General description
DM1 circuit breaker cubicle
1. Top busbar compartment
2. LV compartment
3. Switchgear compartment: feeder
disconnector
4. Operating mechanism compartment
5. Cable connection or lower busbar
compartment
A. Earth bar connection pad
B. Top busbar connection pads
C. Inspection windows
D. SF1 type MV Circuit Breaker
E. Front panel

Schneider Electric - Services Division SM6 Cubicle Training March 2015 3


General description
DM1A Version (cable incoming or outgoing)
(front panel removed)

F. Voltage indicator
G. Voltage transformers
H. Current transformer
K. Load-side earthing switch
L. Capasitive voltage diveders
M. CB control panel
N. Insulating shields

Schneider Electric - Services Division SM6 Cubicle Training March 2015 4


Handling instructions
Cubicle identification

A. Indicator plate Serial number


B. Characteristics and designation
D1: riveted to the front plate of the
C. Manufacturers name plate operating mechanism
NB:The characteristics of the CB D2: glued to the back of the front
are given on its plate
plate of the LV compartment
D3: glued to the upright of the frame

Schneider Electric - Services Division SM6 Cubicle Training March 2015 5


Handling instruction
Caution

Do not handle the cubicle from the front control panel.

Schneider Electric - Services Division SM6 Cubicle Training March 2015 6


Handling instruction
Dimensions

In mm.

Schneider Electric - Services Division SM6 Cubicle Training March 2015 7


Installation instruction
Layout in the substation

Switchboard installed to the right of a Switchboard installed to the left


wall of a wall
*(minimum clearance for trouble-
operation)

Schneider Electric - Services Division SM6 Cubicle Training March 2015 8


Installation instruction
Fitting busbars after installing the cubicles

Mounting of U - fittings
Single - hole U - fitting

Mount the 3 U fittings on the using M8x30 bolts (female


suppporting insulators hexagonal) without locking

Schneider Electric - Services Division SM6 Cubicle Training March 2015 9


Installation instruction
Fitting busbars after installing the cubicles

Mounting of U - fittings
Two - hole U - fitting

Mount the 3 U fittings on the heart using M8x30 bolts (female


of the unit hexagonal) without locking

Schneider Electric - Services Division SM6 Cubicle Training March 2015 10


Installation instruction
Fitting of bars

Place the bars as shown in


the diagram opposite

Schneider Electric - Services Division SM6 Cubicle Training March 2015 11


Installation instruction
Fitting of bars

Version < = 12kV


Identical for single hole U -
fittings

Fit the bars and then the nuts Lock the bolts V for fixing U-
and bolts fittings after all fitted
Tightening torque: 28 Nm Tightening torque: 28 Nm

Schneider Electric - Services Division SM6 Cubicle Training March 2015 12


Installation instruction
Fitting of bars

Version > 12kV


Identical for single hole U
fittings
Note: fitting is identical for Place the field distributors correctly on Incorrect fitting
single-hole or two-hole U fittings the U-fitting
(use fool proofing device to ensure
correct placing)

Fit bars and then nus and bolts


Tightening torque: 28Nm

Lock the bolts V for fixing the U-


fittings after all the bars have been
fitted
Tightening torque: 28Nm

Schneider Electric - Services Division SM6 Cubicle Training March 2015 13


Installation instruction
Top busbar of a DM1A

Schneider Electric - Services Division SM6 Cubicle Training March 2015 14


Installation instruction
Fittting the earth bars

Connect the earth bars together Earth the substation frames


(using HM 8x30 bolts) in either of these two ways

Schneider Electric - Services Division SM6 Cubicle Training March 2015 15


Start-up & operating instructions
Checks before energising

Check that nothing has been left


in the connection compartment.

Put the front panel back in place

Schneider Electric - Services Division SM6 Cubicle Training March 2015 16


Start-up & operating instructions
Voltage indicators

Incoming cubicle: Outgoing panel:


As soon as the load side of the After the feeder disconnector and
insallation is energised, the then the CB have been set to the
voltage indicator lamps should closed position, the voltage
go on indicator lamps should go on

Schneider Electric - Services Division SM6 Cubicle Training March 2015 17


Start-up & operating instructions
Phase concordance test

If the phases concord, the lamp remains off.


If the phases do no concord, the lamp goes on.

