You are on page 1of 13

COAL FROM INDONESIA

Catchment Area of Pit J Lower Pond


COAL FROM INDONESIA PUMP CALCULATION OPTION 01
BY USING MF 385

Daily Rainfall Depth Plan 2.40 mm / day

Assumed Running : 15.00 Hours / Day

Ground Water is assumed 10 ltr / sec 17280 m3 / day

Volume Catchment Inflow Cumm. Inflow Static Pipeline Head Loss Friction Total Head Pump Flowrate
No Pond Alarm level (RL) Outlet Highest Line
(m3) (m2) ( m 3 / day ) ( m 3 / day ) Head (m) ( meter ) (m / 100m) Head (m) Type Number (ltr/s) (m3/hr) (m3/day)

1 SUMP A To RL -55 RL - 55 To Rl 55 1,000,000 2,396 Rl -30 (Series) 19,676 25 300 1.20 3.60 28.60 MF 385 1 120 432 6,480

2 SUMP B To RL -35 RL -35 To Rl 55 56,000 134 Rl 55 17,414 90 1,400 1.33 18.62 108.62 MF 385 1 130 468 7,020

3 SUMP C To RL -10 RL - 10 To Rl 55 46,000 110 Rl 55 17,390 65 2,000 1.33 26.60 91.60 MF 385 1 130 468 7,020

Total Days
2,640 54,480 20,520

Flow rate max (L/s) Total Head Max Type


60 40 m MF140
100 80 m MF340
120 110m MF 385 THIESS
180 120 m MF390 THIESS
273 150 m MF420 THIESS
PUMP CALCULATION OPTION 03
BY USING 1 UNITS MF 390

Daily Rainfall Depth Plan 2.40 mm / day

Assumed Running : 18.00 Hours / Day

Ground Water is assumed 10 ltr / sec 864 m3 / day

Volume Catchment Inflow Cumm. Inflow Static Pipeline Head Loss Friction Total Head Pump Flowrate
No Pond Alarm level (RL) Outlet Highest Line
(m3) (m2) ( m 3 / day ) ( m 3 / day ) Head (m) ( meter ) (m / 100m) Head (m) Type Number (ltr/s) (m3/hr) (m3/day)

1 SUMP A To RL -55 - RL - 55 To Rl 55 1,000,000 2,396 Err:509 3,260 25 300 1.52 4.56 29.56 MF 390 4 140 504 36,288
Rl -30 (Series)
- - -

- - -

- - -

Total Days
2,396 3,260 36,288

Flow rate max (L/s) Total Head Max Type


60 40 m MF140 Pump Days Graphic
100 80 m MF340
150 120 m MF390
280 140 m MF420 1
Water Volume ( meter3 )
1

-
- 5 10 15 20 25

Day
PUMP CALCULATION OPTION 01
BY USING 2 UNITS MF 390

Daily Rainfall Depth Plan 2.40 mm / Hour

Assumed Running : 18.00 Hours / Day

Ground Water is assumed 10 ltr / sec 864 m3 / day

Volume Catchment Inflow Cumm. Inflow Static Pipeline Head Loss Friction Total Head Pump Flowrate
No Pond Alarm level (RL) Outlet Highest Line Pipeline (m)
(m3) (m2) ( m3 / hour ) ( m 3 / hour ) Head (m) ( meter ) (m / 100m) Head (m) Type Number (ltr/s) (m3/hr) (m3/hour)

1 SUMP A To RL -55 - RL - 55 To Rl 55 1,000,000 2,396 Err:509 3,260 25 300 1.52 4.56 29.56 MF 390 4 140 504 36,288 1,200
Rl -30 (Series)
- #N/A #N/A #N/A - - -

- #N/A #N/A #N/A - - -

- #N/A #N/A #N/A - - -

Total Days
2,396 3,260 36,288

Flow rate max (L/s) Total Head Max Type


60 40 m MF140 Pump Days Graphic
100 80 m MF340
150 120 m MF390
280 140 m MF420 1
Water Volume ( meter3 )

