TRANSMISSION DIRECTORATE
BIDDING DOCUMENT
FOR
Procurement of Plant for Gas Insulated 220 kV Barhabise Substation (Design, Supply,
Install and Commission)
Single-Stage, Two-Envelope
Bidding Procedure
Issued on: .
Invitation for Bids No.: ICB-TD-TKTLP073/74 - 02
ICB No.: ICB-TD-TKTLP073/74 - 02
Employer: Nepal Electricity Authority
Country: Nepal
May 2017
Telephone: +977-1-6620016
Contract.
Fax: +977-1-6620016
SCHEDULE - 1 PAGE 1 OF 12
NEPAL ELECTRICITY AUTHORITY
TRANSMISSION DIRECTORATE
Tamakoshi-Kathmandu 220/400 kV Transmission Line Project
IFB No. : ICB-TD-TKTLP-073/74-02: Design, Supply, Installation and Commissioning of Gas Insulated 220 kV Barhabise Substation
Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad
FC: Foreign Currency LC: Local Currency
B POWER TRANSFORMER
5 MVA, 132 /11 kV Three Phase Power Transformer (without
a) 1 Nos.
transformer Oil)
b) Insulating oil for the above Power Transformer 1 Lot
C) LT Transformer
a) 630KVA 11/0.400 Kv 2 Nos.
D 245 KV EQUIPMENTS
D1 245KV GIS Equipment
1.1 245kV, SF6 GIS Bus Bars Module as per section project 2 Sets
1.2 245kV, SF6 GIS Bus Coupler feeder bay Module as per section project
1 Sets
1.3 245kV, SF6 GIS Line feeder bay Module as per section project 4 Sets
1.4 245kV, SF6 GIS spare Line feeder bay Module as per section project
2 Sets
1.5 245kV, SF6 GIS ICT feeder bay Module as per section project 1 Sets
1.6 SF6 Gas Insulated Bus Duct (GIB) outside GIS Hall alongwith
associated support structure and accessories
a) OPTION-I
SCHEDULE - 1 PAGE 2 OF 12
CIP (site) including insurance, clearing,
Total Amount
forwarding and transportation to site Custom, VAT and
Estimated (Excluding Taxes
Item Country of (Excluding Taxes and Duties applicable other taxes
Item description and Duties)
No. origin in Nepal)
FC FC LC
Quantity Unit
Currency# Unit Rate Amount
1600A, 40kA for 1 sec. Single Phase 240 Mtr.
OPTION-II
1600A, 40kA, 1sec three phase 80 Mtr.
Note : Bidder is required to quote for either option-I or Option-II
b) 1600A, 40kA for 1 sec. Single Phase ( for 4X53.33 MVA 1 ph
60 mtr
Transformer)
1.7 220kV, SF6 to Air Bushing alongwith associated support structure
E 145kV Equipment
E.1 145KV GIS Equipment
1.1 145kV, SF6 GIS Bus Bars Module as per section project 2 Sets
1.2 145kV, SF6 GIS Bus Coupler feeder bay Module as per section project
1 Set
1.3 145kV, SF6 GIS Line feeder bay Module as per section project 2 Sets
1.4 145kV, SF6 GIS Spare Line feeder bay Module as per section project
1 Sets
1.5 145kV, SF6 GIS ICT feeder bay Module as per section project for
1 Sets
220/132 kV Transformer
1.6 145kV, SF6 GIS ICT feeder bay Module as per section project for
1 Sets
132/11 kV Transformer
1.7 SF6 Gas Insulated Bus Duct (GIB) outside GIS hall including Bus Duct
support structure and associated accessories
a) 1250A, 31.5kA, 1sec three phase 50 Mtr
b 1250A, 31.5 kA 1sec single phase (for 4x53.33MVA 1-Phase
30 Mtr
Transformer bays)
1.8 145kV, SF6 to Air Bushing alongwith associated support structure
F 11 KV EQUIPMENT
1.0 11 kV Isolator (3-phase)-HDB
i 400A, 25kA for 3 sec, Isolator without E/s (Beam Mounted) 2 Set
2.0 9 kV Surge Arrester (1 ph.) 6 Nos
3.0 11 kV Horn Gap fuse (1 ph.) 6 Nos
4.0 11kV BPI 6 Nos
J SUBSTATION AUTOMATION
1 Substation Automation System as per Technical Specification:
a) 220kV System 8 Nos.
