KRUPP INDUSTRIES INDIA LTD

DESIGN DEDUSTING Calculation Procedure


MANUAL SHEET 1 OF 24

A Dedusting points

1 Troughed belt conveyor


2 Steel apron feeder
3 Steel apron feeder, bulk material standing
4 Deep bucket conveyor
5 Box feeder
6 Weigh belt
7 Bucket elevator, chain - type
8 Bucket elevator, belt - type, single casing
9 Bucket elevator, belt - type, double casing
10 Vibrating trough without flex seal, bulk material falling
11 Vibrating trough without flex seal, bulk material standing
12 Vibrating trough with flex seal, bulk material falling
13 Vibrating trough with flex seal, bulk material standing
14 Vibrating screen without flex seal
15 Vibrating screen with flex seal
16 Aeropol
17 Poldos pressure vessel conveyor
18 Fluidor
19 Clinker silo feed, silo penthouse closed, 1 feed opening
20 Clinker silo feed, silo penthouse closed, 2 feed opening
21 Clinker silo feed, silo penthouse closed, 3 feed opening
22 Clinker silo feed, silo penthouse open, 1 feed opening
23 Clinker silo feed, silo penthouse open, 2 feed opening
24 Clinker silo feed, silo penthouse open, 3 feed opening
25 Clinker silo feed, cover trapezoidal plate, 1 feed opening
26 Clinker silo feed, cover trapezoidal plate, 2 feed opening
27 Clinker silo feed, cover trapezoidal plate, 3 feed opening
28 Bin on top, 1 feed opening
29 Bin on top, 2 feed opening
30 Bin on top, pneumatic feed
31 Polycom
32 Feed hopper
33 Crusher, moisture level < 6%
34 Hammer crusher
35 Vaccume relief
36 Bulk loading, open
37 Cement cooler
38 Other machines / aggregates

surt:\techdata\dedusting\procedure.xls
KRUPP INDUSTRIES INDIA LTD
DESIGN DEDUSTING Calculation Procedure
MANUAL SHEET 2 OF 24

B Types of dust

a) Non - Wearing / Abrasive dust


1 Dust from lime stone
2 Dust from clay
3 Dust from marl
4 Raw mix dust
5 Coal dust
6 Exit dust from raw material dryers
7 Raw gypsum dust

b) Wearing / Abrasive dust


1 Dust from iron ore
2 Dust from slag
3 Exit dust from kiln
4 Cement kiln dust
5 Clinker dust
6 Cement dust

C Recommended air velocities in dedusting pipes

a) Non - Abrasive dust


vmax. = max. air velocity = 19 m/s
vmin = min. air velocity = 13 m/s

b) Abrasive dust
vmax. = max. air velocity = 16 m/s
vmin. = min. air velocity = 10 m/s

D Recommended standard pipe (OD) sizes

139.7 1118
219.1 1219.0
273.0 1422
323.9 1626
355.6 1700
406.4 1800
457.2 1900
558.8 2000
609.6 2100
711.2 2200
813 2300
914 2400
1016 2500
1067

surt:\techdata\dedusting\procedure.xls
KRUPP INDUSTRIES INDIA LTD
DESIGN DEDUSTING Calculation Procedure
MANUAL SHEET 3 OF 24

E Calculation for Pipe size and air velocity

V = Volume i.e. volume of to be dedusted in m3/h


2
V = (pi/4) * (Di/1000) * vmax * 3600 where
vmax = max velocity in m/s
Di = pipe I D in mm.
0.5
Di = 1000 * [(4 * V) / (3600 * pi * vmax)] in mm

Select standard pipe size D from given table corresponding to Di

Di D Di D
Calculated Selected Calculated Selected
pipe I D pipe O D pipe I D pipe O D
> 0.0 < 131.7 139.7 >= 1059 < 1110 1118
>= 160.3 < 211.1 219.1 >= 1110 < 1211 1219.0
>= 211.1 < 265.0 273.0 >= 1211 < 1414 1422
>= 265.0 < 315.9 323.9 >= 1414 < 1618 1626
>= 315.9 < 347.6 355.6 >= 1618 < 1692 1700
>= 347.6 < 398.4 406.4 >= 1692 < 1792 1800
>= 398.4 < 449.2 457.2 >= 1792 < 1892 1900
>= 449.2 < 500 558.8 >= 1892 < 1992 2000
>= 500 < 602 609.6 >= 1992 < 2092 2100
>= 602 < 703 711.2 >= 2092 < 2192 2200
>= 703 < 805 813 >= 2192 < 2292 2300
>= 805 < 906 914 >= 2292 < 2392 2400
>= 906 < 1007 1016 >= 2392 < 2492 2500
>= 1007 < 1059 1067

Calculate air velocity v considering selected pipe dia. D

v = 1000 * ((4 * V) / (3.6* pi * (D - 8)2) in m/s

Calculated velocity should be >= vmin <= vmax


3
Example : Volume calculated V is 7561.51 m /h

Di = 1000 * [(4 * V) / (3600 * pi * vmax)]0.5 in mm


= 375.173
D = 406.4 selected from the table

v = 1000 * (4 * V / (3.6 * pi * (D - 8)2) in m/s


= 16.8491

surt:\techdata\dedusting\procedure.xls
KRUPP INDUSTRIES INDIA LTD
DESIGN DEDUSTING Calculation Procedure
MANUAL SHEET 4 OF 24

