You are on page 1of 7

Pre-Bid report for

Liquid Mud plant Foundation (Concrete pad) & Road

PROPRIETARY NOTICE
2015 Barry-Wehmiller Corp. This document is the intellectual property of Barry-Wehmiller International and not to be copied, reproduced or
distributed under penalty of law without prior written approval of B-WI. Barry-Wehmiller International, 8020, Forsyth Blvd. St. Louis, MO 63105
Page 1
TABLE OF CONTENTS

1. EXECUTIVE SUMMARY..................................................................................................................... 3
2. SCOPE OF WORK..................................................................... ERROR! BOOKMARK NOT DEFINED.
3. INPUTS REQUIRED:.................................................................. ERROR! BOOKMARK NOT DEFINED.
4. DELIVERABLES:....................................................................... ERROR! BOOKMARK NOT DEFINED.
5. EXCLUSIONS: ........................................................................... ERROR! BOOKMARK NOT DEFINED.
6. DURATION: .............................................................................. ERROR! BOOKMARK NOT DEFINED.
7. COMMERCIALS:....................................................................... ERROR! BOOKMARK NOT DEFINED.
7.1 PRICE FOR SCOPE OF WORK: .................................................. ERROR! BOOKMARK NOT DEFINED.
7.2 OTHER CHARGES: ................................................................... ERROR! BOOKMARK NOT DEFINED.
7.3 PAYMENT TERMS: ................................................................... ERROR! BOOKMARK NOT DEFINED.
7.4 TERMS & CONDITIONS:........................................................... ERROR! BOOKMARK NOT DEFINED.
7.5 TAXES & DUTIES ..................................................................... ERROR! BOOKMARK NOT DEFINED.
7.6 VALIDITY: ................................................................................ ERROR! BOOKMARK NOT DEFINED.
8. CONTACTS ............................................................................... ERROR! BOOKMARK NOT DEFINED.
APPENDIX 1. TERMS AND CONDITIONS ............................................. ERROR! BOOKMARK NOT DEFINED.

PROPRIETARY NOTICE
2015 Barry-Wehmiller Corp. This document is the intellectual property of Barry-Wehmiller International and not to be copied, reproduced or
distributed under penalty of law without prior written approval of B-WI. Barry-Wehmiller International, 8020, Forsyth Blvd. St. Louis, MO 63105
Page 2
1. EXECUTIVE SUMMARY
Alhajiry GroupLLC, Oman, is participating in the bid for Liquid mud plant foundation for the
flowing enquiry:

Consultant : Tebodin and Partner LLC (order No: 30032.00 Dated 07 Dec 2015)
Client : Alhajiry Group LLC, Oman
Company : Multi discipline Company Muscat, Oman
Project : DD for Gas line to TRC
Document title : Requisition for FMS

Barry Wehmiller International (B-WI), Chennai India, is supporting SSP to prepare the
document required for the bid, requested vide email lastly dated 5 th Jan 2016. B-WI is providing
the pre-bid support.

2. SCOPE OF THIS DOCUMENT

1. Tentative MTO for Foundation


2. Tentative MTO for Road

Exclusion:

P&ID is excluded from the list since the PEFS provided in the input is elaborate and can
be followed
Control and automation Since this was informed to be taken care by vendor

3. TENTATIVE FOUNDATION DRAWING


The Sample Foundation drawing for the OBM AREA - I is provided as additional document.
The Foundation is maintained as 73 x 33.5 m as per the guideline document provided as
input(approx.).

PROPRIETARY NOTICE
2015 Barry-Wehmiller Corp. This document is the intellectual property of Barry-Wehmiller International and not to be copied, reproduced or
distributed under penalty of law without prior written approval of B-WI. Barry-Wehmiller International, 8020, Forsyth Blvd. St. Louis, MO 63105
Page 3
4. PRELIMINARY MTO FOR CIVIL
The preliminary CIVIL MTO is attached as Annexure 1. Soil Excavation, Well graded soil fill,
Reinforced cement concrete (RCC), Plain cement concrete, Additional quantity as per standard
practices can be included for contingencies.

PROPRIETARY NOTICE
2015 Barry-Wehmiller Corp. This document is the intellectual property of Barry-Wehmiller International and not to be copied, reproduced or
distributed under penalty of law without prior written approval of B-WI. Barry-Wehmiller International, 8020, Forsyth Blvd. St. Louis, MO 63105
Page 4
ANNEXURE - 1

PROPRIETARY NOTICE
2015 Barry-Wehmiller Corp. This document is the intellectual property of Barry-Wehmiller International and not to be copied, reproduced or
distributed under penalty of law without prior written approval of B-WI. Barry-Wehmiller International, 8020, Forsyth Blvd. St. Louis, MO 63105
Page 5
1.1 PURPOSE

The purpose of this report is to Tentative MTO analysis, design & estimation of the Raft
foundation (Concrete pad), supporting the LMP tanks.

1.2 CODES AND STANDARDS

Design Code Description


Structural use of concrete - Code of practice for design and
BS : 8110-Part 1
construction
Structural use of concrete - Code of practice for special
BS : 8110-Part 2
circumstances
Structural use of concrete - Design charts for singly
BS : 8110-Part 3 reinforced beams, doubly reinforced beams and rectangular
columns

1.3 UNITS

The SI units are followed for the analysis and design.

1.4 MATERIAL DATA

Yield strength
Description Material
Fy (N/mm2 )
Structural Rebar Fe 460 460

Compressive
Description Material strength
fck (N/mm2 )
Structural Rebar C 30 30

1.5 METHODOLOGY

Structure was analyzed as three dimensional framed structures, it was modeled by using
STAAD.Pro software, basic loads were applied in the model and all the critical load
combinations were considered in the analysis and design of the structure.

Size of the foundation (73m x 33.5m) and basic loads are considered based on the input
documents.

Soil Subgrade modulus is considered as 8000kN/m3

PROPRIETARY NOTICE
2015 Barry-Wehmiller Corp. This document is the intellectual property of Barry-Wehmiller International and not to be copied, reproduced or
distributed under penalty of law without prior written approval of B-WI. Barry-Wehmiller International, 8020, Forsyth Blvd. St. Louis, MO 63105
Page 6
1.6 MTO CALCULATION

The MTO is calculated by the Raft foundation analysis and design.

SI.NO Items Quantity Unit


1 Soil Excavation 8500 m3
2 Well graded soil fill(225mm thick) 2100 m3
Plain cement Concrete (M5 - 1: 5:10)
3 Volume 1350 m3
4 Concrete (C 30) Volume 6375 m3
5 Reinforcement (Fe 460) weight 365 ton

PROPRIETARY NOTICE
2015 Barry-Wehmiller Corp. This document is the intellectual property of Barry-Wehmiller International and not to be copied, reproduced or
distributed under penalty of law without prior written approval of B-WI. Barry-Wehmiller International, 8020, Forsyth Blvd. St. Louis, MO 63105
Page 7

You might also like