PLANILLA DE METRADOS

MEJORAMIENTO DE LOS SERVICIOS DEPORTIVOS EN LA LOSA DEPORTIVA ELOY G. URETA, DISTRITO ALTO DE LA ALIANZA-TACNA-
PROYECTO:
TACNA
CLIENTE: MUNICIPALIDAD DISTRITAL DE ALTO DE LA ALIANZA
FECHA: 9/17/2017

MEDIDAS
N DE
ITEM DESCRIPCION LARGO ANCH ALTO PARCIAL TOTAL UND
VECES
(L) O (B) (H)
01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3,60 X 2,40M 1.00 1.00 1.00 und
01.02 CASETA DE GUARDIANIA, ALMACEN Y OFICINA DE RESIDENC 1.00 6.00 5.00 30.00 30.00 m2
01.03 CERCO PROVISIONAL DE ESTERAS 1.00 92.00 92.00 92.00 ml
01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MATERI 1.00 1.00 1.00 glb

02 SEGURIDAD Y SALUD
02.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DE PLAN DE SEGURIDAD Y SALUD EN EL TRABAJ 1.00 glb
SERVICIO 1 1.00

02.02 EQUIPOS DE PROTECCION INDIVIDUAL 20.00 und


PROMEDIO DE PERSONAL OBRERO 20 20.00

02.03 EQUIPOS DE PROTECCION COLECTIVA 1.00 glb


1 1.00

02.04 SEALIZACION TEMPORAL DE SEGURIDAD 1.00 glb


1 1.00

02.05 CAPACITACION SOBRE SALUD Y SEGURIDAD 1.00 glb


1 1.00

02.06 RECURSOS DE RESPUESTA DE EMERGENCIA 1.00 glb


1 1.00
03 DEMOLICIONES Y DESMONTAJES
03.01 DEMOLICION DE CONCRETO SIMPLE 11.36 m3
Banca de concreto en ambos lados de la cancha 2 35.50 0.40 0.40 11.36

03.02 DEMOLICION DE CONCRETO ARMADO 1.08 m3


Columnas 4 0.30 0.30 3.00 1.08

03.03 DEMOLICION CANCHA DE PAVIMENTO ASFALTICO DE 2" 840.40 m2


1 AREA = 840.40 840.40

03.04 DESMONTAJE Y RETIRO DE ARCOS 2.00 und


2 2.00

03.05 DESMONTAJE Y RETIRO DE POSTES C.A.C. 2.00 und


2 2.00

03.06 ACARREO DE MATERIAL DEMOLIDO D=30m 14.93 m3


1 vol= 12.44 1.20 14.93

03.07 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA 14.93 m3


1 vol= 14.93 14.93

04 MEJORAMIENTO DEL CERCO PERIMETRICO EXISTENTE


04.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO, NIVELES Y REPLANTEO 19.30 m2
AREA NETA 1 AREA = 19.30 19.30

04.01.02 LIMIPIEZA DE TERRENO MANUAL 19.30 m2


1 AREA = 19.30 19.30

04.01.03 LIJADO, LIMPIEZA Y RESANE EN SOBRECIMIENTOS #CARAS 92.80 m2


1 92.80 2.00 0.50 92.80

04.01.04 LIJADO, LIMPIEZA Y RESANE EN VIGAS Y COLUMNAS 187.92 m2


Columnetas 29 PERI= 0.90 4.00 104.40
Viguetas 1 92.80 PERI= 0.90 83.52

04.01.05 LIJADO, LIMPIEZA Y RESANE EN CERCO METALICO 237.48 m2


MEDIDAS
N DE
ITEM DESCRIPCION LARGO ANCH ALTO PARCIAL TOTAL UND
VECES
(L) O (B) (H)
En cerco perimetrico 1 67.85 3.50 237.48

04.02 MOVIMIENTO DE TIERRAS


04.02.01 EXCAVACION PARA CIMIENTOS A MAS DE 1.00 MT TERRENO NORMAL 23.04 M3
EXCAVACION DE ZANJAS PARA CIMIENTOS
Costado de Grifo Municipal 12.00 1.20 0.80 2.00 23.04

04.02.02 EXCAVACION PARA CIMIENTOS A MENOS DE 1.00 MT TERRENO NORMAL 9.40 M3


EXCAVACION DE ZANJAS PARA CIMIENTOS
Costado de Grifo Municipal 1.00 23.50 0.40 1.00 9.40

04.02.03 RELLENO CON MATERIAL PROPIO 18.95 m2


Volumen de excavaciones 1.00 vol= 32.44 32.44
Volumen de concreto vaciado bajo tierra -1.00 vol= 13.49 -13.49

04.02.04 ACARREO DE MATERIAL EXCEDENTE D=30M 15.52 m3


Volumen de excavaciones 1.00 vol= 32.44 32.44
Volumen de relleno -1.00 vol= 18.95 -18.95
Coeficiente de esponjamiento 1.15

04.02.05 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA 15.52 m3


1.00 vol= 15.52 15.52

04.03 CONCRETO SIMPLE


04.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 6.58 m3
EN CIMIENTOS CORRIDOS DE CERCO
Costado de Grifo Municipal 1.00 23.50 0.40 0.70 6.58

04.03.02 SOLADO DE 4" MEZCLA 1:12 CEMENTO:HORMIGON 11.52 m2


Z-1 12.00 1.20 0.80 11.52

04.03.03 SOBRECIMIENTO: CONCRETO F'C=140KG/CM2 1.60 m3


Eje A 1.00 35.50 0.15 0.30 1.60

04.03.04 SOBRECIMIENTO: ENCOFRADO Y DESENCOFRADO #CARAS 21.30 m2


Eje A 1.00 35.50 2.00 0.30 21.30

04.04 OBRAS DE CONCRETO ARMADO


04.04.01 ZAPATAS
04.04.01. ZAPATAS: CONCRETO F'C=210 KG/CM2 5.76 m3
Z-1 12.00 1.20 0.80 0.50 5.76

04.04.01. ZAPATAS: ACERO F'Y=4200 KG/CM2 1.00 VER HOJA DE ACEROS 102.17 kg

n de
Nro de piezas longitud
diametr peso por long x
Descripcin element por por
o diametro diam
os element pieza
os
Acero x-x
z-1 12.00 6.00 0.70 1/2" 0.99 49.90
Acero y-y
z-1 12.00 4.00 1.10 1/2" 0.99 52.27

04.04.02 COLUMNAS
04.04.02. COLUMNAS: CONCRETO F'C=210 KG/CM2 2.60 m3
tipo eje n veces ancho base altura
c-1 A 13.00 0.30 0.15 4.45 2.60

