Learning Outcome
LearningOutcome

Students will able to:


Studentswillableto:
UnderstandtheconceptofIPR
Differentiatethemethodusedforcalculatingsinglephase
Differentiate the method used for calculating single phase
flowandtwophaseflowIPR
ConstructtheIPRcurve
Construct the IPR curve
Identifythefluidphaseforaparticulargivencondition

CHAPTER 2: RESERVOIR SYSTEM (2) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Contents
ProductivityIndex(PI)
HydrocarbonPhaseBehavior
InflowPerformanceRelationship(IPR)
p( )

CHAPTER 2: RESERVOIR SYSTEM (3) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

FluidInflow

Fluidinflowistheflowofliquidfromformationtothe
bottomhole.
Theflowofliquidsareaffectedby4mainfactors:
Reservoirfluidproperties(physical&chemicalproperties).
P,T,composition,etc.
Physical&Geometricalpropertiesofreservoirrocks.P,T,
composition,structure,overburden,cementing,
compaction etc
compaction,etc.
Pressuredifferential(P=Pf Pw)
Wellgeometry,spacing,productionarea@P
Well geometry spacing production area @ Pf

CHAPTER 1: INTRODUCTION (4) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Productivity Index (PI)


ProductivityIndex(PI)
ThePIexpresstheabilityofproductionofthewell.
Provideameasureofthecapabilityofareservoirtodeliver
fluidstothebottomofawellboreforproduction.
Itdefinestherelationshipbetweenthesurfaceproduction
rateandthepressuredropacrossthereservoir,knownas
thedrawdown.
q
PI J (21)
Ps Pwf
where:
PI =productivityindex,STB/(day)(psi)
q =producingflowrate,STB/day
Ps = reservoir static pressure psi
=reservoirstaticpressure,psi
Pwf =flowingbottomholepressure,psi
CHAPTER 2: RESERVOIR SYSTEM (5) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

Productivity Index (ctd)


ProductivityIndex
Forradialflowandstrongwaterdriveorgascapreservoir
where flow tend to reach steady state flow (from Eqn 13):
whereflowtendtoreachsteadystateflow(fromEq 1 3)

q 0 007082kh
0.007082
PI J .. (22)
Ps Pwf re
Bo ln(( )
rw

PIwillbeaconstantif,Bo &kremainconstant.AplotofP
vs qshouldbeastraightlineofslope1/PIwithanintercept
on the ordinate axis of Pe.
ontheordinateaxisofP

CHAPTER 2: RESERVOIR SYSTEM (6) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Productivity Index (ctd)


ProductivityIndex

Pe

Slope = 1/PI
Slope=
P

q
Productivity Index
ProductivityIndex

CHAPTER 2: RESERVOIR SYSTEM (7) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Productivity Index (ctd)


ProductivityIndex
Forpseudosteadystateflow(fromEqn 14):
q 0.007082kh
PI J (23)
Ps Pwf B (ln re 1
)
o (l
rw 2
Intermsofaveragereservoirpressure,P
I t f i Pavg orP
Pr:

q 0 007082kh
0.007082
PI J (24)
( )
Pr Pwf B (ln re 3 )
o
rw 4

CHAPTER 2: RESERVOIR SYSTEM (8) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Productivity Index (ctd)


ProductivityIndex
Again,providedthefluidandrockproperties(,Bandk)
areconstant,thePIshouldbeconstant,irrespectiveofthe
t t th PI h ld b t t i ti f th
degreeofdepletion.Thus,asforthesteadystatecase,a
straight line relationship exists between P and q
straightlinerelationshipexistsbetweenPandq.

Forgaswell:
qg 0.703k g h
PI J (25)
( )
( Ps 2 Pwf 2 ) re
T ( g z ) avg ln( )
rw

CHAPTER 2: RESERVOIR SYSTEM (9) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Productivity Index (ctd)


ProductivityIndex
Wherethegasflowrate,qg (MSCF/day):

k g h( Pe 2 Pw2 )
qg
re
1422T ( g z ) avg ln( )
rw

PIwillremainconstantifnochangeinthefluidand
reservoirproperties.IfagraphofP2 vs qisdrawn,a
straightlineshouldresultofslope1/PI.

CHAPTER 2: RESERVOIR SYSTEM (10) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Productivity Index (ctd)


ProductivityIndex

Pe2
Slope= 1/PI

P2

AbsoluteOpenFlow
Potential (AOFP)
Potential(AOFP)

qg qo

Gas well productivity relationship


Gaswellproductivityrelationship

CHAPTER 2: RESERVOIR SYSTEM (11) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Productivity Index (ctd)


ProductivityIndex
PIspecific,PIs (STB/(day)(psi)(ft):

PI q
PI s J s (26)
( )
h h( Ps Pwf )

Example2.1
Afieldisdrilleduponarectangular80acrespacing.The
reservoirpressure(Ps)is1000psi,k=50md,h=20ft, =3cp,
Bo =1.25bbl/STB.Thewellsarecompletedwith7incasing.If
= 1 25 bbl/STB The wells are completed with 7 in casing If
theproducingpressureatthebottomofthewellis500psi,(a)
whatistheproductionrateofthewell,(b)thePI,and(c)the
p ,( ) , ( )
specificPI.
CHAPTER 2: RESERVOIR SYSTEM (12) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

Productivity Index (ctd)


ProductivityIndex
Ifthereisgasinfluidflow,thefluidisnolonger
iincompressible,PInotconstantandthissituationhappen
ibl PI t t t d thi it ti h
whenPs <Pb.PIbecomes:
ddq (27)
PI
dPwf
Ifthereiswaterinoilflow(oilandwatermix):
(qo qw ) (28) (2 8)
PI
( Ps Pwf )

CHAPTER 2: RESERVOIR SYSTEM (13) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Productivity Index (ctd)


ProductivityIndex
Foroilwatermix&radialflow(steadystate):
(qo qw ) 0.007082h ko kw (29)
PI ( )
Ps Pwf re
ln( ) o Bo w Bw
rw
FFortwoproductioncondition:
t d ti diti
( PI )1 ( ko / o Bo )1
....(210)
(2 10)
( PI ) 2 ( ko / o Bo ) 2
ToestimatethePI,Lewis&Hornerequationcanbeused:
T ti t th PI L i & H ti b d

4 kh
PI 5
5.9*10
9*10 ( ) ....(211)
(2 11)
o Bo
CHAPTER 2: RESERVOIR SYSTEM (14) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

Productivity Index (ctd)


ProductivityIndex
FactorsinfluencingPI.
ProductionGOR
Pressuredepletion
CumulativeProduction
OilSaturation(So willaffecttheeffectiveandrelativepermeabilityof
th fl id)
thefluid)

