You are on page 1of 126

NEW!

NEW! Model ECV

MiniCore MiniVent Model ERVe

energy boost.
Weve added energy core technology
to our ERV line.
Our Energy Recovery Ventilator selection now includes
ERV PRODUCTS
total energy core options with our new MiniCore and ECV
FEATURES
preconditioners. Like our MiniVent and Model ERVe energy
Sensible and latent
energy transfer wheel models, these ERVs precool and dehumidify outdoor air
Indoor/outdoor in the summer, and preheat it in the winter, significantly lowering
mounting options
Congurable intake and heating and cooling loads for substantial energy savings. The
discharge connections MiniCore and ECV efficiently condition ventilation air to provide
BENEFITS occupant comfort and improved indoor air quality. Whatever
Precondition your energy recovery preference is, Greenheck has it covered.
outdoor air
Reduced heating
and cooling loads on AHRI Certified. ETL Listed.
mechanical equipment
Meets ASHRAE 90.1 Learn more from your Greenheck representative
requirements
or at greenheck.com/4MiniCore
APPLICATIONS
Ofce buildings Fans | Energy Recovery | Packaged Ventilation | Make-up Air
2017 Greenheck

Educational Kitchen Ventilation | Lab Exhaust | Dampers | Louvers | Coils


Health care
Sports facilities
715.359.6171
greenheck.com

input #1 at www.csemag.com/information
input #2 at www.csemag.com/information
Water-Source From 230 tons to ton
Heat Pumps
RN Series (6-140 tons)
Water-Source Heat Pump Rooftop Units RQ Series (2-10 tons)

RL/RZ Series (55-230 tons)

Double Wall Rigid Polyurethane Foam Panel Construction


VFD and ECM Driven Variable Speed Direct Drive Backward
Curved Plenum Fans
Staged, Two-Step, 10-100% Variable Capacity, and VFD
Controlled Variable Speed Compressors
Constant Volume, Variable Air Volume, Single Zone VAV,
and Makeup Air Capability, up to 100% Outside Air

Water-Source Heat Pump Indoor Self-Contained Units


SA Series (23-70 tons)

Double Wall Rigid Polyurethane Foam Panel Construction


VFD and ECM Driven Variable Speed Direct Drive Backward
Curved Plenum Fans
Staged, Two-Step, 10-100% Variable Capacity, and VFD
Controlled Variable Speed Compressors
Constant Volume, Variable Air Volume, Single Zone VAV,
and Makeup Air Capability, up to 100% Outside Air
M2 Series (3-70 tons)
SB Series (3-18 tons)

Small Packaged Water-Source Heat Pump Units


Replacement Ready Stocked Units Options
All Aluminum Cabinet Construction Waterside Economizer
Closed Cell Neoprene Foam Insulation Hot Gas Reheat Humidity Control
Scroll or Rotary Compressors Factory Wired Disconnect

Microchannel Indoor DX Coil Corrosion Resistant Cupronickel


Easy Service Access Heat Exchanger
(-15 tons) Bottom Service Access (- 30 tons)
Internal Condensate Trap (Vertical Configuration)

From High-Tech Customized Systems


to Simple Small Packaged Units
For More Information Contact Your Local AAON Representative Today!
www.AAON.com/WSHP
input #3 at www.csemag.com/information
AUGUST 2017

FEATURES
36 | Global M&A activity holds steady
as domestic M&A falls
More mechanical, electrical, plumbing (MEP), and fire pro-
tection engineering firms are acquiring.
NICK BELITZ

40 | LEED v4 updates and impacts


ON THE COVER:
Illustration by: Curt Spannraft
2017 on lighting controls
LEED v4 has adopted ASHRAE Standard 90.1-2010, which
includes mandatory lighting controls requirements.
COVER STORY ROBERT J. GARRA JR., PE, CDT

33 | MEP Giants revenue increases,


along with staffing concerns 48 | How to use LEED v4
The 2017 MEP Giants gross revenue increased as com- for lighting controls
pared with last year, likely due to company mergers and
Lighting requirements in LEED v4 have become more
larger and more varied projects. MEP/FP design revenue
holistic.
also increased.
JOHN YOON, PE, LEED AP ID+C
AMARA ROZGUS and AMANDA PELLICCIONE

56 | Understanding overcurrent protection


DEPARTMENTS A guide to NFPA 70: National Electrical Code
requirements for overcurrent protection.
05 | Viewpoint 25 | Codes & Standards
STEVEN EICH, PE, CDT, REP, LEED AP
Hungry for information Four strategies for imple-
menting ASHRAE 62.1 in
07 | Research
HVAC systems
Fire, life safety in hospitals, 64 | Developing a circuit schedule
health care facilities 101 | Digital Edition Circuit protection can be interpreted in many ways
Exclusive depending on building load and use.
09 | Career Smart
The basics of arc flash BRIAN MARTIN, PE
To mentor and be mentored: mitigation
What does it really look like?
103 | Advertiser Index
10 | MEP Roundtable ENGINEERING DISCIPLINES
The art of designing sports, 104 | Future of
Use the icons to identify topics of interest.
entertainment, and specialty Engineering
AUTOMATION & CONTROLS HVAC
structures The rise of the digital
building COMMUNICATIONS LIGHTING
19 | Codes & Standards ELECTRICAL PLUMBING
ASHRAE 62.1: uncommon FIRE, SECURITY & LIFE SAFETY
calculations, approaches
CONSULTING-SPECIFYING ENGINEER (ISSN 0892-5046, Vol. 54, No. 7, GST #123397457) is published 11x per year, monthly except in February, by CFE Media, LLC, 3010 Highland Parkway,
Suite #325 Downers Grove, IL 60515. Jim Langhenry, Group Publisher /Co-Founder; Steve Rourke CEO/COO/Co-Founder. CONSULTING-SPECIFYING ENGINEER copyright 2017 by CFE Media, LLC. All rights reserved.
CONSULTING-SPECIFYING ENGINEER is a registered trademark of CFE Media, LLC used under license. Periodicals postage paid at Downers Grove, IL 60515 and additional mailing offices. Circulation records are maintained at CFE
Media, LLC, 3010 Highland Parkway, Suite #325 Downers Grove, IL 60515. Telephone: 630/571-4070. E-mail: customerservice@cfemedia.com. Postmaster: send address changes to CONSULTING-SPECIFYING
ENGINEER, 3010 Highland Parkway, Suite #325 Downers Grove, IL 60515. Publications Mail Agreement No. 40685520. Return undeliverable Canadian addresses to: 3010 Highland Parkway,
Suite #325 Downers Grove, IL 60515. Email: customerservice@cfemedia.com. Rates for nonqualified subscriptions, including all issues: USA, $ 145/yr; Canada, $ 180/yr (includes 7% GST, GST#123397457);
Mexico, $ 172/yr; International air delivery $318/yr. Except for special issues where price changes are indicated, single copies are available for $30.00 US and $35.00 foreign. Please address all subscription mail to CONSULTING-
SPECIFYING ENGINEER, 3010 Highland Parkway, Suite #325 Downers Grove, IL 60515. Printed in the USA. CFE Media, LLC does not assume and hereby disclaims any liability to any person for any loss or damage caused by errors
or omissions in the material contained herein, regardless of whether such errors result from negligence, accident or any other cause whatsoever.

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 3


INSTALL MORE. SAVE TIME.

GROW BUSINESS WITH RHEEM COMMERCIAL TANKLESS


Introducing Rheem Commercial


Condensing Tankless Water
Heaters packed with features
that deliver:

ENERGY SAVINGS
Up to 96% Thermal Efficiency means big
energy savings for business customers

MULTIPLE INSTALLATION OPTIONS


Scale tankless systems up with easy
manifold and common vent solutions1
designed to meet any business need

EASY TO INSTALL
New EZ-Rack Kit installs freestanding
or wall mounted in less than 10 minutes

Applies to manifold control ready units (indoor natural gas


1

models); vent up to 8 units inline with 8" trunk line, compatible


with room air, up to 100' run for up to five units, 8" trunk line.

COMMON VENT
COMPATIBLE
EASILY COMMON VENT
UP TO EIGHT UNITS WITH
Start growing your business. PPs SAVING MORE SPACE
Visit Rheem.com/Commercial-Tankless AND MATERIALS
or see your distributor today.

input #4 at www.csemag.com/information
Editors Viewpoint
CONTENT SPECIALISTS/EDITORIAL
AMARA ROZGUS, Editor-in-Chief/Content Manager
630-571-4070 x2211, ARozgus@CFEMedia.com
EMILY GUENTHER, Associate Content Manager
630-571-4070, EGuenther@CFEMedia.com
AMANDA PELLICCIONE, Director of Research
APelliccione@CFEMedia.com
MICHAEL SMITH, Creative Director
MSmith@CFEmedia.com
ELISA GEISHEIMER, Production Coordinator
630-571-4070, EGeisheimer@CFEMedia.com
Amara Rozgus,
Editor-in-Chief
EDITORIAL ADVISORY BOARD
CORY J. ABRAMOWICZ, PE, LEED AP,

Hungry for information


Associate, Environmental Systems Design Inc., Chicago
PETER ALSPACH, PE, LEED AP BD+C,
Principal, Mechanical Engineer, Arup, Seattle

A
JERRY BAUERS, PE,
Vice President, NV5, Kansas City, Mo. fter a recent visit with one of and will use a lot of different methods
MICHAEL CHOW, PE, LEED AP BD+C,
Principal, Metro CD Engineering LLC, Columbus, Ohio
the nations largest engineer- to gain the knowledge they need.
TOM DIVINE, PE, ing firms, I left with a lot of A concern that kept bubbling to the
Senior Electrical Engineer,
Smith Seckman Reid Inc., Houston
good information to ensure the right top of our conversation was staffing.
CORY DUGGIN, PE, LEED AP BD+C, BEMP, information is released to this audi- While this particular office had just
Energy Modeling Wizard, TLC Engineering for Architecture Inc.,
Brentwood, Tenn.
ence at the right time. We talked about experienced a reorganization in which
ROBERT J. GARRA JR., PE, CDT, print and digital magazines, enews- some people had been laid off, they
Vice President, Electrical Engineer,
CannonDesign, Grand Island, N.Y.
letters, education and webcasts, and were also short on talent in specific
JASON GERKE, PE, LEED AP BD+C, C X A, other means of delivering content. areas. Anyone at a staffing agency or
Mechanical Engineer, GRAEF, Milwaukee
Most of the folks I spoke with are in human resources should perk up
JOSHUA D. GREENE, PE,
Vice President, JENSEN HUGHES, Framingham, Mass. newly minted engineers, or have at this: Theres a shortage of qualified
RAYMOND GRILL, PE, FSFPE, not yet earned their professional engineers and building professionals
Principal, Arup, Washington, D.C.
DANNA JENSEN, PE, LEED AP BD+C,
engineer license. Theyre working at many levels.
Senior Vice President, WSP, Dallas on projects that vary widely, and Their concerns are echoed by
WILLIAM KOFFEL, PE, FSFPE,
President, Koffel Associates Inc., Columbia, Md.
admitted they learn a lot from ask- the 2017 MEP Giants, the top 100
WILLIAM KOSIK, PE, CEM, LEED AP BD+C, BEMP, ing the person in the next office or mechanical, electrical, plumbing
Senior Mechanical Engineer - Mission Critical,
exp US Services Inc., Chicago
workspace for advice and tips. This (MEP), and fire protection engineer-
KENNETH KUTSMEDA, PE, LEED AP, informal mentoring is key; younger ing firms (see page 33).
Engineering Manager, Jacobs, Philadelphia professionals need someone with Unlike past years when the econ-
JULIANNE LAUE, PE, LEED AP BD+C, BEMP,
Senior MEP Engineer, Center for Sustainable Energy, experienceeven if its just a few omys impact on the market was the
Mortenson Construction, Minneapolis years more than they haveto share No. 1 challenge, nearly a quarter of
DAVID LOWREY,
Chief Fire Marshal, Boulder (Colo.) Fire Rescue the trials and tribulations of engi- the MEP Giants companies reported
BRIAN MARTIN, PE, neering building systems. staffing: quality of young engineers
Senior Electrical Engineer, Buildings and Places,
AECOM, Portland, Ore. They also admitted they obtain as their biggest challenge.
DWAYNE G. MILLER, PE, RCDD, AEE CPQ, technical information on-demand. So, what can you or your firm
Chief Executive Officer, NV5, Las Vegas
Working on a hospital project? They do? Offering education and practi-
RODNEY V. OATHOUT, PE, CEM, LEED AP,
Principal, Regional Engineering Leader, search for examples similar to what cal knowledge are key. Whether its
DLR Group, Overland Park, Kan.
theyre designing. Tasked with design- emailing an article or signing up for
FREDDY PADILLA, PE, ATD,
Principal/Senior Electrical Engineer, Page, Austin, Texas ing a complex air system in a school? an online course, these hungry young
GREGORY QUINN, PE, NCEES, LEED AP, Find some practical articles, videos, professionals will appreciate it. Men-
Principal, Health Care Market Leader,
Affiliated Engineers Inc., Madison, Wis. or other collateral to help them bet- toringformally or informallyalso
BRIAN A. RENER, PE, LEED AP, ter understand a system. Need details helps ensure newer staff are guided in
Associate, SmithGroupJJR, Chicago
SUNONDO ROY, PE, LEED AP BD+C,
about how a product works? Call the a manner suiting the companys goals.
Vice President, CCJM Engineers Ltd., Chicago manufacturers representative to ask And manufacturers and vendors must
RANDY SCHRECENGOST, PE, CEM,
Austin Operations Group Manager and
questions or watch a demonstration. continually give younger team mem-
Senior Mechanical Engineer, Our conversation solidified my bers hands-on opportunities to learn
Stanley Consultants, Austin, Texas
MARIO VECCHIARELLO, PE, CEM, GBE,
hunch: Engineers are always curious, about technologies.
Senior Vice President, CDM Smith Inc., Boston
RICHARD VEDVIK, PE,
Senior Electrical Engineer and Acoustics Engineer,
IMEG Corp., Rock Island, Ill.
MIKE WALTERS, PE, LEED AP,
Campus Energy Market Leader, MEP Associates, Verona, Wis.
JOHN YOON, PE, LEED AP ID+C,
Lead Electrical Engineer, McGuire Engineers Inc., Chicago www.csemag.com Consulting-Specifying Engineer AUGUST 2017 5
MACH-ProView
LCD
NOW with TRENDview

TRENDview

SPACEview

Reliable Controls unveils the new MACH-ProView LCD with LISTview


TRENDview. This freely programmable, combination BACnet Building
Controller (B-BC) and BACnet Operator Display (B-OD) resides on
Ethernet, Power over Ethernet, Wi-Fi or EIA-485 networks. Backed
by an industry-recognized 5 year warranty and a nation-wide network
of certified Authorized Dealers, the new MACH-ProView will
empower you to stay in touch with your building's performance.
STATview
input #5 at www.csemag.com/information

www.reliablecontrols.com/MPV
Total annual value
of electrical, power
systems specified
Less than
More than $500,000
$3.0 million

16% research
41% 2016 FIRE AND LIFE SAFETY STUDY
28%
Fire, life safety in hospitals,
15% health care facilities
T
he Consulting-Specifying Engineer officials have the most impact on
$1.1 million to $500,000 to 2016 Fire and Life Safety Study hospital/health care facility fire and
$3.0 million $1.0 million
indicated that 48% of engineers life safety design, according to 78% of
specify, design, or make product selec- respondents. Architects, owners, and
Figure 1: Forty-one percent of engi-
tions for hospitals and health care facili- electrical engineers are also involved in
neering firms specify electrical or
tiesand eight in 10 of these engineers these designs.
power systems valued at more than
are responsible for determining the 4. Challenges: When working on
$3 million into new and existing build-
requirements for these projects. Below fire and life safety systems for hospi-
ings annually. Source: Consulting-
are five fire protection and life safety sys- tals/health care facilities, engineers are
Specifying Engineer 2016 Electrical
tem and design findings as they relate to having the most difficulty with code
and Power Study
these facilities: authorities subjective interpretation of
1. Systems specified: The top three regulations (73%), insufficient budget

8 in 10 engineers are
responsible for determining the
fire and life safety systems being speci-
fied into hospitals/health care facilities
are fire, smoke, heat, and linear detec-
for good design (63%), and designing
for interoperability and integration of
systems (63%).
requirements/writing the specifica- tion systems (87%); smoke detection, 5. Comparing products: Overall
tions for lights, lighting equipment, control systems, dampers, etc. (80%); quality is most important when select-
and/or lighting controls. Source: and network and intelligent fire alarm ing a fire and life safety system for a
Consulting-Specifying Engineer 2017 control panels (69%). hospital/health care facility; engineers
Lighting and Lighting Controls Study 2. Specifications: Engineers are are also looking at manufacturers repu-
most frequently issuing performance tations and service support.
fire and life safety systems specifica-

54% of mechanical engineers


regularly specify dedicated outdoor
tions (80%), followed by prescriptive
specifications (67%).
View more information at
www.csemag.com/2016FireLifeSafety.
3. Discipline impact: Local authorities Amanda Pelliccione is the research direc-
air systems. Source: Consulting- having jurisdiction or local fire tor at CFE Media.
Specifying Engineer 2015 HVAC and
Building Automations Systems Study
Annual value of fire, life safety systems specified
for new, existing hospitals/health care facilities
of fire protection engineers are
responsible for recommending the
Less than $500,000 2
21%

brand of fire and life safety systems $500,000 to $750,000 12%


for projects. Source: Consulting-
$750,001 to $1.0 million 21%
Specifying Engineer 2016 Fire and
Life Safety Study $1.1 million to $3.0 million 20%

$3.1 million to $5.0 million 11%


More research More than $5.0 million 15% 15%
Consulting-Specifying Engineer cov-
ers several research topics each year.
All reports are available at Figure 2: The average firm earns $2.27 million annually from fire and life safety sys-
www.csemag.com/research. tems specified into new and existing hospitals/health care facilities, with 26% generat-
ing more than $3 million each year. Source: Consulting-Specifying Engineer

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 7


Lifting Fork Pockets

30 1/2 12 5/8

13 3/4

Turbulators
Access Panel
7 5/8 Retaining Screws

5 3/16
Reznor packaged rooftop units
Lifting Fork Pockets are highly configurable at the factory, so you get the
exact spec unit you need delivered to the job site. With over 35 options per tonnage
size, there are over 750,000 unit configurations available all meeting 2018 efficiency
standards. Theres a quick-ship option for rush jobs, too. Its the solution-driven answer
to respect your spec.

Find out why successful


engineers rely on Reznor.

reznorhvac.com
Reznor is a registered trademark of Nortek Global HVAC, LLC Nortek Global HVAC, LLC 2017. All Rights Reserved.

input #6 at www.csemag.com/information
Career Smart
REBECCA DELANEY, PE,
Skidmore, Owings & Merrill, Chicago

To mentor and be mentored:


What does it really look like?
Debunking mentorship myths within the engineering industry.

M
entorship is a key component experience of surrounding leaders The mentee didnt let the absence of
to the development and suc- including conference speakers and col- formal titles discount the importance
cess of young professionals lege professors. Some mentors youll of the relationship. In the past several
early in their career. Leading govern- meet once, others regularly, and some years, his informal mentor has inspired
ment officials, CEOs, and thought over coffee quarterly. Many of the tremendous growth in his professional
leaders have each proclaimed the value most meaningful learning moments and personal life.
of mentorship and the role it played in have come from a conversation or
their own success. speaker who created the challenge to Myth #3:
In their books Lean In and think differently about the world. This Mentorship is all about me.
Unfinished Business, Sheryl Sand- can lead to a long-term mentorship. Most of the guidance will flow in the
berg and Anne-Marie Slaughter, Merriam-Webster defines a men- mentees direction. However, being a
respectively, emphasized the impor- tor as a trusted counselor or guide. mentor has profound impacts too. The
tance of mentorship. In 1977, a study A mentor can be any age, have any ability to share experiences provides
published in the Harvard Business relationship to you, or come from any encouragement and confidence while
Review found that approximately 66% level within a company. Mentors are all also serving as a reminder of how
of respondents had a mentor, which around youfinding one is all about much growth has occurred since the
led to higher earnings and increased how you seek them out. Leverage your beginning of the mentors career. Its
happiness at a younger working age. extensive access to potential mentors easy to always look ahead and continue
The concept of mentorship isnt new, through LinkedIn, email, blogs, web- to improve; but as a mentor, reflecting
but in the age of social media and casts, conferenceseven if you only upon that mentor relationship experi-
digital integration, the roles of the interact once, the advice of an experi- ence is very meaningful.
mentor and mentee have evolved to enced professional can still contribute There is value in a formal mentor-
keep pace with access to information, to your success. ship. However, for a young engineer,
resources, and technology. the lack of awareness of such pro-
Here are a few of the myths that have Myth #2: grams can limit access to a network
been debunked regarding mentorship: Mentors must agree to be your mentor. of academic peers and professional
For example, there was a young colleagues. Years later, I realized
Myth #1: man who became good friends with how much mentorship I had already
Mentorship is a formal relationship. a successful, midlevel analyst within received informally in the early years
Mentorship has been presented as a his firm. Their conversations spanned of my careermuch of which laid the
formal relationship between two peo- from sports to the politics of senior foundation for success I have found
ple, most frequently involving a junior management and potential areas of later in my career.
staffer and a senior executive. As a growth for young professionals. The
college graduate, theres the fear of not relationship had all the hallmarks Rebecca Delaney is a mechanical team
finding a mentor early on. Embracing of mentorship, but lacked a formal leader at Skidmore, Owings & Merrills
an informal approach to mentorship arrangement, alleviating pressure on sustainable engineering studio. She was a
allows mentees to leverage the the mentor and mentee. 2016 40 Under 40 award winner.

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 9


MEP Roundtable
Steve Brown, Certified
Automation Professional
Vice President and
The art of designing
sports, entertainment,
Operations Director, Energy
& Automation Teams
Environmental
Systems Design

and specialty structures


Chicago

Entertainment venues are big businessesand big on


complexity, with a host of complex systems and requirements
for engineers to tackle.
Daniel P. Christman,
PE, LEED AP
Vice President/Entertainment
CSE: Whats the No. 1 trend you see sports arenas have an ever-increasing list of
Market Sector Leader
exp today in the design of such specialty complex audio/video (A/V) and telecommu-
Orlando, Fla. structures? nications systems.
The progression of super Wi-Fi networks
Daniel P. Christman: In entertainment by National Football League (NFL) stadiums
design (theme parks, zoos, aquariums, water that incorporate radical speeds and support
parks, etc.) the No. 1 trend in facility design tens of thousands of simultaneous users has
remains designing a facility that supports the led to numerous Division I college football
story. Designing amazing buildings or using stadiums incorporating similar systems.
the latest technology is hollow in this indus- These systems have huge advantages over
try if it doesnt support the story and guest vendor-installed distributed antenna systems
Keith Esarey, experience. (DAS) that use the cellular network but have
PE, LEED AP Keith Esarey: For specialty structures, we large initial first costs when compared with
Principal often see a demand for a structure to have potentially very inexpensive vendor-installed
McClure Engineering multiple uses. These buildings represent sig- DAS. Also, complex sound and video systems
St. Louis
nificant investments, and clients are looking must be programmed and budgeted from
for multiple ways to use the facilities. For the initial steps. These A/V systems must
example, university performing arts venues incorporate new 4K recording trends while
may only be scheduled for six or seven major providing for both internal and external sta-
events, but there are opportunities to partner dium broadcasts.
with the local community to use these spaces. Doug Lancashire: The No. 1 trend were
These additional uses create new challenges seeing in sports facilities is a focus on the fan
in terms of engineering and design. experience. As engineers and architects, we
Tony Hans: In theater design, we see a trend are being challenged with creating an envi-
Tony Hans,
for LED theatrical-lighting instruments that ronment whereby the typical fan is able to
PE, RCDD, LEED AP reduce electrical and heat loads for the per- immerse themselves in a virtual experience
Vice President forming spaces. In addition, sound systems that makes them feel more a part of the action
CMTA including innovative line array speaker tech- and not just a spectator.
Louisville, Ky.
nology combined with the latest in digital Today, we live in a world centered on con-
audio control and processing, for true lifelike nectivity through our smartphones. This
sound reinforcement throughout the audi- connectivity enables the user to customize
ence seating area. Also, todays collegiate their daily experience and develop interac-

10 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


Mike Hart,
PE, LEED AP
Principal, CEO
ME Engineers
Golden, Colo.

Figure 1: Osborn Engineerings work at Progressive Fieldhome of MLBs Cleveland Indi-


ansincludes new concessions and restaurants, suite renovations, new LED field lighting, new
scoreboards, and replacement of the parks chilled-water plant. Courtesy: Osborn Engineering/ Doug Lancashire,
PE, LEED AP,
OSports
CEM, CGBE
Vice President,
Director of Energy/
tion with their environment through immer- the project including location, systems Facility Systems
sive technology. Take, for example, a current engineered, team involved, etc. Osborn Engineering
Cleveland
Osborn project at a Division 1 university.
While the base project is the replacement of Mike Hart: Atlanta Braves SunTrust Park
the scoreboard and the replacement/upgrade is a new Major League Baseball facility for
of the sound system in the main basketball the team. We designed all the mechanical,
arena, the goal of the project is to enhance electrical, and plumbing (MEP) systems
the fan experience. including LED sports lighting as well as the
Scoreboard technology has in it the ability data, Wi-Fi, DAS, and other low-voltage
for apps running on your phone to interact systems. The outdoor baseball-only venue
with the activities of the scoreboard, allowing features multiple name brand local eat-
pregame music activity to play and light up ery concessions bringing local flavors to Chris Skoug, PE, CEM
your cell phone while doing the same on the the fans. The ballpark has one of the most Principal Engineer
scoreboards and the ribbons. Or, pregame or extensive DAS in the league, providing users Southland Engineering
Dulles, Va.
halftime activity could include shooting vir- with cell phone connectivity even under
tual free-throws with your favorite players. full-house conditions.
No more is it sufficient to provide a venue Christman: exps entertainment and sports
for a fan to sit and watch an event. The goal group designs MEP/fire protection (MEP/
today is to get that fan into the game itself. FP), extra-low-voltage (ELV) systems, light-
Chris Skoug: The No. 1 trend I see in the ing, and structural systems for theme parks,
design of specialty structures is a focus on zoos, aquariums, water parks, sporting venues,
flexibility to adapt the structure to maximize and highly themed retail and restaurants all
the use of the facility. A stadium is not just a over the world. Our clients include Walt Dis-
stadium anymorea building owner is look- ney Imagineering, Universal, SeaWorld, Six
ing to maximize the use of the facility to use it Flags, Georgia Aquarium, United States Tennis
for other events, too, such as concerts, speak- Association, and many others.
ing events, and conventions. This multiuse Lancashire: Over the past couple of sea-
approach drives programming and support sons, Osborn Engineering/OSports has been
systems. responsible for a number of upgrades at Pro-
gressive Field, home of the Cleveland Indi-
CSE: Please describe a recent project ans. Projects have included new concessions/
youve worked onshare details about restaurants, renovations of suites, new LED

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 11


MEP Roundtable
field lighting, a new scoreboard, and lighting, next-generation A/V tele- helping them see what is possible and
replacement of the ballparks chilled- communications systems, radiant heat how these technologies can help them
water plant along with major air han- under the stands, and snow melt at the achieve their business goals. Through
dling systems. entries are all strategies recommended. iterative collaborative discussions with
Hans: We have designed security the business stakeholders, the universe
systems for the University of Kentucky CSE: How have you worked with of the possible becomes refined to what
Commonwealth Football Stadium reno- the building owner or facility man- will be practically applied to their facility.
vation and the new baseball stadium. ager to implement the Internet of Skoug: We are more frequently chal-
Also, the University of Kentucky ath- Things (IoT) into their facility man- lenged with the application of emerging
letic complex including softball and agement? Have you helped catalog technology for these specialty facilities
soccer stadiums. The security system every device in these buildings, and work with users to vet viability of
design incorporated coordination with such as lights, fire alarms, electri- integration and mock-up testing to vali-
the university police and tied the stu- cal outlets, room thermostats, and date new applications. Its a very cus-
dent-information database to the cam- other products? tomized effort. There is generally an
pus digital-surveillance network and increased level of integration for these
the campus access-control network via Steve Brown: Every building is projects. Some examples: suites are
digital analytics. unique, presenting its own exciting designed to have single-room control-
In a recent study of an ice arena in opportunities and sometimes equally lers to adjust lighting, HVAC, and A/V.
Ohio, we provided a study of the energy daunting set of design challenges. Spe- There is system integration for HVAC,
performance of the building with rec- cialty structures, such as sports arenas, lighting, electrical load metering, water/
ommendations to provide an expansion stadiums, and theaters, have their own sewer utility metering, and gas meter-
while reducing the energy-use index unique opportunities and challenges. As ing (submetering at kitchens). HVAC
(EUI) and utility bills. The study has the building owners advocate, it is our controls can be modulated based upon
to affect the why of the building so, responsibility to inform facility stake- building occupancy from feedback
as with all arenas, must improve the holders of current IoT technologies from the electronic ticketing system.
fan experience. The use of LED sports and the systems-integration landscape, Lancashire: The best example of this
would be a hotel that we are designing
as part of a larger sports campus. Every
guest room in the hotel has computer-
ized controls that adapt your environ-
ment automatically, either by means of a
multitude of sensors or by means of user
interaction using a graphic touchscreen
in each room. All systems are networked
together and facilitate centralized main-
tenance and management electrically,
mechanically, and technologically.
Christman: Building automation sys-
tems (BAS) have allowed us to connect
many devices together to share data for
some time. Standardized protocols have
allowed us to connect even more devices
to these systems. We have included links
to drawings, operation and maintenance
Figure 2: A team from Southland Engineering facilitated a contractor-and-engineering manuals, and training videos in the
alignment to ensure collaboration on an NFL stadium in the southeastern United graphic screens for BAS. We have also
States. Staff offered mechanical and plumbing system engineering support related to included basic maintenance data that
HVAC central plant design; peer-reviewed mechanical system concepts and load cal- would be needed frequently, such as belt
culations; HVAC air distribution and optimization and computational fluid dynamics and filter sizes. We are now seeing devices
(CFD) modeling; equipment selection; target value design options for mechanical and that arent being connected directly to the
plumbing systems; specification alignment; and building automation controls design. BAS but directly to the internet. The use
Shown are bowl duct CFD analyses. Courtesy: Southland Engineering of LED lighting, digital thermostats, and

12 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


programmable fire alarm devices pro- of coordination and detail required. This Brown: With integration-protocol
vides the owner with the ability to con- enhanced coordination means more inconsistencies, we helped align com-
trol each device individually and remotely communication (we frequently use the munication protocols where they were
over the internet from any of their facili- term hypercommunication), coordina- unclear, inconsistent, or missing entirely.
ties around the world. tion, and creative change. When youre This task is much more effective during
designing a fully immersive guest expe- the design phase, before any equipment
CSE: What are the challenges that rience, one that temporarily transports is ordered and installed. It is still possible
you face when designing specialty a guest to a different place or time, the to correct in the field, but typically more
facilities that you dont normally necessary essentials in a building, such difficult and expensive. In some cases, it
face for other building projects? as HVAC ductwork or electrical discon- may not be possible to correct, resulting
nects, must be cared for with the same in a missed opportunity to capture data
Esarey: Specialty climate control level of detail as the show set or projec- from the affected system. An often over-
tends to be the biggest difference. More tion system or they will diminish the looked item is developing, and following,
specifically, controlling the temperature experience. a consistent naming convention for a cli-
and humidity in a space. For example, There are also several stakeholders that ent and their building systems. Though
climate conditions for instrument stor- are not typically involved in traditional this is important for consistency within
age and use are critical in a perform- buildings. Creative directors, show pro- a system, it is crucial in an integrated
ing arts venue; similarly, the hardwood
floors of athletic facilities require Specialty structures, such as sports arenas, stadiums,
minimum humidity levels to protect
and theaters, have their own unique opportunities and
the structure. The nature of specialty
structures creates a challenge. These challenges. Steve Brown
spaces spend most of the week par-
tially or lightly loaded and very seldom ducers, storytellers, theming contractors, platform when integrating multiple dis-
meet their full occupant capacity. These and ride and show teams are just some parate systems and their data points into
diverse load characteristics need to be of the additional groups the engineering a higher level. Also, upgrading the com-
considered when designing an HVAC team needs to engage for coordination. munication infrastructurewhether in
system that must be able to perform Hans: Many times, these types of design for new construction or in place
efficiently while running at less than facilities have unique structures and for existing buildingsto enable the
design capacity. require some deliberate thought and increased data traffic speed and capac-
Skoug: I have encountered a num- planning as to how the MEP systems ity on the converged network. In existing
ber of unique challenges when design- are designed with respect to main- buildings, it is necessary to inventory the
ing specialty facilities, including high tenance. We try to have some crucial existing building systems to determine
occupancy and ventilation rates, right- conversations early with the stakehold- the ability to incorporate them into the
sizing MEP systems for usage diversity, ers and rely on our experience to ensure integrated platform. These systems have
coordination of MEP utilities within the facility will not only function as been upgraded to recent versions and/or
unique structures, and unique build- planned, but will enable cost-effective open-protocol platforms to enable the
ing envelope HVAC loads for stadiums maintenance throughout the lifecycle integration of their valuable data to the
due to increased vertical and horizontal of the building. Examples would be higher-level platform.
glazing to create a sense of connection designing for access to fixtures and Lancashire: In general, most integra-
to the outside of the structure. devices via catwalks, light-lowering tion and/or interoperability issues seem
Christman: In addition to designing systems, etc. Often, the incorporation to stem from an overcomplicated system
world-class entertainment, gaming, and of lower first-cost systems create high- or systems that is therefore misused or
hospitality projects, exp also designs er maintenance costs, and the balance misunderstood. Our goal as engineers
a multitude of other project types with tight budgets needs to be a coor- is to understand the complexity that is
including health care, science, munici- dinated decision between athletics and required to properly operate a facility
pal works, etc. In many respects, the the facilities management departments. and tailor the design to specific needs
challenges are the same: coordination, and skill sets of the staff operating the
deadlines, communication, etc. CSE: What types of system inte- building. In many cases, simplicity is
The biggest difference between venues gration and/or interoperability what is called for to achieve this goal.
that are focused on the guest experience issues have you overcome in such Christman: In addition to the BAS
and more traditional venues is the level facilities, and how did you do so? controlling the MEP systems, we work