04.04.02. ENCOFRADO Y DESENCOFRADO CARAVISTA EN COLUMNA 52.07 m2

tipo eje n veces


Perimetro altura
c-1 A 13.00 0.90 4.45 52.07

04.04.02. COLUMNAS: ACERO F'Y=4200 KG/CM2 560.25 kg

n de
Nro de piezas longitud
diametr peso por long x
element por por
o diametro diam
EJE os element pieza
os
MEDIDAS
N DE
ITEM DESCRIPCION LARGO ANCH ALTO PARCIAL TOTAL UND
VECES
(L) O (B) (H)
Acero vertical
c-1 A 13.00 4.00 5.00 1/2" 0.99 257.40

Acero horizontal (estribos)


c-1 A 13.00 52.00 0.80 3/8" 0.56 302.85

04.04.03 VIGAS
04.04.03. VIGAS: CONCRETO F'C=210 KG/CM2 LARGO 1.60 m3
tipo eje n veces ancho base altura
V-1 A 1.00 35.50 0.15 0.30 1.60

04.04.03. ENCOFRADO Y DESENCOFRADO CARAVISTA EN VIGAS 26.63 m2


tipo eje n vecesLongitud Perimetro
V-1 A 1.00 35.50 0.75 26.63

04.04.03. VIGAS: ACERO F'Y=4200 KG/CM2 246.31 kg

n de
Nro de piezas longitud
diametr peso por long x
element por por
o diametro diam
os element pieza
os
Acero horizontal
V-1 1.00 4.00 38.40 1/2" 0.99 152.06
estribos
V-1 1.00 198.00 0.85 3/8" 0.56 94.25

04.05 MUROS DE ALBAILERIA


04.05.01 MURO DE CABEZA LADRILLO KIN-KONG 113.60 m2

Eje A 1.00 35.50 3.20 113.60

04.06 REVOQUES ,ENLUCIDOS Y MOLDURAS


04.06.01 TARRAJEO DE MUROS INTERIOR Y EXTERIOR 113.60 m2
n veces largo #caras altura
Eje A 1.00 35.50 1.00 3.20 113.60

04.07 CARPINTERIA METALICA


04.07.01 PUERTA METALICA DE 2 HOJAS SEGUN DISEO 1.00 und
INGRESOS 1.00 1.00

04.08 PINTURA
04.08.01 PINTURA LATEX EN COLUMNAS, VIGAS, SOBRECIMIENTOS Y MUROS #CARAS 311.79 m2
sobrecimientos 1.00 35.50 1.00 0.30 10.65
muros 1.00 67.85 1.00 3.20 217.12
Columnas 13.00 peri= 0.90 4.45 52.07
Vigas 1.00 35.50 peri= 0.90 31.95

04.08.02 PINTURA ESMALTE EN CERCO METALICO EXISTENTE 237.48 m2


n veces ancho altura
cerco perimetrico 1.00 67.85 3.50 237.48

04.09 OTROS
04.09.01 ENCIMADO DE CERCO SUPERIO CON RED DE PROTECCION 203.55 m2
cerco perimetrico 1.00 67.85 3.00 203.55

04.09.02 JUNTA DE CONSTRUCCION CON JEBE MICROPOROSO n lados 9.60 ml


3.00 1.00 3.20 9.60

04.09.03 SUMINISTRO E INSTALACION DE LETRAS EN ALTO RELIEVE 1.00 Glb


LETRAS EN INGRESO PRINCIPAL 1.00 1.00

05 MEJORAMIENTO DE LA CANCHA DEPORTIVA Y GRADERIA EXISTENTE


05.01 TRABAJOS PRELIMINARES
05.01.01 TRAZO, NIVELES Y REPLANTEO 951.03 m2
AREA NETA 1 AREA = 951.03 951.03

05.01.02 LIMIPIEZA DE TERRENO MANUAL 951.03 m2


1 AREA = 951.03 951.03
MEDIDAS
N DE
ITEM DESCRIPCION LARGO ANCH ALTO PARCIAL TOTAL UND
VECES
(L) O (B) (H)

05.01.03 LIJADO, LIMPIEZA Y RESANE EN GRADERIAS 30.42 m2


1 7.70 peri= 3.95 30.42

05.01.04 LIJADO, LIMPIEZA Y RESANE EN RAMPA DE ACCESO 15.00 m2


1 5.00 3.00 15.00

05.02 MOVIMIENTO DE TIERRAS


04.01.02 EXCAVACION PARA CIMIENTOS A MENOS DE 1.00 MT TERRENO NORMAL 6.65 M3
Entre rampa de ingreso principal y cancha 1.00 12.20 0.40 0.60 2.93
Entre SS.HH y Cancha 1.00 9.10 0.40 0.60 2.18
Entre SS.HH y graderia 1.00 6.40 0.40 0.60 1.54

04.01.03 RELLENO CON MATERIAL PROPIO 6.48 m3


Zona de graderias 1.00 area= 43.20 0.15 6.48

04.01.06 BASE GRANULAR DE E=0.15 M CAMPO DEPORTIVO 718.25 M2


en cancha de grass 1.00 AREA= 718.25 718.25

04.01.07 BASE GRANULAR DE E=0.10 M PISO ADOQUIN 68.40 M2


Entre graderia y cancha 1.00 AREA= 43.20 43.20
Entre graderia y SS.HH 1.00 AREA= 25.20 25.20

04.01.04 ACARREO DE MATERIAL EXCEDENTE D=30M 1.15 15.10 m3


Excavaciones 1.00 vol= 6.65 6.65
Relleno 1.00 vol= 6.48 6.48

04.01.05 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA 1.20 18.12 m3


1.00 vol= 15.10 15.10

05.03 CONCRETO SIMPLE


05.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 1.95 m3
Entre rampa de ingreso principal y cancha 1.00 12.20 0.40 0.40 1.95

05.03.02 SARDINEL: CONCRETO F'C=175KG/CM2 0.55 m3


Entre rampa de ingreso principal y cancha 1.00 12.20 0.15 0.30 0.55

05.03.03 ENCOFRADO Y DESENCOFRADO CARAVISTA EN SARDINEL 7.32 m2


Entre rampa de ingreso principal y cancha 1.00 12.20 2.00 0.30 7.32

05.04 OBRAS DE CONCRETO ARMADO


05.04.01 SOBRECIMIENTO ARMADO
05.04.01. CONCRETO EN SOBRECIMIENTO ARMADO F'C= 175 KG/CM2 2.48 m3
Entre SS.HH y Cancha 1.00 9.10 0.40 0.40 1.46
Entre SS.HH y graderia 1.00 6.40 0.40 0.40 1.02