b) 132 kV System 6 Nos.
c) BCU for auxilary system 1 set
d) 11 kV HT Indoor Switchgear 1 set
M Batteries
a 220V
i 600 AH 2 Nos
b 48V
SCHEDULE - 1 PAGE 5 OF 12
CIP (site) including insurance, clearing,
Total Amount
forwarding and transportation to site Custom, VAT and
Estimated (Excluding Taxes
Item Country of (Excluding Taxes and Duties applicable other taxes
Item description and Duties)
No. origin in Nepal)
FC FC LC
Quantity Unit
Currency# Unit Rate Amount
i 600AH 2 Nos
Q Cables along with clamps, glands, lugs and straight joints etc.
R Air conditioning
High wall type split AC unit of 2 TR capacities for control room, relay
1 25 Nos.
room and battery room
T Communication Equipment
1 Transmission Equipment
SDH Equipment ( STM- 4 MADM, upto 3 MSP protected
A
directions)
Base Equipment (Common cards, Cross-connect/control cards, Optical
base cards, Power supply cards, power cabling, other hardware &
(I) 2 No.
accessories including sub-racks, patch cords, DDF etc. fully equipped
excluding (II) and (III) below)
(II) Optical Interface/SFP# for
a) S4.1 4 Nos.
(a) L4.2 6 Nos.
(III) Tributary Cards
(a) E1 Interface card (Minimum 16 interfaces per card ) 2 Nos.
Ethernet interfaces 10/100 Mbps with Layer-2 switching (Minimum
(b) 4 No.
4 interfaces per card.)
2 Termination Equipment
Drop/Insert Multiplexer
Base Equipment (Common cards, Power supply cards, power cabling,
A1
other hardware & accessories including sub-racks, etc. fully equipped 2 Nos.
excluding subscriber line interface cards)
A2 Subscriber Line Interface Cards
a) 2 wire (sub/sub) voice channel cards (min 8 channels per card) 2 Nos.
b) 4 wire (E&M) voice channel cards (min 8 channels per card) 2 Nos.
c) Asynchronous Sub Channels data cards (minimum 4 channels per card) 2 No.
d) Synchronous data card (NX64kbps) 2 Nos.
3 Equipment Cabinets
a) For Drop/Insert Multiplexer 2 No.
b) For SDH Equipment 2 No.
4 TMN Craft Terminal for SDH & PDH Equipments
(a) Hardware 1 set
(b) Software 1 set
5 Synchronization Equipment
GPS clock including all hardware & accessories 1 set
Main Distribution Frame
6
SCHEDULE - 1 PAGE 7 OF 12
CIP (site) including insurance, clearing,
Total Amount
forwarding and transportation to site Custom, VAT and
Estimated (Excluding Taxes
Item Country of (Excluding Taxes and Duties applicable other taxes
Item description and Duties)
No. origin in Nepal)
FC FC LC
Quantity Unit
Currency# Unit Rate Amount
6
(100 pairs) 2 no
7.0 Test Equipment as per TS 1 set
SUB TOTAL PART-A
3 11 KV 2 SET
Bus post insulators, Spacers, equipment support structures,
conductor(s), Al tube, clamp, connectors required for arrangement of
B Neutral formation for one transformer bank for making connection 1 Sets
arrangement to connect spare unit in place of any other unit without
physical shifting complete in all respect
D Illumination System
1.1 Substation Lighting
(i) Control Room cum administrative building illumination 1 LS
(ii) 220kV GIS Building 1 LS
(iii) 132kV GIS Building 1 LS
IV. Indoor Switchyrad Panel Room 1 LS
v Fire Fighting Room 1 LS
vi Outdoor Switchyard Lighting 1 LS
SCHEDULE - 1 PAGE 8 OF 12
CIP (site) including insurance, clearing,
Total Amount
forwarding and transportation to site Custom, VAT and
Estimated (Excluding Taxes
Item Country of (Excluding Taxes and Duties applicable other taxes
Item description and Duties)
No. origin in Nepal)
FC FC LC
Quantity Unit
Currency# Unit Rate Amount
vii Street Lighting 1 LS
viii Occupancy sensor 1 LS
1.2 Township Area Lighting 1 LS
I SUBSTATION AUTOMATION
a Integration of all 220/132kV Bays under present scope with the 1 LS
SCADA of SIEMENS (SINAUT Spectrum) at Load Dispatch Centre,
Kathmandu including supply of Hardware, Software, accessories etc. as
per TS Section Project.
