You are on page 1of 8

Qty.

Item Title Material Drawing


Number
4 5 6 9
1 1 Base Wood 100-B01
1 2 Stop Position - Left Wood 100-SP-01-L
1 3 Tension Post Wood 100-TP-01
1 4 Arm Wood 100-A-01
1 5 CUP Wood 100-C-01
3 1 6 Bolt steel Purchase
1 7 Stop Position - Right Wood 100-SP-01-R
3 8 Quick Release Pin steel Purchase
1 9 Eye_bolt steel Purchase
7 1 10 Rubber Band Holder Wood 100-RB-01
2 11* Wing Nut steel Purchase
1 12 Stop Bumper Rubber 100-SB-01
12 10

8
2

CHECKED BY: DRAWN BY: MATERIAL: FINISH: DATE: SCALE:


1
TITLE:
University of Regina
Faculty of Engineering REV. NO. DRAWING NUMBER:
305
45 40 A
A

18
80

18
200

See Note 1.0

4.3
20

5
SECTION A-A 10

NOTE 1.0 - SEE PARTS LIST


CHECKED BY: DRAWN BY: MATERIAL: FINISH: DATE: SCALE:
COUNTERSINK V DEPTH SHOULD EQUAL WOOD 07/12/2002
STAIN 1:2
SCREW HEAD HEIGHT.
TITLE:
NOTE 2.0: 5 MM ROUND ALONG University of Regina BASE
TOP EDGE
Faculty of Engineering REV. NO. DRAWING NUMBER:
100-B01
R 75
75
O4.3 20
R
85 45 7 X O6.35 sO7.5 X 82
`THRU

30
R

40
25
18

30 15 8.5 2 X O2.9
30 `16
85
55
245

CHECKED BY: DRAWN BY: MATERIAL: FINISH: DATE: SCALE:


WOOD STAIN 07/12/2002 1:2
TITLE:
University of Regina STOP POSITION - LEFT
Faculty of Engineering REV. NO. DRAWING NUMBER:
100-SP-01-L
R 75

75
7 X O6.35 20
45 `15
O4.3
R8 sO7.5 X 82
5

30
R

30
18

2 X O2.9

25
30 `16
15

85 30
245

CHECKED BY: DRAWN BY: MATERIAL: FINISH: DATE: SCALE:


WOOD STAIN 07/12/2002 1:2
TITLE:
University of Regina STOP POSITION - RIGHT
Faculty of Engineering REV. NO. DRAWING NUMBER:
100-SP-01-R
20
O 6.35

R
40 5X 19

20
20
20
125

20

R3
0

230
R5
.9
O 25
`1
O 2.9
` 15 O 80
.5
75

`4
40
30

15

20
45
2 X O2.9 30 NOTE 1: ALL ROUNDS ARE 5 MM
`25.4
55 CHECKED BY: DRAWN BY: MATERIAL: FINISH: DATE: SCALE:
80 WOOD STAIN 07/12/2002 1:2
TITLE:
University of Regina TENSION POST
Faculty of Engineering REV. NO. DRAWING NUMBER:
100-TP-01
6. 7
O
6X

18
25 36 36 36 36 36

275 100
8
O 6.4
26

R1
02
P LA
CES
ROUND EDGES TO
5 MM RADIUS ROUND EDGES TO
2 MM RADIUS

CHECKED BY: DRAWN BY: MATERIAL: FINISH: DATE: SCALE:


WOOD STAIN 07/12/2002 1:2
TITLE:
University of Regina ARM
Faculty of Engineering REV. NO. DRAWING NUMBER:
100-A-01
B B

10
28 22
R
9

1.5
22

22
4.5

SECTION B-B
NOTE 1: V DEPTH EQUAL TO OR CHECKED BY: DRAWN BY: MATERIAL: FINISH: DATE: SCALE:
GREATER THAN THE SCREW HEAD. WOOD STAIN 07/12/2002 1:1
SEE PARTS LIST. TITLE:
University of Regina CUP
Faculty of Engineering REV. NO. DRAWING NUMBER:
100-C-01
O 8.5

2.5
R6
50

O 6

O 14
5

CHECKED BY: DRAWN BY: MATERIAL: FINISH: DATE: SCALE:


WOOD STAIN 07/12/2002 1:1
TITLE:
University of Regina RUBBER BAND HOLDER
Faculty of Engineering REV. NO. DRAWING NUMBER:
100-RB-01

You might also like