05.04.01. ENCOFRADO Y DESENCOFRADO S/REFORZADO CARAVISTA 46.50 m2


ambos
ancho altura
lados
Entre SS.HH y Cancha 2.00 9.10 1.50 27.30
Entre SS.HH y graderia 2.00 6.40 1.50 19.20

05.04.01. ACERO FY=4200 KG/CM2 EN SOBRECIMIENTO REFORZADO 1.00 VER HOJA DE ACEROS 182.89 kg

n de
Nro de piezas longitud
diametr peso por long x
element por por
o diametro diam
os element pieza
os
acero horizontal
Entre SS.HH y Cancha 1.00 8.00 9.00 3/8" 0.56 40.32
Entre SS.HH y graderia 1.00 8.00 6.30 3/8" 0.56 28.22
acero vertical
Entre SS.HH y Cancha 1.00 45.00 1.50 1/2" 0.99 66.83
Entre SS.HH y graderia 1.00 32.00 1.50 1/2" 0.99 47.52

05.04.02 BANCA DE CONCRETO


05.04.02. CONCRETO f'c=175 kg/cm2 PARA BANCA 0.70 m3
2.00 6.00 0.45 0.10 0.54
8.00 0.45 0.10 0.45 0.16
MEDIDAS
N DE
ITEM DESCRIPCION LARGO ANCH ALTO PARCIAL TOTAL UND
VECES
(L) O (B) (H)
05.04.02. ENCOFRADO Y DESENCOFRADO CARAVISTA EN BANCA 9.84 m2
2.00 6.00 PERI= 0.55 6.60
8.00 0.45 PERI= 0.90 3.24

05.04.02. ACERO FY=4200 KG/CM2 EN BANCA 50.76 kg

n de
Nro de piezas longitud
diametr peso por long x
element por por
o diametro diam
os element pieza
os
BANCAS
AS. VERTICAL 2.00 3.00 6.00 1/2" 0.99 35.64
AS. HORIZONTAL 2.00 30.00 0.45 3/8" 0.56 15.12

05.05 PISOS Y PAVIMENTOS


05.05.01 SUMINISTRO E INSTALACION DE PISO EN GRASS SINTETICO 718.25 m2
1.00 area= 718.25 718.25

05.05.02 PISO DE CEMENTO PULIDO SIN COLOREAR E=4" F'C=175 KG/CM2 72.90 m2
Entre graderia y cancha 1.00 AREA= 43.20 43.20
Entre graderia y SS.HH 1.00 AREA= 25.20 25.20
Rampa de acceso a la cancha 1.00 AREA= 25.20 4.50

05.06 CARPINTERIA MADERA


05.06.01 PERGOLA DE MADERA SEGN DISEO 1.00 und
INGRESO 1.00 1.00

05.07 CARPINTERIA METALICA


05.07.01 PASAMANOS Y BARANDA METALICA S/DISEO 6.30 ml
PASAMANO METALICO 1.00 6.30 6.30

05.07.02 CERCO METALICO PARA SEGURIDAD DE CAMPO 9.36 m2


1.00 7.80 1.20 9.36
1.00 18.20 1.20 21.84

05.08 PINTURA
05.08.01 PINTURA ESMALTE EN GRADERIAS 30.42 m2
PINTADO DE CONTRAPASOS 1.00 area= 30.42 30.42

05.09 OTROS
05.09.01 SUMINISTRO Y COLOCACION DE ARCO METALICO PARA CAMPO DEPORTIVO 2.00 und
2.00 2.00

06 COBERTURA CON MALLA RASCHELL


06.01 CARPINTERIA METALICA
06.01.01 COLUMNAS METALICAS PARA CUBIERTA 26.00 und
26.00 26.00

06.01.02 TIJERAL METALICO PARA CUBIERTA 2.00 und


2.00 2.00

06.01.03 TENSORES DE CABLEA ACERADO 511.00 m


20.00 22.00 440.00
2.00 35.50 71.00
06.02 CUBIERTAS
06.02.01 COBERTURA CON MALLA RASCHELL 763.25 m2
1.00 35.50 21.50 763.25

07 MEJORAMIENTO DE SS.HH. EXISTENTE


07.01 TRABAJOS PRELIMINARES
07.01.01 LIJADO, LIMPIEZA Y RESANE DE CONCRETO #CARAS 126.75 m2
Muros interiores 1 7.80 3.00 23.40
1 6.50 3.00 19.50
1 6.50 3.00 19.50
1 6.50 3.00 19.50
Muros exteriores 1 14.95 3.00 44.85

07.01.02 LIJADO, LIMPIEZA Y RESANE EN CIELO RASO 13.00 m2


cielo raso 1 area= 13.00 13.00
MEDIDAS
N DE
ITEM DESCRIPCION LARGO ANCH ALTO PARCIAL TOTAL UND
VECES
(L) O (B) (H)

07.01.03 DESMONTAJE DE APARATOS SANITARIOS 3.00 und


3 3.00
MEDIDAS
N DE
ITEM DESCRIPCION LARGO ANCH ALTO PARCIAL TOTAL UND
VECES
(L) O (B) (H)
07.02 CARPINTERIA METALICA
07.02.01 DIVISIONES METALICAS EN SS.HH. 6.48 m2
3.00 1.20 1.80 6.48

07.03 PINTURA
07.03.01 PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES 126.75 m2
1.00 area= 126.75 126.75

07.03.02 PINTURA LATEX EN CIELO RASO 13.00 m2


1.00 area= 13.00 13.00

07.04 INSTALACIONES SANITARIAS


07.04.01 INODORO TANQUE BAJO COLOR INC. ACCESORIOS 3 3.00 3.00 und
07.04.02 MANTENIMIENTO GENERAL DE INSTALACIONES SANITARIAS 1 1.00 1.00 glb

08 INSTALACIONES ELECTRICAS
08.01 CANALIZACION Y/O TUBERIAS
08.01.01 TUBERIA PVC SAP D=35MM 1 120.00 120.00 120.00 m
08.02 CONDUCTORES
08.02.01 CONDUCTOR 3x10 mm2 + 1x6 mm2 N2XOH 1 120.00 120.00 120.00 m
08.03 TABLERO DE DISTRIBUCION
08.03.01 TABLERO GENERAL 1 1.00 1.00 1.00 u
08.03.02 TABLERO DE DISTRIBUCION TD1 1 1.00 1.00 1.00 u
08.04 VARIOS
08.04.01 INSTALACION DE REFLECTORES 2X400W HALOGENURO 1 4.00 4.00 4.00 u
08.04.02 POZO DE PUESTA A TIERRA 1 1.00 1.00 1.00 u
08.04.03 PRUEBAS ELECTRICAS 1 1.00 1.00 1.00 glb

