Installation

Assembly
The burner is secured on the boiler with
the flange supplied. Holes are drilled as
shown in the drawing. The flange gasket
can be used as a template.
Mount the flange and its gasket on the
boiler. Check for leaks.
The burner is installed in position 1.
If necessary, it may be installed in
position 2 or 3.

Insert the connecting nozzle into the


flange (insertion: see boiler manual).
a (mm) b (mm) c d Tighten the clamp, raising the burner
NC4/6 85-104 150-170 M8 45 slightly.
NC9 95-104 150-170 M8 45
 To fit it in position 2, reverse the
display. To do this while the burner is
operating:
L (m) Hold buttons BP1 and BP2 down at
Corrected the same time, until you notice a
two-line pump 60 l/h single line
H
max US gal/h change.
(m)
0.60 1.00
6/8 mm 8/10 mm 4/6 mm Fuel oil connection
When connecting R 3/8 hoses to the
4 17 54 80 48 piping, allow for the burner to be
3 14 47 70 42 removed.
2 12 40 60 36
1 10 34 51 30 Two-line connection
0.5 9 31 46 28
0 8 27 42 25 The illustration opposite allows the
-0.5 7 24 - - diameter () and the length (L) of the
-1 6 21 - - piping to be determined from the suction
-2 4 14 - - height (H+) or load (H-) (for fuel oil with
-3 - 8 - -
a density of 0.84, to a temperature of
10C, in an installation which includes
one valve, one non-return valve and four
Correction of altitude elbows, at the most).
Pump in suction (H +) or charging (H -) mode
Single line connection
Altitude (m) Theoretical H (m) (for a charged tank only)
0-500 0 Remove the return hose, remove the
connection and the bypass cap. Plug it
501-800 0.5 using a cylindrical cap and a seal.
801-1300 1.0
1301-1800 1.5
1801-2200 2.0
e.g.: altitude 1100m. Theoretical H = 1m actual H 2m.
Corrected H for suction 2 + 1 = 3m
Corrected H for charging 2 - 1 = 1m
Choose the of the piping from the table, based on the
length expanded between the tank and pump.
If corrected H for suction exceeds 4m; make provisions for
a transfer pump (max. pressure 2 bar).

Electrical connection
The electrical setup and the burner
connection must be performed in
compliance with the standards in force.
The burner is supplied with a 7 pin male
connector, to which the single-phase
230V-50Hz power supply with earth and
the thermostat are connected (diagram
opposite).
NB: External connection of an alarm
between S3 and N and an hour meter
between B4 and N.
- Rating of the protective fuse: 6.3A
- Conductor section: 1.5 mm2

32 12/2008 - Art. Nr. 4200 1013 9300A