You are on page 1of 10

Running casing 9-4

) ( casing

) ( pipe rack
) ( rotary table .

)Figure (4-N

54 Casing Design Correction for Well (w5-8) in wafa field


2003-2004
:

4-9-1 Stabbing
((driller & derrick man
) ) coupling
( (stabbing board
.((coupling
.

4.9.2 Making up :
) (power tang

Figure
)(4-O
.

55 Casing Design Correction for Well (w5-8) in wafa field


2003-2004
)Figure (4- Q

) (stop position ) (coupling
) (coupling )
(optimum torque )(API
, ( ( optimum torque
.((casing
) )coupling
) ( maximum torque ) ( coupling
) ( maximum torque
( (max-torque .
) ( Min-torque %75 ) .(optimum torque
) (Max-torque ) . (optimum torgue125%
Lowering casing 3-9-4
.1 ) (grades
) ( weight lb/ft .
.2 ) (joint 10-6
) (fill up liner ) (Float collar or float shoe
) (automatic fill up liner .

56 Casing Design Correction for Well (w5-8) in wafa field


2003-2004
.3

.
.4
((Break circulation

). (one or two bottoms up
.5
,

) (one bottom up


.

57 Casing Design Correction for Well (w5-8) in wafa field


2003-2004
10-4 -:
Effects of external pressure 1-10-4



,
),( plastic failure

) ( elastic deformation
)collapse
( resistance .

:
))( hole (ID), casing (OD
)(casing grade
.
)( weight lb/ft
)(Casing O.D
)(API-collapse resistance
)(API-burst resistance

Effect of internal pressure 2-10-4 :


) (formation fluid
)
( squeezing cement
.

58 Casing Design Correction for Well (w5-8) in wafa field


2003-2004


)
(


) ( burst pressure
): ( Barlow
Pb= 2St / de

= Pb )/ (.
) / ( . = S
) (. = T

.


. ) (Ym

) (API )%(12.5
.
: Pi

Pi =2Ym t(1- 0.125) /de = 1.75Ym t/de

Effect of axial loading 3.10.4


:

59 Casing Design Correction for Well (w5-8) in wafa field


2003-2004
- .
- ,
). (Ym


) (API .
:
Fa= Ym. Aj
=Fa )(.
=Ym )/ (.
=Aj )(.
:
)Aj= (t-h) (de-t-h
11-4 :
Design of combination casing string
))
((


,
) ( longitudinal yielding
.



. Pws

60 Casing Design Correction for Well (w5-8) in wafa field


2003-2004

:
Pi= Pws Ni


) (.



Pc=0.052Nc.P. Ls
:

=Ls ).(ft

=P ).(lb/gal

lb/gal). =Nc )


.

,
.

61 Casing Design Correction for Well (w5-8) in wafa field


2003-2004
12.4 :
Casing setting depth guideline
:
General casing setting depth guidelines



.

.

.
) (R-4
-:
) ( lithology



psi)200 (400
) ( over balance
) . ( where applicable

) (ppg0.35 - ppg0.3 ) (ECD
.
)) LOT'S
.

62 Casing Design Correction for Well (w5-8) in wafa field


2003-2004
:
)(A -
) ( B ) -
( intermediate casing ) ( R-4
) ( C -
) ( D -
.
) ( E -
) ( R-4 ) (E
.
*
) ( :

)Figure (4-R

63 Casing Design Correction for Well (w5-8) in wafa field


2003-2004

You might also like