SUB TOTAL PART-B
D SUBSTATION AUTOMATION
Augmentation of Substation Automation System as per Technical
1
Specification:
a) 220kV System 2 Nos.
E Cables along with clamps, glands, lugs and straight joints etc.
Schedule No. 2: Plant and Equipment including Mandatory Spares Parts to be supplied from within Nepal including Type Test Charges
All prices in local currency, NRs
Ex Faxtory Price (Excluding Total Amount VAT and other
Inland Transportation up to Site Total Amount
Item No. Item Description Quantity Unit VAT) (Excluding Taxes) taxes
Unit Rate Amount Unit Rate Amount
1 2 3 4 5 6 7 8 9 10 11
I 220/132/11 kV GIS Barhabise Substation
PART - A: OWNER ASSESSED QUANTITIES
A POWER TRANSFORMER
53.33MVA, 220/3 / 132//3 kV Single Phase Power
a) 4 Nos.
Transformer (without transformer Oil)
b) Insulating oil for the above Power Transformer 4 Lot
c) 33kV Current transformer (NCT) for autotrasnformer 1 No
d) Oil Storage tank of 20KL 2 Nos.
B POWER TRANSFORMER
5 MVA, 132 /11 kV Three Phase Power Transformer (without
a) 1 Nos.
transformer Oil)
b) Insulating oil for the above Power Transformer 1 Lot
C) LT Transformer
a) 630KVA 11/0.400 Kv 2 Nos.
D 245 KV EQUIPMENTS
D1 245KV GIS Equipment
1.1 245kV, SF6 GIS Bus Bars Module as per section project 2 Sets
1.2 245kV, SF6 GIS Bus Coupler feeder bay Module as per section
1 Sets
project
1.3 245kV, SF6 GIS Line feeder bay Module as per section project
4 Sets
1.4 245kV, SF6 GIS spare Line feeder bay Module as per section
2 Sets
project
1.5 245kV, SF6 GIS ICT feeder bay Module as per section project
1 Sets
1.6 SF6 Gas Insulated Bus Duct (GIB) outside GIS Hall alongwith
associated support structure and accessories
a) OPTION-I
1600A, 40kA for 1 sec. Single Phase 240 Mtr.
SCHEDULE - 2 PAGE 2 OF 11
E 145kV Equipment
E.1 145KV GIS Equipment
1.1 145kV, SF6 GIS Bus Bars Module as per section project 2 Sets
1.2 145kV, SF6 GIS Bus Coupler feeder bay Module as per section
1 Set
project
1.3 145kV, SF6 GIS Line feeder bay Module as per section project
2 Sets
1.4 145kV, SF6 GIS Spare Line feeder bay Module as per section
1 Sets
project
1.5 145kV, SF6 GIS ICT feeder bay Module as per section project
1 Sets
for 220/132 kV Transformer
1.6 145kV, SF6 GIS ICT feeder bay Module as per section project
1 Sets
for 132/11 kV Transformer
1.7 SF6 Gas Insulated Bus Duct (GIB) outside GIS hall including
Bus Duct support structure and associated accessories
F 11 KV EQUIPMENT
1.0 11 kV Isolator (3-phase)-HDB
i 400A, 25kA for 3 sec, Isolator without E/s (Beam Mounted)
2 Set
J SUBSTATION AUTOMATION
1 Substation Automation System as per Technical Specification:
a) 220kV System 8 Nos.
b) 132 kV System 6 Nos.
c) BCU for auxilary system 1 set
d) 11 kV HT Indoor Switchgear 1 set
M Batteries
a 220V
i 600 AH 2 Nos
b 48V
i 600AH 2 Nos
R Air conditioning
High wall type split AC unit of 2 TR capacities for control room,
1 25 Nos.
relay room and battery room
T Communication Equipment
1 Transmission Equipment
SDH Equipment ( STM- 4 MADM, upto 3 MSP protected
A
directions)
SCHEDULE - 2 PAGE 6 OF 11
b) 4 wire (E&M) voice channel cards (min 8 channels per card) 2 Nos.