E Calculation for air volume

1 Troughed belt conveyor

Discharge point
Air volume Vd in m3/h
0.5 3
Vd = kt * kh * ( Belt width in mm) * ( (belt speed in m/s) / 1.7) * 3.6 in m /h
Where
kt = 1 if temperature <= 40 0C
= 1.1 if temperature > 40 0C
kh = 0.65 if height of slope <= 3 m
= 1 if height of slope > 3 m

Feed front point


Air volume Vff in m3/h
Vff = ( Belt width in mm) *( (belt speed in m/s) / 1.7) 0.5 * 3.6 in m3/h

Feed back point


3
Air volume Vfb in m /h
Vfb = kb * 60 in m3/h
kb = 12.2 if belt width is > 1000 mm
= 8.5 if belt width is <= 1000 mm

Example Belt width 2500 mm


Height of slope 4m
Belt speed 1.2 m/s
Temperature 20 0C
Vd =1*1 *( 2500) *( (1.2) / 1.7)0.5 * 3.6 in m3/h
3
= 7561.51 m /h
Vff = ( 2500) * ( (1.2) / 1.7)0.5 * 3.6 in m3/h
= 7561.51 m3/h
Vfb = 12.2* 60 in m3/h
= 732.00 m3/h

2 Steel apron feeder

Discharge point
Air volume Vd in m3/h
Vd = 1.15 * kt * kh * ( width in mm) * 3.6 in m3/h
Where
kt = 1 if temperature <= 40 0C
= 1.16 if temperature > 40 0C
kh = 1 if height of slope <= 3 m
= 1.1 if height of slope > 3 m

surt:\techdata\dedusting\procedure.xls
KRUPP INDUSTRIES INDIA LTD
DESIGN DEDUSTING Calculation Procedure
MANUAL SHEET 5 OF 24

Feed point
Air volume Vf in m3/h
Vf = kt * kh * ( width in mm) * 3.6 in m3/h

Example Width 2500 mm


Height of slope 6 mm
Temperature 30 0C
3
Vd =1.15 * 1 * 1.1 * ( 2500) *3.6 in m /h
= 11385 m3/h
Vf =1*1.1 *( 2500) *3.6 in m3/h
3
= 9900 m /h

3 Steel apron feeder, bulk material standing

Feed point
Air volume Vf in m3/h
Vd = 1.25 * kt * ( width in mm) in m3/h
Where
kt = 1 if temperature <= 40 0C
= 1.1 if temperature > 40 0C
Example Width 2500 mm
Temperature 30 0C
3
Vf =1.25 * 1 * ( 2500) in m /h
= 3125 m3/h

4 Deep bucket conveyor

Discharge point
3
Air volume Vd in m /h
Vd = 1.15 * kt * kh * ( width in mm) * 3.6 in m3/h
kt = 1 if temperature <= 40 0C
= 1.16 if temperature > 40 0C
kh = 1 if height of slope <= 3 m
= 1.1 if height of slope > 3 m

Feed point
Air volume Vf in m3/h
Vf = kt * kh * ( width in mm) * 3.6 in m3/h

Example Width 1400 mm


Height of slope 4m
Temperature 30 0C

KRUPP INDUSTRIES INDIA LTD

surt:\techdata\dedusting\procedure.xls
DESIGN DEDUSTING Calculation Procedure
MANUAL SHEET 6 OF 24

Vd =1.15 * 1 * 1.1 * ( 1400) *3.6 in m3/h


= 638 m3/h
Vf =1*1.1 *( 630) *3.6 in m3/h
3
= 5544 m /h

5 Box feeder

Discharge point
Air volume Vd in m3/h
3
Vd = km * ( width in mm) * 3.6 in m /h
Where
km = 0.6 if moisture level < 6 %
= 0.4 if moisture level > 6 %

Feed point
Air volume Vf in m3/h
3
Vf = 0.27 * ( width in mm) * 3.6 in m /h

Example Width 2500


Moisture level % 4
3
Vd =0.4 * ( 2500) *3.6 in m /h
= 3600 m3/h
3
Vf =0.27*( 2500) *3.6 in m /h
3
= 2430 m /h

6 Weigh belt

Discharge point
Air volume Vd in m3/h
Vd = 0.525 * kt * ( width in mm) * 3.6 in m3/h
Where
kt = 1 if temperature <= 40 0C
0
= 1.15 if temperature > 40 C

Feed point
Air volume Vf in m3/h
Vf = 480 in m3/h when (tph * 1.4) < 480
Vf =1.4 * ( tph ) in m3/h when (tph * 1.4) > 480

Example Width = 2500 mm


tph = 600 tph
Temp. 30 0C

KRUPP INDUSTRIES INDIA LTD

surt:\techdata\dedusting\procedure.xls
DESIGN DEDUSTING Calculation Procedure
MANUAL SHEET 7 OF 24

Vd =0.525 * 1 * ( 2500 ) *3.6 in m3/h


= 11385 m3/h
Vf =1.4 * 600 in m3/h
3
= 840 m /h

7 Bucket elevator, chain - type

Bottom boot
Air volume Vb in m3/h
Vb = 0 when height < 12 m
Vb = 14.61 * ( width in mm)0.67815 in m3/h If temperature <= 40 0C
0
Vb = 13.28 * ( width in mm)0.6777 in m3/h If temperature > 40 C

Top hood
Air volume Vt in m3/h
Vt = 19.33 * ( width in mm)0.67836 in m3/h If temperature <= 40 0C
0.6777 3 0
Vt = 26.56 * ( width in mm) in m /h If temperature > 40 C

