The document discusses overcurrent relay grading calculations for different sections of a power system. It provides load current, fault current ranges, relay settings, and timing calculations to ensure downstream relays operate in time to isolate faults before upstream relays operate. Relay settings and timing are checked for sections A-B, B-C, and C-D to coordinate protection for primary and backup operation for faults along each section. Calculations confirm the relay pick-up settings and expected operation times meet coordination requirements.
The document discusses overcurrent relay grading calculations for different sections of a power system. It provides load current, fault current ranges, relay settings, and timing calculations to ensure downstream relays operate in time to isolate faults before upstream relays operate. Relay settings and timing are checked for sections A-B, B-C, and C-D to coordinate protection for primary and backup operation for faults along each section. Calculations confirm the relay pick-up settings and expected operation times meet coordination requirements.
The document discusses overcurrent relay grading calculations for different sections of a power system. It provides load current, fault current ranges, relay settings, and timing calculations to ensure downstream relays operate in time to isolate faults before upstream relays operate. Relay settings and timing are checked for sections A-B, B-C, and C-D to coordinate protection for primary and backup operation for faults along each section. Calculations confirm the relay pick-up settings and expected operation times meet coordination requirements.
Tail end >>>> To Source End (Radial System) :IDMT Over Current Relay Grading
Enter Data in White Background Cells
Trail end Last Bus Bar D
Load Current (IL) 160 Amp Min Fault Current 2000 Amp Max Fault Current 3000 Amp CT Ratio (Amp) for Relay-D 100 1 Curve Selection for Relay-D Normal Inverse (NI) Plug Setting of Relay-D 200% TMS of Relay-D 0.100 Sec Relay Error (%) 7.5% CT Error (%) 10.0% Over shoot 0.05 Sec C.B Interrupting Time 0.17 Sec Safety 0.33 Sec Total Time Grading: 0.58 Sec Expected Operaion Time of Relay-D 0.25 Sec
O/L Relay Setting for Section: D
Operating Time of Relay D at Max Fault at D
Over Load Current : 125% X IL Over Load Current :(In) 200 Amp Required Over Current Relay Plug Setting 2 2 A X In Actual Plug Setting of Over Current Relay (PMS): (I>) 2 2 A X In Plug Setting Multiplier (PSM): 15 Time Multiplier Setting: (TMS) 0.1 Time of Operation of Relay 2.52 Sec Actual Operaion Time of Relay D: (t>) 0.25 Sec Time Grading: 0.58 Sec Required Operaiting Time of Relay D at Max Fault at Bus-D 0.83 Sec
Operating Time of Relay D at Min Fault at D
Over Current Setting (PMS): 2 Plug Setting Multiplier (PSM): 10 Time Multiplier Setting 0.1 Time of Operation of Relay 2.97 Actual Operaion Time of Relay 0.30 Operating Time of Downsteam Relay 0.1 Time Grading: 0.575 Actual Operaion Time of Relay D at Min Fault at Bus-D 0.8 :Results: Pick Up Setting of Over Current Relay (I>): OK Pick Up Setting of Over Current Relay (I>): 2 A X In Time Multiplier Setting: (TMS) 0.100 Sec Expected Operaion Time of Relay: 0.25 Sec :IDMT Over Current Relay Grading Calculation (50/51): Jignesh.parmar, www.electricalnotes.w
Bus Bar Location C
Load Current 200 Amp Min Fault Current 3500 Amp Max Fault Current 4000 Amp CT Ratio (Amp) for Relay-C 300 1 Curve Selection for Relay-C Normal Inverse (NI) Plug Setting of Relay-C 100% TMS of Relay-C 0.28 Sec Relay Error (%) 7.5% CT Error (%) 10.0% Over shoot 0.05 Sec C.B Interrupting Time 0.10 Sec Safety 0.10 Sec Total Time Grading: 0.28 Expected Operaion Time of Relay-C 0.83 Sec
O/L Relay Setting for Section: C-D
Primary Protection for C-D Operating Time of Relay C at Max Fault at D Over Load Current : 125% X IL Over Load Current :(In) 250 Amp Required Over Current Relay Plug Setting 0.83 0.8 A X In Actual Plug Setting of Over Current Relay (PMS): (I>) 1 1 A X In Plug Setting Multiplier (PSM): 10 Time Multiplier Setting: (TMS) 0.28 Time of Operation of Relay 2.97 Sec Actual Operaion Time of Relay C: (t>) 0.83 Sec Time Grading: 0.28 Sec Required Operaiting Time of Relay D at Max Fault at Bus-C 1.10 Sec Backup Protection for D- Operation Time of Relay C at Min Fault at D Over Current Setting (PMS): 1 Plug Setting Multiplier (PSM): 6.67 Time Multiplier Setting 0.28 Time of Operation of Relay 3.62 Actual Operaion Time of Relay 1.01 Operating Time of Downsteam Relay 0.10 Time Grading: 0.28 Actual Operaion Time of Relay C at Min Fault at Bus-C 0.38 :Results: Pick Up Setting of Over Current Relay (I>): OK Relay Pick up Setting: (I>) 1 A X In Time Multiplier Setting: (TMS) 0.278 Sec Expected Operaion Time of Relay: 0.83 Sec Jignesh.parmar, www.electricalnotes.wordpress.com, jiguparmar@yahoo.com
