Professional Documents
Culture Documents
New ERP
Database Disk Failure
Implementation
- Considerable Downtime
- Install new Disk/Server
N
1 N
Raid Config 2
Cold Backup
Application
Y Y
- No Downtime
- Replace Disk Restore the cold 3 N Data is available
up to last full
backup Archive Logs backup
AMC Server/Raid Y
Controller or All
Disaster Recovery Plan Disks Failure
Apply archive logs
for ERP and there will be
no significant data
loss
APPS
DB or Apps
N
DB 5
Data Guard
Y
N 4
Off Site Full Site/Building Switch to Standby
Legends (Color):- Backup Disaster Database
----- Completed
Y
----- Deliverable
N 6
DR Site
Y
Switch to DR Site
----- Ultimate Disaster Note:- All deliverables will be completed as per mentioned order