Professional Documents
Culture Documents
TABLE OF CONTENTS
[Street Address, City, ST ZIP Code]
Tel [Telephone]
Fax [Fax]
[Website]
ANNUAL
REPORT
FY [Year]
[You can add an abstract or other key statement here. An abstract is
typically a short summary of the document content.]
TABLE OF CONTENTS
TABLE OF CONTENTS
Contents
To Our Stockholders 1
Financial Summary 2
Financial Statements 2
Notes to Financial Statements 2
Independent Auditors Report 2
Contact Information 2
Company Information 2
VACUUM CIRCUIT BREAKER TESTING
Testing Procedure
RATING OF VCB
In our company we are manufacturing two different rating of VCB.
TESTING PROCEDURE
Test Bench Details
The scope test bench contains three variable power supply to operate
The R, Y, B phase opening and closing can be tested by testing voltage 5V DC.
The Vacuum interrupter travel can be measured by the Linear Variable Displacement Transducer. The
mechanism travel is 27mm.
Before open the test panel we have to check the parallel communication between the computer and
breaker, sample clock generator by SFI card testing and three CPU memory bank get tested.
After the above test we have to open the auto scan then we have to give the user name and password
Page 1
VACUUM CIRCUIT BREAKER TESTING
Auto scan is opened then select Edit->Breaker info->Enter Breaker SL.No, Interrupter type and SL.No
and save it
Then we have to give breaker type by selecting Edit->Breaker type->Select breaker type
We have to give the supply voltage for spring charge motor, closing coil, opening coil and save it by giving
password.
1. By using variac we have to set the operating voltage of the closing coil, opening coil and spring
charge motor.
2. Switch on 230 V AC supply and Breaker control switch.
Set mechanism travel TY is 27mm and click Auto place Mechanism. TY shows the TOTAL TRAVEL in mm
for Closing. Same process is repeated for opening. If the same travel value is repeated for closing and
opening then save the travel.
1. Close travel
2. Close speed
This test can be done by selecting the electrical trigger. Then select the close timing at the rated and
select test.
The graph is generated. The time duration of the first closure of contact can be analyzed by the graph. To
analyze the graph select ANALY.
1. Open travel
2. Open speed
Page 2
VACUUM CIRCUIT BREAKER TESTING
This test can be done by selecting the electrical trigger. Then select the open timing at the rated and select
test.
The graph is generated. The time duration of the last opening of contact can be analyzed by the graph. To
analyze the graph select ANALY.
The mechanical operation test have to be done whenever the dashpot is adjusted or after all the above
parameter is achieved. After 50 Mechanical operation test the parameter should not get changed.
Page 3
VACUUM CIRCUIT BREAKER TESTING
done.
2. 85% of control voltage of Tripping coil should be set in Variac. Then 5 closing operation should be
done.
3. 110% of control voltage of Tripping coil and closing coil should be set in Variac. Then 5 closing
100 amp of Dc current is applied across the contact. To measure the xontact resistance of the
breaker.
Select current range enter and select 100A
Select resistor range enter and select 200
Inject the current. The contact resistance should be 30 for interrupter. With flower contact,
contact resistance should be 40
Page 4
VACUUM CIRCUIT BREAKER TESTING
Page 5
VACUUM CIRCUIT BREAKER TESTING
Financial Summary
Use this section to give a brief summary of your financials, highlighting important points.
This is also the perfect place for a few charts that demonstrate key financial information. To add a chart, on
the Insert tab, click Chart. The chart will automatically coordinate with the look of your report.
To show values across categories, such as to compare the revenues of different business units, try a
column or bar chart.
To show values over time, such as for revenue or profit trends, try a line chart.
To compare two sets of related values, such as to compare executive salaries relative to number of
years with the company, try a scatter chart.
And when youre ready to customize the look of your chart, just click in the chart and then check out the
icons you see on the right for everything from style and layout to managing data.
Page 6
VACUUM CIRCUIT BREAKER TESTING
Financial Statements
STATEMENT OF FINANCIAL POSITION
Liabilities
Statement of Financial Position
Ownership Equity
To get started with a table that looks just like the sample here, on the Insert tab, click Tables, then choose
Quick Tables.
TABLE HEADING
Page 7
VACUUM CIRCUIT BREAKER TESTING
DEBT
Of course, we would all prefer to just have profits. But if youve got any debt, this is the place to make notes
about it.
GOING CONCERN
Okay, you get the idea. If youve got notes to add about your financials, add them here.
CONTINGENT LIABILITIES
Keep in mind that some of these headings might not apply to your business (and you might have others to
add). This one, for example, is about potential liabilities that could arise if something happens in the future,
such as a pending legal decision.
TAKEAWAYS
What would you like your readers to understand? Add notes on key takeaways here.
Page 8
VACUUM CIRCUIT BREAKER TESTING
Page 9
VACUUM CIRCUIT BREAKER TESTING
Contact Information
To replace a photo with your own, right-click it and then choose Change Picture.
Company Information
[Company]
[Street Address, City, ST ZIP Code]
Tel [Telephone]
Fax [Fax]
[Website]
Page 10