KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Client Ministry of Public Works (MPW) Report No.


Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment MAIN PUMP 450 750 KW Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Grease all bearings.

Check for any blockages in vent and drain lines.

Check pump & motor alignment.

Check all fasteners and tightness of mounting and integrity of supports.

Check pressure gauge and other ancillary vent/drain connections for leaks and blocks and clear as necessary

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round

1653/ TWI 756 Att.30A Rev.2 24 Nov. 2012 Page 1 of 793


KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att.30A Rev.2 24 Nov. 2012 Page 2 of 793


KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att.30A Rev.2 24 Nov. 2012 Page 3 of 793


KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att.30A Rev.2 24 Nov. 2012 Page 4 of 793


KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment MAIN PUMP 200 450 kW Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Grease all bearings.

Check for any blockages in vent and drain lines.

Check pump & motor alignment.

Check all fasteners and tightness of mounting and integrity of supports.

Check pressure gauge and other ancillary vent/drain connections for leaks and blocks and clear as necessary

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round

1653/ TWI 756 Att. 30B Rev.2 24 Nov. 2012 Page 5 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30B Rev.2 24 Nov. 2012 Page 6 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30B Rev.2 24 Nov. 2012 Page 7 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30B Rev.2 24 Nov. 2012 Page 8 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment MAIN PUMP 100 200 kW Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Grease all bearings.

Check for any blockages in vent and drain lines.

Check pump & motor alignment.

Check all fasteners and tightness of mounting and integrity of supports.

Check pressure gauge and other ancillary vent/drain connections for leaks and blocks and clear as necessary

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round

1653/ TWI 756 Att. 30C Rev.2 24 Nov. 2012 Page 9 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30C Rev.2 24 Nov. 2012 Page 10 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30C Rev.2 24 Nov. 2012 Page 11 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30C Rev.2 24 Nov. 2012 Page 12 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment GREASE PUMP Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check for any contamination of grease by moisture

Check for the amount of grease discharge and adjust feed accordingly

Check for any undue wear and tear of seals and gaskets and replace as necessary

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round

Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30D Rev.2 24 Nov. 2012 Page 13 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30D Rev.2 24 Nov. 2012 Page 14 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30D Rev.2 24 Nov. 2012 Page 15 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30D Rev.2 24 Nov. 2012 Page 16 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment GRIT PUMP Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Grease all bearings.

Check for any blockages in vent and drain lines.

Check pump & motor alignment.

Check all fasteners and tightness of mounting and integrity of supports.

Check pressure gauge and other ancillary vent/drain connections for leaks and blocks and clear as necessary.

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round

1653/ TWI 756 Att. 30E Rev.2 24 Nov. 2012 Page 17 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30E Rev.2 24 Nov. 2012 Page 18 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30E Rev.2 24 Nov. 2012 Page 19 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30E Rev.2 24 Nov. 2012 Page 20 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment BRACKISH/DEWATERING PUMP Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Grease all bearings.

Check for any blockages in vent and drain lines.

Check pump & motor alignment.

Check all fasteners and tightness of mounting and integrity of supports.

Check pressure gauge and other ancillary vent/drain connections for leaks and blocks and clear as necessary.

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round

1653/ TWI 756 Att. 30F Rev.2 24 Nov. 2012 Page 21 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30F Rev.2 24 Nov. 2012 Page 22 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30F Rev.2 24 Nov. 2012 Page 23 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30F Rev.2 24 Nov. 2012 Page 24 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment COOLING PUMPFOR D/G Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Grease all bearings.

Check for any blockages in vent and drain lines.

Check pump & motor alignment.

Check all fasteners and tightness of mounting and integrity of supports.

Check pressure gauge and other ancillary vent/drain connections for leaks and blocks and clear as necessary.

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30G Rev.2 24 Nov. 2012 Page 25 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30G Rev.2 24 Nov. 2012 Page 26 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment ANTI-HAMMERING VALVE Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check for any external leaks

Check the function of ball and air-relief while the pressure main is filled or drained

Visual inspection of smoothness of operation.

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30H Rev.2 24 Nov. 2012 Page 27 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30H Rev.2 24 Nov. 2012 Page 28 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment AIR-RELEASE VALVE Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check for any external leaks

Check the function of ball and air-relief while the pressure main is filled or drained.

Visual inspection of smoothness of operation.

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30I Rev.2 24 Nov. 2012 Page 29 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30I Rev.2 24 Nov. 2012 Page 30 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment DEWATERING PUMP Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check for any joint leaks

Check the opening and closing of NRV and no air locking in raiser pipe

Electrical

Check the ampere for normal motor operation

Check terminal connections at the panel and retighten

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30J Rev.2 24 Nov. 2012 Page 31 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30J Rev.2 24 Nov. 2012 Page 32 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment PENSTOCK 800 X 800 - 1000 X 1000 Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check penstock stem, clean transparent protection tube.

Operate penstock through by opening/closing

Clean by hosing down

Grease all unpainted machine faces, seal faces, wedge face, door guides, stem and nut

Inspect penstock and seal for damage and repair as required

Check and adjust tightness of fasteners

Check for leakage between frame and wall

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30K Rev.2 24 Nov. 2012 Page 33 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30K Rev.2 24 Nov. 2012 Page 34 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment PENSTOCK1000 X 1000 - 2000 X 2000 Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check penstock stem, clean transparent protection tube.

Operate penstock through by opening/closing

Clean by hosing down

Grease all unpainted machine faces, seal faces, wedge face, door guides, stem and nut

Inspect penstock and seal for damage and repair as required

Check and adjust tightness of fasteners

Check for leakage between frame and wall

Performed by: Signature

Checked by: Signature

Date:
Legend OK

1653/ TWI 756 Att. 30L Rev.2 24 Nov. 2012 Page 35 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
N/A Not Applicable

1653/ TWI 756 Att. 30L Rev.2 24 Nov. 2012 Page 36 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30L Rev.2 24 Nov. 2012 Page 37 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30L Rev.2 24 Nov. 2012 Page 38 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment SLUICE GATES Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Operate gates through by opening/closing

Clean by hosing down

Grease all unpainted machine faces, seal faces, wedge face, door guides, stem and nut

Check and adjust tightness of fasteners

Check for leakage between frame and wall

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30M Rev.2 24 Nov. 2012 Page 39 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30M Rev.2 24 Nov. 2012 Page 40 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment AUTOMATIC BAR SCREEN Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Clean chute, inspect chute and gearbox for any sign of oil leakage

Check chain tension, adjust if necessary

Check conveyor belt condition and adjust tension if necessary.

Check gearbox oil levels

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round.

Performed by: Signature

1653/ TWI 756 Att. 30N Rev.2 24 Nov. 2012 Page 41 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30N Rev.2 24 Nov. 2012 Page 42 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30N Rev.2 24 Nov. 2012 Page 43 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30N Rev.2 24 Nov. 2012 Page 44 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment CLASSIFIER -HYDRO DEGRITTER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Check all fasteners for tightness

Greasing of drive motor bearing

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round

Performed by: Signature

Checked by: Signature

Date:
Legend OK

1653/ TWI 756 Att. 30O Rev.2 24 Nov. 2012 Page 45 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
N/A Not Applicable

1653/ TWI 756 Att. 30O Rev.2 24 Nov. 2012 Page 46 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30O Rev.2 24 Nov. 2012 Page 47 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30O Rev.2 24 Nov. 2012 Page 48 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment AIR COMPRESSOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check all pipe connections for any leakage

Check all foundation mountings and tighten

Check compressor oil level and top-up if necessary

Release moisture from condensate trap

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & retighten.

Visual inspection for cooling fan and airways.

Check the motor for over heating & any abnormal sound

Performed by: Signature

1653/ TWI 756 Att. 30P Rev.2 24 Nov. 2012 Page 49 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30P Rev.2 24 Nov. 2012 Page 50 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30P Rev.2 24 Nov. 2012 Page 51 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30P Rev.2 24 Nov. 2012 Page 52 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment HEAVY DUTY MUNCHER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Check all fasteners for tightness

Re-grease all bearings

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Check the motor for over heating & any abnormal round

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30Q Rev.2 24 Nov. 2012 Page 53 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30Q Rev.2 24 Nov. 2012 Page 54 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment SCREW CONVEYOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Check chute and gearbox seals for any sign of leakage

Inspect screw helix and repair if necessary

Check gearbox oil level

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round.

Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30R Rev.2 24 Nov. 2012 Page 55 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30R Rev.2 24 Nov. 2012 Page 56 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30R Rev.2 24 Nov. 2012 Page 57 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30R Rev.2 24 Nov. 2012 Page 58 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment VENTILLATOR BLOWER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check equipment for excessive vibration, temperature and noise

Clean Air filter.

Check all connections for air leakage

Check and re-grease bearings.

Check V Belt tension and adjust as necessary

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round.

1653/ TWI 756 Att. 30S Rev.2 24 Nov. 2012 Page 59 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30S Rev.2 24 Nov. 2012 Page 60 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30S Rev.2 24 Nov. 2012 Page 61 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30S Rev.2 24 Nov. 2012 Page 62 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment OVER HEAD CRANE-10 TON Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check drive gearbox oil level refill if necessary.

Check hosting gear break readjust if necessary.

Grease wire rope, rope guide ring and sliding surface of rope guide ring stop.

Check drive units screw joints, welding seams, buffers of carriage and end stop of runways.

Check power supply including flexible liners

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round.

1653/ TWI 756 Att. 30T Rev.2 24 Nov. 2012 Page 63 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30T Rev.2 24 Nov. 2012 Page 64 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30T Rev.2 24 Nov. 2012 Page 65 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30T Rev.2 24 Nov. 2012 Page 66 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment OVER HEAD CRANE-5 TON Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check drive gearbox oil level refill if necessary.

Check hosting gear break readjust if necessary.

Grease wire rope, rope guide ring and sliding surface of rope guide ring stop.

Check drive units screw joints, welding seams, buffers of carriage and end stop of runways.

Check power supply including flexible liners

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round.

1653/ TWI 756 Att. 30U Rev.2 24 Nov. 2012 Page 67 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30U Rev.2 24 Nov. 2012 Page 68 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30U Rev.2 24 Nov. 2012 Page 69 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30U Rev.2 24 Nov. 2012 Page 70 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment A/C PACKAGE UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check grill temperature and air flow.

Check the gas pressure using pressure gauge.

Fill the gas if required.

Check the system for leak.

Repair the gas leak if existing.

Clean the filters thoroughly (using prescribed cleaning chemical).

Check all cutouts for proper function.

Check the condition of the blower and blower to motor V belts.

Check the cooling fan condition.

Check the control panel and main isolator, clean both.

Replace blown fuses or damaged/deteriorated fuses.

Check the tightness at all component terminals.

Check the condition of Thermostat.

Check the condition of heater repair if necessary.


1653/ TWI 756 Att. 30V Rev.2 24 Nov. 2012 Page 71 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Check the compressor oil level and top up if necessary.

Check cooling fans, cooling fan motors, blowers, blower motors, pulleys etc., for any damage.

Repair or replace pulley-fixing set.

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30V Rev.2 24 Nov. 2012 Page 72 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30V Rev.2 24 Nov. 2012 Page 73 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30V Rev.2 24 Nov. 2012 Page 74 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment A/C SPLIT UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check grills temperature and air flow.

Check gas pressure and fill if necessary.

Check the system for gas leak and repair if required.

Clean the filters.

Repair all system gas leak.

Check the auto operation.

Check and clean all the wiring and tighten all junctions.

Check terminals at compressor.

Repair the blower of indoor unit if required.

Repair the cooling fan and motor of outdoor unit if required.

Clean the whole system thoroughly.

Start and check the A/C for auto operation.

Check the condensate drain line repairs if necessary.

1653/ TWI 756 Att. 30W Rev.2 24 Nov. 2012 Page 75 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30W Rev.2 24 Nov. 2012 Page 76 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30W Rev.2 24 Nov. 2012 Page 77 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30W Rev.2 24 Nov. 2012 Page 78 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment A/C WINDOW UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Check grills temperature and air flow.

Check gas pressure and fill if necessary.

Check the system for gas leak and repair if required.

Clean the filters.

Check and clean all the wiring and tighten all junctions.

Check terminals at compressor.

Clean the whole system thoroughly.

Start and check the A/C for auto operation.

Check the condensate drain line repairs if necessary.

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30X Rev.2 24 Nov. 2012 Page 79 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30X Rev.2 24 Nov. 2012 Page 80 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment DIESEL GENERATOR 1000 - 3000 kVA Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Remove sludge from fuel filter, clean, fill-up and vent.

Clean sludge from edge type filter for circuit lubrication.

Check lubricating oil system and rectify any leaks

Check oil filters, centrifuges of lubricating system

Electrical

Clean the alternator & control panel board.

Check the battery voltage.

Tightening all the junction.

During the test run check the generated voltage.

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30Y Rev.2 24 Nov. 2012 Page 81 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30Y Rev.2 24 Nov. 2012 Page 82 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment DIESEL GENERATOR 500 - 1000 kVA Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Remove sludge from fuel filter, clean, fill-up and vent.

Clean sludge from edge type filter for circuit lubrication.

Check lubricating oil system and rectify any leaks

Check oil filters, centrifuges of lubricating system

Electrical

Clean the alternator & control panel board.

Check the battery voltage.

Tightening all the junction.

During the test run check the generated voltage.

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30Z Rev.2 24 Nov. 2012 Page 83 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30Z Rev.2 24 Nov. 2012 Page 84 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment VACUUM PUMP Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Check for any joint leaks

Check the opening and closing of NRV and no air locking in raiser pipe

Electrical

Check the ampere for normal motor operation

Check terminal connections at the panel and retighten

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30A1 Rev.2 24 Nov. 2012 Page 85 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30A1 Rev.2 24 Nov. 2012 Page 86 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30A1 Rev.2 24 Nov. 2012 Page 87 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30A1 Rev.2 24 Nov. 2012 Page 88 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment SPURGE PUMP Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check for any joint leaks

Check the opening and closing of NRV and no air locking in raiser pipe

Electrical

Check the ampere for normal motor operation

Check terminal connections at the panel and retighten

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30B1 Rev.2 24 Nov. 2012 Page 89 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30B1 Rev.2 24 Nov. 2012 Page 90 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30B1 Rev.2 24 Nov. 2012 Page 91 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30B1 Rev.2 24 Nov. 2012 Page 92 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment GRIT SCRAPPER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check all equipment for excessive vibration & noise

Check all fasteners for tightness

Greasing of drive motor bearing

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Check the motor for over heating & any abnormal Sound

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30C1 Rev.2 24 Nov. 2012 Page 93 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30C1 Rev.2 24 Nov. 2012 Page 94 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment BELT CONVEYOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check chute and gearbox seals for any sign of leakage

Inspect belt and repair if necessary

Check gearbox oil level

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Check the motor for over heating & any abnormal Sound

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30D1 Rev.2 24 Nov. 2012 Page 95 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30D1 Rev.2 24 Nov. 2012 Page 96 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment MONORAIL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check drive gearbox oil level refill if necessary.

Check hosting gear break readjust if necessary.

Grease wire rope, rope guide ring and sliding surface of rope guide ring stop.

Check drive units screw joints, welding seams, buffers of carriage and end stop of runways.

Check power supply including flexible liners

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round.

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30E1 Rev.2 24 Nov. 2012 Page 97 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30E1 Rev.2 24 Nov. 2012 Page 98 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30E1 Rev.2 24 Nov. 2012 Page 99 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30E1 Rev.2 24 Nov. 2012 Page 100 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment PUMP ROOM SHUTTER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Remove dust and grease from rollers and check movements.

Tighten the electrical connections in starter unit and motor terminal box.

Check the limit switch functions.

Lubricate and apply grease to moving rollers

Check power supply including flexible liners

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30F1 Rev.2 24 Nov. 2012 Page 101 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30F1 Rev.2 24 Nov. 2012 Page 102 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment MOTORIZED SLIDING GATE Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Operate gates through by opening/closing

Clean by hosing down

Grease all unpainted machine faces, seal faces, wedge face, door guides, stem and nut

Check and adjust tightness of fasteners

Check for leakage between frame and wall

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30G1 Rev.2 24 Nov. 2012 Page 103 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30G1 Rev.2 24 Nov. 2012 Page 104 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment PINCH VALVE Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check valve for any sign of leakage.

Check closing and opening of valve for normal operation.

Check for any internal component wear and tightness of all fasteners.

Seal and repair where necessary

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30H1 Rev.2 24 Nov. 2012 Page 105 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30H1 Rev.2 24 Nov. 2012 Page 106 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment PRESSURE GUAGES Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Check the Pressure Guage Readings are normal

No Leaks from vent/stop cocks

Clear the vent line if chocked

Remove the guage and check for any blockages and clear as necessary

Check the Dial Glass for visibility,smoking and clean as necessary

Refill with Glycol/Glycerin as needed

Re-fix, check for any leaks and rectify

Calibrate and decommission

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30I1 Rev.2 24 Nov. 2012 Page 107 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30I1 Rev.2 24 Nov. 2012 Page 108 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment CENTRIFUGAL PUMP DRY WELL (Up to 50KW) Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Grease all bearings.

Check for any blockages in vent and drain lines.

Check pump & motor alignment.

Check all fasteners and tightness of mounting and integrity of supports.

Check pressure gauge and other ancillary vent/drain connections for leaks and blocks and clear as necessary.

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round.

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30J1 Rev.2 24 Nov. 2012 Page 109 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30J1 Rev.2 24 Nov. 2012 Page 110 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30J1 Rev.2 24 Nov. 2012 Page 111 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30J1 Rev.2 24 Nov. 2012 Page 112 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment GREASE PUMP Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check for any contamination of grease by moisture

Check for the amount of grease discharge and adjust feed accordingly

Check for any undue wear and tear of seals and gaskets and replace as necessary

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round.

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30K1 Rev.2 24 Nov. 2012 Page 113 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30K1 Rev.2 24 Nov. 2012 Page 114 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment DEWATERING PUMP Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check for any joint leaks

Check the opening and closing of NRV and no air locking in riser pipe

Electrical

Check ampere for normal motor operation

Check terminal connections at the panel and retighten

Yearly

Check the cable for any cut or abrasion

Check the casing for any cracks or pores

Check the motor winding resistance

Check the motor insulation resistance ( with cable ) with respect to earth.

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30L1 Rev.2 24 Nov. 2012 Page 115 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30L1 Rev.2 24 Nov. 2012 Page 116 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30L1 Rev.2 24 Nov. 2012 Page 117 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30L1 Rev.2 24 Nov. 2012 Page 118 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment MAIN SUBMERSIBLE PUMP Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Check for any joint leaks

Check the opening and closing of NRV and no air locking in riser pipe

Electrical

Check ampere for normal motor operation

Check terminal connections at the panel and retighten

Yearly

Check the cable for any cut or abrasion

Check the casing for any cracks or pores

Check the motor winding resistance

Check the motor insulation resistance ( with cable ) with respect to earth.

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30M1 Rev.2 24 Nov. 2012 Page 119 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30M1 Rev.2 24 Nov. 2012 Page 120 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30M1 Rev.2 24 Nov. 2012 Page 121 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30M1 Rev.2 24 Nov. 2012 Page 122 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment SUCTION VALVE(upto-400mm dia) Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Electrical

Switch off the Power supply.

Clean the Actuators.

Check the terminations.

Switch On the Power supply.

Check the local operations.

Check the remote operations

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30N1 Rev.2 24 Nov. 2012 Page 123 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30N1 Rev.2 24 Nov. 2012 Page 124 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment PENSTOCK MANUAL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check penstock stem, clean transparent protection tube.

Operate penstock through by opening/closing

Clean by hosing down

Grease all unpainted machine faces, seal faces, wedge face, door guides, stem and nut

Inspect penstock and seal for damage and repair as required

Check and adjust tightness of fasteners

Check for leakage between frame and wall

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30O1 Rev.2 24 Nov. 2012 Page 125 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30O1 Rev.2 24 Nov. 2012 Page 126 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment VENTILATOR BL;OWER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check equipment for excessive vibration , temperature and noise.

Clean Air filter.

Check all connections for air leakage

Check and re-grease bearings.

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round.

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30P1 Rev.2 24 Nov. 2012 Page 127 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30P1 Rev.2 24 Nov. 2012 Page 128 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment SUCTION PIPING (upto 250 mm Dia ) Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Visual inspection of pipeline and joints & flexible connections.

Check for Pressure Gauge and other tapping for leaks and repair as necessary

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30Q1 Rev.2 24 Nov. 2012 Page 129 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30Q1 Rev.2 24 Nov. 2012 Page 130 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment DISCHARGE PIPING(UPTP 250MM DIA) Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Visual inspection of pipeline and joints & flexible connections.

