Professional Documents
Culture Documents
BridgeDesignTrainingProgram,September2014
HydrologicalAnalysis
Sunday,September14
TrainingMaterialsforLecture3:
DataProcessingandPlausibilityChecking
Thedataprocessingandplausibilitycheckingstepsconsistofthefollowingsteps.
a) Databasepreparation
b) DeterminingpotentialHSCsbasedondifferentcriteria
c) CheckingthedataconsistencyofselectedHSCs
d) Checkingreliability/plausibilityofavailabledata
DatabasePreparation
1. Catchment and River Channel Characteristics Data
a) Hypsometric curve
b) Catchment size, shape, average width, slope, elevation
c) Channel length, channel slope, drainage density, time of concentration
CumulativeAveragePrecipitationofStationX(mm)
20000
a
15000 c
10000
5000
0
0 5000 10000 15000 20000 25000 30000
CumulativeAveragePrecipitationof5stations(mm)
b) Runoff Coefficient
Trendoftimeseriesdata:
250.0 Trend of Average Annual Rainfall (mm) at Thamachit
200.0
150.0
100.0
50.0
0.0
1970 1980 1990 2000 2010
TrendofTotalAnnualRainfall
3000 Trend of Total Annual Rainfall (mm) at Thamachit
2500
2000
1500
1000
500
0
1970 1980 1990 2000 2010
RunoffCoefficientPlausibilityandOutlierData
1.20 Trend of Runoff Coefficient at PBC
1.00
0.80
0.60
0.40
0.20
0.00
1970 1980 1990 2000 2010