Bus Bar Location B
Load Current 200 Amp Min Fault Current 3500 Amp Max Fault Current 4000 Amp CT Ratio (Amp) for Relay-B 300 1 Curve Selection for Relay-B Normal Inverse (NI) Plug Setting of Relay-B 100% TMS of Relay-B 0.42 Sec Relay Error (%) 7.5% CT Error (%) 10.0% Over shoot 0.05 Sec C.B Interrupting Time 0.10 Sec Safety 0.10 Sec Total Time Grading: 0.32 Expected Operaion Time of Relay-B 1.10 Sec
O/L Relay Setting for Section: B-C
Primary Protection for B-C Operating Time of Relay B at Max Fault at C Over Load Current : 125% X IL Over Load Current :(In) 250 Amp Required Over Current Relay Plug Setting 0.83 0.8 A X In Actual Plug Setting of Over Current Relay (PMS): (I>) 1 1 A X In Plug Setting Multiplier (PSM): 13 Time Multiplier Setting: (TMS) 0.418 Time of Operation of Relay 2.63 Sec Actual Operaion Time of Relay B: (t>) 1.10 Sec Time Grading: 0.32 Sec Required Operaiting Time of Relay C at Max Fault at Bus-B 1.42 Sec Backup Protection for C-D Operation Time of Relay B at Min Fault at C Over Current Setting (PMS): 1 Plug Setting Multiplier (PSM): 11.67 Time Multiplier Setting 0.42 Time of Operation of Relay 2.78 Actual Operaion Time of Relay 1.16 Operating Time of Downsteam Relay 0.28 Time Grading: 0.32 Actual Operaion Time of Relay B at Min Fault at Bus-B 0.60 :Results: Pick Up Setting of Over Current Relay (I>): OK Relay Pick up Setting: (I>) 1 A X In Time Multiplier Setting: (TMS) 0.418 Sec Expected Operaion Time of Relay: 1.10 Sec Bus Bar Location A Load Current 200 Amp Min Fault Current 3500 Amp Max Fault Current 4000 Amp CT Ratio (Amp) for Relay-A 300 1 Curve Selection for Relay-A Normal Inverse (NI) Plug Setting of Relay-A 100% TMS of Relay-A 0.54 Sec Relay Error (%) 7.5% CT Error (%) 10.0% Over shoot 0.05 Sec C.B Interrupting Time 0.10 Sec Safety 0.10 Sec Total Time Grading: 0.35 Expected Operaion Time of Relay-A 1.42 Sec
O/L Relay Setting for Section: A-B
Primary Protection for A-B Operating Time of Relay A at Max Fault at B Over Load Current : 125% X IL Over Load Current :(In) 250 Amp Required Over Current Relay Plug Setting 0.83 0.8 A X In Actual Plug Setting of Over Current Relay (PMS): (I>) 1 1 A X In Plug Setting Multiplier (PSM): 13 Time Multiplier Setting: (TMS) 0.540 Time of Operation of Relay 2.63 Sec Actual Operaion Time of Relay A: (t>) 1.42 Sec Time Grading: 0.35 Sec Required Operaiting Time of Relay B at Max Fault at Bus-A 1.78 Sec Backup Protection for B-C Operation Time of Relay A at Min Fault at B Over Current Setting (PMS): 1 Plug Setting Multiplier (PSM): 11.67 Time Multiplier Setting 0.54 Time of Operation of Relay 2.78 Actual Operaion Time of Relay 1.50 Operating Time of Downsteam Relay 0.42 Time Grading: 0.35 Actual Operaion Time of Relay A at Min Fault at Bus-A 0.77 :Results: Pick Up Setting of Over Current Relay (I>): OK Relay Pick up Setting: (I>) 1 A X In Time Multiplier Setting: (TMS) 0.540 Sec Expected Operaion Time of Relay: 1.42 Sec Bus Bar Location E Load Current 200 Amp Min Fault Current 3500 Amp Max Fault Current 4000 Amp CT Ratio (Amp) for Relay-E 300 1 Curve Selection for Relay-E Normal Inverse (NI) Plug Setting of Relay-E 100% TMS of Relay-E 0.67 Sec Relay Error (%) 7.5% CT Error (%) 10.0% Over shoot 0.05 Sec C.B Interrupting Time 0.10 Sec Safety 0.10 Sec Total Time Grading: 0.38 Expected Operaion Time of Relay-E 1.78 Sec
O/L Relay Setting for Section: E-A
Primary Protection for E-A Operating Time of Relay E at Max Fault at A Over Load Current : 125% X IL Over Load Current :(In) 250 Amp Required Over Current Relay Plug Setting 0.83 0.8 A X In Actual Plug Setting of Over Current Relay (PMS): (I>) 1 1 A X In Plug Setting Multiplier (PSM): 13 Time Multiplier Setting: (TMS) 0.674 Time of Operation of Relay 2.63 Sec Actual Operaion Time of Relay E: (t>) 1.78 Sec Time Grading: 0.38 Sec Required Operaiting Time of Relay A at Max Fault at Bus-E 2.16 Sec Backup Protection for A-B Operation Time of Relay E at Min Fault at A Over Current Setting (PMS): 1 Plug Setting Multiplier (PSM): 11.67 Time Multiplier Setting 0.67 Time of Operation of Relay 2.78 Actual Operaion Time of Relay 1.87 Operating Time of Downsteam Relay 0.54 Time Grading: 0.38 Actual Operaion Time of Relay E at Min Fault at Bus-E 0.92 :Results: Pick Up Setting of Over Current Relay (I>): OK Relay Pick up Setting: (I>) 1 A X In Time Multiplier Setting: (TMS) 0.674 Sec Expected Operaion Time of Relay: 1.78 Sec