09 MITIGACION DE IMPACTO AMBIENTAL


09.01 MITIGACION DE IMPACTO AMBIENTAL 2.00 2.00 2.00 mes
09.02 LIMPIEZA FINAL DE OBRA 1.00 area= 990 990.00 990.00 m2
PERGOLA
MADERA TORNILLO
CANTIDAD LARGO (') EN METROS ANCHO (") ESPESOR (")TOTAL
LISTON 31.00 7.87 2.40 4.00 1.50 122.05
LISTON 12.00 8.86 2.70 4.00 1.50 53.15
LISTON 19.00 7.87 2.40 4.00 1.50 74.80
COLUMNA 5.00 13.12 4.00 4.00 6.00 131.23
381.23
400.30
c-1 1.00 1.00 4.00 5.20 1/2" 0.99 20.59
c-1 2.00 1.00 4.00 5.20 1/2" 0.99 20.59
c-1 3.00 1.00 4.00 4.75 1/2" 0.99 18.81
c-1 4.00 1.00 4.00 4.55 1/2" 0.99 18.02
c-1 5.00 1.00 4.00 4.55 1/2" 0.99 18.02
c-1 6.00 1.00 4.00 4.50 1/2" 0.99 17.82
c-1 7.00 1.00 4.00 4.75 1/2" 0.99 18.81
c-1 8.00 1.00 4.00 4.80 1/2" 0.99 19.01
c-1 9.00 1.00 4.00 5.10 1/2" 0.99 20.20
c-1 10.00 1.00 4.00 5.40 1/2" 0.99 21.38
c-1 11.00 1.00 4.00 5.70 1/2" 0.99 22.57
c-1 12.00 1.00 4.00 5.70 1/2" 0.99 22.57
c-1 13.00 1.00 4.00 5.70 1/2" 0.99 22.57
c-1 14.00 1.00 4.00 5.70 1/2" 0.99 22.57
c-1 15.00 1.00 4.00 4.35 1/2" 0.99 17.23
c-1 16.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-3 17.00 1.00 6.00 4.00 1/2" 0.99 23.76
c-1 18.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-2 19.00 1.00 4.00 4.00 5/8" 1.55 24.80
c-1 21.00 1.00 4.00 5.45 1/2" 0.99 21.58
c-1 22.00 1.00 4.00 4.29 1/2" 0.99 16.99
c-3 23.00 1.00 6.00 4.29 1/2" 0.99 25.48
c-1 24.00 1.00 4.00 4.45 1/2" 0.99 17.62
c-1 25.00 1.00 4.00 4.75 1/2" 0.99 18.81
c-1 26.00 1.00 4.00 4.75 1/2" 0.99 18.81
c-1 27.00 1.00 4.00 4.75 1/2" 0.99 18.81
c-1 28.00 1.00 4.00 5.05 1/2" 0.99 20.00
c-1 29.00 1.00 4.00 5.35 1/2" 0.99 21.19
c-1 30.00 1.00 4.00 5.35 1/2" 0.99 21.19
c-1 31.00 1.00 4.00 5.65 1/2" 0.99 22.37
c-1 32.00 1.00 4.00 5.95 1/2" 0.99 23.56
c-1 33.00 1.00 4.00 6.25 1/2" 0.99 24.75
c-1 34.00 1.00 4.00 4.20 1/2" 0.99 16.63
c-1 35.00 1.00 4.00 4.45 1/2" 0.99 17.62
c-1 36.00 1.00 4.00 4.50 1/2" 0.99 17.82
c-1 37.00 1.00 4.00 4.75 1/2" 0.99 18.81
c-1 38.00 1.00 4.00 4.75 1/2" 0.99 18.81
c-1 39.00 1.00 4.00 5.10 1/2" 0.99 20.20
c-1 40.00 1.00 4.00 5.40 1/2" 0.99 21.38
c-1 41.00 1.00 4.00 4.10 1/2" 0.99 16.24
c-1 42.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 43.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 44.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 45.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 46.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 47.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-3 48.00 1.00 6.00 4.00 1/2" 0.99 23.76
c-1 49.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 50.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 51.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 52.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 53.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-2 54.00 1.00 4.00 4.00 5/8" 1.55 24.80
c-1 55.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 56.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 57.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-3 58.00 1.00 6.00 4.00 1/2" 0.99 23.76
c-1 59.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 60.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 61.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 62.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 63.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 64.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 65.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 66.00 1.00 4.00 4.75 1/2" 0.99 18.81
c-1 67.00 1.00 4.00 4.75 1/2" 0.99 18.81
c-1 68.00 1.00 4.00 4.75 1/2" 0.99 18.81
c-1 69.00 1.00 4.00 4.50 1/2" 0.99 17.82
c-1 70.00 1.00 4.00 4.15 1/2" 0.99 16.43
c-1 71.00 1.00 4.00 4.15 1/2" 0.99 16.43
c-1 72.00 1.00 4.00 4.10 1/2" 0.99 16.24
c-1 73.00 1.00 4.00 4.40 1/2" 0.99 17.42
c-1 74.00 1.00 4.00 4.40 1/2" 0.99 17.42
c-1 75.00 1.00 4.00 4.35 1/2" 0.99 17.23
c-1 76.00 1.00 4.00 5.50 1/2" 0.99 21.78
c-1 77.00 1.00 4.00 5.25 1/2" 0.99 20.79
c-1 78.00 1.00 4.00 4.95 1/2" 0.99 19.60
c-1 79.00 1.00 4.00 4.95 1/2" 0.99 19.60
c-1 80.00 1.00 4.00 4.65 1/2" 0.99 18.41
c-1 81.00 1.00 4.00 4.35 1/2" 0.99 17.23
c-1 82.00 1.00 4.00 4.35 1/2" 0.99 17.23
c-1 83.00 1.00 4.00 4.35 1/2" 0.99 17.23
c-1 84.00 1.00 4.00 4.25 1/2" 0.99 16.83
c-1 85.00 1.00 4.00 3.95 1/2" 0.99 15.64
c-1 86.00 1.00 4.00 3.95 1/2" 0.99 15.64
c-1 87.00 1.00 4.00 3.95 1/2" 0.99 15.64
c-1 88.00 1.00 4.00 3.95 1/2" 0.99 15.64
c-1 89.00 1.00 4.00 3.95 1/2" 0.99 15.64
c-1 90.00 1.00 4.00 3.95 1/2" 0.99 15.64
c-1 91.00 1.00 4.00 3.95 1/2" 0.99 15.64
c-2 92.00 1.00 4.00 3.95 5/8" 1.55 24.49
c-1 93.00 1.00 4.00 3.95 1/2" 0.99 15.64
c-1 95.00 1.00 4.00 3.95 1/2" 0.99 15.64
c-1 96.00 1.00 4.00 3.95 1/2" 0.99 15.64
c-1 97.00 1.00 4.00 6.05 1/2" 0.99 23.96
c-1 98.00 1.00 4.00 5.75 1/2" 0.99 22.77
c-1 99.00 1.00 4.00 5.45 1/2" 0.99 21.58
c-1 100.00 1.00 4.00 5.15 1/2" 0.99 20.39
c-1 101.00 1.00 4.00 5.10 1/2" 0.99 20.20
c-1 102.00 1.00 4.00 4.85 1/2" 0.99 19.21
c-1 103.00 1.00 4.00 4.50 1/2" 0.99 17.82
c-1 104.00 1.00 4.00 4.50 1/2" 0.99 17.82
c-1 105.00 1.00 4.00 4.85 1/2" 0.99 19.21
c-1 106.00 1.00 4.00 5.20 1/2" 0.99 20.59
c-1 107.00 1.00 4.00 5.20 1/2" 0.99 20.59
c-1 108.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 109.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 110.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 111.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 112.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 113.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 114.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 115.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 116.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 117.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 118.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 119.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 120.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 121.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 122.00 1.00 4.00 4.00 1/2" 0.99 15.84
c-1 123.00 1.00 4.00 4.00 1/2" 0.99 15.84
40.00
40.00
37.00
35.00
35.00
35.00
37.00
37.00
39.00
42.00
44.00
44.00
44.00
44.00
33.00
31.00
31.00
31.00
31.00
42.00
33.00
33.00
34.00
37.00
37.00
37.00
39.00
41.00
41.00
43.00
46.00
48.00
32.00
34.00
35.00
37.00
37.00
39.00
42.00
32.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
37.00
37.00
37.00
35.00
32.00
32.00
32.00
34.00
34.00
33.00
42.00
40.00
38.00
38.00
36.00
33.00
33.00
33.00
33.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
47.00
44.00
42.00
40.00
39.00
37.00
35.00
35.00
37.00
40.00
40.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
31.00
PLANILLA DE METRADOS