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 13


MEP
Roundtable
on facilities that also have other con- types (e.g., individual office buildings) um, we had a challenge on how to serve
trol systems running. These can be and can be very difficult to comply with utility company power throughout the
ride-control systems and life safety for unique buildings with heavy plug stadium campus. The campus consisted
systems for animals (i.e., water-quality loads on a campus, such as a theme of four separate buildings dedicated for
management). There is a need to keep park. the football stadium (press box/grand-
these systems separate so that an HVAC Skoug: Energy codes are challeng- stand on either side, alumni center on
technician doesnt affect the safety on a ing due to high internal loads, unique south end zone, locker rooms on north
ride, such as a roller coaster. However, building envelope materials, and the end zone) and future plans for three
we do run into occasions where we do physical size of buildings that require separate structures (transportation
need these systems to work together. increased utility distribution. center, natatorium, auditorium). The
owner wanted to limit the amount of
The most challenging standards to follow for atypical utility meters used to avoid having to
pay multiple meter fees, demand charg-
buildings is sustainable-design certification programs.
es, and utility bills.
Daniel P. Christman We originally looked at the owner
installing and owning their own pri-
For binary data, we typically use relays Hans: From IBC Section 1006, mary distribution, but the owner didnt
or dry contacts. For analog values, we lighting calculations in large assembly feel comfortable having to maintain
will create an analog output from one spaces can be difficult and time inten- this distribution. We then looked at
system that will be measured as an ana- sive due to the complex structure of a single primary meter and the utility
log input in the other control system. It the space. Standard general rules for company routing distribution through-
simply requires extensive coordination calculations fall short when designing out the campus, but the owner would
during the design of the project. lighting levels in large, complex spac- have to give up too many easements for
es. Additionally, large assembly spaces this scenario. We ended up scheduling
CSE: What are the most challeng- typically have multiple uses and multi- a meeting with the utility company and
ing codes and standards to follow ple arrangements of seating and enter- helped the owner negotiate a contract
for such structures? What makes tainment equipment that will impact with the utility to provide four meters
them so challenging? egress paths and lighting systems and to serve the entire campus, but only pay
locations. Often, egress paths may one meter charge and have all meters
Lancashire: One interesting challenge change based on different arrange- grouped together on a single bill with
were facing in the renovation of sports ments of the space. All paths must adjusted demand charges. One meter
venues that are only 10 to 20 years be accounted for in terms of general served all football-related facilities with
old is that sports facilities, especially lighting, emergency backup, and con- secondary distribution routed to each
professional stadiums and arenas, are trol during emergency. Egress lighting facility, and separate meters served the
now offering higher-end food-service mounted to bleachers, seating, or aisle transportation, auditorium, and nata-
options with full kitchens and wet bars floors are very prone to damage by torium facilities.
everywhere throughout the building. occupants. Fixtures and connections Christman: One challenge we con-
Gone are the days of providing fans are installed at locations vulnerable to sistently run into on entertainment
with just hot dogs and beer. This means being stepped on, kicked, or becoming and aquarium/zoo projects is the
that we have to provide power, ventila- exposed to liquids. Extensive care must highly corrosive nature of the water
tion, and plumbing services to parts of a be taken to design a lighting system used in rides and exhibits, and the
ballpark that werent originally intend- capable of standing up to the environ- effect this corrosion can have on
ed for that use. In some cases, this can ment in which it is installed. neighboring equipment. This not only
require extremely invasive construction affects the engineering team, but also
to provide these amenities. CSE: Describe a recent electri- the material selected by architects and
Christman: The most challenging cal/power system challenge you theming designers. A best practice
standards to follow for atypical build- encountered when working on such weve implemented is to meet with
ings is sustainable-design certification a project. the design team to establish corrosion
programs, such as U.S. Green Building zones where we can expect corrosive
Council LEED. Those programs are Hans: During the design of a recent material, such as treated freshwater or
designed around more typical facility $60 million high school football stadi- saltwater, to be splashed or carried by

14 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


Design and installation considerations for generator sets

Wednesday, Sept. 13, 2017, at 11 a.m. PT/1 p.m. CT/2 p.m. ET


A Certificate of Completion is available for all attendees
#MTUpower

Designing a generator set system can be challenging and requires in-depth knowledge
regarding several key parameters. This presentation will discuss topics such as
generator set ratings, environmental considerations, derating concerns, new trends
regarding fuel, designing for IBC requirements, and understanding system controls.

Learning objectives:
Generator set ratings and manufacturer allowances
IBC requirements for generator sets
Changes in fuel and the effects of biodiesel
Generator set controls and system integration
Codes and standards for generator sets

Presenter: Brian Ponstein, Regional Sales Engineer,


MTU Onsite Energy

Moderator: Jack Smith, Content Manager and Moderator, Pure


Power, Consulting-Specifying Engineer

Register today at www.csemag.com/webcast

Sponsored by:
MEP Roundtable
themed environments, some current
Timed egress studies are the best way to determine a rea- fire codes do not reflect many of the
sonable exhaust rate. These studies demonstrate that smoke situations presented. Extreme care
can be allowed to gather while occupants exit as long as it must be reserved in these areas to not
only develop a system that meets the
never builds to a point where it impedes exiting. Mike Hart intent of codes and the approvals of the
AHJ, but first and foremost to ensure
guests. We coordinate with the design that we had to integrate into the exist- life safety needs are placed at the high-
team to ensure all devices in these ing space. est priority. This is another area where
areas are specified with the appro- using BIM greatly enhances coordina-
priate materials, gasketing, etc. The CSE: What are some of the chal- tion and enables us to bring attention to
corrosive zones are clearly identified lenges for fire and life safety system challenging areas during design so that
in the documents so the contractors design for specialty facilities? the entire team is comfortable with the
understand where corrosion-resistant eventual outcome.
materials are required. Christman: There are several chal- Hart: Smoke control or exhaust
Lancashire: With sports venues con- lenges designing fire protection sys- is something that must be carefully
stantly competing with each other for tems for highly themed environments addressed in high-occupancy buildings.
the biggest and best of everything, we and animal exhibits. Tremendous care Using prescriptive means of calculating
have designed the installation of several must be taken to route pipe, specify fit- the required exhaust rates may result in
large scoreboards including the largest tings, and select sprinkler types that, unrealistically and unnecessarily high
in MLB. The electrical/power challenge at worst, minimize the impact on the requirements. Timed egress studies are
with this project was that the new score- guest experience, and at best, disappear the best way to determine a reasonable
board demanded its own server room altogether. When working with highly exhaust rate. These studies demonstrate

2016 The Metraflex Company

input #7 at www.csemag.com/information
that smoke can be allowed to gather while CSE: What unique HVAC require- systems for occasional vehicular traf-
occupants exit as long as it never builds to ments do specialty facilities have fic inside the facility.
a point where it impedes exiting. that you wouldnt encounter in other Christman: We frequently work
Hans: Fire alarms in stadiums are buildings? on theme park attractions where the
always a challenge. Trying to provide HVAC systems become part of the
adequate coverage to the concourse Esarey: Large swings in occupancy show. We have created unusually cold
and seating areas is most difficult can wreak havoc with an HVAC sys- or hot spaces that are consistent with
due to a few walls and abundant open tem. We had to develop strategies for the story being told in the space. In
areas. The solution is often to integrate controlling the system at specialty other cases, we have had to design
the fire alarm system with the sound structures during normal hours of special exhaust systems to quickly
system for the facilities. This requires operation when the spaces are par- reset the air quality in a guest space.
additional components to be specified tially or lightly occupied. Humidity In one example, we designed a system
with the sound system so that, in the is a major concern for these kinds of the clears the air of a fog effect that
event of a fire or emergency announce- structures as well as noise, which is a completely immerses a 900-seat the-
ment, the fire alarm would take pri- common issue in performance centers. ater in less than 2 minutes, before the
ority over all other functions that the Skoug: Specialty facilities unique next batch of guests arrive.
sound system is providing. This also HVAC requirements include: field-
Read more at
requires the sound system to be on the heating systems, food-service condens- www.csemag.com including:
emergency generator for the facility. ing equipment, kitchen grease-exhaust  Acoustics.
Sizing of the generator must account duct, ventilation systems for beer keg  BIM.
 Codes and standards.
for the large amplifier loads that must rooms (carbon dioxide beer pump  Fire, life safety, and security systems.
remain active in the event of power systems), and addressing the need for  High-performance and sustainable buildings.
 HVAC systems.
loss to the facility. service corridor garage-ventilation  Integrated project delivery.

S +TECHN
HIC O
AP
LPEC
LO
GR

GY
LIGHTING +

= IMAGE

LPASC

e
il a b l
SLI
SIN 6
C E 197 va
c o n tr ols a

Premium Performance: LSI LED Troffers


Low-Profile, Direct/Indirect Dimmable Lighting with Optional Wireless Controls
SLI LPASC LPEC
Indirect fixture featuring Minimal 2.5 depth ideal for Even illumination
a unique side-lit design tight spaces Excellent, low-angle
Balanced illumination Exceptionally long life brightness control
and high angle light Even illumination Ideal for shallow
Nearly maintenance-free plenum applications
Many models DLC Listed
or DLC Premium
input #8 at www.csemag.com/information

www.lsi-industries.com Ph. (513) 793-3200 Fax (513) 793-0147 10000 Alliance Road. Cincinnati, Ohio 45242
LSI Industries, Inc. The majority of LSIs products are assembled in USA facilities by an American Workforce utilizing both domestic and foreign components.
Energy savings are in the air.
Retrot your AHUs with GreenTech EC fans
and save up to 50% of energy costs.

Inefcient fans with belt drive Highly efcient FanGrid


and external control electronics. with GreenTech EC fans.

ebm-papst develops high efficiency EC fans for building air-conditioning systems.


They benefit not only new buildings, but also existing systems because retrofits pay
for themselves very quickly. To find out how you can reduce operating costs with EC,
contact us at: sales@us.ebmpapst.com
The engineers choice
input #9 at www.csemag.com/information
Codes & Standards

ASHRAE 62.1:
uncommon calculations, approaches
ASHRAE Standard 62.1 is best known for its regulation of the amount of
ventilation air delivered to each space by HVAC systems through its
ventilation-rate procedure approach to system design. ASHRAE 62.1 offers
many calculations and performance approaches.

BY PETER ALSPACH, PE, Arup, Seattle

M
ost HVAC engineers are familiar with  Section 5.9.1: Relative Humidity (RH).
ASHRAE Standard 62.1: Ventilation Learning
for Acceptable Indoor Air Quality.  Section 6.2.6.2: Short-Term Conditions. objectives
Likewise, the fundamental calculations required  Know the basics of ASHRAE
by the standard are also generally familiar and  Appendix A, A1.2.2: Secondary Recircula- Standard 62.1: Ventilation for
have been adopted into many building codes tion Air Systems. Acceptable Indoor Air Quality.
within the United States, either explicitly or as  Summarize the less com-
an alternative means of compliance.  Appendix B, B2: Determining L Distance mon calculations within this
standard.
However, there are some calculations that (for exhaust-air outlet separations).
are less commonly applied and/or codified  Review examples to
enhance the understanding of
that are worth exploring. Some of these cal- Section 5.9.1: Relative Humidity these calculations.
culations are required when pursuing green Section 5 is an important portion of the stan-
building certifications, such as U.S. Green dard that many engineers and architects often
Building Council LEED compliance, as a part fail to fully evaluate for compliance. This sec-
of the overall ASHRAE 62.1 compliance doc- tion of the standard governs many aspects of the
umentation (though some are often ignored HVAC and building (read: architectural) systems
by many practitioners and reviewers). Other that impact IAQ. Aspects governed by this sec-
calculations can help the designer improve tion include duct and air distribution system
the ventilation and indoor-air quality (IAQ) design, air handling system design, outside-air
performance of their designs or offer per- intake proximity to exhausts and other potential
formance-based alternatives to prescriptive contaminant sources, controls, filtration, rain
requirements for consideration. entrainment and faade moisture management,
While this article offers an overview of some and operations and maintenance, to name just
of these calculations, users of the standard are some of the many important aspects covered by
encouraged to purchase the ASHRAE 62.1-2016 the standard and required for compliance.
Users Manual and accompanying calculation One important, and often overlooked, aspect of
spreadsheets from ASHRAE for a thorough good ventilation and HVAC system design is the
and complete understanding of all aspects of control of indoor RH. While the standard does not
the standard. attempt to mandate design checks for all system oper-
This article will summarize and provide exam- ational situations, Section 5.9.1 requires the designer
ples for the following less common calculations to address RH management of the HVAC system
included within ASHRAE Standard 62.1-2016: under a typical dehumidification design condition.

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 19


Codes & Standards
The dehumidification design condi- Relative humidity: Example 1 For the analysis, we will assume a VAV
tion within the standard is to maintain a Location: Baltimore. system with a typical supply air condition
maximum indoor RH of 65% under the of 55F dry-bulb, 54F wet-bulb under the
following: 1% design conditions: 74.1F dewpoint; aforementioned design condition, with the
81.1F mean coincident dry-bulb tem- supply airflow rate determined by the space-
 Outdoor conditions at the dehu- peratures. sensible cooling load. This results in a deliv-
midification design conditions ered airflow rate of 825 cfm.
(user-stipulated at the 2%, 1%, or Indoor design target: 74F dry-bulb; The resulting psychrometric analysis
0.4% conditions); dewpoint and 65% RH. shows that the space conditions will be 74F
mean coincident dry-bulb tem- dry-bulb, 63% RH (see Figure 1). The HVAC
peratures. Space: A 1,000-sq-ft conference room system meets the ASHRAE design require-
with an exterior window. ments as outlined in Section 5.9.1. However,
 Indoor sensible and latent the designer should note that the conditions
loads at design conditions. System type: Variable air volume (VAV). are very close to the maximum allowed
adjustments in supply air temperature above
 No solar loads (but shall include Internal loads: 17,000 Btu/h sensible; the design condition should be avoided to
envelope conduction and infiltra- 10,000 Btu/h latent. maintain acceptable indoor RH conditions.
tion loads).
Envelope load (conduction): 500 Btu/h Relative humidity: Example 2
It is important to consider this type sensible. Location: Los Angeles.
of scenario, as well as other part-load
scenarios with potentially high outdoor Infiltration load: 300 Btu/h sensible; 1% design conditions: 66.2F dewpoint;
or indoor latent loads, when design- 1,200 Btu/h latent. 73F mean coincident dry-bulb tempera-
ing HVAC systems to properly manage tures.
indoor RH, especially in warm and humid Total space load: 17,800 Btu/h sensible;
climate zones that predominate in the 11,200 Btu/hour latent; sensible heat Indoor design target: 74F dry-bulb;
eastern and southern United States. ratio (SHR) = 0.61. 65% RH.

Figure 1: A conference room example


of a relative humidity calculation shows
sensible heat ratio and resultant indoor
relative humidity under part-load condi-
tions. All graphics courtesy: Arup

20 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


Space: A 500-sq ft cocktail lounge We will assume that the fan coil runs at a control) fan coil and maintain a constant
with two exterior windows. constant volume of 750 cfm and modu- supply air temperature off the fan coil of
lates its cooling coil to meet the spaces approximately 55F. This would provide
System type: Dedicated outside-air dry-bulb setpoint. The ventilation air additional latent cooling without wasteful
system (DOAS) with chilled-water fan provides 9,720 Btu/h of sensible cooling, reheat energy consumption.
coil unit (FCU). with the fan coil picking up the remaining
7,280 Btu/h of sensible cooling at a supply Short-term conditions
Internal loads: 17,250 Btu/h sensible; air condition of 65F dry-bulb, 62.7F wet- Section 6.2.6.2, Short-Term Condi-
13,750 Btu/h latent. bulb (sensible-only cooling is assumed tions, addresses design situations that
due to the part-load operation). occur less frequently, but are helpful to
Envelope load (conduction): -200 Btu/h With an SHR of 0.54, the resultant pre- give the designer flexibility in designing
sensible. dicted indoor RH is 72%. This clearly fails a right-sized ventilation system. Some
the required design criteria (see Figure 2). space types, projects, or program areas
Infiltration load: -50 Btu/h sensible; In reality, the indoor RH will be higher have highly intermittent occupancies,
525 Btu/h latent. than 72%, as the initial analysis assumed which may not warrant the full ventilation
a drier starting point for the FCU cooling flow rate on a constant basis that would
Total space load: 17,000 Btu/h sensible; coil, which will result in a higher-enthalpy otherwise be determined by the standard
14,275 Btu/h latent; SHR = 0.54. mixed-air condition and resultant higher if occupancy were relatively constant.
indoor RH. The standard approaches averaging
Peak-cooling space-sensible load: In this condition, the designer must by looking at an averaging time that
25,000 Btu/h, including solar load modify the design or controls to meet the is equivalent to three time constants
(for FCU system sizing). required maximum RH of 65%. The con- (approximately 95%) of the space without
ventional, if inefficient, approach would any averaging reductions. The formula is
For the analysis, we will assume that be to subcool and reheat at the FCU to given as Equation 6.2.6.2-1 (IP):
the DOAS provides ventilation air at a meet the RH target. The more energy-
3v
constant rate of 450 cfm at a supply air efficient approach would be to use a vari- T = ______
condition of 55F dry-bulb, 54F wet-bulb. able-speed (not multispeed/staged fan Vbz

Figure 2: This bar example of a relative


humidity calculation shows sensible
heat ratio and resultant indoor relative
humidity under part-load conditions.

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 21


Codes & Standards
Where expected to arrive over the course of 1 However, due to the large reductions,
hour, all mingling for 15 minutes before these assumptions should be thoroughly
v = the volume of the ventilation the main hall doors are opened and reviewed with any building owner to
zone, in ft3. then entering the hall over the course of ensure they meet the current and future
another 15 minutes. The lobby remains needs and flexibility of the space. Alter-
Vbz = the breathing zone outside airflow empty for 2 hours during the concert. natively, the system could maintain the
rate, in cubic feet per minute, calcu- The guests then exit over 15 minutes, capacity and capability of the full ventila-
lated per equation 6.2.2.1 at the design, and the venue is then empty for the tion rate and simply use controls to reduce
steady-state, population. remainder of the night (staff ignored the ventilation rate, leaving the flexibility
for simplicity). This occupancy profile for the owner to later change the basis for
T = averaging time (minutes). is shown in Figure 3. the design ventilation approach.
The first step is to determine the time
Once the time period is calculated, the period over which the averaging must Secondary recirculation systems
variable occupancy can be averaged over occur. The space volume is 435,000 ft3. For systems where the supply air con-
that period. In addition to allowing the The breathing-zone ventilation rate, sists partially of zone-level return air, the
ventilation rate to be based on an average assuming a zone-ventilation effective- zone-level ventilation effectiveness needs
occupancy over that time period, the stan- ness of 1.0, is calculated based on the peak to take the return system into account, as
dard also allows the designer to vary the occupancy of 1,500 people and an area of found in Normative Appendix A: A1.2.2
supply of ventilation air to the space over 10,000 sq ft = 1,500 x 2.5 + 10,000 x 0.06 Secondary Recirculation Systems. The
time, provided the time-averaged ventila- = 4,350 cfm. Therefore: most common example of this situation
tion rate is met. is a fan-powered VAV unit. The zone-level
3 x 435,000
For example, the ventilation supply T = _________ = 300 minutes (5 hours) ventilation effectiveness is determined by
could be varied by cycling a VAV box 4,3050 the equation:
damper between closed and open posi- The average occupancy over the course
tions or cycling an outside-air damper for of the 5-hour time-averaging period is, Fa + Xs x Fb - Zpz x Ep x Fc
a system. Averaging the ventilation supply therefore, 337.5 occupants. This revised Evz = _______________________
can be helpful in meeting low-ventilation average occupancy can be used to calcu- Fa
requirements in equipment with insuffi- late the design ventilation rate. Where
cient turndown. This approach reduces the design
breathing-zone ventilation rate from Evz = zone-ventilation efficiency.
Variable-occupancy example 4,350 cfm to 1,444 cfm. This can result
Setting: A 10,000-sq-ft concert hall in significant operational and capital cost Fa = supply air fraction.
lobby with 43.5-ft ceilings. The lobby is savings if applied on known variable and
expected to hold a maximum of 1,500 intermittently occupied spaces, particu- Xs = average outdoor-air fraction.
guests ahead of the concert, with guests larly those with high air volumes.
Fb = mixed-air fraction.

Zpz = primary outdoor-air fraction.

Ep = primary air fraction.

Fc = outdoor-air fraction.

Fa = supply air fraction.

One of the key variables for the designer


to consider is Erthe one secondary recir-
culation fraction. The ASHRAE 62.1 User
Manual provides guidance on selection of
the zones secondary recirculation fraction.
Figure 3: This concert halls lobby occupancy profile shows the change in population For a terminal unit with a ducted return to
over time at a typical event. the zone served, Er = 0. For a design where

22 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


the system-level return is used, such as a VAV interior zones and some fan-powered required separation for the nearest AHU
dual-fan or dual-duct, Er = 1. The purpose perimeter zones. The ASHRAE 62MZ outside-air intake?
of this calculation is to appropriately credit spreadsheet calculation tool or another For this example, we consider the
zones for transfer air from other overven- equivalent or approved method (alterna- three vents to be acting as a single vent.
tilated zones within the system. tive methods are typically approved by The standard guides the designer to use
local authorities having jurisdiction, or an exhaust flow rate of 150 cfm for a
Fan-powered VAV example AHJ), such as some load-calculation tools, plumbing vent. Therefore, the total flow
For this example, we shall consider a is recommended for properly calculating rate, Q, is 450 cfm. Plumbing vents are
series fan-powered VAV terminal sup- the complexities of multiple-zone systems. considered Class 3 air, so the dilution
plying 2,000 cfm of air to an open-office factor is 15. A discharge velocity of 0 is
zone of 1,600 sq ft in heating mode using Determining distance L assumed per Table B2-3 for plumbing
plenum return. At design conditions, the For most designers, Table 5.5.1 is gener- vents.
leaving air temperature of the terminal ally suitable for determining the separation
unit is 90F with a design space tempera- distance required for an outside-air intake L = 0.09 x u450 x (u15 - 0) = 7.4 ft
ture of 70F. The heating primary airflow from pollutant sources. However, Appendix
is set at 200 cfm by the designer. The air B provides designers a performance-based From Table 5.5.1, the designer can see
handling unit (AHU) at design heating alternative for determining the required that, prescriptively, for a vent less than
condition has an outside-air fraction of separation distance. ASHRAE 62.1 uses the 3 ft above the level of the outside-air
50%. Note that equations should be ref- stretched string measurement approach intake, the minimum separation dis-
erenced from the standardnot all are for determining compliance with the sepa- tance is 10 ft. Therefore, Appendix B
repeated here for brevity. ration distance. However, there is one caveat provides a potential advantage for sit-
Er is assumed to be 0.5 based on guid- for noxious or dangerous air (Class 4 air) ing of the outside-air intake closer to the
ance from the User Manual, given the if the vertical separation between the plumbing vents, if required for spatial
location of the terminal units return. exhaust location and the outside-air intake coordination. However, this will need to
is less than 65 ft, the L separation distance be reviewed by the local AHJ for accept-
Vbz = 136 cfm using default values from shall be measured only in the horizontal ability; AHJ approval for deviations from
Table 6.2.2.1. plane (i.e., there can be no credit for any historic and prescriptive requirements
vertical separation). may prove difficult.
Xs = 0.50. Three examples are shown to illus-
trate the performance-based analytical Boiler example
Ep = 200/2,000 = 0.1. approach of Appendix B, with compari- Four 6,000-MBH boilers are vented
sons to Table 5.5.1. All approaches use through a single flue with a powered
Ez = 0.8 per Table 6.2.2.2. equation B2-1 for the calculation, tak- exhaust located on the roof. The exhaust
ing into consideration the air class of the fan has a discharge velocity of 1,500 fpm.
Voz = 136/0.8 = 170 cfm. exhaust, the discharge velocity, and the What is the minimum required separation
flow rate. for the nearest operable window?
Zpz = 170/200 = 0.85. Note that an operable window, when

Fa = 0.1 + (1 - 0.1) x 0.5 = 0.55.


L(ft) = 0.09 x uQ x (uDF - ____
U
400
) used for natural ventilation, must meet
the same separation requirements as an
Where: AHU outside-air intake.
Fb = Ep = 0.1. A boiler flue is considered Class 4 air
Q = volumetric flow rate of the as it conveys dangerous particles of com-
Fc = 1 (1 0.8) x (1 0.5) x exhaust, in cubic feet per minute. bustion, therefore the dilution factor is 50
(1 0.1) = 0.91. from Table B2-2. The default assumption
DF = dilution factor, from Table B2-2. from the standard of 250 cfm/1 million
Evz = (0.55 + 0.50 x 0.1 0.85 x 0.1 x Btu/h of boiler capacity is used for the
0.91)/0.55 = 0.95. U = exhaust-air discharge velocity, calculation (note that this should always
This example is simplified for illus- in feet per minute. be verified with the final equipment selec-
tration of the calculation. In reality, the tion); therefore Q = 6,000 cfm. Because
determination of the AHUs outside- Plumbing vent example the exhaust is hot and discharged upward,
air fraction will be an iterative process Three plumbing vents are clustered 500 fpm is added to the discharge veloc-
amongst all the zonessome single-duct together on a roof. What is the minimum ity, thus U = 2,000.

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 23


Codes & Standards
L = 0.09 x u6000 x (u50 - 2000/400) ft above the discharge, and the door is 20 u702 + 202 = 72.8 ft
= 14.4 ft ft horizontally away from the grease-fan
discharge. Is this situation compliant with Using Appendix B, the calculation
In this case, Table 5.5.1 requires a the standard? indicates that the door location is not
separation of 15 ft; therefore, the design Grease exhaust is considered Class 4 air acceptable, as the calculated L distance is
benefits of this analytical approach are per Table 5.16.1. Because the discharge is greater than the actual stretched string
marginal for the designer. However, directed toward the building opening, U distance.
if fewer boilers were combined with a is given a negative value per Table B2-3. However, the designer may also choose
similar discharge velocity, it would like- to use Table 5.5.1 insteadhere, the sep-
ly be advantageous if closer outside-air L = 0.09 x u10,000 x (u50 + 1500/400) aration is prescriptively listed as 30 ft,
proximity was required. Also note that = 97 ft indicating the configuration meets the
for gas-burning appliances, NFPA 54: standard. While the designer is entitled
National Fuel Gas Code must also be Section B1.3 of the standard allows a to use Table 5.5.1 if lower, the designer
followed regardless of allowances within separation of L/2 to be used for openings should further evaluate the situation and
ASHRAE 62.1. that are not used for mechanical or natural try to remedy the condition. The Appen-
ventilation. However, that allowance does dix B calculation clearly indicates that a
Grease-exhaust example not apply to Class 4 exhaust-air streams potential odor/entrainment problem will
A neighboring building has a 10,000- the separation must equal L. Because the exist and mitigation measures should be
cfm grease-exhaust fan discharging balcony is more than 65 ft above the fan considered.
toward your buildings roof. The exhaust discharge, the stretched string measure- For example, if the grease-exhaust
velocity is 1,500 fpm. Your building ment approach can be used. In this case, discharge can be redirected to be at
desires to locate a shallow balcony with the distance between the discharge and least 45 deg away from the opening, U
a door leading into a lounge at a level 70 the door is: then equals 0, resulting in L = 63.6 ft, an
acceptable condition per the standard.
Like many ASHRAE standards, Stan-
dard 62.1 has aspects that many design-
ers either are not familiar with or do not
typically use. This article sheds a bit of
light on some of those aspects that will
bring the designer a greater understand-
ing of maintaining proper IAQ as well as
increased design flexibility, which may
be leveraged to save first cost, energy,
operating costs, and provide greater
design flexibility in architectural coor-
dination.
As with most performance-based
design approaches, the designer needs
to carefully consider the pros and cons
of deviating from accepted engineering
norms or designing too tightly around
singular scenarios that may limit future
flexibility.

Peter Alspach is a principal and mechani-


cal engineer at Arup. His expertise is in
HVAC systems design, building physics
analysis, and faade engineering. Alspach
is a member of the Consulting-Specifying
Engineer editorial advisory board and was
a 2008 40 Under 40 award winner.

input #10 at www.csemag.com/information 24 Consulting-Specifying Engineer


Codes & Standards

Four strategies for implementing


ASHRAE 62.1 in HVAC systems
Theres room in ASHRAE 62.1 to improve energy efficiency
in a commercial ventilation system.

BY KARI ENGEN, PE, LEED AP, CXA; WD Partners, Dublin, Ohio

W
hen designing HVAC systems to calculated at a different rate, the area rate (R a),
meet local codes and ASHRAE in cubic feet per minute per square foot. Refer Learning
62.12016: Ventilation for Accept- to the ASHRAE 62.1-2016 Table 6.2.2.1, Mini- objectives
able Indoor Air Quality, reducing the amount mum Ventilation Rates in Breathing Zone for  Understand how to design
of necessary outside air that needs to be condi- the specific per-person airflow rates (Rp) and ventilation systems using
tioned for acceptable indoor use is allowed, and per-square-foot airflow rates (R a) based upon ASHRAE Standard 62.1: Ven-
there are several means by which the designer the use of the space. tilation for Acceptable Indoor
Air Quality.
can approach such reductions, all of which are The breathing-zone outdoor airflow (Vbz) is
 Learn four strategies to
described within this ASHRAE Standard. calculated by summing the people ventilation
realize cost and energy sav-
Four strategies will be examined to save energy requirements and the area ventilation require- ings.
and realize cost savings. Approaching HVAC ments for the space (ASHRAE 62.1-2016 Section
outdoor-air calculations in this manner may not 6.2.2.1). For a dedicated outdoor-air single-zone
be the easiest way to design ventilation systems, system, summing up the ventilation require-
but the payoff could make it worthwhile. The ments for each zone results in the total possible
potential reduction in required outdoor airflow
could exceed 50% depending on what combina-
tion of strategies are implemented for a given
Reduction in design outdoor airflow requirements
HVAC system or a combination of systems.
strategies: time averaging, occupant diversity, both

Strategy 1: Occupant diversity 2,500 Volume (cfm)


People that occupy a room will contami-
2,000
nate indoor air by exhaling carbon dioxide,
sweating, coughing, etc. Thats on top of air
Volume (cfm)

1,500
contamination that comes from paint, carpet,
upholstery, and other fixtures that emit minute
1,000
particles and vapors, all of which are already
figured into the mathematic formulas found in 500
ASHRAE 62.1-2016, the standard that regulates
outdoor air. Outdoor-air requirement rates of 0
airflow (R) due to occupants (p for popula- ASHRAE 62.1 ASHRAE 62.1 ASHRAE 62.1 ASHRAE 62.1 with both
Vou with time with diversity and time
tion or people) are calculated at one rate, the averaging diversity averaging
per person rate (Rp) in cubic feet per minute
per person based upon the design-zone popula- Figure 1: This graphic compares the reductions in required design outdoor
tion (Pz). Those requirements that are due to the airflow that results from the use of time-averaging, diversity in occupancy,
zone area/square footage of the spaces (Az) are and the combined use of both strategies.