Generally,PIwilldecreasewithtime&Pbecause:
Turbulenceduetoincreasingofflowrate.
OilpermeabilitydecreaseduetopresentofgaswhenPdecrease
nearthewellbore.
o increasewithpressuredepletionbelowPb.
Permeabilitydecreaseduetoformationcompression.
CHAPTER 2: RESERVOIR SYSTEM (15) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

Productivity Index (ctd)


ProductivityIndex
FuturePI:
kro
( )f
o Bo (211)
PI f PI p
kro
( )p
o Bo
where:
h
1.8 PI
PI p
Pwf
1 0.8( )
Pavg

CHAPTER 2: RESERVOIR SYSTEM (16) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

HydrocarbonPhaseBehavior
Hydrocarbon Phase Behavior
HCreservoirfluid:complexmixtureofHCmolecules.
Compositiondependon:
C iti d d
Sourcerock
Maturationdegree
Maturation degree
P&T
PhasechangefromHPHT
Phase change from HPHT cool&lowpressure
cool & low pressure effectto
effect to
performance
Singlephaseinreservoir(liquidphase)
Single phase in reservoir (liquid phase)
Remainssinglephase(liquid)atwellbore(significantreduction
inP&smallchangeinT@flowinreservoir(singlephase
region)) ))
StartstoevolvegasasT&Preduced@flowupintubing
(bubble point)
(bubblepoint)
Evolvesincreasingamountofgasuntilseparator(twophase
region)
CHAPTER 2: RESERVOIR SYSTEM (17) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

Hydrocarbon Phase Behavior (ctd)


HydrocarbonPhaseBehavior

1. Singlephaseinreservoir(a)
g p ( )
2. Remainssinglephaseliquidatwellbore(significantreductionin
P&smallchangeinT@flowinreservoir(a b)
3 StartstoevolvegasasT&Preduced@flowupintubing(c)
3. St t t l T & P d d @ fl i t bi ( )
4. Evolvesincreasingamountofgas(de)untilseparator(f)
CHAPTER 2: RESERVOIR SYSTEM (18) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

Hydrocarbon Phase Behavior (ctd)


HydrocarbonPhaseBehavior
PossiblePhaseChangesinProductionFlowSystem

CHAPTER 2: RESERVOIR SYSTEM (19) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Inflow Performance Relationship (IPR)


InflowPerformanceRelationship(IPR)
TheIPRisdefinesasthefunctionalrelationshipbetweenthe
production rate and the flowing bottom hole pressure
productionrateandtheflowingbottomholepressure.
AlwaystermedasIPRCurve;aplotofPwf vs q(Pwf on
verticalaxisandqonhorizontalaxis).
ti l i d h i t l i)
FromthedefinitionofPI
q
Pwf Ps
PI
Ps isconstant,andifPIalsoassumedtobeconstant,the
relationshipbetweenP
relationship between Pwf &qislinearwithanegativeslopeof
& q is linear with a negative slope of
1/PI.

CHAPTER 2: RESERVOIR SYSTEM (20) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

IPR (ctd)
IPR

Slope= 1/PI

TypicalIPRCurveforIncompressibleFluid
CHAPTER 2: RESERVOIR SYSTEM (21) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

IPR (ctd)
IPR
Whenq=0,Pwf =Ps (noflow).
WhenPwf =0,q=Ps*PI=qmax
(absoluteopenflowpotential AOFP)
Ps
AOFPisthemaximumratethatthe
Slope = - 1/PI
formationcandeliverfluidtothe
borehole. Pwf
ThefigureisatypicalIPRcurvefor Absolute Open
flow potential
radialflowequationforsinglephase,
incompressiblefluid.
Fromthefigure: q qmax
qmax
tan PI
Ps
CHAPTER 2: RESERVOIR SYSTEM (22) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

Example 22
Example2 2
Given:
Permeability,k
P bili k = 30mD
30 D
Paythickness,h = 40ft
Average reservoir pressure Pr
Averagereservoirpressure,P = 3000 psi
3000psi
Reservoirtemperature,T = 200oF
Well spacing A
Wellspacing,A = 160 acres
160acres
Drilledholesize,D = 12in(openhole)
Formation volume factor, B
Formationvolumefactor,B = 1.2 bbl/STB
1.2bbl/STB
Oilviscosity, = 0.8cp
Skinfactor,St
, = 0
Calculate:AbsoluteOpenFlowPotentialandPI
PlotIPRcurve.

CHAPTER 2: RESERVOIR SYSTEM (23) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

IPR (ctd)
IPR
Formostwell,IPRcurveisnotalinearrelationship,because
PI decrease when q increase and pressure depleted
PIdecreasewhenqincreaseandpressuredepleted.
PIdecreasewithpressuredepletion.
Thismethod(PImethod)ofpredictingIPRisonlycanbeused
forsinglephaseflow(Ps >Pb).ForsolutiongasreservoiratPs
<Pb,Vogel method isapplicable.

CHAPTER 2: RESERVOIR SYSTEM (24) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

IPR GasFlow
IPR Gas Flow
Compressiblefluid IPRnotstraightline
CanbederivedfromDarcyLawbyusingaverageproperties
betweenreservoir&wellbore(lowq):
( 2 Pwf2)
q=C(Pr
C=constant
ForhigherflowrateduenonDarcy(turbulentflow)effect
For higher flow rate due nonDarcy (turbulent flow) effect
fieldobservation BureauofMineseq:
( 2 Pwf2)n
q=C(Pr
q
n=0.5 1.0
Loglogplotofqvs (Pr2 Pwf2) straightlinewith:
Slope=n
l
Intercept=C
Standardtestforgaswell:measureP
Standard test for gas ell meas re Pwf at4productionrate.
at 4 prod ction rate

CHAPTER 2: RESERVOIR SYSTEM (25) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

IPR 2Phase(Gas
IPR 2 Phase (GasLiquid)
Liquid)Flow
Flow
Saturatedreservoir
Vogelequationforsolutiongasdrivewellscanbeused:
Vogel equation for solution gas drive wells can be used:
q/qmax =1 0.2(Pwf/Pr)0.8(Pwf/Pr)2
qmax =AOF(q@P
AOF (q @ Pwf =0)
0)
Ifmultirate testdataavailable:
q/qmax ={1 (Pwf/Pr)2}n

Plot loglog q vs (Pwf/Pr)2 straightlinewithslope=n


Plotloglogqvs straight line with slope = n
.