PROYECTO:MEJORAMIENTO DE LOS SERVICIOS DEPORTIVOS EN LA LOSA DEPORTIVA ELOY G. URETA, DISTRITO ALTO DE LA ALIANZA-TACNA-TACNA
CLIENTE: MUNICIPALIDAD DISTRITAL DE ALTO DE LA ALIANZA
FECHA: 9/17/2017

MEDIDAS
N DE
ITEM DESCRIPCION PARCIAL TOTAL UND
VECES LARGO ANCH ALTO
(L) O (B) (H)
01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3,60 X 2,40M 1.00 1.00 1.00 und
01.02 CASETA DE GUARDIANIA, ALMACEN Y OFICINA DE RESIDENCIA 1.00 6.00 5.00 30.00 30.00 m2
01.03 CERCO PROVISIONAL C/MALLA ARPILLERA 1.00 92.00 92.00 92.00 ml
01.04 MOVILIZACION DE EQUIPOS Y HERRAMIENTAS 1.00 1.00 1.00 glb

02 SEGURIDAD Y SALUD
02.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DE PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO 1.00 glb
SERVICIO 1 1.00

02.02 EQUIPOS DE PROTECCION INDIVIDUAL 1.00 und


PROMEDIO DE PERSONAL OBRERO 1 1.00

02.03 EQUIPOS DE PROTECCION COLECTIVA 1.00 glb


1 1.00

02.04 SEALIZACION TEMPORAL DE SEGURIDAD 1.00 glb


1 1.00
402.9074
02.05 CAPACITACION SOBRE SALUD Y SEGURIDAD 1.00 glb
1 1.00

02.06 RECURSOS DE RESPUESTA DE EMERGENCIA 1.00 glb


1 1.00
03 DEMOLICIONES Y DESMONTAJES
03.01 DEMOLICION DE CONCRETO SIMPLE 20.88 m3 11.36
Banca de concreto en ambos lados de la cancha 2 35.50 0.40 0.50 14.20
Demolicion de rampa de concreto 1 2.00
Demolicion de sardinel de concreto 1 1.84 0.15 0.60 0.17
1 1.88 0.15 0.60 0.17
Demolicion parapeto hall, local comercial y entrada 1 2.05 0.15 2.50 0.77
1 6.68 0.15 1.00 1.00
1 1.85 0.15 1.00 0.28
1 2.00 0.15 1.00 0.30
Demolicin de muro para abertura de puerta 1 0.80 2.50 2.00

03.02 DEMOLICION DE CONCRETO ARMADO 5.60 m3 1.08


Columnas 4 0.30 0.30 3.00 1.08
Abertura P/Puerta C.Perez Gamboa (P-01) 1 0.90
Abertura P/Puerta C.Eloy Ureta (P-02) 1 0.90
Graderia 01 (Eloy Ureta) 1 AREA = 13.58 0.20 2.72

03.03 DEMOLICION CANCHA DE PAVIMENTO ASFALTICO DE 2" 840.40 m2


1 AREA = 840.40 840.40

03.04 DESMONTAJE Y RETIRO DE ARCOS 4.00 und 2


2 2.00
Desmontaje de puerta en rampa de acceso 1 1.00
Desmontaje de puerta en graderia 01 1 1.00

03.05 DESMONTAJE Y RETIRO DE POSTES C.A.C. 2.00 und


2 2.00

03.06 ACARREO DE MATERIAL DEMOLIDO D=30m 31.77 m3


1 vol= 26.48 1.20 31.77

03.07 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA 31.77 m3


1 vol= 31.77 31.77

04 MEJORAMIENTO DEL CERCO PERIMETRICO EXISTENTE


04.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO, NIVELES Y REPLANTEO 172.00 m2 19.3
graderias perez gamboa y otros 1 AREA = 80.00 80.00
rampa acceso calle ureta y otros 1 AREA = 80.00 80.00
cimentaciones malla rache 1 AREA = 12.00 12.00

