About the project

The new building for professional services provider PwC at 7 More London, near Tower Bridge, is the
first in the capital, and the first major office in the UK, to be awarded the BREEAM Outstanding rating.
Occupation of the building commenced in March 2011.

More than 45 items of equipment from Williams Refrigeration were installed on the site, creating an
integrated refrigeration system designed to maximise energy savings and minimise heat emissions,
including:

Glycol system circulating a PwCs vision for the 48,000m2 site Director of The Peter Burholt
chilled glycol solution to Level on the south bank of the Thames, Partnership, explained: The shell
3 chiller coldrooms and serving close to City Hall, was to raise the and core building was designed
areas including multi decks bar for the sustainable design of an by Sir Norman Fosters architects
Five chiller coldrooms office building. Aggregates used in practice.
serving the kitchens and food the build were predominantly from
preparation areas, located on recycled sources, part of a strategy PwCs design development
levels 1,3, 8 and in the Basement to integrate sustainable products introduced a variety of catering
Freezer room on Level 3 and materials throughout the site. throughout the building. Our task
Four remote DX refrigeration PwC worked with multi-discipline was to design a catering operation
units for the coldrooms design consultancy BDP to meet, that required a minimum amount
Thirty upright and undercounter and then exceed, the BREEAM of air extraction. In order to clean
refrigerators and freezers across standards. exhaust air, UV technology was
the building, in a range of styles introduced into the canopies.
including bench and glass- Working with BDP, The Peter Burholt
fronted models Partnership was commissioned The ten-storey building is home


Five multideck, glycol refrigerated to develop the catering strategy to 6000 people with an expected
food and drink display units and design for the building. The 4500 on any given day. The food We chose Williams Refrigeration because of
One reach-in blast chiller for the brief presented some very specific handling and catering facilities their proven track record with Glycol.
main kitchen challenges, as Graham Moore, developed for the building include:

Graham Moore, Director AT The Peter Burholt Partnership


Building Design: Foster+partners Interior Fit-Out architect and environmental engineer: BDP Kitchen Design: Graham Moore, The Peter Burholt
Partnership Project Manager: Julian Parfitt, Williams Refrigeration Installation: Derek Smith, Berkeley Projects Contractor: Overbury

the Vision
The international BREEAM and we set ourselves the target to
standard is the highest award for secure the BREEAM Outstanding
best practice in sustainable design rating.
and environmental performance for
buildings, and the Outstanding You have got to be single-minded
rating is the top award. To achieve to set and achieve these new
the rating, the site at 7 More standards; involve people early on
London had to meet or exceed and make sure the support of your
a score of 85%, and included developer, contractors and design
environmental innovations such as team matches your clients vision.
Basement: Goods Delivery and reduce the quantity of CFCs. This the use of 80% recycled aggregate
Bulk Storage. also kept rejected heat outside the
Facts and Figures within the concrete used, and the
Ground floor: A Coffee Shop plus building, thereby reducing the air recycling of waste heat to cool and
a Receiving Pantry serving three conditioning requirements. First major office in the UK warm the building.
lecture rooms. to be awarded the BREEAM
Level 1: A Finishing Kitchen plus The refrigeration system had to run Outstanding rating. Roger Reeves, partner, PwC said:
Beverages Pantry serving client- the cold rooms and reach-in food With the design process for the
facing meeting rooms. display cabinets, as well as a large 25% of energy produced on site building we had the opportunity to
Level 3: The Main Production number of refrigerated cupboards, take a blank sheet of paper and
Kitchen, Stores, Servery and along with bespoke food wells, 6,000 people based in a ten raise the bar, both for ourselves
Wash-up serving all office staff. manufactured by Essex Fabrication -storey building and others, in the environmental
Level 8: A VIP Kitchen producing Ltd, in the main staff servery. and sustainability performance of
food for Level 1 and 10 Includes two restaurants, a office buildings. This assessment
Level 10: A Finishing Kitchen Graham Moore added We chose coffee shop, and two finishing sends a really clear message that
serving the Partners and Client Williams Refrigeration because kitchens planning for the sustainable use
fine dining room of their proven track record with of resources, in detail and right
Glycol. through the process, can make
Graham Moore said: From the good business sense.
beginning, a BREEAM rating of This was a major requirement
Outstanding was required. We within our scheme, so we needed Bob Spittle, chairman of

25
therefore had to reduce power a company capable of designing environmental engineering at BDP
and water consumption wherever and installing a system where the % said: This major achievement
possible, and include materials that compressors could be located at emerged from the sheer
would not have a detrimental effect roof level, seven floors above the determination of PwC to set a new
on the rating. kitchen and servery. of energy produced on site standard in office design. Initially 30 upright and
we were aiming for the BREEAM undercounter
Glycol Refrigeration was specified Excellent rating, however during refrigerators and freezers
for the Level 3 coldrooms and the fit-out design we could see the
servery refrigeration in order to opportunity to lead and innovate,
Design Excellence : Cool Technology

Reading University
Temperature controlled CPU: catering for 30,000 students, staff and
visitors - achieved excellent BREEAM results
7 Coldrooms, 3 Prep rooms, 2 Modular blast chillers.

The Bateson Research Institute


One of the Cancer Research UKs core-funded institutes
7 x temperature controlled chiller rooms
Special requirements: 1 x vibration free temperature controlled room

Twickenham Stadium
The largest rugby union stadium in the United Kingdom
12 x chiller/freezer rooms, 14 x chilled beer stores, 2 x Roll-in blast freezers
Special requirements: continuous public access throughout

HMS Collingwood
The largest naval training facility in Western Europe
Bespoke Glycol secondary refrigeration system capable of running multiple
units, chilled areas and cold rooms

Burj Al Arab - DubaI


Worlds first 7 star hotel - an icon that represents Dubai
Cabinets, counters, bottle coolers, blast chillers

greenlogic

www.williams-refrigeration.com Williams Refrigeration


Bryggen Road
For further information about this, other case studies North Lynn Industrial Estate
or to view the complete range of Williams products Kings Lynn
please visit www.williams-refrigeration.com Norfolk PE30 2HZ
T +44 (0) 1553 817 000
F +44 (0) 1553 817 111
E info@williams-refrigeration.co.uk

MK/Lit/CASE/PwC/0711

You might also like