UNIT COST
TOTAL
No. DESCRIPTION UNIT QTY Labor & Other
Material Total AMOUNT
Cost
E Roof Deck
1 Polyvinyl Chloride Conduit / Flexible Metallic Conduit
a. PVC, 20mm lght
b. Elbow, 20mm pcs
c. Adaptor w/ Locknut, 20mm prs
d. FMC, 15mm lm
e. Straight Connector, 15mm pcs
f. Others (Pls. Specify)
Pipe 15mm IMC l
Pipe 32mm IMC l
Adaptor w/ LB 32 mm pairs
Sub-Total (Raceways)
Wire 38.0mm2 lm
,
n. 800A, 3f 4 Conductor with Integral Hou lm
Aluminum Busway, Including accessories and connectors
o. Others (Pls Specify)
Bus Duct Flatwise Elbow - 4x800 sets
Bus Duct Edgewise Elbow - 4x800 sets
Bus Duct Plug-In Tap Box - 4x800 AMP sets
Bus Duct Terminal Lugs - 4x800 AMP sets
Br: 2B-90T/AF, 1P
2 - Space
a.2 Digital Kwhr-meter Gutter
with 28- Digital Kwhr-meters with Pulse Concentrator
LIGHTNING PROTECTION
2 Raceways
a. PVC, 63 mm dia. lght
b. PVC, 32 mm dia. lght
c. End Bell, 63 mm dia. pcs
d. Elbow, 63 mm dia. pcs
e. Elbow, 32 mm dia. pcs
f. Adaptor w/ Locknut, 63mm prs
g. Adaptor w/ Locknut, 32mm prs
h. Others (Pls. Specify)
3 Equipment
a. Lightning Arrester complete with Lightning assy
Counter in watertight fiber glass pullbox,
stand alone mast withbrackets and down conductor
b. Grounding system consists of 3 - ground assy
connection and concrete ground pit with cover
c. Grounding Busbar pcs
d. 25mm dia x 3000mm long Ground Rod C pcs
e. Miscellaneous and Consumables lot
LIGHTNING FIXTURES
B. Ground Floor
D. Roof Deck
WIRING DEVICES
B. Ground Floor
D Roof Deck
BOXES
A. Common Areas (Ground Floor to Eight Floor)
B. Ground Floor
D. Roof Deck