Check for Pressure Gauge and other tapping for leaks and repair as necessary

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30R1 Rev.2 24 Nov. 2012 Page 131 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30R1 Rev.2 24 Nov. 2012 Page 132 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment PRESSURE GUAGES Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check the Pressure Gauge Readings are normal

No Leaks from vent/stop cocks

Clear the vent line if chocked

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30S1 Rev.2 24 Nov. 2012 Page 133 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30S1 Rev.2 24 Nov. 2012 Page 134 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment SCREW CONVEYOR(upto 25 KW) Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check chute and gearbox seals for any sign of leakage

Inspect screw helix and repair if necessary

Check gearbox oil level

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round

Performed by: Signature

Checked by: Signature

Date:

Legend OK

1653/ TWI 756 Att. 30T1 Rev.2 24 Nov. 2012 Page 135 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

N/A Not Applicable

1653/ TWI 756 Att. 30T1 Rev.2 24 Nov. 2012 Page 136 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30T1 Rev.2 24 Nov. 2012 Page 137 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30T1 Rev.2 24 Nov. 2012 Page 138 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment SCREW CONVEYOR (>25 KW ) Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check chute and gearbox seals for any sign of leakage

Inspect screw helix and repair if necessary

Check gearbox oil level

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30U1 Rev.2 24 Nov. 2012 Page 139 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30U1 Rev.2 24 Nov. 2012 Page 140 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment GEAR BOXES Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check chute and gearbox seals for any sign of leakage

Inspect screw helix and repair if necessary

Check gearbox oil level


Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30V1 Rev.2 24 Nov. 2012 Page 141 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30V1 Rev.2 24 Nov. 2012 Page 142 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment GREASE PUMP Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check for any contamination of grease by moisture

Check for the amount of grease discharge and adjust feed accordingly

Check for any undue wear and tear of seals and gaskets and replace as necessary

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30A Rev.2 24 Nov. 2012 Page 143 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30A Rev.2 24 Nov. 2012 Page 144 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment PENSTOCK MANUAL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check penstock stem, clean transparent protection tube.

Operate penstock through by opening/closing

Clean by hosing down

Grease all unpainted machine faces, seal faces, wedge face, door guides, stem and nut

Inspect penstock and seal for damage and repair as required

Check and adjust tightness of fasteners

Check for leakage between frame and wall

Performed by: Signature

Checked by: Signature

Date:

Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30X1 Rev.2 24 Nov. 2012 Page 145 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30X1 Rev.2 24 Nov. 2012 Page 146 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment VENTILATION BLOWER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check equipment for excessive vibration , temperature and noise.

Clean Air filter.

Check all connections for air leakage

Check and re-grease bearings.

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal round.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

1653/ TWI 756 Att. 30Y1 Rev.2 24 Nov. 2012 Page 147 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

N/A Not Applicable

1653/ TWI 756 Att. 30Y1 Rev.2 24 Nov. 2012 Page 148 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30Y1 Rev.2 24 Nov. 2012 Page 149 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30Y1 Rev.2 24 Nov. 2012 Page 150 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment A/C WINDOW UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check grills temperature and air flow.

Check gas pressure and fill if necessary.

Check the system for gas leak and repair if required.

Clean the filters.

Check and clean all the wiring and tighten all junctions.

Check terminals at compressor.

Clean the whole system thoroughly.

Start and check the A/C for auto operation.

Check the condensate drain line repairs if necessary

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30Z1 Rev.2 24 Nov. 2012 Page 151 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30Z1 Rev.2 24 Nov. 2012 Page 152 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment DIESEL GENERATOR SETS(uptp 75KVA) Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Remove sludge from fuel filter, clean, fill-up and vent.

Clean sludge from edge type filter for circuit lubrication.

Check lubricating oil system and rectify any leaks

Check oil filters, centrifuges of lubricating system

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30A2 Rev.2 24 Nov. 2012 Page 153 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30A2 Rev.2 24 Nov. 2012 Page 154 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment DIESEL GENERATOR(75 to125 KVA ) Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Remove sludge from fuel filter, clean, fill-up and vent.

Clean sludge from edge type filter for circuit lubrication.

Check lubricating oil system and rectify any leaks

Check oil filters, centrifuges of lubricating system

Performed by: Signature

Checked by: Signature

Date:
Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30B2 Rev.2 24 Nov. 2012 Page 155 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30B2 Rev.2 24 Nov. 2012 Page 156 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment CUBICLE Location
Tag No.
Monthly Work Order No.
Maintenance Period & Stat
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Check the Cubicle and clean the same by using vacuum cleaner.

Tighten the screws for fixing the covers, sheets, barriers, wiring .. etc.

Check the cubicle door for proper closing and locking.


Check the gasket and sealing for all the cubicle doors and shutters and change or clean the air filters where
necessary.

Check the cubicle lighting and space heaters.

Check the cubicle for proper dust and vermin proofing.


Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30C2 Rev.2 24 Nov. 2012 Page 157 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30C2 Rev.2 24 Nov. 2012 Page 158 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment BUSBAR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Check the bus bars, tighten the connection and clean the bus bar and the supporting.

Clean the post isolators and the through bushings and check for any hairline cracks

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30D2 Rev.2 24 Nov. 2012 Page 159 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30D2 Rev.2 24 Nov. 2012 Page 160 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment SWITCH & DRIVE MECHANISM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Clean the disconnecting mechanism and clean the tightness of the connections.

Slightly lubricate the contact surfaces with contact grease and check the operation of the proper mating of the
contacts.

Check the closing and opening operation under no-voltage condition.

Check links, joints etc. and lubricate wherever necessary.

Check the interlock system including transfer on load interlocking system.

Check the isolator driving motor (if applicable) for proper and load current.

Check the isolator position indication mechanically and electrically, local, remote and supervisory as applicable.

(N.B : For isolators of single break type, care must be taken during operation, check as isolator tips in dead bus bar
compartment will alive if live bus bar isolator is closed, MPW Engineer shall be noted).
All maintenance works on the circuit breaker should be carried out only after discharging the drive mechanism
to avoid an unintentional closing of the breaker.

1653/ TWI 756 Att. 30E2 Rev.2 24 Nov. 2012 Page 161 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30E2 Rev.2 24 Nov. 2012 Page 162 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30E2 Rev.2 24 Nov. 2012 Page 163 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30E2 Rev.2 24 Nov. 2012 Page 164 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment VACUUM CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Vacuum circuit breakers require little maintenance. In fact only the part subject to normal wear and aging need
be serviced to ensure fully reliable operation.

Maintenance and inspection intervals should be adjusted to suit the particular operating condition of each
interruption. Under the normal condition the vacuum interrupters need not to be serviced frequently, the
maximum permissible contact wear is 3 mm.

Before starting any work the breaker should be isolated short circuited and earthed.

Disconnect the auxiliary supply and open and close the breaker by hand until both springs have been
discharged. Reference should be made to the safety regulation.

Check the circuit breaker for its general condition and for any abnormality.

Measure the contact resistance of the CB and analyze the values to confirm proper CB contact as
recommended by the manufacturer.

Check vacuum leaking current according to the manufacturer recommendation.


Performed by: Signature

1653/ TWI 756 Att. 30F2 Rev.2 24 Nov. 2012 Page 165 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment VACUUM CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30F2 Rev.2 24 Nov. 2012 Page 166 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment VACUUM CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Replace the CB pole by new one (if necessary).

Lubricate the main points of the breaker using anti corrosive oil obtained through the manufacturer representative or approved
supplier. The main point to be lubricated bearing and sliding surfaces, joints and auxiliary switches and all the appropriate

Before putting the breaker into service clean the circuit breaker with lent free cloth.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30F2 Rev.2 24 Nov. 2012 Page 167 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30F2 Rev.2 24 Nov. 2012 Page 168 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30F2 Rev.2 24 Nov. 2012 Page 169 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30F2 Rev.2 24 Nov. 2012 Page 170 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year 2010
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment DRIVE MECHANISM OF CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Clean and lubricate the drive mechanism. Lubricating points should be as per the
manufacturer instruction manual, as over lubrication and lubrication on some
components of the trip mechanism can effect the normal operation of the circuit
breaker.

Check the charging, closing and opening operation of the drive mechanism
mechanically and electrically and indication positions local remote and test.

Check and clean auxiliary contacts of the C.B and check for proper functioning.

Check the drive mechanism charging motors for proper load current.
Check the function of the interlocks and the closing, opening and tripping the circuit
breaker.

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30G2 Rev.2 24 Nov. 2012 Page 171 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30G2 Rev.2 24 Nov. 2012 Page 172 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30G2 Rev.2 24 Nov. 2012 Page 173 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment SECONDARY PLUG &CONTROL WIRING OF BREAKERS Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Clean of the contact of the secondary plugs.

Check the alignment and locking of the secondary plugs to socket.

Check for any defects with the wiring terminal connections

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30H2 Rev.2 24 Nov. 2012 Page 174 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30H2 Rev.2 24 Nov. 2012 Page 175 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment CB TRUCK & CB COMPARTEMENT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Clean and lubricate the wheels of the truck, rails, mechanical interlocks and the rocking mechanism.
Checking for the smooth operation of the racking mechanism mechanically and electrically as
applicable.

Clean and check the circuit breaker for any cracks.

Examine point finish.

Check the racking IN / OUT motor for proper load current (if applicable).

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30I2 Rev.2 24 Nov. 2012 Page 176 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30I2 Rev.2 24 Nov. 2012 Page 177 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment CURRENT TRANSFORMER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Clean and check the insulation.

Check and tighten the primary and secondary connections.

Check current transformer magnetizing curve.


Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30J2 Rev.2 24 Nov. 2012 Page 178 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30J2 Rev.2 24 Nov. 2012 Page 179 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment VOLTAGE TRANSFORMER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check and clean the insulation and tighten the connections.

Check primary contact, clean as slightly lubricate contacts.

Check secondary connection, plugs, secondary circuit MCB, etc., tighten secondary connection.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30K2 Rev.2 24 Nov. 2012 Page 180 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30K2 Rev.2 24 Nov. 2012 Page 181 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.

Equipment BUSBAR / CABLE EARTHING SWITCHES DRIVING MECHANISM Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Clean the earthing switches and check the tightness of the connection.
Slightly lubricate the contact surface with contact grease and check the operation for proper mating of the
contacts.

Check the closing and opening operation under no voltage condition and special attention for the voltage
from the other end.
Check lings, joints etc. and lubricate wherever necessary.
Check the interlock system includes.

Check the earthing switch driving motor (if applicable) for proper load current.

Check the earthing switch position indication (as applicable) mechanically and electrically local and remote.

Earthing trucks (if applicable) to be covered for protection against dust.

Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30L2 Rev.2 24 Nov. 2012 Page 182 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30L2 Rev.2 24 Nov. 2012 Page 183 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30L2 Rev.2 24 Nov. 2012 Page 184 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30L2 Rev.2 24 Nov. 2012 Page 185 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment CABLE TERMINATION / COMPARTEMENT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check for any damages to the sealing end and see for any leakage of compound or oil (if leakage is noticed it
should be reported to MPW Engineer)

Clean the bushing and tighten the connections.

Check for the efficient earthing of the cable box and cable sheath.

Checking for any corona discharge.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30M2 Rev.2 24 Nov. 2012 Page 186 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30M2 Rev.2 24 Nov. 2012 Page 187 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.

Equipment POWER TRANSFORMER & AUTO TRANSFORMER GENERAL MAINTENANCE Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check for any oil leakage.

Clean the transformer thoroughly by using steam jet after necessary precautions to prevent water seepage to
protective instrument and wiring terminals.
After thorough cleaning if any major repair is required to stop the oil leakage, report the matter to the MPW
Engineer.

Check the point finish and carry out re-painting of transformer if required.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30N2 Rev.2 24 Nov. 2012 Page 188 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30N2 Rev.2 24 Nov. 2012 Page 189 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment POWER TRANSFORMER & AUTO TRANSFORMER HV & LV CABLE AND BOXES Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Clean and check for any oil or compound leakage.

If oil and compound are found mixed, report to MPW Engineer for further action.

Check the compound level gauges for any defects.

Check silica gel breather if provided. Clean breather and replace the silica gel.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30O2 Rev.2 24 Nov. 2012 Page 190 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30O2 Rev.2 24 Nov. 2012 Page 191 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment POWER TRANSFORMER & AUTO TRANSFORMER MAIN TANK & CONSERVATOR TANK Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check for any oil leakage.

Take oil samples from the main tank and conservator tank for laboratory testing.

Top up oil if required (only new tested or insulated oil should be used for topping up).

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30P2 Rev.2 24 Nov. 2012 Page 192 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

us
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30P2 Rev.2 24 Nov. 2012 Page 193 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

POWER TRANSFORMER & AUTO TRANSFORMER DEHYDRATOR BREATHER


Equipment COMPARTEMENT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check and tighten the pipe connection if required.

Change the silica gel of the breather and the oil in the dust trap.

Check the normal functioning of the breathers.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30Q2 Rev.2 24 Nov. 2012 Page 194 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30Q2 Rev.2 24 Nov. 2012 Page 195 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment POWER TRANSFORMER & AUTO TRANSFORMER OIL & OIL LEVEL GAUGES Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check for any oil leakage.

Replace the gauges if found defective.

Clean the gauges glasses if found hazy.

Oil samples are to be taken from all sampling points and to be tested by the contractor, the test
results shall be referred to the permissible values

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30R2 Rev.2 24 Nov. 2012 Page 196 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30R2 Rev.2 24 Nov. 2012 Page 197 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

POWER TRANSFORMER & AUTO TRANSFORMER WINDING TEMPERATURE


Equipment INSTRUMENT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Note down the maximum temperature readings and reset the same.

Check the setting of alarm and trip.

Test the operation of the instruments.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30S2 Rev.2 24 Nov. 2012 Page 198 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30S2 Rev.2 24 Nov. 2012 Page 199 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment POWER TRANSFORMER & AUTO TRANSFORMER WINDING Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Measure and record the insulation resistance between H.V and L.V windings and between the H.V
windings and earth and between the L.V winding and earth using 2.5 kv or 5 kv Megger. Ambient
temperature should be recorded along with the measured valves of th

Insulation value of the control cable is to be measured and recorded in maintenance sheet

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30T2 Rev.2 24 Nov. 2012 Page 200 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30T2 Rev.2 24 Nov. 2012 Page 201 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment POWER TRANSFORMER & AUTO TRANSFORMER BUCHOLTZ & GAS RELAYS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check for any oil leakage.

Check the operation of the relays (operation of the float relay is to be checked by air pump or any
other facility).
Test the buchholz relays for alarm and trip mechanism, and tap changer gas relay for tripping
operation.
Check the insulation values of all control cables and values shall be recorded in the maintenance
sheets.

Check the stability of these relays against vibrations.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30U2 Rev.2 24 Nov. 2012 Page 202 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30U2 Rev.2 24 Nov. 2012 Page 203 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment POWER TRANSFORMER & AUTO TRANSFORMER TAP CHANGER Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Cleaning, checking tighting as necessary the operating mechanism, checking of wiring and
inspecting all contactor, micro switches, MCBs .. etc.

Inspection of motor shaft, level gears, position transmitter combination, coupling pins for proper
operation.

Oiling and greasing and tightening are to be done as required.

Checking of tap changer drive cubicle to ensure proper closing, checking of the operation of
tap changer drive for raising, lowering and over runs and limit lockout .. etc.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30V2 Rev.2 24 Nov. 2012 Page 204 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30V2 Rev.2 24 Nov. 2012 Page 205 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment MOTOR STARTER VACUUM CONTACTOR SWITCHGEAR Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Prepare all proper tools and measuring equipment before starting the maintenance works.

Switch OFF the pump motor of the 3.3 kv vacuum contactor cubicle.

Switch OFF the control supply mcb/fuses in the switchgear cubicle.

Operate the bus bar isolating lever to OFF position for disengaging the cubicle from the 3.3 kv
bus bar.- Release the latch lever of the withdraw able cubicle unit.

Withdraw the 3.3 kv vacuum contactor truck (cubicle).

Inspect visually and thoroughly the cubicle for any abnormal condition.

Clean the cubicle with hand blower and hand brush.

Clean the H.T. bus bar with clean cloth.


Performed by: Signature

1653/ TWI 756 Att. 30W2 Rev.2 24 Nov. 2012 Page 206 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment MOTOR STARTER VACUUM CONTACTOR SWITCHGEAR Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30W2 Rev.2 24 Nov. 2012 Page 207 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment MOTOR STARTER VACUUM CONTACTOR SWITCHGEAR Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Clean the bus bar isolating contacts with contact cleaner and then with clean and apply also thin
film of petroleum jelly on the surfaces.

Clean the vacuum switch tube of the vacuum contactor with clean cloth.

Check the setting of the magnetic coil unit and its pole faces.

Check and tighten the magnetic coil terminations.

Check the bus bar isolating lever and its mechanism.

Lubricate the moving parts of the above firmly.

Clean the auxiliary switch contacts with contact cleaner and check the correct setting.

Check, clean and tighten the limit switch and its terminal wire connections.

Check and clean the operating mechanism.


Performed by: Signature

1653/ TWI 756 Att. 30W2 Rev.2 24 Nov. 2012 Page 208 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment MOTOR STARTER VACUUM CONTACTOR SWITCHGEAR Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30W2 Rev.2 24 Nov. 2012 Page 209 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment MOTOR STARTER VACUUM CONTACTOR SWITCHGEAR Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Tighten the vacuum contactor incoming an outgoing terminal bolts and nuts.

Check the braided copper links and tighten its terminals.

Clean the control supply plug and socket with contact cleaner.

Check and tighten terminal wires of motors protection relays.

Clean and lubricate the rolling wheels of the truck unit.

Clean the inside panel compartment.

Check the bus bar closing shutters and its levers lubricate if necessary.

Check, clean and tighten control contactors and relays and their terminal wiring connection.

Check earth leakage relay and tighten its terminal wiring.


Performed by: Signature

1653/ TWI 756 Att. 30W2 Rev.2 24 Nov. 2012 Page 210 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment MOTOR STARTER VACUUM CONTACTOR SWITCHGEAR Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Checked by: Signature

Date:

Check the insulation resistance values of each pole-to-Earth with Megger.

Check the emergency and (ON) button and their terminal wiring.

Check the bulb indicator and its holder termination.

Check the control compartment door lock.

Check the magnetic coil control circuit resistor and its terminal wiring.

When every thing satisfied, connect the testing extension cable unit between the cubicle and the
panel and test the cubicle by ON/OFF operation.

Check the opening and closing of the contracts of the vacuum contactor.

1653/ TWI 756 Att. 30W2 Rev.2 24 Nov. 2012 Page 211 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment MOTOR STARTER VACUUM CONTACTOR SWITCHGEAR Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30W2 Rev.2 24 Nov. 2012 Page 212 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment MOTOR STARTER VACUUM CONTACTOR SWITCHGEAR Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Disconnect and remove the testing extension unit. And insert the cubicle in the panel position.

Engage the latch lever. Operate the bus bar isolating lever to ON position.

Switch ON the control supply.

Switch ON the 3.3 kv pump motor and check the operation of the vacuum contactor and
investigate the proper values of all measuring parameters.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable


1653/ TWI 756 Att. 30W2 Rev.2 24 Nov. 2012 Page 213 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30W2 Rev.2 24 Nov. 2012 Page 214 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30W2 Rev.2 24 Nov. 2012 Page 215 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30W2 Rev.2 24 Nov. 2012 Page 216 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30W2 Rev.2 24 Nov. 2012 Page 217 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30W2 Rev.2 24 Nov. 2012 Page 218 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30W2 Rev.2 24 Nov. 2012 Page 219 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30W2 Rev.2 24 Nov. 2012 Page 220 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30W2 Rev.2 24 Nov. 2012 Page 221 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment MOTOR STARTER VACUUM CONTACTOR SWITCHGEAR Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Prepare all proper tools and measuring equipment before starting the maintenance works.

Switch OFF the pump motor of the 3.3 kv vacuum contactor cubicle.

Switch OFF the control supply mcb/fuses in the switchgear cubicle.

Operate the bus bar isolating lever to OFF position for disengaging the cubicle from the 3.3 kv
bus bar.

Release the latch lever of the withdraw able cubicle unit.

Withdraw the 3.3 kv vacuum contactor truck (cubicle).

Inspect visually and thoroughly the cubicle for any abnormal condition.

Clean the cubicle with hand blower and hand brush.


Performed by: Signature

1653/ TWI 756 Att. 30X2 Rev.2 24 Nov. 2012 Page 222 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment MOTOR STARTER VACUUM CONTACTOR SWITCHGEAR Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30X2 Rev.2 24 Nov. 2012 Page 223 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment MOTOR STARTER VACUUM CONTACTOR SWITCHGEAR Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Clean the H.T. bus bar with clean cloth.

