CUANTIFICACION DEL CONCRETO PARA COLUMNAS

(0.6)(0.4)(6.7)=1.61m3---vol. De columna(1)

(1.61m3)(8 columnas)=12.88m3---total de columnas

DOSIFICACION

(PARA COLUMNAS DE FC=200 KG/CM2. GRAVA TAMAO MAX.=3/4"(19 MM))


(210 KG/CM2)

CEMENTO:(361 KG)12.88)=4650 KG
ARENA: (0.476KG)(12.88)=6.14 M3
GRAVA=(0.715)(12.88)=9.21 M3
AGUA=(26)(93)= 2411816=2.418 M3

4650/50=93

______________________________________________________________________
CUANTIFICACION DEL CONCRETO PARA TRABE 2

[(0.15)(8.00)+(0.25)(8.00)/2](0.40)=0.88^3

(0.88^3 )(4 )=3.52^3 210 KG/CM2


DOSIFICACION (PARA TRABES DE FC=200 KG/CM2
GRAVA TAMAO MAX=3/4"(19 MM)

CEMENTO:(361 KG)(3.52)=12.71 KG
ARENA: (0.476KG)3.52)=1.68M3
GRAVA=(0.715)(3.52)=2.52 M3
AGUA=(26)(26)= 2411816=676 lt

1271/50=25.42=26
TRABE 1
(0.25)(0.50)=0.70 M3------1 TRABE

(0.70)(6 TRABES)=4.2 M3

(0.8)(0.25)(0.50)=(0.1 M3)(4 (# de partes))=0.4 M3 -------PARTE DEL EJE ENTRE B Y 1

TRABES=(4.2+0.4)=4.6 M3

DOSIFICACION

CEMENTO: (361 KG)(4.6 M3)=1661 KG


ARENA: (0.476)(4.6 M3)=2.18 M3
GRAVA: (0.715)(4.6 M3)=3.28 M3
AGUA: (26)(34)=884 LT

1661/50=34

T1+T2=
CEMENTO: 1271+1589=2860 KG
ARENA: 1.68+2.10=3.78 M33
GRAVA: 2.52+3.15=5.67
AGUA: 676+832=1508 LT
500 cm

25 cm
a =(((500)^2 )+) (25)^2=500.6 cm=501

(501)(2000)(12)=1154=1
(1154)(2)=2310 m3
(12.024)(2)=24.05 m3 porque se toma encuenta el metro de ampliacion

CEMENTO: (0.715)(24.05)=17.20 m3
ARENA: (0.476)(24.05)=11.44 m3
GRAVA: (361)(24.05)=8682.05 kg=8683 kg
AGUA: (174)(26)=4524 lt

8683/50=17.66=174
FIRME(MONOLITICO)

V=(0.20)(20)(10)=40 M3

CEMENTO:(0.708)(40 M3)=28.32 M3
ARENA: (0.506)(40 M3)=20.24 M3
GRAVA=(307)(40M3)=12280 KG
AGUA=(246)(31)= 7626 lt

122280/50=245.6=246
GRUPO RENDIMIENTO No.GRUPO No:JORNAD JORNADAS
CONCEPTO CANTIDAD UNIDAD
PROPUESTO PROPUESTO ASREALIZAR DEFINITIVAS

1 LIMPIEZA Y TRAZO 264 M2 2 50 M2/JOR 3 1.76 2


2 EXCAVACION 194.578 M3 1 4 M3/JOR 10 4.86 5
3 TRASPALEO 26.413 M3 1 18 M3/JOR 2 0.73 1
4 ACARREO 34.337 M3 1 5 M3/JOR 3 2.28 3
5 RELLENO 168.16 M3 1 7 M3/JOR 5 4.8 5
6 PLANTILLAS 68.26 M2 2 14 M2/JOR 2 2.43 3
7 HAB. Y ARMADO AR EN CM 1.955 TON 4 0.17 TON/JOR 1 11.5 12
8 CIMBRA Y DESCIMBRADO EN CM 116.98 M2 3 9.5 M2/JOR 1 12.31 13
9 FAB.DE CONCRETO FC= 20 KG/CM2 23 M3 2 3.75 M3/JOR 3 2.04 2
10 ACABADO 23 M3 2 1.5 M3/JOR 8 1.91 2
HAB. Y ARMADO DE ACERO DE REF. EN TON 4 0.16 TON/JOR 4 0.64 4
11 COLUMNAS 2.507
12 CIMBRA Y DESCIMBRADO
FABRICACION EN DE
DE CONCRETO COLUMNAS
F'C = 200 107.2 M2 3 7.5 M2/JOR 3 22.5 5
13 KG/CM2 EN COLUMNA 12.88 M3 2 3.75 M3/JOR 2 7.5 2
14 VACIADO DE CONCRETO EN COLUMNAS 12.88 M3 2 0.85 M3/JOR 2 1.7 8
15 CIMBRA Y DESCIMBRADO EN TRABES 88.88 M2 3 8.5 M3/JOR 3 25.5 3
16 ARMADO DE ACERO
FABRICACION EN REF. EN
DE CONCRETO DE TRABES
F'C = 200 1.474 TON 4 0.16 TON/JOR 4 0.64 2
17 KG/CM2 EN TRABES 7.92 M3 2 3.75 M3/JOR 2 7.5 1
18 VACIADO DE CONCRETO EN TRABES 7.92 M3 2 0.95 M3/JOR 2 1.9 4
19 CIMBRA Y DESCIMBRADO DE LOSA RETICULAR 204.8 M2 3 9 M3/JOR 3 27 8