3 11 KV 2 SET
Bus post insulators, Spacers, equipment support structures,
conductor(s), Al tube, clamp, connectors required for
arrangement of Neutral formation for one transformer bank for
B making connection arrangement to connect spare unit in place of 1 Sets
any other unit without physical shifting complete in all respect
D Illumination System
1.1 Substation Lighting
(i) Control Room cum administrative building illumination 1 LS
(ii) 220kV GIS Building 1 LS
(iii) 132kV GIS Building 1 LS
IV. Indoor Switchyrad Panel Room 1 LS
v Fire Fighting Room 1 LS
vi Outdoor Switchyard Lighting 1 LS
vii Street Lighting 1 LS
viii Occupancy sensor 1 LS
1.2 Township Area Lighting 1 LS
SCHEDULE - 2 PAGE 8 OF 11
I SUBSTATION AUTOMATION
a Integration of all 220/132kV Bays under present scope with the 1 LS
SCADA of SIEMENS (SINAUT Spectrum) at Load Dispatch
Centre, Kathmandu including supply of Hardware, Software,
accessories etc. as per TS Section Project.
D SUBSTATION AUTOMATION
Augmentation of Substation Automation System as per
1
Technical Specification:
a) 220kV System 2 Nos.
Note : 1) Bidder is required to quote prices in this Schedule for all the individual items/sub-items.
2.) The Prices of equipments are inclusive of type test charges except for those mentioned in Schedule 4( e)
3.) BOQ given above is indicative only based on the scope of work as given in Project Specific Requirements. The quantities mentioned above may undergo change during detailed
engineering to meet the functional requirement and scope of work defined in Employer's Requirements.
1 NOT APPLICABLE
Installation Charges
Portion in Nepaln Currency
Portion in Foreign Currency
Sl. No. Item Description Unit Qty. (in NRs)
Currency* Unit Rate Total Charges Unit Rate Total Charges
B POWER TRANSFORMER
a) 5 MVA, 132 /11 kV Three Phase Power Transformer (without transformer Oil) Nos. 1
C) LT Transformer
a) 630KVA 11/0.400 Kv Nos. 2
D 245 KV EQUIPMENTS
D1 245KV GIS Equipment
1.1 245kV, SF6 GIS Bus Bars Module as per section project Sets 2
1.2 245kV, SF6 GIS Bus Coupler feeder bay Module as per section project Sets 1
1.3 245kV, SF6 GIS Line feeder bay Module as per section project Sets 4
1.4 245kV, SF6 GIS spare Line feeder bay Module as per section project Sets 2
1.5 245kV, SF6 GIS ICT feeder bay Module as per section project Sets 1
1.6 SF6 Gas Insulated Bus Duct (GIB) outside GIS Hall alongwith associated support
structure and accessories
a) SF6 Gas Insulated Bus Duct (GIB) outside GIS Hall alongwith associated support
structure and accessories
OPTION-I Mtr. 240
1600A, 40kA for 1 sec. Single Phase
OPTION-II Mtr. 80
1600A, 40kA, 1sec three phase
Note : Bidder is required to quote for either option-I or Option-II