Clean the bus bar isolating contacts with contact cleaner and then with clean and apply also thin
film of petroleum jelly on the surfaces.

Clean the vacuum switch tube of the vacuum contactor with clean cloth.

Check the setting of the magnetic coil unit and its pole faces.

Check and tighten the magnetic coil terminations.

Check the bus bar isolating lever and its mechanism.

Lubricate the moving parts of the above firmly.

Clean the auxiliary switch contacts with contact cleaner and check the correct setting.

Check, clean and tighten the limit switch and its terminal wire connections.

1653/ TWI 756 Att. 30X2 Rev.2 24 Nov. 2012 Page 224 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment MOTOR STARTER VACUUM CONTACTOR SWITCHGEAR Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30X2 Rev.2 24 Nov. 2012 Page 225 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment MOTOR STARTER VACUUM CONTACTOR SWITCHGEAR Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check and clean the operating mechanism.

Tighten the vacuum contactor incoming an outgoing terminal bolts and nuts.

Check the braided copper links and tighten its terminals.

Clean the control supply plug and socket with contact cleaner.

Check and tighten terminal wires of motors protection relays.

Clean and lubricate the rolling wheels of the truck unit.

Clean the inside panel compartment.

Check the bus bar closing shutters and its levers lubricate if necessary.

Check, clean and tighten control contactors and relays and their terminal wiring connection.

Check earth leakage relay and tighten its terminal wiring.

1653/ TWI 756 Att. 30X2 Rev.2 24 Nov. 2012 Page 226 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment MOTOR STARTER VACUUM CONTACTOR SWITCHGEAR Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30X2 Rev.2 24 Nov. 2012 Page 227 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment MOTOR STARTER VACUUM CONTACTOR SWITCHGEAR Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check the insulation resistance values of each pole-to-Earth with Megger.

Check the emergency and (ON) button and their terminal wiring.

Check the bulb indicator and its holder termination.

Check the control compartment door lock.

Check the magnetic coil control circuit resistor and its terminal wiring.

When every thing satisfied, connect the testing extension cable unit between the cubicle and the
panel and test the cubicle by ON/OFF operation.

Check the opening and closing of the contracts of the vacuum contactor.

Disconnect and remove the testing extension unit. And insert the cubicle in the panel position.
Performed by: Signature

1653/ TWI 756 Att. 30X2 Rev.2 24 Nov. 2012 Page 228 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment MOTOR STARTER VACUUM CONTACTOR SWITCHGEAR Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30X2 Rev.2 24 Nov. 2012 Page 229 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment MOTOR STARTER VACUUM CONTACTOR SWITCHGEAR Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Engage the latch lever. Operate the bus bar isolating lever to ON position.

Switch ON the control supply.

Switch ON the 3.3 kv pump motor and check the operation of the vacuum contactor and
investigate the proper values of all measuring parameters.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30X2 Rev.2 24 Nov. 2012 Page 230 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30X2 Rev.2 24 Nov. 2012 Page 231 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30X2 Rev.2 24 Nov. 2012 Page 232 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30X2 Rev.2 24 Nov. 2012 Page 233 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30X2 Rev.2 24 Nov. 2012 Page 234 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30X2 Rev.2 24 Nov. 2012 Page 235 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30X2 Rev.2 24 Nov. 2012 Page 236 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30X2 Rev.2 24 Nov. 2012 Page 237 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30X2 Rev.2 24 Nov. 2012 Page 238 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30X2 Rev.2 24 Nov. 2012 Page 239 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV AIR CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Prepare all proper tools and measuring equipment before starting the work.

Switch OFF the load connected to the air circuit breaker, and de-energize it.

Follow the manufacturer instructions to draw out the Master pact ACB.

Clean all part of Master pact ACB thoroughly by hand blower and soft brush.

Inspect all part of the ACB, visually and by hand checking.

Close the ACB to check the wear of the contacts.

Check the condition of the arc-chute, make sure that the arc chute body is not broken and
the separators are not corroded.

Check the protection unit, display and adjustment of each parameters, reprogramme it if
required.
Performed by: Signature

1653/ TWI 756 Att. 30Y2 Rev.2 24 Nov. 2012 Page 240 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV AIR CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Checked by: Signature

Date:

Check the ammeter function of the protection unit for the parameters Ir, Tr, Im, I, In, th,
and follow the manufacturer procedures for readjusting them if required.

Store the correct parameter programmed and lock the settings by means of the sealing
plate.

Remove the front cover, check the condition of MX mobile core with the C.B closed.

Insert the ACB-unit in the panel firmly and check the following :

Open and close the breaker locally and remotely using the different auxiliaries
successively,

Test the order channels.

Test the operation of the control unit with the mini test-kit.

Check the control unit with the complete test-kit.

1653/ TWI 756 Att. 30Y2 Rev.2 24 Nov. 2012 Page 241 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV AIR CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Check the geared motor power supply.


Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30Y2 Rev.2 24 Nov. 2012 Page 242 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV AIR CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Test the protection of the network for overload, short circuit and earth faults.

Measure the current density flowing in each phase physically.

Remove the racking handle and put it in the storage.

Remove disabling and put the ACB into operation.


Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30Y2 Rev.2 24 Nov. 2012 Page 243 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30Y2 Rev.2 24 Nov. 2012 Page 244 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30Y2 Rev.2 24 Nov. 2012 Page 245 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30Y2 Rev.2 24 Nov. 2012 Page 246 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30Y2 Rev.2 24 Nov. 2012 Page 247 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV AIR CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Prepare all proper tools and measuring equipment before starting the work.

Switch OFF the load connected to the air circuit breaker, and de-energize it.

Follow the manufacturer instructions to draw out the Master pact ACB.

Clean all part of Master pact ACB thoroughly by hand blower and soft brush.

Inspect all part of the ACB, visually and by hand checking.

Close the ACB to check the wear of the contacts.

Check the condition of the arc-chute, make sure that the arc chute body is not broken and the
separators are not corroded.

Check the protection unit, display and adjustment of each parameters, re -programmed it if
required.

Check the ammeter function of the protection unit for the parameters Ir, Tr, Im, I, In, th, and
follow the manufacturer procedures for readjusting them if required.

1653/ TWI 756 Att. 30Z2 Rev.2 24 Nov. 2012 Page 248 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV AIR CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Performed by: Signature

Checked by: Signature

Date:

Store the correct parameter programmed and lock the settings by means of the sealing plate.

Remove the front cover, check the condition of MX mobile core with the C.B closed.

Insert the ACB-unit in the panel firmly and check the following

Open and close the breaker locally and remotely using the different auxiliaries successively,

Test the order channels.

Test the operation of the control unit with the mini test-ket.

Check the control unit with the complete test-kit.

1653/ TWI 756 Att. 30Z2 Rev.2 24 Nov. 2012 Page 249 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV AIR CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Check the geared motor power supply.

Test the protection of the network for overload, short circuit and earth faults.
Performed by: Signature

Checked by: Signature

Date:

Measure the current density flowing in each phase physically.

Remove the racking handle and put it in the storage.

Remove disabling and put the ACB into operation


Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30Z2 Rev.2 24 Nov. 2012 Page 250 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV AIR CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30Z2 Rev.2 24 Nov. 2012 Page 251 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30Z2 Rev.2 24 Nov. 2012 Page 252 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30Z2 Rev.2 24 Nov. 2012 Page 253 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30Z2 Rev.2 24 Nov. 2012 Page 254 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30Z2 Rev.2 24 Nov. 2012 Page 255 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV AIR CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Prepare all proper tools and measuring equipment before


starting the work.
Switch OFF the load connected to the air circuit breaker,
and de-energize it.
Follow the manufacturer instructions to draw out the Master
pact ACB.
Clean all part of Master pact ACB thoroughly by hand
blower and soft brush.

Inspect all part of the ACB, visually and by hand checking.

Close the ACB to check the wear of the contacts.

Check the condition of the arc-chute, make sure that the arc
chute body is not broken and the separators are not corroded.

Check the protection unit, display and adjustment of each


parameters, reprogrammed it if required.
Performed by: Signature

1653/ TWI 756 Att. 30A3 Rev.2 24 Nov. 2012 Page 256 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV AIR CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30A3 Rev.2 24 Nov. 2012 Page 257 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV AIR CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Check the ammeter function of the protection unit for the


parameters Ir, Tr, Im, I, In, th, and follow the manufacturer
procedures for readjusting them if required.

Store the correct parameter programmed and lock the


settings by means of the sealing plate.
Remove the front cover, check the condition of MX mobile
core with the C.B closed.
Insert the ACB-unit in the panel firmly and check the
following :
Open and close the breaker locally and remotely using the
different auxiliaries successively,

Test the order channels.

Test the operation of the control unit with the mini test-ket.
Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30A3 Rev.2 24 Nov. 2012 Page 258 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV AIR CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Check the control unit with the complete test-kit.

Check the geared motor power supply.


Test the protection of the network for overload, short circuit
and earth faults.
Measure the current density flowing in each phase
physically.

Remove the racking handle and put it in the storage.

Remove disabling and put the ACB into operation


Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30A3 Rev.2 24 Nov. 2012 Page 259 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30A3 Rev.2 24 Nov. 2012 Page 260 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30A3 Rev.2 24 Nov. 2012 Page 261 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30A3 Rev.2 24 Nov. 2012 Page 262 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30A3 Rev.2 24 Nov. 2012 Page 263 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment MCCB FOR LV INCOMING FEEDER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Prepare all proper tools and measuring equipment before


starting the work.

Switch OFF the load connected to the MCCB.


Follow the manufacturers instructions to draw out the
MCCB.

Clean all parts of MCCB thoroughly by hand blower and


soft brush.
Inspect all parts of the MCCB, visually and by hand
checking.

Close the MCCB to check the wear of the contacts.


Check the condition of the arc-chute, make sure that the arc
chute body is not broken and the separators are not
corroded.
Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30B3 Rev.2 24 Nov. 2012 Page 264 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment MCCB FOR LV INCOMING FEEDER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Date:

1653/ TWI 756 Att. 30B3 Rev.2 24 Nov. 2012 Page 265 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment MCCB FOR LV INCOMING FEEDER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Check the tripping mechanism by pushing the trip test


button and ensure the breaker contacts are open .

Insert the MCCB unit and put back in operation.


Test the protection of the network overload and also
measure the current flow in each phase my meter.
Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30B3 Rev.2 24 Nov. 2012 Page 266 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30B3 Rev.2 24 Nov. 2012 Page 267 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30B3 Rev.2 24 Nov. 2012 Page 268 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30B3 Rev.2 24 Nov. 2012 Page 269 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

MCCs withdraw able starter unit of the main and Remote distribution
panels
Prepare all proper tools and measuring equipment before starting the
preventive maintenance works.

Switch OFF the load connected to the MCC and also switch OFF the
MCC unit and draw it out of the panel.

Inspect visually the MCC unit for any abnormal condition and carry out the
following works:

Clean switch fuse, fuse holder, fuse lever and terminations.

Clean the bus bar isolating contacts with contact cleaner and clean cloth.
Apply thin layer of petroleum jelly on the contact surfaces.

Remove the control supply plug from the socket (in tele-technique MCC
unit only) and clean the contact with contact cleaner and plug it back.

Performed by: Signature

1653/ TWI 756 Att. 30C3 Rev.2 24 Nov. 2012 Page 270 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30C3 Rev.2 24 Nov. 2012 Page 271 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Check the contactor and tighten its termination.


Check the thermal overload relay and its current setting, tighten the
terminal wires.

Check fuses and fuse holders.

Check the control relays, timers and their terminations.

Check the earth leakage relays and its termination

Check the control supply mcb and its termination.

Check the selector switch, push-buttons and their terminations.


Check the ammeter, indicator lamps and lamp holder and their wiring
terminations.

Check the counter hour meter and its termination.


Performed by: Signature

1653/ TWI 756 Att. 30C3 Rev.2 24 Nov. 2012 Page 272 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30C3 Rev.2 24 Nov. 2012 Page 273 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Check all internal wiring for any damage or overheating.

Check the terminal connector wiring and tighten it.

When everything satisfied, insert the MCC in the panel and switch ON.

Operate the MCC unit in all modes by charging the selector switch
position.
Check the operation of the indication light, ammeter and hour meter during
loading.

Put the MCC unit in the operation programmed.


MCCs fixed starter unit of the main distribution Panels Manufacturer
:Himel
Arrange proper tools and measuring equipment before starting the
maintenance works.

Switch OFF the incoming air circuit breaker of the MCC panel.
Performed by: Signature

1653/ TWI 756 Att. 30C3 Rev.2 24 Nov. 2012 Page 274 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30C3 Rev.2 24 Nov. 2012 Page 275 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Switch OFF the MCCB of the MCC unit and carry out the followings :

Check the MCCB / Motor protection switch and operating lever.

Check and tighten terminal wires of MCCB.

Check the ELCB and its terminations.

Check the indication lamp, holder and termination.

Check the terminal connector and terminations.

Check the flexible cable connection for any damage or burnout.

Clean the interior parts of the MCC by clean cloth.


If everything satisfied switch ON the incoming Air Circuit Breaker and
put ON the MCC - unit.
Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30C3 Rev.2 24 Nov. 2012 Page 276 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30C3 Rev.2 24 Nov. 2012 Page 277 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30C3 Rev.2 24 Nov. 2012 Page 278 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30C3 Rev.2 24 Nov. 2012 Page 279 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30C3 Rev.2 24 Nov. 2012 Page 280 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30C3 Rev.2 24 Nov. 2012 Page 281 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30C3 Rev.2 24 Nov. 2012 Page 282 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30C3 Rev.2 24 Nov. 2012 Page 283 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30C3 Rev.2 24 Nov. 2012 Page 284 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30C3 Rev.2 24 Nov. 2012 Page 285 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

MCCs withdrawable starter unit of the main and Remote distribution panels

Prepare all proper tools and measuring equipment before starting the preventive maintenance
works.

Switch OFF the load connected to the MCC and also switch OFF the MCC unit and draw it
out of the panel.

Inspect visually the MCC unit for any abnormal condition and carry out the following works:

Clean switch fuse, fuse holder, fuse lever and terminations.

Clean the bus bar isolating contacts with contact cleaner and clean cloth. Apply thin layer of
petroleum jelly on the contact surfaces.

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30D3 Rev.2 24 Nov. 2012 Page 286 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Remove the control supply plug from the socket (in tele- technique MCC unit only) and clean the
contact with contact cleaner and plug it back.

Check the contactor and tighten its termination.

Check the thermal overload relay and its current setting, tighten the terminal wires.

Check fuses and fuse holders.

Check the control relays, timers and their terminations.

Check the earth leakage relays and its termination

Check the control supply mcb and its termination.


Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30D3 Rev.2 24 Nov. 2012 Page 287 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Date:

1653/ TWI 756 Att. 30D3 Rev.2 24 Nov. 2012 Page 288 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Check the selector switch, push-buttons and their terminations.

Check the ammeter, indicator lamps and lamp holder and their wiring terminations.

Check the counter hour meter and its termination.

Check all internal wiring for any damage or overheating.

Check the terminal connector wiring and tighten it.

When everything satisfied, insert the MCC in the panel and switch ON.

Operate the MCC unit in all modes by charging the selector switch position.

Check the operation of the indication light, ammeter and hour meter during loading.
Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30D3 Rev.2 24 Nov. 2012 Page 289 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Date:

1653/ TWI 756 Att. 30D3 Rev.2 24 Nov. 2012 Page 290 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Put the MCC unit in the operation programmed.

MCCs fixed starter unit of the main distribution Panels Manufacturer: Himel

Arrange proper tools and measuring equipment before starting the maintenance works.

Switch OFF the incoming air circuit breaker of the MCC panel.

Switch OFF the MCCB of the MCC unit and carry out the followings :

Check the MCCB / Motor protection switch and operating lever.

Check and tighten terminal wires of MCCB.

Check the ELCB and its terminations.


Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30D3 Rev.2 24 Nov. 2012 Page 291 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Date:

1653/ TWI 756 Att. 30D3 Rev.2 24 Nov. 2012 Page 292 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Check the indication lamp, holder and termination.

Check the terminal connector and terminations.

Check the flexible cable connection for any damage or burnout.

Clean the interior parts of the MCC by clean cloth.


If everything satisfied switch ON the incoming Air Circuit Breaker and put ON the MCC -
unit.
Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30D3 Rev.2 24 Nov. 2012 Page 293 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30D3 Rev.2 24 Nov. 2012 Page 294 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30D3 Rev.2 24 Nov. 2012 Page 295 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30D3 Rev.2 24 Nov. 2012 Page 296 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30D3 Rev.2 24 Nov. 2012 Page 297 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30D3 Rev.2 24 Nov. 2012 Page 298 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30D3 Rev.2 24 Nov. 2012 Page 299 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30D3 Rev.2 24 Nov. 2012 Page 300 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30D3 Rev.2 24 Nov. 2012 Page 301 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

MCCs withdrawable starter unit of the main and Remote distribution panels

Manufacturer Himel

Main Panel :

Inflow structure panel :

Prepare all proper tools and measuring equipment before starting the preventive
maintenance works.

Switch OFF the load connected to the MCC and also switch OFF the MCC unit and
draw it out of the panel.

Inspect visually the MCC unit for any abnormal condition and carry out the following
works:

Clean switch fuse, fuse holder, fuse lever and terminations.


Performed by: Signature

1653/ TWI 756 Att. 30E3 Rev.2 24 Nov. 2012 Page 302 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30E3 Rev.2 24 Nov. 2012 Page 303 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Clean the bus bar isolating contacts with contact cleaner and clean cloth. Apply thin layer
of petroleum jelly on the contact surfaces.

Remove the control supply plug from the socket (in telemechanique MCC unit only) and
clean the contact with contact cleaner and plug it back.

Check the contactor and tighten its termination.

Check the thermal overload relay and its current setting, tighten the terminal wires.

Check fuses and fuse holders.

Check the control relays, timers and their terminations.

Check the earth leakage relays and its termination


Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30E3 Rev.2 24 Nov. 2012 Page 304 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Check the control supply mcb and its termination.

Check the selector switch, push-buttons and their terminations.

Check the ammeter, indicator lamps and lamp holder and their wiring terminations.

Check the counter hour meter and its termination.

Check all internal wiring for any damage or overheating.

Check the terminal connector wiring and tighten it.

When everything satisfied, insert the MCC in the panel and switch ON.

Operate the MCC unit in all modes by charging the selector switch position.

Check the operation of the indication light, ammeter and hour meter during loading.
Performed by: Signature

1653/ TWI 756 Att. 30E3 Rev.2 24 Nov. 2012 Page 305 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30E3 Rev.2 24 Nov. 2012 Page 306 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Put the MCC unit in the operation programmed.

MCCs fixed starter unit of the main distribution Panels

Manufacturer

Arrange proper tools and measuring equipment before starting the maintenance works.

Switch OFF the incoming air circuit breaker of the MCC panel.

Switch OFF the MCCB of the MCC unit and carry out the followings :

Check the MCCB / Motor protection switch and operating lever.

Check and tighten terminal wires of MCCB.


Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30E3 Rev.2 24 Nov. 2012 Page 307 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Date:

1653/ TWI 756 Att. 30E3 Rev.2 24 Nov. 2012 Page 308 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Check the ELCB and its terminations.

Check the indication lamp, holder and termination.

Check the terminal connector and terminations.

Check the flexible cable connection for any damage or burnout.

Clean the interior parts of the MCC by clean cloth.


If everything satisfied switch ON the incoming Air Circuit Breaker and put ON the
MCC - unit.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

1653/ TWI 756 Att. 30E3 Rev.2 24 Nov. 2012 Page 309 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

N/A Not Applicable

1653/ TWI 756 Att. 30E3 Rev.2 24 Nov. 2012 Page 310 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30E3 Rev.2 24 Nov. 2012 Page 311 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30E3 Rev.2 24 Nov. 2012 Page 312 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30E3 Rev.2 24 Nov. 2012 Page 313 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30E3 Rev.2 24 Nov. 2012 Page 314 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30E3 Rev.2 24 Nov. 2012 Page 315 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30E3 Rev.2 24 Nov. 2012 Page 316 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30E3 Rev.2 24 Nov. 2012 Page 317 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30E3 Rev.2 24 Nov. 2012 Page 318 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year 2010
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment EL-231 LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

MCCs withdraw able starter unit of the main and Remote distribution panels

Manufacturer : Himel

Main Panel : Telemechanique

Inflow structure panel : Cymesco LTD. Cyprus


Prepare all proper tools and measuring equipment before starting the preventive
maintenance works.

Switch OFF the load connected to the MCC and also switch OFF the MCC unit and
draw it out of the panel.

