MOP for UL850 script

___________________________________
VHA Transmission Integration Centre

Contents
1 About This Document .............................................................................................................................. 3
1.1 Purpose of Document...................................................................................................................... 3
1.2 Document Control ........................................................................................................................... 3
1.3 Document Change Control .............................................................................................................. 3
1.4 Referenced Documents ................................................................................................................... 3
1.5 Document Audience ........................................................................................................................ 3
2 Document References and Checklist....................................................................................................... 4
2.1 Document Abbreviations................................................................................................................. 4
3. Work Process ............................................................................................................................................... 5
4. UL850 concept ............................................................................................................................................. 7
4.1. Scenarios .............................................................................................................................................. 7
4.2. Design and script location .................................................................................................................... 7
5. UL850 Script ................................................................................................................................................ 9
5.1. Check current transmission .................................................................................................................. 9
5.2. Pre-check for IP duplication then load script. ...................................................................................... 9
6. Escalation contact Point ............................................................................................................................ 10

Page 2 of 10 C3 - Private & Confidential / Confidential


VHA Transmission Integration Centre

1 About This Document


1.1 Purpose of Document
The purpose of this MOP is to provide a process and guideline for script for UL850 Project on VHA TX
network.

1.2 Document Control


Author Owners
Name: Sung-Jin LIM
Title: RAN integration Controller
Email: sungjin.lim@vodafone.com.au
Phone: 0414 478 792

1.3 Document Change Control


Version Date Description Author
1.0 24th July 2014 Initial Sung-Jin LIM
1.1 4th Aug 2014 Change the diaram Sung-Jin LIM

1.4 Referenced Documents


The following documents are either referenced within this document or are related to this document and
may provide useful reading and additional clarification:

Document Version Location

1.5 Document Audience


The following groups should refer to this document:

VHA TIC

Page 3 of 10 C3 - Private & Confidential / Confidential


VHA Transmission Integration Centre

2 Document References and Checklist


2.1 Document Abbreviations
Abbreviation Definition

Page 4 of 10 C3 - Private & Confidential / Confidential


VHA Transmission Integration Centre

3. Work Process

PM Design TIC
team

PM send next Design team


week site lists on release script
Monday daily basis

Create new Yes Load the script


design and
CX script

New script is
on right TX ?
No
TIC sends email to design
team for the existing TX.
Yes

Load the script


and update in the
tracker at the end
of week.

Page 5 of 10 C3 - Private & Confidential / Confidential


VHA Transmission Integration Centre

Page 6 of 10 C3 - Private & Confidential / Confidential


VHA Transmission Integration Centre

4. UL850 concept
4.1. Scenarios
Scenario A 1) Site has U900, U850 and U2100 in one 3G BBU and L1800, give new
UL850 IP address in 3G range.

Scenario A 2) Site has two BBU for U900, U850 and U2100 and L1800, no work
required.

Scenario B Site has U900, U850 in one BBU and L1800, give a 2 nd BBU IP in 3G
range.

Page 7 of 10 C3 - Private & Confidential / Confidential


VHA Transmission Integration Centre

Scenario C 1) Site has U900, U850 and U2100 and no LTE on site. Give a UL850 IP
address in 4G range.

Scenario C 2) Site has two BBU for U900, U850 and U2100 and no LTE on site. Give
a UL850 IP address in 4G range for 2nd BBU and migrate 2nd BBU by using 4G IP.

Scenario D Site has one BBU for U900, U850 and no LTE on site. Give a UL850 IP
address in 4G range and integrate 2nd BBU by using 4G IP.

4.2. Design and script location : J:\02_Design\Logical Design\UL850


LDD & Scripts

Page 8 of 10 C3 - Private & Confidential / Confidential


VHA Transmission Integration Centre

5. UL850 Script
5.1. Check current transmission
a. Check existing 3G VLAN and double check with design.
Command: LST VLANMAP

5.2. Pre-check for IP duplication then load script.


a. Duplicate IP address
- Command: Shutdown your interface if it is not migrated, then double check IP
address (Display IP routing-table xxx.xxx.xxx.xxx )

If you cant see any line, it means there is no duplicate IP address. Then load the
script.

Page 9 of 10 C3 - Private & Confidential / Confidential


VHA Transmission Integration Centre

6. Escalation contact Point


Role Name Email
PM Simon Miles simon.miles@vodafone.com.au
Design Jaraspong
Team Saengmanee Jaraspong.Saengmanee@vodafone.com.au
TIC Sung-Jin LIM sungjin.lim@vodafone.com.au

Page 10 of 10 C3 - Private & Confidential / Confidential