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 25


Codes & Standards
uncorrected outdoor-air intake value. In populations results in a maximum poten- ASHRAE 62.1-2016 Section 6.2.3.5.1
simple terms, find the maximum occu- tial occupancy of 250 total, and the for- allows the designer to determine the
pants in each space, find the areas of mulas help to determine the ventilation diversity (D) by dividing the number of
each space, calculate the breathing-zone needs based on that number. total building occupants by the sum of
outdoor airflows, and then add them up. Yet the real occupancy rate may be all possible occupants of all spaces. In
Note that this article focuses on the much lower, and thats where occupant the example, thats 100/250a potential
calculation of uncorrected outdoor diversity may be applied, which is per- reduction of 60% in the required people
airflow values as generally defined in mitted under Section 6.2.5.3.1. This outdoor airflow. That can mean a signifi-
ASHRAE 62.1-2016 Section 6.2.5.3. This strategy calls for adjusting the system cant savings when heating and cooling
article does not examine the prescriptive needs based on the actual number of the building. One thing that engineers
formulas accounting for multiple-zone people who will be working in the build- can do when creating such systems is to
systems, zone air-distribution effective- ing, or the buildings system population ask specific questions about the build-
ness, or zone primary outdoor airflow (Ps.) Keep in mind that, with most build- ings use and the realistic intended occu-
fractions. These corrections to the out- ing codes, it is not necessary to design pancy before deciding on the final ven-
door airflow are omitted from the exam- a building for every person that every tilation plan. See Example 1.
ples in order to focus attention on the room is designed to accommodate, but
calculation that results from use of the the design must include a reasonable Strategy 2: Time averaging
specific strategies mentioned within the approximation of the expected use of the ASHRAE 62.1-2016 Section 6.2.6.2
article. Such corrections to the outdoor building. The same scenario noted above allows the designer to account for situa-
airflow can be examined independently can be designed for outdoor ventilation tions where the occupancy will peak for
of the additional factors that affect an by applying occupant diversity within only short durations of time. Depending
HVAC systems outdoor airflow and sup- the calculation. In a case where a build- on the building and the business it holds,
ply airflow requirements. ing actually has a total of 100 employees some people may occupy a space for only
To demonstrate the strategies, a sample (full-time-equivalent occupants of the a short period of time. In such situations,
building with a large, open office space building), those 100 people are either at an appropriate strategy is to apply time
that will hold 100 people in addition to a desk, in a private office, in the cafete- averaging. For example, in a transient-
five conference rooms accommodat- ria, or sitting in a conference room, but occupancy situation in which a confer-
ing up to 20 occupants each and a caf- not occupying two spaces at once. This ence room often sits completely empty
eteria accommodating 50 people will be means that the system population is 100, but is occasionally full for a short period
used throughout. The sum of the zone not the sum of all zones populations. of time. The typical meeting will last for
only 45 minutes, requiring occupied
outdoor-air ventilation for that short
Example 1: Calculation of outdoor airflow period of time. However, the prescriptive
requirements in the example building: formulas would indicate the need for full
ventilation for that space all day during
Open office space: 20,000 sq ft (Az1), 100 occupants (Pz1) occupied hours, every day, representing
Conference rooms: 5 at 400 sq ft (Az2), 20 occupants (Pz2) a potentially overventilated room.
Cafeteria/break room: 2,000 sq ft (Az3), 50 occupants (Pz3) By focusing on the amount of time
people are staying in a space, the
From Table 6.2.2.1, office, conference, and break room: Ra = .06 cfm/sq ft; Rp = 5 cfm/person
required outdoor-air requirements can
System population provided by building owner: Ps= 100 be reduced anywhere from 30% to 50%.
Occupant diversity, D = Ps/(Pz1 + 5 x Pz2 + Pz3) Similar to this example would be retail
D = 100/(100 + 5 x 20+50) = 0.40 spaces and restaurants where the occu-
Uncorrected outdoor-air intake (Vou) = D(Rp1 x Pz1 + 5 x Rp2 x Pz2 + Rp3 x Pz3) + pancy varies depending on the day or
(Ra1 x Az1 + 5 x Ra2 x Az2 + Rp3 x Az3) time. The ultimate idea is that meaning-
ful energy savings can result from using
Vou = 0.40 x (5 cfm/person x 100 people + 5 rooms x 5 cfm/person x 20 people + 5 cfm/person x
these different deductions to design the
50 people) + (0.06 cfm/sq ft x 20,000 sq ft + 5 rooms x 0.06 cfm/sq ft x 400 sq ft +
right system for the spacefor exactly
0.06 cfm/sq ft x 2,000 sq ft)
Result: Vou using diversity = 1,940 cfm
the way its meant to be used. The key to
the calculation is to determine the allow-
Vou without using diversity: 2,690 cfm able averaging time period, T. Equation
The use of occupant diversity in Example 1 reduces the required outdoor airflow by 28%. 6.2.6.2-1 is the calculation for the aver-
aging time period:

26 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


Equation 6.2.6.2-1: T (min) = 3 /Vbz
Reduction in system operating outdoor airflows
The variable () is the volume of the strategy: DCV dynamic reset of outdoor air
space in cubic feet. See Example 2.
2,500 Volume (cfm)
For the conference room that is occu-
pied for only 30 minutes out of a 90-min-
2,000
ute time period, the time-averaged zone
population, Pz avg, is the average of the
occupancy over that 90-minute time 1,500

Volume (cfm)
period.

1,000
Pz avg = ((20 people x 30 min) +
(0 people x 60 min))/90 min
500
Pz avg = 6.667 (round to 7 people)

0
Thus, the outdoor airflow required
ASHRAE 62.1 Vou ASHRAE 62.1 with DCV in ASHRAE 62.1 with DCV in
is calculated with Pz avg instead of the conference rooms (high CO2) conference rooms (normal CO2)
default Pz.
Figure 2: The application of demand control ventilation (DCV) does not allow for a
Vbz (Time-averaged) = Pz avg x reduction in design outdoor airflow, but may reduce the operational outdoor airflow
Rp + Az x R a during times of low CO2 concentration. All graphics courtesy: WD Partners

Vbz (Time-averaged) = 7 people x 5


cfm/person + 400 sq ft x .06 cfm/sq ft
Example 2: A 400-sq-ft conference room
Result: Vbz (Time-averaged) = has a 10-ft ceiling:
59 cfm The owner provides historical data showing that the conference rooms in the building are occupied for
30 minutes every 90 minutes, on average, and that the break room is occupied only between 11:45
In this example, the required breath- a.m. and 1:15 p.m. each day.
ing-zone airflow for this conference
Equation 6.2.6.2-1 calculates the allowable time-averaging time period:
room has been reduced by 52% from 124
cfm to 59 cfm. T = 3v/Vbz
For an office building that contains a v = room volume in cubic feet
large number of sparsely occupied rooms, v = (400 sq ft x 10 ft)
this reduction in required, outdoor air- v = 4,000 ft3
flow can result in a significant reduction Occupant density = 50 people per 1,000 sq ft (from Table 6.2.2.1)
in the total required outdoor airflow that
Default Pz = (50/1,000) x 400
must be heated or cooled.
Default Pz = 20 people
The two strategies noted above are
not exclusive, but they can be used for Rp = 5 cfm per person (from Table 6.2.2.1)
the same outdoor-air calculation. Com- Az = 400 sq ft
bining the results of Example 1 with Ra = 0.06 cfm/sq ft (from Table 6.2.2.1)
Example 2, the Vou calculation is further
reduced as follows. See Example 3. Vbz = Ra x Az + Rp x Pz
Vbz = 0.06 cfm/sq ft x 400 sq ft + 5 x 50 persons/1,000 sq ft x 400 sq ft
The reduction in required outdoor air-
Vbz = 124 cfm
flow, when applied diligently to HVAC
systems design, can result in reduced T = 3v/Vbz
required cooling capacity in tonnage as T = 3 x (4,000 ft3)/124 cfm
well as reductions in fan airflow, duct Result: T = 97 minutes
sizing, and fan horsepower. In addition This result allows the designer to take the average occupancy over a time period up to 97 minutes.
to the first cost of this equipment, there

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 27


Codes & Standards
is also the potential for a reduction in a rough energy analysis, and presenting air-quality conditions change. These
electrical system design sizing, such the results to the building owner or other approaches involve the use of sensors that
as smaller wire sizes, smaller circuits stakeholders who facilitate that decision collect data in a specific zone and com-
ampacity, reduced electric operating- may make a sizable difference in the municate the information in real time to
demand kilowatts, as well as electrical decision-making process. the HVAC control system, which then
energy-consumption reductions. makes immediate adjustments in the ven-
Such impacts may not be evident Strategy 3: Real-time air monitoring tilation airflow. The additional control
immediately, but the use of building using CO2 sensing system complexity that is associated with
energy simulations can demonstrate The next two strategies are variations the use of DCV should be considered in
cumulative effects of a thorough design of what is considered demand-control the decision-making process.
approach to a systems outdoor airflow. ventilation (DCV)or dynamic reset of Designing the ventilation system with
A building owner may not conceptual- outdoor airflow, as it is referred to under demand-control ventilation and the
ize the value of such reductions if the ASHRAE 62.1-2016 Section 6.2.7, potential reduction in required outdoor
engineer simply describes these strate- which is an interactive HVAC system airflows during system operation will
gies; however, a diagram will clearly that increases or decreases the real-time also be examined.
demonstrate the cost savings. Running requirement for outdoor air as the space The most common application of DCV
uses carbon dioxide (CO2) sensors to
determine if people who are occupying
Reduction in design outdoor airflow requirements a room are creating a condition of exces-
strategy: DCV and occupant diversity sive carbon dioxide and negative oxygen
and, if so, remediate it immediately with
2,500 Volume (cfm) increased outdoor air. This strategy is a
form of dynamic reset, where the air is
2,000
constantly being sampled and treated,
not allowing CO2 a chance to concen-
Volume (cfm)

1,500
trate above a predetermined high value.
With these sensors, if CO2 levels begin
1,000
to rise, the system resets to a new value
500 of outdoor-intake airflow until the CO2
drops below the control systems high
0 value. Once this condition is restored,
ASHRAE 62.1 Vou ASHRAE 62.1 with DCV and ASHRAE 62.1 with DCV and the HVAC control system resets back to
diversity in conference rooms diversity in conference rooms
(High CO2) (low CO2) its normal setting.
ASHRAE 62.1-2016 6.2.7.1.1 describes
Figure 6: Application of demand control ventilation (DCV) combined with designed the allowance for outdoor airflow reset
diversity has the combined effect of reduced design outdoor airflow, due to diversity, in response to system population. When
and potentially, reduced operational outdoor airflow during periods of low CO2 con- using a DCV system, the system designer
centration. must determine what airflow range is
appropriate for the zone and for the system.
Section 6.2.7.1.2 describes the require-
Example 3: Combining diversity and time-averaging: ment that the value of V bz cannot be
reset lower than the area airflow rate (R a
Vou with diversity only: 1,940 cfm
x Az) for the zone. So when CO2 values
Calculation of Example 1 Vou with diversity and time-averaged Vbz for the conference room: are low (less than the high value), the
Vou = D (Rp1 x Pz1 + 5 x Rp2 x Pz2 + Rp3 x Pz3) + (Ra1 x Az1 + 5 x Ra2 x Az2 + Rp3 x Az3) designer can set Vbz = R a x A z, which
eliminates the people airflow until the
Vou = 0.40 x (5 cfm/person x 100 people + 5 rooms x 5 cfm/person x 7 people + 5 cfm/person x 50
CO2 levels increase to the high value. At
people) + (0.06 cfm/sq ft x 20,000 sq ft + 5 rooms x 0.06 cfm/sq ft x 400 sq ft +
that time, the V bz must be recalculated
0.06 cfm/sq ft x 2,000 sq ft)
to include people airflow as well as the
Result: Vou (time-averaging and diversity) = 1,810 cfm
area airflow.
Vou (neither time-averaging nor diversity) = 2,690 cfm It is important to note that the high value
Percent reduction in standard-required uncorrected outdoor air = 32.7% should be determined with some knowl-
edge of the ambient concentration of CO2.

28 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


Example 4: Demand control ventilation calculation
applied to the sample buildings conference rooms:
Often, a value of 1,000 parts per million
(ppm) CO2 is considered adequate for the Vbz (high CO2) = Ra x Az + Rp x Pz
dynamic-reset high CO2 value. The use Vbz (high CO2) = 0.06 cfm/sq ft x 400 sq ft + 5 cfm/person x 20 people
of 1,000 ppm assumes that the ambient Result: Vbz (high CO2) = 124 cfm
CO2 concentration in outdoor air is well Vbz (low CO2, reset) = Ra x Az
below that value, in the range of 400 to Vbz (low CO2, reset) = 0.06 cfm/sq ft x 400 sq ft
500 ppm. However, in urban areas, the Result: Vbz (low CO2, reset) = 24 cfm
ambient outdoor-air CO2 concentration
may be much closer to 1,000 ppm, and
in such cases, the designer should con- Consequently, the cooling or heating building automation system responds
sider how this higher ambient CO2 may demand may increase as a result during accordingly. Motion sensors are com-
impact the high-value setpoint as well the time that the increased outdoor airflow monly used in other applications, such
as the reset values for outdoor airflow. is being supplied to the room. as lights that trigger automatically when
To demonstrate the value of operating Ideally, these CO2 sensors are used a customer enters a store restroom or
an outdoor-air reset control with DCV, in areas that have the potential of being security lights that turn on or brighten
examine the sample building that has densely but intermittently occupied, such when a person walks by.
been used for the examples within this as in cafeterias, auditoriums, gymnasi- The approach to outdoor airflows can
article and one or all of its 400-sq-ft con- ums, and conference rooms. The sensors be the same that is used with CO2 sen-
ference rooms, for 20 people, fitted with may not provide a quantifiable benefit sors, whereupon the sensing of motion
CO2 sensors for dynamic reset. for other spaces, such as open-office causes the outdoor airflow to reset to
The designer must determine the or reception areas, due to the smaller the high airflow rate; when there is no
appropriate design dynamic-reset out- number of occupants per unit of area. motion, the system resets to the low
door airflow rates for the high CO2 ASHRAE 62.1s default occupant density outdoor airflow rate. Alternatively, if
condition and for the normal CO2 for offices is one person per 200 sq ft. the designer chooses to use a dedicated
condition. See Example 4. There are certainly open-office designs outdoor-air system (DOAS) system
The values above represent two with much higher densities, but gener- and directly supplies outdoor air to all
required minimum HVAC system venti- ally, spaces are considered densely occu- spaces, there is a new provision in
lation operating conditions. The engineer pied when there are more than 20 people ASHRAE 62.1-2016 that allows for zero
must size the equipment and outdoor- per 1,000 sq ft. At this higher density, required outdoor-air ventilation with
and supply-air ductwork to accommodate consider a CO2 sensor for the space and occupancy if people arent in a particu-
both the high and low conditions. Due to use a dynamic-reset/DCV approach. lar room, according to Section 6.2.7.1.2
this requirement, HVAC system capacity When they were first introduced more within the exception text.
is not reduced, so there is no first-cost than 25 years ago, CO2 sensors were Based upon this exception, there may
advantage to the use of DCV. In fact, DCV expensive, unreliable, and in need of be opportunities to design the outdoor-
will generally be a higher first cost due to regular recalibration. Early generation air ventilation system supply airflow to
the additional controls complexity that is energy-management systems were prob- vary between zero and Vbz values. Note
required to operate with DCV. lematic and susceptible to bugs. Today, that a system that uses occupancy sensors
In Example 4, the building control CO2 sensors are more dependable and as the means of reset will not be able to
system can reset the outdoor airflow to more cost-effective. Driven by LEED count the number of occupants, so the
this room by approximately 80% dur- certification and more stringent energy outdoor airflow is either 0 cfm or R a x
ing times of normal CO2 concentration. codes, customer demand for CO2 sensors Az + Rp x Pz, depending on the status of
During that time period, the HVAC has grown and manufacturers improved the sensor.
equipment may operate at a reduced the reliability of digital CO2 sensors. At this time, HVAC system designs that
system-cooling tonnage demand, and As a result, the use of CO2-based DCV incorporate occupancy sensors are not
potentially a reduced fan airflow in has become commonplace in systems of as common in practice as CO2 sensors.
variable-air-volume supply fan systems, varying design capacities. Initially, they were developed for com-
which translates to a lower operating-fan mercial applications but really caught on
horsepower. Once the room becomes Strategy 4: Real-time monitoring as a way for homeowners to reduce their
fully occupied, and the CO2 concentra- through occupancy sensing energy expense. A prime example of this
tion rises above the high value, the build- The final strategy is using DCV with is a thermostat that adjusts the tempera-
ing control system adjusts the supply fan occupancy sensors. These devices are ture to preset efficiency targets when no
speed to increase the outdoor airflow to always monitoring. When there is motion one is home, yet adjusts when it senses
the room to the Vbz (high CO2) value. in a space that triggers the sensors, the motion.

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 29


Codes & Standards
The International Energy Conserva- DCV is a good strategy for any space The savings that can
tion Code now requires the engineer to that is expected to be intermittently
use demand-control ventilation strate- occupied, regardless of whether code be realized upon
gies in any space that is at a density equal requires it. Major manufacturers of pack-
to or greater than 25 people per 1,000 aged single-zone HVAC equipment are implementation of any or
sq ft, with some exceptions for small including DCV control modules as a
SENS-DC Print Ad_08 outlines.pdf
systems or specialized HVAC systems.
1 7/21/17 10:09 AM
factory option in addition to the more
all of the strategies noted
above can be in first cost
and operating cost.
complex and larger air handling unit sys-
tems.
Using part or all of these strategies to
estimate the total cost savings can be tricky.
There are several variables to consider, and
any savings has to be calculated on a case-
by-case basis. But these strategies are quan-
tifiable energy and money savers, which can
be an attractive opportunity for a building
owner
Getting away from the prescriptive for-
mulas to more reality-based formulas and
strategies is a smart move. It requires a thor-
ough and critical analysis of the building
and its ventilation needs.
C The savings that can be realized upon
M
implementation of any or all of the strat-
egies noted above can be in first cost and
operating cost.
Y

CM
Smaller outdoor-air ventilation system
MY size can result in a smaller heating or cool-
ing plant and smaller equipment. Smaller
CY
equipment leads to smaller duct and/or pip-
CMY
ing as well as reductions in electrical wire
K sizing and circuit breakers.
Operationally, the reduced outdoor air-
flow saves costs throughout the life of the
equipment and the building through small-
er operating horsepower of pumps and fans
supplying and conditioning the outdoor air.
Regardless, implementing a strategy to
maximize energy efficiency in HVAC sys-
tems can add up, quickly resulting in appre-
ciable savings for property owners over the
long term.

Kari Engen is a senior mechanical engi-


neer at WD Partners. She is a member of
ASHRAE and has provided HVAC design
and commissioning services for commer-
cial projects for more than 15 years.

input #11 at www.csemag.com/information


30 AUGUST 2017
2017 Siemens Industry, Inc.

The Power of Sm@rtGear


Revolutionary Platform with Embedded Intelligence

Take your equipment to the Sm@rt level of safety and convenience

Sm@rt SB Switchboard Sm@rt LVS Switchgear

Sm@rt HMI in Remote Enclosure

Customer Benefits:
Enhanced arc flash safety
What is Sm@rtGear? - Pre-configured and pre-programmed HMI enables out-of-the
Pre-configured and pre-programmed box remote monitoring, configuration and control
- Gets personnel outside the arc flash hazard boundary when
switchboards and/or low voltage metal performing breaker operations (configuration, open/close,
enclosed switchgear that provides racking and maintenance mode activation)
Ease of use large (22) HMI display and intuitively designed
out-of-the-box remote monitoring, navigation screens make remote monitoring, configuration and
configuration and control of embedded control very user friendly
Active power quality monitoring with user configurable alarms
intelligent devices. Expedited "search and repair" capability that can be used to
quickly identify power disruption root cause
Usage-based preventative and predictive maintenance
information
input #12 at www.csemag.com/information usa.siemens.com/Sm@rtGear
We make what matters work.*

Energizing healthcare IT to
safeguard data and lives.

* Power. Its all around us. Turn on the lights. Step onboard a train.
Open your laptop. Drive to the store. Take an elevator to work.
Share a cup of coffee with a friend. Nearly everything we do
and experience is made possible by power. And the companies
we depend on to keep our modern world moving depend on
Eaton. To help manage power and resources more safely, reliably
and efficiently each and every day. Because this is what really

matters. And were here to make sure it works.

To learn more go to: Eaton.com/whatmatters

We make what matters work.

2017 Eaton. All rights reserved.


input #13 at www.csemag.com/information
2017

MEP Giants revenue increases,


along with staffing concerns
The 2017 MEP Giants gross revenue increased as compared with
last year, likely due to company mergers and larger and more varied
projects. MEP/FP design revenue also increased.

BY AMARA ROZGUS, Editor-in-Chief, and


AMANDA PELLICCIONE, Director of Research, Consulting-Specifying Engineer, Downers Grove, Ill.

T
he 2017 MEP Giants gener- companies and moving some firms up the
ated approximately $47.65 list due to a larger combined revenue (see
billion in gross annual rev- page 36 for the article Global M&A activ-
enue during the previous ity holds steady as domestic M&A falls).
fiscal year, a slight increase Table 1 shows the top firms based on
from last years numbers, in which firms MEP design revenue, which is how the
generated $47.43 billion. In 2015, MEP MEP Giants are ranked. Table 2 shows the
Giants firms generated $41.89 billion in top MEP Giants firms based on total gross
gross revenue. This year, the MEP Giants revenue. The complete table of rankings
earned $6.33 billion in mechanical, elec- is provided at www.csemag.com/giants.
trical, plumbing, and fire protection About 58.3% of all 2017 MEP Giants
(MEP/FP) engineering design revenue, revenue is generated from MEP design,
a 3.6% increase over 2016 revenue of with an average MEP design revenue of
$6.11 billion. $63.33 million per firm, a slight increase
Several companies either joined the from the past fiscal year, in which aver-
list for the first time or returned after age design revenue was reported at $61.11
an absence in reporting data: Integral million per firm.
Group (No. 25), NV5 Global (No. 44),
tk1sc (No. 46), Southland Industries (No. Table 1: Top 10 firms by MEP design revenue
51), Primary Integration Solutions Inc. Rank Firm MEP design revenue ($)
(No. 54), Michaud Cooley Erickson (No.
1 Jacobs $1,589,068,115
61), Dunham Associates Inc. (No. 62),
2 AECOM $730,800,000
LiRo Engineers Inc. (No. 80), kW Mis-
3 Burns & McDonnell $250,868,110
sion Critical Engineering (No. 87), and
4 Stantec Inc. $183,734,575
POND (No. 98).
5 WSP USA $164,321,000
The list this year comprises 64% private
6 JENSEN HUGHES $141,500,000
companies, 24% employee-owned com-
7 HDR $133,197,637
panies, 7% limited-liability companies,
8 Arup $130,910,384
and 5% public companies. This is nearly
9 Affiliated Engineers Inc. $126,740,000
identical to last years data.
10 IPS-Integrated Project Services $105,612,657
Several mergers and acquisitions
occurred in the past year (23%, which was Table 1: Top 10 firms are listed by MEP design revenue. Jacobs topped the list as the
a slight uptick from the previous year of No. 1 firmas it has since 2013with 14% of its gross revenue dedicated to MEP
21%), changing the name and face of many design. All graphics courtesy: Consulting-Specifying Engineer

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 33


2017

Engineers on staff MEP design revenue by project type


Fire protection Environmental Commissioning (new buildings)
Maintenance/ or retrocommissioning
3.3% repair/ Other
Plumbing operation
3%
9.8% 7%
8%
8.4%
42.7% 44%

35.8% 38%

Electrical Mechanical Retrofit/renovation New construction

Figure 1: Among those employed by the 2017 MEP Giants, Figure 2: Similar to data from previous MEP Giants research,
there are 22,808 mechanical, electrical, plumbing, fire protec- the amount of new construction is nearly the same as retrofit/
tion, and environmental engineers (a slight increase from last renovation work. These numbers have remained constant over
years 21,900). several years.

In a change from past years, 24% of design or project management at 12% This years MEP Giants employ 196,128
companies reported staffing: qual- and staffing: keeping older engineers people, including all types of staff and job
ity of young engineers as their biggest trained/current at 6%. titles. Last year, firms averaged 2,241 staff
challenge. In past reports, participants members, both engineering and nonengi-
indicated that the economys impact on Staffing, global revenue numbers neering staff. This number was reduced
the construction market was the great- The 2017 MEP Giants firms employ by 12% to 1,961 for the 2017 MEP Giants.
est challenge, which fell to second place 61,326 engineers, down from 63,688 This years firms engineering staffs are
among challenges this year at 14%. This engineers last year. On average, each 2017 made up of 14% females (up from 13%
shift is large; 26% of firms indicated the MEP Giants firm has 97 mechanical engi- last year). On average, 43% of nonengi-
economy was a challenge in 2016 MEP neers (up from 83 in 2016), 82 electrical neering staff are female.
Giants data, indicating that the economys engineers (down from 85), 19 plumbing Specialized accreditations include
rebound is no longer top of mind. Other engineers (up from 17), 8 fire protection LEED Accredited Professionals (at any
challenges for 2017 MEP Giants included engineers (no change), and 22 environ- level) at 4.3% and commissioning agents
evolving information technologies for mental engineers (down from 27). or professionals (CxA or CxP) at 0.87%.
In 2017, the MEP Giants earned 89.5%
Table 2: Top 10 firms by gross annual revenue of their MEP design revenue for U.S.-
Gross annual Total MEP based projects, an increase from last
Rank Firm
revenue ($) revenue % year (83.9%). Several opportunities are
2 AECOM $17,400,000,000 4% open to MEP Giants outside the United
1 Jacobs $10,964,157,000 14% States. Engineering services are provid-
4 Stantec Inc. $3,028,935,971 6% ed in North America (Mexico, Canada)
3 Burns & McDonnell $2,529,705,230 10% 56% of the time. Other areas of growth
7 HDR $2,219,900,000 6% include the European Union (34%), Asia
5 WSP USA $1,378,720,000 12% (33%), the Middle East (32%), the Carib-
68 CDM Smith $1,191,544,145 2%
bean (23%), and South America (19%).
51 Southland Industries $748,000,00 4%
Projects in the European Union jumped
11 exp $469,990,000 22%
the most, from 27% in the last report-
56 STV $414,270,000 6%
ing period to 34% in this fiscal reporting
Table 2: This shows the top 10 firms by gross annual revenue. MEP design revenue is less period. Asian projects dropped from 42%
than one-quarter at all of these firms, indicating the breadth of their engineering work. to 33%, respectively.

34 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


MEP design revenue by building type

Hospitals/health care facilities 16%

Office buildings 12%


Industrial or manufacturing
When it comes to sustainable engineer- facilities/warehouses
11%
ing, the number of U.S. Green Building
Council LEED projects increased for this
Colleges or universities 11%
reporting period; 1,553 projects were sub-
Government or military facilities 10%
mitted for LEED certification in the past
fiscal year, whereas 1,332 projects were Utilities, public works,
transportation 9%
submitted for the previous reporting peri-
Engineered multi-dwelling
od. The number of projects submitted in buildings, retail complexes, 7%
the past fiscal year to the U.S. Environ- restaurants
mental Protection Agencys Energy Star Data centers 6%
Buildings Label decreased by 11% over
the previous reporting period. K-12 schools 5%
Project types Research laboratories 4%
The 100 firms listed here dont handle
all aspects of engineering. Many subcon-
tract specialty services including acous- Figure 3: The 2017 MEP Giants earned revenue in four key building types: hospitals/
tics (71%), computational fluid dynamics health care facilities, office buildings, industrial or manufacturing facilities/warehous-
modeling (20%), construction manage- es, and colleges or universities. Industrial or manufacturing facilities/warehouses is
ment (20%), and security system design new to the top building types this year.
(20%). More firms are bringing some spe-
cialty services in-house, including chilled nesses. Some interesting facts about the  Aside from traditional labor and
water or boiler system design, electrical 2017 MEP Giants: overhead costs, a percentage of MEP
system design, and plumbing design.  New York again tops the state in Giants spend capital funds on new tools
As shown in Figure 2, MEP Giants indi- which firms are headquartered. (such as software or hardware, 26%),
cated that they split their time between  Many firms have lead engineers or capital improvement (such as office
new construction (44%) and retrofit/ experts who handle a particular focus: space, 17%), and promotions and mar-
renovation (38%), which has deviated business development director (87%), keting (16%).
only slightly from past years. Rounding chief electrical engineer (85%), chief  Private project or building own-
out the projects are maintenance, repair, mechanical engineer (84%), and commis- ers remain the No. 1 source of work/
and operations (7%); commissioning or sioning engineer or coordinator (80%). clients.
retro-commissioning (7%); and other
(3%). For a more in-depth report on com-
METHODOLOGY
missioning, read the October 2017 issue
on the Commissioning Giants. At the beginning of the year, the Consulting-Specifying Engineer (CSE) staff col-
The 2017 MEP Giants firms continue to lected and analyzed data from several consulting and engineering firms. Some of
work on several projects in hospitals and the top mechanical, electrical, plumbing, and fire protection (MEP/FP) engineering
health care facilities, office buildings, indus- firms submitted their firms profiles to CSE; however, not all consulting firms were
trial/manufacturing facilities, and schools. willing or able to participate in this years MEP Giants survey. The minimum MEP
Figure 3 breaks down the various building design revenue required for consideration is $5 million, although the smallest
types in which MEP Giants firms work; the firms on this list far exceed that minimum (the smallest amount of MEP design
health care and office building markets were revenue reported this year was nearly $11 million).
at the top for this reporting period, as they In 2017, more than 100 engineering firms provided their information for the
were last year. Read about several project MEP Giants program, with some newcomers or firms re-entering the program. A
profiles at www.csemag.com/giants. tie (No. 62) is unusual, but not unheard of. Data and percentages are based on
the top 100 companies that responded to the request for information; the results
Companies are well-rounded do not fully represent the construction and engineering market as a whole. How-
Several new questions were introduced ever, with nearly identical questions asked in previous years and more than 100
in the past couple of years to help pro- engineering firms participating this year, we present a qualified portrait of where
vide a broader picture of how the MEP the top engineering firms stand in 2017.
Giants firms are managing their busi-

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 35


2017

Global M&A activity holds


steady as domestic M&A falls
More mechanical, electrical, plumbing (MEP), and fire protection
engineering firms are acquiring while other engineering sectors slow
deal-making activities.

BY NICK BELITZ, Morrissey Goodale, Denver

F
ollowing back-to-back years of making; when the economy contracts,
record-setting levels of mergers mergers and acquisitions pause.
and acquisitions (M&A) in the However, 2016 saw the opposite in the
architecture and engineering United States: rising GDP and a decrease
(A/E) industry, the number of in the number of deals. This is likely due
transactions in the industry declined to the relative flurry of transactions seen
modestly in 2016. Morrissey Goodale over the prior 2 years; pent-up demand
tracked 347 A/E deals globally in 2016, was released as the effects of the Great
down slightly from 352 deals in 2015, Recession faded, transactions peaked in
but still up from 341 deals in 2014 (see 2014 and 2015 after buyers and sellers
Figure 1). gained confidence in the market, and
Consulting-Specifying Engineers 2017 then the domestic A/E M&A market
MEP Giants somewhat defied the trend took a bit of a breather in 2016 after 2
and increased deal making in 2016, with torrid years of activity.
23% of the largest mechanical, electri-
cal, plumbing (MEP), and fire protec- Interstate activity on the rise
tion firms reporting at least one acquisi- Interstate deal activity (defined as
Interstate deal tion. This represents an increase in the firms headquartered in two different
number of Giants involved in acquiring states consummating a deal) jumped in
activity (defined as another firm over prior years. In 2015 2016 to its highest level in the past 10
firms headquartered and 2014, 21% of the Giants made at least years, at nearly 61% of overall domestic
one deal, while in 2013, only 16% of the M&A (see Figure 3). Even as the overall
in two different states Giants completed an acquisition. number of U.S. deals fell in 2016 relative
to 2015, this indicates a high degree of
consummating a Domestic M&A down confidence in the general market as buy-
deal) jumped in 2016 While global M&A activity in 2016 was ers risked investment capital to expand
approximately in line with the number of to new geographies and diversify client
to its highest level in deals done in 2015, domestic A/E indus- bases across state lines. Interstate activ-
try mergers and acquisitions fell from ity in 2016 represents a notable increase
the past 10 years, at 241 deals in 2015 to 215 deals last year over 2015, in which 57% of deals were
nearly 61% of overall (see Figure 2). This represents a bit of a between firms not headquartered in the
conundrum because M&A activity typi- same state, and also exceeds the previ-
domestic M&A. cally is tied to overall economic activity. ous high-water mark of interstate deals
When the economy grows, so does deal set in 2008.

