Up until recently, electric power suppliers in Japan had been working on various strategies to
provide an inexpensive and stable supply of electric power, and they had largely succeeded.
However, the tight energy supply brought on by the Great East Japan Earthquake has created
an opportunity for Japan to review the risks of depending on large-scale power plants for its
power supply and has accelerated discussion on reforming its electric-power supply system.
The trend is now toward greater dependency on thermal power generation and liberalization
of the industry by legally separating the power-generation component from the transmission-
and-distribution component. As a result, electric power suppliers find themselves in a difficult
situation because they must now make management more efficient and reduce costs while
still providing a stable power supply. Fujitsu has developed an asset management solution for
thermal power plants to help suppliers reduce their equipment maintenance cost. This paper
describes the asset-centric data model of this solution, the organization of asset-management
work based on that model, and the usefulness and importance of an asset-centric data model.
76 FUJITSU Sci. Tech. J., Vol. 50, No. 2, pp. 7684 (April 2014)
N. Fujisawa et al.: Thermal Power Plant Asset Management with Asset-centric Data Model
(100-million kWh)
9845
10 000
9396
8557
31.0
8000 Nuclear power
7376 34.3
34.0
Source: Agency for Natural Resources and Energy, Outline of Japans Electric Power Supply
Figure 1
Trends in electric power generation.
Table 1
Transition in breakdown of electricity rates (average cost basis of business expenses per kWh of ten power companies).
(yen/kWh)
1996 1998 2000 2006 2008
Fuel expenses 2.25 2.49 2.47 3.13 5.04
Purchased power 2.15 2.15 2.21 2.11 2.28
Labor expenses 2.08 2.00 2.08 1.77 1.56
Breakdown Repair expenses 2.56 2.39 2.23 1.84 1.73
Depreciation 3.66 3.70 3.36 2.47 2.26
Tax and public dues 1.61 1.56 1.41 1.26 1.17
Other expenses 2.77 2.84 2.90 2.64 2.35
Total 17.08 17.14 16.66 15.21 16.38
(%)
*1 Total of figures in each column may not match total shown due to rounding.
*2 Figures for cost ratio of fuel expenses include purchased power in addition to fuel expenses.
*3 Purchased power refers to expense of paying for electric power from independent power producers (IPPs) and other power
companies.
Source: Agency for Natural Resources and Energy, Comparison of Electricity Rates Among Various Countries
Asset
information
(asset ledger)
Figure 2
Range of asset management work.
about past results. This not only makes it easier to inspection targets by switching from time-based main-
reference asset information at the time of planning but tenance (TBM), a maintenance technique in which
also enables work history and past procurement condi- repair work is performed at fixed intervals, to condition-
tions similar to those of the target asset to be checked, based maintenance (CBM), a maintenance technique
which can help make planning more efficient and ac- in which repair time is determined by diagnosing the
curate. Furthermore, as a management system based condition of target equipment.
on accumulated data in which equipment = inspection Why is it that equipment diagnoses and deci-
target, checking on the procurement conditions of con- sions on the need for equipment maintenance are
struction work makes it easy to isolate those targets for facilitated by using asset information in an equipment
which cost-reduction measures must be taken. = inspection target management system? The answer
Such checking may simply be a study on reducing lies in the fact that the condition of an asset, such as
costs in units of inspection targets, but it can also be the thickness of a pipe, recorded in an inspection (tar-
a study on the need for construction work in units of get = equipment) history and the cause and effect of
an equipment-related accident recorded in a problem data model having a multifaceted structure that can
history are important pieces of information when di- facilitate the uniform management of equipment = in-
agnosing a piece of equipment and determining the spection target information and for a multiphase data
need for maintenance work. Such information can be structure that satisfies user needs.
managed from an asset-centric viewpoint and used Kaname Analysis is useful in establishing a
when applying accident prevention measures, thereby foundation for such a data model. This is a technique
achieving stable and safe maintenance operations. formalized by Fujitsu for system development work and
inspired by the book Success by Analyzing Things and
4. Fujitsus solution ObjectsSimple Method for Conceptualizing Work3)
Fujitsu provides an asset management solution by Zentaro Nakamura, Professor Emeritus of Keio
for thermal power plants based on the above consid- University. It can be used for a variety of scenarios,
erations. This solution consists of an interval package from upstream processes such as work analysis to
function based on a data model that describes an system construction based on a service-oriented archi-
equipment = inspection target management system tecture (SOA).
and a systems engineering (SE) service for implement- Kaname Analysis clarifies the nature of each
ing that function. The following describes this solution type of work associated with equipment = inspection
in more detail. target and also clarifies what equipment = inspection
target information should be managed and at what
4.1 Data model describing equipment = level of detail while making associations between that
inspection target management system information and the various types of associated work.