-
- 5 10 15 20 25

Day
PUMP CALCULATION OPTION 02
BY USING 3 UNITS MF 390

Daily Rainfall Depth Plan 2.40 mm / day

Assumed Running : 18.00 Hours / Day

Ground Water is assumed 10 ltr / sec 864 m3 / day

Volume Catchment Inflow Cumm. Inflow Static Pipeline Head Loss Friction Total Head Pump Flowrate
No Pond Alarm level (RL) Outlet Highest Line
(m3) (m2) ( m 3 / day ) ( m 3 / day ) Head (m) ( meter ) (m / 100m) Head (m) Type Number (ltr/s) (m3/hr) (m3/day)

1 SUMP A To RL -55 - RL - 55 To Rl 55 1,000,000 2,396 Err:509 3,260 25 300 1.52 4.56 29.56 MF 390 4 140 504 36,288
Rl -30 (Series)
- - -

- - -

- - -

Total Days
2,396 3,260 36,288

Flow rate max (L/s) Total Head Max Type


60 40 m MF140 Pump Days Graphic
100 80 m MF340
150 120 m MF390
280 140 m MF420 1
Water Volume ( meter3 )

-
- 2 4 6 8 10 12 14 16 18

Day
PUMP CALCULATION OPTION 03
BY USING 1 UNITS MF 420

Daily Rainfall Depth Plan 2.40 mm / day

Assumed Running : 18.00 Hours / Day

Ground Water is assumed 10 ltr / sec 864 m3 / day

Volume Catchment Inflow Cumm. Inflow Static Pipeline Head Loss Friction Total Head Pump Flowrate
No Pond Alarm level (RL) Outlet Highest Line
(m3) (m2) ( m 3 / day ) ( m 3 / day ) Head (m) ( meter ) (m / 100m) Head (m) Type Number (ltr/s) (m3/hr) (m3/day)

1 SUMP A To RL -55 - RL - 55 To Rl 55 1,000,000 2,396 Err:509 3,260 25 300 1.95 5.85 30.85 MF 420 3 220 792 42,768
Rl -30 (Series)
- #N/A #N/A #N/A - -

- #N/A #N/A #N/A - -

- #N/A #N/A #N/A - -

Total Days
2,396 3,260 42,768

Flow rate max (L/s) Total Head Max Type


60 40 m MF140 Pump Days Graphic
100 80 m MF340
150 120 m MF390
280 140 m MF420 1

Water Volume ( meter3 )


1

-
- 2 4 6 8 10 12 14 16 18
Day
PUMP CALCULATION OPTION 03
BY USING 1 UNIT 140, 1 UNIT 340, 1 UNIT MF 390 and 1 UNIT MF 420

Daily Rainfall Depth Plan 2.40 mm / day

Assumed Running : 18.00 Hours / Day

Ground Water is assumed 10 ltr / sec 864 m3 / day

Volume Catchment Inflow Cumm. Inflow Static Pipeline Head Loss Friction Total Head Pump Flowrate
No Pond Alarm level (RL) Outlet Highest Line
(m3) (m2) ( m 3 / day ) ( m 3 / day ) Head (m) ( meter ) (m / 100m) Head (m) Type Number (ltr/s) (m3/hr) (m3/day)

1 SUMP A To RL -55 - RL - 55 To Rl 55 1,000,000 2,396 Err:509 3,260 25 300 0.33 0.99 25.99 MF 140 1 60 216 3,888
Rl -30 (Series)
- 25 300 0.82 2.46 27.46 MF 340 1 100 360 6,480

- 25 300 1.52 4.56 29.56 MF 390 1 140 504 9,072

- 25 300 1.95 5.85 30.85 MF 420 1 220 792 14,256

Total Days
2,396 3,260 33,696

Flow rate max (L/s) Total Head Max Type


60 40 m MF140 Pump Days Graphic
100 80 m MF340
150 120 m MF390
280 140 m MF420 1
Water Volume ( meter3 )