36 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


Annual global M&A activity
341 352 347
332
318
303 295
252 254
Technology, health care, specialized 235
knowledge drive M&A
With general economic growth driv-
ing broad expansions in the U.S. com-
mercial, industrial, residential, health
care, education, and other markets,
MEP firms have widespread oppor-
tunities in the marketplace. Growth
through acquisition is a proven means 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
of expanding market share for MEP Year
Giants and interest in the sector
remained robust in 2016, as evidenced Figure 1: The number of global deals dipped slightly in 2016, as compared with 2015.
by the acquisitive nature of nearly one- All graphics courtesy: Morrissey Goodale
quarter of the MEP Giants.
While interest in the MEP sector was
Annual domestic M&A activity
broad-based, numerous acquisitions
by MEP Giants focused on sellers with 241
expertise in technology applications, 223
215
health care, or other specialized market
180 182 184
knowledge. Notably: 175 175
152 152
 No. 1 Jacobs Engineering (Pasade-
na, Calif.) acquired The Van Dyke
Technology Group Inc. (Columbia,
Md.), a cybersecurity firm special-
izing in access management, threat
mitigation, and cybersecurity con-
sulting.
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
 No. 6 JENSEN HUGHES (Balti- Year
more) acquired Stevenson & Asso-
ciates (Woburn, Mass.), a provider Figure 2: The domestic merger-and-acquisition market dipped a bit in 2016, likely due
of risk- and hazard-engineering to a very busy deal-making year in 2015.
consulting services for the nuclear
power industry as well as engineer-  No. 29 EYP Inc. (Albany, N.Y.) Stantecs acquisitions indicated a gener-
ing services for special-perfor- acquired Stanley Beaman & Sears al desire to round out the firms vertical
mance facilities. (Atlanta), a firm recognized for design capabilities, with deals in building
expertise in the design of childrens design and multidisciplinary engineer-
 No. 17 DLR Group (Minneapolis) hospitals. ing firms both in the U.S. and Canada.
acquired Westlake Reed Leskosky JENSEN HUGHES acquisitions sought
(Cleveland), a provider of inte-  No. 93 Ross & Baruzzini (St. Louis) to expand expertise in specific disciplines
grated engineering, building opti- acquired Mitchell Planning Associ- including fire protection, risk manage-
mization, and specialty consulting ates (Northbrook, Ill.), a provider ment, and forensic science and engineer-
services. of medical equipment planning ing consulting.
services. Also, frequent acquirer No. 44 NV5
 No. 22 TLC Engineering for Archi- (Hollywood, Fla.) made a splash by
tecture Inc. (Orlando, Fla.) acquired Repeat buyers active in the market acquiring fellow MEP Giant No. 60 JBA
Allan and Conrad Inc. (Winter Notable in 2016 was the activity of No. Consulting Engineers (Las Vegas). The
Park, Fla.), specializing in engineer- 4 Stantec and No. 6 JENSEN HUGHES, deal, when added to NV5s June 2017
ing for health care and entertain- which made five deals and four deals, acquisition of RDK Engineers (Bos-
ment facilities. respectively, to advance strategic goals. ton), is expected to vault NV5 to the top

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 37


Interstate M&A activity
2017

echelons of Consulting-Specifying Engi-


60.0% 60.9%
neers MEP Giants list. 59.2%
56.6% 56.1%
The road ahead for A/E M&A 55.4%
While 2016 and early 2017 repre- 57.3%
sents a bit of a cooling-off period for 55.3%
54.3%
the A/E M&A market, buyer interest in 52.7%
engineering firms remains strong, with
acquirers looking to expand geographic
reach and service offerings through tar-
geted, disciplined acquisitions. Sellers,
enjoying consecutive years of strong 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
financial performance, are looking Year
to capitalize on the value created, but
also want to select the best partner to Figure 3: Interstate deal activity jumped to a very high level. Deals havent been this
provide an orderly transition and more high since before the Great Recession.
opportunities for staff.
With both buyers and sellers in the
mindset of carefully evaluating prospective Nick Belitz is a principal with Morrissey firms Denver office, Belitz works with
deals, M&A activity in 2017 is expected Goodale LLC, a management consulting AEC firms to deliver M&A, consulting,
to continue at a steady, though somewhat and research firm that exclusively serves and financial advisory solutions. Mor-
subdued pace relative to the deal making the architecture, engineering, and con- rissey Goodale is a CFE Media content
of the last several years. struction (AEC) industry. Based in the partner.

Open Unitary Controller


Open protocol BACnet/IP

and MS/TP
Open drag and drop component
based programming language
Sedona Framework
Unrestricted programming
tool our free Sedona
Application Editor

BAScontrol

Learn more at www.ccontrols.com/controllers

input #14 at www.csemag.com/information


Congratulations,
40 Under 40 Winners!

The 10th annual 40 Under 40 award


winners are a dynamic bunch with
the future of the industry in their sights.

Read each of the 2017 profiles at


www.csemag.com/40under40
LEED v4 updates and
impacts on lighting controls
LEED v4 has adopted ASHRAE Standard 90.1-2010, which includes
a number of mandatory lighting controls requirements.

BY ROBERT J. GARRA JR., PE, CDT; CannonDesign, Grand Island, N.Y.

P
revious studies have shown that understanding of possible energy-savings
Learning more electricity is consumed related to lighting controls, Lawrence
objectives for lighting in commercial Berkeley National Laboratory (LBNL)
 Explore ASHRAE 90.1-2010, buildings than for other appli- published A Meta-Analysis of Energy
the new basis for LEED v4. cations. With tighter opera- Savings from Lighting Controls in Com-
 Understand how lighting tional budgets and enhanced focus on mercial Buildings, an analysis of 240
control design can contribute supporting better environmental out- energy savings estimates from 88 papers
to LEED v4 points through comes, organizations are committed to and case studies, focusing on actual field
best practices.
changing this. LEED v4 supports this installations as opposed to simulations.
aim by using ASHRAE 90.1-2010: Energy From this data, LBNL produced the best
Standard for Buildings Except Low-Rise estimates of average lighting energy sav-
Residential Buildings as a baselinean ings for four primary lighting control
updated standard with an aggressive strategies (see Table 1).
goal of 30% energy-cost savings over
the previous standard. To help give an Update to the energy
baseline in LEED v4
In prior versions of LEED, the energy
Average energy savings baseline was ASHRAE 90.1-2007. This
38% has now been increased to ASHRAE
38%
90.1-2010. ASHRAE 90.1 is a standard
38%
38% that provides minimum requirements for
38% energy-efficient designs for buildings.
The following is a comparison of
ASHRAE 90.1-2007 versus ASHRAE
90.1-2010 for specific highlights as they
relate to lighting controls:

Threshold for compliance:


 2007: Any new or retrofit proj-
Occupancy Daylight Personal Institutional Multiple strategies ects encompassing 50% or greater
harvesting tuning tuning (any combination
of the above) alteration of the connected lighting
load.
Table 1: The Lawrence Berkley National Laboratory produced the best estimates of  2010: Any new or retrofit projects
the average energy savings for lighting for four primary lighting control strategies. encompassing 10% or greater altera-
Courtesy: Lawrence Berkley National Laboratory, 2011. tion of the connected lighting load.

40 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


Figure 1: This illustrates an occupancy sensor installed in a classroom that reflects one of the lighting control strategies dis-
cussed. Courtesy: CannonDesign.

Automatic shutoff of lighting:  2010: 50% of receptacles in private The following gives a brief overview of
 2007: Required in buildings larger offices, open offices, and computer the credit and a lighting control strategy
than 5,000 sq ft. classrooms must be automatically to implement:
 2010: Required in all spaces. shut off.
Light-level reduction: Energy and Atmosphere credit category
 2007: Not a requirement. There are several control methods Enhanced Commissioningmaxi-
 2010: Lighting must be wired to available to incorporate the requirements mum of six points. (Six points are
allow for a power reduction of 30% stated above. A networked lighting con- achieved by following Path 2 and Enve-
to 70% in addition to turning off trol system from a building level is one lope Commissioning).
the lighting by either dimming or option. Or installing multiple types of
switching. systems (e.g., relay control, architectural  Intent of credit: To further sup-
Daylight zones: dimming systems, wall box dimming) is port the design, construction, and
 2007: Not a requirement. another option. As we will see later, the eventual operation of a project
 2010: Daylighting control must be preferred option may be to use a net- that meets the owners project
automatic based on natural-light worked system to maximize the points requirements for energy, water,
contribution and must be installed available in the LEED v4 scorecard. indoor environmental quality, and
in spaces with windows and sky- durability.
lights. Contributing to the LEED scorecard
Exterior lighting: Lighting control strategies can be  Implementation: Develop a design
 2007: Lighting must be off during used to earn a maximum of 32 points narrative that describes the intent
the day. in six credits, housed in three credit for the lighting control design.
 2010: Lighting must be off dur- categories. It should be noted that the This narrative will be used by the
ing the day and must be off or at a maximum points per credit is not just commissioning authority to com-
reduced level at night. for lighting controls. There are several mission the lighting control system
Plug-load control: design factors that will come together in and ensure it meets the owners
 2007: Not a requirement. a given credit. requirements.

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 41


LEED v4 and lighting controls
Optimize Energy Performancemaxi- in a specific room to prevent over- exterior of the window glass. A ceil-
mum of 18 points: lighting. ing-mounted vacancy sensor turns
off the room lighting if occupants
n Intent of credit: To achieve increasing n Personal control: Individuals can forget to turn it off when they leave.
levels of energy performance beyond tailor the lighting in their workspace
the prerequisite standard to reduce to their personal preferences. n Corridors and lobbies: These are
environmental and economic harms the only building areas with two
associated with excessive energy use. n Control of emergency egress light- modes of operation: during busi-
ing: In the past, lighting on emer- ness hours and after business
n Implementation: Comply with gency circuits was often on 24/7 as hours. In the corridors, an array of
ASHRAE 90.1-2010. The following a safety measure, burning through occupancy sensors turn lighting on
strategies could be incorporated: the night long after occupants of a and off according to occupancy and
building had left. Advances in con- the current response mode, dictated
n Time/astronomical scheduling: Light- trol devices now allow emergency by the lighting control systems
ing in a defined area turns on or off, lighting circuits to be controlled time clock. Perimeter areas are also
or dims, based on a predetermined, by time schedules or by automatic equipped with photo sensors to
customizable schedule. sensors. By equipping these devices adjust the amount of electric light
with a UL 924 emergency transfer based on the amount of daylight in
device, which can override the digi- the space. Luminaires in these areas
The lighting system can tal lighting control system if normal are adjusted to lower-level output
be connected to the BAS power is lost, the system is able to when a load-shed signal is sent.
turn on all lights connected to the
to use the detection signal emergency circuit and maintain n During business hours: Upon
of occupancy sensors at all egress levels for occupant safety detecting occupancy in a corridor,
without wasting energy. the lighting control system turns
hours to adjust mechanical lights on and keeps them on until
The lighting control system can be the system enters after business
setpoints. connected to the BAS to use the detec- hours mode, after which point
tion signal of occupancy sensors at all it only turns lights on when the
n Occupancy/vacancy control: In hours to adjust mechanical setpoints. building has occupancy, preventing
each area of the building, lighting is If multiple lighting control zones are the corridors from lighting up on
turned on or off based on detected provided in a single mechanical system holidays, snow days, and other low-
occupancy. With vacancy control, zone, the lighting control system can occupancy days. Once triggered,
users must manually turn on lights, accumulate the occupancy zones within lighting remains on in the corridor
but lights are automatically turned the mechanical zone to help refine the throughout the business day, pre-
off when a space is vacant. Vacancy efficiency of the HVAC system. venting short on-off cycling of cor-
sensors are generally considered more Specific area examples include: ridor lighting as occupants move
efficient than, therefore preferable to, from space to space. At the end of
occupancy sensors because they only n Interior private offices or rooms: during business hours, the sys-
turn lighting off, not onusers have Occupants turn lights on and off by tem transfers to the after business
to turn lights on manually. pressing a low-voltage wall switch. hours lighting control mode.
A ceiling-mounted vacancy sensor
n Daylight harvesting: Electric light turns the room lighting off if occu- n After business hours: Occupancy
levels are automatically adjusted to pants forget to turn it off when they sensors control corridor lighting
account for the amount of natural leave. via auto-on and auto-off functions.
sunlight in a space. Appropriate light After 15 minutes of non-detection,
levels are maintained for functional n Perimeter offices or rooms with lighting automatically turns off.
purposes, and total illumination is adequate daylight: Occupants turn Minimum cycling of lighting is
evenly maintained throughout the lights on and off by pressing a low- expected during these low-occu-
space. voltage wall switch. This switch pancy hours. Maximum light levels
turns the lights on to a level allowed are set during this time period, as
n Task tuning: Maximum light levels by a photo sensor that monitors it is anticipated that the full light
are set for a particular use or task the amount of daylight hitting the level will not be needed.

42 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


 Restrooms and stair towers: For example, offices that are occupied on effort to reduce demand. Lighting
Lighting in these rooms is deter- average for approximately 5 hours per day is turned off or dimmed in pre-
mined 24/7 by occupancy sensors. will need input for the lighting to be on determined areas at times of peak
After 15 minutes of nondetection, for that duration. Daylighting modeling is demand. A networked lighting con-
the lighting automatically turns done using sophisticated algorithms based trol system can receive an initiation
off. Luminaires in these areas are on simple inputs of length of window area, signal from a demand-response
adjusted to lower-level output depth of the daylit zone, and type of glazing. program provider and will also
when a load-shed signal is sent. restore light levels at the end of the
Advanced Energy Metering demand-response event.
 Utility and storage rooms: Occu- maximum of one point
pants turn lights on and off by Indoor Environmental
pressing a low-voltage switch on the  Intent of credit: To support energy Quality credit category
wall. A 2-hour timeout sequence management and identify opportuni-
starts when the switch is activated. ties for additional energy savings by Interior Lightingmaximum of two
A blink warning occurs when 5 tracking building-level and system- points:
minutes remain in the 2-hour level energy use.
countdown. If the user wants to  Implementation: Use a networked  Intent of credit: To promote
remain in the room, the switch can lighting control system that has energy occupants productivity, comfort,
be activated again, and another metering incorporated. and well-being by providing high-
2-hour timeout sequence commenc- quality lighting.
es. Luminaires in these areas are Demand Responsemaximum
adjusted to lower-level output when of two points  Requirement specific to lighting
a load-shed signal is sent. It is worth control: For at least 90% of indi-
noting that NFPA 70: National  Intent of credit: To increase par- vidual occupant spaces, provide
Electrical Code, Article 100.26 (D), ticipation in demand-response tech- individual lighting controls that
requires a manual switch/override nologies and programs that make enable occupants to adjust the
for electrical rooms. energy-generation and distribution lighting to suit their individual
systems more efficient, increase grid tasks and preferences, with at least
 Conference rooms: Occupants turn reliability, and reduce greenhouse gas three lighting levels or scenes (on,
the lights on and off by either press- emissions. off, midlevel). Midlevel is 30% to
ing a low-voltage wall switch or 70% of the maximum illumination
using a preset scene-dimming con-  Implementation: Lighting control level (not including daylight contri-
trol station. Ceiling-mounted occu- can contribute to a buildingwide butions).
pancy sensors operating in vacancy
mode turn the lighting off if occu-
pants leave without turning off the
Percent of buildings with control strategy
lights. Maximum light levels are set
for this space for certain tasks. Demand responsive lighting 4%

In order to maximize the credits Multi-level lighting or dimming 7%


achieved, it is important to understand
the inputs to the energy model, and what
Task tuning 1%
is required from the facility owner/occu-
pant. For example, eQuest, is an energy
Daylight harvesting 2%
modeling software that can model the
time based on lighting control, occu-
Occupancy sensors 16%
pancy control, and daylighting control.
For the time-based control strategy, input
is needed from the facilitys owner/occu- Time-based scheduling 18%
pant in regards to the duration of the on/
off setting (i.e. on at 7 a.m., and off at 7
p.m.). In addition, input is needed for the Table 2: These are the results of the 2012 Commercial Buildings Energy Consumption
duration of occupancy for certain spaces. Survey. Courtesy: U.S. Energy Information Administration

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 43


LEED v4 and lighting controls
Implementation: By using the In addition to more advanced light- building owners and managers. This
strategies noted above in the Energy ing control systems, LED technology environment emphasizes the importance
and Atmosphere credit, has helped in being able to meet energy of LEED-certified buildings. The points
this credit should be realized. codes and achieve LEED certification. noted above give designers and engineers
additional tools to both meet and exceed
the expectations of current and future
Rising energy costs and more regulation through energy
energy code regulations.
codes are making energy management a top priority for building Illustrated in Table 2, the strategies
owners and managers. that are discussed are not frequently
used. As lighting and electrical designers
Innovation credit category LED technology is increasingly afford- become more familiar with the technolo-
able and is being used more frequently. gies available, energy savings will become
Innovationmaximum of two points: One advantage of LED lighting is that it much more commonplace.
is inherently dimmable: If you pair the
Intent of credit: To encourage proj- LEDs dimmable driver with a compat- Robert J. Garra Jr. is a senior vice presi-
ects to achieve exceptional or innova- ible control, additional components are dent at CannonDesign. An engineering
tive performance. not required to tune the light. The 20% leader who understands clients and their
to 30% additional cost is no longer neces- goals, Garra applies his project leader-
Implementation: Nearly 30% savings sary for a controllable fluorescent ballast, ship and industry knowledge across the
have been realized in lighting energy opening up the possibilities of light mod- firms market segments while providing
consumption by implementing the ularity as the norm instead of a novelty. strategic direction to the engineering
control strategies noted above. This Rising energy costs and more regula- group. He is a member of the Consult-
has qualified such projects for an tion through energy codes are making ing-Specifying Engineer editorial advi-
innovation credit. energy management a top priority for sory board.

Unrivaled.
Belimo Advanced
Buttery Valve.
Belimos new buttery valve assembly is the most
intelligent, energy efcient, and reliable high ow solution
NEAR FIELD for HVAC applications. With a smartphone, easily program,
COMMUNICATION
(NFC) ENABLED
commission, and troubleshoot the buttery valve. NFC and
BACnet communication provide the data access you need
to ease installation and ensure optimal performance.
Belimo offers the highest quality products that are backed
by world-class service and support.

Discover all the advantages at belimo.us

Belimo Assistant App

Google Play and the Google Play logo are trademarks of Google Inc.

input #15 at www.csemag.com/information


EMPOWERING YOU

CORES
CONFIGURE ORDER REPORT ESTIMATE & ENERGY ANALYSIS SUBMITTAL

O N L I N E T O O L S Y O U N E E D.
ANYTIME. ANYWHERE.

C O M I N G J A N U A R Y 2 0 18

RenewAire.com
Register now to receive 800.627.4499
updates on CORES:
http://conta.cc/2sx5zwd
input #16 at www.csemag.com/information
Advertorial

CFE Medias
New Products for
Engineers Database
Featured Products
Littelfuse PSR Series High-Speed Square Body Fuses are specially
designed for protection of power semiconductor devices.
Features:
Best in Class DC performance
Extremely current limiting
Superior cycling capability
Global certification cURus, CCC, IEC
Direct bus-bar mount design
Littelfuse, Inc. Visual and optional microswitch fuse blown indication
Low watt-loss design
PSR Series - High-Speed Compliance with US and Canadian requirements
Square Body Fuses Class aR performance according to IEC60269-4.
PSR
www.csemag.com/NP4E/LittelfusePSRSeries
Reznor Model YDMA can provide air distribution with 30% to 100%
outside air to meet ASHRAE standards for ventilation or IAQ.
Features:
650 - 7,000 SCFM direct drive backward inclined plenum fan
High external static pressure capacity
Easy CFM verification for all fans - factory installed variable
frequency drive (VFD)
High eciency digital scroll compressors
(10% - 100% capacity control)
Anti-rust dual sloped condendate drain pan
Reznor Natural gas or propane heating
Dedicated Outdoor Air 92% or 80% gas heating thermal eciency
System (DOAS) Optional electric heating
Model YDMA Rugged double wall cabinet construction with foam insulation
Convenient single door access panel for all controls.

www.csemag.com/NP4E/ReznorDOAS
Catapult your career forward
Earn learning units and discover exclusive content through videos, presentations and
access to experts at CFE Edu, an on-demand education platform by CFE Media.

Check out the course catalog today at cfeedu.cfemedia.com/catalog.

Introduction to IIoT and Introduction to PLCs Critical Power: Generators


Industrie 4.0 and System Design

Lighting: LED Codes Electrical Systems: Impacts of Climate and


and Standards Designing Electrical Cooling Technology on
Rooms Data Center and Energy Use

Critical Power: Hospitals Data Centers Safety First: Arc Flash 101

Learn more about CFE Edu at cfeedu.cfemedia.com/catalog and become a student today!
How to use LEED v4
for lighting controls
Lighting requirements in LEED v4 have become more holistic, with a greater
emphasis on improving the quality of illumination for building occupants.

BY JOHN YOON, PE, LEED AP ID+C; McGuire Engineers, Chicago

T
he lighting requirements in LEED prerequisites and credits
Learning LEED v4, governed by the for lighting controls
objectives U.S. Green Building Coun- The format and organization of LEED
 Review the new lighting cil (USGBC), have become prerequisites and credits have changed
control requirements within much more holistic with a between LEED 2009 and v4. While the
U.S. Green Building Councils greater emphasis on improving the qual- general classifications have not changed
LEED v4.
ity of illumination for the occupants of a much (for example, Energy & Atmo-
 Understand associated building. The associated new metrics for sphere, Indoor Environmental Qual-
interdependencies of the vari-
ous prerequisites and credits
lighting within the standard represent a ity, etc. are still present), the number-
within the standard. steep learning curve. The lighting credits ing of the various individual credits and
 Provide guidance in imple- include new criteria, such as lamp life, prerequisites has been eliminated from
mentation and documentation color rendering, reduction in the use of the project-checklist spreadsheets pub-
of LEED v4 project. direct-only lighting, surface reflectance lished by USGBC. Referring to EAc1.2
within a room, illumination uniformity (which referred to Lighting Controls
ratios, etc. Lighting controls, while part under LEED 2009) is no longer allowed;
of the prerequisite and credit options, are the actual title needs to be referenced
relatively straightforward as compared for that particular credit. While many
with these other new requirements. independent online references have
The new lighting control requirements assigned numbers to the various cred-
within LEED v4 will be reviewed to its to aid in organization, they do not
understand associated interdependencies appear in the authoritative USGBC
of the various prerequisites and credits LEED v4 checklists.
within LEED v4, and help provide guid- The impact of lighting controls in
ance in implementation and documenta- LEED v4 doesnt extend much beyond
tion. While this article focuses on LEED what was commonly considered under
v4 for Interior Design and Construction LEED 2009. The following is a list of
(ID+C), the general concepts are usually prerequisites and credits where lighting
applicable for all versions of the rating controls apply:
system. LEED v4 does not represent a
monumental change in lighting control  EA: Fundamental Commissioning
requirements as compared with those and Verification (prerequisite)
incorporated into the prevailing energy
codes. It is vital to understand the new  EA: Enhanced Commissioning
criteria in LEED v4 in order to create a (credit)
successful LEED submission.

48 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


n EA: Optimize Energy Perfor-
mance (prerequisite)

n EA: Advanced Energy


Metering (credit)

n EA: Demand Response


(creditBD+C and O+M rating
system only)

n EQ: Interior Lighting (credit).

Lighting controls is one potential com-


ponent of an overall strategy to consider
when the building systems are designed
to allow for adaptive reuse over the life-
cycle of the building structure.

Defining the baseline for


energy performance
LEED mandates a minimum level
of energy performance. The baseline Figure 1: Modern lighting control systems often use digital addressable devices for
reference energy-conservation code status and control functions. This picture is of a Dali to DMX control gateway to auto-
for LEED v4 is ASHRAE 90.1-2010: mate control of tunable white LED light fixtures. All graphics courtesy:
Energy Standard for Buildings Except McGuire Engineers Inc.
Low-Rise Residential Buildings. This
is compared against ASHRAE 90.1- either the space-by-space method or the Energy modeling
2007, which used LEED 2009. While whole-building lighting power allow- If the energy-modeling compliance
not necessarily as stringent as more ance. Credit points for additional light- path is chosen, selection of lighting con-
recent versions of ASHRAE 90.1, the ing power reductions are also possible trols can help improve the models over-
U.S. Department of Energy (DOE) including 10% for one point, 15% for two all performance. While credit is not given
performed a study indicating that points, 20% for three points, and 25% for for spaces where ASHRAE 90.1 already
ASHRAE 90.1-2010 still represented a four points. requires automatic controls, credit can be
potential average improvement of 18% The LEED prerequisites state that taken if furnished for spaces where use
across all building types as compared Energy Star appliances, office equipment, of specific types of controls is optional
with ASHRAE 90.1-2007. electronics, and commercial food-service (i.e., multilevel occupancy sensors, day-
All LEED projects must comply with equipment account for at least 50% (by light-adaptive dimming, etc.). Typically,
all applicable mandatory provisions of rated power) of the total Energy Star-eli- the result is an adjustment that allows
ASHRAE 90.1-2010. To meet the LEED gible products in the project. It is worth the reduction in the connected lighting
Optimize Energy Performance pre- mentioning that while there is an Energy power usage by a control factor (cf ) as
requisite, it must be demonstrated that Star category for commercial lighting, it defined by ASHRAE 90.1-2010, Table
there is an improvement in the proposed does not apply to LEED. HVAC, lighting, 9.6.2. Note that in 2012, Table 9.6.2
performance beyond the baseline rating and building envelope products are spe- replaced Appendix G, Table G3.2, which
as defined by ASHRAE 90.1-2010. LEED cifically excluded. While outside of the listed power-adjustment percentages for
v4 for ID+C projects provide two dif- scope of this article, Energy Star certifica- automatic lighting controls in Adden-
ferent compliance-path options; energy- tion has been recently extended to several dum cg. The control factors listed in
modeling compliance path where a mini- other product categories, such as unin- Table 9.6.2 are much more comprehen-
mum of a 3% improvement is required terruptable-power supplies (UPS) and sive than Table G3.2. Table 9.6.2 also can
for the systems related to the area of network and computer server equipment. be used to provide an additional lighting
work, or a prescriptive compliance path LEED review comments may include power allowance for the prescriptive path,
where a 5% reduction in the connected requests to quantify these new categories which can be a significant contribution
lighting power density is required. The of Energy Star-eligible equipment that are when attempting additional LEED credit
5% reduction may be calculated using included in projects. points for lighting power reduction.

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 49


LEED v4 for lighting controls
Prescriptive compliance either time-of-day, occupancy sen- can be accomplished via dimming,
The work associated with creating an sors, or a signal from another control alternate switching of fixtures,
energy model is not trivial, and the asso- or alarm system that indicates that turning off individual lamps with-
ciated cost is not justifiable for many the area is unoccupied. in a multilamp fixture, etc.
projects. In those cases, the reduced doc-
umentation requirements of the prescrip-  Automatic control devices shall be  Automatic daylighting controls
tive-compliance path make more sense. either manual-on (i.e., semi-auto- with multilevel control (including
For prescriptive compliance in ID+C, a matic or vacancy-sensing) or shall dimming) for side-lighted areas
simple checklist of lighting control code turn on lighting to not more to 50%. exceeding 250 sq ft or areas with
requirements per ASHRAE 90.1-2010 is The primary exception to this rule top lighting exceeding 900 sq ft.
required. BD+C forms are even more basic is where manual-on operation could
and omit any type of lighting controls endanger safety or security.  Space with multiscene control
information within the online EA mini- systems, shop and lab classrooms,
mum energy-performance forms. Instead,  Each space enclosed by floor-to- areas that require 24-hour lighting,
BD+C prescriptive paths need only upload ceiling partitions shall have inde- or where automatic shutoff would
supporting compliance documentation pendent control for the lights with endanger safety or security are
with either the ASHRAE Advanced Ener- that space. The control shall be exempt.
gy Design Guide or Advanced Building readily accessible and located so as
Core Performance Guide. to allow the occupants to see the Several states have already adopted
In comparison with ASHRAE 90.1- controlled lighting. energy-conservation codes more strin-
2007, ASHRAE 90-1.2010 has more gent than ASHRAE 90.1-2010. If adopted
stringent lighting control requirements  Each control device shall control no by the local authority having jurisdiction,
that apply to more space types. How- more than 2,500 sq ft for a space of the more stringent code takes prece-
ever, the control requirements are still 10,000 sq ft or less and a maximum dence. However, the additional control
relatively straightforward. The following of 10,000 sq ft for a space greater requirements in those more current
are general minimum lighting controls than 10,000 sq ft. energy-conservation codes can translate
required by ASHRAE 90.1-2010: to additional credit points under LEED.
 Automatic lighting shutoff controls  Controlled lighting shall have at
are required in all spaces (with some least one control step between 30% The optimize energy-performance
special exceptions). Controls may be and 70% in addition to all-off. This prerequisite
The Energy and Atmosphere Opti-
Are you ready for LEED v4? mize Energy Performance ID+C prereq-
uisite form also includes fields for Inte-
OCT. 31, 2016, was an important date for those who were working on a LEED project late last year rior Lighting Control credits. Inclusion
because it was the deadline for registering a project under the old LEED 2009 rating system. While the of daylight controls for at least 25% of
registration deadline was extended more than a year beyond the original date of June 27, 2015, many the connected lighting load is worth one
were still left scrambling in an attempt to get their projects submitted prior to the deadline. point. Inclusion of occupancy controls for
With a new rating system, there is always a period of uncertainty and apprehension. When the LEED at least 75% of the connected lighting load
v4 pilot program went live in 2013, U.S. Green Building Council (USGBC) expended a considerable is worth another point. These points are
amount of resources on education to support the adoption of the LEED v4 rating system. Nevertheless, in addition to the potential credit points
a survey of participants at the 2014 Greenbuild convention indicated that 61% of respondents were still offered by the environmental quality (EQ)
not ready or unsure if they were ready to pursue LEED v4. Few were compelled to attempt certifica- Interior Lighting credit.
tion under LEED v4 prior to the deadline. A search of the USGBC online project database only returned Filling out the portion of the form
2,320 LEED v4 projects versus an overall total of 57,159 LEED projects registered between Sept. 30, related to lighting controls is relatively
2013, and May 1, 2017. straightforward (Figure 1). However,
LEED has a reputation for driving innovation and efficiency in green building design. However, by the additional documentation beyond just
time the deadline came for the new rating system, LEED 2009 had been in effect for more than 7 years. filling out the form is required. Typi-
What was once innovative had become the de facto industry standard. As with any progressive standard cally, you will want to prepare a floor
in effect for that long without significant change, it had the potential to fall into irrelevancy without major plan specific to lighting controls, with
updates to keep pace with evolution of the green building industry that it originally helped define. While the primary goal of assisting the LEED
the revisions incorporated into LEED v4 helps maintain the standards position at the forefront of the green reviewer in easily visualizing the relative
building movement, the associated design practices now have to evolve as well. percentage of areas and associated light
fixtures controlled by each control type.

50 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


The floor plan should indicate the room-
name identification, space type, and
lighting control type used in that area
along with the location of the associ-
ated controls. The information should
be presented in a clear and concise man-
nervisualization strategies, such as
color-coding rooms on the floor plan to
identify the control type that is present
in each room, may help (Figure 2). The
information that is presented on these
plans should be easy to cross-reference
with information entered on the form.
Remember that the LEED reviewer will
be seeing this information for the first
time and will not have the same intimate Figure 2: Vacancy sensing lighting controls are a ASHRAE 90.1-2010 requirement for
familiarity with the project as the design several different space types. This picture is of a ceiling mounted dual technology
team. Anything that you can do to make it sensor with an integrated photocell. The DIP switches allow it to be configured as
easier for the reviewer to understand the either an occupancy (auto on/auto off) or vacancy (manual on/auto off) sensor.
design methodology will help. The floor
plan that you create can also be used for has been expanded with a requirement are exceptions to this requirement for
the EQ Interior Lighting credit if you that at least three lighting levels (on, off, certain space types that dont fall into
choose to pursue it. midlevel) are also provided. The midlevel the categories defined by ASHRAE 90.1-
must be 30% to 70% of the maximum 2010, Section 9.4.1.2b. Per the exception
EQ interior lighting credit illumination level. Daylight contribu- to Section 9.4.2.1.2c:
Providing a comfortable and visually tions shall not be included in that assess- A remote control location shall be per-
pleasing environment with high-quality ment. Any daylight contribution does not mitted for reasons of safety or security
lighting has a greater emphasis in LEED qualify as a separate lighting level. While when the remote control device has an
v4. USGBC has rewritten and expanded motorized window treatments may be indicator pilot light as part of or next to
the LEED 2009 IEQc6.1 Controllability useful elsewhere within the rating sys- the control device and the light is clearly
of SystemsLighting credit. Under LEED tem, they have no impact for this credit. labeled it identify the controlled lighting.
2009, the credits only requirement was to In open-office environments, task The format for the Interior Lighting
provide individual lighting controls for lighting may still be used to satisfy the credit form is similar to the old LEED
a minimum of 90% of individual occu- individual control requirement. Task 2009 credit form. The form still separates
pants and 100% of multioccupant spaces lights are not required to be hardwired to individual occupant and multi-occupant
to enable adjustments to suit individual meet this requirementplug-in type may spaces due to differences in the mini-
task needs and preferences. Achieving be used. The multilevel control require- mum compliance thresholds (90% ver-
this credit was worth one point. The new ment also applies to shared multi-occu- sus 100%). The individual spaces must
LEED v4 EQ credit Interior Lighting pant spaces, such as conference rooms still be tabulated into specific groups
has expanded that to two potential credit and classrooms. For both individual and (open-plan workstation, private office,
points. There are two credit options to multi-occupant spaces, the percentage of etc.). The various group types are defined
choose from, each of which is worth one compliant spaces is based on the num- via pull-down menus in the PDF credit
point. Option 1 involves providing light- ber of occupant spaces, not percentage of form. For spaces not matching any of the
ing controls above and beyond ASHRAE overall floor area per usage type. predefined options, there is an other
90.1-2010. Option 2 offers eight strategies Another requirement is that the con- category in the pull-down menu. The
involving the quality of illumination, of trols are in a location that is convenient shared multi-occupant section of the
which four must be implemented to meet to the occupants. This means that the form has an additional column, Meets
the minimum credit threshold. Both control is readily accessible and located Requirements for Switch Controls. As
options can be pursued for credit. so that occupants can see the controlled described in the fine print immedi-
For the lighting controls option, lighting. For example, in health care ate below the schedule, this means that
the basic requirement of providing at projects, there must be considerations manual controls must be located within
least 90% of individual occupants with for patient areasthe controls need to the space and have a direct line of sight
lighting controls remains. However, it be accessible from the patient bed. There to the controlled luminaries.