TON 4 0.16 TON/JOR 4 0.64 8


20 ARAMDO DE ACERO
FABRICACION DE REF. EN
DE CONCRETO DE LOSA RETICULAR
F'C=200KG/CM2 4.821
21 EN LOSA RETICULAR 23.1 M3 2 3.75 M3/JOR 2 7.5 3
22 VACIADO DE CONCRETO EN LOSA RETICULAR 23.1 M3 2 0.95 M3/JOR 2 1.9 12
ACTIVIDAD 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 LIMPIEZA Y TRAZO
2 EXCAVACION
3 TRASPALEO
4 ACARREO
5 RELLENO
6 PLANTILLAS

7 HAB. Y ARMADO AR EN CM
CIMBRA Y DESCIMBRADO
8 EN CM

FAB.DE CONCRETO FC= 20


9 KG/CM2
10 ACABADO
HAB. Y ARMADO DE ACERO
11 DE REF. EN COLUMNAS
CIMBRA Y DESCIMBRADO
12 EN COLUMNAS

FABRICACION DE
CONCRETO DE F'C = 200
13 KG/CM2 EN COLUMNA

VACIADO DE CONCRETO EN
14 COLUMNAS
CIMBRA Y DESCIMBRADO
15 EN TRABES

ARMADO DE ACERO EN
16 REF. EN TRABES

FABRICACION DE
CONCRETO DE F'C = 200
17 KG/CM2 EN TRABES

VACIADO DE CONCRETO EN
18 TRABES

CIMBRA Y DESCIMBRADO
19 DE LOSA RETICULAR

ARAMDO DE ACERO DE
20 REF. EN LOSA RETICULAR

FABRICACION DE
CONCRETO DE
F'C=200KG/CM2 EN LOSA
21 RETICULAR

VACIADO DE CONCRETO EN
22 LOSA RETICULAR
24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81
82 83 84 85 86 87 88 89 90
Hoja: De:
Calculo: Fecha:
Reviso:

LISTA DE VARILLAS
H O J A D E C A L C U L O
No. PESO
LONG
MCA TIPO DIAM. TOTAL A B C D E F KILOGRA
REQ MOS

300 I 3/8" 56 250 65 45 15 79


301 I 3/8" 248 210 55 35 15 292
302 II 3/8" 248 170 55 35 15 236
307 I 3/8" 276 160 45 20 15 247
308 I 3/8" 122 170 50 20 15 116
309 I 3/8" 122 190 55 25 15 130
1100
400 IV 1/2" 48 225 195 15 15 108
401 IV 1/2" 44 245 215 15 15 108
402 IV 1/2" 56 255 225 15 15 142
403 IV 1/2" 52 275 245 15 15 142
410 IV 1/2" 4 825 795 15 15 33
1553
502 IV 5/8" 8 900 860 20 20 224
503 VI 5/8" 8 1900 236
504 V 5/8" 8 170 150 20 22
505 VI 5/8" 16 300 75
506 IV 5/8" 8 835 75 20 20 104
507 V 5/8" 8 220 200 28
508 IV 5/8" 8 835 195 20 20 104
509 V 5/8" 8 220 200 20 28
821
600 IV 3/4" 48 235 185 25 25 253

800 IV 1" 48 920 860 30 30 1755


Hoja: De:

Calculo: Fecha:
TRABE 1 Reviso:

LISTA DE VARILLAS
H O J A D E C A L C U L O

No. PESO
LONG
MCA TIPO DIAM. TOTAL A B C D E F KILOGRA
REQ MOS

500 IV 5/8" 4 2020 126


501 VI 5/8" 4 700 44
502 IV 5/8" 4 2020 126
503 VI 5/8" 4 900 56
504 VI 5/8" 6 170 16
368
300 I 3/8" 272 150 44 20 10 229
Hoja: De:
Calculo: Fecha:
TRABE 2 Reviso:

LISTA DE VARILLAS
H O J A D E C A L C U L O
No. PESO
LONG
MCA TIPO DIAM. A B C D E F KILOGRA
REQ TOTAL MOS
301 I 3/8" 240 135 182

406 VI 1/2" 8 1000 80

600 VIII 3/4" 8 200 100 100 36


601 VIII 3/4" 16 160 130 10 58

800 IV 1" 8 820 800 10 10 261


801 XXVII 1" 8 818 399 399 10 260
877