04.01.02 LIMIPIEZA DE TERRENO MANUAL 172.00 m2


1 AREA = 172.00 172.00

04.01.03 LIJADO, LIMPIEZA Y RESANE EN SOBRECIMIENTOS #CARAS 92.80 m2


1 92.80 2.00 0.50 92.80

04.01.04 LIJADO, LIMPIEZA Y RESANE EN VIGAS Y COLUMNAS 187.92 m2 150


Columnetas 29 PERI= 0.90 4.00 104.40
Viguetas 1 92.80 PERI= 0.90 83.52

04.02 MOVIMIENTO DE TIERRAS


04.02.01 EXCAVACION PARA CIMIENTOS A MAS DE 1.00 MT TERRENO NORMAL 15.00 M3 23.04
EXCAVACION DE ZANJAS PARA CIMIENTOS
Costado de Grifo Municipal 10.00 1.00 1.00 1.50 15.00

04.02.02 EXCAVACION PARA CIMIENTOS A MENOS DE 1.00 MT TERRENO NORMAL 11.75 M3 9.4
EXCAVACION DE ZANJAS PARA CIMIENTOS
Costado de Grifo Municipal 1.00 23.50 0.50 1.00 11.75

04.02.03 RELLENO CON MATERIAL PROPIO 9.00 m2


Volumen de excavaciones 1.00 vol= 26.75 26.75
Volumen de concreto vaciado bajo tierra -1.00 vol= 17.75 -17.75

04.02.04 ACARREO DE MATERIAL EXCEDENTE D=30M 20.41 m3


Volumen de excavaciones 1.00 vol= 26.75 26.75
Volumen de relleno -1.00 vol= 9.00 -9.00
Coeficiente de esponjamiento 1.15

04.02.05 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA 20.41 m3


1.00 vol= 20.41 20.41

04.03 CONCRETO SIMPLE


04.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 11.75 m3 6.58
EN CIMIENTOS CORRIDOS DE CERCO
Costado de Grifo Municipal 1.00 23.50 0.50 1.00 11.75

04.03.02 SOLADO DE 4" MEZCLA 1:12 CEMENTO:HORMIGON 10.00 m2 11.52


Z-1 10.00 1.00 1.00 10.00

04.03.03 SOBRECIMIENTO: CONCRETO F'C=140KG/CM2 1.60 m3


Eje A 1.00 35.50 0.15 0.30 1.60

04.03.04 SOBRECIMIENTO: ENCOFRADO Y DESENCOFRADO #CARAS 21.30 m2


Eje A 1.00 35.50 2.00 0.30 21.30

04.04 OBRAS DE CONCRETO ARMADO


04.04.01 ZAPATAS
04.04.01. ZAPATAS: CONCRETO F'C=210 KG/CM2 5.00 m3
Z-1 10.00 1.00 1.00 0.50 5.00

04.04.01. ZAPATAS: ACERO F'Y=4200 KG/CM2 1.00 VER HOJA DE ACEROS 69.30 kg 102.17

n de
Nro de piezas longitud
diametr peso por long x
Descripcin element por por
o diametro diam
os element pieza
os
Acero x-x
10.00 5.00 0.70 1/2" 0.99 34.65
Acero y-y
z-1 10.00 5.00 0.70 1/2" 0.99 34.65

04.04.02 COLUMNAS
04.04.02. COLUMNAS: CONCRETO F'C=210 KG/CM2 2.60 m3 2.6
tipo eje n veces ancho base altura
c-1 A 10.00 0.30 0.15 4.45 2.00
4.00 0.30 0.15 3.30 0.59

04.04.02. ENCOFRADO Y DESENCOFRADO CARAVISTA EN COLUMNA 51.93 m2 52.07


ACERO ACERO ESTRIBOS
tipo eje n veces
Perimetro altura EN 60 CM RESTAR -60
c-1 A 10.00 0.90 4.45 40.05
4.00 0.90 3.30 11.88

04.04.02. COLUMNAS: ACERO F'Y=4200 KG/CM2 430.96 kg

n de
Nro de piezas longitud
diametr peso por long x
element por por
o diametro diam
os element pieza
os
MEDIDAS
N DE n de
ITEM DESCRIPCION Nro de LARGO ANCH ALTO PARCIAL
piezas longitud TOTAL UND
VECES
element (B) diametr
(L) O por
por (H) peso por long x
o diametro diam
EJE os element pieza
os
Acero vertical
c-1 A 10.00 4.00 5.00 1/2" 0.99 198.00

Acero horizontal (estribos)


c-1 A 10.00 52.00 0.80 3/8" 0.56 232.96

04.04.03 VIGAS
04.04.03. VIGAS: CONCRETO F'C=210 KG/CM2 LARGO 1.60 m3
tipo eje n veces ancho base altura
V-1 A 1.00 35.50 0.15 0.30 1.60

04.04.03. ENCOFRADO Y DESENCOFRADO CARAVISTA EN VIGAS 26.63 m2


tipo eje n vecesLongitud Perimetro EN 60 CM RESTAR -60
V-1 A 1.00 35.50 0.75 26.63

04.04.03. VIGAS: ACERO F'Y=4200 KG/CM2 246.31 kg

n de
Nro de piezas longitud
diametr peso por long x
element por por
o diametro diam
os element pieza
os
Acero horizontal
V-1 1.00 4.00 38.40 1/2" 0.99 152.06
estribos
V-1 1.00 198.00 0.85 3/8" 0.56 94.25

04.05 MUROS DE ALBAILERIA


04.05.01 MURO DE LADRILLO KIN-KONG AMARRE SOGA 113.60 m2

Eje A 1.00 35.50 3.20 113.60

04.06 REVOQUES ,ENLUCIDOS Y MOLDURAS


04.06.01 TARRAJEO DE MUROS INTERIORES 113.60 m2
n veces largo #caras altura
Eje A 1.00 35.50 1.00 3.20 113.60

04.07 CARPINTERIA METALICA


04.07.01 PUERTA METALICA DE 2 HOJAS SEGUN DISEO 2.00 und
INGRESOS 2.00 2.00

04.07.02 SUM. E INST. DE ENREJADO EN CERCO PERIMETRICO EXISTENTE 22.00 und


PERIMETRO 22.00 22.00
04.08 PINTURA
04.08.01 PINTURA LATEX EN COLUMNAS, VIGAS, SOBRECIMIENTOS Y MUROS #CARAS 208.27 m2
sobrecimientos 1.00 35.50 1.00 0.30 10.65
muros 1.00 35.50 1.00 3.20 113.60
Columnas 13.00 peri= 0.90 4.45 52.07
Vigas 1.00 35.50 peri= 0.90 31.95

04.09 OTROS
04.09.01 ENCIMADO DE CERCO SUPERIOR CON RED DE PROTECCION 390 m2
04.09.01 JUNTA DE CONSTRUCCION CON JEBE MICROPOROSO n lados 16.00 ml 9.6 cerco perimetri 1 130 3 390
1.00 10.00 1.00 10.00
2.00 3.00 6.00
04.09.02 SUMINISTRO E INSTALACION DE LETRAS EN ALTO RELIEVE 1.00 Glb 11445
LETRAS EN INGRESO PRINCIPAL 1.00 1.00 3.625