Example Width 1000 mm


Height 30 m
Temp. 30 0C

Vb = 14.61 * ( 1000)0.67815 in m3/h


= 1582 m3/h
Vt = 19.33 * ( 1000)0.67836 in m3/h
= 2096 m3/h

8 Bucket elevator, belt type, single casing

Top hood
Air volume Vt in m3/h
Vt = 27.41 * ( width in mm)0.741 in m3/h If temperature <= 40 0C
Vt = 46.1 * ( width in mm)0.6877 in m3/h If temperature > 40 0C

Example Width 1000 mm


Height 30 m
Temp. 30 0C
Vb = 27.41 * ( 1000)0.741 in m3/h
= 4580.46 m3/h

KRUPP INDUSTRIES INDIA LTD

surt:\techdata\dedusting\procedure.xls
DESIGN DEDUSTING Calculation Procedure
MANUAL SHEET 8 OF 24

9 Bucket elevator, belt type, double casing

Bottom hood
Air volume Vb in m3/h
Vb = 0 in m3/h If height < 12 m
0.741 3 0
Vb = 11.8 * ( width in mm) in m /h If temperature <= 40 C
Vb = 40.92 * ( width in mm)0.52 in m3/h If temperature > 40 0C

Top hood
Air volume Vt in m3/h
0.741 3 0
Vt = 15.62 * ( width in mm) in m /h If temperature <= 40 C
Vt = 21.5 * ( width in mm)0.752 in m3/h If temperature > 40 0C

Example Width 1000 mm


Height 30 m
0
Temp. 30 C

Vb = 11.8 * ( 1000)0.741
3
= 1972 m /h
Vt = 15.62 * ( width in mm)0.741
3
= 2610 m /h

10 Vibrating trough without flex seal, bulk material falling

Feed point
Air volume Vf in m3/h
Vf = 0.16 * ( width in mm) * 3.6 * (1 + 2 * Length in m ) If temperature <= 40 0C
Vf = 0.2 * ( width in mm) * 3.6 * (1 + 2 * Length in m ) If temperature > 40 0C

Discharge point
Air volume Vd in m3/h
Vd = 0.6 * ( width in mm) * 3.6 If temperature <= 40 0C
Vd = ( width in mm) * 3.6 If temperature > 40 0C

Example Width 1500 mm


Length 8m
Temp. 100 0C
Vf = 0.2 * ( 1500) * 3.6 * (1 + 2 * 8 )
3
= 18360 m /h
Vd = (1500) * 3.6
= 5400 m3/h

KRUPP INDUSTRIES INDIA LTD

surt:\techdata\dedusting\procedure.xls
DESIGN DEDUSTING Calculation Procedure
MANUAL SHEET 9 OF 24

11 Vibrating trough without flex seal, bulk material standing

Feed point
Air volume Vf in m3/h
Vf = 0.08 * ( width in mm) * 3.6 * (1 + 2 * Length in m ) If temperature <= 40 0C
Vf = 0.12 * ( width in mm) * 3.6 * (1 + 2 * Length in m ) If temperature > 40 0C

Discharge point
Air volume Vd in m3/h
Vd = 0.4 * ( width in mm) * 3.6 If temperature <= 40 0C
Vd = 0.8 * ( width in mm) * 3.6 If temperature > 40 0C

Example Width 1500 mm


Length 8m
Temp. 100 0C
Vf = 0.12 * ( 1500) * 3.6 * (1 + 2 * 8 )
3
= 11016 m /h
Vd = 08 * (1500) * 3.6
= 4320 m3/h

12 Vibrating trough with flex seal, bulk material falling

Feed point
Air volume Vf in m3/h
0
Vf = 0.08 * ( width in mm) * 3.6 * (1 + 2 * Length in m ) If temperature <= 40 C
Vf = 0.12 * ( width in mm) * 3.6 * (1 + 2 * Length in m ) If temperature > 40 0C

Discharge point
Air volume Vd in m3/h
Vd = 0.4 * ( width in mm) * 3.6 If temperature <= 40 0C
Vd = 0.7 * ( width in mm) * 3.6 If temperature > 40 0C

Example Width 1500 mm


Length 8m
Temp. 100 0C
Vf = 0.12 * ( 1500) * 3.6 * (1 + 2 * 8 )
3
= 11016 m /h
Vd = 0.7 * (1500) * 3.6
= 3780

KRUPP INDUSTRIES INDIA LTD

surt:\techdata\dedusting\procedure.xls
DESIGN DEDUSTING Calculation Procedure
MANUAL SHEET 10 OF 24

13 Vibrating trough with flex seal, bulk material standing

Feed point
Air volume Vf in m3/h
Vf = 0.05 * ( width in mm) * 3.6 * (1 + 2 * Length in m ) If temperature <= 40 0C
Vf = 0.075 * ( width in mm) * 3.6 * (1 + 2 * Length in m ) If temperature > 40 0C

Discharge point
Air volume Vd in m3/h
Vd = 0.35 * ( width in mm) * 3.6 If temperature <= 40 0C
Vd = 0.55 * ( width in mm) * 3.6 If temperature > 40 0C

Example Width 1500 mm


Length 8m
Temp. 100 0C
Vf = 0.075 * ( 1500) * 3.6 * (1 + 2 * 8 )
= 6885 m3/h
Vd = 0.55 * (1500) * 3.6
= 2970