b 1600A, 40kA for 1 sec. Single Phase ( for 4X53.33 MVA 1 ph Transformer) mtr 60
SCHEDULE - 4 (a) PAGE 2 OF 12
Installation Charges
Portion in Nepaln Currency
Portion in Foreign Currency
Sl. No. Item Description Unit Qty. (in NRs)
Currency* Unit Rate Total Charges Unit Rate Total Charges
1.7 220kV, SF6 to Air Bushing alongwith associated support structure Nos. 16
1.8 245kV, SF6 GIS Auxiliary Bus Module as per section project to connect spare unit of
set 1
Transformer
D.2 1600A, 40kA for 1 sec. Single Phase
1.1 216 KV Surge Arrester (1-phase) Nos. 16
1.2 4400pF, 245 kV Capacitive Voltage Transformer (1-Phase) Nos. 12
1.3 245kV Bus Post Insulator (1-Phase) (Except for wave trap) Nos. 12
E 145kV Equipment
E.1 145KV GIS Equipment
1.1 145kV, SF6 GIS Bus Bars Module as per section project Sets 2
1.2 145kV, SF6 GIS Bus Coupler feeder bay Module as per section project Set 1
1.3 145kV, SF6 GIS Line feeder bay Module as per section project Sets 2
1.4 145kV, SF6 GIS Spare Line feeder bay Module as per section project Sets 1
1.5 145kV, SF6 GIS ICT feeder bay Module as per section project for 220/132 kV
Sets 1
Transformer
1.6 145kV, SF6 GIS ICT feeder bay Module as per section project for 132/11 kV
Sets 1
Transformer
1.7 SF6 Gas Insulated Bus Duct (GIB) outside GIS hall including Bus Duct support
structure and associated accessories
a) 1250A, 31.5kA, 1sec three phase Mtr 50
b 1250A, 31.5 kA 1sec single phase (for 4x53.33MVA 1-Phase Transformer bays)
mtr 30
1.8 145kV, SF6 to Air Bushing alongwith associated support structure
a) 1250A, 31.5kA, 1sec single phase Set 13
1.9 145kV, SF6 GIS Auxiliary Bus Module as per section project to connect spare unit of
set 1
Transformer
E.2 145kV EQUIPMENT(AIS)
1.0 120 kV Surge Arrestors (1-Phase) Nos. 13
2.0 8800pF, 145 kV Capacitive Voltage Transformer (1-Phase) Nos. 6
3.0 145KV Bus Post Insulator Nos. 6
F 11 KV EQUIPMENT
1.0 11 kV Isolator (3-phase)-HDB
i 400A, 25kA for 3 sec, Isolator without E/s (Beam Mounted) Set 2
2.0 9 kV Surge Arrester (1 ph.) Nos 6
3.0 11 kV Horn Gap fuse (1 ph.) Nos 6
4.0 11kV BPI Nos 6
Installation Charges
Portion in Nepaln Currency
Portion in Foreign Currency
Sl. No. Item Description Unit Qty. (in NRs)
Currency* Unit Rate Total Charges Unit Rate Total Charges
J SUBSTATION AUTOMATION
1 Substation Automation System as per Technical Specification:
a) 220kV System Nos. 8
b) 132 kV System Nos. 6
c) BCU for auxilary system set 1
d) 11 kV HT Indoor Switchgear set 1
Installation Charges
Portion in Nepaln Currency
Portion in Foreign Currency
Sl. No. Item Description Unit Qty. (in NRs)
Currency* Unit Rate Total Charges Unit Rate Total Charges
M Batteries
a 220V
i 600 AH Nos 2
b 48V
i 600AH Nos 2
Q Cables along with clamps, glands, lugs and straight joints etc.
