NELLYESTHERINAJOHN
UNIVERSITIMALAYSIASABAH
RO1:PAVEMENT
RO2:MAINTENANCEOFROADSHOULDER
RO3:GRASSCUTTING
RO4:MAINTENANCEOFROAD
FURNITURE
RO5:MAINTENANCEOFBRIDGESAND
CULVERTS
RO6:MAINTENANCEOFDRAINS
RO7:ROUTINEINSPECTION
Whatis
pothole?
Pothole=Defectof
pavementsurfacedueto
lossofwearingorbinder
course
CAUSES REMEDIES
Lossofsurfacematerial Patchingofpotholes
(wearingcourse)
Weakbasecourse Basereconstruction
JALANBUKITMANGGIS,
PAPAR
1. Setuptrafficmanagementandwearsafety
attire
2. Removeallloosematerialsfromthepotholes
3. Cuttheareaat150mmfromouteredgeof
potholeandshapedusingpavementcutter
4. Sprayedbituminoustackcoatuniformly(0.25
0.55l/sq.m)
5. Fillinthecutoutareawithmixasphaltand
compactitusingpowerhandcompactor
6. Opentotraffic
CrocodileCracks=
Cracksthatform
networkofmulti
sidedblocks
CAUSES REMEDIES
Inadequatepavement Reconstructionorstrengthen
thickness thepavement
Weakwearingcourse Replacethewearingcourse
Weakbase Basereconstruction
Shoving=Bulging
ofroadsurface
mainlyinthe
directionoftraffic
wherebrakingor
JalanBantayanMinintod acceleration
movementsoccur
POSSIBLECAUSES REMEDIES
Lowstabilitymix Replacethebituminous
surfacing
Weakbondingbetween Replacebituminous
asphaltsurfaceand surfacing
underlyingsurface
Inadequatepavement Reconstructthepavementor
thickness bituminousoverlay
Unstablegranularbase Basereconstruction
Delamination=Loss
ofdiscreteandlarge
areaofwearing
course
JalanKgLikas
POSSIBLECAUSES REMEDIES
Inadequatetackcoatbefore Millofforreplacethelayer
layingthewearingcourse
Weakandlooselayer Reconstruction
Seepageofwaterthrough Replacewearingcourseor
asphalt thinbituminousoverlay
Setuptrafficmanagement
Sprayingtackcoat
Layingpremix(120
160C)
Compactusingroller
compactor(34times)
Compactusingpneumatic
tyreroller(8times)
Normallycompactingstartedfromouter
edgetowardthecenter
ACWC50mm)
ACBC(50mm)
ROADBASE(300 600mm)
SUBBASE(200 300mm)
NATURALSUBGRADE
1. PowerBroom
2. CompressedAirBlower
3. TackCoat/PrimeCoatSpreader
4. PaverMachine
5. TipTrucks
6. RollerCompactor(4tonne)
7. RollerCompactor/PneumaticTyreRoller(9
10tonne)
Settingupthelineusingchalkedrope
RoadMarkingMachine
Materialusedinroadmarking:
Thermoplastic
Heatedwithtemperatureof180Cbeforebeinglaid
Glassmicrobeads
Donotconductroadmarkingimmediately
aftertheasphaltislaid cancausethe
thermoplastictopeeledoff.
BitumenExtractionTest
Procedure:
Prepare1000gofasphalt makesuretoputthe
asphaltintheovenforovernightwith
temperature120 160C
Puttheasphaltinthebowlandputfilterpaperon
topofthebowl
Putthebowlinthecentrifugeextractor
Prepare2000mLofmethylenechloridetobepour
inthesample alwaysremembertostopthe
machinebeforepouringtheliquid
Makesurealltheliquidisgone
Putthesamplesintheovenforabout3040min
withtemperature120 150C
Makesurethesamplesiscoolbeforeweightit
CoringTest
EquipmentUsed:DiamondCoreDrill
Coringinprogress
Fillintheholewith
sand+cement
Compactproperlyusing
hammer
PortableDigital
Balances
VernierCalliper
Coringtestinthelab
Preparedallequipmentandmakesureallof
itisclean
Forcoringatsite,makesuretosetuptraffic
managementandwearsafetyattire
Forcoringtestinthelabtheresultofthe
density:
ACWC=98 100%
ACBC=95 100%
MarshallTest
Heatupasphalt(150C) Putasphaltinthemould
Putinthemachinewith
75sec/blowsfortopand
bottom
Removethesample
fromthemould
Letitcooledandthen
weightit
Soakedinwaterbathfor30
minwithtemperatureof
60C
Putinthemachinefor
testing
FEDERAL STATESPECIFICATION
SPECIFICATION
ACB 28 ACW 20 ClassB ClassC
Wearing Binder
Stability >450kg >500kg >450kg >360kg
VoidinTotal 3% 7% 3% 5% 3% 5% 3% 6%
Mix
VoidFills 65% 80% 75% 85% 75% 85% 65% 80%
With
Bitumen
CONCRETEWALKWAY
Replacingtheoldwalkway
1. Setuptrafficmanagement
2. Excavateorpreparedtherequiredarea
3. Installroadkerb(Type1 orType8)
4. Laysandasfillinembankment
5. InstallUPVCClassCpipeforweephole
6. Compactandlevelthesurface
7. Preparedformwork
8. Lay125micronlowdensitypolyethylene
9. Layreinforcementbars(A94.99kg/m2)
10. LayGrade25(1:1.5:3)concrete
Installingroadkerb
UPVCClassCpipe
Fillinembankment
Sawnformwork
After
SlumpTest
MethodforSlumpTest:
Makesurealltheequipmentisclean
Placetheconeonasmoothsurfacewiththe
smalleropeningatthetop
Fillinthreelayeroffreshconcreteinthecone
Eachlayeristamped27timeswithtampingrod
Afterfilling,lifttheconeslowlyandmeasurethe
slump
Rangeforslumpis75 125mm
CrushingTestMachine
Equipmentusedtoprepareconcretecube:
Cubemouldandtampingrod
Methodforpreparingconcretecube:
Makesuretheequipmentusedisclean
Fillinthreelayeroffreshconcreteinthecone
Eachlayeristamped35timeswithtampingrod
Leaveitforonedayandthenremoveitfromthe
mould
Curefor7daysand28daysfortesting
Testthecubeforeachcuringtimewithcrushing
testmachine
CONCRETE DAYS CRUSHINGVALUEREQUIREMENT
GRADE (MN/m2)
Grade20 7 14
28 20
Grade25 7 17
28 25
Grade30 7 20
28 30