You are on page 1of 1

OBJECT: CONSTRUCTION OF BORDER PROCESSING GRADIKA - ATRNJA

LOCATION: MUNICIPALITYGRADIKA
INVESTOR: INDIRECT TAX ADMINISTRATION BIH

4.3. sound barrier Unit price Total pric

Supply and installation of aluminum aluces of 3.96m length


46 4.3.3. and 0.5m width on the wall and concrete wickets with m 1.302,00 -
welding on steel and HEA 160 profiles (as a staircase)

UKUPNO ZVUNA BARIJERA : -

You might also like