CHAPTER 2: RESERVOIR SYSTEM (26) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

VogelssEquation
Vogel Equation
IntroducedbyVogelin1968andrecommendedforsolution
gas drive reservoir where Ps <P
gasdrivereservoirwhereP < Pb .
VogelsEquation;
2
qo Pwf Pwf
1 0.2 0.8
(qo ) max Ps Ps
qo Pwf
Basedontheequation,Vogelplot vs
(qo ) max Ps
forsolutiongasdrivereservoir.
knownasdimensionlessIPRCurveofVogelChart,VogelEquation
known as dimensionless IPR Curve of Vogel Chart Vogel Equation
orVogelChart.
canbeusedtopredicttheIPRofsolutiongasdrivereservoir
can be used to predict the IPR of solution gas drive reservoir

CHAPTER 2: RESERVOIR SYSTEM (27) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

VogelssEquation
Vogel Equation (ctd)
ThisIPRcurvecanbegeneratedifeithertheqmax and
reservoirpressureareknown,orthereservoirpressure&a
reservoir pressure are known or the reservoir pressure & a
flowrateandthecorrespondingbottomholeflowing
pressure are known
pressureareknown.
Foreithercase,abuilduptestforthereservoirpressure,and
a flow test with bottom hole gauge are required
aflowtestwithbottomholegaugearerequired.
Pwf
Fromtheequation;if 0,
qo
1
Ps (qo ) max
qo Pwf
andif 0, 1
(qo ) max Ps

qo Pwf Pwf
0 1 1 0
0.8
8
(qo ) max Ps Ps

CHAPTER 2: RESERVOIR SYSTEM (28) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example 23
Example2 3
Given
qo = 300BPD
300 BPD
Pwf = 1500psi
Ps = 1800 psi
1800psi

Determine:
(a) qmaximum
((b)) q@Pwf =1000psi
q p
byPIandVogelmethods.

CHAPTER 2: RESERVOIR SYSTEM (29) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example 24
Example2 4
Given
qo = 300BPD
300 BPD
Pwf = 1500psi
Ps = 1800 psi
1800psi

Determine Pwf forq


DetermineP for qo =600BPD
600 BPD byPIandVogelmethods.
by PI and Vogel methods.

CHAPTER 2: RESERVOIR SYSTEM (30) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Standing Method
StandingMethod
AlsoknownasStandingsExtensionofVogelsIPR
NotethatVogelsIPRisindependentofskinfactor,thus
applicabletoundamagedwellonly.
Standingextendtheeffectofskin onVogelsIPRequationand
comeupwiththeconceptofflowefficiencyfactororFE
(productivityratio).
P 'wf Ps FE ( Ps Pwf )
Ideal bottom hole flowing pressure, Pwf @ S=0

So,VogelsIPRcanbewrittenas
S l b i
2
qo P 'wf P 'wf
1 0.2
0 2 0.8
0 8
(qo ) max Ps s
P
CHAPTER 2: RESERVOIR SYSTEM (31) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

Standing Method (ctd)


StandingMethod

Pideal PI ideal ( Ps P 'wf )


FE id l
id l

Preal PI real ( Ps Pwf ) ...(a)
P 'wf Pwf Pskin .(b)

Combining(a)&(b):
C bi i ( ) & (b)

( Ps Pwf Pskin ) m = slope of straight


FE ..(c) line curve of PBU test
( Ps Pwf ) (Horner)

162.6q B
Pskin 0.87 mSt 0.87 St
kh
CHAPTER 2: RESERVOIR SYSTEM (32) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

Standing Method (ctd)


StandingMethod
Equation(c)showsthatifFE<1,thewellisdamage.IfFE>1,
thewellisstimulated.WhenFE=1.0,Standing
the well is stimulated When FE 1 0 Standingsscorrelation
correlation
becomesVogelsequation.
StandingproduceIPRcurveforFE=0.5
S di d IPR f FE 0 5 1.5,andcanbe
15 d b
usedtodetermine:
maximumflowratefordamagewell(formation)
maximumflowrateforrepaired/stimulatedwell
FlowrateforanyvalueofflowpressureatdifferentFE
ToconstructIPRcurvefordamageandstimulatedwell.

CHAPTER 2: RESERVOIR SYSTEM (33) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Standing Method (ctd)


StandingMethod
(Figure 9.5page285:Chilingarian)

CHAPTER 2: RESERVOIR SYSTEM (34) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example 25
Example2 5
Thefollowinginformationisavailablefromawelltest:
Productionrate=500BPD
P d i 500 BPD
Staticreservoirpressure=3000psig
Bottomhole flowingpressure=2500psig
flowing pressure = 2500 psig
Flowefficiency=0.7
Find:qatP
Find: q at Pwf =1700psig,when(a)FE=0.7,(b)FE=1.0,and
= 1700 psig when (a) FE = 0 7 (b) FE = 1 0 and
(c)FE=1.3

Solution:
(Pwf/Ps)=(2500)/(3000)=0.833
FromFig.,atFE=1.0,q/(q)maxFE=1=0.19.
Thus,(q) maxFE=1=(500)/(0.19)=2632BPD.
F
ForaP
Pwf of1700psig:
f 1700 i

CHAPTER 2: RESERVOIR SYSTEM (35) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example 25
Example2 5(ctd)
FromFigure:
(a)ForFE=0.7,q/(q)
(a) For FE = 0 7 q/(q)maxFE=1 =0.47,
= 0 47
thusq=(0.47)(2632)=1237BPD
(b) For FE =1.0,q/(q)
(b)ForFE 1.0, q/(q)maxFE=1 =0.65,
0.65,
thusq=(0.65)(2632)=1711BPD
q q maxFE=1 =0.77,
(c)ForFE=1.3,q/(q)
thusq=(0.77)(2632)=2026BPD

Theaboveexampleillustrateshowtopredicttheflowrateat
variousvaluesofPwf.Hence,aslongasFEisknown,anIPR
curvecanbedevelopedforaparticularwell.

CHAPTER 2: RESERVOIR SYSTEM (36) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Skin Factor
SkinFactor
Factorsthatincreasetherestrictionoffluidflowtothe
wellbore
wellbore.
Itcanbemechanicalorphysicalphenomenon.
St =SSd +SSpc +SSswp +SSp
where
St = ttotaldimensionlessskinfactor
t l di i l ki f t
Sd = formationdamageskinfactor
Spc = skin factor due to partial completion
skinfactorduetopartialcompletion
Sswp = skinfactorduetowelldeviation
Sp = perforation skin factor
perforationskinfactor
Thetotalskincanbeashigheras100andtheminimumskin
in highly stimulated well is about 5.
inhighlystimulatedwellisabout 5.

