Professional Documents
Culture Documents
1. SET UP:
2. OBJECTIVES:
3. FUNDING MODEL:
4. FULFILLMENT OF OBJECTIVES:
A. Bridge Chair
5. BENEFITS DERIVED:
Bridge Engineering
C. Consultancy provided
Chenab Bridge
Gambhir Bridge
Ganga Bridge at Patna & Munger
Vehicle Dynamics
1. SET UP:
Railway Technology Cell at IIT Kanpur: Set up in 2001 in the field of Geo
Tech and Bogie Design for a period of 5 years which was automatically
extended for five more years. MOU with IIT/Kanpur has been again renewed
from 04.01.2011 to 03.01.2016 vide Railway Board letter No.
99/E&R/3400/18 dated 16.07.2012.
2. OBJECTIVES:
3. FUNDING MODEL:
4. BENEFITS DERIVED:
5. FULFILLMENT OF OBJECTIVES:
Geo Tech:
The following three new projects have been formulated with IIT/Kanpur and
draft MoUs have been signed:-
Effect of seismic forces on Railway embankment and its remedy
Design of Railway Embankment on Soil Prone to Liquefaction
Design of Micro piles to Stabilize Railway Embankment
Bogie design