14 Vibrating screen without flex seal

Feed point
Air volume Vf in m3/h
Vf_spec = 0 If length / width < 2.5
Vf_spec = kt * 0.6 * ( width in mm ) * 3.6 If length / width > 2.5
kt = 1 If temperature <= 40 0C
kt = 1.1 If temperature > 40 0C
Vf = Vf_spec

Screen track
Air volume Vst in m3/h

Vst_spec = 0.3 * ( width in mm ) * 3.6 If temperature <= 40 0C


Vst_spec = 1.1 * 0.3 * ( width in mm ) * 3.6 If temperature > 40 0C

Vst = 0 If length / width < 2.5


Vst = Vst_spec If length / width > 2.5

Discharge point
Air volume Vd in m3/h
0
Vd_spec = 0.75 * ( width in mm ) * 3.6 If temperature <= 40 C
Vd_spec = 1.3 * ( width in mm ) * 3.6 If temperature > 40 0C

KRUPP INDUSTRIES INDIA LTD

surt:\techdata\dedusting\procedure.xls
DESIGN DEDUSTING Calculation Procedure
MANUAL SHEET 11 OF 24

Vd = Vf_spec + Vst_spec + Vd_spec If length / width < 2.5


Vd = Vd_spec If length / width > 2.5

Example Width 1500 mm


Length 8000 mm
Temp. 100 0C
Vf_spec = 1.1 * 0.6 * (1500 ) * 3.6
= 3564
Vf = Vf_spec
= 3564 m3/h
Vst_spec = 1.1*0.3 * ( 1500 ) * 3.6
= 1782
Vst = Vst_spec
= 1782 m3/h
Vd_spec = 1.3 * ( 1500 ) * 3.6
= 7020
Vd = Vd_spec
= 7020 m3/h

15 Vibrating screen with flex seal

Feed point
Air volume Vf in m3/h
Vf_spec = 0 If length / width < 2.5
Vf_spec = 0.2 * ( width in mm ) * 3.6 If length / width > 2.5

Vf = Vf_spec If temperature <= 40 0C


0
Vf = 1.1 * Vf_spec If temperature > 40 C

Screen track
Air volume Vst in m3/h
Vst_spec = 0.3 * ( width in mm ) * 3.6 If temperature <= 40 0C
Vst_spec = 0.55 * ( width in mm ) * 3.6 If temperature > 40 0C

Vst = Vf_spec +Vst_spec If length / width < 2.5


Vst = Vst_spec If length / width > 2.5

Example Width 1500 mm


Length 8000 mm
0
Temp. 100 C
Vf_spec = 0.2 * (1500 ) * 3.6
= 1080
Vf = 1.1 * Vf_spec
= 1188 m3/h

KRUPP INDUSTRIES INDIA LTD


DESIGN DEDUSTING Calculation Procedure

surt:\techdata\dedusting\procedure.xls
MANUAL SHEET 12 OF 24

Vst_spec = 0.55 * ( 1500 ) * 3.6


= 2970
Vst = Vst_spec
3
= 2970 m /h

16 Aeropol

Pressure vessel
3
Air volume Vpa in m /h
Vpa = 0.00000000002 * (Aeropol dia.)4 + 0.00000024 * (Aeropol dia.)3
- 0.001 * (Aeropol dia.)2 + 1.353 * ( Aeropol dia.) - 221.1 vessel dia. In mm

Aeropol dia 800 1000 1250 1600 2000 2500


m3/h 352 392 425 498 725 1443
m3/min 6 7 7 8 12 24

Conveying pipe
Air volume Vcp in m3/h
Vcp = tph * ((273 + temp) / 273) * 1.1

Example Aeropol dia. 1000 mm


tph 65
Temperature 80 0C

Vpa = 391.90 m3/h


Vcp = 92.45 m3/h

17 Poldos pressure vessel conveyor

Fluidisation air
3
Air volume Vfl in m /h
Vfl = 2 * (spec air volume) * ((273 + Temperature) / 293)
Where
3
spec air volume = air volume for aeration in m /h
Temperature = aeration air temperature in 0 C

Compressor
Air volume Vc in m3/h
Vfl = (spec air volume) * ((273 + Temperature) / 293) * 1.1
Where
spec air volume = air volume of compressor in m3/h
Temperature = compressor air temperature in 0 C
3
Example Volume for aeration air in m /h 150
0
Temperature of aeration air in C 30
3
Volume for compressor air in m /h 8000
Temperature of compressor air in 0 C 30

KRUPP INDUSTRIES INDIA LTD


DESIGN DEDUSTING Calculation Procedure

surt:\techdata\dedusting\procedure.xls
MANUAL SHEET 13 OF 24

Vfl = 2 * (150) * ((273 + 30) / 293)


3
= 310 m /h
Vfl = (spec air volume) * ((273 + Temperature) / 293) * 1.1
= 9100

18 Fluidor

Aeration air
Air volume Va in m3/h
Va = ka * ((width in mm)/1000) * (length in m) * 60 * (273 + temp)/293 * 1.1
2
ka = 2 in m3/min/m for raw meal, cement
= 5 in m3/min/m2 for circulating material
= 6.7 in m3/min/m2 for grits

Example width 300 mm


length 25 m
0
temperature 30 C
Va = 2 * (300/1000) * 25 * 60 * (273 + 30)/293 * 1.1 for raw meal / cement
3
1024 m /h
Va = 5 * (300/1000) * 25 * 60 * (273 + 30)/293 * 1.1 for circulating material
2559 m3/h
Va = 6.7 * (300/1000) * 25 * 60 * (273 + 30)/293 * 1.1for grits
3430 m3/h