CHAPTER 2: RESERVOIR SYSTEM (37) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

SkinZone
CHAPTER 2: RESERVOIR SYSTEM (38) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

Skin Factor (ctd)


SkinFactor
Pressuredropduetoskin:
162.6q B 141.2q B
Pskin 0.87mSt 0.87 S t St
kh kh

PartialCompletionSkinEffect,Spc
Reservoirnotperforatedovertheentirethicknessofthepay
f d h h k f h
zone

Deviationfromradialflowduetopartialpenetrationorcompletion

CHAPTER 2: RESERVOIR SYSTEM (39) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Skin Factor (ctd)


SkinFactor
Incaseswherethewellispartiallycompleted,theflowcan
no longer considered horizontal and well productivity will
nolongerconsideredhorizontalandwellproductivitywill
dependuponboththehorizontalandverticalpermeabilities.

FormationDamageSkinFactor,Sd.
Duringdrillingoperationandinspecificcompletionphases,
wellborefluidwillleakoffintotheformation.
Thisfiltrate,togetherwithfineparticles,willcauseachange
inthepermeabilityofthereservoirrockbyanyoneofa
range of mechanisms shown in next page
rangeofmechanismsshowninnextpage.

CHAPTER 2: RESERVOIR SYSTEM (40) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Skin Factor (ctd)


SkinFactor

Clay
S lli
Swelling

Particulate
Wettability
Plugging

Formation
Damage
Fines
Emulsion
Migration
g

Scale&
Water
Inorganic Blocking
Precipitate

FormationDamageMechanism
CHAPTER 2: RESERVOIR SYSTEM (41) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

Skin Factor (ctd)


SkinFactor
WellDeviationSkinEffect,Sswp.
Ifawellentersaformationatanangle,thelengthofborehole
If ll f i l h l h fb h l
andhencecrosssectionalareaforflowwillbeincreased.
Theproductivitywillthusbeincreased
The productivity will thus be increased

Deviated Well Geometry


DeviatedWellGeometry

CHAPTER 2: RESERVOIR SYSTEM (42) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Skin Factor (ctd)


SkinFactor
PerforationSkinEffect,Sp.
Theprocessofperforationcreatesalimitednumberofsmall
holeentrypointsforfluidtoflowintothewellbore.
Thiswillaffecttheproductivityofthewell.

CHAPTER 2: RESERVOIR SYSTEM (43) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Construction of IPR
ConstructionofIPR
BasedonVogelMethod,thedatarequiredare:
Flowrate,q
l
Bottomholeflowingpressure,Pwf
Reservoirpressure,P
R i Ps.
Allthesedatacanbeobtainedfrom:
Productiontest
d
Flowtest
PBUtest
PBU
Themethodofconstructingthecurvedependuponthe
conditionofwell,i.e.
diti f ll i
Singlephaseflow
Twophaseflow:P
T h fl Ps <P
< Pb andP
d Ps >P
> Pb

CHAPTER 2: RESERVOIR SYSTEM (44) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Single Phase Flow


SinglePhaseFlow
DeterminePI: PI q
( Ps Pwf )
Determineqmax :qmax =Ps*PI Ps
Slope = - 1/PI
PlotgraphofPwf vs q
Pwf
Pwff =PPs q
q =0
0
Absolute Open
Pwf =0 q=qmax flow potential

Theplotwillproduceastraight
The plot will produce a straight
line q qmax

CHAPTER 2: RESERVOIR SYSTEM (45) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Two Phase Flow


TwoPhaseFlow
TherearethreemethodsdependuponthePs,Pwf,andPb.

1) Ps <Pb
2) Ps >Pwf >Pb
3) Ps >Pb >Pwf

CHAPTER 2: RESERVOIR SYSTEM (46) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

((1)P
) s <Pb
Determine(qo)max fromVogelEquation
2
qo Pwf Pwf
1 0.2 0.8
(qo ) max s
P Ps
qo
(qo ) max 2
Pwf Pwf
1 0.2 0.8
Ps Ps
Ifproductiontestdataisnotavailable,qo canbeestimated
fromDarcyequation,and(qo)max from:
qo Ps PI * Ps
(qo ) max Derivation1
1.8( Ps Pwf ) 1.8
0.007082kh( Pr Pwf )
q
r 3
Bo (ln e )
rw 4
CHAPTER 2: RESERVOIR SYSTEM (47) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

Derivation 1
2
qo Pwf Pwf
1 0.2
0 2 0.8
0 8
(qo ) max Ps Ps
Pwf Pwf Ps Pwf Pwf
1 1 0.8
08 1 0.8
08
P s Ps Ps P s



qo Ps 1 PI * P 1
(qo ) max
( Ps Pwf )
s
Pwf Pwf
1 0.8 1 0.8
Ps Ps
IfPwf totendtoPs (withsmalldrawdown atinitialstage)

qo Ps PI * Ps
(qo ) max
1 8( Ps Pwf )
1.8( 11.88
Back
CHAPTER 2: RESERVOIR SYSTEM (48) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

((1)P
) s <Pb (ctd)

AssumeanumbersofP
Assume a numbers of Pwf (from0to
(from 0 to
Ps),determineqfromVogelEqn or
VogelssReferenceIPR
Vogel Reference IPR
Ps
PlotgraphofPwf vs qo
Pwf =Ps qo =0 Pwf
Pwf =0 qo =(qo)max
Theplotwillproduceacurve

q qmax

Pwf Pwf
2

qo (qo ) max 1 0.2 0.8


Ps Ps
CHAPTER 2: RESERVOIR SYSTEM (49) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

((2)P
) s >Pb
IPRcurvewillhavetwoparts:
Ps >Pwf >Pb astraightline 4000

Pwf <Pb acurve 3500

3000
ConsideredasgeneralizedIPR
2500

Pwf(psi)
acombinationofthePImethod
abovethebubblepoint 2000

pressureandVogelsIPRbelow 1500
thebubblepointpressure
h b bbl i . 1000

500
Twosituations:
0

GivenPwf >Pb 0 50
q(BPD)
100 150 200

GivenPwf <Pb

CHAPTER 2: RESERVOIR SYSTEM (50) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

((2)P
) s >Pb (ctd)

qb PI ( Ps Pb )

qPb PI * P
qv b
1.8 Ps Pwf 1.8

CHAPTER 2: RESERVOIR SYSTEM (51) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

((21)P
) wf >Pb
MarkthepointPs @q=0,andPwf @givenq.Connectthe
two points with a straight line
twopointswithastraightline.
Determineqb fromaboveplotorfromequation
qb =PI(P
( s Pb)
qPb PI * Pb
Determineqmax from: qmax qb qb
1 8 Ps Pwf
1.8 11.88