Inspect visually the MCC unit for any abnormal condition and carry out the following
works:

Clean switch fuse, fuse holder, fuse lever and terminations.


Performed by: Signature

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 319 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year 2010
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment EL-231 LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 320 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year 2010
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment EL-231 LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Clean the bus bar isolating contacts with contact cleaner and clean cloth. Apply thin layer
of petroleum jelly on the contact surfaces.

Remove the control supply plug from the socket (in telemechanique MCC unit only) and
clean the contact with contact cleaner and plug it back.

Check the contactor and tighten its termination.

Check the thermal overload relay and its current setting, tighten the terminal wires.

Check fuses and fuse holders.

Check the control relays, timers and their terminations.

Check the earth leakage relays and its termination


Performed by: Signature

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 321 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year 2010
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment EL-231 LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 322 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year 2010
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment EL-231 LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Check the control supply mcb and its termination.

Check the selector switch, push-buttons and their terminations.

Check the ammeter, indicator lamps and lamp holder and their wiring terminations.

Check the counter hour meter and its termination.

Check all internal wiring for any damage or overheating.

Check the terminal connector wiring and tighten it.

When everything satisfied, insert the MCC in the panel and switch ON.

Operate the MCC unit in all modes by charging the selector switch position.
Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 323 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year 2010
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment EL-231 LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Date:

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 324 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year 2010
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment EL-231 LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Check the operation of the indication light, ammeter and hour meter during loading.

Put the MCC unit in the operation programmed.

MCCs fixed starter unit of the main distribution Panels

Manufacturer : Himel

Arrange proper tools and measuring equipment before starting the maintenance works.

Switch OFF the incoming air circuit breaker of the MCC panel.

Switch OFF the MCCB of the MCC unit and carry out the followings :

Check the MCCB / Motor protection switch and operating lever.


Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 325 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year 2010
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment EL-231 LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Date:

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 326 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year 2010
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment EL-231 LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Check and tighten terminal wires of MCCB.

Check the ELCB and its terminations.

Check the indication lamp, holder and termination.

Check the terminal connector and terminations.

Check the flexible cable connection for any damage or burnout.

Clean the interior parts of the MCC by clean cloth.


If everything satisfied switch ON the incoming Air Circuit Breaker and put ON the
MCC - unit.

Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 327 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year 2010
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment EL-231 LV MCC WITHDRAWABLE STARTER UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 328 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 329 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 330 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 331 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 332 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 333 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 334 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 335 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 336 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 337 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30F3 Rev.2 24 Nov. 2012 Page 338 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment FIXED MCCs & LOCAL STARTER PANEL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Switch OFF the load connected to the panel.

Switch OFF the load break switch or MCCB (if Equipped).

Open the panel carefully and check visually for any abnormality.

Clean the interior of the panel using hand air blower and soft brush.

Check all wiring and tighten the termination of all parts.

Check the contactors, thermal overload relay, timer relays and their terminations.

Check fuses and fuse holders.

Check push-buttons, emergency stop and rotary switches and termination.


Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30G3 Rev.2 24 Nov. 2012 Page 339 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment FIXED MCCs & LOCAL STARTER PANEL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Check the cable entry hubs, sealing door gasket and correct if necessary.

Check / replace indicator light and holder (if necessary).

Close the panel door after last visual check and switch ON the unit.

Check the operation of the starter panel on-load.


Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30G3 Rev.2 24 Nov. 2012 Page 340 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30G3 Rev.2 24 Nov. 2012 Page 341 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30G3 Rev.2 24 Nov. 2012 Page 342 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment LOCAL PUSH BUTTON STATION & AUXILLIARIES Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

For various equipment at the pump rooms, inflow structure etc. Start / Stop push-
button emergency push-button, selector switches, cam and rotary switches etc.

Switch OFF the MCC unit connected to the local stations.

Open the local station carefully and check visually for any abnormal condition or
damages.

Check all wiring termination for loose connection or corrosion effect and adjust it.

Clean all contacts and terminals using contact cleaner and soft brush.

Check the entire conduit holes and clean all hubs,

Check the earthing connection, fitting and earthing cables.


Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30H3 Rev.2 24 Nov. 2012 Page 343 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment LOCAL PUSH BUTTON STATION & AUXILLIARIES Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Date:

1653/ TWI 756 Att. 30H3 Rev.2 24 Nov. 2012 Page 344 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment LOCAL PUSH BUTTON STATION & AUXILLIARIES Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Check the wirings continuity between the push-button station and the related MCC
unit in control room using multimeter.

Clean the interior of push-button box by hand blower and soft brush.

Check the cover gasket condition, replace it (if necessary).

Close the push-button cover firmly and test the operation of the control circuit only.

If everything satisfied, put the selector switch in remote position and start in load for

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30H3 Rev.2 24 Nov. 2012 Page 345 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment LOCAL PUSH BUTTON STATION & AUXILLIARIES Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30H3 Rev.2 24 Nov. 2012 Page 346 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30H3 Rev.2 24 Nov. 2012 Page 347 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30H3 Rev.2 24 Nov. 2012 Page 348 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30H3 Rev.2 24 Nov. 2012 Page 349 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30H3 Rev.2 24 Nov. 2012 Page 350 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment BUILDING ELECTRICAL EQUIPMENTS Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Check local D.Bs for power and lighting distribution as follows

Clean internal parts by air blower.

Check all wiring condition and tighten (if necessary).

Check mcbs. Proper operation individually.

Check tripping mechanism of ELCBs individually.

Check the live bus bar tightness and condition.

Check the earth cable / wire termination and tightness.

Insure / measure 3-phase load balance.

Check proper closing of D.B. cover and gasket condition.


Check all lighting fitting, replace any defective parts. (Bulbs,holders, tubes, chook, starter,
switches etc.)
Performed by: Signature

1653/ TWI 756 Att. 30I3 Rev.2 24 Nov. 2012 Page 351 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment BUILDING ELECTRICAL EQUIPMENTS Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30I3 Rev.2 24 Nov. 2012 Page 352 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment BUILDING ELECTRICAL EQUIPMENTS Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Check all power outlet fitting condition, replace if necessary any defected parts (13 amp. Plug /
socket, socket box, wiring, conduit .. etc.)

Check the telephone network and units, correct if necessary and mal functioning of the circuits,
socket etc.

Check bells and intercom system, repair any damage or defective unit.

Check all kitchen wares and electrical equipment for any damage or defect (electric heater,
boilers, hot plates, kettles, refrigerators, water coolers, exhaust fans, electric ovens etc.).

Check all washing room electrical equipment for any abnormalities and replace all defective
parts

Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30I3 Rev.2 24 Nov. 2012 Page 353 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment BUILDING ELECTRICAL EQUIPMENTS Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30I3 Rev.2 24 Nov. 2012 Page 354 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30I3 Rev.2 24 Nov. 2012 Page 355 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30I3 Rev.2 24 Nov. 2012 Page 356 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30I3 Rev.2 24 Nov. 2012 Page 357 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30I3 Rev.2 24 Nov. 2012 Page 358 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment CONTROL PANEL CONSOLE DESK / MIMIC PANEL Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Prepare all proper tools and measuring equipment before starting the maintenance works.

Clean the control panel thoroughly with vacuum cleaner and then with hand brush.

Check all the following equipment and tighten their wiring termination.

Auxiliary contactors.

Contactor relays.

Universal relays.

Timing relays.

Different relays.
Performed by: Signature

1653/ TWI 756 Att. 30J3 Rev.2 24 Nov. 2012 Page 359 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment CONTROL PANEL CONSOLE DESK / MIMIC PANEL Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30J3 Rev.2 24 Nov. 2012 Page 360 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment CONTROL PANEL CONSOLE DESK / MIMIC PANEL Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Earth leakage circuit breakers.

Earth fault relays.

Electronics relays.

Miniature circuit breakers.

Programmable controllers.

Selector switches.

Cam-switches.

Push buttons.
Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30J3 Rev.2 24 Nov. 2012 Page 361 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment CONTROL PANEL CONSOLE DESK / MIMIC PANEL Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Date:

1653/ TWI 756 Att. 30J3 Rev.2 24 Nov. 2012 Page 362 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment CONTROL PANEL CONSOLE DESK / MIMIC PANEL Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Ammemeters, Voltmeters and frequency meter.

Current transformer / bases.

Illumination light fittings.

Light emitting diodes (LEDs)

Indication lamps / holders.

Counter meters.

Water level indicators.

Pressure monitors.

Flow meters / display units


Performed by: Signature

1653/ TWI 756 Att. 30J3 Rev.2 24 Nov. 2012 Page 363 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment CONTROL PANEL CONSOLE DESK / MIMIC PANEL Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30J3 Rev.2 24 Nov. 2012 Page 364 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment CONTROL PANEL CONSOLE DESK / MIMIC PANEL Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Check the proper operation of all above equipment and adjust of the correct.

Replace any damage equipment or blown off fuses or lamp indicator.

Test the operation of the water level control system (Huber / Ultrasonic), replace damages
parts.

Test the operation of the emergency push button of the control panel.

Check the terminal strips wiring and label conditions, replace if required.

Check the earthing of the control panel.

Check the door of the panels and door lock operation.

Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30J3 Rev.2 24 Nov. 2012 Page 365 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment CONTROL PANEL CONSOLE DESK / MIMIC PANEL Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30J3 Rev.2 24 Nov. 2012 Page 366 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30J3 Rev.2 24 Nov. 2012 Page 367 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30J3 Rev.2 24 Nov. 2012 Page 368 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30J3 Rev.2 24 Nov. 2012 Page 369 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30J3 Rev.2 24 Nov. 2012 Page 370 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30J3 Rev.2 24 Nov. 2012 Page 371 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30J3 Rev.2 24 Nov. 2012 Page 372 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30J3 Rev.2 24 Nov. 2012 Page 373 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30J3 Rev.2 24 Nov. 2012 Page 374 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment BATTERY CHARGER PANEL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Before starting the maintenance works, check the meter reading of the output voltage,
charging current and charger output current.

Switch OFF the incoming AC supply.

Check the AC power available indication in OFF condition and AC power failure indication
in ON condition.

Again note the reading of the battery charger meters.

Check visually and thoroughly the battery charger for any abnormal condition.

Clean the battery charger with hand blower.

Check and tighten all wire terminals and connector block termination.
Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30K3 Rev.2 24 Nov. 2012 Page 375 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment BATTERY CHARGER PANEL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Date:

1653/ TWI 756 Att. 30K3 Rev.2 24 Nov. 2012 Page 376 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment BATTERY CHARGER PANEL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Clean the heat sinks of the thyristors.

Check and clean the cooling fan and filter (if required).

Check all the wiring arrangement for any burnout or damages.

Check the proper fitting of electronic printed circuit boards.

Check the fuses and fuse holders.

Check and tighten all meters terminations

Check and tighten the indication bulb holder terminations.

Check and tighten all outgoing circuit MCB terminals.


Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30K3 Rev.2 24 Nov. 2012 Page 377 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment BATTERY CHARGER PANEL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Date:

1653/ TWI 756 Att. 30K3 Rev.2 24 Nov. 2012 Page 378 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment BATTERY CHARGER PANEL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Replace and faulty or damage parts or overheated wiring.

When everything satisfied, switch ON the incoming AC supply and note the meter
readings.

Check the Battery electrolyte level alarm by removing the sensing probe from the Battery.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30K3 Rev.2 24 Nov. 2012 Page 379 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30K3 Rev.2 24 Nov. 2012 Page 380 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30K3 Rev.2 24 Nov. 2012 Page 381 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30K3 Rev.2 24 Nov. 2012 Page 382 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30K3 Rev.2 24 Nov. 2012 Page 383 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30K3 Rev.2 24 Nov. 2012 Page 384 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment BATTERY UNITS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Before starting the maintenance of the batteries, switch OFF the


battery charger incoming AC supply.

Check terminal voltage of each battery.


Clean the battery cells individually with soft brush and rinse with
water if required to remove any soft deposits of the top of the
battery, do not use wire brush or solvents of any kind.

Check that all connectors are tight, the connector and pole screws
should be cleaned and corrosion protected by coating with thin
layer of anti-corrosion oil.

Top up the electrolyte level using only distilled or de-ionized water


(only if required), in order to keep the electrolyte at maximum level
(not more). However let the battery fall below the low mark, this
may damage the battery capacity and there may be

Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30L3 Rev.2 24 Nov. 2012 Page 385 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment BATTERY UNITS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Date:

1653/ TWI 756 Att. 30L3 Rev.2 24 Nov. 2012 Page 386 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment BATTERY UNITS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

It will ruin the battery, filling bottle, hydrometers.. etc, used with
lead acid battery must never be used with alkaline batteries.

Check the electrolyte density. The density is not influenced by the


state of charge, but increase slightly when electrolyte level is
lowered due to water loss. The density should not measure
immediately after the water has been added, wait a while for the

When taking electrolyte sample for measuring the density, dip the
syringe sufficiently deep to avoid sucking up the cell oil.

Check the proper voltage setting of the charger. It is of great


importance that the recommended charging voltage be kept
unchanged. High water consumption of the battery usually is
caused by in proper voltage setting of the charger.
Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30L3 Rev.2 24 Nov. 2012 Page 387 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment BATTERY UNITS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Re-clean the batteries after topping up and rub it with dry clean
cloth. A wet batteries can results in earth faults and / or erratic
operation for the system.

For maximum safety while working on the battery, always keep the
flame arresting vent closed except for the moment of topping up.

When everything satisfied, switch ON the battery charger


incoming AC supply.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30L3 Rev.2 24 Nov. 2012 Page 388 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30L3 Rev.2 24 Nov. 2012 Page 389 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30L3 Rev.2 24 Nov. 2012 Page 390 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30L3 Rev.2 24 Nov. 2012 Page 391 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30L3 Rev.2 24 Nov. 2012 Page 392 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LIGHTING & POWER DB Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Prepare all proper tools and measuring equipment before staring the maintenance
works.

Switch OFF all lighting circuit mcbs in the distribution board.

Switch OFF the incoming supply to the lighting D.B.

Clean the lighting D.B with hand blower and hand brush.

Check the incoming load break switches and its operating handle.

Check the terminal wire and its tightness.

Check the operating of the ELCBs and their terminations.

Check the mcbs and their ON/OFF operation.


Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30M3 Rev.2 24 Nov. 2012 Page 393 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LIGHTING & POWER DB Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Date:

1653/ TWI 756 Att. 30M3 Rev.2 24 Nov. 2012 Page 394 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LIGHTING & POWER DB Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Check the mcbs incoming bus bar termination and tighten it.

Check the mcbs outgoing terminal connections.

Check the Neutral bus bar and tighten all wiring termination.

Check the Earth bar and tighten all wiring connection.

Check and retighten all terminal connector wiring.

Check the out door lighting photocell control unit and its connections.

Check the photocell control contactor and its terminations.

Check the voltmeter and voltage selector switch and their wiring connections.
Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30M3 Rev.2 24 Nov. 2012 Page 395 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LIGHTING & POWER DB Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Date:

1653/ TWI 756 Att. 30M3 Rev.2 24 Nov. 2012 Page 396 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LIGHTING & POWER DB Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Repeat all the above steps for checking the power supply circuit of the power
outlet socket1-ph and 3-ph.

Switch ON the incoming power supply to the D.B.

Switch ON all ELCBs and MCBs.

Test the ELCBs by pressing the trip button.

Reset the ELCB and put the distribution board in operation

Performed by: Signature

Checked by: Signature

Date:

Legend OK

1653/ TWI 756 Att. 30M3 Rev.2 24 Nov. 2012 Page 397 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment LIGHTING & POWER DB Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

N/A Not Applicable

1653/ TWI 756 Att. 30M3 Rev.2 24 Nov. 2012 Page 398 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30M3 Rev.2 24 Nov. 2012 Page 399 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30M3 Rev.2 24 Nov. 2012 Page 400 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30M3 Rev.2 24 Nov. 2012 Page 401 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30M3 Rev.2 24 Nov. 2012 Page 402 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30M3 Rev.2 24 Nov. 2012 Page 403 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment EMERGENCY LIGHTING UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Prepare all proper tools and measuring equipment before staring the works.

Switch OFF the AC power supply to the emergency lighting unit or remove the AC
plug from the wall outlet (if provided).

Check the emergency unit light are glowing properly.

Open the unit cover and inspect visually inside for any abnormal condition.

Check the battery voltage value and then clean the batteries and terminations.

Tighten all battery terminal wiring.

Check the electrolyte level of the battery and top up with distilled water (if required).
Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30N3 Rev.2 24 Nov. 2012 Page 404 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment EMERGENCY LIGHTING UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Date:

1653/ TWI 756 Att. 30N3 Rev.2 24 Nov. 2012 Page 405 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment EMERGENCY LIGHTING UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Check the terminal wire of the battery unit.


Check visually the condition of the battery, charging unit and the printed circuit
board for any abnormal notice.

Check the termination of the control transformer and the control unit.

Check the bulb and holders, replace if necessary.

Check the light doom and clean it.

Tighten the unit cover perfectly.


Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30N3 Rev.2 24 Nov. 2012 Page 406 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment EMERGENCY LIGHTING UNIT Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

Check the AC power supply cable and plug, replace it if necessary.

Check the outlet socket of the emergency lighting unit AC supply.

Insert the plug in the socket and switch ON the emergency light

Check now the emergency light unit bulbs are switched OFF and put the unit in the
normal operation.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30N3 Rev.2 24 Nov. 2012 Page 407 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30N3 Rev.2 24 Nov. 2012 Page 408 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30N3 Rev.2 24 Nov. 2012 Page 409 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30N3 Rev.2 24 Nov. 2012 Page 410 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30N3 Rev.2 24 Nov. 2012 Page 411 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment EMERGENCY LIGHTING UNIT EXPLOSION PROOF Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Prepare all proper tools and measuring equipment before staring the works.

Switch OFF the AC power supply to the emergency lighting unit or remove the AC
plug from the wall outlet (if provided).

Check the emergency unit light are glowing properly.

Open the unit cover and inspect visually inside for any abnormal condition.

Check the battery voltage value and then clean the batteries and terminations.

Tighten all battery terminal wiring.

Check the electrolyte level of the battery and top up with distilled water (if required).
Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30O3 Rev.2 24 Nov. 2012 Page 412 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment EMERGENCY LIGHTING UNIT EXPLOSION PROOF Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Date:

1653/ TWI 756 Att. 30O3 Rev.2 24 Nov. 2012 Page 413 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment EMERGENCY LIGHTING UNIT EXPLOSION PROOF Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Check the terminal wire of the battery unit.


Check visually the condition of the battery, charging unit and the printed circuit board
for any abnormal notice.

Check the termination of the control transformer and the control unit.

Check the bulb and holders, replace if necessary.

Check the light doom and clean it.

Tighten the unit cover perfectly.

Check the AC power supply cable and plug, replace it if necessary.


Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30O3 Rev.2 24 Nov. 2012 Page 414 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment EMERGENCY LIGHTING UNIT EXPLOSION PROOF Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Date:

Check the outlet socket of the emergency lighting unit AC supply.

Insert the plug in the socket and switch ON the emergency light unit.

Check now the emergency light unit bulbs are switched OFF and put the unit in the
normal operation.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30O3 Rev.2 24 Nov. 2012 Page 415 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30O3 Rev.2 24 Nov. 2012 Page 416 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30O3 Rev.2 24 Nov. 2012 Page 417 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30O3 Rev.2 24 Nov. 2012 Page 418 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30O3 Rev.2 24 Nov. 2012 Page 419 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment OVERHEAD CRANE & CONTROL PANEL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Statu
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Before starting the maintenance works, arrange the proper tools and testing equipment.

Follow the safety regulation of the manufacturer instruction manual.

Switch OFF the power supply to the over head crane and put the men at work display board at the main
isolating switch.

Clean the control switch gear panel, check and tighten the terminal of the contactor, thermal over load and timer ..
etc.

Check the tightness of all wire connected to the terminal connectors.

Check the traveling cable clamping guide rollers and tighten its termination.

Lubricate the guide of the traveling cable clamping rollers.


Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30P3 Rev.2 24 Nov. 2012 Page 420 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment OVERHEAD CRANE & CONTROL PANEL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Statu
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Date:

1653/ TWI 756 Att. 30P3 Rev.2 24 Nov. 2012 Page 421 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment OVERHEAD CRANE & CONTROL PANEL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Statu
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Check and tighten hoist traveling motor fixing bolts and terminations.

Check the insulation resistance value of the motors.

Clean the motor with dry compressed air hand brush.

Check the limit switches position and their operating levers and tighten all wiring termination.

Check the over head power supply rails and its contact carbon brushes and brush holder (if equipped).

Check the brake setting of the hoist motor.

Check and readjust the stopper of the over head crane traveling strokes.

Check / clean the control push-button station, emergency push-button, selector switch and their termination.