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 51


LEED v4 for lighting controls
As with the EA prerequisite, provid- Commissioning is fundamental n Develop a sequence of operation for
ing proper supporting documentation The most energy-efficient light fixture the lighting controls. This should
to this credit is critical. While the most is the one that doesnt turn on when it harmonize with the narrative
effective strategies for documentation isnt needed. However, what happens description included with the EA
are debatable, ultimately the basic goal when the lighting controls dont work as Lighting Controls credit docu-
should be to clearly and concisely convey expected and the lighting either doesnt mentation.
to the reviewer what controls are present turn off or turns off when it needs to stay
in which area. New additions to the credit on? LEED v4 specifically requires light- n Where other credits are pur-
form include a section requiring a writ- ing control systems commissioning to sued (i.e., Demand Response,
ten narrative description explaining how address these types of issues. The LEED Advanced Energy Metering, etc.),
individual occupant spaces and shared v4 commissioning requirements are not all associated aspects of the inter-
multioccupant spaces were determined, particular unusual and encompass the face of the lighting controls to those
if certain spaces were excluded and why, traditional documentation and func- systems should also be included in
and the overall lighting control strate- tional testing that was generally required the documentation.
gies used for the project. Any floor plans in LEED 2009. Most of the work is associ-
that are submitted should support this ated with the fundamental commission- n Include required setpoints (light
information thats entered into the credit ing prerequisite, and the enhanced com- levels for multilevel dimming sys-
form. Again, it may be effective to expand missioning concerns the commissioning tem, daylit zones, etc.) and run
on the documentation submitted for EA authority (CxA). However, a significant time schedules where time-of-day
Optimize Energy Performance lighting amount of input from the design team is controls are specified. Again, these
controls category. Make sure that all sup- still required. The basic documentation should harmonize with the docu-
porting information is uploaded so that requirements for the design team, in addi- mentation furnished for the other
the reviewer doesnt have to reach out to tion to the general basis-of-design system lighting control prerequisites and
you to request it. narrative, should include the following: credits.

WE TURN
YOU ON.
(OR OFF)
Douglas Lighting Controls
Experience. Quality. Trust.
Douglas Lighting Controls has been
turning lights on and off or somewhere in
between for over 50 years. Whether its
office buildings, campuses, government
facilities or stadiums, our high quality
lighting controls solutions are trusted
throughout North America.

A member of the Panasonic Group

604-873-2797 | douglaslightingcontrols.com | lighting@douglaslightingcontrols.com input #17 at www.csemag.com/information


n Preventative maintenance plan improve what you cant measure. LEED
based on the manufacturers recom- v4 has an EA credit for Advanced Energy
mendations. Metering. The credit requires that any
energy end use that represents 10% or
n Provide all of the project-specific more of the total annual energy con-
system manualsnot just the sumption must be measured. Lighting
manufacturers generic equipment systems typical fall under this require-
manuals. ment.
Many modern lighting controls sys-
n If monitoring-based commission- tems using a centralized server are able
ing is performed for credit under to meet this metering requirement. The
the Enhanced Commissioning two typical compliance solutions are
credit, all aspects of the building extrapolation and actual measurement.
energy-usage measurement system The extrapolation method is based on the Figure 3: If direct line-of-sight to the light
including the lighting must be assumption that a predefined light fixture fixtures is not possible due to security
included. power usage multiplied by the measured or functional concerns, ASHRAE 90.1-
run time for those lighting fixtures will 2010 require some way of annunciating
Advanced energy meter and be representative of the actual energy the status (on or off) for the light fixtures
demand response usage (i.e., a 100 W lamp multiplied by that are connected to any particular con-
By having reliable, quantifiable data 100 hours of run time equals 10 kWh). By trol device. This shows a touchscreen
on the energy usage and performance of monitoring how long a particular light- lighting control in debug model. When
the building, it is more likely that per- ing zone is on, the power usage can properly configured, it can display the
sistent or improved energy efficiency be determined if it is known what/how status of any lighting control zone for
can be achieved. After all, its difficult to many light fixtures are connected to that this system.

CAU T ION
9 out of 10 Engineers specify the wrong VRF insulation
Be the one who does it right. Insist on Aerocel EPDM. Heres why:
VRF
Continuous 257 service temperature Non-corrosive
Exceeds VRF ductless split system Use on copper, aluminum and stainless steel
condenser unit temperature of 248 without corrosion
Best water vapor resistance Lowest VOC emissions
XXXXXXXXXXXXXXXXXXX
Takes colder operating temperatures of Works in sustainable construction and areas
VRF systems without water absorption where fumes are undesirable
Best size range available Real UV resistance
ID from " up to 2" No weather barrier needed, reduces installed
Wall thickness of ", ", 1", 1", 2" cost and improves long-term investment
Fire Resistant
VRF systems are widely used in Comes Standard
high-occupancy buildings that require NO EXTRA CHARGE
exceptional fire-safety input #18 at www.csemag.com/information

Get your FREE SAMPLE


of Aerocel EPDM

simply visit www.aeroflexusa.com/vrf today Done once. Done fast. Done right.

Call today for the name of your nearest distributor: 1-866-237-6235 | Or visit www.aeroflexusa.com
LEED v4 for lighting controls
eNewsletters
Figure 4: Automatic
lighting control is
Check out Consulting- required by ASHRAE
Specifying Engineers 90.1-2010. For certain
eNewsletters! space types, time-of-day
control is acceptable
way to comply with this
Providing helpful and requirement. This is of
specific information thats a stand-alone dimming
directly applicable to your system that is also
career. capable of automatic
time-of-day control.

control zone. While it is a cost-effective Also, when a centralized server is used


approach due to its reduced hardware/ for lighting control, other features, such
metering equipment requirements, this as utility demand-response programs,
methodology only provides an estimate are much easier to implement. LEED
of energy usage. This is due to the fact v4 offers an EA credit for Demand
Products For Engineers
that it doesnt depend on direct measure- Response. However, this credit is only
SHOWCASE
PE
Control Systems Process Manufacturing Discrete Manufacturing System Integration Netwroking & Security Info Management
ments of the lighting branch-circuit cur- available under the BD+C and the O+M
rent draw. The accuracy of the estimated rating systems. It is not available for
Wednesday, October 22, 2015
One Chip. One Company. All Your Network Kepware Releases KEPServerEX V5.16
Solutions. with New Local Historian Plug-In

energy usage is directly dependent on ID+C projects. When demand response


The netX network controller chip The plug-in captures data at the
family from Hilscher integrates source to prevent data loss and
fieldbus and industrial Ethernets improve operational efficiency with
for transparent protocol an easy to configure, flexible, open,
conversion. One chip, 12 networks, and cost-effective solution.
24 protocol stacks. All stacks have Download a free Demo.

the accuracy of the predefined quantity is implemented, the functionality of these


the same Driver Interface. Master
stacks include FDT-based
Configuration Tool.
Register to learn more.

of power required by any particular con- systems has to be verified through the
One Chip. One Company. All Your Network Engineers' Choice Awards finalists
Solutions.

Solutions Direct offers discounted Official Engineers Choice ballots are


prices on over 8,000 Electrical open for voting for Control

trol zone. If dimming is used, ongoing Fundamental Commission prerequisite.


Enclosures and Thermal Engineering North American print
Management Products. Sizes range and digital edition qualified
from 2 x 2 to 86 x 187 and meet subscribers. Based on your
NEMA/UL Ratings. experience, vote for the best
Click to learn more. Engineers Choice finalists of 94
products in 26 categories.
Vote Now!

On-demand webcasts One Chip. One Company. All Your Network


Solutions.
modifications/remodeling work is caus- Lighting control requirements span
ing a change in the quantity or type of several different LEED prerequisites
It's never been easier to earn The netX network controller chip
continuing education credits! Attend family from Hilscher integrates
our 1-hour-long webcasts now fieldbus and industrial Ethernets
available on-demand. for transparent protocol
Learn More. conversion. One chip, 12 networks,
24 protocol stacks. All stacks have

light fixtures, or other similar variables and credits. Most prerequisites can be
the same Driver Interface. Master
stacks include FDT-based
Configuration Tool.
Register to learn more.

are anticipated that would impact the easily met through compliance with the
accuracy of the extrapolated data, this prescriptive requirements of ASHRAE
methodology is not recommended. In 90.1-2010. However, LEED v4 has
that case, use of a true electrical meter- evolved beyond a simple emphasis on
ing system incorporating current trans- specifying the basic parts of a light-
formers to measure current draw at the ing control system. LEED v4 brings a
branch-circuit level would be justified. renewed emphasis on functional testing
Some energy-metering and measure- of lighting control systems to make sure
ment systems will use a hybrid combi- that they function properly. Lighting
Sign up today! Go to nation of these two methods to achieve control systems play a fundamental role
www.csemag.com/newsletters some level of cost savings. in LEEDs core concepts of environmen-
If provided, lighting system metering tal responsibility and providing build-
can also potentially contribute to the ing occupants with the ability to control
pilot credit Energy Performance Meter- their environment. They cannot be left
ing Path. The goal of this pilot credit as an afterthought in designs.
is to validate the energy-usage reduc-
tion that was estimated by the energy John Yoon is a lead electrical engineer at
model created for Option 1 of the EA McGuire Engineers Inc. and is a member of
Minimum Energy Performance pre- the Consulting-Specifying Engineer edito-
requisite. rial advisory board.

54 Consulting-Specifying Engineer AUGUST 2017


FULLY AUTOMATED,
WEB CONNECTED,
CORROSION PREVENTION
Introducing Potters IntelliGen
Nitrogen Generators:
The only nitrogen solution that
does all the hard work for you.
3RWWHUVQWHOOL*HQ1LWURJHQ*HQHUDWRUVFRQWLQXRXVO\FROOHFW
LQIRUPDWLRQWRXQGHUVWDQGZKDWVJRLQJRQLQ\RXUUHVSULQNOHU
V\VWHP7KLVDOORZVWKHPWRDXWRPDWLFDOO\VZLWFKWRWKHFRUUHFW
OO PRGH ZLWKRXW FRPSOLFDWHG EDOO YDOYH FRQJXUDWLRQV
$GGLWLRQDOO\ PRQLWRU \RXU V\VWHP ZLWK WKH QWHOOL9LHZ
'DVKERDUGDQLQWHUDFWLYHZHEVLWHWKDWDOORZV\RXWRDFFHVV
V\VWHP VWDWXV QLWURJHQ SXULW\ LQIRUPDWLRQ PDLQWHQDQFH
KLVWRULFDOGDWDDQGPXFKPRUHIURPDQ\ZKHUHLQWKHZRUOG

&OLFNKHUHWROHDUQPRUH
www.PotterIntelligen.com

FEATURES

( Potters IntelliGen Controller (Patent Pending)


 )XOO\DXWRPDWHVWKHDLUDQGQLWURJHQOOSURFHVV
 $GYDQFHGOHDNUDWHGHWHFWLRQ
 QWHJUDWHG%\SDVVDODUP
 :HE(QDEOHGV\VWHPFDQEHPRQLWRUHG
  DQ\ZKHUHWKHUHLVLQWHUQHWFRQQHFWLYLW\
( $XWRPDWLFDOO\HPDLOVWURXEOHDOHUWVDQGPDLQWHQDQFH
reminders
( QFOXGHVDOODLUFRPSUHVVRUVWDQNVOWHUVUHOLHI
 YDOYHVFRROHUVDXWRPDWLFGUDLQVDQGJDXJHV

Stay connected to your nitrogen system


with the Potter IntelliView Dashboard

input #57 at www.csemag.com/information


Understanding
overcurrent protection
Electrical engineers can use this guide to understand NFPA 70:
National Electrical Code requirements for overcurrent protection.
BY STEVEN EICH, PE, CDT, REP, LEED AP; Environmental Systems Design, Chicago

O
vercurrent protection the equipment being protected, and the
Learning objectives seems like a simple con- strength of the source.
 Understand the three types of overcurrent cept: Limit the current Fortunately, NFPA 70: National Electric
conditions to consider in typical NFPA 70: flow in a circuit to a safe Code (NEC) gives requirements for most
National Electrical Code applications.
value. Electrical designers of the applications that electrical engi-
 Ascertain how to protect a circuit from face this task daily. neers and designers encounter in their
dangerous overloads and short-circuits.
But there is much more to it. How do you work. Though at first glance, the NEC
 Review overcurrent protection for certain
limit the current flow? What is a safe value? requirements might not seem straightfor-
types of building equipment.
The answers depend on the application, ward, there is solid reasoning behind the
overcurrent-protection code rules.
Overcurrent protection (OCP) protects
a circuit from damage due to an overcur-
rent condition. There are three types of
overcurrent conditions to consider in
typical NEC applications:
Overload: NEC 2017 defines overload
as operation of equipment in excess of
normal, full-load rating or of a conduc-
tor in excess of rated ampacity that, when
it persists for a sufficient length of time,
would cause damage or dangerous over-
heating. A fault, such as a short circuit or
ground fault, is not an overload.
Overload conditions are usually not as
time-critical as short circuits and ground
faults. Electrical equipment can usually
withstand some level of load current over
its rating for a length of time. Information

Figure 1: There are four types of short


circuits: 3-phase fault, line-to-ground
fault (the most common), line-to-line
ground fault, and line-to-line fault. A
3-phase fault usually results in the high-
est fault current. All graphics courtesy:
Environmental Systems Design

56 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


regarding equipment-overload capability
often comes from the manufacturer. How-
ever, some equipmentmotors, trans-
formers, and conductors, for example
have overload-protection requirements set
by the NEC.
Short circuit: A short circuit is defined
as flow of current outside the intended Figure 2: Example of a circuit with no fault. The current can flow indefinitely without
current path. In a 3-phase circuit, two tripping the overcurrent protection.
types of short circuits are possible: sym-
metrical 3-phase faults and unsymmetri- breaker will allow the short circuit cur-  460 Capacitors
cal single-phase faults (Figure 1). Sym- rent to flow for only a short time. If the  517 Health care facilities
metrical faults result in the same current fault current persists, the insulation will  620 Elevators
flow in each phase during the fault condi- melt and the conductors themselves will  660 X-ray equipment
tion. Unsymmetrical faults have different be damaged.  695 Fire pumps
fault currents in each phase. Symmetrical Figure 5 shows a ground-fault condi-  700 Emergency systems.
3-phase faults rarely occur, but their anal- tion. In this example, the ground-fault
ysis is useful in understanding a systems path adds approximately .012 ohms of The general requirement for overcur-
response to a fault and usually results in resistance in parallel with the load resis- rent protection of conductors is provided
the worst-case fault levels. Unsymmetrical tance, resulting in a much lower circuit in Section 240.4, Protection of Conduc-
faults are more common and usually result resistance. The fault current is approxi- tors. The basic rule for overcurrent pro-
in less fault current than a symmetrical mately 5,000 amps. As in the case with the tection of conductorsother than using
3-phase fault. short circuit, the circuit breaker will allow flexible cords, flexible cables, and fixture
Ground fault: A ground fault is a spe- the fault current to flow for only a short wiresis to protect the conductor in
cific type of short circuit involving at least time. Again, if the fault current persists, accordance with the ampacities specified
one of the phase conductors encountering the insulation will melt and the conduc- in Section 310.15. Article 310 provides
a grounded conductor or surface. Ground tors will eventually be damaged. the general requirements for conduc-
faults include a single line-to-ground fault tors, insulation, markings, mechanical
and multiple-line-to-ground faults (Figure How to protect a circuit from strength, and ampacity rating.
1). The single line-to ground fault is the dangerous overloads and short Several articles applicable to commer-
most common type of fault. circuits cial buildings modify the general NEC
The different types of faults are shown The requirements for overcurrent pro- rule for overcurrent protection, as sum-
in Figure 1 to illustrate the concept of tection of equipment can be found in the marized below:
overcurrent protection. NEC article that addresses that specific
What happens during an overload or equipment. NEC Table 240.3 provides a  240.4(A) Power Loss Hazard. If
fault condition? Figure 2 depicts a simple list of the applicable sections. Sections for circuit interruption due to an over-
single-phase circuit operating in a normal articles pertaining to equipment typically load condition could create a haz-
configuration. In this case, the load cur- found in commercial buildings include: ardfor instance, shutting down a
rent is 10 amps. The circuit is protected fire pumpoverload protection is
by a 15-amp circuit breaker. The circuit  230 Services not required. Short-circuit protec-
breaker does not open; the load current  368 Busways tion is required.
flows and the conductors do not overheat.  406 Receptacles
Figure 3 illustrates the result of an over-  410 Luminaires  240.4(B) Overcurrent Devices
load condition. In the overloaded circuit,  422 Appliances Rated 800 amps or Less. This
the load current is nearly 20 amps. The  427 Fixed electric heating for section allows the next higher
circuit breaker will allow the overload pipelines and vessels standard overcurrent device rat-
condition to continue for approximately  430 Motors, motor circuits, ing (provided the rating does not
2.5 minutes before opening the circuit. and controllers exceed 800 amps) to be used, as
The conductors will begin to heat up, but  440 Air conditioning and long as the conductors it is pro-
will not be damaged. refrigerating equipment tecting are not used to supply a
Figure 4 shows the result of a short  445 Generators branch circuit with more than one
circuit condition. The fault current is  450 Transformers and receptacle for plug-connected loads
approximately 10,000 amps. The circuit transformer vaults and the ampacity of the conductor

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 57


Overcurrent protection
does not correspond with a standard two special conditions involving Selecting OCP ratings
ampere rating. If the overcurrent pro- two-wire, single-phase, and delta- In the following examples, the rating
tective device is adjustable, it must be delta 3-wire, requires transformer of the OCP trip value will be determined
adjusted to the value equal to or less secondary conductors to be pro- along with the ampacity of the conduc-
than the conductor ampacity. tected by a secondary OCP. tors used in the circuit. The short-circuit
current rating and interrupting rating
 240.4(E) Tap Conductors. The gen-  240.4(G) Overcurrent Protection must also be determined based on the
eral NEC rule requires the OCP to for Specific Conductor Applica- available short-circuit current in the cir-
be located upstream of the conductor tions. The NEC requirements for cuit. Calculation of the available short-
being protected. There are, however, overcurrent protection for specific circuit current is outside the scope of this
special rules allowing the OCP to be applications are found in sections discussion.
placed in other locations of the circuit other than 240. For example, the Branch circuits. The requirements for
provided all the conditions of the requirements for air conditioning and branch-circuit overcurrent protection
NEC are met. For instance, house- refrigeration equipment are found in are found in Section 210.20. The general
hold ranges and cooking appliances, Article 440, parts III and VI. Capaci- requirement is to size the OCP for no less
fixture wiring, busways, and motors tor circuit conductor OCP require- than 125% of the continuous load and
all have special rules allowing taps to ments are found in Section 460. 100% of the noncontinuous load. The NEC
be used. Motors and motor-control conductor definition of a continuous load is a load
overcurrent-protection requirements where the maximum current is expected to
 240.4(F) Transformer Secondary are found in Article 430 parts II, III, continue for 3 hours or more. See sidebar
Conductors. The NEC, except in IV, V, VI, and VII. on page 61.
For example, consider a single-phase
120 V circuit feeding an open-office light-
ing load (continuous) of 1,000 VA and a
small cooling units condensate pump load
(non-continuous) of 100 VA. The circuit
load for the purpose of sizing the OCP is:

OCP sizing load


= 1.25 x 1,000 VA + 1.00 x 100 VA
= 1,350 VA.

OCP sizing current


= 1,350 VA/120 V
= 11.25 amps
Figure 3: Example of a circuit with an overload. The overload current can flow for 2 to The next highest standard OCP
3 minutes before the overcurrent protection will open the circuit. (see Table 240.6(A)) is 15 amps.

Now select a conductor in accordance


with sections 210.19(A) and 310.15. Sec-
tion 210.19(A) requires the conductor
to be sized in the same manner as the
OCPno less than 125% of the continu-
ous load and 100% of the noncontinuous
load. In the example above, the circuit
conductors copper heat-resistant ther-
moplastic (THHN) are routed through
the office environment in a conduit con-
taining six current-carrying conductors.
By referencing Table 310.15(B)(16), the
minimum conductor size allowed is
Figure 4: Example of a circuit with a short circuit. The short-circuit current will cause #14. Even though this example is using
the overcurrent protection to open the circuit immediately. copper THHN wire, rated for 90C, the

58 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


60C column must be used due to the
requirement of Section 110.14(C)(1)(a).
This section requires the use of the 60C
column in Table 310.15(B)(16), because
the terminations for equipment rated
100 amps or less is assumed to be rated
for 60C unless listed and labeled oth-
erwise. Further, Section 240.4(D), Small
Conductors, requires the OCP for #14
wire to be rated at 15 amps.
The general rule for NEC ampac- Figure 5: Example of a circuit with a ground fault. The ground-fault current will cause
ity selection is found in Section 310.15, the overcurrent protection to open the circuit immediately.
which refers to the tables in Section
310.15(B). Section 310.15 contains lim-
iting factors that must be applied to the the correction factor for copper THHN OCP sizing current
ampacity table values when determining 90C wire is 1.0, so no ampacity adjust- = 47,500 VA/(1.73 x 208 V)
ampacity for your specific design condi- ment is required. = 132 amps
tions. Of the factors to be considered, two Next, derating for the number of con- The next highest standard OCP
commonly encountered factors, or derat- ductors in the conduit must be consid- (see table 240.6(A)) is 150 amps.
ings, are the ambient temperature and ered. In our example, there are six cur-
the number of conductors in a raceway. rent-carrying conductors routed in the Next, select a conductor in accor-
Looking through the tables in 310.15(B), conduit. Table 310.15(B)(3)(a) is used dance with Sections 215.2 and 310.15.
notice that some tables are based on an to determine the appropriate derating Section 215.2 requires the conductor
ambient temperature of 30C and others factor. For four to six conductors in a to be sized in the same manner as the
are based on 40C. Ambient-temperature raceway, the derating factor is 80%. OCPno less than 125% of the contin-
correction factors for 30C tables are uous load and 100% of the noncontin-
found in Table 310.15(B)(2)(a). Ambi- Number of conductors uous load. In this example, the circuit
ent-temperature correction factors for #14 copper THHN ampacity conductors (copper THHN) are routed
40C tables are found in Table 310.15(B) = 25 amps x 0.8 through a boiler room where the tem-
(2)(b). Adjustments for the number of = 20 amps perature will not exceed 120F. The con-
current-carrying conductors in a race- duit will contain three current-carrying
way are found in Table 310.15(B)(3)(a). As discussed above, the 60C ampac- conductors.
There are some conditions under which ity of 15 amps must be used for the #14 Referencing Table 310.15(B)(16),
the derating factors do not apply, as seen wire in this example despite the higher the minimum conductor size allowed
in 310.15(B)(3)(a)(2) through (4). For ampacity calculated. for an OCP rating of 150 amps is #1/0.
example, the derating factors do not apply Feeder circuits. The requirements for As with the previous example, the wire
to type armored cable (AC) and metal- feeder-circuit overcurrent protection are type selected is copper THHN, which
clad (MC) cables provided the cables do found in Section 215.3 and are similar is rated for 90C. In this case, the
not have an overall jacket, each cable has to the requirements for branch circuits. 75C column must be used due to the
not more than three current-carrying As with branch circuits, the general requirement of Section 110.14(C)(1)(a).
conductors, the conductors are #2 AWG, requirement is to size the OCP no less This section requires the use of the 75C
and not more than 20 current-carrying than 125% of the continuous load and column in Table 310.15(B)(16), because
conductors are installed without main- 100% of the noncontinuous load. the terminations for equipment rated
taining spacing. Consider a 208 V, 3-phase feeder sup- 100 amps or higher are required to be
For this example, the wires are routed plying a panelboard with a noncontinu- rated for 75C unless listed and labeled
through an office environment where ous load of 10 kVA and a continuous otherwise.
the highest temperature is expected to load of 30 kVA. The circuit load for the In this example, the wires are routed
be 85F during times when the cooling purpose of sizing the OCP is: through a boiler room where the highest
systems are turned off. Table 310.15(B) temperature is expected to be no higher
(2)(a) provides the ambient-temperature OCP sizing load than 120F. Table 310.15(B)(2)(a) pro-
correction factors, which must be applied = 1.25 x 30,000 VA + vides the ambient-temperature correc-
to the ampacities given in Table 310.15(B) 1.00 x 10,000 VA tion factors, which must be applied to
(16). For an ambient temperature of 85F, = 47,500 VA the ampacities given in Table 310.15(B)

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 59


Overcurrent protection
(16). For an ambient temperature of 120F, For long circuits, the conductor size overcurrent protection. The require-
the correction factor for copper THHN may need to be increased to maintain ments for motor-circuit overcurrent
90C wire is 0.82. Thus, the calculated minimum voltage-drop requirements. protection are different than branch and
ampacity for the #1/0 copper THHN wire The NEC has informational notes con- feeder circuits, often leading to confu-
used in this example is: cerning voltage drop for branch circuits sion. For motor circuits, overload protec-
and feeders, but it is not a code rule. tion is provided by the motor-overload
Ambient temperature However, many authorities having juris- protector (refer to Article 430 Part III).
#1/0 copper THHN ampacity diction have made voltage drop a code The motor-overload protector is usually
= 170 amps x 0.82 requirement. Also, energy codes require a device, located in the motor starter, that
= 139.4 amps voltage drop to be considered. responds to motor current and is set to
Note that there is an exception to After applying the appropriate derat- trip open the motor controller when
Table 310.15(A)(2) that allows the higher ings, the calculated ampacity of the #1/0 the motor current exceeds 125% of the
nameplate current for 1.15 service fac-
tor motors or 115% of nameplate current
Some electrical distributuion manufacturers for motors without a service factor. The
OCP used to provide power to the motor
provide slide-rule-type guides to help select controller and motor has to then provide
short-circuit and ground-fault protection
motor-circuit ratings. for the motor circuit. The requirements
for determining the maximum rating or
ampacity to be used for cables having dif- wire is adequately protected by the 150- setting for motor-branch-circuit short
ferent ampacities where the lower ampac- amp OCP selected above. Consideration circuit and ground-fault protection can
ity does not exceed 10 ft or 10% of the total should be given to load growth. The load be found in Table 430.52. To use this
circuit length. and cable ratings calculated above are table, you must know the type of motor
Next, derating for the number of con- minimum values. It is common practice used in the circuit and the type of OCP
ductors in the conduit must be consid- to add 20% of the minimum cable rating used to protect the circuit.
ered. In the example above, there are to be used for future load additions. Consider a 460 V, 3-phase motor
three current-carr ying conductors branch circuit supplying power to a 100-
routed in the conduit. Since the ampaci- Requirements for hp, squirrel-cage motor protected by an
ties in Table 310.15(B)(3)(a) already motor-circuit protections inverse-time molded-case circuit breaker.
account for up to three current-carry- The requirements for motor-circuit The copper THHN circuit conductors are
ing conductors, no further derating is overcurrent protection start with Table routed in an area with an ambient tem-
required. 240.4(G), Specific Conductor Applica- perature not exceeding 104F, and the
Once the ampacity is determined, the tions. Table 240.4(G) requires Article 430 number of current-carrying conductors
voltage drop should also be considered. to be used for selection of motor-circuit in the raceway is three. For this example,
Table 430.52 allows a circuit breaker with
a maximum rating of 2.5 times the full-
load current of the motor. The motor
full-load current used in this calculation
is not the nameplate current, but the cur-
rent value found in Table 430.250.

Motor current
= 124 amps

Max OCP rating


= 2.5 x 124 amps
= 310 amps.

Section 430.52(C)(1) has an excep-


Figure 6: A common overcurrent protective device (OCP) is a circuit breaker. These tion that allows the next higher standard
power circuit breakers are commonly used for large feeder circuits and have an rating to be used. In this case, the maxi-
adjustable trip setting. mum OCP rating is then 350 amps. If

60 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


Continuous and noncontinuous loads
NFPA 70: National Electric Code (NEC) gives little guidance regarding continuous and
noncontinuous loads and why this is important. It is important to have a distinction continuous
the motor starting torque and time to and noncontinuous loads because of heat. Consider a 25-amp load flowing in a circuit. In the
reach operating speed is such that the noncontinuous case (for example, a large sump pump), the load might be active for less than a
motor will not start, Section 430.52(C) minute. In the continuous case (for example, a chiller), the load might be active for 8 hours or
(1), Exception 2, allows the OCP rating longer. Comparing the two cases, the chiller circuit conductors will be at a higher temperature
to be raised even higher. In the case of an during operation than the sump pump circuit conductors. The NEC requires a more conservative
inverse-time circuit breaker for the motor selection (125%) in the case of continuous loads due to increased heat dissipated by the circuit
in this example, Exception (c) allows the conductors as compared with noncontinuous loads. Some examples of continuous loads include
OCP rating to be increased from 250% office lighting, exterior lighting, data center equipment, fixed storage-type water heaters with
to 300%. However, the next higher rating capacities of less than 120 gal (450 l; as per NEC 422.13), and chilled/hot-water circulating
allowance does not apply to Exception pumps. Some examples of noncontinuous loads include food-waste disposers, sump/sewage
(c). An OCP rating of 300% higher than ejector pumps, garage door operators, and electric pencil sharpeners. Determining whether a
the full-load current is 3 x 124 amps = load is continuous or noncontinuous is not always clear. Consider the case of an office storeroom
372 amps. This rating falls between the lighting circuit. If designed to current energy code requirements, it should have a vacancy sen-
standard ratings of 350 amps and 400 sor to automatically shut off the lights when there are no occupants detected. This seems like
amps. In this example, the OCP rating an example of a noncontinuous circuit. What if the sensor failed or the room was temporarily
cannot be increased above 350 amps. repurposed as an office? Some permit reviewers might require this to be considered a continuous
Typical practice is to use an OCP rating load. In cases where a load is certain to be noncontinuous, size the circuit to 100% of the load.
less than the maximum calculated above. If the load is debatable, be conservative and design for a continuous load.
Some electrical distribution manufactur-
ers provide slide-rule-type guides to help In this example, the wires are routed These values are generally higher than
select motor-circuit ratings. Phone apps through an environment where the the FLA values found on the actual
are also available that provide the same highest temperature is expected to be no motor nameplate, resulting in conserva-
function as the slide rule. Three differ- higher than 104F. Table 310.15(B)(2)(a) tively selected OCP and conductor rat-
ent manufacturer slide-rule guides were provides the ambient-temperature cor- ings. In the case of hermitically sealed
checked; they all recommend a circuit rection factors, which must be applied to motor compressors, the motor FLA
breaker OCP rating for 200 amps for the the ampacities given in Table 310.15(B) values found in Article 430 will not be
following example. (16). For an ambient temperature of higher than actual motor values due to
The conductor ampacities for a motor 104F, the correction factor for copper the cooling effect the refrigerant has on
circuit can be determined using Article THHN 90C wire is 0.91. The calculated the motor windings.
430, Part II. Section 430.22 applies to this ampacity for the #2/0 copper THHN wire For example, a 1.5-hp motor used in a
example in that it is a single motor circuit. used in this example is: hermetically sealed compressor might be
The requirement for sizing the conductors able to do 2 hp of work because heat is
is simply 125% of the full-load current Ambient temperature being removed from the motor windings,
specified in Table 430.50. #2/0 copper THHN ampacity allowing higher currents to flow with-
= 195 amps x 0.91 out exceeding the winding-conductor
Motor circuit conductor ampacity = 177.5 amps. temperature rating. For this reason, the
= 1.25 x 124 amps manufacturer must provide data specific
= 155 amps. The conductor ampacity derated for to the air conditioning and refrigerat-
ambient temperature is higher than the ing equipment being used. Specifically,
Referring to Table 310.15(B)(16), using 75C ampacity column, so it is acceptable the maximum overcurrent-protection
the 75C column, the minimum size wire for use in this example. (MOP) value must be used to deter-
acceptable is #2/0 with a rating of 175 Air conditioning and refrigerating mine the rating of the air conditioning
amps. Note that the maximum OCP rating equipment circuits. As with motors, the or refrigerant circuit. Also, minimum
is 350 amps, which is significantly higher requirements for motor-circuit overcur- circuit amperes (MCA) must be used
than even the 90C column ampacity of rent protection start with Table 240.4(G), to determine the minimum conductor
195 amps. This condition is allowed by Specific Conductor Applications. Table rating. This data will be found on the
the NEC because overload protection is 240.4(G) requires Article 440 to be used equipment nameplate and can also be
provided by the overload protector in the for selection of motor-circuit overcur- obtained from the manufacturer in the
motor starter, which is set at 125% of full- rent protection for air conditioning and form of a data sheet. The air condition-
load nameplate current for a motor service refrigeration equipment. ing and refrigeration equipment manu-
factor of 1.15. The motor-circuit OCP is When determining OCP ratings for facturer must also indicate whether a fuse
providing only short-circuit and ground- motors, the full-load ampere (FLA) or circuit breaker can be used to supply
fault protection. values given in Article 430 are used. the equipment.

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 61


Overcurrent protection
Consider an example of an air condi- ing unit is located outdoors with a maxi- could be used since the manufacturer
tioning unit with a MOP (circuit breaker mum ambient temperature of 120F. listed the equipment with both types of
or fuse) of 50 amps and an MCA of 31.0 In this example, the OCP is simply OCP device.
amps. In this example, the air condition- equal to the manufacturer-supplied The wire size will be based on the
ing unit is fed using copper THHN wire MOP value of 50 amps, since 50 amps manufacturer-supplied MCA value,
in a conduit containing three current- is a standard OCP rating per Table which in this case is 31.0 amps. Using
carrying conductors. The air condition- 240.6(A). Either a circuit breaker or fuse Table 310.15(B)(16), the 75C column,
the minimum wire size is #8. The #10
wire has sufficient ampacity, but per
Section 240.4(D), it must be protected
with an OCP with a rating of 30 amps
or less. This example requires a 50-amp
OCP, therefore a #8 wire must be used.
Since there are only three current-car-
rying conductors in the conduit for this
example, derating for the number of
conductors is not required. The cable
ampacity must be corrected for an ambi-
ent temperature of 120F. Referring to
Table 310.15(B)(2)(a), the correction
factor for 90C-rated copper THHN
wire with a maximum ambient tempera-
ture of 120F is 0.82.