AssumeanumbersofPwf ((0toPb))anddetermineqfrom:
q
2
(q qb ) wf
P wf
P
1 0.2 0.8 OtherForm
(qmax qb ) Pb Pb
PlotPwf vs q. 2

PI * Pb Pwf Pwf
q qb 1 0.2 0.8
1.8
Pb b
P

CHAPTER 2: RESERVOIR SYSTEM (52) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

2
(q q b ) Pwf Pwf
1 0.2 0.8
( max q b )
(q Pb Pb
Pwf Pwf
2

q q b (q
( max q b ) 1 00.22 00.8
8
Pb Pb
qPPb PI * Pb
but (q max q b ) q v
1.8 Ps Pwf 1.8

Pwf
2
qPb Pwf

q q b 1 0.2 0.8
1.8 Ps Pwf Pb
b
P


PI * Pb Pwf Pwf
2

q qb 1 00.2
2 00.8
8
1.8
Pb Pb Back
CHAPTER 2: RESERVOIR SYSTEM (53) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

((22)P
) wf <Pb
Determineqb fromequation
Pb

wf
P wf
P
2

qb q 1 1 0.2 0.8
1.8( Ps Pwf ) Pb Pb

qPb
Determineqmax from: qmax qb
1 8 Ps Pwff

1.8

AssumeanumbersofPwf ((0toPb))anddetermineqfrom:
q
2
(q qb ) Pwf Pwf
1 0.2 0.8
(qmax qb ) b
P b
P
PlotPwf vs q+astraightlinefromPb toPs.
PI * Pb Pwf Pwf
2

q qb 1 0.2 0.8
1.8
Pb b
P
CHAPTER 2: RESERVOIR SYSTEM (54) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

4000

Ps
3500

3000

Pwf(psi)
2500

2000
Pb
1500

1000

500

qb
0
0 20 40 60 80 100 120 140 160 180 200

q(BPD) qmax

T i lC
TypicalCompositeIPRCurve
it IPR C

CHAPTER 2: RESERVOIR SYSTEM (55) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example25
p
ThePulai No1wastestedforeighthoursatarateofabout38
STB/day Wellbore flowing pressure is 585 psi After shutting
STB/day.Wellboreflowingpressureis585psi.Aftershutting
thewellinfor24hours,thebottomhole pressurereacheda
static value of 1125 psi Calculate:
staticvalueof1125psi.Calculate:
1. Productivityindex,PI
2 Absoluteopenhole
2. Ab l h l flowingpotential
fl i i l
3. Oilflowrateforawellboreflowingpressureof350psi
4. Wellboreflowingpressurerequiredtoproduce60STB/day

DrawtheIPRcurve,indicatingthecalculatedquantities.

CHAPTER 2: RESERVOIR SYSTEM (56) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example25:Solution
p

1200
Example25
Pwf (psi) q(BPD) 1000

1125 0 Pwf(psi) 800

100 72.2
800 22.9 600

585 38.0
400 51 0
51.0 400

350 54.6
200 65.1 200

0 79 2
79.2
0
0 10 20 30 40 50 60 70 80 90
q (STB/day)

CHAPTER 2: RESERVOIR SYSTEM (57) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example26
p
Adiscoverywell,Tanjung No.3,wastestedintheT9Sandat
a rate of 200 STB/day with a bottomhole flowingpressureof
arateof200STB/daywithabottomhole flowing pressure of
3220psi.Theestimatedbubblepointpressureof4020psi
indicates that the well is draining saturated oil since the
indicatesthatthewellisdrainingsaturatedoil,sincethe
staticpressurewas4000psi.

PlottheIPRusingtheVogelequation.

CHAPTER 2: RESERVOIR SYSTEM (58) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example26:Solution
p
VogelEquation:
2
qo Pwf Pwf
1 0.2 0.8
(qo ) max Ps s
P
qo
(qo ) max 2
Pwf Pwf
1 0.2 0.8
Ps s
P
200
(qo ) max 2
624 STB / day
3220 3220
1 0.2 0.8
4000 4000

Calculateseveralratesatspecificdrawdowntohaveenough
p g
pointstoplotIPR

CHAPTER 2: RESERVOIR SYSTEM (59) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example26:Solution
p ((ctd))

4500
Pwf (psi) (Pwf/Ps) (Pwf/Ps)2 q(BPD) Example 2-6
4000 1 1 0 4000

3750 0.9375 0.8789 68 3500


3500 0 8750
0.8750 0 7656
0.7656 133
3250 0.8125 0.6602 193 3000

Pwf(psi)
3000 0.7500 0.5625 250 2500
2750 0.6875 0.4727 302
2000
2500 0 6250
0.6250 0 3906
0.3906 351
2250 0.5625 0.3164 396 1500
2000 0.5000 0.2500 437
1000
1750 0.4375 0.1914 474
1500 0.3750 0.1406 507 500
1250 0.3125 0.0977 536 0
1000 0.2500 0.0625 562 0 100 200 300 400 500 600 700
750 0.1875 0.0352 583
500 0.125 0.0156 601
q(BPD)
250 0.0625 0.0039 614
0 0 0.0000 624
Pwf Pwf
2

qo 624 1 0.2 0.8


4000 4000
CHAPTER 2: RESERVOIR SYSTEM (60) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

Example27
p
Given:
Staticreservoirpressure,psi=3620
Bubblepointpressure,psi=1825
Bottomhole flowingpressure,psi=1980
Productionrate,BPD=108

1. DeterminetheProductivityIndexthatisvalidifPwf >Pb.
2. CalculatetheoilrateifPwf =Pb.
3. Calculatethemaximumoilrate.
4. PlotIPR

CHAPTER 2: RESERVOIR SYSTEM (61) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example27:Solution
p
Ps >Pwf >Pb:

q 108
1) PI: PI ( ) 0.066 BPD / psi
Ps Pwf 3620 1980

2) qb =PI(Ps Pb)=0.066(3620 1825)=118.5BPD

qPb (108)(1825)
3) qmax: qmax qb 118.5 185.3BPD
1 8( Ps Pwff )
1.8( 1 8(3620 1980)
1.8(3620
Pwf Pwf
2

4) IPR: qo (qmax qb ) 1 0.2 0.8 qb


b
P b
P
Pwf Pwf
2

qo (185.3 118.5) 1 0.2 0.8 118.5


1825 1825

CHAPTER 2: RESERVOIR SYSTEM (62) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example27:Solution
p ((ctd))

Pwf (psi) (Pwf/Pb) (Pwf/Pb)2 q(BPD) 4000


Example 2-7
3620 0 3500

1825 1 1.0000
1 0000 119 3000
1650 0.9041 0.8174 130
1500 0.8219 0.6755 138 2500

Pwff(psi)
1250 0.6849 0.4691 151
2000
1000 0.5479 0.3002 162
750 0.411 0.1689 171 1500