Check the tightness of the push-button stations stay wire, always its length should be less than the flexible cable.

Performed by: Signature

1653/ TWI 756 Att. 30P3 Rev.2 24 Nov. 2012 Page 422 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment OVERHEAD CRANE & CONTROL PANEL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Statu
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30P3 Rev.2 24 Nov. 2012 Page 423 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment OVERHEAD CRANE & CONTROL PANEL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Statu
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Check the earthing of the overhead crane.

Switch ON the overhead crane and operate all function one by one and note down the motor load current.

Check the operation of the limit switches by operating the hoisting motor.

Check the operation of the emergency push-button and selector switches.

When everything satisfied put the overhead crane in operation.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30P3 Rev.2 24 Nov. 2012 Page 424 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30P3 Rev.2 24 Nov. 2012 Page 425 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30P3 Rev.2 24 Nov. 2012 Page 426 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30P3 Rev.2 24 Nov. 2012 Page 427 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30P3 Rev.2 24 Nov. 2012 Page 428 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30P3 Rev.2 24 Nov. 2012 Page 429 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment 3.3 KV ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Before starting the maintenance works arrange proper tools, spare and measuring equipment.

Follow the manufacturer maintenance instruction and safety regulations.

Switch OFF the motor and draw out the 3.3 KV MCC switchgear unit.

Display the Men at work board in the MCC Unit.

Switch OFF the Anti Condensating heater.

Inspect the surrounding area of the motor and inspect any dripping of water or any unusual amount of dust over the
motor.

Check any board, cloths, covers.. etc are left on the body which may affect ventilation.
Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30Q3 Rev.2 24 Nov. 2012 Page 430 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment 3.3 KV ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Date:

Check to make sure, grease or oil is not leaking out of the bearing housing if any leakage is present, correct the
condition continuing to operate.

Clean the external cooling fan and check its fixing aids.

Clean the fan impeller covers and cooling air tube with dry compressed air.

Open the terminal box, check the internal condition thoroughly and clean it perfectly as follows:

Clean the internal box walls.

Inspect, clean the terminal bushings.

Check and tighten the cable lugs at the terminal bushings.

Check the earth cable connection and its termination.

1653/ TWI 756 Att. 30Q3 Rev.2 24 Nov. 2012 Page 431 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment 3.3 KV ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Performed by: Signature

Checked by: Signature

Date:

Check the space heater terminal tightness.

Closed the unused entries or holes in the terminal box.

Check the gasket condition.

Check the cable clamping

Retighten of all fixing bolts and nuts.

Check the alignment of motor with pump and coupling.

Re-grease / lubricate the motor bearing as per manufacturer instruction.

1653/ TWI 756 Att. 30Q3 Rev.2 24 Nov. 2012 Page 432 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment 3.3 KV ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30Q3 Rev.2 24 Nov. 2012 Page 433 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment 3.3 KV ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Check the insulation resistance of the motor winding with Megger 5000 Volts and compare the Megger values with
manufacturer specifications.

Switch ON the anti-conducting heating coils and check the operation.

Switch ON the motor and allow it to run for full load test and note down the values of the starting voltage and
current.

Keep the motor running on full load test and check the following condition :

Motor outer temperature.

Bearing sound and temperature.


Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30Q3 Rev.2 24 Nov. 2012 Page 434 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment 3.3 KV ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Motor vibrations.

Cooling fan sound and air flow.

Motor coupling condition.

Full load, voltage and current values

When everything satisfied, put the motor in the operation program.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

1653/ TWI 756 Att. 30Q3 Rev.2 24 Nov. 2012 Page 435 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment 3.3 KV ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

N/A Not Applicable

1653/ TWI 756 Att. 30Q3 Rev.2 24 Nov. 2012 Page 436 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

eriod & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Q3 Rev.2 24 Nov. 2012 Page 437 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

eriod & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Q3 Rev.2 24 Nov. 2012 Page 438 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

eriod & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Q3 Rev.2 24 Nov. 2012 Page 439 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

eriod & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Q3 Rev.2 24 Nov. 2012 Page 440 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

eriod & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Q3 Rev.2 24 Nov. 2012 Page 441 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

eriod & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Q3 Rev.2 24 Nov. 2012 Page 442 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment 415V ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Before starting the maintenance works arrange proper tools, spare and measuring equipment.

Follow the manufacturer maintenance instruction and safety regulations.

Switch OFF the motor and draw out the 415V MCC switchgear unit

Display the Men at work board in the MCC Unit.

Switch OFF the Anti Condensating heater.

Inspect the surrounding area of the motor and inspect any dripping of water or any unusual amount of dust
over the motor.

Check any board, cloths, covers.. etc are left on the body which may affect ventilation.

Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30R3 Rev.2 24 Nov. 2012 Page 443 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment 415V ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Date:

Check to make sure, grease or oil is not leaking out of the bearing housing if any leakage is present, correct the
condition continuing to operate.

Clean the external cooling fan and check its fixing aids.

Clean the fan impeller covers and cooling air tube with dry compressed air.

Open the terminal box, check the internal condition thoroughly and clean it perfectly as follows:

Clean the internal box walls.

Inspect, clean the terminal bushings.

Check and tighten the cable lugs at the terminal bushings.

Check the earth cable connection and its termination.


Performed by: Signature

1653/ TWI 756 Att. 30R3 Rev.2 24 Nov. 2012 Page 444 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment 415V ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Checked by: Signature

Date:

Check the space heater terminal tightness.

Closed the unused entries or holes in the terminal box.

Check the gasket condition.

Check the cable clamping

Retighten of all fixing bolts and nuts.

Check the alignment of motor with pump and coupling.

Re-grease / lubricate the motor bearing as per manufacturer instruction.

1653/ TWI 756 Att. 30R3 Rev.2 24 Nov. 2012 Page 445 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment 415V ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check the insulation resistance of the motor winding with Megger 5000 Volts and compare the Megger values
with manufacturer specifications.

Performed by: Signature

Checked by: Signature

Date:

Switch ON the anti-conducting heating coils and check the operation.

Switch ON the motor and allow it to run for full load test and note down the values of the starting voltage
and current.

Keep the motor running on full load test and check the following condition :

Motor outer temperature.

Bearing sound and temperature.

1653/ TWI 756 Att. 30R3 Rev.2 24 Nov. 2012 Page 446 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment 415V ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Motor vibrations.

Cooling fan sound and air flow.


Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30R3 Rev.2 24 Nov. 2012 Page 447 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment 415V ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Motor coupling condition.

Full load, voltage and current values

When everything satisfied, put the motor in the operation program.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30R3 Rev.2 24 Nov. 2012 Page 448 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30R3 Rev.2 24 Nov. 2012 Page 449 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30R3 Rev.2 24 Nov. 2012 Page 450 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30R3 Rev.2 24 Nov. 2012 Page 451 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30R3 Rev.2 24 Nov. 2012 Page 452 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30R3 Rev.2 24 Nov. 2012 Page 453 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30R3 Rev.2 24 Nov. 2012 Page 454 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment VALVE ACTUATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

AUMA-VALVE ACTUATOR

Manufacturer : AUMA

Type : SA12E & SA25E

Arrange proper tools and measuring equipment before starting the maintenance works.

Switch OFF the actuator and draw out the MCC unit.

Provide Men at work display board in the MCC.

Open the cable entry side cover of the actuator unit and carry on the followings.

Clean the terminal block unit.


Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30S3 Rev.2 24 Nov. 2012 Page 455 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment VALVE ACTUATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Date:

Check the tightness of all terminal wires and connections.

Check the motor input wires.

Close the cover and tight it properly.

Remove the selector switch cover and check the operation of the selector switch and its termination.

Check the contactors, over load relay and their termination (type SA12E).

Check and clean the power and control plug in terminals.

Remove the cover of the limit switch mechanism and clean it.

Lubricate sparingly the gear wheels of the limit switch operating mechanism.
Performed by: Signature

1653/ TWI 756 Att. 30S3 Rev.2 24 Nov. 2012 Page 456 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment VALVE ACTUATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Checked by: Signature

Date:

Check the limit switches, termination and settings.

Check the torque switches, termination and settings.

Check the valve position indicators.

Close and insert all components removed for maintenance to the proper locations.

Switch ON the power supply to the valve actuators.

AUMA-VALVE ACTUATOR

Manufacturer : EMG-DREHMO

Type : DATZD19 :

1653/ TWI 756 Att. 30S3 Rev.2 24 Nov. 2012 Page 457 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment VALVE ACTUATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Performed by: Signature

Checked by: Signature

Date:

Arrange proper tools and measuring equipment before starting the maintenance works.

Switch OFF the power supply of the valve actuator and draw out the MCC unit.

Provide A Men at work safety label at MCC door.

Open the electrical component side cover and carry on the followings:

Check selector switch and its terminal connectors.

Check the push-buttons and its termination.

Check the limit switches and their terminations.

1653/ TWI 756 Att. 30S3 Rev.2 24 Nov. 2012 Page 458 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment VALVE ACTUATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30S3 Rev.2 24 Nov. 2012 Page 459 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment VALVE ACTUATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check the settings of limit switches and torque switches.

Check the actuator motor and its wiring terminations.

Switch ON the MCC of the valve actuator and operate the valve for opening and closing mechanism.

Check the opening / closing limit switches operation and the position indicator.

When everything satisfied, put the valve actuator in operation.


Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30S3 Rev.2 24 Nov. 2012 Page 460 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30S3 Rev.2 24 Nov. 2012 Page 461 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30S3 Rev.2 24 Nov. 2012 Page 462 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30S3 Rev.2 24 Nov. 2012 Page 463 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30S3 Rev.2 24 Nov. 2012 Page 464 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30S3 Rev.2 24 Nov. 2012 Page 465 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30S3 Rev.2 24 Nov. 2012 Page 466 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment DIESEL GENERATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Check the lubricant oil level and inspect the pre-lubrication pump operation (if equipped).

Check the fuel level.

Check the water level in the radiator tank and make-up water tank.

Drain the water and sediments from the air compressor and air charging system (if it is air starting system).

Check the air pressure in the air tank, test the diesel air compressor (if equipped).

Check the air cleaner indicator and clean the engine.

Check the jacket water heater and its operation.

Check the jacket water heater circulation pump (if equipped).


Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30T3 Rev.2 24 Nov. 2012 Page 467 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment DIESEL GENERATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Date:

1653/ TWI 756 Att. 30T3 Rev.2 24 Nov. 2012 Page 468 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment DIESEL GENERATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Check the 24 Volts D.C batteries and clean units, terminals and apply a thin layer of petroleum jelly.

Check the electrolyte level of the battery and top-up with distilled water if its found low.

Clean the control panel interiors.

Check and tighten the control panel wiring and connection.

Check the space heater condition of the alternator in the internal electrical equipment of the control panel.

Run the D.G set in manual mode without load and inspect the engine operation.

Note down all the meter readings.

Stop the D.G set and put it in Auto. Position.


Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30T3 Rev.2 24 Nov. 2012 Page 469 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment DIESEL GENERATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Date:

1653/ TWI 756 Att. 30T3 Rev.2 24 Nov. 2012 Page 470 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment DIESEL GENERATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Inspect the pre-lubrication oil pump and all lubrication system for any leakage.

Inspect fuel system for any leakage.

Drain the sediments in the diesel tank.

Check the air filter indicator, if necessary clean the air filter.

Check the radiator, tank cooling fan motor (if equipped).

Check the D.G. set incomer breakers and clean it.

Check and clean the power transformer (3.3 k.v / 415 Volts) and its oil level (if equipped).

Check the color of the sficajel in transformer.

Run the D.G set in Auto mode with load.


Performed by: Signature

1653/ TWI 756 Att. 30T3 Rev.2 24 Nov. 2012 Page 471 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment DIESEL GENERATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30T3 Rev.2 24 Nov. 2012 Page 472 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment DIESEL GENERATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Note all the meter readings.

Check the D.G set performance and vibration.

Check the engine speed sensor.


Check the automatic voltage regulator (AVR) operation.

Check the automatic transformer switch (ATS) operation.

Check the overhead radiator unit and its cooling fan motor operation.

Stop the D.G set and put it in Auto. Position.

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30T3 Rev.2 24 Nov. 2012 Page 473 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment DIESEL GENERATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30T3 Rev.2 24 Nov. 2012 Page 474 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30T3 Rev.2 24 Nov. 2012 Page 475 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30T3 Rev.2 24 Nov. 2012 Page 476 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30T3 Rev.2 24 Nov. 2012 Page 477 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30T3 Rev.2 24 Nov. 2012 Page 478 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30T3 Rev.2 24 Nov. 2012 Page 479 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30T3 Rev.2 24 Nov. 2012 Page 480 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30T3 Rev.2 24 Nov. 2012 Page 481 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30T3 Rev.2 24 Nov. 2012 Page 482 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment H2S MONITORING SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

GENERAL :

The existing H2S monitoring system of the main pumping station comprise of a continuous automatic H2S gas
controller, monitoring the concentration in PPM 0 different locations at the pumping station.

The system includes, SENSYS industrial I/O digital controller units Model S400 A of Sierra product USA
which is processor for measurement and data acquisitions, accepts direct sensor inputs and generate outputs can
be controlled by computer via RS 232 com

The SENSYS controllers are being mounted and installed at the control room of all main pumping station,
connected to different locations on the site. The controller has 16 channels analog input and they are mostly
used for the existing H2S sensors located

1653/ TWI 756 Att. 30U3 Rev.2 24 Nov. 2012 Page 483 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment H2S MONITORING SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30U3 Rev.2 24 Nov. 2012 Page 484 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment H2S MONITORING SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Gas sensors models 4101-05 of sierra product USA are an electrochemical sensors for H2S gases were mounted
at pump room, inflow structure chambers and OCF equipment which may cover most of critical area of the
pumping stations.

B. PREVENTIVE MAINTENANCE OF THE EXISTING SYSTEM :

The contractor shall also be responsible of the maintenance and repair works required to the H2S monitoring
system and all related equipment, fittings, cable and accessories through the whole duration of the contract and
he should keep in his store the re

The contractor shall carry out the following work periodically :

Clean the sensors assembly and all transducers by contact cleaner.


Performed by: Signature

1653/ TWI 756 Att. 30U3 Rev.2 24 Nov. 2012 Page 485 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment H2S MONITORING SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30U3 Rev.2 24 Nov. 2012 Page 486 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment H2S MONITORING SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Check the metal conduit of the signal cable.

Clean H2S controller and all internal components with hand blower and soft brush.

Clean all electrical contact with contact cleaner.

Tight electrical connection and terminations.

Check memory back up and controller back-up batteries.

Check alarm limits of H2S and chlorine gas sensors.

Check controller programmed.


Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30U3 Rev.2 24 Nov. 2012 Page 487 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment H2S MONITORING SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Due to the high severe atmosphere and the expires of the life time of the existing sensors, the contactor shall
replace all the sensor cells at all main pumping stations by a spare identical cells, which he shall arrange to be
provided and fitted within 6

The Contactor shall be responsible of conducting a periodical field calibration to the system components using
the standard calibration gas samples, supplied as per the manufacturer recommendations. thee contractor shall
supply to the ministry a complete

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30U3 Rev.2 24 Nov. 2012 Page 488 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment H2S MONITORING SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

The contactor, after each calibration process for all detectors shall submit to Engineer for approval, the test
report for all sensors performance and efficiency and the adjustment of H2S controller being carried out with a
PC in the field.

The Contractor shall utilize adequate tools instruments and kids for adjustment, setting and calibration of the
sensors, complete with enough gas capsules and sensing elements to ensure continuous operation of the system
during the contract period.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30U3 Rev.2 24 Nov. 2012 Page 489 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30U3 Rev.2 24 Nov. 2012 Page 490 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30U3 Rev.2 24 Nov. 2012 Page 491 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30U3 Rev.2 24 Nov. 2012 Page 492 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30U3 Rev.2 24 Nov. 2012 Page 493 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30U3 Rev.2 24 Nov. 2012 Page 494 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30U3 Rev.2 24 Nov. 2012 Page 495 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30U3 Rev.2 24 Nov. 2012 Page 496 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment ULTRASONIC LEVEL CONTROL SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Clean the Ultra-sonic level controller thoroughly with clean and soft brush.

Clean the Ultra-sonic transmitter.


Check and clean the sensors.

Check the solid connection of the ground cable and tighten it.

Paint the sensor enclosure by Anti-corrosive paint (if required).

Tight the sensor cable connections.

Clean and tight electrical connection of the Ultra sonic controller.

Check the programmed setting and adjust it (if required).

Check and clean the display unit and tight electrical connection.

Check the memory back up battery.


Performed by: Signature

1653/ TWI 756 Att. 30V3 Rev.2 24 Nov. 2012 Page 497 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30V3 Rev.2 24 Nov. 2012 Page 498 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30V3 Rev.2 24 Nov. 2012 Page 499 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30V3 Rev.2 24 Nov. 2012 Page 500 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment HUBER LEVEL CONTROL SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Clean the contact maker unit with soft brush.

Tight the electrical connection of the contact maker unit.

Readjust the mercury tube position and return spring.

Check the oil container and the membrane functioning for any abnormal condition or oil leakage.

Clean the quid shaft and spring.

Check the operation of the remote level indicator, clean and adjust (if necessary).

Check all parts of the pneumatic connecting pipe (all the route) for any leakage of air from the ai
rbel, clean and tight tube joints.

Performed by: Signature

Date:

1653/ TWI 756 Att. 30W3 Rev.2 24 Nov. 2012 Page 501 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30W3 Rev.2 24 Nov. 2012 Page 502 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30W3 Rev.2 24 Nov. 2012 Page 503 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment PRESSURE MONITORING SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Clean and remove choked from impulse pipe.

Check Tee and coupling connection (replace if necessary)

Check the pressure transducer with fresh water and soft brush.

Calibrate pressure transducer and produce calibration report.

Remove and clean isolation valve, check valve leakage (replace if necessary).

Open pressure gauge diaphragm and clean with fresh water.

Replace pressure gauge diaphragm and clean with fresh water.

Replace pressure gauge diaphragm Teflon gasket if necessary.


Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30X3 Rev.2 24 Nov. 2012 Page 504 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment PRESSURE MONITORING SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Date:

1653/ TWI 756 Att. 30X3 Rev.2 24 Nov. 2012 Page 505 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment PRESSURE MONITORING SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Calibration pressure gauge and produce calibration report.

Maintain pressure gauge damping oil level and quantity.

Reinstall pressure transducer, pressure gauge by using thread sealing Teflon tape.

Tighten and clean electrical connection and terminations of the digital display unit.

Check calibration of the digital display unit (adjust if necessary).

Performed by: Signature

Checked by: Signature

Date:

Legend OK

1653/ TWI 756 Att. 30X3 Rev.2 24 Nov. 2012 Page 506 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment PRESSURE MONITORING SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

N/A Not Applicable

1653/ TWI 756 Att. 30X3 Rev.2 24 Nov. 2012 Page 507 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30X3 Rev.2 24 Nov. 2012 Page 508 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30X3 Rev.2 24 Nov. 2012 Page 509 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30X3 Rev.2 24 Nov. 2012 Page 510 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment FLOWMETER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Clean the flow meter transducer, display unit and chart recorders thoroughly with the help of
hand blower and soft brush.

Clean Doppler flow meter sensors with soft clean cloth.

Replace coupling grease of Doppler flow meter sensor and tighten the sensor clamp.

Clean magnetic flow-meter sensors with soft brush and clean cloth.

Clean the magnetic flow meter sensor connections with a good quality contact cleaner.

Check all function of the chart recorders, adjust roller position and speed, pen condition (replace
if necessary or life time expired) and totalize function.

Clean internal part of the chart records using soft brush.


Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30Y3 Rev.2 24 Nov. 2012 Page 511 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment FLOWMETER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Date:

1653/ TWI 756 Att. 30Y3 Rev.2 24 Nov. 2012 Page 512 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment FLOWMETER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Check data storage memory card on the chart recorder, adjust slot cartridge.

Check display reading and characters configuration, compare with standard or portable flow
meter readings and adjust if required.

Check the memory back up battery, replace it if required.

Clean the sensors of open channel flow meters.


Clean all electrical contacts and terminations of all types of flow meters with good quality
contact cleaner.

Tighten all electrical connections.

Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30Y3 Rev.2 24 Nov. 2012 Page 513 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment FLOWMETER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct.

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30Y3 Rev.2 24 Nov. 2012 Page 514 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30Y3 Rev.2 24 Nov. 2012 Page 515 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30Y3 Rev.2 24 Nov. 2012 Page 516 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30Y3 Rev.2 24 Nov. 2012 Page 517 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

135

Remarks
Nov. Dec.

