You are on page 1of 2

REABILITARE DN1C DEJ - BAIA MARE COD: FCC-CATCAU

KM 61+500 KM 147+990 EDITIA 1


REVIZIA 0
CONTRACT 6R10
Beneficiar: CNADNR
Consultant: Ramboll Halcrow Luca Way

PROCES VERBAL DE ARMARE/

(Protocol for reinforcement)

Nr./ No. ____1____ Data /Date _______26.06.2017________

Incheiat astazi/ Closed today _________26.06.2017__________

Pozitia /Location: Obiect/Element:


Object/Element:
Km 111+216.50 Consolidare Piloti 1000, km 111+216.50 km 111+255.80
Km 111+255.80

Descrierea lucrarii /Description of Work: ARMARE GRINDA CORONAMENT NR. 1 PILOTI:


P1P8

...
Documente de executie /Works Documents (proiect, plansa, etc/ project, drawing, etc)
PLANSA: C08 revizia D - Plan armare grinzi coronament

Documente atasate /Attached Documents:


DECLARATIE DE CONFORMITATE Nr. 498/25.05.2017, PENTRU OTEL BETON FASONAT;

S-au verificat urmatoarele/The following shall be checked:

Numarul, diametrul si pozitia armaturilor in diferitele sectiuni transversale ale elementelor structurii/Number, diameter
and position of reinforcement in various cross-sectional areas of structure element

........CORESPUNDE CU PLANUL DE ARMARE SI EXTRASUL DE ARMATURA DIN PLANSA DE


EXECUTIE: .. C08 revizia D ...
...............................................................................................................................................................................................
...............................................................................................................................................................................................
Distanta dintre etrieri, diametrul acestora si modul lor de fixare / Distance between stirrups, their diameter and fixing
...............................................................................................................................................................................................
...............................................................................................................................................................................................

Lungimea portiunilor de bare care depasesc reazemele sau care urmeaza a fi inglobate in elemente care se toarna
ulterior / Length of rebar sections that exceed the bearings and will be further embedded in the elements to be
concreted:.........Nu este cazul.....................................................................................................................................

Page 1 of 2
Pozitia innadirilor si lungimile de petrecere ale barelor / Position of splices and overlapping lengths of rebars

.............Corespunde cu planul de armare.........

Calitatea sudurilor/Welds quality


...............................................................................................................................................................................................
...............................................................................................................................................................................................

Numarul si calitatea legaturilor dintre bare /Number and quality of ties between rebars
.Corespunde cu planul de armare..

Dispozitivele de mentinere a pozitiei armaturilor in cursul betonarii /Blocking devices for maintaining rebars in
position during concreting:

Nu este cazul..

Modul de asigurare a grosimii stratului de acoperire cu beton si adimensiunile acestuia /Ensure the thickness of
concrete cover and its dimensions

.S-au montat distantieri pentru a se asigura acoperirea cu beton conform cu proiectul ..


...................................................................................................................................................................................

Pozitia modul de fixare si dimensiunile pieselor inglobate/Position, fixing and dimensions of embedded items

...............................................................................................................................................................................................
...............................................................................................................................................................................................

Upon the documents reviewing and the checking on site the following conclusions have been drawn /Din verificarile
efectuate pe teren si examinarea documentelor au rezultat urmatoarele:

Se poate trece la betonarea grinzii de coronament cu beton clasa C35/45.......

The following actions will be taken /Se vor lua urmatoarele masuri :.
Dupa turnare, betonul se va proteja conform NE012/2010.

Remarks/Mentiuni speciale: .

CONTRACTOR / EXECUTANT BENEFICIAR/ EMPLOYER PROIECTANT/ DESIGNER SUBCONTRACTOR

Firma/ Company:

Nume/Name Semnat./Sign. Nume/Name Semnat/Sign Nume/Name Semnat/Sign Nume/Name Semnat/Sign


MANAFU
Angela-CQ
BARBATEI
Ioan-RTE

S-au realizat masurile dispuse/The disposed actions have been accomplished: Da/Yes Nu/No

Data /Date: _________________ BENEFICIAR/EMPLOYER


Semnatura /Signature ___________________