Roof Flashing Details Index

FD01 Interior Roof Drain Detail 2

FD02 Interior Drain with Gravel Stop Detail 3

FD03 Scupper Roof Drain Detail 4

FD04 Gutter Roof Drain Detail 5

FD05 Roof-Top Equipment Curb Detail 6

FD06 Roof-Top Metal Air Shaft Curb Detail 7

FD07 Roof-Top Wood Air Shaft Curb Detail 8

FD08 Roof Skylight Detail 9

FD09 Roof-Top Chimney Pipe Detail 10

FD10 Roof-Top Plumbing Vent Pipe Detail 11

FD11 Sheet Metal Pipe Enclosure Detail 12

FD12 Roof-Top Pipe Roller Support Detail 13

FD13 Structural Roof Deck Penetration Detail 14

FD14 Metal Covered Expansion Joint Detail 15

FD15 Premanufactured Expansion Joint Detail 16

FD16 Roof Area Divider Detail 17

FD17 Raised Metal Roof Edge Detail 18

FD18 Gravel Stop Metal Roof Edge Detail 19

FD19 Post Supported Roof Deck Flashing Detail 20

FD20 Wall Supported Roof Deck Flashing Detail 21

FD21 Concrete Wall Counterflashing Detail 22

FD22 Metal Wall Cap Flashing Detail 23

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD01 Interior Roof Drain Detail

Coverboard insulation A 30 sq min, 1.5 lb to 4 lb lead, or 16 oz copper flashing adhered


onto finished roof with M300 RubrMastic. Prime top surface of
Thermal insulation metal flashing with M400 RubrPrime and install M60 RubrPoly
flashing sheets

Drain strainer

M60 RubrPoly flashing sheets

Roof deck
Tapered insulation
Clamping ring
Deck clamp
Drain bowl
Fields roof membrane sheets, metal flashing, & M60
RubrPoly flashing sheets all under clamping ring
Fields M300 RubrMastic
Fields roof membrane sheets
Side View
A 30 sq min, 1.5 lb to 4 lb lead, or 16 oz copper flashing
adhered onto finished roof with M300 RubrMastic. Prime
top surface of metal flashing with M400 RubrPrime and Clamping ring
install M60 RubrPoly flashing sheets
Drain strainer
M60 RubrPoly
flashing sheets
Fields roof
membrane sheets

Tapered insulation

Fields roof membrane sheets, metal


Notes flashing, & M60 RubrPoly flashing
sheets all under clamping ring
1. Metal deck sump pans are prohibited.
Roof deck Drain bowl

2. Type 1 dead level asphalt is prohibited in the drain Thermal insulation Deck clamp
sump area.
Coverboard insulation

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD02 Interior Drain with Gravel Stop Detail

A 1 x 4 sheet metal gravel stop, 36 sq min A 30 sq min, 1 1/2 lb to 4 lb lead, or 16 oz copper


adhered in place with M300 RubrMastic flashing adhered onto finished roof with M300
RubrMastic. Prime top surface of metal flashing
M60 RubrPoly with M400 RubrPrime and install M60 RubrPoly
flashing sheets flashing sheets

Drain strainer
4
M60 RubrPoly flashing sheets

Thermal
insulation
Coverboard
insulation
Roof deck
Tapered insulation
Clamping ring
Deck clamp
Drain bowl
Fields roof membrane sheets, metal flashing, & M60
RubrPoly flashing sheets all under clamping ring
M300 RubrMastic
Side View
Fields roof membrane sheets
A 30 sq min, 1 1/2 lb to 4 lb lead, or 16 oz copper flashing adhered onto
finished roof with M300 RubrMastic. Prime top surface of metal flashing
with M400 RubrPrime and install M60 RubrPoly flashing sheets Clamping ring

A 1 x 4 sheet metal Drain strainer


gravel stop, 36 sq min M60 RubrPoly
adhered in place with flashing sheets
M300 RubrMastic
Fields roof
M60 RubrPoly membrane sheets
flashing sheets

Tapered insulation

Notes Fields roof membrane sheets, metal


flashing, & M60 RubrPoly flashing
sheets all under clamping ring
1. Metal deck sump pans are prohibited.
Roof deck Drain bowl

2. Type 1 dead level asphalt is prohibited in the Thermal insulation Deck clamp
drain sump area.
Coverboard insulation

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD03 Scupper Roof Drain Detail

Bead of sealent High domed, capped, & gasketed


fasteners 18 oc, depending upon wind
Sheet metal scupper zone and local conditions

A .75 x 3 min L shaped See Raised Metal Roof Edge Detail FD17
gravel guard secured to the for sheet metal fascia counterflashing
scupper flange & notched to
permit drainage
4 min
Sheet metal
4 min
conductor head
2 min

Slope to the drain

M60 RubrPoly flashing sheets

Scupper fastened to blocking with fasteners 3 oc &


staggered. Flange adhered into M300 RubrMastic &
primed with M400 RubrPrime before installing M60
RubrPoly flashing sheets