Temperature derated ampacity


= 0.82 x 55 amps
= 45.1 amps.

The derated temperature rating is high-


er than the MCA value of 31.0 amps for
the #8 conductor, which is acceptable for
this example.
There are several applicable sections
of the NEC that set the requirements for
the selection of OCPs and conductors for
commercial buildings. Several of the NEC
sections are modified for all the specific
installations and equipment found in
commercial buildings. By paying attention
to the details, OCP ratings can be selected
to provide safe and reliable operations for
the lifetime of the equipment.

Steven Eich is a vice president and elec-


trical technical director at Environmental
Systems Design in Chicago. His expertise
includes 29 years of designing electrical
systems for industrial and commercial
projects including high-rise buildings, hos-
pitals, schools, theaters, museums, hotels,
convention centers, manufacturing facili-
ties, water treatment plants, and nuclear
power facilities.

input #19 at www.csemag.com/information 62 Consulting-Specifying Engineer


Consulting-
Specifying Engineer
Webcasts help you
obtain educational

Webcasts information on
specific topics and
learn about the latest
industry trends.

Check out some of our


Webcasts on topics like:

Critical power: Backup, standby, and


emergency power in mission critical facilities

HVAC: Hospitals and health care facilities

Critical power: Emergency power

Electrical: Data and communications cabling


and pathways

Lighting: Designing lighting systems with


LEDs

Critical power: Power generation systems in


high-performance buildings

Fire and life safety: Specifying fire detection


and notification systems

Critical power: Designing electrical rooms.

www.csemag.com/webcast
Developing
a circuit schedule
Circuit protection, as defined by NFPA 70: National Electrical Code, can be
interpreted in many ways, depending on building load and use. Electrical
engineers should design a circuit schedule that can be used on the project.

BY BRIAN MARTIN, PE, AECOM, Portland, Ore.

T
o efficiently, quickly, and cost- conditions for which it is built. Typically,
Learning effectively design electrical we need to know the ambient conditions,
objectives systems, developing a circuit quantity of current-carrying conductors,
 Learn how to create a cir- schedule that all engineers and temperature rating of the terminations,
cuit sizing standard. designers can use on the proj- conductor material, and the conductor
 Know the applicable codes ect is required. With advance planning, type and temperature rating. Unless
and standards for circuit siz- circuit schedules can be created that han- otherwise noted, the examples below
ing and protection. dle the overwhelming majority of design will assume:
 Understand how to develop conditions and ensure continuity across
a circuit legend that can be the design. Now that many programs are  30Cthe default condition from
applied to electrical modeling
software.
evolving from simple CAD programs to NFPA 70: National Electrical Code
modeling programs, development of a cir- (NEC) Table 310.15(B)(16).
cuit schedule can help engineers fully use  Three current-carrying conductors.
their modeling capabilities.  Termination provisions of the
Table 1 Developing the circuit standard can be default condition as per NEC
Circuit designator OCPD broken down into a few key steps, typically Article 110.14(C)(1):
20CU-1 20 amp completed in sequence: -60C for 100 amp and lower.
30CU-1 30 amp
-75C for higher than 100 amp.
 Determine the design conditions  Thermoplastic high heat-resistant
40CU-1 40 amp
for which to build a circuit legend. nylon-coated (THHN) wiring
Table 1: This is a basic single-phase cir-  Decide upon a naming standard. (90C).
cuit legend, partially complete. This will  Determine standard circuit sizes.  Copper conductors.
be expanded upon as the calculations  Determine standard ground sizes.  A maximum conductor size of 600
progress. All graphics courtesy: AECOM  Develop circuit legends for kcmil. This size of conductor is
special conditions. widely accepted on terminations
Table 2 for large size breakers while 750
Following these basic kcmil is less widely accepted.
Circuit Current-carrying Allowable
designator
OCPD
conductors ampacity steps, we can develop a
20CU-1 20 amp 2 x 12 AWG THHN 20 amp legend for our most com- Naming standard
30CU-1 30 amp 2 x 10 AWG THHN 30 amp
mon design conditions. There are many different schools of
thought when deciding upon a circuit-
40CU-1 40 amp 2 x 8 AWG THHN 40 amp
Design conditions naming standard. Many legends choose
Table 2: This is the single-phase circuit legend without The circuit legend is to either use sequential naming, alpha-
grounding conductor sizing completed. only good for the design numeric combinations, or circuit-

64 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


Nonlinear load example
In the simple example as shown in Figure 1, what
circuit from the schedule in Table 5 is required for THHN
conductors? To answer this question, use the steps
outlined below:
conductor ampacity. The naming in this
article will be based on the overcurrent 1. Calculate the overcurrent protection size: 23.0
protective device (OCPD), conductor amp x 1.25 = 28.75 amp. NFPA 70: National Elec-
material (e.g. CU), and an indication of trical Code (NEC) 210.20(A) requires that the over-
phase quantity (-1 for single, -3 for three). current protection be greater than 28.8 amp, so
when referring to Table 2, the next size up would
Naming the circuit with the OCPD will
be a 30-amp breaker.
enable us to easily select trip sizes dur-
ing one-line drawing development and 2. Choose the circuit: The circuit for a 30-amp
allow us to closely align our circuit leg- breaker is 30CU-3N. Figure 1: This provides a contin-
end with programs like Autodesk Revit, uously nonlinear load example.
3. Check the ampacity of the circuit:
which uses the OCPD to determine the
circuit conductors. Check the terminations. Per NEC 210.19(A)(1)(a), the ampacity of the circuit must be
125% of the continuous load.

Single-phase legend 23 amp x 1.25 = 28.8 amp.


Developing a circuit schedule for sin-
The ampacity of our conductor using 60C terminations is 30 amp, so our circuit is
gle-phase circuits is relatively easy. The acceptable.
first steps are to create a table with the
standard overcurrent protection sizes Per NEC 210.19(A)(1)(b), the adjusted ampacity of the circuit must be greater than the load
listed from NEC Article 240 and to assign we are serving. Our load is 23 amp and, per Table 7, the adjusted ampacity is 32 amp,
therefore circuit 30CU-3N is acceptable.
a circuit designator (see Table 1).
Next, we look up the ampacity of con-
ductors in the 60C column of NEC Table Table 3
310.15(B)16. For example, #12 AWG is
Current-carrying Allowable
rated 20 amp in the 60C column. There Circuit designator OCPD
conductors ampacity
are also two asterisk (**) next to #12 20CU-3 20 amp 3 x 12 AWG 20 amp
AWG, referring to NEC 240.4(D), which
30CU-3 30 amp 3 x 10 AWG 30 amp
limits the overcurrent device size for
40CU-3 40 amp 3 x 8 AWG 40 amp
12-AWG conductors to 20 amp. There-
300CU-3 300 amp 3 x 300 kcmil 285 amp
fore, we can fill in circuit 20CU-1 in Table
2 with an allowable ampacity of 20 amp 400CU-3 400 amp 3 x 500 kcmil 380 amp

and 2- to 12-AWG conductors. Circuits 800CU-3 800 amp 2 x (3 x 500 kcmil) 760 amp
30CU-1 and 40CU-1 use the same logic. 1200CU-3 1,200 amp 3 x (3 x 600 kcmil) 1,260 amp

Table 3: The beginning step to developing the 3-phase legend closely follows the
3-phase legend method used for the single-phase legend. This is the 3-phase circuit legend without
We can apply a similar methodology grounding conductor sizing completed.
to build a 3-phase, 3-wire circuit legend
(Table 3). The circuit legend will need
circuits rated higher than 100 amp. NEC Table 4
110.14(C)(1)(b) allows us to use the Circuit
Individual conductor ampacity Number of
Allowable
per Table 310.15(B)(16), conductors per
75C column of NEC Table 310.15(B)16 designator ampacity
75C column phase
for circuits rated higher than 100 amp.
800CU-3 380 amp 2 760 amp
An example of a few of these circuits is
1200CU-3 420 amp 3 1,260 amp
shown in Table 3.
Circuits 300CU-3, 400CU-3, 800CU-3, Table 4: In order to complete the 3-phase legend, we must multiply by the number of
and 1200CU-3 in Table 3 require expla- conductors per phase to determine the total circuit ampacity.
nation. First, for circuits 800CU-3 and
1200CU-3, the circuit ampacity requires lower, NEC 240.4(B) allows the next tors must be equal to or greater than
some simple calculations as shown in higher standard overcurrent device rat- the rating of the overcurrent device.
Table 4. ing (above the ampacity of the conduc- For circuit 1200CU-3, the overcurrent
For circuits 300CU-3, 400CU-3, and tors being protected) to be used. device is more than 800 amp, therefore
800CU-3, the allowable ampacity of the Lastly, NEC 240.4(C) states that for the ampacity of the conductors must at
circuit is less than the size of trip. For overcurrent devices rated more than least be equal to the rating of the overcur-
overcurrent devices rated 800 amp or 800 amp, the ampacity of the conduc- rent device.

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 65


Developing a circuit schedule
Ground-circuit sizing developed. Design conditions that can conditions happen commonly enough in
Now that we have the current-carrying impact the application of our circuit the design, it saves time to make addi-
conductor sizing determined, we need to schedule include: tional circuit schedules to quickly deter-
size the ground wires. For our example mine the proper circuit size for those
circuit schedule, NEC Table 250.122  More than three current-carrying circumstances.
describes the required sizes of ground- conductors in a raceway. Ampacity adjustment and correction,
ing conductors based on the rating of the  Ambient temperature. or derating, is frequently required and
circuits overcurrent device. Using this  Adjustments due to voltage drop. can be confusing. In this case, assume
table, we can fill out our circuit schedule  Adjusting ground conductor sizing. that we have several 4-wire circuits that
as shown in Table 5. feed nonlinear loads. Per NEC Article
Creating new circuit-protection stan- 310.15(B)(5)(c), we must count the
Special conditions dards for these conditions requires cal- neutral conductor as a current-carrying
Many different conditions may impact culations and the proper application of conductor. The adjustment factor for
the basic circuit schedule that we have additional sections of the NEC. If these more than three current-carrying con-
ductors in a raceway is given in NEC
Table 5 Table 310.15(B)(3)(a). The adjustment
required for four to six current-carrying
Circuit Current-carrying Allowable Ground
designator
OCPD
conductors ampacity conductor
conductors is 0.8. Now lets convert our
3-wire branch-circuit table to a 4-wire
20CU-3 20 amp 3 x 12 AWG 20 amp 1 to 12 AWG table.
30CU-3 30 amp 3 x 10 AWG 30 amp 1 to 10 AWG To calculate the ampacity adjustment,
40CU-3 40 amp 3 x 8 AWG 40 amp 1 to 10 AWG as long as our conductor is rated 90C,
300CU-3 300 amp 3 x 300 kcmil 285 amp 1 to 4 AWG we can use the 90C column of Table
400CU-3 400 amp 3 x 500 kcmil 380 amp 1 to 3 AWG 310.15(B)(16). NEC Article 110.14(C)
800CU-3 800 amp 2 x (3 x 500 kcmil) 760 amp 1 to 1/0 AWG
states that Conductors with tempera-
ture ratings higher than specified for
1200CU-3 1,200 amp 3 x (3 x 600 kcmil) 1,260 amp 1 to 3/0 AWG
terminations shall be permitted to be
Table 5: The next step in completing the circuit legend is determining the proper used for ampacity adjustment, correc-
ground conductor sizing. This table includes the 3-phase circuits with the ground tion, or both.
sizes determined.

Ambient temperature correction


In Figure 2, assume that we need to feed a 286-amp continuous load in a space with an ambi-
ent temperature of 59C and we are using THHN wire.

Applying the same methodology and Table 8 from our previous examples:

1. Calculate the overcurrent protection size: 286 amp x 1.25 = 357.5 amp. NFPA 70: National
Electrical Code (NEC) 210.20(A) requires that the overcurrent protection be greater than
357.5 amp, so when referring to Table 8, the next size up would be a 400-amp breaker.

2. Choose the circuit: The circuit for a 400-amp breaker is 400CU-3_60.

3. Next, check the ampacity of the circuit:

Check the terminations. Per NEC 210.19(A)(1)(a), the ampacity of the circuit must be 125%
of the continuous load.

286 amp x 1.25 = 357.5 amp.

The ampacity of our conductor at 75C must be greater than 357.5 amp. In this case, our
circuit ampacity is 525 amp, so our circuit is acceptable. Figure 2: This design needs to feed a
Per NEC 210.19(A)(1)(b), the adjusted ampacity of the circuit must be greater than the load 286 amp continuous load in a space
we are serving. In this case, our adjusted circuit ampacity is 369.2 amp and our load is with an ambient temperature of 59C
286 amp, thus our circuit is acceptable. and uses THHN wire.

66 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


Table 6
Circuit Individual conductor ampacity per Ampacity adjustment
OCPD Conductor Adjusted ampacity
number Table 310.15(B)(16), 90C column factor
300CU-3N 300 300 kcmil 320 amp 0.8 256 amp
400CU-3N 400 600 kcmil 475 amp 0.8 380 amp

Table 6: To properly size our circuits, ampacity adjustments must be made for four wire circuits. The table includes the results of
the ampacity adjustments using Table 5 as the basis.

First, lets try and use a few of the Table 7


conductors from Table 5 and see if the Circuit Current-carrying Termination Adjusted
OCPD
circuit is still properly protected. For the designator conductors ampacity ampacity

300CU-3 circuit, the conductor ampacity 20CU-3N 20 amp 4 x 12 AWG 20 amp 24 amp
per Table 310.15(B)(16), 90C column, 30CU-3N 30 amp 4 x 10 AWG 30 amp 32 amp
is 320 amp. 40CU-3N 40 amp 4 x 8 AWG 40 amp 44 amp
300CU-3N 300 amp 4 x 300 kcmil 285 amp 256 amp
320 amp x 0.8 = 256 amp 400CU-3N 400 amp 4 x 600 kcmil 420 amp 380 amp
800CU-3N 800 amp 2 x (4 x 600 kcmil) 840 amp 760 amp
Because the next highest trip rating
1200CU-3N 1,200 amp 3 x (4 x 750 kcmil) 1,425 amp 1,284 amp
is 300 amp, as long as the load current
does not exceed 256 amp, this circuit can Table 7: Now that the conductor ampacities have been adjusted, the 3-phase legend
remain the same. including grounded conductors can be completed.
For the 400CU circuit, the conductor
ampacity per Table 310.15(B)(16), 90C In Tables 7 and 8, these will be referred Because 750- kcmil conductors are
column, is 430 amp. to as termination ampacity and adjusted unlikely to terminate on a 400-amp
ampacity, respectively. The 3-phase cir- panelboard, two conductors per phase
430 amp x 0.8 = 344 amp cuit legend in Table 5 has been recalcu- are necessary. Using two 4/0 conductors
lated with current-carrying grounded per phase:
Because the next higher trip rating is conductors in Table 7.
350 amp, we need to increase the size 520 amp x 0.71 = 369.2 amp
of the current-carrying conductors for Ampacity adjustment: ambient
this circuit so it can be protected by a temperature correction This is acceptable to use on a 400-
400-amp breaker. The results are shown Assume that we plan to route conduc- amp breaker. Repeating this method, the
in Table 6. tors to a 400-amp panelboard through a results for a 60C compensated circuit
For these circuits, we need to keep a building with an ambient temperature legend are shown in Table 8.
table of the allowable ampacities for ter- of 60C. We can apply the same basic
minations as well as adjusted ampacities. methodology to create a circuit sched- Circuit adjustment:
NEC Article 215.2(A)(1) and 210.19(A) ule for those conditions. NEC Table ground conductors
(1) require that the conductors must be 310.15(B)(2)(a) describes derating fac- Note that, in the examples above
sized to carry the larger of either: tors for conductors operating in ambi- for ampacity adjustment, we did not
ent temperatures higher than 30C. For specify the ground conductor size.
n The sum of the noncontinuous load a 60C ambient, the correction factor NEC 250.122(B) requires that Where
plus 125% of the continuous load. is 0.71. ungrounded conductors are increased
n An allowable ampacity not less than Starting with the 400CU circuit in in size from the minimum size that has
the maximum load to be served after Table 5, the conductor ampacity per sufficient ampacity for the intended
ampacity adjustment (refer to Exam- Table 310.15(B)(16), 90C column, is installation, wire-type equipment-
ple 3 for the application of continu- 475 amp. grounding conductors, where installed,
ous and noncontinuous loads). shall be increased in size proportionately
475 amp x 0.71 = 337.3 amp according to the circular mil area of the
Because of this, our conductors must ungrounded conductors.
be calculated for the ampacity of the con- Because the next highest trip rating Please note that 250.122(B) is not
ductor at its normal temperature rating in per NEC 240.6 is 350 amp, we cannot consistently applied across all juris-
accordance with NEC 110.14(C) and the apply this circuit with a 400-amp breaker dictions. In many jurisdictions, you
ampacity of the conductors after derating. in this application. only need to adjust the equipment-

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 67


Developing a circuit schedule
grounding conductor if the ampacity, Because a #2 AWG is 66,360 circular circuits. While there are many rules that
based on Article 240, is adjusted (typical- mils, our new ground conductor will be govern the protection of branch circuits,
ly voltage drop). In other jurisdictions, a #2 AWG. the most important one to understand is
however, any adjustment to ampacity the difference between the requirements
requires a proportional increase in the Apply the circuit standard for continuous and noncontinuous loads.
equipment-grounding conductor. For and protect the circuit A continuous load is defined in NEC
our purposes, we will assume the latter. Now that we have developed a circuit Article 100 as a load where the maxi-
Using our example for calculating schedule, we must properly apply the mum current is expected to continue for
4-wire circuits (Table 6), our 400-amp rules governing branch circuits and feed- 3 hours or more. For branch circuits,
conductor increased in size from 500 to ers. For both branch circuits and feeders, the rating of the overcurrent protective
600 kcmil; therefore, the size of our new we can apply this basic methodology: device must be at least the rating of 125%
ground conductor increased in size: of the continuous load plus 100% of the
 Determine the overcurrent noncontinuous load per NEC 210.20(A).
600/500 = 1.2 protection required.
 Choose the circuit that matches Circuiting using modeling programs
Our existing ground was a #3 AWG, the OCPD. As you can see from the examples, cal-
which per Chapter 9, Table 8, is 52,620  Verify that the calculated ampac- culating a custom circuit legend for mul-
circular mils. ity of the circuit is greater than or tiple conditions can get tedious. Recently,
equal to the required ampacity. modeling programs, such as Revit, have
52,620 circular mils x 1.2 = included preloaded circuit legends. With
63,144 circular mils NEC Article 210 covers the protec- these programs, you typically must select
tion of branch

Feeder example
The requirements that were applied to branch circuits also
apply to feeders, although those requirements are detailed in NFPA
70: National Electrical Code (NEC) Article 215.2(A)(1) and 215.3. In
Figure 3, we have three continuous loads fed by THHN conductors.

Using the same procedure from the previous branch-circuit sec-


tion, we determine the overcurrent protection (X) and the feeder
circuit (Y):

1. Overcurrent protection: Per NEC 215.3, the overcurrent


device must be not less than 125% of the continuous load.

X 1.25 x (286 amp + 310 amp + 23 amp) or


X 773.8 amp

Therefore, the overcurrent protection must be at least 774


amp. This is not a standard size; the next size up in Table 7
is 800 amp.

2. Choose the circuit: The circuit in Table 7 next to the 800-amp


OCPD is 800CU-3N. Figure 3: A feeder calculation is shown with three continuous
loads fed by THHN conductors.
3. Next, check the ampacity of the circuit:

Check the terminations. Per NEC 215.2(A)(1)(a), the ampacity of the circuit must be 125% of the continuous load.

1.25 x (286 amp + 310 amp + 23 amp) = 773.8 amp.

The ampacity of our conductor at 75C must be greater than 773.8 amp. In this case, our termination ampacity is 840 amp, so our circuit is
acceptable.

Per NEC 215.2(A)(1)(b), the adjusted ampacity of the circuit must be greater than the load we are serving. In this case, our adjusted circuit
ampacity is from Table 7 is 760 amp and our load is 286 amp + 310 amp + 23 amp = 619 amp, therefore our circuit is acceptable.

68 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


Table 8
Current-
Circuit Termination Adjusted
OCPD carrying
designator ampacity ampacity
conductors
20CU-3_60 20 amp 3 x 12 AWG 20 amp 21.3 amp
30CU-3_60 30 amp 3 x 10 AWG 30 amp 28.4 amp
40CU-3_60 40 amp 3 x 8 AWG 40 amp 39.1 amp
3 x 400
300CU-3_60 300 amp 335 amp 269.8 amp
kcmil
2 x (3 x 4/0
400CU-3_60 400 amp 520 amp 369.2 amp
AWG)
2 x (3 x 750
800CU-3_60 800 amp 1,070 amp 759.7 amp
kcmil)
4 x (3 x 500
1200CU-3_60 1,200 amp 1,520 amp 1,221.2 amp
kcmil)

Table 8: Using the same basic methodology as was shown in


Table 7, we can develop a legend for an ambient temperature
adjustment that is frequently encountered in our design. The
table shows the ampacity adjustment for an ambient tempera-
ture of 60C.

the conductor material, termination temperature rating, and the


insulation type to use in your project. Based on that, preselected
circuit legends are loaded into the project. That legend is then
available for circuiting in the model. The circuit size is automati-
cally selected from the legend based on the size of the upstream
OCPD that is circuited.
However, there are a few shortcomings to some of these pro-
grams. For example, if you select a 400-amp OCPD and conduc-
tors with an ampacity of 380 amp, most programs will allow you
to load the circuit to 381 amp with no errors. Many either do not
apply ambient temperature correction or apply it to the entire
model rather than a room or space. You may also disagree with
the tables that are preloaded. For these cases, the true power of
these programs is the ability to create custom legends similar to
the circuit legends that we created above. For example, we can
create a custom legend based on Table 8, 60C Corrected Circuit
Schedule, and then select circuits from that legend every time
the circuit enters the 60C ambient area.
When developing a circuit schedule, it must meet the require-
ments of the NEC, but it also must meet the objectives of the
design. Circuit schedules can be developed to use 100%-rated
breakers effectively, to account for voltage drop or to migrate
easily into short-circuit, protection, and arc-flash-calculation
software. By determining the important elements of the design
early and developing circuit schedules around those elements,
an engineer can enable design teams to quickly and consistently
design a facility.

Brian Martin is a senior electrical engineer, buildings and places,


with AECOM. Martin has more than 20 years of experience in
engineering planning, project management, design, purchasing, and
start-up of industrial projects. He is a member of the Consulting-
Specifying Engineer editorial advisory board.

Consulting-Specifying Engineer AUGUST 2017 69 input #20 at www.csemag.com/information


E ngineers Benefit from
Reliable Controls
Consultant and Engineer
Support Center

To obtain credentials:
1) Click on the [Support] link on our
homepage and choose Support Center
Login from the dropdown.
2) Click on [Apply for an Account] then
choose Consultant / Engineer from the
account dropdown.
3) Fill in the Contact Information then click
on the Submit Request button. Your
request will be automatically sent
for processing.
Product Drawings - Choose from over one hundred product
Once you have received your credentials, go drawings in *.dwg, *.png, and *.svg formats. Download the
ahead and begin to download the benefits! entire product drawing library as Visio 2007 Stencils.

Guide Specifications - Save time in Software Official Releases - Download and install Free Trial
specifying a complete BTL-Listed native Versions of RC-Archive and RC-Reporter software and begin
BACnet DDC system by downloading our archiving and analyzing a limited number of objects from any
guide specifications in CSI Master Format accessible IP-connected BACnet facility, or download any of
1995 and 2012. Your junior system the online software manuals.
designers will be enlightened to have the
fully annotated guide specification Engineering Submittal Sheets and User Guides
that provides valuable references and Download the complete range of product submittal sheets
background information. and hardware user guides. Feel confident that you have the
most current and comprehensive engineering and technical
BACnet Resources - Download a complete documentation produced directly by the manufacturer.
and current list of BACnet Protocol
Implementation conformance Statements
(PICS), or view the Advanced BACnet
info@reliablecontrols.com
Training Manual to help you take full 877-475-9301
advantage of BACnet for your projects. www.reliablecontrols.com

input #21 at www.csemag.com/information


Education and personal development are vital to the advancement
of the engineering community. We invite you to explore and
celebrate the educational efforts of the following companies
participating in our annual Educating Engineers program:

AAon Linx Industries


Air Monitor Corp. LSI Industries, Inc.
ARCoM national Lightning
Armstrong International Protection Corporation
Baldor Polywater
Belimo Air Controls PVI Inc.
Carlo Gavazzi Inc. Red-White Valve Corp.
Carnes Company Reliable Controls
Cleaver-Brooks RenewAire
Connectrac Reznor
Contemporary Controls Rheem Manufacturing
Daikin Applied Company
Data Aire Inc. Snake Tray
Douglas Lighting Controls Stored Energy Systems (SEnS)
Grace Engineered Products, Inc. STULZ Air Technology Systems
Greenheck Fan Corporation Titus
Gripple UV Resources
L&T Technology Services Varco Pruden Buildings
AAON believes in the
importance of education,
offering many different
learning opportunities for
building industry professionals

AAON offers many education opportunities


for consulting-specifying engineers, building
owners, contractors, and service technicians.
details, and general HVAC engineering training, such as
At both the Tulsa and Longview manufactur- psychrometrics. AAON webinar training is available to AAON
ing facilities, AAON offers customer visits that representatives and their customers with video recordings
include tours and training by AAON person- available after the live sessions are completed.
nel. The Tulsa University Room has seating for
up to 100 people with high definition video and Throughout the year AAON provides hands-on service technician
audio capabilities. Training topics are focused training. During this training AAON Warranty and Service person-
on what is most important to the customer. nel cover the unique features of AAON equipment and what to
Tours include a complete walkthrough of the expect during startup and maintenance. This training includes
state-of-the-art AAON manufacturing facilities information on all the available AAON controls options.
and new research & development laboratory.
AAON provides Technical Brochures on the AAON website
AAON provides multiple Product Showcase about many HVAC related topics, including fans, motors,
Trailers that travel throughout North America humidity control, cabinet construction, and energy recovery.
year-round directly to customers offices. Technical brochures allow customers to learn about industry
These trailers allow customers to kick the topics on their own schedule.
tires of real AAON equipment and often
include supplemental training on the features AAON believes education is the key to our shared success.
and applications of the products. Contact your local AAON representative to learn more.

Online webinar training is provided by AAON


engineering and sales personnel throughout
the year. These trainings cover a wide range
of topics including new and current product
insights, product application, system design marketing@aaon.com 918-583-2266 www.aaon.com/RepSearch

input #22 at www.csemag.com/information


A RCOM is dedicated to
providing reliable,
accurate, and up-to-date
specifications to engineers.

ARCOM, the specification experts, specializes


in master specifications, specification
productivity software, and specification
decision-making tools for the construction
of MasterSpec specifications. Based on the users answers to
industry. ARCOMs team of full-time
specific product needs, SpecBuilder Desktop automatically and
specification writers is the most experienced
intelligently edits each MasterSpec specification.
in the industry with over 300 years of
combined specification writing experience. SpecBuilder Cloud, our latest innovation, revolutionizes the
way people can create, edit and collaborate on specs from
Master Guide Specifications Written by
engineers, for engineers virtually anywhere.
MasterSpec the most trusted and compre- Manufacturer and Product Tool used to globally select, find
hensive master guide specification system, and specify products and manufacturers for specific sections,
contains building engineering specifications eliminating hours of research and editing time.
used by over 80% of the top engineering firms.
Sustainability Tool helps you easily specify multiple
SpecText master guide specification system sustainability requirements, automatically incorporating
focuses on infrastructure construction, preferences within MasterSpec sections.
including the most complete water and waste-
water specifications. Each specification section Supporting Documents:
includes editing instructions, reference Summary Section scope overview
standards, manufacturer and product Evaluations Industry recognized comprehensive
comparisons, and supporting documents. background information on section topics
Checklists Drawing and specification coordination checklists
Specification Productivity Tools
MasterWorks automates many of the word To ensure users get the most out of ARCOMs products,
processing functions associated with continuing education, webinars, and workshops are available.
specification editing and production. MasterSpec and SpecText are endorsed by ACEC and NSPE.
Additional checklist and reporting tools make
assembling project manuals quick and easy.

SpecBuilder Desktop, a powerful question- 800.424.5080


and-answer wizard, works on a database arcomnet.com/engspecs
input #23 at www.csemag.com/information
C entury-old, Family-Owned
Company Provides
Intelligent System Solutions to
Optimize and Boost Thermal
Utility System Efciency

For more than a century, Armstrong Often the rst to market, Armstrong was the inventor of the
International has been the global leader in IB trap, and holds more than 50 patents on exceptional products
energy management by providing intelligent and software.
solutions in steam, air and hot water for a
wide and growing range of industries. As a Our wide-range products and solutions for Industrial and
fth-generation family-owned company, our Institutional Systems include:
sage knowledge and in-depth experience has 6 Steam System Equipment
made us uniquely skilled in designing and 6 Steam and Hot Water System Monitoring Technology
producing the rugged, reliable products 6 Digital Hot Water Solutions
paired with unparalleled digital technology 6 Humidication Solutions
that successfully reduce emissions and 6 Heating and Cooling Coils
improve energy efciency for customers all 6 Refrigeration Equipment
over the world. 6 Flow Measurement Solutions

Our complete range of industry-leading Learn more about Armstrongs industry-leading products,
products, packaged solutions, and advance- solutions and support at www.armstronginternational.com.
ments in steam and hot water system
technology consistently deliver best-in-class Armstrong University
quality as they work together to create the We take pride in our wealth of knowledge, experience and insight
most intelligent system solutions. Armstrongs we have derived from more than a century. Through Armstrong
solutions are backed by our global enterprise University, we give you access to this unique legacy of in-depth
represented by more than 3,000 employees knowledge by providing seminars, online training and education.
and representatives. Armstrong can even create a curriculum custom-tailored and
delivered at your site.
Our digital utility monitoring technology
SAGE enables you to maximize equipment
   

reliability, efciency and safety in real time,
marketing@armstronginternational.com
making it the most state-of-the-art steam and armstronginternational.com
hot water system management available today. armstronginternational.com/sage

input #24 at www.csemag.com/information


T he Heat of the Matter:
Motor Selection
Considerations to Reduce
Failure due to Heat

When can you start to actively prevent


motor failures? The answer is, before you
purchase the motor. Motors dont fail only
because of age or hours of operation.
Stresses from heat, power supply,
moisture, contamination, improper
lubrication, and unusual mechanical loads
work in conjunction with time to degrade Dirty motors will run much hotter, due to a reduction in
components within a motor, resulting in effective cooling properties. Air inlet screens and passages
motor failures. Failures due to excess heat should be kept free of obstruction. Ventilation filters should
show the critical need to properly select be checked periodically and cleaned or replaced as
and size the right motor for your application. necessary. Motor enclosures dissipate heat differently and
offer varying protection levels so it is important to consider
Temperatures over the design rating take both of these needs when selecting enclosure type to ensure
their toll on the motor in various ways. adequate ventilation and protection.
Electrical insulation deteriorates at a rate
that doubles for every 10oC over rated Overloading and high ambient temperatures are other
temperature. This can shorten the life of a contributors to excess heat on the motor. Properly sizing
motor by one-half, making heat the number the motor for the load and ensuring the motor insulation
one cause of reduced insulation life. system is rated for the environment are simple, upfront ways
Excessive temperature also causes to prevent heat failures.
separation of greases and breakdown of
oils causing premature bearing failure.

Motors require proper ventilation and are


designed to dissipate heat. However,
proper motor installation and maintenance
is required. www.baldor.com

input #25 at www.csemag.com/information


C ARNES has provided
engineers and design
professionals product
education for over 75 years.

Carnes, a global manufacturer of HVAC


equipment, has been providing solutions and
innovative building products to the HVAC
industry for over 75 years. Our extensive
product offering includes Registers, Grilles,
Diffusers, Terminal Units, Fans, Louvers,
Penthouses, Energy Recovery Units, and
Humidifiers. Carnes is dedicated to educating
Product submittals with fan curve data can be developed in Carnes Complete.
the engineering and design communities in
properly sizing and selecting our products.
in engineering and design professional offices. The topics are
Sizing and Selecting Made Easy determined by you and your design and specifying needs.
Carnes Complete is our web based selection Our past seminars have included fan application, sizing, and
software which makes sizing and selecting selection. The seminar length is determined by you. We can
our complete line of products easy. Product tailor our programs to fit your needs. Go to our website to find a
submittals with fan curve data can also be sales representative near you. If a sales representative is not in
developed in Carnes Complete along with your area, contact Carnes via our website and we will get you in
complete model numbers for easy specifying. contact with the appropriate product manager.

If you have been frustrated when using If an onsite program is not convenient we can develop a
complicated competitor selection programs, webinar to fit your educational requirements. Webinars
then go to www.carnes.com and register to generally run under one hour and can cover specific Carnes
begin using Carnes Complete. products. Contact us for details.