1653/ TWI 756 Att. 30Y3 Rev.2 24 Nov. 2012 Page 518 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment DIFFERENTIAL LEVEL CONTROL SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Clean silo meter sensor and its in closer.

Check and clean electrical and printed circuit board contact.

Tighten electrical connection of transmitter.

Check programming of the controller, adjust it if required.

Check cable condition and conduit pipes.


Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30Z3 Rev.2 24 Nov. 2012 Page 519 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30Z3 Rev.2 24 Nov. 2012 Page 520 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment CUBICLE Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check the Cubicle and clean the same by using vacuum cleaner.

Tighten the screws for fixing the covers, sheets, barriers, wiring .. etc.

Check the cubicle door for proper closing and locking.

Check the gasket and sealing for all the cubicle doors and shutters and change or clean the air filters where
necessary.

Check the cubicle lighting and space heaters.

Check the cubicle for proper dust and vermin proofing.


Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30A4 Rev.2 24 Nov. 2012 Page 521 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30A4 Rev.2 24 Nov. 2012 Page 522 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30A4 Rev.2 24 Nov. 2012 Page 523 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30A4 Rev.2 24 Nov. 2012 Page 524 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment BUSBARS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check the bus bars, tighten the connection and clean the bus bar and the supports.

Clean the post isolators and the bushings and check for any hairline cracks.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30B4 Rev.2 24 Nov. 2012 Page 525 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30B4 Rev.2 24 Nov. 2012 Page 526 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment DISCONNECTING SWITCHES (ISOLATORS) & DRIVING MECHANISM Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Clean the earthing switches and check the tightness of the connection.

Slightly lubricate the contact surface with contact grease and check the operation for proper mating of
the contacts.

Check the closing and opening operation under no voltage condition and special attention for the
voltage from the other end.

Check lings, joints etc. and lubricate wherever necessary.


Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30C4 Rev.2 24 Nov. 2012 Page 527 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment DISCONNECTING SWITCHES (ISOLATORS) & DRIVING MECHANISM Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check the interlock system includes.

Check the earthing switch driving motor (if applicable) for proper load current.

Check the earthing switch position indication (as applicable) mechanically and electrically local and
remote.

Earthing trucks (if applicable) to be covered for protection against dust.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

1653/ TWI 756 Att. 30C4 Rev.2 24 Nov. 2012 Page 528 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135

Equipment DISCONNECTING SWITCHES (ISOLATORS) & DRIVING MECHANISM Location


Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

N/A Not Applicable

1653/ TWI 756 Att. 30C4 Rev.2 24 Nov. 2012 Page 529 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30C4 Rev.2 24 Nov. 2012 Page 530 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30C4 Rev.2 24 Nov. 2012 Page 531 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Prepare all proper tools and measuring equipment before starting the work.

Switch OFF the load connected to the MCCB.

Follow the manufacturers instructions to draw out the MCCB.

Clean all parts of MCCB thoroughly by hand blower and soft brush.

Inspect all parts of the MCCB, visually and by hand checking.

Close the MCCB to check the wear of the contacts.


Check the condition of the arc-chute, make sure that the arc chute body is not broken and the separators
are not corroded.
Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30D4 Rev.2 24 Nov. 2012 Page 532 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30D4 Rev.2 24 Nov. 2012 Page 533 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30D4 Rev.2 24 Nov. 2012 Page 534 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30D4 Rev.2 24 Nov. 2012 Page 535 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment CURRENT TRANSFORMER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Clean and check the insulation.

Check and tighten the secondary connections

Check current transformer magnetizing curve.


Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30E4 Rev.2 24 Nov. 2012 Page 536 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30E4 Rev.2 24 Nov. 2012 Page 537 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment VOLTAGE TRANSFORMER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check and clean the insulation and tighten the connections.

Check primary contact, clean and slightly lubricate contacts.

Check secondary connection, plugs, secondary circuit MCB, etc tighten secondary connection.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30F4 Rev.2 24 Nov. 2012 Page 538 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30F4 Rev.2 24 Nov. 2012 Page 539 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment BUSBAR/ CABLE/ EARTHING SWITCHES Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Clean the earthing switches and check the tightness of the connection.

Slightly lubricate the contact surface with contact grease and check the operation for proper mating of
the contacts.

Check the closing and opening operation under no voltage condition and special attention for the
voltage from the other end.

Check lings, joints etc. and lubricate wherever necessary.

Check the interlock system is functional.

Check the earthing switch driving motor (if applicable) for proper load current.

Check the earthing switch position indication (as applicable) mechanically and electrically local and
remote.

Earthing trucks (if applicable) to be covered for protection against dust.


Performed by: Signature

1653/ TWI 756 Att. 30G4 Rev.2 24 Nov. 2012 Page 540 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment BUSBAR/ CABLE/ EARTHING SWITCHES Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30G4 Rev.2 24 Nov. 2012 Page 541 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30G4 Rev.2 24 Nov. 2012 Page 542 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30G4 Rev.2 24 Nov. 2012 Page 543 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment ELPLS-408 LOCAL PUSH BUTTON Location
Tag No.
Monthly Work Order No.
Maintenance Perio
Activity Description
Jan. Feb. Mar. Apr. May.

For various equipment at the pump rooms, inflow structure etc. Start / Stop push-button emergency push-button, selector
switches, cam and rotary switches etc.

Switch OFF the MCC unit connected to the local stations.

Open the local station carefully and check visually for any abnormal condition or damages.

Check all wiring termination for loose connection or corrosion effect and adjust it.

Clean all contacts and terminals using contact cleaner and soft brush.

Check the entire conduit holes and clean all hubs,

Check the earthing connection, fitting and earthing cables.

Check the wirings continuity between the push-button station and the related MCC unit in control room using multimeter.

Clean the interior of push-button box by hand blower and soft brush.

1653/ TWI 756 Att. 30H4 Rev.2 24 Nov. 2012 Page 544 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment ELPLS-408 LOCAL PUSH BUTTON Location
Tag No.
Monthly Work Order No.
Maintenance Perio
Activity Description
Jan. Feb. Mar. Apr. May.

Check the cover gasket condition, replace it (if necessary).

Close the push-button cover firmly and test the operation of the control circuit only.

If everything satisfied, put the selector switch in remote position and start in load for testing.
Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30H4 Rev.2 24 Nov. 2012 Page 545 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Report No.
Year 2010
Contract No. SE/S/135
Location

aintenance Period & Status


Remarks
Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30H4 Rev.2 24 Nov. 2012 Page 546 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Report No.
Year 2010
Contract No. SE/S/135
Location

aintenance Period & Status


Remarks
Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30H4 Rev.2 24 Nov. 2012 Page 547 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW)
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area
Contractor Kharafi National KSC (Closed)

Equipment BUILDING ELECTRICAL EQUIPMENT & MOTOR ROOM


Tag No.
Monthly Work Order No.

Activity Description
Jan. Feb.

Check local D.Bs for power and lighting distribution as follows:

Clean internal parts by air blower.

Check all wiring condition and tighten (if necessary).

Check mcbs. Proper operation individually.

Check tripping mechanism of ELCBs individually.

Check the live bus bar tightness and condition.

Check the earth cable / wire termination and tightness.

Insure / measure 3-phase load balance.

Check proper closing of D.B. cover and gasket condition.

1653/ TWI 756 Att. 30I4 Rev.2 24 Nov. 2012 Page 548 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW)
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area
Contractor Kharafi National KSC (Closed)

Equipment BUILDING ELECTRICAL EQUIPMENT & MOTOR ROOM


Tag No.
Monthly Work Order No.

Activity Description
Jan. Feb.

Check all lighting fitting, replace any defective parts. (Bulbs, holders, tubes, chook, starter, switches etc.)

Check all power outlet fitting condition, replace if necessary any defected parts (13 amp. Plug / socket, socket box, wiring, conduit .. etc.)

Check the telephone network and units, correct if necessary and mal functioning of the circuits, socket etc.

Check bells and intercom system, repair any damage or defective unit.

Check all kitchen wares and electrical equipment for any damage or defect (electric heater, boilers, hot plates, kettles, refrigerators, water coolers,
exhaust fans, electric ovens etc.).

Check all washing room electrical equipment for any abnormalities and replace all defective parts.
Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30I4 Rev.2 24 Nov. 2012 Page 549 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW)
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area
Contractor Kharafi National KSC (Closed)

Equipment BUILDING ELECTRICAL EQUIPMENT & MOTOR ROOM


Tag No.
Monthly Work Order No.

Activity Description
Jan. Feb.

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30I4 Rev.2 24 Nov. 2012 Page 550 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Report No.
Year
Contract No. SE/S/135

Location

Maintenance Period & Status


Remarks
Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30I4 Rev.2 24 Nov. 2012 Page 551 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Report No.
Year
Contract No. SE/S/135

Location

Maintenance Period & Status


Remarks
Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30I4 Rev.2 24 Nov. 2012 Page 552 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year 2010
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment ELPLS-410 CONTROL PANEL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Switch OFF the load connected to the panel.

Switch OFF the load break switch or MCCB (if Equipped).

Open the panel carefully and check visually for any abnormality.

Clean the interior of the panel using hand air blower and soft brush.

Check all wiring and tighten the termination of all parts.

Check the contactors, thermal overload relay, timer relays and their terminations.

Check fuses and fuse holders.

Check push-buttons, emergency stop and rotary switches and termination.

Check the cable entry hubs, sealing door gasket and correct if necessary.

Check / replace indicator light and holder (if necessary).

1653/ TWI 756 Att. 30J4 Rev.2 24 Nov. 2012 Page 553 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year 2010
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment ELPLS-410 CONTROL PANEL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Close the panel door after last visual check and switch ON the unit.

Check the operation of the starter panel on-load.


Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30J4 Rev.2 24 Nov. 2012 Page 554 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30J4 Rev.2 24 Nov. 2012 Page 555 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30J4 Rev.2 24 Nov. 2012 Page 556 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW)
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area
Contractor Kharafi National KSC (Closed)

Equipment 1 LIGHTING & POWER DISTRIBUTION BOARD


Tag No.
Monthly Work Order No.

Activity Description

Prepare all proper tools and measuring equipment before staring the maintenance works.

Switch OFF all lighting circuit mcbs in the distribution board.

Switch OFF the incoming supply to the lighting D.B.

Clean the lighting D.B with hand blower and hand brush.

Check the incoming load break switches and its operating handle.

Check the terminal wire and its tightness.

Check the operating of the ELCBs and their terminations.

Check the mcbs and their ON/OFF operation.

Check the mcbs incoming bus bar termination and tighten it.

Check the mcbs outgoing terminal connections.

Check the Neutral bus bar and tighten all wiring termination.

Check the Earth bar and tighten all wiring connection.

Check and retighten all terminal connector wiring.

Check the out door lighting photocell control unit and its connections.

Check the photocell control contactor and its terminations.

Check the voltmeter and voltage selector switch and their wiring connections.

1653/ TWI 756 Att. 30K4 Rev.2 24 Nov. 2012 Page 557 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW)
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area
Contractor Kharafi National KSC (Closed)

Equipment 1 LIGHTING & POWER DISTRIBUTION BOARD


Tag No.
Monthly Work Order No.

Activity Description

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30K4 Rev.2 24 Nov. 2012 Page 558 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW)
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area
Contractor Kharafi National KSC (Closed)

Equipment 1 LIGHTING & POWER DISTRIBUTION BOARD


Tag No.
Monthly Work Order No.

Activity Description

Repeat all the above steps for checking the power supply circuit of the power outlet socket1-ph and 3-ph.

Switch ON the incoming power supply to the D.B.

Switch ON all ELCBs and MCBs.

Test the ELCBs by pressing the trip button.

Reset the ELCB and put the distribution board in operation.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30K4 Rev.2 24 Nov. 2012 Page 559 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
ublic Works (MPW)
of Sewage Pumping & Lifting Station-2 Area
nal KSC (Closed)

& POWER DISTRIBUTION BOARD

Monthly Work Order No.

Activity Description
Jan.

ring equipment before staring the maintenance works.

mcbs in the distribution board.

y to the lighting D.B.

lower and hand brush.

itches and its operating handle.

htness.

and their terminations.

operation.

termination and tighten it.

connections.

ten all wiring termination.

wiring connection.

nnector wiring.

ell control unit and its connections.

tor and its terminations.

lector switch and their wiring connections.

1653/ TWI 756 Att. 30K4 Rev.2 24 Nov. 2012 Page 560 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
ublic Works (MPW)
of Sewage Pumping & Lifting Station-2 Area
nal KSC (Closed)

& POWER DISTRIBUTION BOARD

Monthly Work Order No.

Activity Description
Jan.

1653/ TWI 756 Att. 30K4 Rev.2 24 Nov. 2012 Page 561 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
ublic Works (MPW)
of Sewage Pumping & Lifting Station-2 Area
nal KSC (Closed)

& POWER DISTRIBUTION BOARD

Monthly Work Order No.

Activity Description
Jan.

king the power supply circuit of the power outlet socket1-ph and 3-ph.

supply to the D.B.

p button.

ution board in operation.

Applicable

1653/ TWI 756 Att. 30K4 Rev.2 24 Nov. 2012 Page 562 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Report No.
Year
Contract No. SE/S/135

Location

Maintenance Period & Status


Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30K4 Rev.2 24 Nov. 2012 Page 563 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Report No.
Year
Contract No. SE/S/135

Location

Maintenance Period & Status


Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30K4 Rev.2 24 Nov. 2012 Page 564 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Report No.
Year
Contract No. SE/S/135

Location

Maintenance Period & Status


Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30K4 Rev.2 24 Nov. 2012 Page 565 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30K4 Rev.2 24 Nov. 2012 Page 566 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30K4 Rev.2 24 Nov. 2012 Page 567 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30K4 Rev.2 24 Nov. 2012 Page 568 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW)
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area
Contractor Kharafi National KSC (Closed)
Equipment EMERGENCY LIGHTING UNIT
Tag No.
Monthly Work Order No.

Activity Description

Prepare all proper tools and measuring equipment before staring the works.

Switch OFF the AC power supply to the emergency lighting unit or remove the AC plug from the wall outlet (if provided).

Check the emergency unit light are glowing properly.

Open the unit cover and inspect visually inside for any abnormal condition.

Check the battery voltage value and then clean the batteries and terminations.

Tighten all battery terminal wiring.

Check the electrolyte level of the battery and top up with distilled water (if required).

Check the terminal wire of the battery unit.

Check visually the condition of the battery, charging unit and the printed circuit board for any abnormal notice.

1653/ TWI 756 Att. 30L4 Rev.2 24 Nov. 2012 Page 569 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW)
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area
Contractor Kharafi National KSC (Closed)
Equipment EMERGENCY LIGHTING UNIT
Tag No.
Monthly Work Order No.

Activity Description

Check the termination of the control transformer and the control unit.

Check the bulb and holders, replace if necessary.

Check the light doom and clean it.

Tighten the unit cover perfectly.

Check the AC power supply cable and plug, replace it if necessary.

Check the outlet socket of the emergency lighting unit AC supply.

Insert the plug in the socket and switch ON the emergency light unit.

Check now the emergency light unit bulbs are switched OFF and put the unit in the normal operation.

When everything satisfied put the overhead crane back in operation.

1653/ TWI 756 Att. 30L4 Rev.2 24 Nov. 2012 Page 570 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW)
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area
Contractor Kharafi National KSC (Closed)
Equipment EMERGENCY LIGHTING UNIT
Tag No.
Monthly Work Order No.

Activity Description

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30L4 Rev.2 24 Nov. 2012 Page 571 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Report No.
Year
Contract No. SE/S/135
Location

Maintenance Period & Status


Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30L4 Rev.2 24 Nov. 2012 Page 572 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Report No.
Year
Contract No. SE/S/135
Location

Maintenance Period & Status


Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30L4 Rev.2 24 Nov. 2012 Page 573 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Report No.
Year
Contract No. SE/S/135
Location

Maintenance Period & Status


Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30L4 Rev.2 24 Nov. 2012 Page 574 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30L4 Rev.2 24 Nov. 2012 Page 575 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30L4 Rev.2 24 Nov. 2012 Page 576 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks

1653/ TWI 756 Att. 30L4 Rev.2 24 Nov. 2012 Page 577 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Before starting the maintenance work, prepare all tools and spare parts and measuring
equipment.

Switch OFF the motor and draw out its MCC and provide men at work safety label.

Switch OFF the space heater if required.


Inspect the surrounding area and note any dripping of water, fumes, any unusual amount of
dust over the motor body.

Check to make sure grease or oil is not leaking out of the bearings housing.

If any leak is present, check and correct the condition before continuing to operate.

Clean / check the external cooling fan and its proper fixation.

Clean the cooling fan of the stator body with compressed dry air.
Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30M4 Rev.2 24 Nov. 2012 Page 578 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Date:

1653/ TWI 756 Att. 30M4 Rev.2 24 Nov. 2012 Page 579 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Clean the bells of the motor and fan cover.


Open the terminal box and check the interior area and the walls, clean and blow off any
residues as follows :

Clean the inner sides by soft brush.

Inspect, clean and tighten the cable terminal lugs, nut and bolts.

Check the earth cable connection and its termination.

Check the space heater terminal and retighten of its bolts (if equipped).

Closed the unused entries or holes in the terminal box.

Check any abnormal condition of the terminal block (crack or damage).


Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30M4 Rev.2 24 Nov. 2012 Page 580 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Date:

1653/ TWI 756 Att. 30M4 Rev.2 24 Nov. 2012 Page 581 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Check the cover gasket condition.

Check the cable entry and cable gland.

Check the alignment of motor with the pump (or any equipment) and coupling.

Check the tightness of all fixing bolts.

Re-grease the bearings as per manufacturer recommendation.

Check the insulation resistance of the motor windings with 500 Volt Megger and compare
the resistance values with the manufacturer specification.

During measuring the insulation resistance note down the temperature of the motor
windings.

Switch ON the motor and allow it to run for a full load test and check the following:
Performed by: Signature

1653/ TWI 756 Att. 30M4 Rev.2 24 Nov. 2012 Page 582 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30M4 Rev.2 24 Nov. 2012 Page 583 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Check the starting voltage and current.

Motor temperature.

Bearing sound and temperature.

Smooth running and vibration.

Cooling fan sound and air flow.

Motor coupling condition.

Full load voltage and current.

When everything is satisfied, put the motor into the operating programme.

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30M4 Rev.2 24 Nov. 2012 Page 584 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30M4 Rev.2 24 Nov. 2012 Page 585 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30M4 Rev.2 24 Nov. 2012 Page 586 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30M4 Rev.2 24 Nov. 2012 Page 587 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30M4 Rev.2 24 Nov. 2012 Page 588 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30M4 Rev.2 24 Nov. 2012 Page 589 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30M4 Rev.2 24 Nov. 2012 Page 590 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30M4 Rev.2 24 Nov. 2012 Page 591 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Remarks
Dec.

1653/ TWI 756 Att. 30M4 Rev.2 24 Nov. 2012 Page 592 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment ULTRASONIC LEVEL SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Clean the Ultra-sonic level controller thoroughly with cleaner and soft brush.

Clean the Ultra-sonic transmitter.

Check and clean the sensors.

Check the solid connection of the ground cable and tighten.

Paint the sensor enclosure by Anti-corrosive paint (if required).

Tight the sensor cable connections.

Clean and tight electrical connection of the Ultra sonic controller.

Check the programmed setting and adjust it (if required).

Check and clean the display unit and tight electrical connection.

Check the memory back up battery.


1653/ TWI 756 Att. 30N4 Rev.2 24 Nov. 2012 Page 593 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Performed by: Signature

Checked by: Signature

Date:

Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30N4 Rev.2 24 Nov. 2012 Page 594 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30N4 Rev.2 24 Nov. 2012 Page 595 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30N4 Rev.2 24 Nov. 2012 Page 596 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment HUBER LEVEL CONTROL SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Clean the contact maker unit with soft brush.

Tight the electrical connection of the contact maker unit.

Readjust the mercury tube position and return spring.

Check the oil container and the membrane functioning for any abnormal condition or oil leakage.

Clean the quid shaft and spring.

Check the operation of the remote level indicator, clean and adjust (if necessary).

Check all parts of the pneumatic connecting pipe (all the route) for any leakage of air from the airbel, clean and
tight tube joints.

Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30O4 Rev.2 24 Nov. 2012 Page 597 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30O4 Rev.2 24 Nov. 2012 Page 598 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30O4 Rev.2 24 Nov. 2012 Page 599 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30O4 Rev.2 24 Nov. 2012 Page 600 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment CUBICLE Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check the Cubicle and clean the same by using vacuum cleaner.

Tighten the screws for fixing the covers, sheets, barriers, wiring .. etc.

Check the cubicle door for proper closing and locking.