19 Clinker silo feed silo penthouse closed, 1 feed opening

Silo
Air volume Vs in m3/h
Vs = (Dia of silo/1000)2 * pi()/4 * (Dia of silo/2000) * 0.5773503/3 * 3

Feed opening
Air volume Vf in m3/h
Vf = width of opening in mm * height of opening in mm /1000 * 1.5 * 3.6
3
Required air volume Vr in m /h
Vr = Vs If Vs > Vf
Vr = Vf If Vs < Vf

Example Silo dia 10000 mm


width 2000 mm
height 2500 mm
2
Vs = (10000/1000) * pi()/4 * (10000/2000) * 0.5773503/3 * 3
227 m3/h

KRUPP INDUSTRIES INDIA LTD


DESIGN DEDUSTING Calculation Procedure

surt:\techdata\dedusting\procedure.xls
MANUAL SHEET 14 OF 24

Vf = 2000 * 2500 /1000 * 1.5 * 3.6


3
27000 m /h
3
Vr = Vf = 27000 m /h as Vs < Vf

20 Clinker silo feed silo penthouse closed, 2 feed opening

Silo
Air volume Vs in m3/h
2
Vs = (Dia of silo/1000) * pi()/4 * (Dia of silo/2000) * 0.5773503/3 * 3

Feed opening 1
Air volume Vf1 in m3/h
Vf1 = width of opening1 in mm * height of opening1 in mm /1000 * 1.5 * 3.6

Feed opening 2
3
Air volume Vf2 in m /h
Vf2 = width of opening2 in mm * height of opening2 in mm /1000 * 1.5 * 3.6
Vf = Vf1 + Vf2

Required air volume Vr in m3/h


Vr = Vs If Vs > Vf
Vr = Vf If Vs < Vf

Example Silo dia 12000 mm


width1 1000 mm width1 900 mm
height1 1250 mm height2 1300 mm
2
Vs = (12000/1000) * pi()/4 * (12000/2000) * 0.5773503/3 * 3
392 m3/h
Vf1 = 1000 * 1250 /1000 * 1.5 * 3.6
6750 m3/h
Vf2 = 900 * 1300 /1000 * 1.5 * 3.6
3
6318 m /h
3
Vf = Vf1+Vf2 = 13068 m /h
3
Vr = Vf = 13068 m /h as Vs < Vf

21 Clinker silo feed silo penthouse closed, 3 feed opening

Silo
Air volume Vs in m3/h
Vs = (Dia of silo/1000)2 * pi()/4 * (Dia of silo/2000) * 0.5773503/3 * 3

Feed opening 1
Air volume Vf1 in m3/h
Vf1 = width of opening1 in mm * height of opening1 in mm /1000 * 1.5 * 3.6

KRUPP INDUSTRIES INDIA LTD


DESIGN DEDUSTING Calculation Procedure

surt:\techdata\dedusting\procedure.xls
MANUAL SHEET 15 OF 24

Feed opening 2
3
Air volume Vf2 in m /h
Vf2 = width of opening2 in mm * height of opening2 in mm /1000 * 1.5 * 3.6

Feed opening 3
Air volume Vf3 in m3/h
Vf3 = width of opening3 in mm * height of opening3 in mm /1000 * 1.5 * 3.6
Vf = Vf1 + Vf2 +Vf3
3
Required air volume Vr in m /h
Vr = Vs If Vs > Vf
Vr = Vf If Vs < Vf

Example Silo dia 15000


width1 1000 width1 900 width3 900
height1 1250 height2 1300 height3 1300
Vs = (15000/1000)2 * pi()/4 * (15000/2000) * 0.5773503/3 * 3
3
765 m /h
Vf1 = 1000 * 1250 /1000 * 1.5 * 3.6
6750 m3/h
Vf2 = 900 * 1300 /1000 * 1.5 * 3.6
3
6318 m /h
Vf3 = 900 * 1300 /1000 * 1.5 * 3.6
6318
Vf = Vf1 + Vf2 + Vf3
3
19386 m /h
3
Vr = Vf = 19386 m /h as Vs < Vf

22 Clinker silo feed silo penthouse open, 1 feed opening

Silo
Air volume Vs in m3/h
Vs = (Dia of silo/1000)2 * pi()/4 * (Dia of silo/2000) * 0.5773503/3 * 3

Feed opening
Air volume Vf in m3/h
Vf = width of opening in mm * height of opening in mm /1000 * 2 * 3.6

Required air volume Vr in m3/h


Vr = Vs If Vs > Vf
Vr = Vf If Vs < Vf

Example Silo dia 10000


width 2000
height 2500

KRUPP INDUSTRIES INDIA LTD


DESIGN DEDUSTING Calculation Procedure

surt:\techdata\dedusting\procedure.xls
MANUAL SHEET 16 OF 24

Vs = (10000/1000)2 * pi()/4 * (10000/2000) * 0.5773503/3 * 3


227 m3/h
Vf = 2000 * 2500 /1000 * 2 * 3.6
3
36000 m /h
3
Vr = Vf = 36000 m /h as Vs < Vf

23 Clinker silo feed silo penthouse open, 2 feed opening

Silo
Air volume Vs in m3/h
Vs = (Dia of silo/1000)2 * pi()/4 * (Dia of silo/2000) * 0.5773503/3 * 3

Feed opening 1
3
Air volume Vf1 in m /h
Vf1 = width of opening1 in mm * height of opening1 in mm /1000 * 2 * 3.6

