You are on page 1of 4

REFERNECES

Books
[1] Billinton,R., Power System Reliability Evaluation, Gqrdon and Breach, New york, t970.
[2] Billirrton, R., R.J. Ringlee and A.J. Wood. Power System Reliabitity Calculations, The MIT
Press, Boston, Mass, 1973.
[3] Kusic, G.L., computer Aided Power system Analysis, prentice-Hall, Nerv Jersey, 1986.
[4] Kirchmayer,L .K., Economic operation of Power systems John wiley, New york, I 9 ) 6 .
[5] Kirchmayer, L.K., Economic control of Interconnected systems, wiley, New york, 1959.
[6] Knight, u.G., Power systemsE ngineeringa nd Mathematics pergamon press, New York. 1972
[7] cuenswanoer, J.}(-, Modern power systems, International rext Book co., New York, 1971.
[8] singh, c. and R. Billinton, system Reliabitity, Modelling and Evaluation, Hutchinsono f
London,1 977.
[9] sullvan, R.L., power system planning, McGraw-Hil, New york, 1977.
[10] Wood, A'J' and B.F' Wollenberg, Power Generation, operation and Control, Znd edn.,
Wiley, New york, 1996
[11] Mahalanabis,A .K., D.p. Kothari and s.I. Ahson, computer Aided power system Analysis
and control, Tata McGraw-Hill, New Delhi. r9gg.
[12] Bergen,A .R., power system Anarysisp, rentice-Hall,r nc., Ncw Jersey, 19g6.
[13] Billinton, R. and R.N. Allan, Reliability Evaluation of power System, plenum Press, New
york, 1984.
[14] Sterling,M .J.H., power System Control, I.E.E., England,1 97g.
[15] Khatib, H., "Economics of power systems Reliability, ', Technicopy. r9g0.
[16] warwick, K. A.E. Kwue and R. Aggarwar (Eds), A.r. Techniques in power System.sIE, E,
UK, 1997.
[17] Momoh, J.A., Electric power System Applications of Optimization, Marcel Dekker, Inc.,
New York., 2001.
[18] Yong-HuaS ong (Ed.), Modern optimization Techniques in power Systems,Kluwer
Academic Publishers, London, 1999.
[19] Debs, A.S., Modern power systems control and operation, KAp, New york, 1988.
[20] Berrie,T ,W., Power System Economics, IEE, London, 19g3.
[21] Berrie, T.w., Electricity, Economics and planning, IEE, London, rp92. Dono-o r q l , E r ; ,
[22] Meyer, w.s. and v.D. Albertson, ..Improved Loss Formula computation by optimally
ordered EriminationT echniques',, IEEE Transmp As, 1971, 90: 716.
[23] Hill, E.F. and w.D. stevenson, J.R., ..A New Method of Determining Loss Coefficients",
IEEE Trans. pAS, July 196g, g7: 154g.
[24] Agarwal, S'K. and I.J' Nagrath," optimal Scheduling of Hydrothermal Systems,,, Proc.
IEEE, 1972, 199: 169.
[25] Aytb, A'K' and A.D. Patton, "Optimal Thermal Generating Unit Commitment,,, IEEE
Trans., July-Aug 1971, pAS_90: 1752.
[26] Dopazo, J'F. et al., "An optimization Technique for Real and Reactive power Allocation",
Proc, IEEE, Nov 1967. 1g77.
[27] Happ, H.H., "optimal power Dispatch-A Comprehensives survey,,, IEEE Trans. 1977, PAS-
96: 841.
[28] Harker, 8.c., "A primer on Loss Formula", AIEE Trans, r95g, pt ilr,77: 1434.
[29] IEEE Commitfee Report, "Economy-security Functions in power -system options " .IEEE
,snpr inl Pt thl i rnt inn 1,5J fv\rrrJvn o7awo7 .w.
[30] Kothari, D.p., "optimal Hydrothermal Scheduling and Unit commitment,. ph. D. Thesis,
B.I.T.S, Pilani, 1975.
[31] Kothari, D.P. and I.J. Nagrath," security Constrained Economic thermal Generating Unit
Commitment,, J.I.E. (India), Dec. 197g, 59: 156.
[32] Nagrath,I .J. and D.P. Kothari, "optimal Stochastic Scheduling of Cascaded Hydrothermal
Systems", J.I.E. (India), June 1976, 56: 264. ffi Modern power svstem Analysis
[34] Dommel, H.w. and w.F. Trinney, "optimal power Flow solution", IEEE Trans., October
1968, PAS. 87: 1866.
[35] Sasson, A.M. and H.M. Itlerrill, "Sonne Applications of Optimization Techniques to Power
System Problems", Proc. IEEE, July 1974,62: 959.
[36] wu, F. et al., "A Two-stage Approach to solving optimal power Flows", proc. 1979 PICA
Conf. pp. 126-136.
[37] Nanda, J., P.R. Bijwe and D.P. Kothari, "Application of Progressive Optimality Algorithm
to Optimal Hydrothermal Scheduling Considering Deterministic and Stochastic Data",
International Journal of Electrical Power and Energy Systems, January 1986, 8: 61.