Although the stated goal here is to achieve an
equipment = inspection target management system, 4.2 Interval package function
this is not simply a matter of grouping equipment tar- The interval package function operates a work
geted for inspection and managing information on that system based on the above data model. The work sys-
equipment. For example, in asset-maintenance work tem manages inspections and construction planning
that involves medium- and long-term planning, budget and results, which are the most important components
drafting, placing of orders, and making of contracts, of asset management work envisioned by Fujitsu.
there is also a need for information that can be used In the interval package function, the inspection
to assess the suitability of such budgets and plans. At interval table lies at the center of work for managing
the same time, work related to accepting and complet- inspections and construction planning and results, as
ing inspections requires information on the condition shown in Figure 3. The function is configured so that
of target equipment brought to light in an inspection equipment = inspection target information can be ref-
in addition to historical information on work period, erenced, registered, and modified from that table.
expenses, etc. Also needed is equipment-related infor- The inspection interval table screen (Figure 4) en-
mation such as equipment manufacturer, year/month/ ables the user to display ten years worth of work-item
date of manufacture, and equipment problems for use planning and subsequent results at the time of periodic
in identifying the cause of an accident. inspections in terms of equipment = inspection target
The equipment = inspection target information and of construction-work planning and subsequent
depends on the type of work performed. Consequently, results with respect to equipment. In addition, plan-
if equipment information is prepared and managed ning can be automatically updated when additions or
for each type of work, that information will become changes are made to inspections or construction work.
scattered about the system, making it difficult to co- The equipment details screen (Figure 5) can be
ordinate information between different types of work used to refer to information on equipment targeted for
even for the same asset (equipment). This situa- inspection. When adjusting inspection plans, display-
tion can not only hinder efficient operations but also ing required equipment information in a simple format
lead to inappropriate maintenance work. To prevent enables the user to visualize the equipment in an intui-
these problems from occurring, there is a need for a tive manner.
Legend:
Inspection Interval Table button
Menu Main Sub
menu menu
Equipment
Check
Register Copy Registration button Equipment link
inspection
work item details
conditions
context menu
Check inspection
Register
conditions inspection
Work item Work Item link context
Inspection menu Register
results
details
Edit button interval inspection results Add
table Icon criterion
context menu Add
Modify Construction-work
inspection
work item planning/results Icon
Icon plans
(work item column)
Select (equipment Register
construction column) special
Icon
work instructions
Register
construction- Inspection
work planning/ Icon budget
Edit results
Modify Details of Register master
construction- button construction- Register button
work planning/ work planning/ budget
results results maintenance
Upload
Figure 3
Overview of interval package function.
Click on
Edit button
Click on
Work Item link
Figure 4
Inspection interval table screen (interval package function).
Equipment details
Click on
Equipment link
Figure 5
Equipment details screen (interval package function).
Click on
Edit button
Click on
Work Item link
Figure 6
Work-item registration, detail, and modification screen (interval package function).
The work-item registration, detail, and modi- of the work-item registration, detail, and modification
fication screen (Figure 6) provides functions for screen or the construction-work registration, detail,
referencing, registering, and modifying the contents and modification screen are instantly reflected on the
of work that is carried out at the time of a periodic inspection interval table.
equipment inspection. Similarly, the construction-work The master-budget-maintenance-list registration,
registration, detail, and modification screen (Figure 7) detail, and modification screen (Figure 8) enables
enables the contents of equipment construction work to uniform management of master budget data such as
be referenced, registered, and modified. The contents incidental work required for periodic inspections and
Click on Construction
Work link
Inspection interval table
* This window is limited to two or more
construction-work items; if only one
exists, the user is taken directly to the Register construction-work planning/results
screen showing details of
construction-work planning/results.
Right-click or
Click on Select
Construction Work
Click on
icon
Figure 7
Construction-work registration, detail, and modification screen (interval package function).
Click on
New Registration
Register master budget maintenance
Click on
Edit button
Modify master budget maintenance
Figure 8
Master-budget-maintenance-list registration, detail, and modification screen (interval package function).
expenses associated with safety countermeasures. The interval package function can run in a stand-
Combining the information shown on this screen with alone manner on a personal computerthere is no
other information like construction expenses set for need to deploy a large-scale system. It does, however,
certain work items enables the budget for periodic in- need data to operate. We can therefore envision cases
spections to be roughly estimated. in which new data will have to be prepared. However,
Strategy formulation
Status monitoring/notification/display function Maintenance EAM Work
KPI management Scorecard plan planning
Asset management
Improvement-proposal
Asset information
draft-support function Work information
Improvement-proposal Work management
drafting
Non-compliance
Check/Approve/Reject Non-compliance management
Analysis information
Recommendation drafting
database
Degradation RCM
mechanism table
Analysis function RCA
Root cause analysis
Analysis/Evaluation Construction-work
Purchase-order management
information
KPI: Key performance indicator Power-generation
Operations information management
Figure 9
Meridium APM solution.
realizing this goal. 2) Agency for Natural Resources and Energy: Comparison
of Electricity Rates in Various Countries (in Japanese).
http://www.enecho.meti.go.jp/denkihp/shiryo/
References
110817kokusaihikakuyouin.pdf
1) Agency for Natural Resources and Energy: Energy in 3) Z. Nakamura: Success by Analyzing Things and
Japan 2010. ObjectsSimple Method for Conceptualizing Work.
http://www.enecho.meti.go.jp/topics/energy-in-japan/ Nikkan Kogyo Shimbun, 2003 (in Japanese).
english2010.pdf