Technical Seminars
Carnes product managers and our nationwide
network of independent sales representatives
team up to provide scheduled technical 608-845-6411 carnes@carnes.com
seminars which can include lunch and learns www.carnes.com

input #26 at www.csemag.com/information


D ispelling Common
Myths about Condensing
Boiler Systems

Many engineers have been led to believe


that condensing boilers do not fit a variety of
design applications, but this is often untrue.
In most applications, condensing boilers can
be used in place of standard non-condensing
boilers, and with a few system modifications,
the energy savings associated with condens-
ing boilers can be realized.

Below are some common myths associated


with implementing a condensing boiler:
Myth 5 Hot water supply temperature is important
Myth 1 Maintain 180F hot water supply. for efficiency. This is a minor part of the equation, but is not
Most hydronic systems can operate with a the defining point in determining a boilers efficiency.
reduced supply temperature, either full-time
Myth 6 Maintenance is more difficult. A condensing boiler
or with a temperature reset strategy, which
has a stainless steel heat exchanger, which is more resistant
in turn lowers the return water temperature.
to condensate that is produced in condensing mode than
The return water temperature is key to
materials used in a standard, non-condensing boiler.
condensing boiler efficiency.
There are many technologies available in the condensing
Myth 2 Maintain a 20F system T. boiler segment. High-mass firetube condensing boilers can
In condensing systems, temperature differen-
be piped in a variety of systems with success.
tials of 30F or higher can be designed.
When making a boiler selection, be sure to understand
Myth 3 Hot water reset doesnt work. each boilers operating requirements as well as total cost
With condensing boilers, the hot water reset
of ownership.
functionality based on outside air is generally
built-in.

Myth 4 Variable-flow-primary systems


are more complex. Variable-flow-primary
systems require one set of pumps to handle Tel: 888-352-5933 hydronics@cleaverbrooks.com
everything in the system. www.cleaverbrooks.com/myths

input #27 at www.csemag.com/information


D aikin Applied Learning
Resources Help You
Achieve Better Customer
Outcomes

Technology is creating new value chains


and networks of people, places, and things,
helping engineers create smarter, more
efcient solutions for your customers.
Daikin Learning Institute delivers industry-leading training
Increasing our reliance on technology also
adds extra pressure to stay ahead of these
changes. Daikin is committed to helping For more hands on experience, Daikins Solutions Plaza
the industry grow by providing technical puts innovation front and center with product
training and hands-on experiences with our demonstrations and a series of IACET-accredited classes
HVAC solutions, so you can create better to polish your skills. Experience our advanced technology
outcomes throughout your career. in person through operational, real-world residential,
commercial, and applied equipment exhibits. Visitors return
The Daikin Learning Institute home with a comprehensive understanding of the latest of
will help you build your under- Daikin equipment, systems, and technology, ready to design
standing of the principles and the right solution.
gain experience that sets you
apart as the trusted advisor for your When traveling isnt possible, Daikins social media is a
clients. We offer classes for every level, go-to learning resource. Daikin provides industry insights
ranging from fundamental principles to and innovation on all social platforms and our blog.
specic training to develop a higher Daikin invests in creating access to expert resources both
prociency in operation, maintenance, in-person and online to give engineers an advantage for
and service of todays advanced HVAC better outcomes.
technology. World-class textbooks and
reference tools are also available for
purchase from our store.

Daikin Applied is accredited by the Interna-


tional Association for Continuing Education
and Training (IACET) and is authorized to Daikin Applied
award Continuing Education Units (CEUs). 
     

input #28 at www.csemag.com/information


D ata Aire educates engineers
through best practice
examples of solutions and
equipment applications

Extensive support
Data Aire supports engineers extensively
through a series of Education and Training
Workshops at our California facility,
through our video library and online
resources, as well as in the field support
from our technical sales professionals.

The 30 Year Mission: Cooling for Uncle Sam Scott Hawkins, building Project Manager of the
John Duncan Federal Building, Knoxville, Tennessee
The John Duncan Federal Building has been
home to a wide range of government agen-
Your average HVAC units last 10 years. Data Aire units at
cies over the years including the Social
30 years are still going strong, states Hawkins.
Security Administration, the FBI, the IRS, the
ATF, the Department of Homeland Security
Chris Finger, Chief Engineer of H&S, has worked at the facility
and the Secret Service. Currently, the main
for 23 years. His team maintains the data center. The thing to
tenant is the Office of Surface Mining
learn is that with proper maintenance, Data Aire units are easy
Reclamation and Enforcement a division of
to sustain, and exceed all expectations as far as AC equipment
the Department of the Interior.
for a computer room. Other units dont hold up as well.

The Keepers of the Cool The sales and engineering staff at Data Aire are happy to
Data Temp Series floor-mounted CRAC assist you in determining the best solution for your particular
equipment, installed in 1987, has been installation even if that means customization of a standard
cooling the data center servers and related product to meet your unique needs. Data Aire is equipped to
equipment pretty much without a hiccup for provide you with product configurations and options to match
an entire 30-year time period. your installation requirements.

Scott Hawkins of H&S Resources has been


the building Project Manager since 2002 800-347-2473 sales@dataaire.com
and has worked at the location since 1997. dataaire.com

input #29 at www.csemag.com/information


C ontinuous Remote
Temperature Monitoring
of Electrical Systems Offer
Safety Benefits Beyond Costly
Infrared (IR) Inspections

GraceSense Hot Spot Monitor (HSM)


provides non-conductive temperature
monitoring and alarming that identifies
potential hot spots and failure points within
electrical equipment. Identifying faults
before they occur saves money when
unplanned outages, service interruptions,
and equipment failures are avoided. The
HSM installs into any new or existing
electrical systems up to 38kV and the
design flexibility allows the use in either
stand-alone or fully integrated into a
plant-wide information system.
Current flowing through electrical connections at these PFPs
Mounting the temperature probe (lugs, screw terminals, circuit breaker stabs, bus-bar joints,
assemblies is easy as they piggy-back etc.) is the main cause for electrical hot spots.
onto existing secure bolted connections
inside of the electrical equipment where Furthermore, some critical hot spots are inaccessible by
heat sources (bus-bars, lug connections, infrared thermography, and therefore, go unnoticed because
etc.) or hot spots often originate. Once an infrared camera cannot obtain an acceptable temperature
bolted to the connection point, the fiber measurement. Infrared inspections are only a snap-shot in
optic leads are routed through the equip- time and are typically performed with the electrical equipment
ment and terminated to the HSM module doors open or using IR windows and the system is energized
mounted on a DIN rail channel inside the under normal load conditions, which exposes workers to the
control or low voltage compartment. risk of arc flash and shock hazard.

All power distribution systems have the


Phone: 563.386.9596
potential of developing hot spots at critical
Toll Free: 800.280.9517
connections that could turn into Potential info@grace-eng.com
Failure Points (PFPs). www.gracesense.com

input #30 at www.csemag.com/information


G reenheck, the worldwide
leader in manufacturing
and distributing air movement,
conditioning and control
equipment, offers educational
opportunities for engineers.

Greenhecks vast product line includes offering practical, relevant knowledge that will
roof-top and wall-mount exhaust fans and help you improve your understanding of the
ventilators, and an ever-growing selection latest HVAC trends, applications and codes.
of special-purpose products such as HVAC University is held at various times
dampers, energy recovery ventilators, make- throughout the year at Greenhecks Schoeld, Wisconsin
up air units, centrifugals and vane axials, headquarters and a limited number of seats are available.
louvers, lab exhaust systems and more. Learn more at greenheck.com/hvacu or contact your
Greenheck rep for more information.
Along with this comprehensive product line,
Greenheck offers online opportunities for Engineers can also earn PDH credits through several Greenheck
engineers to learn more about a wide range online training courses that can be taken for free at your
of HVAC subject areas. Visit greenheck.com convenience. Courses include:
and click on the Library tab. There you will nd
numerous application and industry articles, 8Fan Fundamentals Modules 1.1 and 1.2 (1 hour PDH credit each)
project proles and podcasts discussing 8Fan Coatings (.25 hour PDH credit)
topics such as motor starters and mixed ow 8Fan Construction Materials (.25 hour PDH credit)
inline fans. Instructional videos cover topics 8Fan Accessories (.25 hour PDH credit)
such as Vari-Green motors and Greenhecks 8Fan Bearings (.25 hour PDH credit)
latest cloud-based eCAPS software that 8Fan Motors (1 hour PDH credit)
helps engineers select the best value fan or
For more on these courses, visit greenheck.com and click on
louver for the application.
the Education tab. To receive certicates of completion for PDH
Engineers can earn Professional Development credits earned, engineers must set up a My Greenheck account.
Hour (PDH) credits through Greenhecks HVAC
University developed specically for HVAC  
    
design engineers. Choose from 25 courses www.greenheck.com

input #31 at www.csemag.com/information


G ripple: Your Trusted
Partner for the
Suspension and Bracing of
Ductwork, Lighting, Electrical
Services, and Piping

With manufacturing facilities in the USA and


UK, Gripple prides itself on having created
the cable hanger industry as a preferred
means of installing all types of suspended
services for construction. Gripple cable hangers offer many advantages, including:
Ready-to-use kits that have been pull-tested - Includes a
For almost two decades, Gripple has
length of cable with your choice of end fixing and a Gripple
revolutionized the way contractors suspend
fastener. No cutting or tools are needed to install.
Ductwork, Mechanical, Piping, Lighting, and
Electrical services. As a proven, certified, Five load rated hanger sizes with cable diameters ranging
from 1/16" to 1/4", 7x7 and 7x19 cable construction, and SWLs
load-rated, and adjustable alternative to
from 25 to 715 lbs per hanger, all with a 5:1 safety factor.
hanging with threaded rod, strap, jack chain,
or other methods, Gripple works with Installation solutions for every type of building structure
contractors to develop new and innovative Precast concrete, metal deck, wood, etc.
products that solve suspension challenges Lightweight & compact products - Means fewer materials to
and save hours of time on installations. transport and less carbon emissions, increased job site safety,
and reduced loading of the interior structure.
Gripple products have numerous approvals Technical and Take Off Services Free technical and take
including SMACNA verification, UL & CSA off services for any construction project, showing the
listings, and MSS & ICC compliance. In locations and quantities of Gripple cable hangers or braces
addition, Gripple boasts an impressive needed to suspend or seismically brace your services.
resume of suspending or bracing services
on thousands of construction projects in
North America, including major sports stadi-
ums, retail chains, medical facilities, data
centers, and government & military projects.
1-866-474-7753 or 1-630-406-0600
grippleinc@gripple.com www.gripple.com
YouTube: www.youtube.com/user/GrippleTV

input #32 at www.csemag.com/information


E ngineering the Change

L&T Technology Services (LTTS) is a


leading global pure-play engineering services
company, built upon a 75 year old legacy and
heritage of the Larsen and Toubro. We are
engineers who believe in engineering better
products and discovering novel ways to build
L&T Technology Services delivery center in Peoria, IL
a sustainable future.

We provide practical, economical, and industries, and is proud to provide services and solutions to
scalable business solutions in the form of 52 Fortune 500 customers.
Engineering Research & Development
(ER&D) services to help customers achieve Digital Portfolio
faster time-to-market for their end products Through our Digital Engineering (DE) portfolio, we provide
and services, innovate to create new end-to-end support through the entire lifecycle of design,
products and solutions, reduce cost of engineering, planning, production, warehousing and distribution
development and meet increasing regulatory of products. Our Smart Products & Services along with
requirements more effectively. LTTS has 13 Smart Manufacturing offerings provide seamless integration of
delivery centers across the globe, six of them physical and virtual worlds across the industry and technology
in the United States. eco-system.

We also work closely with international scien- LTTS has developed mature solutions such as IoT platform
tific institutions to continually source ideas UBIQWeise and smart buildings framework iBEMS in
for engineering solutions. Tech Panorama emerging technology areas to support our customers. The
is our largest internal innovation event and UBIQWeise platform provides insights on information such as
serves as a platform for employees to operational efficiency and preventive maintenance schedules by
showcase their skills to ideate and innovate collecting operational data on a near real-time basis, which is
on a variety of topics related to major then sent to a cloud platform.
industries and technologies.

Core Engineering
LTTS offers high end services and solutions
that span the entire engineering life cycle Tel: +91 80 6767 5173 Aniruddha.basu@lnttechservices.com
(conceptualization to aftermarket) to all major www.lnttechservices.com

input #33 at www.csemag.com/information


P revent thermal bridging
and water condensation
on hvac duct systems

What is thermal bridging?


In systems joined with sheet metal flange
connections, flanges produces a thermal
conduit, or short circuit, where the cold air
flowing inside the duct causes the warm
flange and the adjoining ductwork to cool.
The cool surface and flange temperature Problematic water condensation on standard hvac system

create an ideal situation for water conden-


sation. The calculation to determine the compress to maintain the integrity of the insulation and
heat gain to the cold air moving inside the the continuity of the thermal insulation across the joint.
duct for the entire system is complex, but
let us contemplate an example. Linx EnergyX systems consist of a perforated or solid
inner liner, glass fiber insulation, a solid outer pressure
Consider a system and environment shell, and the EnergyX connection. The system is self-
consisting of 22" average inside diameter sealing. The simple single slip-fit connection outperforms
of double wall duct, 500 linear feet of duct ASHRAE Leakage Class 3 requirements without the use of
with flanges every 10 feet, $0.10 per kwH, external sealants all while preventing thermal bridging
75% overall efficiency for cooling, 24/ in the process.
hours/day, and 365/days/year, thermal
bridging results in an order of magnitude of Learn more
$500/year in added energy costs. Contact the Linx Engineering Department for technical
details or download valuable comparison literature to learn
The solution is Linx EnergyX Double Wall how Energy X can resolve the thermal bridging challenge.
with the Safe gasketed connection.
The EnergyX duct system is constructed
with an insulation stop made of a closed-
cell elastomeric foam with a maximum
conductivity factor (k) of 0.28 BTU-in/hr
x ft2 x F and an operating temperature Linx Industries
range of -70F to +220F. When duct and www.li-hvac.com
fittings are joined, the EnergyX connections (800)797-7476

input #34 at www.csemag.com/information


T here are over 22 million
lightning strikes
in the USA every year

There are three major areas of concern


from a lightning strike to your facility:
personnel safety, environmental impact,
and financial consequences. Each of these
concerns can have a substantial impact
from property loss, business interruption,
systemic breakdown, production loss, and
potential cleanup costs (which may include
environmental lawsuits and costs incurred
from Federal oversight).
Budgetary pricing is available, which is typically less
A lightning strike can damage computer than 0.005% of the project cost when installed during
networks, machinery, PLCs, and new construction.
diagnostic or control systems which
could easily cause a facility shutdown. Make an Educated Decision
Be informed and make an educated decision for your
In the aftermath of a lightning strike there facility. Have this option made available for your design/
may be hidden damage to electrical construction teams consideration. National Lightning
distribution systems, motor relays, Protection is ready to provide risk analysis and design
transistors, and circuit boards. Last but not services for your project at no cost or project commitment.
least, the risk of fire caused by a lightning
strike makes it the most probable cause of To learn more please contact us at 800-628-2816.
catastrophic damage insurance claims.

A simple risk assessment of your facility


can determine whether or not a lightning
protection system is required. With the risk
assessment in hand, a preliminary design
of a lightning protection system to current Tel: 800-628-2816 sales@nlpcorp.com
standards can be produced and evaluated. www.NationalLightning.com

input #35 at www.csemag.com/information


C able Installation,
Conduit Design and
Conduit Sealing Seminar

Course Content to be Presented:


Cable Installation and Conduit Design
Use Pull-Planner 4.0 computer software
to optimize cable installation. FREE for
attending the seminar!
Using pulling theory to optimize cable
installation and conduit design. Refurbishment and Cable Removal
Coefficient of friction determination and How to get stuck wires and cables out of conduit systems.
how friction affects cable installation
tension and sidewall pressure. Conduit Joining Techniques for HDPE conduits
Cable pulling lubricant for fire rated cable BonDuit Conduit Adhesive for bonding HDPE to PVC, rigid
systems using Low-Smoke Zero-Halogen, steel and fiberglass.
CPE, CSPE, and Hypalon cables.
Learning Objectives of the Seminar:
Conduit Sealing Solutions to Meet ALL Five of A. To understand pulling theory and friction as it relates
the NEC Codes. Stop Water & Gas to cable installation tension, sidewall pressure, and
Polywater FST- Foam Duct Sealant properly planned pulls.
installation techniques and performance. B. To be able to estimate cable pulling tensions and side
Understand the NEC Codes 225.27, 230.8, wall pressure before the pull begins.
300.5(G), 300.7 (A), 501.15 (B)(2) for C. To learn about where sealants can be used effectively
Raceway Seals. to meet the NEC codes.
How to increase reliability and reduce D. To master the Pull-Planner 4.0 software free to
outages of electrical systems. anyone who specifies Polywater products.

Pad Mounted Transformer Entrance Protection Two ways to attend our seminar
Polywater InstaGrout seals the pad Contact us to set up a lunch and learn or office visit.
openings to transformers, sectionalizing Contact us to attend an engineering webinar.
cabinets and switchgear to keep
animals out. CEU credits may be applied.

support@polywater.com
651-430-2270 ext. 825
www.polywater.com
input #36 at www.csemag.com/information
R WV Fixed Orifice
Balancing Valves

Red-White Valve Corp. has been


manufacturing Balancing Valves for 20
successful years. All Engineering, Design,
Testing and Manufacturing is done at the
companys plant in Italy. By manufacturing
these valves from solid brass bar stock to
the finished product gives Red-White Valve differential manometer. The 9510 series has the capability of
Corp. a strong advantage in the HVAC reaching flow rates as low as 0.12 GMP with an accuracy of
market. In essence everything is done +/-3%. It has an Integral Memory Stop to ensure the valve
under one roof. is return to its set-point after using the positive Shut-Off
function. Connections are available in Sweat, IPS or Press.
The 9510 valves are manufactured with a
Fixed Orifice Venturi Insert which allows Download RWV app
a more precise and accurate measure- To assist Engineers and Contractors on the simple procedure
ment so that the desired flow rate will be of operating the 9510 Balancing Valves a Utility Software and
achieved with an accuracy that is not Smartphone app have been developed and made available
attainable with a Variable Orifice. for down-loading.

DZR Brass is standard to prevent Other HVAC products available: Commercial Flanged
Dezincification in adverse water conditions. Balancing Valves 2" thru 12", Automatic Balancing from "
Regardless of the application the 9510 thru 12", Pressure Independent Control Valves, Actuated
Series covers the need for both Potable Balancing, and Coil Kit Hook-ups.
Water and Closed Loop HVAC systems.
Red-White Valve is recognized in Master- To learn more, please visit us on our Website at
spec and has Revit capability for Engineer www.redwhitevalvecorp.com or call 1-800-222-7982.
and Contractor availability.

The 9510 valves have three functions. It


acts as Shut-Off valve, a Balancing Valve, 1-800-222-7982
and a Meter-Station to measure flow via a www.redwhitevalvecorp.com

input #37 at www.csemag.com/information


T he New RenewAire
Experience: Empowerment,
Integration, Innovation
and Sustainability
Its an exciting time at RenewAire. Were
introducing an online tool to facilitate business,
were unveiling several new products and we
moved into a larger facility seeking LEED Gold
certification.This adds up to the new RenewAire
experience, which is one of empowerment,
integration, innovation and sustainability.
New products include:
CORES COMING JANUARY 2018 Electric Duct Heater: Duct-mounted configurable heater for
Configure | Order | Report | Estimate commercial ERVs..
& Energy Analysis | Submittal Indirect Gas-Fired Duct Furnace: Duct-mounted configurable
heater for commercial ERVs.
RenewAires new online tool, CORES, will
Bypass Economizer: Allows HE indoor units to capitalize on
enhance the user experience from project
free cooling.
conceptualization to unit commissioning and
Integrated Programmable Controls: Intelligent BMS-capable
empower our network anytime, anywhere.
controls optimize usability and commercial ERV performance.
Key benefits for engineers include: New Residential ERV (EV240): As a new addition to our
Increase operational efficiencies: robust line, the EV240 provides a 240 CFM airflow option.
Streamline the sales process, reduce
errors and improve communication. New and Larger Facility
Accelerate the speed of business: Committed to sustainability, RenewAire moved into an
24/7 access will empower customers by 111,000-square-foot facility thats seeking LEED Gold, Green
increasing autonomy and flexibility. Globes and ENERGY STAR certifications to meet rigorous
environmental standards. This state-of-the art facility has
Register now for updates:
adopted numerous ventilation strategies, including 100%
http://conta.cc/2sx5zwd
outdoor air without recirculation, thus creating healthy IAQ and
offering training opportunities to demonstrate real-time energy
New Products and cost savings.
RenewAire is constantly developing an ever-
growing, controls-focused and holistically Learn more at
integrated product line to meet growing demand www.renewaire.com.
for our Energy Recovery Ventilators (ERVs). 800.627.4499

input #38 at www.csemag.com/information


F or the Right Rooftop
with the Right Spec
Right Now, Engineers
Turn to Reznor

Reznor light commercial packaged roof-


tops are highly configurable at the factory,
so consultant engineers or design-build
contractors can get the exact spec unit
they need delivered to the job site. manufacturing process in the industry. To ensure
accuracy, each unit is bar-code verified to the bill-of-
The Right Features material components as it rolls down the line.
Foam panel construction and hinged panel
doors are standard. The one-inch foam The Right Spec
panel wall construction ensures indoor air With over 35 options per tonnage size, there are over
quality is fiberglass-free, and inhibits mold 750,000 unit configurations available. Having the units
growth. Panel walls are easy to clean and built to spec at the factory increases product quality
provide a super high R-value. High-quality while lowering installation labor costs. Have a fast-track
hinges eliminate screws on the roof and job? No problem. A quick-ship option is available out
keep the access doors in place, even in of our factory in Dyersburg, Tennessee.
high wind conditions.
When you choose a rooftop with all the right options,
The Right Efficiency you get the right spec for your needs. Find out why
At 12.7 IEER, Reznor light commercial successful engineers rely on Reznor.
packaged units meet federal minimum
efficiency standards for 2018, which Go to www.reznorhvac.com or call your local Reznor
puts the product ahead of many units on Sales Engineer at 800-695-1901.
the market.

The Right Quality


Specific components are factory-installed
using Demand Flow Technology (DFT), the
most advanced and flexible quality-control 1-800-695-1901 www.reznorhvac.com

input #39 at www.csemag.com/information


W hen Time is Money
Go the EZ Route

The Rheem Commercial Condensing


Tankless line is here to make your job
easier. Our engineers have created
products designed specifically with
plumbers in mind to save time, money
and energy.

Rheem tankless units not only provide


continuous hot water to keep up with the
hot water demand for businesses, but Also, these units are Common Vent Compatible, meaning
there are many features to speed up up to eight Rheem Commercial Tankless Water Heaters can
installation. For example, Rheem units can be in-line common vented by using available header kits.
be installed using the Tankless EZ- Rack Venting units together can help save space, materials and
Kit. The EZ-Rack Kit holds two units reduce the number of penetrations to an outside wall.
back-to-back when set-up as a free-
standing system. When wall-mounted, And to make installing tankess water heaters even easier,
a hanging bracket attaches the tankless specificers and contractors now have access to Rheems
accessory rack with one tankless water online sizing tool and a full-time Tankless Application
heater to the wall. Engineer to assist in choosing the right model, number of
units and accessories needed for a tankless application.
Ideal for hotels, restaurants, large offices
and even schools and senior centers Only Rheem offers the industrys complete Commercial
the Rheem Commercial Condensing Tankless Line that includes Manifold Control Ready Units,
Tankless line comes Manifold Control Hot Start Programming, Overheat Film Wrap and EZ-Rack
Ready which allows up to 20 units to be Kit. Visit www.Rheem.com/Commercial-Tankless
connected in daisy-chain configuration for more information.
with the included cable.

Once connected, the tankless units work


together as a load-sharing systemso if
one heater goes down, the business can info@www.rheem.com
stay up and running. www.Rheem.com/Commercial-Tankless

input #40 at www.csemag.com/information


E ngineers Solve Problems!
Snake Tray Delivers the
Solutions for Cable Pathways!

Snake Tray BISCI CEC Training Programs


Designing cable pathways that are not
only code compliant but provide the
best solution to keep up with changing
Snake Tray Resource Center
technologies requires strategic planning.
Snake Tray offers many other learning resources for
Snake Trays expertise in designing and
engineers. Visit www.snaketray.com/resources where
manufacturing cable tray systems for
youll find convenient links to the following:
over 20 years can support engineers in
designing the best cable pathways to suit CSI Specifications
the needs of the end user now and into Loading Capacity Guide
the future.
Installation Instructions
Drawings
Snake Tray offers a series of one hour
BISCI approved courses and will come Video Demos
to your facility and train your team of White Papers and more!
engineers in the following topics:
About Snake Tray
How to Design Cost Effective and Snake Tray has been innovating cable management and
Proper Pathways and Spaces Using power distribution solutions since 1996! Our goal is to
Cable Trays provide our customers with cost effective solutions that
help reduce the total cost of construction. We look forward
NEC (National Electric Code)
to continuing to serve the engineering community with
Compliance when Designing Cable
training opportunities and solutions that offer cost-effective
Pathways and Spaces
and time saving benefits.
How to adhere to NEMA Standards
when Designing Cable Pathways
Tel: 800-308-6788
Call us today at 800-308-6788 to schedule www.snaketray.com
your lunch-n-learn. info@snaketray.com

input #41 at www.csemag.com/information


P recision vs Comfort Cooling
in Computer Rooms:
New regulations to learn now
so you dont pay later

Many engineers and contractors are


facing increasing concern about comfort
(residential) cooling units being misapplied
to computer room applications. Prior to
2010 there was no energy efficiency
requirement for computer room cooling
equipment in the United States. This has
changed and selected units must now meet
Today, comfort cooling air conditioners should not be used in
the SCOP criteria defined by the Department
spaces that meet the definition of a computer room because:
of Energy.
They are not designed for the tight temperature and
Since computer rooms consume large humidity control that is required
amounts of power, CRAC manufacturers They may not meet the requirements of your local energy
have dedicated thousands of hours of conservation code
R&D to create the most energy efficient They do not meet the federally mandated energy
equipment. Comfort cooling equipment has efficiencies and have not been submitted to the D.O.E.
neither the tight control, robust design, nor for acceptance in this specific application
the built in energy efficiency required to
serve the computer room adequately. Download the White Paper
For engineers who are designing small IT spaces, a new
In ASHRAE 90.1-2013 a computer room is STULZ White Paper explores the federal regulations related to
defined as the following: Computer room: this critical decision between comfort and precision cooling.
A room whose primary function is to house Download the white paper at http://hubs.ly/H082ysD0
equipment for the processing and storage
of electronic data and that has a design
electronic data equipment power density
exceeding 20 watts per square foot of Learn more at:
conditioned floor space. www.stulz-usa.com

input #42 at www.csemag.com/information


T itus helps engineers get
and stay qualified online,
offline and hands-on.

Technology never stands still. The field


of air distribution and comfort control
involves the intersection of a number of Engineers benefit from a Titus in-house training session
engineering disciplines, and this can
present a challenge both to young is a 39,000 square-foot center designed specifically for
engineers and to those who have been learning and experimentation in the realm of HVAC. This
professionally active for years. space features a number of purpose-built labs, including a
Throw Room, UFAD Room, Critical Environment Lab,
Luckily, there are resources available to Reverb Room, a new chilled beams chamber, and more.
help. At Titus, we offer the very popular
Titus eLearning website, an online version Architects, engineers, and other industry professionals
of our webinars that is available to can take advantage of the latest in 3D and Virtual Reality
engineers and others, where participants simulations, where they can see how products and modules
can learn at their own speed. Subjects work together without having to be onsite. 3D and VR are
range from Basic HVAC Design to specific just some of the latest innovative educational tools that
topics such as Chilled Beam Systems, customers and others have come to expect from Titus.
Cleanroom Design and Standards Updates.
Courses are eligible for PDH credits in most
states. Learn more, and find our course For more information about Titus University, our webinars,
catalog, at www.titus-elearning.com. eLearning and podcasts, 3D and VR training, or the
In addition, we offer more formal eLearning Comfort Zone, visit www.titus-hvac.com or speak to your
courses on our website under the header local Titus representative.
Titus University.

Online seminars and webinars are great


for busy professionals, but sometimes
theres nothing quite like hands-on. 972-212-4800
Our recently upgraded Comfort Zone titus@titus-hvac.com

input #43 at www.csemag.com/information


H elping HVAC/R engineers
maximize ROI for Ultraviolet
Germicidal UV-C systems

By eliminating accumulated organic and


biofilm growth in commercial air handlers, the
use of Ultraviolet energy (UV-C) significantly
improves airflow and heat-exchange efficiency
levels, reducing HVAC/R energy use by a
potential 10-25 percent, decreasing system
maintenance costs and providing cleaner,
healthier air.

UV-C light kills, and prevents growth of, UV-C is consistent with the goals of retro-commissioning
virtually all known microorganisms living in projects: low-cost fixes with fast payback that are easy to
HVAC/R components, such as cooling coils, implement, have a persistent energy-saving impact, and a
plenum surfaces, drain pans and on air filters. measurable return on investment.

Building owners, operators and contractors Why do HVAC/R professionals turn to


UV Resources for solutions?
who incorporate UV-C into their HVAC/R
system enjoy greater system efficiencies, UV Resources founders were the pioneers in the modern
reduced maintenance and improved indoor application of UV-C in HVAC/R equipment, having participated
environmental quality. in many industry patents and helping to guide ASHRAE
Handbook standards. Today, it has become the most
In fact, UV-C contributes to the triple bottom affordable, common sense UV-C manufacturer in the market.
line (energy, economics, environment) of
green/sustainable/high-performance Cost-Effective Solutions
buildings by: With an average installed cost of $0.15 per CFM, the
Maintaining design-level system cooling investment in UV-C technology is truly minimal. Furthermore,
capacity and air-system performance; field reports indicate that a UV systems initial cost is about
Reducing HVAC/R energy consumption and the same as one properly performed coil-cleaning procedure,
maintaining healthy IAQ; and less when system shutdowns, off-hours work (overtime),
Cleaning organic matter from filters, and/or contractor labor costs, are considered.
which reduces filter costs and provides
odor control;
Reducing water and hazardous chemical 877-884-4822 info@uvresources.com
usage and disposal. www.UVResources.com

input #44 at www.csemag.com/information


B uilding Solutions
One relationship at a time.

Varco Pruden Buildings is one of North


Americas oldest and largest providers
of steel-framed building systems.
VP Buildings meets CWB and IBC
standards, with many products for
achieving green building requirements.
2011 code. As part of the complete system design,
VP builds relationships with consulting ThermaLift also helps to maintain panel alignment for
engineers through our coast-to-coast efficient installation and an attractive finished roof.
network of authorized VP builders,
focused on providing the best solutions For complete product information, contact your local,
for each customers specific needs. authorized Varco Pruden Builder or visit VP online at
Our design and estimating software is www.vp.com. Our commitment to providing project-specific
compatible with the latest AutoDesk, BIM building solutions for our customers is a tradition that began
and TEKLA technology. Authorized VP more than 60 years ago. It continues today, one relationship
Builders enjoy the best in technological at a time.
tools to compete in their local markets.

Recently, Varco Pruden developed a new Learn with VP University


proprietary, hot-box tested insulation Did you know that Varco Pruden offers a number of
system to increase energy efficiency. valuable educational opportunities? Learn about training
Varco Prudens ThermaLift system lifts seminars, webinars and videos with the VP University
SSR roof panels up to 7" above group at www.vpbuilder.com.
secondary structural allowing two layers
of blanket insulation and U-factor
performance as low as 0.029. The result
is a cost-effective roof system that meets vpsales@vp.com
todays more stringent energy codes, 901-748-8000
including IECC 2015 and Canadas NECB VP.com

input #45 at www.csemag.com/information


Accurate and Reliable Ducted Airflow Measurement
with ELECTRA-flo Probes, Transmitters and Stations
Air Monitors ELECTRA-flo series of thermal dispersion airflow
measurement instruments accurately measure airflow in a variety
of commercial HVAC applications and installations such as
building airflow measurement and control, ducted airflow
systems, and fan inlet airflow systems.

At the heart of each ELECTRA-flo airflow measurement system


is a pair of precision matched thermistors and an aerodynamic
sensor aperture assembly specifically designed to reduce the
effects of angular flow distortions found within ducted air distribu-
tion systems. The factory-matched and configured transmitter
provided with each measurement system guarantees system per- AIR MONITOR
formance. The ELECTRA-flo G5 transmitter supports the highest AIRFLOW MEASUREMENT SOLUTIONS

number of sensing points per transmitter in the industry. Native www.airmonitor.com


BACnet or MODBUS communication protocols are available. amcsales@airmonitor.com 1-800-AIRFLOW

input #46 at www.csemag.com/information


cse201708_eduEngH F_ i Moni o .indd 1 7/7/2017 12:07: 7 PM

Experience Efficiency
Belimo offers professional engineers, end users, contractors,
system integrators, OEMs, and distributors the tools and
resources to help support and grow their business.

Belimo University
Belimo University (www.belimouniversity.com) offers
comprehensive training programs that will assist you with
understanding HVAC fundamentals and Belimo products.

Belimo software tools help you find the right solution.