i 3.5Cx300 sqmm (XLPE) cable for filter Machine along with 2 nos outdoor
KM 1
receptacles -250A
R Air conditioning
High wall type split AC unit of 2 TR capacities for control room, relay room and
1 Nos. 25
battery room
T Communication Equipment
SCHEDULE - 4 (a) PAGE 5 OF 12
Installation Charges
Portion in Nepaln Currency
Portion in Foreign Currency
Sl. No. Item Description Unit Qty. (in NRs)
Currency* Unit Rate Total Charges Unit Rate Total Charges
1 Transmission Equipment
A SDH Equipment ( STM- 4 MADM, upto 3 MSP protected directions)
Installation Charges
Portion in Nepaln Currency
Portion in Foreign Currency
Sl. No. Item Description Unit Qty. (in NRs)
Currency* Unit Rate Total Charges Unit Rate Total Charges
3 11 KV SET 2
Bus post insulators, Spacers, equipment support structures, conductor(s), Al tube,
clamp, connectors required for arrangement of Neutral formation for one transformer
B Sets 1
bank for making connection arrangement to connect spare unit in place of any other
unit without physical shifting complete in all respect
D Illumination System
1.1 Substation Lighting
(iii) 132kV GIS Building LS 1
IV. Indoor Switchyrad Panel Room LS 1
v Fire Fighting Room LS 1
vi Outdoor Switchyard Lighting LS 1
vii Street Lighting LS 1
G Visual Monitoring System for watch & ward as per technical specification LS 1
Installation Charges
Portion in Nepaln Currency
Portion in Foreign Currency
Sl. No. Item Description Unit Qty. (in NRs)
Currency* Unit Rate Total Charges Unit Rate Total Charges
Installation Charges
Portion in Nepaln Currency
Portion in Foreign Currency
Sl. No. Item Description Unit Qty. (in NRs)
Currency* Unit Rate Total Charges Unit Rate Total Charges
18.0 Supplying & laying hume pipe of grade (NP-3) excluding concrete and reinforcement
Installation Charges
Portion in Nepaln Currency
Portion in Foreign Currency
Sl. No. Item Description Unit Qty. (in NRs)
Currency* Unit Rate Total Charges Unit Rate Total Charges
Earth work in excavation and filling in all types of soils including soft/disintegrated
i Cu. M 50000
rock with all leads and lifts within sub station boundary
Earth work in filling with borrowed earth with all leads and lifts including
ii Cu. M 10000
royalty,taxes etc
All civil works for security room as per TS including septic tank and soak pit. Internal
26.0 and external finish, sanitary and plumbing works, plinth protection etc. to complete Sq. m. 9
the building are included in the item.
Construction of retaining wall with random rubble masonary in cement sand mortar
(1:6) including levelling up with cement concrete (1:6:12), providing weep holes of
PVC pipes (150 mm dia) with necessary filter material at the mouth of weep holes, 50
27.0 mm thick cement concrete (1:2:4) copping on the top of wall, 100 mm thick PCC Cu. M 9900
(1:4:8) below RR masonary work, excavation of foundation for all lifts up to 3m
above lower level. Item of excavation, PCC (1:2:4 & 1:4:8) shall be measured and
paid seperately under respective items of BPS
Installation Charges
Portion in Nepaln Currency
Portion in Foreign Currency
Sl. No. Item Description Unit Qty. (in NRs)
Currency* Unit Rate Total Charges Unit Rate Total Charges
D SUBSTATION AUTOMATION
1 Augmentation of Substation Automation System as per Technical Specification:
a) 220kV System Nos. 2
E Cables along with clamps, glands, lugs and straight joints etc.
a 220 kV grade 1 core, 1200sq.mm.XLPE insulated copper cable as per technical
KM 1.5
specification
b Cable end termination(s) on Gantry as per technical specification nos 6
PART-C-Civil Works
SCHEDULE - 4 (a) PAGE 11 OF 12
Installation Charges
Portion in Nepaln Currency
Portion in Foreign Currency
Sl. No. Item Description Unit Qty. (in NRs)
Currency* Unit Rate Total Charges Unit Rate Total Charges
Excavation in all types of soil and rock including backfilling disposal etc. for all leads
1.0 Cu.M 950
and lifts
2.0 Providing and laying of Plain Cement Concrete (PCC) (1:4:8) Cu.M 125
3.0 Providing and laying of Plain Cement Concrete (PCC) (1:2:4) Cu.M 60
Providing and laying of Reinforced Cement Concrete Design Mix M25 including pre
4.0 cast, shuttering, Grouting of pockets & underpinning but excluding steel Cu.M 230
reinforcement
Providing and laying Plain Cement Concrete 1:5:10 (1 cement : 5 sand : 10 Stone
5.0 Cu.M 75
aggregate)
6.0 Steel Reinforcement ( Fe 500) MT 11
Misc. Structural steel including rails, embedments, edge protection angles, gratings
7.0 MT 5
etc. but excluding the reinforcement steel and steel for lattice and pipe structures.