Time Estimate for Draine Pond


1

1. Using MF 420 1 Unit


0 Day 1

2. Using MF 420 1 Unit + MF 140 1 Unit + 390 1 Unit 1

Flow rate Total


1
490 L/s
Time Estimation
0 Day 0

3. Using MF 390 2 Unit


Flow rate total 0
300 L/s
Time Estimation
0 Day 0

4. Using MF 420 2 Unit


0

Flow rate Total


560 L/s -
Time Estimation - 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210

Day
Sump Dimension Calculation
COAL FROM INDONESIA

SUMP A
Catchment Area 1,000,000.00 meter2

Daily Rainfall 2.40 mm/day

Inflow 2,395.75 meter3 / day

Ground water 864.00 meter3 / day

Total Inflow 3,259.75 meter3

Option Length Width Depth Volume

1 30 25 4 3,000

2 30 20 4 2,400

3 40 15 4 2,400

Sump Dimension Calculation


COAL FROM INDONESIA

SUMP B
Catchment Area 56,000.00 meter2

Daily Rainfall 2.40 mm/day

Inflow 134.16 meter3 / day

Ground water 864.00 meter3 / day

Total Inflow 998.16 meter3

Option Length Width Depth Volume

1 30 15 4 1,800

2 30 20 4 2,400

3 25 25 4 2,500
Sump Dimension Calculation
COAL FROM INDONESIA

SUMP C
Catchment Area 46,000.00 meter2

Daily Rainfall 2.40 mm/day

Inflow 110.20 meter3 / day

Ground water 864.00 meter3 / day

Total Inflow 974.20 meter3

Option Length Width Depth Volume

1 30 15 4 1,800

2 25 20 4 2,000

3 25 25 4 2,500
DYNAMIC HEAD VS FLOWRATE

385 & 390 420


315 OD 355 OD
Flowrate (L/s) Headloss (m/100m) Headloss (m/100m)
12
13
14
15
16
18
20
22 0.05
24 0.06
26 0.07
28 0.08
30 0.09
35 0.12
40 0.16
45 0.18
50 0.23 0.13
55 0.28 0.16
60 0.33 0.18
65 0.38 0.21
70 0.43 0.24
75 0.49 0.27
80 0.55 0.31
90 0.68 0.38
100 0.82 0.46
110 0.98 0.55
120 1.15 0.64
130 1.33 0.75
140 1.52 0.85
160 1.94 1.09
180 2.41 1.35
200 2.92 1.64
220 3.48 1.95
240 4.09 2.29
260 4.73 2.65
280 5.43 3.04
300 6.16 3.45
325 7.14 4.00
350 8.19 4.58
375 9.30 5.20
400 10.48 5.86
425 11.72 6.55
450 7.28
475 8.05
500 8.85
525 9.68
550 10.55

Flow rate max (L/s) Head (Dynamic) max Type


60 40 m MF140
100 80 m MF340
120 130 m MF 385
150 120 m MF390
280 140 m MF420
PIT J RAINFALL DEPTH 2004 - 2006

YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL
1995 275.1 205.0 219.8 194.5 231.5 206.5 83.2 251.7 96.5 123.3 133.0 183.0 2,203.10
1996 231.5 300.3 141.5 133.3 218.5 116.5 181.5 48.8 55.8 177.0 57.0 145.5 1,807.20
1997 118.0 206.3 132.8 155.0 119.8 121.8 92.3 130.8 1.0 73.8 208.0 321.3 1,680.90
1998 222.4 277.2 341.7 119.7 158.5 116.9 221.6 302.4 191.3 225.4 176.4 255.1 2,608.60
1999 237.5 147.9 157.9 209.3 169.3 190.7 183.5 100.5 119.9 181.2 238.7 257.2 2,193.60

DIKETAHUI
JAN FEB MAR APR MAY JUN JUL AUG SEP mm / day
OCT NOV DEC Luas Cachment area =100ha
2.971 3.114 2.722 2.224 2.459 2.061 2.088 2.285 1.273 2.139 2.228 3.1838 2.395753 Debit Air Tanah=20.0 l/Jam
Luas Sump = 300.0 m2
Tinggi Permukaan Air =50.0 mdpl
Tinggi permukaan Tambang = 75.0 mdpl
Panjang pipa =300.0 m
Head Losse =1.2 m/100

Maximum In A 275.1 300.3 341.7 209.3 231.5 206.5 221.6 302.4 191.3 225.4 238.7 321.3 2608.6
Average In A M 9.2 10.0 11.4 7.0 7.7 6.9 7.4 10.1 6.4 7.5 8.0 10.7
Rain Plan / Qua 10.19 7.19 7.95 8.73

20.434
Water Volume Vs Actual Elevation
In Payau Pond
Water Volume (meter3)

800,000

700,000

600,000

500,000

400,000

300,000

200,000

100,000

-
50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94

Actual elevation