Schneider Electric - Services Division SM6 Cubicle Training March 2015 18


Start-up & operating instructions
Feeder disconnector operating lever positions

Position the lever as indicated Position the lever as indicated


for downward (opening) for upward (closing) operations.
operations.

Schneider Electric - Services Division SM6 Cubicle Training March 2015 19


Start-up & operating instructions
CB no-load Operations
Initial status: 1. Lock the lever 2. Remove the key
insertion point E from B then insert
The feeder it at point C.
of the feeder
disconnector
disconnector with Unlock then
is in open or
the key inserted charge the CB
earth position.
at point B.
CB locked in
open position.

3. Press the CB by 4. Open CB by


pressingpush pressing
button I pushbotton
O.

Schneider Electric - Services Division SM6 Cubicle Training March 2015 20


Start-up & operating instructions
CB no-load Operation

5. Lock CB open with key in C 6. Remove the key from C


position by pressing the position and insert it in B.
pushbutton O. Unlock the opening of lever E
of the feeder disconnector.

Schneider Electric - Services Division SM6 Cubicle Training March 2015 21


Start-up & operating instructions
Energizing the load side of the installation
Initial status: 1. Set the feeder 2. Set the
disconnector to feeder
The feeder disconnector
open position
disconnector is in using the to closed
earth. CB is locked operating lever. position, then
open position. Front Note: in the case lock lever
panel in place. of a DM1A, the insertion
load earthing point E of
switch opens feeder
simultaneously. disconnector
with key to A.

3. Remove key from 4. Close CB by


A,place in C and pressing
unlock the CB. pushbutton I.
Charge the CB (see The load side
CB instructions). of the
installation is
energized.

Schneider Electric - Services Division SM6 Cubicle Training March 2015 22


Start-up & operating instructions
De-energizing the load side of the installation
Initial status:
1. Open CBby 2. Lock the CB
The feeder open with key
pressing
disconnector is in in C by
pushbutton O.
closed position. pressing
CB is closed. pushbutton O.

3. Remove key 4. Set feeder


from C & insert disconnector to
it in A. Unlock open position.
lever insertion
point E of
feeder
disconnector.

Schneider Electric - Services Division SM6 Cubicle Training March 2015 23


Start-up & operating instructions
De-energizing the load side of the installation

5. Set feeder disconnector to


earthed position. The front
panel can be removed.
Note: in the case of a DM1A,
the load earthing switch
closes simultaneously.

Schneider Electric - Services Division SM6 Cubicle Training March 2015 24


Start-up & operating instructions
Operating safety

Operation is impossible when If the feeder disconnector is


CB is closed. in open or closed position, the
front panel can not be
The front panel can not be
removed.
removed or installed unless
the feeder disconnector is in If the front panel is removed,
earth position. the feeder disconnector can
be set to open position.
However it can not be set to
closed position.

Schneider Electric - Services Division SM6 Cubicle Training March 2015 25


Start-up & operating instructions
Padlocking
With one to three 8 1. Padlocking 2. Padlocking
mm padlocks per feeder feeder
locking point. disconnector disconnector
in earth in open
position. position.

3. Padlocking 4. Padlocking
feeder of the front
disconnector panel.
in closed (1 padlock
position. only)

Schneider Electric - Services Division SM6 Cubicle Training March 2015 26


Maintenance instruction
Preventive maintenance
Never lubricate the operating mechanism.
No particular maintenance is required under normal operating
conditions.

Schneider Electric - Services Division SM6 Cubicle Training March 2015 27


Maintenance instruction
Corrective maintenance
Replacing a voltage indicator block:

Pull out the voltage indicator block.


(The switchboard can remain
energized).

Schneider Electric - Services Division SM6 Cubicle Training March 2015 28


Maintenance instruction
Troubleshooting chart
Voltage indicator not illuminated. Check the voltage indicator
block.
Check that the feeder
disconnector & the CB are
closed.
Check that the incoming cables
are live.
Front panel cant be opened or Check that the feeder indicator is
closed. in earth position.
Feeder disconnector cant be set Check that the feeder
to earth position. disconnector is in open position.

Feeder disconnector cant be set Check that the feeder


to closed position. disconnector is in open position.

CB cant be operated See CB instructions.

Schneider Electric - Services Division SM6 Cubicle Training March 2015 29


End Presentation

Schneider Electric - Services Division SM6 Cubicle Training March 2015 30

You might also like