Start Here

New ERP
Database Disk Failure
Implementation
- Considerable Downtime
- Install new Disk/Server

N
1 N
Raid Config 2
Cold Backup
Application
Y Y
- No Downtime
- Replace Disk Restore the cold 3 N Data is available
up to last full
backup Archive Logs backup

AMC Server/Raid Y
Controller or All
Disaster Recovery Plan Disks Failure
Apply archive logs
for ERP and there will be
no significant data
loss

APPS
DB or Apps

N
DB 5
Data Guard

Y
N 4
Off Site Full Site/Building Switch to Standby
Legends (Color):- Backup Disaster Database

----- Completed
Y

----- Deliverable
N 6
DR Site
Y
Switch to DR Site

----- Disaster Occurred


- Buy and Install New Server
- Restore the last backup

----- Ultimate Disaster Note:- All deliverables will be completed as per mentioned order