8.0 Stone spreading including antiweed treatment in switchyard excluding PCC Sq. M. 1000
12.0 Supplying & laying hume pipe of grade (NP-3) excluding concrete and reinforcement
a) 250mm dia RM 50
b) 300mm dia RM 30
c) 450mm dia RM 25
d) 600mm dia RM 25
13.0 Drains Excluding Concrete
a) Section A-A (300 mm wide X depth up to 600mm) RM 60
b) Section B-B ( 450 mm wideX depth from 600 mm to 900 mm) RM 20
c) Section C-C (600 mm wide X depth from 900 mm to 1200 mm) RM 20
d) Section D-D (750 mm wide X depth from 1200 mm to 1500mm ) RM 20
14.0 Site levelling
Earth work in excavation and filling in all types of soils including soft/disintegrated
i Cu. M 10000
rock with all leads and lifts within sub station boundary
Earth work in filling with borrowed earth with all leads and lifts including
ii Cu. M 2000
royalty,taxes etc
Construction of retaining wall with random rubble masonary in cement sand mortar
(1:6) including levelling up with cement concrete (1:6:12), providing weep holes of
PVC pipes (150 mm dia) with necessary filter material at the mouth of weep holes, 50
15.0 mm thick cement concrete (1:2:4) copping on the top of wall, 100 mm thick PCC Cu. M 1000
(1:4:8) below RR masonary work, excavation of foundation for all lifts up to 3m
above lower level. Item of excavation, PCC (1:2:4 & 1:4:8) shall be measured and
paid seperately under respective items of BPS
SCHEDULE - 4 (a) PAGE 12 OF 12
Installation Charges
Portion in Nepaln Currency
Portion in Foreign Currency
Sl. No. Item Description Unit Qty. (in NRs)
Currency* Unit Rate Total Charges Unit Rate Total Charges
Total PART-C
Total for 220kV KHIMTI Substation (II) (Part-A+ Part-B+ Part C)
TOTAL INSTALLATION SERVICES (Total of (I) and (II) to be carried
forward to Schedule No. 5: Grand Summary)
Note : 1) Bidder is required to quote prices in this Schedule for all the individual items/sub-items.
2.) BOQ given above is indicative only based on the scope of work as given in Employer's Requirements. The quantities mentioned above may undergo change during detailed engineering to meet the functional requirement and scope
of work defined in Employer's Requirements.
* Specify currency in accordance with BDS ITB Clause 19.1, Part-I of the Bidding Documents.
Strike out if not applicable
TRANSFORMERS 5
Total for Training Charges ( total of column 6 To
be carried forward to Schedule 5: Grand
Summary)
Date: Signature:
Printed Name:
Designation:
Common Seal:
Schedule 4 (d) Page 1 of 1
Date: Signature:
Printed Name:
Designation:
Common Seal:
SCHEDULE - 4 (e) PAGE 1 OF 1
TRANSMISSION DIRECTORATE
Tamakoshi-Kathmandu 220/400 kV Transmission Line Project
IFB No. : ICB-TD-TKTLP-073/74-02: Design, Supply, Installation and Commissioning of Gas Insulated 220 kV Barhabise Substation
Sl. No. Description of Tests Country of Testing Unit Qty. Currency # Amount
(1) (2) (3) (4) (5) (6) (7)=(5) x ( 6)
I 220/132kV, 53.33MVA Single Phase Power Transformer
a) Temperate rise test 1
b) Measurement of zero sequence reactance 1
c) Measurement of Accoustic Noise Level 1
d) Measurement of Harmonic Level at No-load current 1
e) Measurement of power taken by fans and pumps 1
II 132/11, 5 MVA Three Phase Power Transformer
a) Temperate rise test 1
b) Measurement of zero sequence reactance 1
c) Measurement of Accoustic Noise Level 1
d) Measurement of Harmonic Level at No-load current 1
e) Measurement of power taken by fans and pumps 1
Date: Signature:
Printed Name:
Designation:
Common Seal:
SCHEDULE - 6 PAGE 1 OF 1
Schedule No. 6: Recommended Availability/Optional Spares parts and Recommended Test Equipment (in line with Technical Specifications)
Item No. Name & Description of Name of Original Part No. Number of Units in Total No. of Sets to Unit Price Total Price Remarks
Parts Manufacturer each set be provided