You are on page 1of 14

Station: NTPC- Simhadri BHEL Ref No.

PS-DC-186-500-100
Sheet 1 of 12
NTPC Ref no SIM/1/TS/2/100
Plant area: TURBINE
Testing Schedule : TURBINE ON BARRING GEAR.
SLNO

1.0 PLANT DETAILS

2.0 OBJECTIVE

3.0 PROPOSAL

4.0 SERVICES REQUIRED

5.0 SAFETY PERECAUTIONS

6.0 EMERGENCY PROCEDURE

7.0 STAE OF THE PLANT

8.0 TEST METHOD

9.0 COMPLETION CRITERIA

10.0 APPENDICES

a. TECHNICAL SPECIFICATION

b. DRAWING

c. LOG SHEET
Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-100
Sheet 2 of 12
NTPC Ref no SIM/1/TS/2/100
Plant area: TURBINE
Testing Schedule : TURBINE ON BARRING GEAR
SLNO STATUS

1.0 PLANT DETAILS:

1.1 Turbine and Generator Train is supported on 6 No of bearings,


thurst bearing at HP rear.

1.2 Oil pumps for lubrication consisting of 2 Nos Aux. Oil pumps, one
No. of DC EOP and one number Main oil pump with connected
pipe lines.

1.3 Jacking oil pumps two AC driven one DC driven with connected
pipe lines.

1.4 Oil tank to hold the required quantity of oil.

1.5 Auxiliary oil pumps, Jacking oil pumps and oil vapour exhaust
fans 2 nos are mounted on the top of oil tank.

1.6 Level gauge and probes are installed to indicate and give alarm
whenever the level variation is there from low to high.

1.7 One number duplex filter is there in the oil line to thrust bearing to
prevent the solid partides more than 37 mic. entering into the
thrust bearing.

1.8 One number bucket filter is installed inside the oil tank.

1.9 Throttles are there to regulate the oil flow into the bearings and
one throttle at discharge of pumps to adjust the oil pressure of lub
oil header.

Signatures

NTPC BHEL
Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-100
Sheet 3 of 12
NTPC Ref no SIM/1/TS/2/100
Plant area: TURBINE
Testing Schedule : TURBINE ON BARRING GEAR
SLNO STATUS

1.10 Two numbers of coolers are there to maintain the lub oil
temperature along with temperature control valve.

1.11 One number oil turbine is mounted on the IP rear coupling to run
the shat system at low speed during startup and shutdown of
turbine. Provision for hand baring is also available.

1.12 One number pressure relief valve in the Jop line.

1.13 One number NRV in Jop line going to each bearing.

Signatures

NTPC BHEL
Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-100
Sheet 4 of 12
NTPC Ref no SIM/1/TS/2/100
Plant area: TURBINE
Testing Schedule : TURBINE ON BARRING GEAR
SLNO STATUS

2.0 OBJECTIVE:

To rotate the turbine rotor system continuously on low speed


during start up and shutdown of the machine. This is to over
come the break away torque during startup and enable uniform
cooling of the rotor system during shutdown to prevent distortion
of rotor.

Signatures

NTPC BHEL
Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-100
Sheet 5 of 12
NTPC Ref no SIM/1/TS/2/100
Plant area: TURBINE
Testing Schedule : TURBINE ON BARRING GEAR
SLNO STATUS

3.0 PROPOSAL:

To run the barring gear for 8 hours continuously for observing the
performance.

Signatures

NTPC BHEL
Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-100
Sheet 6 of 12
NTPC Ref no SIM/1/TS/2/100
Plant area: TURBINE
Testing Schedule : TURBINE ON BARRING GEAR
SLNO STATUS

4.0 SERVICES REQUIRED:

4.1 Auxiliary oil pump

4.2 DC Emergency oil pump

4.3 Jack oil pumps AC & DC

4.4 oil Vapour fans

4.5 Power and control supply for the above.

4.6 Gate valve gearing with power supply.

4.7 Cooling water to oil coolers.

4.8 Availability of oil temperature controller.

4.9 Required operating personnel.

4.10 Availability of fire fighting system.

4.11 Proper lighting arrangement in all the floors.

4.12 All working areas shall be free of debris.

Signatures

NTPC BHEL
Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-100
Sheet 7 of 12
NTPC Ref no SIM/1/TS/2/100
Plant area: TURBINE
Testing Schedule : TURBINE ON BARRING GEAR
SLNO STATUS

5.0 SAFETY PRECAUTIONS:

5.1 Availability of first Aid kit.

5.2 Group carryingout the operation shall be aware of the procudure.

5.3 The other agencies working in the operating area shall be


cautioned about the activity.