04.09.03 CERRAMIENTO PUERTAS DE INGRESO 1.00 1.00 Est 3.625


Puerta 1 C. Ureta
Puerta 2 (Esquina Ureta - Manco Capac ) 31351.88
Puerta 2 (Esquina Perez Gamboa - Manco Capac ) 0.05

05 MEJORAMIENTO DE LA CANCHA DEPORTIVA Y GRADERIA EXISTENTE 756


05.01 TRABAJOS PRELIMINARES 792
05.01.01 TRAZO, NIVELES Y REPLANTEO 951.03 m2
AREA NETA 1 AREA = 951.03 951.03 0.955
135.30062705
05.01.02 LIMIPIEZA DE TERRENO MANUAL 951.03 m2
1 AREA = 951.03 951.03

LIJADO LIMPIEZA Y RESANE EN GRADERIAS


05.02 MOVIMIENTO DE TIERRAS LIJADO LIMPIEZA Y RESANE EN RAMPA DE ACCESO
05.02.01 EXCAVACION PARA CIMIENTOS A MENOS DE 1.00 MT TERRENO NORMAL 11.38 M3 6.65
Rampa de ingreso discapacitados 12% 1.00 14.63 0.40 0.60 3.51 14.63
Graderias Perez Gamboa 1.00 20.59 0.40 0.60 4.94 20.59
Graderias 01 Ingreso Principal 1.00 6.65 0.40 0.60 1.60 6.65
Banca de concreto H=0.45m 1.00 4.58 0.40 0.30 0.55 4.58
Sardinel de Concreto H=0.50m 1.00 6.50 0.40 0.30 0.78

05.02.02 RELLENO CON MATERIAL PROPIO 53.25 m3


Rampa de ingreso discapacitados 12% 1.00 area= 18.17 0.70 12.72 18.17 11.2
Graderias Perez Gamboa 1.00 area= 37.47 0.90 33.72 4.25
Graderias 01 Ingreso Principal 1.00 area= 7.15 0.80 5.72 2.72
Banca de concreto H=0.45m 1.00 area= 2.18 0.50 1.09
37.47 20.61
05.02.03 BASE GRANULAR DE E=0.15 M CAMPO DEPORTIVO 836.05 M2 16.86
Cancha de grass 1.00 AREA= 806.37 806.37 806.37
Zona recreativa nios 1.00 AREA= 29.68 29.68 29.68

05.02.04 BASE GRANULAR DE E=0.10 M PISO CEMENTO PULIDO 68.40 M2


Entre graderia y cancha 1.00 AREA= 43.20 43.20
Entre graderia y SS.HH 1.00 AREA= 25.20 25.20

05.02.05 ACARREO DE MATERIAL EXCEDENTE D=30M 1.15 13.09 m3


Excavaciones 1.00 vol= 11.38 11.38

05.02.06 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO 42.65 m3


Relleno (rampa,graderias y banca) 1.00 vol= 53.25 53.25
material de excavaciones 1.00 vol= -10.60 -10.60

05.02.07 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA 1.20 36.00 m3


demoliciones 1.00 vol= 30.00 30.00

05.03 CONCRETO SIMPLE


05.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 11.38 m3
Rampa de ingreso discapacitados 12% 1.00 VOL= 11.38 - 11.38
Graderias Perez Gamboa
Graderias 01 Ingreso Principal
Banca de concreto H=0.45m SARDINEL:CONCRETO F'C=175KG/CM2
Sardinel de Concreto H=0.50m ENCOFRADO Y DESENCOFRADO CARAVISTA EN SARDINEL

05.04 CONCRETO ARMADO


05.04.01 CONCRETO EN SOBRECIMIENTO ARMADO F'C= 175 KG/CM2 7.73 m3
Rampa de ingreso discapacitados 12% 1.00 14.63 0.15 1.20 2.63
Graderias Perez Gamboa 1.00 20.59 0.15 1.10 3.40
Graderias 01 Ingreso Principal 1.00 6.65 0.15 0.90 0.90
Banca de concreto H=0.45m 1.00 4.58 0.15 0.45 0.31 4180
Sardinel de Concreto H=0.50m 1.00 6.50 0.15 0.50 0.49
12540

05.04.02 ENCOFRADO Y DESENCOFRADO S/REFORZADO CARAVISTA 103.00 m2


ambos
ancho altura
lados
Rampa de ingreso discapacitados 12% 2.00 14.63 1.20 35.11 7.00
Graderias Perez Gamboa 2.00 20.59 1.10 45.30 7.00
Graderias 01 Ingreso Principal 2.00 6.65 0.90 11.97
Banca de concreto H=0.45m 2.00 4.58 0.45 4.12
Sardinel de Concreto H=0.50m 2.00 6.50 0.50 6.50 402907.4
359290 43617.4
05.04.03 ACERO FY=4200 KG/CM2 EN SOBRECIMIENTO REFORZADO 1.00 VER HOJA DE ACEROS 369.40 kg

n de
Nro de piezas longitud
diametr peso por long x
element por por
o diametro diam
os element pieza H CIMIENTOCOR 0.65
os
acero horizontal DESDE C-SC H SC
Rampa de ingreso discapacitados 12% 1.00 7.00 14.63 3/8" 0.56 57.35 2.95 #REF! #REF!
Graderias Perez Gamboa 1.00 7.00 20.59 3/8" 0.56 80.71
Graderias 01 Ingreso Principal 1.00 6.00 6.65 3/8" 0.56 22.34
Banca de concreto H=0.45m 1.00 5.00 4.58 3/8" 0.56 12.82
Sardinel de Concreto H=0.50m 1.00 3.00 6.50 3/8" 0.56 10.92
acero vertical DESDE C-SC H SC
Rampa de ingreso discapacitados 12% 1.00 73.00 1.50 3/8" 0.56 61.32 2.95 #REF! #REF!
Graderias Perez Gamboa 1.00 103.00 1.40 3/8" 0.56 80.75
Graderias 01 Ingreso Principal 1.00 33.00 1.20 3/8" 0.56 22.18
Banca de concreto H=0.45m 1.00 20.00 0.75 3/8" 0.56 8.40
Sardinel de Concreto H=0.50m 1.00 30.00 0.75 3/8" 0.56 12.60
BANCA DE CONCRETO
MEDIDAS
N DE
ITEM DESCRIPCION PARCIAL TOTAL UND
VECES LARGO ANCH ALTO
(L) O (B) (H)
05.05 PISOS Y PAVIMENTOS
05.05.01 SUMINISTRO E INSTALACION DE PISO EN GRASS SINTETICO 836.05 m2
1.00 area= 836.05 836.05