SelectPro is a quick and simple tool for accurately sizing
and selecting valves, actuators, sensors and replacement
solutions. Savings Estimators enables you to estimate the
energy and annual dollar savings you can expect when Learn more at
installing pressure independent valves. www.belimo.us.

input #47 at www.csemag.com/information


cse201708_eduEngHF_belimo.indd 1 7/19/2017 3:18:39 PM
Carlo Gavazzi puts knowledge at engineers
ngertips 24/7, on various web-based platforms
GAVAZZI APP is multi-language, free of charge, and puts most
of the power of our website at engineers ngertips: data sheets,
user manuals, brochures, inventory, pricing and a quick means
to quickly email links to most of these to others.

CarloGavazziNA YouTube Channel provides engineers with


both short and long format videos on various product series.
They were designed to quickly provide the type of content,
which engineers are looking for, which can be easily shared.

Online Training Modules: This Fall, Carlo Gavazzi will be


rolling out three levels of product training modules (Basics/
Principles, Product Breadth and Markets/Applications) for our Tel: 847-465-6100
most popular Sensing, Switching and Control product lines. www.GavazziOnline.com

input #48 at www.csemag.com/information

Connectrac Wireways Bring Simplicity and


Convenience to Cable Management
Connectrac Wireways are the best oor-based solution for bring-
ing power, data, and communications to all interior commercial
applications without core drilling, trenching or unsightly power
poles. Providing a variety of options and nishes, Connectrac
allows any workspace to transform elegantly and seamlessly.

For the last decade, Connectrac has been providing customers


Connectrac In-Carpet Wireway offers discreet
with cable management that is easy to handle and gives a and elegant cable management
subtle and elegant look to a workspace. With core drilling or
trenching come the hassle of disruptive installations, intrusions
on employees and neighboring tenants, and additional costs.
A much more convenient, simple, and cost-efcient cable
management solution Connectrac works suitably with users   


schedules and can be recongured as workspaces evolve. Connectrac.com

input #49 at www.csemag.com/information


Avoid Control Vendor Dependency
Instead Choose an Open Controller Built on Sedona
Todays building controllers come with a programming language
for implementing sequence of operations. Rather than using a
proprietary programming language that requires a restricted (and
often expensive) programming tool, Contemporary Controls
recommends using Sedona, an open-source component based
drag-and-drop programming language.

Contemporary Controls BAScontrol Series of BACnet/IP unitary


controllers are built on Sedona. In addition, Contemporary Controls
has released several FREE tools to help users leverage Sedona:
The Sedona Application Editor (SAE) programs Sedona devices
The BASemulator replicates on a PC the operation of
BAScontroller, thereby allowing sequence of operation (SOO)
verification without having the actual controller 630-963-7070
info@ccontrols.com
BASbackup saves and restores all BAScontrol configuration and www.ccontrols.com/controllers
programming files as a project www.sedona-alliance.org

cse201708_eduEngHLF_contempCon.indd 1 7/14/2017 2:46:00 PM


input #50 at www.csemag.com/information

Dialog Centralized Lighting Control System


Provides Reliability, Flexibility and Expandability
The Dialog Centralized Lighting Control System connects and
controls lights through relays, occupancy sensors, photo
sensors, and switch stations. It is an advanced, centralized
solution that can globally manage facility lighting requirements by
area or room. The systems flexibility and scalability allows for a
variety of applications from small commercial buildings to large
facilities such as office towers, schools, airports and stadiums.

The Dialog system network is based on a 2-wire, non-polarized


power and data bus using standard and readily available #18AWG
wire, reducing the cost and connectivity issues associated with
wiring, CAT5 cables, terminator plugs and connectors.

Visit www.douglaslightingcontrols.com/products/dialog
to learn more about the Dialog system and find cut sheets, 877-873-2797 lighting@douglaslightingcontrols.com
specifications and other resources. www.douglaslightingcontrols.com

Each Dialog control system is factoryinput


configured,
cse201708_eduEngHlf_douglasFINAL.indd 1 pro-
#51 at www.csemag.com/information 7/20/2017 1:44:46 PM
grammed, and tested for the project before shipping to the
LSI Technical Design Services
Lighting the Way to Innovation
Technical Design Services is responsible for creating lighting
designs from concept through final 2-D and 3-D models. Each
day finite element analysis models utilizing progressive refinement
radiosity calculations are generated to serve the Automotive,
Commercial Industrial, Petroleum, and Quick Service Restaurant
markets to which LSI provides lighting fixtures and lighting controls.

Advanced software tools that include Lighting Analyst AGI32, Elum


Tools, Photometric Toolbox, Autodesk REVIT, and Autodesk Auto-
CAD facilitate projects ranging from animated videos and simulated
walk-throughs, to design submittal packages that enhance every
Tel: 513.793.3200
facet of the lighting design. These designs aid the LSI sales force
www.lsi-industries.com
in communicating its lighting fixture products to every customer
with uniquely tailored, easy-to-understand presentations.

input #52 at www.csemag.com/information


cse201708_eduEngHf_LSI.indd 1 7/19/2017 4:32:07 PM

Revolutionary material used in the fabrication of potable


hot water storage vessels and water heaters
Lean duplex stainless steel is an engineered alloy of austenitic and ferritic steels
that combines the grain structures and physical properties of 300 and 400 series
stainless steels. Fully pickle-passivated, AquaPLEX stainless steel is naturally
resistant to aqueous corrosion. Immune to chloride stress corrosion cracking and
capable of storing water >200F, AquaPLEX is approved by ASME for construction
of Section IV (H stamp), Section IV, Part HLW and Section VIII vessels.
AquaPLEX is offered in all PVI water heaters.

PVI invites engineers to explore the updated version of the


PVI Water Heater Sizing Guide at https://sizing.pvi.com/login/.
Build simple or complicated projects, calculate demand loads
and view the comprehensive PVI product selection for a wide
range of commercial and institutional application types.
www.pvi.com

cse201708_eduEng_PVIhalf.indd 1
input #53 at www.csemag.com/information 6/2/2017 8:32:52 AM
Stationary Battery Information Relevant to
Engineers Interested in High Reliability
Essential to mission-critical operations, DC power systems and
batteries power switchgear and SCADA systems, and start generators.
New developments in power electronics and control systems substan-
tially improve the reliability and longevity of critical power equipment.

sens-usa.com provides DC system reliability information highly


relevant to specifying engineers, including:
FAQs answering basic questions about industrial battery charging
Videos discussing new in genset battery chargers; why small size Valuable information abounds on SENS youtube channel
and high efficiency are important; designed-in reliability;
recharging more safely than ever before; and how to
safely double the life of most genset starting batteries
Education Series - seven modules cover technology and operational
choices that improve the reliability of emergency generators
White papers deliver in-depth information on battery charging and Tel: 303-678-7500 info@sens-usa.com
low-cost battery failure detection technologies www.sens-usa.com

cse201708_eduEngHLF_SENS.indd 1 7/14/2017 3:09:13 PM


input #54 at www.csemag.com/information

Engineering is personal.
So is the way you use information.
CFE Media delivers a world of knowledge to you.
Personally.
CFE Media is home to some of the most trusted names in the business.
To do your job better each day, you need a trusted source of information:
CFE Media Content for Engineers

www.cfemedia.com

CFE_General_HalfHorizontal.indd 1 2/9/2017 2:25:34 PM


Digital Edition
Exclusive Content
Visit www.csemag.com/digitaledition for exclusive content and for
more technical feature articles. The digital edition includes tablet-friendly
viewing (HTML5), headlines linking to longer versions, and an emailed link
as soon as its ready.

DE-1 The basics


of arc flash mitigation
Electrical engineers must understand the codes,
standards, and design requirements when engi-
neering for arc flash mitigation.
BY MATTHEW ZEGA, PE

Visit www.csemag.com/research for a


variety of research studies, including: research

 Electrical and power systems


 Fire and life safety
 HVAC, BAS
 Lighting and lighting controls
 2017 MEP Giants
 Salary survey.

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 101


The basics of
arc flash mitigation
Electrical engineers must understand the codes, standards, and design
requirements when engineering for arc flash mitigation.

BY MATTHEW ZEGA, PE, RTM Engineering Consultants LLC, Chicago

A
n arc flash is an explosion Codes and standards
of light, heat, and energy Before diving into the implementation
caused by the shorting of techniques, its important to know what
electrical connections, governs arc flash regulations. There are
which poses as a seri- four publications that play a large role
ous hazard when working on electrical in arc flash regulations including NFPA,
equipment. An arc flash occurrence can NESC, OSHA, and IEEE.
happen as a result of personnel mistakes NFPA 70: National Electrical Code
or as a result of equipment or connec- contains a section about arc flash hazard
tion failure. warnings, which states that
Many factors go into Learning it is required for electrical
mitigating the danger objectives equipment to be field- or
that electrical work- factory-marked to inform
ers face; engineers must  Know that arc flash mainte- personnel of the risk in
thoughtfully design sys- nance and design mitigation working on each indi-
are paramount to electrical
tems to reduce and miti- vidual piece of equipment.
safety.
gate these incidents in The NFPA 70 code specifi-
 Understand NFPA 70:
the field. Owners, facil- cally refers to its counter-
National Electrical Code and
ity managers, engineers, other codes or standards part, NFPA 70E: Standard
and contractors can all related to arc flash mitigation for Electrical Safety in
contribute to providing design. the Workplace, to outline
a safer place for person-  Learn design tactics that more detailed require-
nel to work. The process will mitigate arc flash inci- ments for arc flash safety.
all starts with safe equip- dents. NFPA 70E outlines many
ment and engineering of the arc flash require-
Figure 1: This image shows a breaker design, followed by proper installation ments in more detail including arc flash
panel in which the arc flash hazard is of equipment and proper training and risk assessments, arc flash boundaries, arc
clearly labeled to warn personnel of maintenance procedures. flash personal protective equipment (PPE),
potential danger. All graphics courtesy: Maintenance mitigation and design and electrical equipment labeling.
RTM Engineering Consultants mitigation will be covered in this arti- National Electrical Safety Code
cle, and an overview of the national (NESC) also outlines arc flash regula-
codes and standards that pertain to arc tions including arc flash hazard analysis
flash. This holistic approach is intended to be completed before maintenance is
to keep the best interests of all parties performed on live equipment within cer-
at hand while making personnel safety tain voltage thresholds above exposure
paramount. levels greater than 2 cal/cm2.

DE1 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


OSHA also recently added new regu- sonnel to wear full arc flash
lations on arc flash safety. This evolu- suits). Refer to Table 1 for a
tion in regulations defines requirements full description of each arc
for arc flash studies being performed. flash level.
OSHA also outlines the use of PPE Although it is important
when working on and around exposed to properly label equip-
energized parts. ment, there also should be
The IEEE Standard 1584 outlines the arc flash hazard warnings
specification of scope and deliverable marked on the floor of any
requirements for an arc flash hazard cal- areas of danger. Its impor-
culation. This guide is extremely impor- tant to understand that dis-
tant in outlining the steps, from begin- tance greatly reduces the
ning an arc flash study and collecting incident energy of arc fault,
data to making assumptions on unknown but knowing and under-
data, executing a study, and completing standing these boundaries
the equipment-labeling process. will help to keep person-
These guidelines are the foundation nel who are not working
for designing, installing, and maintaining on equipment safe while
electrical equipment safely while mitigat- informing and educating
ing risk and exposure to the dangers of them on the limits of arc
arc flash incidents. flash areas.
Two additional mainte-
Arc flash studies, labeling nance factors that are cru-
The prime way to mitigate arc flash cial to be considered are
incidents is to ensure the facility has the tightening of equip-
recently conducted a study, labeled ment conductor connec-
equipment, noted zones, and trained tions and the review of old
facility staff in maintenance procedures. and deteriorating conduc-
NFPA 70E outlines when a study must be tors. Over time, conduc- Figure 2: Switchgear within a large health care facility. Proper
conducted and for which types of equip- tors can become loose as installation, maintenance, and labeling of electrical equip-
ment. Once the proper arc flash study a result of vibrations and ment as well as educating personnel on safety measures
has been performed, the overall system thermal changes. Conduc- are especially important in health care facilities, not only for
can be analyzed and the incident energy tors that are not properly personnel safety but also for patients whose lives sometimes
levels at each piece of equipment can be torqued are a prime hazard depend on these systems to be in working order.
reviewed. At that time, its important to for arc flash occurrences.
determine whether modifications need to They should be regularly inspected and This poses an obvious challenge and can
be made to the system to reduce danger- torqued to assure proper connection and result in conductors being left in opera-
ous incident energy levels. to reduce arcing. tion longer than their anticipated lifes-
The next step after any potential sys- The second and potentially more seri- pan. Insulation provides a false sense of
tem modifications are made is to prop- ous factor concerns the degradation of security when cracking and degradation
erly label each piece of equipment to conductor insulation. While torqueing a can begin to expose energized parts of
identify its hazard level. The four lev- conductor can be completed in a routine the conductor.
els of arch flash hazard range from one and cost-effective manner, replacing old
(least hazardous) to four (requiring per- conductors can be costly and difficult. Arc flash design considerations
Another tactic in mitigating arc flash
Table 1: Arc flash personal protective equipment schedule incidents involves implementing the right
Hazard PPE category level 1 Minimum arc rating of 4 cal/cm2 initial design or modifying the existing
Hazard PPE category level 2 Minimum arc rating of 8 cal/cm 2 systems to help reduce incident energy
Hazard PPE category level 3 Minimum arc rating of 25 cal/cm2
levels. This entails fully understanding
the electrical system and running an arc
Hazard PPE category level 4 Minimum arc rating of 40 cal/cm2
flash analysis study. In doing so, its also
Table 1: This table identifies each of the hazard levels of arc flash incident, ranging important to take into consideration
from one to four. selective coordination of the electrical

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 DE2


Arc flash mitigation
analyzing and reducing available short- Its important to know these options are
circuit currents. There are a few meth- available when specifying switchgear
ods that can be employed to achieve that can interface with remote racking
this, including installing a line reactor, systems to help facility personnel prac-
installing an isolation transformer, and tice safe racking methods.
increasing conductor length. While all Another method to mitigate arc flash
three of these options come at a price, incident energy is to install a remote
they should be carefully weighed as they circuit breaker operator. This solution
can greatly affect the available short- can be most effective when existing
circuit current and the respective arc equipment is realized to be above safe
flash incident energy levels. arc flash levels. In some cases, due to
Employing high-resistance grounding high levels of incident energy, it can be
is yet another design choice that impacts necessary to have the utility company go
the arc flash incident energy levels of a to a facility to power down main equip-
facility. Implementing a current-limiting ment. With a remote circuit breaker, the
resistor into the electrical distribution facility will be able to safely de-energize
system can effectively increase the resis- equipment without the need to call in
tance and limit the available fault cur- special personnel.
rent. While this system has its advantag- ZSI is another method to consider as
es and disadvantages, the main benefit it relates to arc flash mitigation. While
of this type of grounding is to lessen the the primary principle of it is to provide
effects of arc flash by adding resistance a coordinated electrical system, ZSI can
in your ground path. be a valid design option when reducing
Note that while a line-to-ground arc flash incident energy levels. Given
fault can benefit greatly from having this method relies on additional control
resistance at the ground, this configura- circuitry, it should be closely analyzed
tion does nothing to limit the incident prior to employment. This method can
energy of a line-to-line fault. Addition- be analyzed when completing an arc
ally, it also must be considered that this flash analysis and reviewing the over-
type of installation may be prohibited in current device trip settings.
some cases, so further research may be Specifying the correct overcurrent
Figure 3: This photo shows switchgear within required to implement this strategy. protection is an important factor when
a large health care facility. implementing a safe system, which can
Arc flash mitigation components be accomplished by first completing an
system. While having a fully coordinated Many engineering design techniques arc flash study on the facility at hand.
electrical system is important, this must can be employed to help reduce the Following that, adjusting the trip set-
be weighed with adjusting the system to arc flash hazard. A few of the equip- tings found on modern overcurrent-
mitigate and extinguish arc flashes in ment options include remote racking, protection circuit breakers can be an
an expedient manner. When working to remote operators, zone-selective inter- effective method in mitigating the
adjust breaker settings for a coordinat- locking (ZSI), maintenance switches, amount of arc flash incident energy.
ed system, creating delays in adjustable arc-fault relays, and arc flash protec- Carefully reviewing and analyzing the
tripping will prolong arc flash incidents tive equipment. breaker trip settings as it relates to the
and expose personnel to increased risk. Various affordable, robot-like prod- arc flash study is an important compo-
The decision must be made based on the ucts are available that remove rotary- nent in setting the power system up to
level of critical operation of the equip- style circuit breakers via remote con- perform optimally.
ment. When it is decided that neither trol, placing the operator outside of the Typically, in arc flash safety, it is ideal
selectivity nor arc flash mitigation can arc flash boundary. Remote racking is to have the breaker trip at the soonest
be compromised, there are means to dial one concept that increases the workers possible moment in order to mitigate
in instantaneous breaker time-trip set- distance from arc flash areas, thereby the amount of arc flash incident energy;
tings while personnel are operating on reducing the available arc flash incident however, the problem with setting all of
equipment. energy levels and improving personnel the breakers down to the quickest instan-
Another design scheme to be used safety. This method can be reviewed in taneous trip setting is that it can result in
in reducing arc flash incidents involves conjunction with specifying equipment. an uncoordinated electrical system and

DE3 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


compromise the safety of the electrical duct channels built into the switchgear.
system. For instance, having an unco- If you have ever worked at a facility that
ordinated emergency electrical system has experienced an arc flash, youll know
within a hospital or medical facility the damage that can result to not only
could greatly compromise patient safety the equipment itself, but also the adja-
if upstream breakers were to trip. These cent equipment. Arc-resistant switchgear
options need to be carefully weighed and helps to channel the blast away from both
discussed with the facility owner and personnel and adjacent equipment.
personnel prior to implementing. Every quarter,
Another option relating to trip settings Mitigation training strategies
that can be considered is the employment One important concept when design- Consulting-
of a maintenance switch, which can pro- ing for arc flash mitigation is connecting Specifying
vide a safe and effective way to switch with the owner and creating a plan for
between a time-delay breaker that favors arc flash mitigation safety. Its important Engineer conducts
coordination and an instantaneous trip to educate on mitigation techniques and research studies
setting that provides maximum protec- outline the safety issues that relate to it.
tion against arc flash levels. This mainte- If the engineering team is designing in on the industries
nance switch allows personnel to switch a bubble without collaborating with the serviced by the
to the instantaneous trip setting while owner and contractor, its easy for safety-
working on equipment, providing the implementation items to get value- publication:
most protection. Once maintenance is engineered during the budgeting process.
complete and normal operating condi- Its important to educate the owner and
tions resume, they then can switch back agree on the level of engineering imple-
Electrical and Power
to the coordinated time-delay trip setting. mentation so that its clearly understood Fire and Life Safety
While not every single arc flash is avoidable HVAC/BAS
because of equipment failures, proper maintenance, Lighting
personnel training, proper studies to understand risk,
and employing the correct equipment are all means by
which the risk of arc flash can be greatly mitigated.
An arc flash relay is another device what cost impact certain mitigation tech-
that can help mitigate incident energy in niques can have on the overall budget.
both medium- and low-voltage switch- In summary, there are many methods
gear. There are arc flash relays avail- that can be employed to help mitigate the
able on the market that measure both risk of arc flash. While not every single
light flash and current to detect arc arc flash is avoidable because of equip-
flash occurrences and help mitigate the ment failures, proper maintenance, per-
incident energy. The benefit of detect- sonnel training, proper studies to under-
ing both light output from an arc flash stand risk, and employing the correct
while also measuring current, ensures equipment are all means by which the
safe operation and works to eliminate risk of arc flash can be greatly mitigated.
nuisance tripping. Arc flash relays can Being well-educated and taking the prop-
be a great solution for both new and er training steps can help ensure a safer
retrofit-type installations. system for all involved.
Finally, arc-resistant switchgear is an
option in the defense against arc flash. Matt Zega is an associate with RTM Engi- Download the Consulting-Specifying
Arc-resistant switchgear is specifically neering Consultants. He specializes in elec- Engineer Editorial Research Studies:
designed to help redirect potential ener- trical power distribution for commercial,
gy blasts away from personnel and out industrial, and health care facilities. www.csemag.com/
media-library/research
www.csemag.com Consulting-Specifying Engineer AUGUST 2017 DE4
MEDIA SHOWCASE FOR ENGINEERS
Clean+Green TM

POWER + CONTROL
In
1 Connection

Up to 5 contacts
for POWER
AIR CLEANING SYSTEM +
6 contacts for
2/3 less fan energy than MERV 14 filters CONTROL
Extend filter service intervals from months
to YEARS
Provide electrical power
Better IAQ with MERV 15 performance
Removes
and control motor drives,
ultrafine communicate alarms
Power
particles,
Contact
or monitor process
VOCs parameters with
AND odors only 1
connection.
Ratings up to
Auxiliary 250A, 600V,
Contact Type 4X

meltric.com
www.DynamicAQS.com 800.433.7642
Input #100 at www.csemag.com/information Input #101 at www.csemag.com/information Input #102 at www.csemag.com/information

Product & Literature Digest

Why Should You


Filter Your Water?
On a quarterly basis, Consulting-Specifying
Engineer conducts research studies on the
industries serviced
by the publication

Electrical and
Power
Fire and
Life Safety
Scale formation reduces the heat transfer rate and
HVAC/BAS
increases the water pressure drop through the heat
exchanger and pipes. In fact, one study has shown Lighting
that .002" fouling will increase pumping needs by 20%.

The Best Engineered Water Filtering


Solution Always Costs Less
2 67 2 S . L a C i e n e g a B l v d . L o s A n g e l e s , C A 9 0 0 3 4 U S A Download the Consulting-Specifying Engineer Editorial Research Studies:
( 8 0 0 ) 3 3 6 - 194 2 ( 310 ) 8 3 9 - 2 8 2 8 F a x : ( 310 ) 8 3 9 - 6 87 8 www.csemag.com/media-library/research
w w w. t e k l e e n . c o m info@tekleen.com

Input #103 at www.csemag.com/information Input #104 at www.csemag.com/information

102
102 Consulting-Specifying Engineer AUGUST 2017 cse2014_research_QTR.indd 1 www.csemag.com
1/22/2014 4:01:21 PM

3.5" wide x 4.5" high


3010 Highland Parkway, Suite 325, Downers Grove,
IL 60515. 630-571-4070 Fax 630-214-4504
Advertiser Index
Request more information about products and advertisers in this issue by using the
PUBLICATION SERVICES http://csemag.com/information link and reader service number located near each item.
Jim Langhenry, If youre reading the digital edition, the link will be live. You may also check the circle
Co-Founder and Publisher, CFE Media
630-571-4070 x2203; JLanghenry@CFEMedia.com
adjacent the page reference to indicate which companies you are interested in, then
Steve Rourke, Co-Founder, CFE Media
FAX this back to Consulting-Specifying Engineer at 630-214-4504 for FREE information.
630-571-4070 x2204, SRourke@CFEMedia.com When you contact a company directly, please let them know you read about them in
Trudy Kelly, Executive Assistant Consulting-Specifying Engineer.
630-571-4070 x2205, TKelly@CFEMedia.com

Elena Moeller-Younger, Marketing Manager Reader


773-815-3795, EMYounger@CFEMedia.com Company Page Service # Phone # Web site Send Info

Kristen Nimmo, Marketing Manager AAON ............................................... 2 ......................3 ................918-583-2266................. www.AAON.com .....................................
630-571-4070 x2215; KNimmo@CFEMedia.com
Aeroflex USA .................................. 53 ....................18 ..............866-237-6235................. www.aeroflexusa.com ............................
Paul Brouch, Director of Operations
Air Monitor Corp ............................ 62 ....................19 ..............800-AIRFLOW ................ www.airmonitor.com ..............................
630-571-4070 x2208, PBrouch@CFEMedia.com
Air Solution Company .................... 69 ....................20 ..............800-819-2869................. www.airsolutioncompany.com ..............
Rick Ellis, Audience Management Director
303-246-1250, REllis@CFEMedia.com BELIMO ............................................ 44 ....................15 ..............877-833-1647................. www.belimo.com ....................................

Michael Rotz, Print Production Manager


CFE Edu ............................................ 47 .......................................630-571-4070................. http://CFEedu.cfemedia.com/catalog ....
717-766-0211 x4207, Fax 717-506-7238 CFE Media, Engineering
mike.rotz@frycomm.com Is Personal ....................................... 100 .....................................630-571-4070................. www.csemag.com ...................................
Maria Bartell, List Rental Account Director CFE Medias New Products
Infogroup Targeting Solutions for Engineers Database
847-378-2275, maria.bartell@infogroup.com Featured Products........................... 46 .......................................630-571-4070................. www.csemag.com/NP4E .........................
Claude Marada, List Rental Manager Congratulations, 40 Under
402-836-6274, claude.marada@infogroup.com 40 Winners! ..................................... 39 .......................................630-571-4070................. www.csemag.com/40under40 ...............
Letters to the Editor CONTEMPORARY CONTROLS ........ 38 ....................14 ..............630-963-7070................. www.ccontrols.com/controllers .............
Please e-mail your letters to
CSE E-newsletters ........................... 54 .......................................630-571-4070................. www.csemag.com/newsletters .............
ARozgus@CFEMedia.com
Letters should include name, company, and CSE Webcasts .................................. 63 .......................................630-571-4070................. www.csemag.com/webcast ...................
address, and may be edited for space and clarity. Design and Installation
Information Considerations for Generator
For a Media Kit or Editorial Calendar, Sets Webcast Sponsored by
e-mail Trudy Kelly at: TKelly@CFEMedia.com. MTU Onsite Energy ........................ 15 .......................................630-571-4070................. www.csemag.com/webcast ...................
Douglas Lighting Controls ............. 52 ....................17 ..............604-873-2797................. www.DouglasLightingControls.com .....

REPRINTS Eaton Corp ...................................... 32, 32A-32L ....13 ..............412-893-4052................. www.Eaton.com/whatmatters ..............
For custom reprints or electronic usage, contact: Eaton Corp ...................................... C-4...................56 ..............412-893-4052................. www.eaton.com/doubledoor ................
Brett Petillo, Wrights Media
281-419-5725, bpetillo@wrightsmedia.com ebm-papst, Inc ................................ 18 ....................9 ................860-674-1515................. http://ebmpapst.us .................................
ESL Power Systems......................... 24 ....................10 ..............800-922-4188................. www.eslpwr.com.....................................

PUBLICATION SALES Greenheck ...................................... C-2...................1 ................715-359-6171................. www.greenheck.com ..............................


Midwest LSI Industries, Inc. ........................... 17 ....................8 ................513-793-3200................. www.lsi-industries.com ..........................
Matt Waddell MWaddell@CFEMedia.com Metraflex......................................... 16 ....................7 ................312-738-3800................. www.Metraflex.com ...............................
1111 W. 22nd St. Suite 250 312-961-6840
Oak Brook, IL 60523 Fax 630-214-4504 Potter Electric Signal Company ..... 55 ....................57 ..............800-325-3936................. www.PotterIntelligen.com .....................
Reliable Controls............................. 6 ......................5 ................250-475-2036................. www.reliablecontrols.com .....................
West, TX, OK
Tom Corcoran TCorcoran@CFEMedia.com RenewAire LLC ................................ 45 ....................16 ..............800-627-4499................. www.RenewAire.com .............................
1111 W. 22nd St., Suite 250 215-275-6420 Reznor.............................................. 8 ......................6 ................800-695-1901................. www.reznorhvac.com .............................
Oak Brook, IL 60523 Fax 484-631-0598
Rheem Manufacturing Company .. 4 ......................4 ................770-351-3000................. www.Rheem.com/Commercial-Tankless .........
Northeast Schneider Electric............................ 1 ......................2 ........................................................ www.schneider-electric.us/smartsystems .......
Richard A. Groth Jr. RGroth@CFEMedia.com
12 Pine Street 774-277-7266
SENS ................................................. 30 ....................11 ..............866-736-7872................. www.sens-usa.com/systems ..................
Franklin, MA 02038 Fax 508-590-0432 Siemens ........................................... 31 ....................12 ...................................................... www.sea.siemens.com ...........................

Director of Content Marketing Solutions


Yaskawa America, Inc .................... C-3...................55 ..............800-927-5292................. www.yaskawa.com .................................
Patrick Lynch PLynch@CFEMedia.com
1111 W. 22nd St., Suite 250 630-571-4070 x2210 Need More Info? FAX this page to: 630-214-4504
Oak Brook, IL 60523 Fax 630-214-4504
or mail to Consulting-Specifying Engineer magazine, 3010 Highland Parkway, Suite 325, Downers Grove, IL 60515
Marketing Consultant
Brian Gross BGross@CFEMedia.com Name Title
1111 W. 22nd St., Suite 250 630-571-4070 x2217
Oak Brook, IL 60523 Fax 630-214-4504 Company Address
International
Stuart Smith stuart.smith@ssm.co.uk City State Zip
SSM Global Media Ltd. +44 208 464 5577
Fax +44 208 464 5588 Phone Fax e-mail
Consulting-Specifying Engineer does not assume and hereby disclaims any liability to any person for any loss or damage caused by errors
or omissions in the Advertiser contacts regardless of whether such errors result from negligence, accident, or any other cause whatsoever.

www.csemag.com Consulting-Specifying Engineer AUGUST 2017 103


Future of Engineering
JAMES C. WADDELL, RCDD, MAI;
CannonDesign, Chicago

The rise of the digital building


Digital buildings combine architecture, engineering, and technology
for increased building optimization.

D
esigning for autonomous process Building systems and IoT movement data from location sensors
automation requires a shift in Todays building systems are also ben- allows the systems to understand and
consulting-specifying methods efiting immensely from loT. All systems predict optimal ventilation, tempera-
and practices. Engineering now includes currently use some form of information ture, and light levels for a specific day or
a broader set of integrated systems technology (IT) networking for commu- night. Data about the movement of indi-
requiring a well-defined and well- nication, monitoring, management, and viduals through open spaces can help
communicated bridge between a clients control. Although powering each device tenants boost the productivity of work-
expected outcome and the construction or system typically requires an electri- ers by better designing tasks and breaks
process. cal connection and a data connection to facilitate collaboration between
A digital building includes a set of at each device, the digital building con- employees.
solutions that creates a synergy between verges these requirements into a single Designers now have the option within
comfort, safety, energy efficiency, and secure, open standards-based frame- traditional building systems to use the
security. Its a blend of architecture, work designed to deliver power and data cost savings and enhanced value of a
engineering, and technology that turns through a single data cable. converged system. Leveraging PoE tech-
buildings into something more Providing power over data cable is a nology to create a holistic infrastructure
uniquely different from the smart build- tested and proven way to energize IoT that can power and provide IT network-
ings of the past. Digital building is a devices. Power over Ethernet (PoE) ing for various building technology
smart building evolvedone that uses technology is an approved way to systems is at the core design principles
cognitive computing to drive autono- safely transfer electrical power, along of digital buildings. As building systems
mous optimization. with data, to remote devices over stan- become more network-enabled, so too
dard networking cables in an Ethernet will the infrastructure that drives them.
The concept of a digital building network. The result is that almost all New and innovative business mod-
Digital buildings fundamentally office phones and security cameras els within the design community have
transform a space into an app-driven specified today are PoE-enabled. already begun to shift the balance of
utility. Although designers are focused Devices and controls systems that are power in the marketplace. As a result,
on creating spaces that optimize the commonly specified have options to competitive situations will give way
human condition, advance wellness, use PoE technology. to more complex engagements where
and increase the ability to collaborate It used to be that consulting- companies are interconnected in ecosys-
and share, digital buildings turn spaces specifying engineers designed in a way tems. Partnerships between traditional
into digital assistants. A digital build- that made it easier for people to under- architecture and engineering firms and
ing relies heavily on Internet of Things stand technology. Digital buildings now large IT vendors will also play a more
(IoT) devices to deliver this level of allow consulting-specifying engineers significant role.
automation. to design systems in a way that makes
IoT refers to the ever-growing net- it easier for technology to understand James Waddell is a member of Can-
work of physical objects that feature an people. Advances in IoT devices are nonDesigns technology-consulting
IP address for network connectivity. helping facility managers capture data. practice leadership team, focused on
These devices use embedded software, Combining building management leveraging the integration of converged
sensors, and controls to interact with the system-captured environmental data technology systems to enhance the
external environment. (temperature and air quality) with built environment.

104 Consulting-Specifying Engineer AUGUST 2017 www.csemag.com


PUSH YOUR
EXPECTATIONS

Low Harmonics
IEEE519-1992 Compliant

Power Factor
0.98 or higher

You can get more out of your


current system performance by
Greater Efciency
integrating the new Z1000U 19% less system losses
Matrix Drive from Yaskawa.
Our new offering gives you
everything you need to maximize
operations and reduce costs. Power Regeneration
Reduced Energy Demand
Push your expectations.
Learn more at Yaskawa.com/
z1000umatrix.
Compact Size
65% Reduction
Z1000U Matrix Drive

Expanded Motor Control


IM/PM Motor Control

For more info:


http://budurl.me/YAI1078 input #55 at www.csemag.com/information

YASKAWA AMERICA DRIVES & MOTION DIVISION YASKAWA.COM 1-800-YASKAWA


Make mine a double.

The industrys rst double-door safety switch.


The internal barrier isolates fuses by separating the line-side power
and switch base from the fuse base, offering greater safety.

Learn more about the new Eaton double-door safety


switch at eaton.com/doubledoor.

input #56 at www.csemag.com/information