What to do Next?
A. 65 F (18 C)
B. 55 F (12 C)
C. 50 F (10 C)
D. 36 F (2.2 C)
A. 65 F (18 C)
B. 55 F (12 C)
C. 50 F (10 C)
D. 36 F (2.2 C)
17.58 COP
66% Variation!!
% Load
66% Variation!!
IPLV Points
% Load
66% Variation!!
IPLV Points
% Load
A. Load
B. Lift
A. Load
B. Lift
66% Variation!!
IPLV Points
% Load
Chiller
Waterside
Economizer
Tower Building
Load
Chiller
Waterside
Economizer
Tower Building
Load
Chiller
Waterside
Economizer
Tower Building
Load
Chiller
Waterside
Economizer
Tower Building
Load
Condenser
44F
85F (6.7C)
(29C)
Evaporator
YMC2 is the first chiller in the world to continuously operate in inverted duty
Inverted Duty: condenser water return is lower than the chilled water
supply temperature
Tower Building
Load
Condenser
44F
85F (6.7C)
(29C)
Evaporator
36F
(2.2C)
Flow Rate is Constant Per Design Condition
Ensures adequate
Chiller can adjust refrigerant flow
speed to operate in from the
a wide range of condenser to the
conditions evaporator to avoid
starving the
evaporator
Eliminates
concerns about oil
return to the Providing highest
compressor chiller efficiency on
the market
Three Locations
Dallas ASHRAE Climate Zone 3A warm, moist
Chicago - ASHRAE Climate Zone 5A cool, moist
San Francisco Bay Area ASHRAE Climate Zone 3C warm, marine
Annual Energy
Cost
Electricity
Location Base Chiller and
Rate ($/kWh)
Waterside
Economizer
Chicago $0.089 $70,900
Dallas $0.078 $98,000
San
Francisco $0.156 $125,900
Bay Area
Modeling Assumptions
ASHRAE 90.1-2013
The chilled water plants are modeled according to the Appendix G baseline with variable speed chillers and primary-only,
variable flow chilled water loops
eQUEST simulation program utilized to obtain hourly chilled water load profiles
Theoretical Optimal Plant Performance approach in obtaining the chilled water plant performance
Flat electricity rates are assumed based on the Energy Information Administration average price database
Modeling Assumptions
ASHRAE 90.1-2013
The chilled water plants are modeled according to the Appendix G baseline with variable speed chillers and primary-only,
variable flow chilled water loops
eQUEST simulation program utilized to obtain hourly chilled water load profiles
Theoretical Optimal Plant Performance approach in obtaining the chilled water plant performance
Flat electricity rates are assumed based on the Energy Information Administration average price database
Annual Energy
Cost Associated with
Location Cost Savings of Payback
Waterside Economizer
the YMC
Chicago $149,752 $1,200 INSTANT
Dallas $211,507 $10,600 INSTANT
San Francisco
$199,261 $13,600 INSTANT
Bay Area
Modeling Assumptions
Costs Estimates are based on data provided by contractors and suppliers for the plant configurations
Total installed costs are adjusted based on city cost indexes from the RS Means Mechanical Cost Data
Less pipe
Fewer Investment for
bypass/isolation the future
valves
Tower Building
Load
Waterside
Economizer
Tower Building
Load
Waterside
Economizer
WSE can no longer
meet the free
35 Johnson Controls, Inc. 2016
cooling needs
Retrofit or Increased Building Load?
An installed YMC2 can
accommodate the increased
Tower building load Building
Load
20+ year
The 2 Chiller
YMCold chiller Increases
due to
expansion
Waterside
Economizer
While the WSE is
being used for free
36 Johnson Controls, Inc. 2016
cooling
What about ASHRAE 90.1?
3
1 2 Non-Prescriptive Path
Simplified Approach Prescriptive Path (Energy Cost Budget
Method)
Example of how the Energy Cost Budget Method was performed- http://hpac.com/air-
conditioning/using-standard-901-energy-savings-and-leed-credits
Contact
Read the study summary
http://www.york.com/for-your-workplace/chilled-water- jci@bay
systems/engineering-study
market
Access the recording of this webinar
http://event.on24.com/r.htm?e=1172609&s=1&k=9B238 force.com
4BD2448268D9174C4FE56463757 with questions.
Related Resources
Cold Weather Operation of Cooling Towers ASHRAE
Journal Article - https://www.ashrae.org/resources--publications/periodicals/ashrae
journal/features/cold-weather-operation-of-cooling-towers
Central Plant Optimization - http://www.johnsoncontrols.com/buildings/services-and-
support/optimization-and-retrofit-services/central-plant-optimization