Feed opening 2
Air volume Vf2 in m3/h
Vf2 = width of opening2 in mm * height of opening2 in mm /1000 * 2 * 3.6
Vf = Vf1 + Vf2

Required air volume Vr in m3/h


Vr = Vs If Vs > Vf
Vr = Vf If Vs < Vf

Example Silo dia 12000


width1 1000 width2 900
height1 1250 height2 1300
Vs = (12000/1000)2 * pi()/4 * (12000/2000) * 0.5773503/3 * 3
392 m3/h
Vf1 = 1000 * 1250 /1000 * 2 * 3.6
9000 m3/h
Vf2 = 900 * 1300 /1000 * 2 * 3.6
8424 m3/h
Vf = 17424 m3/h
3
Vr = Vf = 17424 m /h as Vs < Vf

24 Clinker silo feed silo penthouse open, 3 feed opening

Silo
Air volume Vs in m3/h
Vs = (Dia of silo/1000)2 * pi()/4 * (Dia of silo/2000) * 0.5773503/3 * 3

KRUPP INDUSTRIES INDIA LTD


DESIGN DEDUSTING Calculation Procedure
MANUAL SHEET 17 OF 24

surt:\techdata\dedusting\procedure.xls
Feed opening 1
Air volume Vf1 in m3/h
Vf1 = width of opening1 in mm * height of opening1 in mm /1000 * 2 * 3.6

Feed opening 2
Air volume Vf2 in m3/h
Vf2 = width of opening2 in mm * height of opening2 in mm /1000 * 2 * 3.6

Feed opening 3
Air volume Vf3 in m3/h
Vf3 = width of opening3 in mm * height of opening3 in mm /1000 * 2 * 3.6

Vf = Vf1 + Vf2 +Vf3


3
Required air volume Vr in m /h
Vr = Vs If Vs > Vf
Vr = Vf If Vs < Vf

Example Silo dia 15000


width1 1000 width1 900 width3 900
height1 1250 height2 1300 height3 1300
Vs = (15000/1000)2 * pi()/4 * (15000/2000) * 0.5773503/3 * 3
3
765 m /h
Vf1 = 1000 * 1250 /1000 * 2 * 3.6
6750 m3/h
Vf2 = 900 * 1300 /1000 * 2 * 3.6
3
6318 m /h
Vf3 = 900 * 1300 /1000 * 2 * 3.6
6318
Vf = Vf1 + Vf2 + Vf3
3
19386 m /h
3
Vr = Vf = 19386 m /h as Vs < Vf

25 Clinker silo feed cover trapezoidal plate, 1 feed opening

Silo
Air volume Vs in m3/h
Vs1 = Dia of silo / 2000 * pi() / 180 * 35
Vs2 = 1.2 * 293 / (273 + temp)
Vs3 = Vs1 * (1.2 - Vs2) * 10
0.5
Vs4 = (2 * Vs3 / (3 * Vs2))
if
(Dia of silo /1000)2 * pi()/4 * Dia of silo / 2000 * 0.5773503 / 3 * 6
< Dia of silo / 1000 * pi() * width annular gap * Vs4 * 3.6

KRUPP INDUSTRIES INDIA LTD


DESIGN DEDUSTING Calculation Procedure
MANUAL SHEET 18 OF 24

surt:\techdata\dedusting\procedure.xls
then
Vs = (Dia of silo /1000) * pi() * width annular gap * Vs4 * 3.6

otherwise
Vs = (Dia of silo /1000) 2 * pi() / 4 * Dia of silo / 2000 * 0.5773503 / 3 * 6

Feed opening
Air volume Vf in m3/h
Vf = width of opening in mm * height of opening in mm /1000 * 2 * 3.6

Required air volume Vr in m3/h


Vr = Vs If Vs > Vf
Vr = Vf If Vs < Vf

Example Silo dia 10000 annular gap 50 temp 40


width 2000
height 2500
Vs1 = 10000 / 2000 * pi() / 180 * 35
3.05433
Vs2 = 1.2 * 293 / (273 + temp)
1.12332
Vs3 = Vs1 * (1.2 - Vs2) * 10
2.34198
Vs4 = (2 * Vs3 / (3 * Vs2)) 0.5
1.17894
2
(Dia of silo /1000) * pi()/4 * Dia of silo / 2000 * 0.5773503 / 3 * 6
= 453
Dia of silo / 1000 * pi() * width annular gap * Vs4 * 3.6
= 6667
Vs = (10000/1000) * pi() * width annular gap * Vs4 * 3.6
3
6667 m /h
Vf = 2000 * 2500 / 1000 * 2 * 3.6
36000 m3/h
3
Vr = Vf = 36000 m /h as Vs < Vf

26 Clinker silo feed cover trapezoidal plate, 2 feed opening

Silo
Air volume Vs in m3/h
Vs1 = Dia of silo / 2000 * pi() / 180 * 35
Vs2 = 1.2 * 293 / (273 + temp)
Vs3 = Vs1 * (1.2 - Vs2) * 10
Vs4 = (2 * Vs3 / (3 * Vs2)) 0.5
if
2
(Dia of silo /1000) * pi()/4 * Dia of silo / 2000 * 0.5773503 / 3 * 6
< Dia of silo / 1000 * pi() * width annular gap * Vs4 * 3.6

