soil Bearing Capacity = 120 kN/sqm
Gross Bearing Capacity = 172.2 kN/sqm
Permissible SBC Increase for EQ = 0 %
Permissible SBC Increase for = 0 %
Wind
Live Load Reduction = 0 %
Permissible area of loss of contact = 0 %

Design cross section by Consider : Average pressure


overburden pressure

Footing Type : Pad


Footing Size (L x B x D) : 2200mm X 2000mm X 300mm
Effective Self Weight = 33.00 KN

Offset Along L (Loff) = 800 mm


Offset Along B (Boff) = 800 mm

Check For Maximum Soil Pressure:


Critical Analysis Load = 13
Combination
Critical Load Combination = [2] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pcomb = 631.05 kN
P = Pcomb + Effective Self Weight x 1.2
P = 670.65 kN
Mx = 0.42 kNm
My = -0.22 kNm
P/A = 152.42 kN/sqm
Mx/Zx = 0.26 kN/sqm
My/Zy = -0.15 kN/sqm
Maximum Soil Pressure = 152.84 kN/sqm
Allowable Soil Pressure = 1 X 172.2 kN/sqm
= 172.2 kN/sqm

Check For Minimum Soil Pressure:


Critical Analysis Load = 15

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 357 of 360

Combination
Critical Load Combination = [4] : 1.2 (LOAD 9:
DEADLOAD) +0.5 (LOAD
5: WINDLOAD+X) +1.6
(LOAD 11:
ROOFLIVELOAD)
Pcomb = 289.71 kN
P = Pcomb + Effective Self Weight x 1.2
P = 329.31 kN
Mx = -1.84 kNm
My = -1.84 kNm
P/A = 74.84 kN/sqm
Mx/Zx = -1.14 kN/sqm
My/Zy = -0.18 kN/sqm
Minimum Soil Pressure = 73.53 kN/sqm
> 0

Design For Bending:


Bottom Reinforcement Along L:
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 631.05 kN
Mux = 0.42 kNm
Muy = -0.22 kNm
P/A = 143.42 kN/sqm
Mx/Zx = 0.26 kN/sqm
My/Zy = -0.15 kN/sqm

Deff = 217 mm
Beff = 2000 mm
SPu = 143.68 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 91.96 kNm
Ast Rqd (BM) = 1179 sqmm
Ast Prv = 11 - #19 @ 200
= 3152 sqmm
Distributed Across Total Width

Bottom Reinforcement Along B:


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 358 of 360

Pu = 631.05 kN
Mux = 0.42 kNm
Muy = -0.22 kNm
P/A = 143.42 kN/sqm
Mx/Zx = 0.26 kN/sqm
My/Zy = -0.15 kN/sqm

Deff = 201 mm
Leff = 2200 mm
SPu = 143.57 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 101.08 kNm
Ast Rqd (BM) = 1406 sqmm
Ast Prv = 12 - #19 @ 200
= 3438 sqmm
Distributed Across Total Length

Design For Shear:


One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 631.05 kN
Mux = 0.42 kNm
Muy = -0.22 kNm
P/A = 143.42 kN/sqm
Mx/Zx = 0.26 kN/sqm
My/Zy = -0.15 kN/sqm

Deff = 217 mm
Beff = 2000 mm
SPu = 143.68 kN/sqm
Vu = SPu X (Loff - d) X B
= 167.54 kN
Vc = 400.78 kN
Vu < Vc

One Way Shear Along B:


Critical Section @ d from Column Face

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 359 of 360

= 201 mm
Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 631.05 kN
Mux = 0.42 kNm
Muy = -0.22 kNm
P/A = 143.42 kN/sqm
Mx/Zx = 0.26 kN/sqm
My/Zy = -0.15 kN/sqm

Deff = 201 mm
Leff = 2200 mm
SPu = 143.57 kN/sqm
Vu = SPu X (Boff - d) X L
= 189.20 kN
Vc = 374.74 kN
Vu < Vc

Design For Punching Shear:


Critical Section @ d/2 from Column Face
= 104 mm

Critical Analysis Load = 13


Combination
Critical Load Combination = [17] : 1.2 (LOAD 9: DEADLOAD) +1.6 (LOAD 10:
LIVELOAD) +(LOAD 11: ROOFLIVELOAD)
Pu = 631.05 kN
Mux = 0.42 kNm
Muy = -0.22 kNm
P/A = 143.42 kN/sqm
Mx/Zx = 0.26 kN/sqm
My/Zy = -0.15 kN/sqm

Deff = 209 mm
Leff = 809 mm
Beff = 609 mm
SPu = Average Pressure
= 143.42 kN/sqm
Vud = { N - Pcr(axial)[ (Cx + d) X
(Cy + d)]}
= 560.39 kN

file:///C:/Users/Superman/AppData/Local/Temp/tmp6A5B.tmp 7/21/2017
Footing Design: Design Calculation Page 360 of 360

Vn = 1481.81 kN
Vc = 977.995 kN
No Shear Reinforcement
Vud < Vc
Required

Load Transfer Check For Load Transfer From Column To Footing


Critical Analysis Load = 13
Combination
Critical Load Combination = [17] : 1.2 (LOAD 9:
DEADLOAD) +1.6 (LOAD
10: LIVELOAD) +(LOAD
11: ROOFLIVELOAD)
Pu = 631.05 kN
A2 = 0.24 sqm
A1 = 2.88 sqm
Base Area = 4.4 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.4641
Thus, Modification Factor = 2
Pnb = 0.85 X 0.75 X Fck X Modication Factor X Column Area
= 7650 kN
Pnb > Pu, Hence Safe.