Check the gasket and sealing for all the cubicle doors and shutters and change or clean the air filters
where necessary.

Check the cubicle lighting and space heaters.

Check the cubicle for proper dust and vermin proofing.

Performed by: Signature

Checked by: Signature

Date:

Legend OK
1653/ TWI 756 Att. 30P4 Rev.2 24 Nov. 2012 Page 601 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

N/A Not Applicable

1653/ TWI 756 Att. 30P4 Rev.2 24 Nov. 2012 Page 602 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30P4 Rev.2 24 Nov. 2012 Page 603 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment BUSBARS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check the bus bars, tighten the connection and clean the busbar and the supports.

Clean the post isolators and the bushings and check for any hairline cracks.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30Q4 Rev.2 24 Nov. 2012 Page 604 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30Q4 Rev.2 24 Nov. 2012 Page 605 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.

Equipment DISCONNECTING SWITCHES (ISOLATORS) & DRIVING MECHANISM Location


Tag No.
Monthly Work Order No.
Maintenance Period &
Activity Description
Jan. Feb. Mar. Apr. May. Jun.

Clean the earthing switches and check the tightness of the connection.

Slightly lubricate the contact surface with contact grease and check the operation for proper mating of the contacts.

Check the closing and opening operation under no voltage condition and special attention for the voltage from the other
end.

Check lings, joints etc. and lubricate wherever necessary.

Check the interlock system includes.

Check the earthing switch driving motor (if applicable) for proper load current.

Check the earthing switch position indication (as applicable) mechanically and electrically local and remote.

Earthing trucks (if applicable) to be covered for protection against dust.

1653/ TWI 756 Att. 30R4 Rev.2 24 Nov. 2012 Page 606 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.

Equipment DISCONNECTING SWITCHES (ISOLATORS) & DRIVING MECHANISM Location


Tag No.
Monthly Work Order No.
Maintenance Period &
Activity Description
Jan. Feb. Mar. Apr. May. Jun.

Performed by: Signature

Checked by: Signature

Date:

Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30R4 Rev.2 24 Nov. 2012 Page 607 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
rt No.

ract No. SE/S/135

ion

ance Period & Status


Remarks
Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30R4 Rev.2 24 Nov. 2012 Page 608 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
rt No.

ract No. SE/S/135

ion

ance Period & Status


Remarks
Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30R4 Rev.2 24 Nov. 2012 Page 609 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

- Prepare all proper tools and measuring equipment before starting the work.

Switch OFF the load connected to the MCCB.

Follow the manufacturers instructions to draw out the MCCB.

Clean all parts of MCCB thoroughly by hand blower and soft brush.

Inspect all parts of the MCCB, visually and by hand checking.

Close the MCCB to check the wear of the contacts.

Check the condition of the arc-chute, make sure that the arc chute body is not broken and the separators are
not corroded.

Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30AS4 Rev.2 24 Nov. 2012 Page 610 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Date:

Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30AS4 Rev.2 24 Nov. 2012 Page 611 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30AS4 Rev.2 24 Nov. 2012 Page 612 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30AS4 Rev.2 24 Nov. 2012 Page 613 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment CURRENT TRANSFORMER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Clean and check the insulation.

Check and tighten the secondary connections.

Check current transformer magnetizing curve.


Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30T4 Rev.2 24 Nov. 2012 Page 614 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30T4 Rev.2 24 Nov. 2012 Page 615 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment VOLTAGE TRANSFORMER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check and clean the insulation and tighten the connections.

Check primary contact, clean and slightly lubricate contacts.

Check secondary connection, plugs, secondary circuit MCB, etc tighten secondary connection.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30U4 Rev.2 24 Nov. 2012 Page 616 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30U4 Rev.2 24 Nov. 2012 Page 617 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment BUSBAR/ CABLE/ EARTHING SWITCHES Location
Tag No.
Monthly Work Order No.
Maintenance Period &
Activity Description
Jan. Feb. Mar. Apr. May. Jun.

Clean the earthing switches and check the tightness of the connection.

Slightly lubricate the contact surface with contact grease and check the operation for proper mating of the contacts.

Check the closing and opening operation under no voltage condition and special attention for the voltage from the other
end.

Check lings, joints etc. and lubricate wherever necessary.

Check the interlock system is functional.

Check the earthing switch driving motor (if applicable) for proper load current.

Check the earthing switch position indication (as applicable) mechanically and electrically local and remote.

Earthing trucks (if applicable) to be covered for protection against dust.

1653/ TWI 756 Att. 30V4 Rev.2 24 Nov. 2012 Page 618 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment BUSBAR/ CABLE/ EARTHING SWITCHES Location
Tag No.
Monthly Work Order No.
Maintenance Period &
Activity Description
Jan. Feb. Mar. Apr. May. Jun.

Performed by: Signature

Checked by: Signature

Date:

Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30V4 Rev.2 24 Nov. 2012 Page 619 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
rt No.

ract No. SE/S/135


ion

ance Period & Status


Remarks
Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30V4 Rev.2 24 Nov. 2012 Page 620 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
rt No.

ract No. SE/S/135


ion

ance Period & Status


Remarks
Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30V4 Rev.2 24 Nov. 2012 Page 621 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW)
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area
Contractor Kharafi National KSC (Closed)
Equipment LOCAL PUSH BUTTON
Tag No.
Monthly Work Order No.
Main
Activity Description
Jan. Feb. Mar.

For various equipment at the pump rooms, inflow structure etc. Start / Stop push-button emergency push-button, selector switches, cam and
rotary switches etc.

Switch OFF the MCC unit connected to the local stations.

Open the local station carefully and check visually for any abnormal condition or damages.

Check all wiring termination for loose connection or corrosion effect and adjust it.

Clean all contacts and terminals using contact cleaner and soft brush.

Check the entire conduit holes and clean all hubs,

Check the earthing connection, fitting and earthing cables.

Check the wirings continuity between the push-button station and the related MCC unit in control room using multimeter.

Clean the interior of push-button box by hand blower and soft brush.

1653/ TWI 756 Att. 30W4 Rev.2 24 Nov. 2012 Page 622 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW)
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area
Contractor Kharafi National KSC (Closed)
Equipment LOCAL PUSH BUTTON
Tag No.
Monthly Work Order No.
Main
Activity Description
Jan. Feb. Mar.

Check the cover gasket condition, replace it (if necessary).

Close the push-button cover firmly and test the operation of the control circuit only.

If everything satisfied, put the selector switch in remote position and start in load for testing.

Performed by: Signature

Checked by: Signature

Date:

Legend OK
N/A Not Applicable

1653/ TWI 756 Att. 30W4 Rev.2 24 Nov. 2012 Page 623 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Report No.
Year
Contract No. SE/S/135
Location

Maintenance Period & Status


Remarks
Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30W4 Rev.2 24 Nov. 2012 Page 624 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Report No.
Year
Contract No. SE/S/135
Location

Maintenance Period & Status


Remarks
Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30W4 Rev.2 24 Nov. 2012 Page 625 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment CONTROL PANEL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Switch OFF the load connected to the panel.

Switch OFF the load break switch or MCCB (if Equipped).

Open the panel carefully and check visually for any abnormality.

Clean the interior of the panel using hand air blower and soft brush.

Check all wiring and tighten the termination of all parts.

Check the contactors, thermal overload relay, timer relays and their terminations.

Check fuses and fuse holders.


Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30X4 Rev.2 24 Nov. 2012 Page 626 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment CONTROL PANEL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check push-buttons, emergency stop and rotary switches and termination.

Check the cable entry hubs, sealing door gasket and correct if necessary.

Check / replace indicator light and holder (if necessary).

Close the panel door after last visual check and switch ON the unit.

Check the operation of the starter panel on-load.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30X4 Rev.2 24 Nov. 2012 Page 627 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30X4 Rev.2 24 Nov. 2012 Page 628 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30X4 Rev.2 24 Nov. 2012 Page 629 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW)
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area
Contractor Kharafi National KSC (Closed)

Equipment LIGHTING & POWER DISTRIBUTION BOARD


Tag No.
Monthly Work Order No.

Activity Description
Jan. Feb.

Prepare all proper tools and measuring equipment before staring the maintenance works.

Switch OFF all lighting circuit mcbs in the distribution board.

Switch OFF the incoming supply to the lighting D.B.

Clean the lighting D.B with hand blower and hand brush.

Check the incoming load break switches and its operating handle.

Check the terminal wire and its tightness.

Check the operating of the ELCBs and their terminations.

Check the mcbs and their ON/OFF operation.

Check the mcbs incoming bus bar termination and tighten it.

1653/ TWI 756 Att. 30Y4 Rev.2 24 Nov. 2012 Page 630 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW)
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area
Contractor Kharafi National KSC (Closed)

Equipment LIGHTING & POWER DISTRIBUTION BOARD


Tag No.
Monthly Work Order No.

Activity Description
Jan. Feb.

Check the mcbs outgoing terminal connections.

Check the Neutral bus bar and tighten all wiring termination.

Check the Earth bar and tighten all wiring connection.

Check and retighten all terminal connector wiring.

Check the out door lighting photocell control unit and its connections.

Check the photocell control contactor and its terminations.

Check the voltmeter and voltage selector switch and their wiring connections.
Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30Y4 Rev.2 24 Nov. 2012 Page 631 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW)
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area
Contractor Kharafi National KSC (Closed)

Equipment LIGHTING & POWER DISTRIBUTION BOARD


Tag No.
Monthly Work Order No.

Activity Description
Jan. Feb.

Date:

1653/ TWI 756 Att. 30Y4 Rev.2 24 Nov. 2012 Page 632 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW)
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area
Contractor Kharafi National KSC (Closed)

Equipment LIGHTING & POWER DISTRIBUTION BOARD


Tag No.
Monthly Work Order No.

Activity Description
Jan. Feb.

Repeat all the above steps for checking the power supply circuit of the power outlet socket1-ph and 3-ph.

Switch ON the incoming power supply to the D.B.

Switch ON all ELCBs and MCBs.

Test the ELCBs by pressing the trip button.

Reset the ELCB and put the distribution board in operation.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

1653/ TWI 756 Att. 30Y4 Rev.2 24 Nov. 2012 Page 633 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW)
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area
Contractor Kharafi National KSC (Closed)

Equipment LIGHTING & POWER DISTRIBUTION BOARD


Tag No.
Monthly Work Order No.

Activity Description
Jan. Feb.

N/A Not Applicable

1653/ TWI 756 Att. 30Y4 Rev.2 24 Nov. 2012 Page 634 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Report No.
Year
Contract No. SE/S/135

Location

Maintenance Period & Status


Remarks
Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Y4 Rev.2 24 Nov. 2012 Page 635 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Report No.
Year
Contract No. SE/S/135

Location

Maintenance Period & Status


Remarks
Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Y4 Rev.2 24 Nov. 2012 Page 636 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Report No.
Year
Contract No. SE/S/135

Location

Maintenance Period & Status


Remarks
Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Y4 Rev.2 24 Nov. 2012 Page 637 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Report No.
Year
Contract No. SE/S/135

Location

Maintenance Period & Status


Remarks
Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Y4 Rev.2 24 Nov. 2012 Page 638 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Before starting the maintenance work, prepare all tools and spare parts and measuring equipment.

Switch OFF the motor and draw out its MCC and provide men at work safety label.

Switch OFF the space heater if required.

Inspect the surrounding area and note any dripping of water, fumes, any unusual amount of dust over the motor
body.

Check to make sure grease or oil is not leaking out of the bearings housing.

If any leak is present, check and correct the condition before continuing to operate.

Clean / check the external cooling fan and its proper fixation.

Clean the cooling fan of the stator body with compressed dry air.
Performed by: Signature

1653/ TWI 756 Att. 30Z4 Rev.2 24 Nov. 2012 Page 639 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30Z4 Rev.2 24 Nov. 2012 Page 640 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Clean the bells of the motor and fan cover.

Open the terminal box and check the interior area and the walls, clean and blow off any residues as follows :

Clean the inner sides by soft brush.

Inspect, clean and tighten the cable terminal lugs, nut and bolts.

Check the earth cable connection and its termination.

Check the space heater terminal and retighten of its bolts (if equipped).

Closed the unused entries or holes in the terminal box.

Check any abnormal condition of the terminal block (crack or damage).


Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30Z4 Rev.2 24 Nov. 2012 Page 641 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Date:

1653/ TWI 756 Att. 30Z4 Rev.2 24 Nov. 2012 Page 642 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Check the cover gasket condition.

Check the cable entry and cable gland.

Check the alignment of motor with the pump (or any equipment) and coupling.

Check the tightness of all fixing bolts.

Regrease the bearings as per manufacturer recommendation.

Check the insulation resistance of the motor windings with 500 Volt Megger and compare the resistance values
with the manufacturer specification.

During measuring the insulation resistance note down the temperature of the motor windings.

Switch ON the motor and allow it to run for a full load test and check the following:
Performed by: Signature

1653/ TWI 756 Att. 30Z4 Rev.2 24 Nov. 2012 Page 643 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30Z4 Rev.2 24 Nov. 2012 Page 644 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Check the starting voltage and current.

Motor temperature.

Bearing sound and temperature.

Smooth running and vibration.

Cooling fan sound and air flow.

Motor coupling condition.

Full load voltage and current.

When everything is satisfied, put the motor into the operating programmed.

Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30Z4 Rev.2 24 Nov. 2012 Page 645 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment ELECTRIC MOTORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30Z4 Rev.2 24 Nov. 2012 Page 646 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Z4 Rev.2 24 Nov. 2012 Page 647 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Z4 Rev.2 24 Nov. 2012 Page 648 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Z4 Rev.2 24 Nov. 2012 Page 649 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Z4 Rev.2 24 Nov. 2012 Page 650 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Z4 Rev.2 24 Nov. 2012 Page 651 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Z4 Rev.2 24 Nov. 2012 Page 652 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Z4 Rev.2 24 Nov. 2012 Page 653 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Z4 Rev.2 24 Nov. 2012 Page 654 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment DIESEL GENERATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check the lubricant oil level and inspect the pre-lubrication pump operation (if equipped).

Check the fuel level.

Check the water level in the radiator tank and make-up water tank.

Drain the water and sediments from the air compressor and air charging system (if it is air starting
system).

Check the air pressure in the air tank, test the diesel air compressor (if equipped).

Check the air cleaner indicator and clean the engine.

Check the jacket water heater and its operation.

Check the jacket water heater circulation pump (if equipped).


Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30A5 Rev.2 24 Nov. 2012 Page 655 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment DIESEL GENERATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Date:

1653/ TWI 756 Att. 30A5 Rev.2 24 Nov. 2012 Page 656 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment DIESEL GENERATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check the 24 Volts D.C batteries and clean units, terminals and apply a thin layer of petroleum jelly.

Check the electrolyte level of the battery and top-up with distilled water if its found low.

Isolate the control panel and carry-out the following works :

Clean the control panel interiors.

Check and tighten the control panel wiring and connection.

Check the space heater condition of the alternator in the internal electrical equipment of the control panel.

Run the D.G set in manual mode without load and inspect the engine operation.

Note down all the meter readings.

Stop the D.G set and put it in Aut. Position.


Performed by: Signature

1653/ TWI 756 Att. 30A5 Rev.2 24 Nov. 2012 Page 657 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment DIESEL GENERATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30A5 Rev.2 24 Nov. 2012 Page 658 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment DIESEL GENERATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Inspect the pre-lubrication oil pump and all lubrication system for any leakage.

Inspect fuel system for any leakage.

Drain the sediments in the diesel tank.

Check the air filter indicator, if necessary clean the air filter.

Check the radiator, tank cooling fan motor (if equipped).

Check the D.G. set incomer breakers and clean it.

Check and clean the power transformer (3.3 k.v / 415 Volts) and its oil level (if equipped).

Check the color of the sficajel in transformer.

Run the D.G set in Auto mode with load.

Note all the meter readings.


Performed by: Signature

1653/ TWI 756 Att. 30A5 Rev.2 24 Nov. 2012 Page 659 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment DIESEL GENERATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Checked by: Signature

Date:

1653/ TWI 756 Att. 30A5 Rev.2 24 Nov. 2012 Page 660 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment DIESEL GENERATOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check the D.G set performance and vibration.

Check the engine speed sensor.

Check the automatic voltage regulator (AVR) operation.

Check the automatic transformer switch (ATS) operation.

Check the overhead radiator unit and its cooling fan motor operation.

Stop the D.G set and put it in Aut. Position.


Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30A5 Rev.2 24 Nov. 2012 Page 661 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30A5 Rev.2 24 Nov. 2012 Page 662 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30A5 Rev.2 24 Nov. 2012 Page 663 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30A5 Rev.2 24 Nov. 2012 Page 664 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30A5 Rev.2 24 Nov. 2012 Page 665 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30A5 Rev.2 24 Nov. 2012 Page 666 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30A5 Rev.2 24 Nov. 2012 Page 667 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30A5 Rev.2 24 Nov. 2012 Page 668 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment ULTRASONIC LEVEL SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Clean the Ultra-sonic level controller thoroughly with cleaner and soft brush.

Clean the Ultra-sonic transmitter.

Check and clean the sensors.

Check the solid connection of the ground cable and tighten.

Paint the sensor enclosure by Anti-corrosive paint (if required).

Tight the sensor cable connections.

Clean and tight electrical connection of the Ultra sonic controller.


Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30B5 Rev.2 24 Nov. 2012 Page 669 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment ULTRASONIC LEVEL SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check the programmed setting and adjust it (if required).

Check and clean the display unit and tight electrical connection.

Check the memory back up battery.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30B5 Rev.2 24 Nov. 2012 Page 670 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30B5 Rev.2 24 Nov. 2012 Page 671 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30B5 Rev.2 24 Nov. 2012 Page 672 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment HUBER LEVEL SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Clean the contact maker unit with soft brush.

Tight the electrical connection of the contact maker unit.

Readjust the mercury tube position and return spring.

Check the oil container and the membrane functioning for any abnormal condition or oil leakage.- Clean the
quid shaft and spring.

Check the operation of the remote level indicator, clean and adjust (if necessary).

Check all parts of the pneumatic connecting pipe (all the route) for any leakage of air from the airbel, clean and
tight tube joints.

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30C5 Rev.2 24 Nov. 2012 Page 673 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30C5 Rev.2 24 Nov. 2012 Page 674 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30C5 Rev.2 24 Nov. 2012 Page 675 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment AUTOMATIC TRANSFER SWITCH Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Switch OFF the load connected to the panel.

Switch OFF the load break switch or MCCB to the ATS.

Open the panel carefully and check visually for any abnormality.

Clean the interior of the panel using hand air blower and soft brush.

Check all wiring and tighten the termination of all parts.

Check the contactors, phase failure relays, timer relays and their terminations.

Check fuses and fuse holders.

Check selector switches and rotary switches.


Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30D5 Rev.2 24 Nov. 2012 Page 676 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment AUTOMATIC TRANSFER SWITCH Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Date:

1653/ TWI 756 Att. 30D5 Rev.2 24 Nov. 2012 Page 677 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment AUTOMATIC TRANSFER SWITCH Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Check manual bypass connections

Check the bus bar connections for tightness.

Check the cable entry hubs, sealing door gasket and correct if necessary.

Check / replace indicator light and holder (if necessary).

Close the panel door after last visual check and switch ON the panel.

Check the operation of the ATS on different modes, if satisfactory keep in AUTO / NORMAL position.

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30D5 Rev.2 24 Nov. 2012 Page 678 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No. SE/S/135
Equipment AUTOMATIC TRANSFER SWITCH Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep.

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30D5 Rev.2 24 Nov. 2012 Page 679 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30D5 Rev.2 24 Nov. 2012 Page 680 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30D5 Rev.2 24 Nov. 2012 Page 681 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

tus
Remarks
Oct. Nov. Dec.

1653/ TWI 756 Att. 30D5 Rev.2 24 Nov. 2012 Page 682 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment VERTICAL PUMPS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Sta
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Check and inspect coupling

Check and inspect bearings, re-grease where necessary

Check pipe and connections for any leaks or cracks

Check for any corrosion of parts

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and air ways.

Check the motor for over heating & any abnormal sound

Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30E5 Rev.2 24 Nov. 2012 Page 683 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30E5 Rev.2 24 Nov. 2012 Page 684 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30E5 Rev.2 24 Nov. 2012 Page 685 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30E5 Rev.2 24 Nov. 2012 Page 686 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment DOSING PUMP Location
Tag No.
Monthly Work Order No.
Maintenance Period & St
Activity Description
Jan. Feb. Mar. Apr. May. Jun.

Check and clean dosing pump NRVs for scaling

Check and correct all diaphragm stop valves

Check dosing head for any wear and crack condition

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and air ways.