KRUPP INDUSTRIES INDIA LTD


DESIGN DEDUSTING Calculation Procedure
MANUAL SHEET 19 OF 24

surt:\techdata\dedusting\procedure.xls
then
Vs = (Dia of silo /1000) * pi() * width annular gap * Vs4 * 3.6
otherwise
2
Vs = (Dia of silo /1000) * pi() / 4 * Dia of silo / 2000 * 0.5773503 / 3 * 6

Feed opening
3
Air volume Vf in m /h
Vf1 = width of opening1 in mm * height of opening1 in mm /1000 * 2 * 3.6
Vf2 = width of opening2 in mm * height of opening2 in mm /1000 * 2 * 3.6
Vf = Vf1 + Vf2

Required air volume Vr in m3/h


Vr = Vs If Vs > Vf
Vr = Vf If Vs < Vf

Example Silo dia 12000 annular gap 50 temp 40


width1 1000 width2 900
height1 1250 height2 1300
Vs1 = 12000 / 2000 * pi() / 180 * 35
3.05433
Vs2 = 1.2 * 293 / (273 + temp)
1.12332
Vs3 = Vs1 * (1.2 - Vs2) * 10
2.34198
Vs4 = (2 * Vs3 / (3 * Vs2)) 0.5
1.17894
(Dia of silo /1000)2 * pi()/4 * Dia of silo / 2000 * 0.5773503 / 3 * 6
= 784
Dia of silo / 1000 * pi() * width annular gap * Vs4 * 3.6
= 8000
Vs = (12000/1000) * pi() * width annular gap * Vs4 * 3.6
8000 m3/h
Vf1 = 1000 * 1250 / 1000 * 2 * 3.6
3
9000 m /h
Vf2 = 900 * 1300 / 1000 * 2 * 3.6
8424 m3/h
Vf = Vf1 + Vf2
17424
3
Vr = Vf = 17424 m /h as Vs < Vf

27 Clinker silo feed cover trapezoidal plate, 3 feed opening

Silo
Air volume Vs in m3/h
Vs1 = Dia of silo / 2000 * pi() / 180 * 35
Vs2 = 1.2 * 293 / (273 + temp)

KRUPP INDUSTRIES INDIA LTD


DESIGN DEDUSTING Calculation Procedure
MANUAL SHEET 20 OF 24

surt:\techdata\dedusting\procedure.xls
Vs3 = Vs1 * (1.2 - Vs2) * 10
Vs4 = (2 * Vs3 / (3 * Vs2)) 0.5

if
(Dia of silo /1000)2 * pi()/4 * Dia of silo / 2000 * 0.5773503 / 3 * 6
< Dia of silo / 1000 * pi() * width annular gap * Vs4 * 3.6
then
Vs = (Dia of silo /1000) * pi() * width annular gap * Vs4 * 3.6
otherwise
2
Vs = (Dia of silo /1000) * pi() / 4 * Dia of silo / 2000 * 0.5773503 / 3 * 6

Feed opening
Air volume Vf in m3/h
Vf1 = width of opening1 in mm * height of opening1 in mm /1000 * 2 * 3.6
Vf2 = width of opening2 in mm * height of opening2 in mm /1000 * 2 * 3.6
Vf3 = width of opening3 in mm * height of opening3 in mm /1000 * 2 * 3.6
Vf = Vf1 + Vf2 + Vf3

Required air volume Vr in m3/h


Vr = Vs If Vs > Vf
Vr = Vf If Vs < Vf

Example Silo dia 15000 annular gap 50 temp 40


width1 1000 width2 900 width3 900
height1 1250 height2 1300 height3 1300
Vs1 = 15000 / 2000 * pi() / 180 * 35
3.05433
Vs2 = 1.2 * 293 / (273 + temp)
1.12332
Vs3 = Vs1 * (1.2 - Vs2) * 10
2.34198
Vs4 = (2 * Vs3 / (3 * Vs2)) 0.5
1.17894
(Dia of silo /1000)2 * pi()/4 * Dia of silo / 2000 * 0.5773503 / 3 * 6
= 1530
Dia of silo / 1000 * pi() * width annular gap * Vs4 * 3.6
= 10000
Vs = (15000/1000) * pi() * width annular gap * Vs4 * 3.6
10000 m3/h
Vf1 = 1000 * 1250 / 1000 * 2 * 3.6
3
9000 m /h
Vf2 = 900 * 1300 / 1000 * 2 * 3.6
8424 m3/h
Vf3 = 900 * 1300 / 1000 * 2 * 3.6
8424 m3/h

KRUPP INDUSTRIES INDIA LTD


DESIGN DEDUSTING Calculation Procedure
MANUAL SHEET 21 OF 24

surt:\techdata\dedusting\procedure.xls
Vf = Vf1 + Vf2 + Vf3
25848
3
Vr = Vf = 25848 m /h as Vs < Vf

28 Bin on top 1 feed opening

V = 1 * width1 * height1 / 1000 *3.6 m3/h if temperature <= 400C


= 1.15 * width1 * height1 / 1000 *3.6 m3/h if temperature > 400C

Example width1 1000 mm


height 1200 mm
temp. 30 0C
V = 1000 * 1200 /1000 * 3.6
= 4320

29 Bin on top 2 feed opening

V1 = 1 * width1 * height1 / 1000 *3.6 m3/h if temperature <= 400C


= 1.15 * width1 * height1 / 1000 *3.6 m3/h if temperature > 400C

V2 = 1 * width2 * height2 / 1000 *3.6 m3/h if temperature <= 400C


3 0
= 1.15 * width2 * height2 / 1000 *3.6 m /h if temperature > 40 C

V = V1 + V2 m3/h

Example width1 800 mm width1 500 mm


height 1000 mm height 800 mm
temp. 30 0C temp. 30 0C
V1 = 800 * 1000 /1000 * 3.6
= 2880
V2 = 500 * 800 /1000 * 3.6
= 1440
V= 4320 m3/h