05.05.02 PISO DE CEMENTO PULIDO COLOREADO E=4" F'C=175 KG/CM2 80.88 m2


Estar 01 C.Perez Gamboa 1.00 area= 20.68 20.68
Estar 02 C.Eloy Ureta 1.00 area= 27.71 27.71
Rampa de ingreso discapacitados 12% (E=2") 1.00 area= 18.17 0.50 9.09
Graderias Perez Gamboa (E=2") 1.00 area= 37.47 0.50 18.74
Graderias 01 Ingreso Principal (E=2") 1.00 area= 7.15 0.50 3.58
Banca de concreto H=0.45m (E=2") 1.00 area= 2.18 0.50 1.09

05.05.03 PISO CERAMICO 30X30 22.88 m2


ss.hh varones y mujeres hall e ingreso principal (calle Ureta) 1.00 area= 22.88 22.88

05.06 CARPINTERIA METALICA


05.06.01 PASAMANOS Y BARANDA METALICA S/DISEO 26.06 ml
Baranda metlica hall ss.hh varones y ss.hh mujeres 1.00 5.49 5.49
Baranda escalera 01 ingreso principal C.Ureta 1.00 2.13 2.13
Baranda rampa de acceso C. Ureta 1.00 8.13 8.13
1.00 4.54 4.54
1.00 3.81 3.81
1.00 1.96 1.96
92.75
05.06.02 MALLA METALICA PARA SEGURIDAD DE CAMPO 258.30 m2 185.5
1.00 129.15 2.00 258.30 129.15
2.79
05.06.03 COBERTURA METALICA EN GRADERIAS 12.00 und
12.00 12.00
3.635
05.07 MUROS Y TABIQUES
05.07.01 MURO DE LADRILLO KING KONG AMARRE SOGA 6.25 m2 0.465
muro local comercial 1 2.50 2.50 6.25 0.6058333333

05.08 PINTURA 0.055


05.08.01 PINTURA ESMALTE EN GRADERIAS 928.58 m2
Pintado graderias (C.Perez Gamboa) 1.00 area= 20.61 2.50 51.53
1.00 area= 16.86 2.50 42.15
Pintado cerco perimtrico 2.00 129.15 3.00 774.90
ss.hh varones, mujeres, deposito 1.00 area= 60.00 1.00 60.00
05.09 OTROS
05.09.01 SUMINISTRO Y COLOCACION DE ARCO METALICO PARA CAMPO DEPORTIVO 2.00 und
2.00 2.00

05.09.02 COBERTURA CON MALLA RASCHELL 34.50 m2


1.00 AREA= 34.50 34.50
50.00 m
05.09.03 TUBERIA P/DRENAJE 4" 1.00 50.00 50.00

06 COBERTURA CON MALLA RASCHELL 0.003175


06.01 CARPINTERIA METALICA
06.01.01 COLUMNAS METALICAS PARA CUBIERTA 12.00 und
12.00 12.00

06.01.02 VIGA METALICA PARA CUBIERTA 2.00 und


2.00 2.00

06.02 CUBIERTAS
06.02.01 COBERTURA CON MALLA RASCHELL 763.25 m2 138.32 23.053333333
1.00 35.50 21.50 763.25
78 13
07 MEJORAMIENTO DE SS.HH. EXISTENTE
07.01 TRABAJOS PRELIMINARES
07.01.01 LIJADO, LIMPIEZA Y RESANE DE CONCRETO #CARAS 139.75 m2
Muros interiores 1 7.80 3.00 23.40
1 6.50 3.00 19.50
1 6.50 3.00 19.50
1 6.50 3.00 19.50
Muros exteriores 1 14.95 3.00 44.85

cielo raso 1 area= 13.00 13.00

07.01.02 DESMONTAJE DE APARATOS SANITARIOS 3.00 und


3 3.00
MEDIDAS
N DE
ITEM DESCRIPCION PARCIAL TOTAL UND
VECES LARGO ANCH ALTO
(L) O (B) (H)
07.02 CARPINTERIA METALICA
07.02.01 PUERTAS METALICAS 6.48 m2
EN SS.HH Y DEPOSITO 3.00 1.20 1.80 6.48
07.02.02 VENTANAS METALICAS 3.40 m2
EN SS.HH Y DEPOSITO 1.00 2.17 1.20 2.60
1.00 0.88 0.50 0.44
1.00 0.71 0.50 0.36

07.03 PINTURA
07.03.01 PINTURA ESMALTE EN PAREDES Y TECHOS 147.75 m2
PINTURA ESMALTE EN MUROS INTERIORES Y EXTERIORES 1.00 area= 139.75 139.75

PINTURA LATEX EN CIELO RASO 1.00 area= 8.00 8.00

08 INSTALACIONES SANITARIAS
08.01 INODORO TANQUE BAJO COLOR INC. ACCESORIOS 3 3.00 3.00 und
08.01 LAVATORIO NACIONAL CON PEDESTAL BLANCO 2 2.00 2.00 und
08.03 MANTENIMIENTO GENERAL DE INSTALACIONES SANITARIAS 1 1.00 1.00 glb

09 INSTALACIONES ELECTRICAS
09.01 CONDUCTOR NYY 2-1 x 6mm2 + 1THW 6mm2 1 20.00 20.00 20.00 m
09.02 CONDUCTOR 2-1 x 6mm2-NH 80 1 10.00 10.00 10.00 m
09.03 CONDUCTOR 2x4mm2-NH 80 1 120.00 120.00 120.00 m
09.04 TABLERO DE DISTRIBUCION 1 1.00 1.00 1.00 u
09.05 SUMINISTRO E INSTALACION DE REFLECTORES 1x400 W HALOG 1 8.00 8.00 8.00 u
09.06 LAMPARA DE VAPOR DE SODIO DE 80 W 1 2.00 2.00 2.00 u
09.07 BRAQUETE DE VAPOR DE SODIO DE 80 W 1 4.00 4.00 4.00 u
09.08 POZO A TIERRA 1 1.00 1.00 1.00 u
09.09 PRUEBAS ELECTRICAS 1 1.00 1.00 1.00 glb
10 MITIGACION DE IMPACTO AMBIENTAL
09.01 MITIGACION DE IMPACTO AMBIENTAL 1.00 1.00 1.00 glb
09.02 LIMPIEZA FINAL DE OBRA 1.00 area= 990 990.00 990.00 m2