You are on page 1of 2

Murin Solar Energia SPE Ltda.

5 projects 150 MW Oliveira dos Brejinhos, Bahia (BA)


total

OUR SER ENERGIA is a large-scale PV project development


company in Brazil.

COMPANY
As a pioneer in the segment, SER was able to
secure the best site location alternatives with high
solar irradiation, easy access, efficient connection
solutions and favorable topography, providing its
projects great competitiveness.
With a portfolio of 36 projects of 30MW (1080 MW
as in July 2014) distributed among 18 SPCs (Special
Purpose Companies), SER has developed projects in
several states in the northeast of Brazil, region with
the highest solar irradiation of the country, favoring
high energy yields.
The company exhaustively seeks high quality
standards in every step of the development process.
All the documentation of the projects, SPCs, land
contracts, environmental license or communication
to the agents of the sector are all organized, up-to-
date and traceable.

The location of the projects were strategically Internal View


chosen after careful and extensive study of
alternatives. All the areas of the projects are
secured, either through long term rental
contracts or acquisition. There were considered:

[1] Solar Irradiation

[2] Connection solution

[3] Topography

[4] Land Price

[5] Access
Northeast
Region of
Brazil OUR SPCs
CEAR
MURIN
H

RIO GRANDE
Q
F
E
D C G DO NORTE
J K I L

150MW
M
PIAU
A
B
N PARABA

R PERNAMBUCO
O Latitude: N 8.624.921,786
P
ALAGOAS Longitude: E 735.988,2046
Q
BAHIA Zone: 23L
SERGIPE
Elevation 514m
Irradiation per day:
Access: BA-156 (State Road)
5,5 / 6,0 kWh/m2

5,0 / 5,5 kWh/m2


AVG. IRRAD (GHI): 2.215 kWh/m2/year
4,5 / 5,0 kWh/m2
AVG. TEMP: 24,9oC

I Malta 30MW
J Angico 30MW
A Sobral 60MW K Lagoa 90MW ABOUT THE PROJECT
The area is located 24km southeast from the City Oliveira dos
B Serto 60MW L Cara 120MW
Brejinhos, through State Road BA-156, in the center west region
C Ors 120MW M Arig 90MW of Bahia State. The area is mostly flat and some of the area is
already deforested. Today it is used for cattle.
D Jandu 30MW N Xaxado 90MW
E Acau 30MW O Assuru 30MW
CONNECTION Type of Connection: Sectioning
transmission line Brotas Macaubas
F Breju 30MW P Citrino 30MW
Utility Company: CHESF - Bom Jesus da Lapa
G Engady 30MW Q MURIN 150MW Voltage Connection: 230 kV
H Extremoz 30MW R Sobrado 30MW Distance to Connection: 10 Km

TECHNICAL INFORMATION
The following information corresponds to the project registered at ANEEL and EPE. Equipment can be changed.

Murin 1 & 2 (each) Murin 3 & 4 (each) Murin 5


Nominal Power 30.000 kW 30.000 kW 30.000 kW
Power Peak 39.240 kWp 39.240 kWp 39.240 kWp Access through State Road BA-156

Technology Silicon Poly Cristalline Silicon Poly Cristalline Silicon Poly Cristalline
Structure Fixed 15 Fixed 15 Fixed 15
kWh/kWp 1.851 hrs per year 1.851 hrs per year 1.851 hrs per year
Net Yearly Production 70.441 MWh 70.441 MWh 70.441 MWh
Performance Ratio 81,1 % 81,1 % 81,1 %
Energy Certificated 7,39 MW Avg./year* 7,39 MW Avg./year* 7,39 MW Avg./year*

*Average Energy Yield at year 10 for a 20-year PPA. Certified by independent company (Garrad-Hassan) considering P50 and 0,75% yearly module
degradation. Calculation method considered by EPE for energy auctions.

You might also like