500 0.274 0.0751 178


1000
2 0
250 0 3
0.137 0 0 88
0.0188 182
82
0 0 0.0000 185 500

0
P Pwf
2
0 20 40 60 80 100 120 140 160 180 200
qo (qmax qb ) 1 0.2 wf 0.8 qb q(BPD)
Pb b
P
Pwf Pwf
2

qo (185.3
(185 3 118.5)
118 5) 1 0.2
0 2 0.8
0 8 118.5
118 5
1825 1825

CHAPTER 2: RESERVOIR SYSTEM (63) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example28
p
Given:
Staticreservoirpressure,psi =1750
Bubblepointpressure,psi =1200
Bottomhole flowingpressure,psi =900
Productionrate,BPD =600

1. PlotIPR
2. Determinewellpotential
3. DeterminePwf requiredifqo is800BPD

CHAPTER 2: RESERVOIR SYSTEM (64) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example28:Solution
p
Ps >Pb >Pwf:Determineqb:
Pb Pwf Pwf
2


qb q 1 1 0.2 0.8
1.8( Ps Pwf ) Pb Pb

1200 900 900
2

qb 600 1 1 0.2 0.8 412 BPD


1.8(1750
( 900)) 1200 1200

Determineqmax:
qPb 600*1200
qmax qb 412 883BPD
1.8( Ps Pwf ) 1.8(1750 900)

Calculateseveralratesatspecificdrawdowntohaveenough
pointstoplotIPR

CHAPTER 2: RESERVOIR SYSTEM (65) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example28:Solution
p ((ctd))

2000
Example 2-8
28
1800

Pwf (psi) (Pwf/Pb) (Pwf/Pb)2 q(BPD) 1600

1400

1200 1 1 412 1200

Pwf(psi)
1000 0.8333 0.6944 543 1000
800 0.6667 0.4444 653 800
600 0.5 0.2500 742
600
400 0.3333 0.1111 810
400
200 0.1667 0.0278 857
200
0 0 0.0000 883
0
P Pwf
2 0 200 400
q(BPD)
600 800 1000

qo (qmax qb ) 1 0.2 wf 0.8 qb


Pb b
P
Pwf Pwf
2
(ii)WellPotential=qmax =883BPD
qo (883 412) 1 0.2 0.8 412
1200 1200 (iii)Pwf @q=800BPD:
fromIPR,Pwf =

CHAPTER 2: RESERVOIR SYSTEM (66) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Fetkovich Method
Multipointbackpressuretestofgaswellsisacommon
procedure to establish the performance curve of gas wells or
proceduretoestablishtheperformancecurveofgaswellsor
deliverability.
FFetkovich
k i h appliedthesetestsonoilwellandfoundthatoil
li d h il ll d f d h il
wellproducingbelowthebubblepointpressurebehavejust
like gas well
likegaswell.
Thegeneralconclusionfromthebackpressuretests:

q PI '( Ps2 Pwf2 ) n


where:
PIistheproductivityindex,theexponentnwasfoundtobe
between0.5and1.0.

CHAPTER 2: RESERVOIR SYSTEM (67) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Fetkovich Method(ctd)
( )

Aplotofqvs
A l f ( s2 Pwf2)onloglogpaperresultsinastraightline
(P ) l l l i i h li
withslope1/n.
Thisequationoftenreferredtoasthebackpressureequation.
Thi ti ft f dt th b k ti
TheequationwasderivedfromEvinger andMuskat fortwo
phaseradialflow:
h di l fl
(7.08kh)
q f ( P)dP
re
ln( )
rw
kro
f ( P)
o B0

CHAPTER 2: RESERVOIR SYSTEM (68) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example281
p

Given:
Staticreservoirpressure,psi = 2000
Bottomhole flowingpressure,psi = 1400
Production rate, BPD
Productionrate,BPD = 1020

1. PlotIPRwhenn=1.0
1 Plot IPR when n = 1 0
2. PlotIPRwhenn=0.5

CHAPTER 2: RESERVOIR SYSTEM (69) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example281:Solution
p
(a)n=1.0:[(b)n=0.5]:

q PI '( Ps2 Pwf2 ) n


q 1020 BPD
PI ' 2
( Ps Pwf )
2 1.0
(2000
(
2 1.0
ppsi ) 1400 ppsi
2

5 x 104 bbl /(day )( psi ) 2 0.7141
q 5 x 10 bbl /(day )( psi ) 2000 psi Pwf
4 2
2 2

5 x 104 4 x 106 Pwf2 BPD

0.7141 4 x 10 P
05
0.5
6 2
wf BPD
CHAPTER 2: RESERVOIR SYSTEM (70) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

Example281:Solution
p ((ctd))

2500
Pwf(psi) Example 2-8-1

2000
Pwf (psi) q(BPD) Pwf (psi) q(BPD)
2000 0 2000 0
1500 875 1500 944.67 1500
1200 1280 1200 1142.56
1000 1500 1000 1236.86
800 1680 800 1308.97
1000
600 1820 600 1362.42
400 1920 400 1399.34
200 1980 200 1421.04
0 2000 0 1428.20 500

0
0 500 1000 1500 2000 2500
q(BPD)

CHAPTER 2: RESERVOIR SYSTEM (71) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

PredictionofFutureIPR
OneofthemethodusedtopredictfutureIPRisStanding
Method Develop by Standing based on Vogel Equation
Method.DevelopbyStandingbasedonVogelEquation.
StandingrewroteVogelEquationas:
q Pwf Pwf
(1 )(1 0.8 )
qmax Ps Ps
q qmax Pwf
( )(1 0.8 )
Ps Pwff Ps Ps
qmax Pwf
PI ( )(1 0.8 )
Ps Ps .(1)
LetPI*betheinitialvalueofPI(thePIforsmalldrawdown.
AllowingP
g wf totendtoPs:

CHAPTER 2: RESERVOIR SYSTEM (72) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

PredictionofFutureIPR(ctd)
( )

1.8qmax ..(2)
PI * ( )
Ps
Equation(1)&(2):
1 8PI
1.8 PI
PI *
Pwf
(1 0.8 )
Ps
Vogelequation&(2):produceanequationforfutureIPR

2
PI *f *( Ps ) f Pwf Pwf
qf
1 0.2 0.8
18
1.8 ( Ps ) f ( Ps ) f

CHAPTER 2: RESERVOIR SYSTEM (73) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