30 Bin on top PNEUMATIC FEED

3
V = 1.4 * tph m /h

31 Polycom

KRUPP INDUSTRIES INDIA LTD


DESIGN DEDUSTING Calculation Procedure
MANUAL SHEET 22 OF 24

surt:\techdata\dedusting\procedure.xls
32 Feed hopper

V = 0.5 * width * height / 1000 * 3.6 m3/h

33 Crusher moisture level < 6%

Inlet
3
Vi = 61 * width_inlet * height_inlet / 1000000 * 60 m /h

Outlet
Vo = 76 * width_inlet * height_inlet / 1000000 * 60 m3/h

34 Hammer crusher

Inlet
Vi = 61 * width_inlet * height_inlet / 1000000 * 60 m3/h

Outlet
Vo = 107 * width_inlet * height_inlet / 1000000 * 60 m3/h

35 Vacuume relief
Air volume V in m3/h

Y1 = 1.3089969
X = Abs( Temp. * 100) / ( 8 * 7.85 * 9.81 )
If X > 1 Then
Y2 = Atn(-1 / Sqr ( -1 * 1 + 1 ) ) +2 * Atn ( 1 ) '=arccos(1)'
Else
Y2 = Atn(-X / Sqr ( -X * X + 1 ) ) +2 * Atn ( 1 ) '=arccos(X)'

Y3 = width * length * 0.000001


Y4 = Y3 * ( Cos ( Y2 ) - Cos ( Y1 )

If Y2 > Y1 Then
V=0
Else
V = ( 2 * Y42 * Abs((Temp1 * 100) / (1.8 *1.2)))0.5 * 3600 * ((273 +Temp) / 293 )

Example width 550 mm


length 550 mm
Temp1 = Temp 60 0C
0
Temp2 = Temp1 5 C
Y1 = 1.309
X = Abs( 5 * 100) / ( 8 * 7.85 * 9.81 )
0.8116
Y2 = ACOS(X) As X < 1
0.62391

KRUPP INDUSTRIES INDIA LTD


DESIGN DEDUSTING Calculation Procedure
MANUAL SHEET 23 OF 24

surt:\techdata\dedusting\procedure.xls
Y3 = width * length * 0.000001
0.3025
Y4 = Y3 * ( Cos ( Y2 ) - Cos ( Y1 ))
0.16722
Y2 < Y1 Hence
V = ( 2 * Y42 * Abs((Temp1 * 100) / (1.8 *1.2)))0.5 * 3600 * ((273 +Temp) / 293 )
14720.7 m3/h

36 Bulk loading open


Air volume in m3/h
If Dia of hood > 0
V = Dia. Of hood / 1000 * PI(0 * 0.1 * 2.5 * 3600 * (273 +Temp) / 293
If Dia of hood = 0
V =( width / 1000 + length / 1000) * 2 * 0.1 * 2.5 * 3600 * (273 +Temp) / 293

Example1 Dia. Of hood 500 mm


Temp 20 0C
V = Dia. Of hood / 1000 * PI(0 * 0.1 * 2.5 * 3600 * (273 +Temp) / 293
3
1413.72 m /h

Example2 width 800 mm


length 400 mm
Temp 20 0C
V = (width / 1000 + length / 1000) * 2 * 0.1 * 2.5 * 3600 * (273 +Temp) / 293
2160

37 Cement cooler

Fluidor
Air volume Vf in m3/h
Vf = ka * ((width in mm)/1000) * (length in m) * 60 * (273 + temp)/293 * 1.1
2
ka = 2 in m3/min/m for raw meal, cement
2
= 5 in m3/min/m for circulating material

Example width 500 mm


length 25 m
0
temperature 100 C
Va = 2 * (500/1000) * 25 * 60 * (273 + 100)/293 * 1.1for raw meal / cement
2101 m3/h
Va = 5 * (500/1000) * 25 * 60 * (273 + 30)/293 * 1.1 for circulating material
4266 m3/h

Screw conveyor
Air volume Vsc in m3/h

KRUPP INDUSTRIES INDIA LTD


DESIGN DEDUSTING Calculation Procedure
MANUAL SHEET 24 OF 24

Dsc is Dia. Of screw conveyor in mm

surt:\techdata\dedusting\procedure.xls
If
( Dsc / 1000)2 / 2 - 0.5 * (Dsc / 1000 )2 * PI() / 4 *2* 3600 < 510 + 1.237 * Dsc
Then
Vsc = 510 + 1.237 *Dsc
Else
Vsc = ( Dsc / 1000)2 / 2 - 0.5 * (Dsc / 1000 )2 * PI() / 4 *2* 3600

Example Dsc 500 mm

( Dsc / 1000)2 / 2 - 0.5 * (Dsc / 1000 )2 * PI() / 4 *2* 3600


-706.73
510 + 1.237 * Dsc
1128.5
Vsc = 510 + 1.237 *Dsc
1128.5 m3/h

Cement cooler
Air volume Vcc in m3/h
Vcc = tph * 1.2

Example tph 100


Vcc = tph * 1.2
3
120 m /h

38 Other machine

V = Air volume in m3/h