[38] Kothari, D.P. et al., "Some Aspects of Optimal Maintenance Scheduling of Generatingl
Jnits", "/./.E (India), August 1985, 66: 41.
[39] Kothari, D.P. and R.K. Gupta, "Optimal Stochastic Load FIow Studies", J.I.E. (India),
August 1978, p. 34.
[40] Description and Bibliography of Major Economy-security Functions-Part I, il, and III",
IEEE committee Report,IEEE Trans. Jan 1981. pAS-r00, zlr-235.
[41] Bijwe, P.R., D.P., Kothari, J. Nanda, and K.S. Lingamurthy, .,Optimal Voltage Control
using Constant Sensitivity Matrix", Electric Power System Research, Vol. II, No. 3, Dec.
1986, pp. 195-203.
[42] Nanda,J ., D.P. Kothari and K.S. Lingamurthy, "Economic-emission Load Dispatch through
coal Programming Techniques", IEEE Trans.o n Energy conversion, vol. 3, No. 1, March
1988, pp. 26-32.
[43] Nanda, J.D.P. Kothari and s.c. srivastava, "A New optimal power Dispatch Algorithm using
Fletcher's QP Method", Proc. IEE, pte, vol. 136. no. 3, May 1989, pp. 153-161.
[44] Dhillon, J.S., S.C. Parti and D.P. Kothari, "stochastic Economic Emission Load Dispatch",
Int. J. of Electric Power system Research, Yol. 26, No. 3, 1993, pp. 179- 183.
[45] Dhillon, J.S., S.C. Parti and D.P. Kothari, "Multiobjective Optimal Thermal Power
Dispatch", Int. J. of EPES, Vol. 16, No.6, Dec. L994, pp.383-389.
[46] Kothari, D.P. and Aijaz Ahmad, "An Expert system Approach to the unit commitment
problem", Energy conversion and Management", vol. 36, No. 4, April 1995, pp. 257-261.
[47] Sen, Subir, D.P. Kothari and F.A Talukdar, "Environmentally Friendly Thermal Power
Dispatch - An Approach", Int. J. of Energy Sources, Vol. 19, no. 4, May 1997, pp.397-408.
[48] Kothari, D.P. and A. Ahmad, "Fuzzy Dynamic Programming Based optimal Generator
Maintenance Scheduling Incorporating Load Forecasting",i n Advances in Intelligent
systems, edited by F.c. Morabito, IoS press, ohmsha, 1997, pp. /.J5 - /4U.
[49] Aijaz Ahmad and D.P. Kothari, "A Review of Recent Advances in Generator Maintenance
scheduling", Electric Machines and Power systems, yol 26, No. 4, 1998, pp. 373-387.
[50] Sen S., and D.P. Kothari, "Evaluation of Benefit of Inter-Area Energy Exchange of Indian
Power System Based on Multi-Area Unit Commitment Approach", Int. J. of EMPS, Vol.26,
No. 8, Oct. 1998, pp. 801-813. mal
[51] Kulkarni, P.S., A.G. Kothari and D.p. Dispatch using Improved BpNN", /nf. 3t - 4_7
[52] Aryu, L.D., S.C. Chaude and D.P. Kothari, "Economic Despatch Accounting Line Flow
Constraints using Functional Link Network," Int. J. of Electrical Machine & Power Systems,
28, l, Jan 2000, pp. 55-6g.
[53] Ahmad, A. and D.P. Kothari, "A practical Model for Generator Scheduling with
transmission constraints", Int. J. of EMps, vol. 2g, Approach for No. 2, Nov. Thermal
Generation Commitment-A 7, Oct. 1998, pp. 443-451.
[54] Kothari, "Combined Economic and Emission J. of EMPS, Vol. 28, No. l, Jan 2000, pp.
Maintenance No. 6, June 2000, pp. 501 -514.
[55] Dhillon, J.s. and D.P. Kothari, "The surrogate worth trade off Mutliobjective Thermal power
Dispatch problem". EpsR, vol. 56, 2000, pp. 103-110.
[56] Son, S. and D.P. Kothari, "Large Scale Thermal Generating Unit Commitment: A New
Model", in The Next Genera\ion of Electric Power (Joint Commitment Models, edited by
B.F. Hobbs et. al. KAp, ,Boston, 2001, pp. Zll-225-
[57] Dhillon, J.s., s.c. Parti and D.p. \ Kothari , ,,Fuzzy Decision Making in Multi objective
Long;term scheduling of Hydrothermal system,,, rnt. t. oy erns, vol. 23, No. l, Jan 2001, pp.
lg-29.
[58] Brar, Y.s., J.s. Dhillon and D.p. Kothari, "Multi-objective Load Dispatch by Fuzzy Logic
based Searching Weightage Pattern," Electric power Systems Research, Vol. 63, 2002, pp.
149-160.
[59] Dhillion, J.s., S.c. Parti and D.p. Kothari, "Fuzzy Decision-making in stochastic
Multiobjective short-term Hydrothermal scheduling," Ip,B proc.tcTD, vol. l4g, z, March
2fi02, pp l9i-200.
[60] Kothari, D.P., Application of Neural Networks to Power Systems (Invited paper), Proc. Int.
Conf., ICIT 2000, Jan. 2000, pp. 62l_626.

You might also like