Check the motor for over heating & any abnormal sound

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30F5 Rev.2 24 Nov. 2012 Page 687 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30F5 Rev.2 24 Nov. 2012 Page 688 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
rt No.

ract No. SE/S/135


ion

ance Period & Status


Remarks
Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30F5 Rev.2 24 Nov. 2012 Page 689 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30F5 Rev.2 24 Nov. 2012 Page 690 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment BOOSTER PUMP SET Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check & inspect coupling.

Check all pipe connections for any sign of crack or leakage

Check all foundation fittings

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and air ways.

Check the motor for over heating & any abnormal round

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30G5 Rev.2 24 Nov. 2012 Page 691 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30G5 Rev.2 24 Nov. 2012 Page 692 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30G5 Rev.2 24 Nov. 2012 Page 693 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30G5 Rev.2 24 Nov. 2012 Page 694 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment CHLORINE DRUM VALVE Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check and clean any deposits in the valve and pipe areas

Repaint any corroding parts

Replace gaskets and clean threaded areas

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30G5 Rev.2 24 Nov. 2012 Page 695 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30G5 Rev.2 24 Nov. 2012 Page 696 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment DIAPHRAM STOP VALVE Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check and clean any deposits in the valve spring area

Replace gaskets and clean threaded areas

Check for damage of diaphragm and replace as necessary

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30I5 Rev.2 24 Nov. 2012 Page 697 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30I5 Rev.2 24 Nov. 2012 Page 698 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment MAIN CONTROLLER VALVE Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check and clean any deposits in the valve spring areas

Replace seal rings and clean threaded areas

Check for damage of diaphragm and replace as necessary

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Check the motor for over heating & any abnormal round

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30J5 Rev.2 24 Nov. 2012 Page 699 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30J5 Rev.2 24 Nov. 2012 Page 700 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30J5 Rev.2 24 Nov. 2012 Page 701 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30J5 Rev.2 24 Nov. 2012 Page 702 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment SAFETY VALVE Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check and clean any deposits in the valve spring area

Check for proper tension of spring and safety closing

Replace gaskets and clean threaded areas

Check for damage of diaphragm and replace as necessary

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30K5 Rev.2 24 Nov. 2012 Page 703 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30K5 Rev.2 24 Nov. 2012 Page 704 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment PRE-CONTROLLER VALVE Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Check and clean any deposits in the valve spring area

Check for proper tension of spring and safety closing

Replace gaskets and clean threaded areas

Check for damage of diaphragm and replace as necessary

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30L5 Rev.2 24 Nov. 2012 Page 705 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30L5 Rev.2 24 Nov. 2012 Page 706 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment VENTITATORS FAN V100 Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Clean and replace the intake air filters and pre-filters as necessary

Clean and inspect wear and tear of V-belts and pulley alignments

Greasing of motor bearings

Check all fasteners for tightness

Clean and remove any leaks from duct connections

Check functioning of pressure indicators

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and air ways.

1653/ TWI 756 Att. 30M5 Rev.2 24 Nov. 2012 Page 707 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Check the motor for over heating & any abnormal sound

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30M5 Rev.2 24 Nov. 2012 Page 708 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30M5 Rev.2 24 Nov. 2012 Page 709 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30M5 Rev.2 24 Nov. 2012 Page 710 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment VENTITATORS FAN V200 Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Clean and replace the intake air filters and prefilters as necessary

Clean and inspect wear and tear of V-belts and pulley allignment

Greasing of motor bearings

Check all fasteners for tightness

Clean and remove any leaks from duct connections

Check functioning of pressure indicators

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and air ways.

1653/ TWI 756 Att. 30N5 Rev.2 24 Nov. 2012 Page 711 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Check the motor for over heating & any abnormal sound.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30N5 Rev.2 24 Nov. 2012 Page 712 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30N5 Rev.2 24 Nov. 2012 Page 713 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30N5 Rev.2 24 Nov. 2012 Page 714 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment VENTITATORS FAN V300 Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Clean and replace the intake air filters and pre-filters as necessary

Clean and inspect wear and tear of V-belts and pulley alignment

Greasing of motor bearings

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and air ways.

Check the motor for over heating & any abnormal sound.

Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30O5 Rev.2 24 Nov. 2012 Page 715 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30O5 Rev.2 24 Nov. 2012 Page 716 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30O5 Rev.2 24 Nov. 2012 Page 717 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30O5 Rev.2 24 Nov. 2012 Page 718 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment ACID FEED PUMP Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Check all fasteners for tightness

Check the peristaltic hose for any wear and tear

Greasing of drive motor bearing

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and air ways.

Check the motor for over heating & any abnormal sound

Performed by: Signature

Checked by: Signature

1653/ TWI 756 Att. 30P5 Rev.2 24 Nov. 2012 Page 719 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30P5 Rev.2 24 Nov. 2012 Page 720 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30P5 Rev.2 24 Nov. 2012 Page 721 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30P5 Rev.2 24 Nov. 2012 Page 722 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment CAUSTIC SODA FEED PUMP Location
Tag No.
Monthly Work Order No.
Maintenance Period & Sta
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Check all fasteners for tightness

Check the peristaltic hose for any wear and tear

Greasing of drive motor bearing

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and air ways.

Check the motor for over heating & any abnormal sound

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30Q5 Rev.2 24 Nov. 2012 Page 723 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30Q5 Rev.2 24 Nov. 2012 Page 724 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Q5 Rev.2 24 Nov. 2012 Page 725 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30Q5 Rev.2 24 Nov. 2012 Page 726 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment ELECTRIC HOIST Location
Tag No.
Monthly Work Order No.
Maintenance Period & S
Activity Description
Jan. Feb. Mar. Apr. May. Jun.

Check hosting gear break readjust if necessary.

Grease wire rope, rope guide ring and sliding surface of rope guide ring stop.

Check drive units screw joints, welding seams, buffers of carriage and end stop of monorail.

Check power supply including flexible liners

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and air ways.

Check the motor for over heating & any abnormal sound

Performed by: Signature

1653/ TWI 756 Att. 30R5Rev.2 24 Nov. 2012 Page 727 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30R5Rev.2 24 Nov. 2012 Page 728 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
rt No.

ract No. SE/S/135


ion

ance Period & Status


Remarks
Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30R5Rev.2 24 Nov. 2012 Page 729 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30R5Rev.2 24 Nov. 2012 Page 730 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment VALVES (MOV) Location
Tag No.
Monthly Work Order No.
Maintenance Period & S
Activity Description
Jan. Feb. Mar. Apr. May. Jun.

Greasing all gears in motorized valves

Check and Inspect for damage to the diaphragm for the chemical valves

Check and clean any deposits in the valve insert areas

Lubricate all moving parts

All fasteners check for tightness

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and coating ducts.

Check the motor for over heating & any abnormal sound

1653/ TWI 756 Att. 30S5 Rev.2 24 Nov. 2012 Page 731 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30S5 Rev.2 24 Nov. 2012 Page 732 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
rt No.

ract No. SE/S/135


ion

ance Period & Status


Remarks
Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30S5 Rev.2 24 Nov. 2012 Page 733 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30S5 Rev.2 24 Nov. 2012 Page 734 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment PRESSURE INDICATOR GAUGES Location
Tag No.
Monthly Work Order No.
Maintenance Period & S
Activity Description
Jan. Feb. Mar. Apr. May. Jun.

Electrical

Visually inspect the gauge for physical condition.

Isolate and check functioning of pressure gauges

Check for alarm and cut off settings


Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30T5 Rev.2 24 Nov. 2012 Page 735 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
rt No.

ract No. SE/S/135


ion

ance Period & Status


Remarks
Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30T5 Rev.2 24 Nov. 2012 Page 736 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment EXTRACTION FAN Location
Tag No.
Monthly Work Order No.
Maintenance Period & S
Activity Description
Jan. Feb. Mar. Apr. May. Jun.

Clean and replace the intake air filters and pre-filters as necessary

Clean and inspect wear and tear of V-belts and pulley alignment

Greasing of motor bearings

Check all fasteners for tightness

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and air ways.

Check the motor for over heating & any abnormal sound

Performed by: Signature

Checked by: Signature

Date:

Legend OK

1653/ TWI 756 Att. 30U5 Rev.2 24 Nov. 2012 Page 737 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

N/A Not Applicable

1653/ TWI 756 Att. 30U5 Rev.2 24 Nov. 2012 Page 738 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
rt No.

ract No. SE/S/135


ion

ance Period & Status


Remarks
Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30U5 Rev.2 24 Nov. 2012 Page 739 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30U5 Rev.2 24 Nov. 2012 Page 740 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment PREFILTER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Sta
Activity Description
Jan. Feb. Mar. Apr. May. Jun.

Check and clean pre-filter frame and internals


Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30V5 Rev.2 24 Nov. 2012 Page 741 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
rt No.

ract No. SE/S/135


ion

ance Period & Status


Remarks
Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30V5 Rev.2 24 Nov. 2012 Page 742 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment GAS DETECTOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Clean the controller.

Clean the sensors.

Check the terminations in sensors.

Check the terminations in the controller.

Switch On and put in operation.

Calibrate detector against gases in cylinders.

Replace batteries as necessary

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30W5 Rev.2 24 Nov. 2012 Page 743 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30W5 Rev.2 24 Nov. 2012 Page 744 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment VENTILATION FAN Location
Tag No.
Monthly Work Order No.
Maintenance Period & St
Activity Description
Jan. Feb. Mar. Apr. May. Jun.

Greasing of bearings

Check all fasteners for tightness

Clean and remove any leaks from duct connections

Electrical

Visually inspect the motor for physical condition.

Check the motor for over heating & any abnormal sound

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30X5 Rev.2 24 Nov. 2012 Page 745 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
rt No.

ract No. SE/S/135


ion

ance Period & Status


Remarks
Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30X5 Rev.2 24 Nov. 2012 Page 746 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment PRE-FILTER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Sta
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Check and clean pre-filter frame and internals


Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30Y5 Rev.2 24 Nov. 2012 Page 747 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Y5 Rev.2 24 Nov. 2012 Page 748 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment RECYCLE PUMPS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Statu
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Check and inspect flexible coupling

Check and inspect bearings, re-grease where necessary

Check pipe and connections for any leaks or cracks

Check for any corrosion of parts

Electrical

Visually inspect the motor for physical condition.

Open & check the motor supply terminal box for heat up & tighten.

Visual inspection for cooling fan and air ways.

Check the motor for over heating & any abnormal sound.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

1653/ TWI 756 Att. 30Z5 Rev.2 24 Nov. 2012 Page 749 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

N/A Not Applicable

1653/ TWI 756 Att. 30Z5 Rev.2 24 Nov. 2012 Page 750 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30Z5 Rev.2 24 Nov. 2012 Page 751 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment ELECTRICAL SWITCH BOARD Location
Tag No.
Monthly Work Order No.
Maintenance Period & Statu
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Clean the panel externally.

Clean the modules.

Check the indication bulbs.

Check all wiring & terminations.

Test the module and switch ON.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30A6 Rev.2 24 Nov. 2012 Page 752 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30A6 Rev.2 24 Nov. 2012 Page 753 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment ELECTRICAL CONTROL-BOARD Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Switch off the Power supply from MSB/MCC.

Clean the control panel.

Check the terminations.

Check the MCBs.

Check the push buttons.

Check the indication bulb.

Check the control relays.

Check the control wiring.

Check the pressure switch, limit switch,

Proximity switch etc., connections with the control panel.

Check the door and door locks

Put the panel into operation.

Performed by: Signature

1653/ TWI 756 Att. 30B6 Rev.2 24 Nov. 2012 Page 754 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30B6 Rev.2 24 Nov. 2012 Page 755 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30B6 Rev.2 24 Nov. 2012 Page 756 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30B6 Rev.2 24 Nov. 2012 Page 757 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment AUXILLARY PANNEL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Stat
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Switch off the Power supply from MSB/MCC.

Clean the auxiliary panel.

Check the terminations.

Check the MCBs.

Check the push buttons.

Check the indication bulb.

Check the control relays.

Check the control wiring.

Check the pressure switch, limit switch,

Proximity switch etc., connections with the control panel.

Check the door and door locks

Put the panel into operation.

Performed by: Signature

1653/ TWI 756 Att. 30C6 Rev.2 24 Nov. 2012 Page 758 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30C6 Rev.2 24 Nov. 2012 Page 759 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30C6 Rev.2 24 Nov. 2012 Page 760 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30C6 Rev.2 24 Nov. 2012 Page 761 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment MIMIC PANEL Location
Tag No.
Monthly Work Order No.
Maintenance Period & Sta
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Switch off the Power supply from MSB/MCC.

Clean the auxiliary panel.

Check the terminations.

Check the MCBs.

Check the push buttons.

Check the indication bulb.

Check the control relays.

Check the control wiring.

Check the pressure switch, limit switch,

Proximity switch etc., connections with the control panel.

Check the door and door locks

Put the panel into operation.

Performed by: Signature

1653/ TWI 756 Att. 30D6 Rev.2 24 Nov. 2012 Page 762 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30D6 Rev.2 24 Nov. 2012 Page 763 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30D6 Rev.2 24 Nov. 2012 Page 764 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30D6 Rev.2 24 Nov. 2012 Page 765 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Switch OFF the load connected to the circuit breaker, and de-energize.

Clean all parts of CB thoroughly by hand blower and soft brush.

Inspect all parts of the CB, visually and by hand checking.

Close the CB to check the wear of the contacts.


Check the condition of the arc-chute, make sure that the arc chute body is not broken and the separators are not
corroded.

Check the protection unit, display and adjustment of each parameters, reprogramme it if required.

Check the ammeter function of the protection unit for the parameters Ir, Tr, Im, I, In, th, and follow the
manufacturer procedures for readjusting them if required.
Store the correct parameter programmed and lock the settings

Insert the ACB-unit firmly in panel and check the following:

Open and close the breaker locally and remotely using the different auxiliaries successively,

Test the order channels.

Test the operation of the control unit with the mini test-kit.

Check the control unit with the complete test-kit.

1653/ TWI 756 Att. 30E6 Rev.2 24 Nov. 2012 Page 766 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Check the geared motor power supply.

Test the protection of the network for overload, short circuit and earth faults.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30E6 Rev.2 24 Nov. 2012 Page 767 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30E6 Rev.2 24 Nov. 2012 Page 768 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30E6 Rev.2 24 Nov. 2012 Page 769 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment MOTOR Location
Tag No.
Monthly Work Order No.
Maintenance Period & Sta
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Switch OFF the motor


Inspect the surrounding area and check for any dripping of water, fumes, any unusual amount of dust over the motor
body.

Clean / check the external cooling fan its proper fixation.

Open the terminal box and check the interior area and the walls, clean and blow of any residues as follows :

Clean the inner sides by soft brush

Inspect, clean and tighten the cable terminal lugs, nut and bolts.

Check the earth cable connection and its termination.

Check the space heater terminal and retighten of its bolts (if equipped).

Closed the unused entries or holes in the terminal box.

Check any abnormal condition of the terminal block (crack or damage).

Check the cover gasket condition.

Check the cable entry and cable gland.


Check the insulation resistance of the motor windings with 500 Volt Megger and compare the resistance values with
the manufacturer specification.
1653/ TWI 756 Att. 30F6 Rev.2 24 Nov. 2012 Page 770 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Switch ON the motor and allow it to run for a full load test and check the following:

Check the starting voltage and current.

Full load voltage and current.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30F6 Rev.2 24 Nov. 2012 Page 771 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30F6 Rev.2 24 Nov. 2012 Page 772 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30F6 Rev.2 24 Nov. 2012 Page 773 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment VALVE ACTUATORS Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Switch off the Power supply.

Clean the Actuators.

Check the terminations.

Switch On the Power supply.

Check the local operations.

Check the remote operations.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30G6 Rev.2 24 Nov. 2012 Page 774 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30G6 Rev.2 24 Nov. 2012 Page 775 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment LIGHTING Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Check all lighting switches.

Check all light fittings.

Check the socket outlet.

Check all junction boxes.

Check all exhaust fans.

Check the terminations in socket outlet.

Check the terminations in junction boxes.

Check the terminations in the light fittings.

Check the light fitting control gear.

Check the earthing of light fittings

Performed by: Signature

Checked by: Signature

Date:

1653/ TWI 756 Att. 30H6 Rev.2 24 Nov. 2012 Page 776 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30H6 Rev.2 24 Nov. 2012 Page 777 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30H6 Rev.2 24 Nov. 2012 Page 778 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30H6 Rev.2 24 Nov. 2012 Page 779 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment PH Measuring Electrode Location
Tag No.
Monthly Work Order No.
Maintenance Period & Statu
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Disconnect and remove the sensor.

Clean the sensor with distilled water.

Clean the membrane head of the electrode.

Check the supports of the sensors.

Connect the sensor with the analyzer.

Calibrate pH sensor against buffer solutions

Wait for the sensor reading to stabilize

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30I6 Rev.2 24 Nov. 2012 Page 780 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30I6 Rev.2 24 Nov. 2012 Page 781 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment RH MEASURING ELECTRODE Location
Tag No.
Monthly Work Order No.
Maintenance Period & S
Activity Description
Jan. Feb. Mar. Apr. May. Jun.

Clean the analyzer unit.

Disconnect and remove the sensor.

Clean the sensor with distilled water.

Clean the membrane head of the electrode.

Check the supports of the sensors.

Connect the sensor with the analyzer.

Calibrate rH sensor against multimeter settings

Wait for the sensor reading to stabilize.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30J6 Rev.2 24 Nov. 2012 Page 782 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
rt No.

ract No. SE/S/135


ion

ance Period & Status


Remarks
Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30J6 Rev.2 24 Nov. 2012 Page 783 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment CHLORINE GAS ANALYSER Location
Tag No.
Monthly Work Order No.
Maintenance Period &
Activity Description
Jan. Feb. Mar. Apr. May. Jun.

Clean the controller.

Clean the sensors.

Check the terminations in sensors.

Check the terminations in the controller.

Top up with the KI solution prepared in Laboratory.

Calibrate detector against gases in cylinders.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30K6 Rev.2 24 Nov. 2012 Page 784 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
rt No.

ract No. SE/S/135


ion

ance Period & Status


Remarks
Jul. Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30K6 Rev.2 24 Nov. 2012 Page 785 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment CHLORINE CYLINDER WEIGHING SYSTEM Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul.

Clean the display unit.

Clean the load cell.

Check the fixing of the load cells.

Calibrate dial readings based on test weights

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30L6 Rev.2 24 Nov. 2012 Page 786 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

o. SE/S/135

Period & Status


Remarks
Aug. Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30L6 Rev.2 24 Nov. 2012 Page 787 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment ELECTRICAL SWITCHBOARD Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Clean the panel externally.

Clean the modules.

Check the indication bulbs.

Check all wiring & terminations.

Test the module and switch ON.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30M6 Rev.2 24 Nov. 2012 Page 788 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30M6 Rev.2 24 Nov. 2012 Page 789 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT
Client Ministry of Public Works (MPW) Report No.
Project MPW-O&M of Sewage Pumping & Lifting Station-2 Area Year
Contractor Kharafi National KSC (Closed) Contract No.
Equipment CIRCUIT BREAKER Location
Tag No.
Monthly Work Order No.
Maintenance Period & Status
Activity Description
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug.

Switch OFF the load connected to the circuit breaker, and de-energize it.

Clean all part of CB thoroughly by hand blower and soft brush.

Inspect all part of the CB, visually and by hand checking.

Close the CB to check the wear of the contacts.


Check the condition of the arc-chute, make sure that the arc chute body is not broken and the separators are
not corroded.

Check the protection unit, display and adjustment of each parameters, reprogramme it if required.
Check the ammeter function of the protection unit for the parameters Ir, Tr, Im, I, In, th, and follow the
manufacturer procedures for readjusting them if required.

Store the correct parameter programmed and lock the settings

Insert the ACB-unit firmly in panel and check the following:

Open and close the breaker locally and remotely using the different auxiliaries successively,

Test the order channels.

Test the operation of the control unit with the mini test-kit.

Check the control unit with the complete test-kit.

1653/ TWI 756 Att. 30N6 Rev.2 24 Nov. 2012 Page 790 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

Check the geared motor power supply.

Test the protection of the network for overload, short circuit and earth faults.

Performed by: Signature

Checked by: Signature

Date:

Legend OK

N/A Not Applicable

1653/ TWI 756 Att. 30N6 Rev.2 24 Nov. 2012 Page 791 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

SE/S/135

& Status
Remarks
Sep. Oct. Nov. Dec.

1653/ TWI 756 Att. 30N6 Rev.2 24 Nov. 2012 Page 792 of 793
KHARAFI NATIONAL MONTHLY MAINTENANCE REPORT

1653/ TWI 756 Att. 30N6 Rev.2 24 Nov. 2012 Page 793 of 793