Signatures

NTPC BHEL
Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-100
Sheet 8 of 12
NTPC Ref no SIM/1/TS/2/100
Plant area: TURBINE
Testing Schedule : TURBINE ON BARRING GEAR
SLNO STATUS

6.0 EMERGENCY PROCEDURE:

6.1 The operating personnel shall be aware of steps to be taken


during power supply failure and oil pumps tripping.

6.2 They shall also be aware of the procedure to be followed in case


of accident involving injury to personnel.

6.3 They shall intimate the abnormal condition of the equipments to


shift incharge.

Signatures

NTPC BHEL
Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-100
Sheet 9 of 12
NTPC Ref no SIM/1/TS/2/100
Plant area: TURBINE
Testing Schedule : TURBINE ON BARRING GEAR
SLNO STATUS

7.0 STATE OF THE PLANT:

7.1 Any one of AOPs is in service and the other is kept on standby.

7.2 DC emergency oil pump is on auto mode.

7.3 Any one of JOPs is in service and the other is kept on standby.

7.4 DC Jop is kept on auto mode.

7.5 Oil temperature controller is put on auto.

7.6 Coolers are charged with cooling water.

7.7 All instrumentations are kept in service.

7.8 Machine is ready for bearing gear operation.

7.9 Open and close limit switches of gate valve gearing is set and the
operation of valve is checked.

7.10 Throttles in the lub oil line to individual bearing are set for its
required flow. Turbovisory instruments are calibrated & ready for
barring operation.

Signatures

NTPC BHEL
Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-100
Sheet 10 of 12
NTPC Ref no SIM/1/TS/2/100
Plant area: TURBINE
Testing Schedule : TURBINE ON BARRING GEAR
SLNO STATUS

8.0 METHOD:

8.1 Set the throttle for the oil system to maintain the lub oil header
pressure to the required valve.

8.2 Set the throttles in the lub oil lines to individual bearings to
maintain the required flow to the bearings. Ensure the oil flow
through view glass in the return line.

8.3 SGC of oil system is commissioned.

8.4 SLC of pumps is commissioned and the auto change over of oil
pumps is established.

8.5 Check the functioning of oil temperature controller

8.6 Adjust the pressure control valve in the Jop discharge line to
maintain the required header pressure.

8.7 Check the SLC operation of Jack oil pumps.

8.8 Stop the Jack oil pump and mount dial gauges on the shaft
nearer to the bearings. This is to measure the lift of the shaft with
Job.

8.9 Start one Jop and notedown the lift of the shaft at each bearing. If
the lift is zero at any one of bearings adjust the isolating valve in
the Jop lines to bearings to alter the lift oil pressure and initiate
the lift. The lift should be at least 0.02 mm min, & 0.1 mm mas.
Mum.

8.10 Do hand barring and it should rotate freely. If it is found difficult,


check the lift again at all the bearings and improve the same if it
is zero at any of bearings.

Signatures

NTPC BHEL
Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-100
Sheet 11 of 12
NTPC Ref no SIM/1/TS/2/100
Plant area: TURBINE
Testing Schedule : TURBINE ON BARRING GEAR
SLNO STATUS

8.11 Hookup the interlock and protection for barring gear and check
the same.

8.12 Put the machine on baring gear first by opening the gate valve
gearing and then starting the Jop.

8.13 The speed of the shaft system shall increase and attain the
specified speed.

8.14 Check for any rubbing of seals and sound in the bearings by
means of hearing rod. If no sound is heared, allow it to run for
some time.

8.15 Stop the bearing gear by closing the gate valve gearing and note
down the coasting down time.

8.16 Again open the gate valve gearing and run the barring gear for 8
hrs to check its performance.

8.17 Notedown the following readings every hour.

1. Lub oil header pressure


2. Lub oil temperature
3. Thrust position.
4. Bearing and shaft vibration
5. Speed
6. Bearing babbit temperature.
7. Jop header pressure and the same at individual bearing.
8. Return oil temperature.

Signatures

NTPC BHEL
Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-100
Sheet 12 of 12
NTPC Ref no SIM/1/TS/2/100
Plant area: TURBINE
Testing Schedule : TURBINE ON BARRING GEAR
SLNO STATUS

9.0 COMPLETION CRITERIA:

If the above parameters for 8 hrs. barring is found normal, the


trial run of barring gear operation is successful.

Signatures

NTPC BHEL
TURBINE ON BARRING GEAR
Station: NTPC- Simhadri BHEL Ref No.PS-DC-
Sheet 2 of
NTPC Ref no SIM/
Plant area: TURBINE
Testing Schedule : TURBINE ON BARAING GEAR
SLNO STATUS

Signatures

NTPC BHEL

You might also like