PredictionofFutureIPR(ctd)
( )

where:
(kro / o Bo ) f
PI PI
* *

(kro / o Bo ) p
f p

n
so sor
kro
1 sor swi

CHAPTER 2: RESERVOIR SYSTEM (74) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example29
p
Productiontestdataforawellareasfollows:

Parameter 2009 2015

SStaticreservoirpressure,psig
i i i 3000 2000
Bottomholeflowingpressure,psig 2500
Bublepointpressure,psig 3500
P d i
Productionrate,BPD
BPD 5000
Oilsaturation,% 60 45
Residualoilsaturation,% 20 15
I iti l t
Initialwatersaturation,%
t ti % 10 30

Oilformationvolumefactor,bbl/STB 1.3 1.01


Oil viscosity cp
Oilviscosity,cp 08
0.8 08
0.8
Gasliquidratio,MCF/STB 0.8 0.8
Oilspecificgravity,oAPI 30 30
Gas specific gravity
Gasspecificgravity 06
0.6 06
0.6

CHAPTER 2: RESERVOIR SYSTEM (75) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example29
p ((ctd))

i. ConstructIPRCurvefortheyearof2009and2015.
ii. Determinewellpotentialfortheyearof2009and2015.
iii. Determinethebottomhole flowingpressureifthewellshould
produced14000BPDin2009.
iv. Determineproductionratein2015ifthebottomhole
p flowing
g
pressureis750psig.

CHAPTER 2: RESERVOIR SYSTEM (76) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example29:Solution
p
For2009:Ps<Pb useVogelEquation
qo
(qo ) max 2
P Pwf
1 0.2 wf 0.8
Ps s
P

5000
(qo ) max 2
18, 000 BPD
2500 2500
1 0.2 0.8
3000 3000

Calculateseveralpresentratesatspecificdrawdowntohave
enoughpointstoplot2009IPR.

CHAPTER 2: RESERVOIR SYSTEM (77) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example29:Solution
p ((ctd))

Present IPR Curve


PresentIPRCurve
Pwf (psi) (Pwf/Ps) (Pwf/Ps)2 q(BPD)
2009 IPR
3000 1 1 0
3500
2750 0 9167
0.9167 0 8403
0.8403 2600
2500 0.8333 0.6944 5000 3000
2250 0.75 0.5625 7200
2000 0.6667 0.4444 9200 2500
1750 0 5833
0.5833 0 3403
0.3403 11000 2009IPR

Pwf(psi)
1500 0.5 0.2500 12600 2000

1250 0.4167 0.1736 14000


1500
1000 0.3333 0.1111 15200
750 0.25 0.0625 16200 1000
500 0.1667 0.0278 17000
250 0.0833 0.0069 17600 500
100 0 0333
0.0333 0 0011
0.0011 17864
0 0 0 18000 0
0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000
q(BPD)
P Pwf
2

qo (qo ) max 1 0.2


0 2 wf 0.8
0 8
Ps s
P

CHAPTER 2: RESERVOIR SYSTEM (78) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example29:Solution
p ((ctd))

TopredictfutureIPR,useStandingApproach:
(q ) Pwf 18000 2500
PI o max 1 0.8 1 0.8 10
Ps Ps 3000 3000

1.8* PI 1.8*10
PI *p 10.8
Pwf (2500)
1 0.8 1 0.8
P s (3000)
(kro / o Bo ) f
PI PI
* *
11.53
f p
( k /
ro o o p
B )

PI *( Ps ) f
2
*
Pwf Pwf
qf
f
1 0.2 0.8
1.8 (P )
s f ( Ps ) f
11.53* 2000 wf
P wf
P
2

qf 1 0.2
0 2 0.8
0 8
1.8 2000 2000
CHAPTER 2: RESERVOIR SYSTEM (79) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

Example29:Solution
p ((ctd))

Calculate several future rates at specific drawdown to


have enough points to plot 2015 IPR
IPR.
FutureIPRCurve
3500
Example 2
2-9
9

Pwf(psi)
Pwf (psi) (Pwf/Ps) (Pwf/Ps)2 qf(BPD) 3000

2000 1 1 0 2500
1750 0.875 0.7656 2722
1500 0.75 0.5625 5124 2000 2009IPR
1250 0.625 0.3906 7206
2015IPR
1000 05
0.5 0 2500
0.2500 8968 1500
750 0.375 0.1406 10409
500 0.25 0.0625 11530
1000
250 0.125 0.0156 12331
0 0 0.0000 12811
500
PI *( Ps ) f Pwf
2
*
Pwf
qf 1 0.2 0.8
( P ) ( P ) 0
f

1.8 s f s f
0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000
23060
qf 1 1*104 ( Pwf ) 2 *107 ( Pwf ) 2
1.8 q(BPD)
CHAPTER 2: RESERVOIR SYSTEM (80) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

PredictingFutureIPRbyFetkovich
g y Method
FromMuskat:PIatanyspecifictimeisrelatedtothePIatother
time:
PI1 (kro / o Bo )1

PI 2 (kro / o Bo ) 2
Fetkovich:kro islineartowardsthepressure:
p
kro @ Ps Ps

kroi Psi
Frombackpressureequation:

q PI '( Ps2 Pwf2 ) n .(1)

CHAPTER 2: RESERVOIR SYSTEM (81) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

PredictingFutureIPRbyFetkovich
g y Method((ctd))
Basedonthesethreeequations:
Ps 2
q PI ' ( Ps Pwf2 ) n
Psi
OR: q PI ' Ps 2 ( P 2 P 2 ) n (2)
1 s2 wf
Ps1
DeterminePIbybackpressureequation.
Findtherelationshipqvs Pwf byEqn.(2)
AssumeanumbersofPwf,anduseEqn (2)tofindqvs Pwf at
specificPs.
PlotPwf vs qq.

CHAPTER 2: RESERVOIR SYSTEM (82) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

PredictingFutureIPRbySimpleMethod
g y p
CollectseveralPIdatafromwellswhichknownPs.
PlotPI/(PI)i vs Ps.(PI)i =PIatearlystageofproductionPI@Pi).
Findthebeststraightline.
ForanyspecificvalueofPs,findPI.
BasedontheobtainedPI,futureIPRcurvecanbeplottedusing
Based on the obtained PI future IPR curve can be plotted using
previousmethods.

CHAPTER 2: RESERVOIR SYSTEM (83) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

DeterminationofPIorIPRatField
Fielddeterminationisdependontheconditionsofthewell.

a) SimpleCase.
DatarequiredareP
q wf,qandP
q s.
Shutinwellfor24 72hours PBU

Withpressuregaugeatbottom,flowthewellatlowestqand
p g g , q
recordPwf (stable maybe24hours)
FlowthewellathighestrateandrecordPwf (asstep2)

Repeatforanotherflowrate minimum3reading

Ps frompressurebuilduptest.

PIcanbedeterminebymethodexplainedearlier.

CHAPTER 2: RESERVOIR SYSTEM (84) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

DeterminationofPIorIPRatField(ctd)
( )

b) SpecialCase
Forwellwithoutpacker.
F ll i h k
Duringproduction,someofthegaswillcomeoutand

accumulated at the top of the annulus


accumulatedatthetopoftheannulus.
Atequilibrium,

Pwf =P
Pc +pressureduetogascolumn
+ d t l
Gilbert:

P
Pressureduetogascolumn=P
d t l PcD1.5
1 5/100psia
/100 i

Pwf =Pc(1+D1.5/100) psia

where Pc = casingheadpressure,psia
D = tubing depth per 1000 ft
tubingdepth,per1000ft

CHAPTER 2: RESERVOIR SYSTEM (85) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example210
p
Given:
Tubingdepth
b d h = 3000ftf
q = 42BPD@Pc =550psig
= 66BPD@Pc =320psig
ByassumingconstantPI,determine:
1. PI
2. Ps
3. Wellpotential

CHAPTER 2: RESERVOIR SYSTEM (86) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example210:Solution
p

D1.5 31.5
Pwf Pc 1 565 1 595 psia 580 psig
100 100

Pwf =580psig@q=42BPD
580 i @ 42 BPD

D1.5 31.5
Pwf Pc 1 335 1 353 psia 338 psig
100 100

Pwf =338psig@q=66BPD

CHAPTER 2: RESERVOIR SYSTEM (87) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

Example210:Solution
p ((ctd))

g)
Pwf (psig

1000
Fromtheplot:
PI=100/1000=0.1BPD/psi
580 Ps =1000psig
qmax =100BPD
100 BPD
338

0 42 66 100 q (BPD)

CHAPTER 2: RESERVOIR SYSTEM (88) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

IPR MethodSelection
DissolvedGasDriveReservoir
AboveP
Above Pb:
ConstantGOR Nogasbreakingoutofsolutionandno
interferingwithoilflow.
g
PImethodisapplicable
BelowP
B l Pb:
Gasbreakoutofsolution&impedestheoilflow
Vogelmethod
V l h d

CHAPTER 2: RESERVOIR SYSTEM (89) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

IPR MethodSelection(ctd)
( )

WaterDriveReservoir
Has:
H
ConstantproducingGOR
Pr ismaintainedbywaterinflux
is maintained by water influx
Nogasbreakingoutofsolution
PImethodcanbeused.
However,ifwaterinfluxrateisexceeded,thenthereservoir
willperformlikeadissolvedgasdrivereservoir,therefore
Vogel method will be applicable
Vogelmethodwillbeapplicable.

CHAPTER 2: RESERVOIR SYSTEM (90) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

IPR MethodSelection(ctd)
( )

GasCapDriveReservoir
WellsproducingfromtheoilcolumnbelowtheGOC
W ll d i f th il l b l th GOC
ProducewithaconstantGOR
PImethodcanbeused.
PI method can be used.
But,aftergasbreaksthroughtoawell,neitherthePInora
vogel methodisapplicable.Inmostinstances,thewell
shouldbeshutinafterthegascapbreakthroughinorderto
conservegascapenergytoproducedownstructurewell.

CHAPTER 2: RESERVOIR SYSTEM (91) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

IPR MethodSelectionSummaryy
PIMethod
Usetoevaluatedissolvedgasdrivewellsabovethebubble
U t l t di l d di ll b th b bbl
point
Usetoevaluategascapexpansiondrivewellspriortogas
g p p p g
capbreakthrough
Usetoevaluatewaterdrivewellsbeforeexceedingwater
influx rate
influxrate
VogelMethod
Usetoevaluatedissolvedgasdrivewellsbelowthebubble
U t l t di l d di ll b l th b bbl
point
Usetoevaluatewaterdrivewellsafterwaterinfluxrateis
exceeded

CHAPTER 2: RESERVOIR SYSTEM (92) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

GasWellPerformance
Gaswellproductivitydeterminedwithdeliverabilitytesting
Twobasicrelationshipinused:
Two basic relationship in used:
Rawlins&Schellhardt (empiricalbackpressuremethod)
Houpeurt (theoretical)
(theoretical )

Deliverabilitytestmethod:
Flowafterflowtest(fourpointtest)
Isochronaltest
Modifiedisochronaltest

CHAPTER 2: RESERVOIR SYSTEM (93) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

GasWellPerformance(ctd)
( )

Rawlins&Schellhardts deliverabilityeq:

qg =C(Ps2 Pwf2)n

where:
h C=flowcoefficient
C fl ffi i t
n=deliverabilityexponent
nonDarcy:n=0.5 1.0
Darcyflow:n=1.0

Aplotofq
A l t f g vs (Ps2 Pwf2)onloglogpaperresultsinastraight
) l l lt i t i ht
linewithslope1/n.
Thisequationoftenreferredtoasthebackpressureequation
Thi ti ft f dt th b k ti
IPRcanbeplottedby:
qg/qg max =[1 (Pwf/Ps)2]n
CHAPTER 2: RESERVOIR SYSTEM (94) MOHD FAUZI HAMID
SKPP 3513: PRODUCTION ENGINEERING

GasWellPerformance(ctd)
( )

Houpeurt relationship:

Deliverabilityeq:
Ps2 Pwf2 =aqg +bqg2

where;
a=laminarflowcoefficient
b=turbulencecoefficient
( s2 Pwf2 ))/q
Fromplotof(P
p / qg vs qg ((straightline)
g )
a=interceptwithyaxis
b=slope

CHAPTER 2: RESERVOIR SYSTEM (95) MOHD FAUZI HAMID


SKPP 3513: PRODUCTION ENGINEERING

GasWellPerformance(ctd)
( )

OR:
a 1422zT[ln (re/rw)
a=1422 ) +s]/kh
+ s] / kh
b=(1422zT/kh)D
D=nonDarcyflowcoefficient,D/Mscf
D = non Darcy flow coefficient D/Mscf
D=[2.715x1015 kMPsc]/hgrwTsc

=turbulencefactor,ft1: =1.88x1010k1.470.53
k =md
=cp
cp
Psc =standardpressure,psia
Tsc =standardtemperature,oR
M
M =molecularweight,lbm/lbmmole
l l i ht lb /lb l
=porosity,fraction
s =skinfactor
h =formationthickness,ft

CHAPTER 2: RESERVOIR SYSTEM (96) MOHD FAUZI HAMID

You might also like