Fields roof membrane sheets


M60 RubrPoly
envelope sheet Coverboard insulation

Treated wood nailers Thermal insulation

M60 RubrPoly sheet extended Roof deck


below blocking Side View
See Raised Metal Edge Detail FD17 for
sheet metal fascia counterflashing
Sheet metal scupper
Scupper fastened to blocking with
A .75 x 3 min L
Notes shaped gravel guard
fasteners 3 oc & staggered. Flange
adhered into M300 RubrMastic &
secured to the scupper
primed with M400 RubrPrime before
flange & notched to
1. This detail shall be installed only where the deck is permit drainage
installing M60 RubrPoly flashing sheets
supported by the outside wall.
Sealant
M60 RubrPoly flashing sheets
2. This detail may be adapted to roof edges as shown in
Interior Roof Drain Detail FD01. Fields roof membrane
sheets
3. Roof surfaces shall be sloped for positive drainage. Coverboard insulation
sloped to the drain
4. Attach wood nailer to wall with suitable fasteners. Thermal insulation

5. Wood blocking shall be slotted for venting wet filled Roof deck
decks. M60 RubrPoly envelope sheet
M60 RubrPoly sheet extended below
6. Scupper opening through roof edge shall be 2 or less. Sheet metal
blocking
conductor head.

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD04 Gutter Roof Drain Detail

Sheet metal edge flashing with gravel stop lip.


Flange primed with M400 RubrPrime before
installing M60 RubrPoly flashing sheets
Fields roof membrane sheets
M60 RubrPoly flashing sheets

M60 RubrPoly
Fasteners 3 oc & staggered
envelope sheet
Gutter spacers alternately spaced from
brackets

M60 RubrPoly flexible sheet closure into


gutter
Roof deck
Continuous cleat
Wood nailers
Gutter brackets supported 12 to 36 oc
depending upon conditions

Sheet metal gutter

Turn down
Continuous sheet metal closure
fastened 18 oc Flange adhered into M300 RubrMastic
M60 RubrPoly sheet extended to
overlay metal closure
Side View

M60 RubrPoly flashing


sheets

Sheet metal edge flashing with gravel M60 RubrPoly flexible


stop lip. Flange primed with M400 sheet closure into gutter
RubrPrime before installing M60
M60 RubrPoly envelope
Notes RubrPoly flashing sheets
sheet
Continuous cleat Fasteners 3 oc staggered
1. In climates where the winter temperature
Gutter spacers alternately Fields roof membrane
remains below freezing for extended periods of sheets
spaced from brackets
time, install Raised Metal Roof Edge Detail
FD17 and interior drains, or through curb Turn down
scuppers to drain the roof.

2. Gutter brackets are required to be at least one


gauge heavier than gutter stock.
Sheet metal gutter
3. Attach wood nailer to wall or deck with suitable Roof deck
fasteners. Wood nailers
Gutter brackets supported 12 to
4. Gutter expansion joints shall be installed at 36 oc depending upon conditions
appropriate intervals commensurate with the type Continuous sheet metal closure M60 RubrPoly sheet extended to
of metal. fastened 18 oc overlay metal closure

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD05 Roof-Top Equipment Curb Detail

Sheet metal cover with receiver


for counterflashing

Install bolts into sealant

Neoprene pad
flashing height
10 nominal

Removable sheet metal counterflashing

High domed, capped, & gasketed fasteners 18 oc,


depending upon wind zone and local conditions

Fasteners 8 oc

Fields roof membrane sheets extended 2 min above


top of cant

Wood cant fastened to wood nailers

M60 RubrPoly flashing sheets extended to a min


height of 8

Wood curb Fields roof membrane sheets

Wood nailers Coverboard insulation

Thermal insulation

Roof deck
Side View
Sheet metal cover with receiver for
counterflashing
High domed, capped, & gasketed
fasteners 18 oc, depending upon
Install bolts into sealant wind zone and local conditions
Noeprene pad Removable sheet metal
counterflashing

Notes Fasteners 8 oc
Fields roof membrane sheets
flashing height
10 nominal

extended 2 min above top of cant


1. This detail allows for roof maintenance around
supported equipment. The continuous support M60 RubrPoly flashing sheets
extended to a min height of 8
design shall be installed in light weight struc-
tural systems so as to distribute the equipment
weight across two or more structural support
members. A min of 2 of horizontal clearance
shall be provided for removal and replacement
of roofing and flashing between parallel sup-
ports. A min of 3 of vertical clearance from
roof surface to bottom of supported equipment Wood curb Fields roof membrane sheets
shall be provided.
Wood nailers Coverboard insulation

2. Attach wood nailer to deck with suitable fasteners. Wood cant fastened to Thermal insulation
wood nailers
Roof deck

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD06 Roof-Top Metal Air Shaft Curb Detail

Equipment mounting curb Sheet metal flashing receiver


Sealing material Min of 2 high domed, capped, & gasketed
fasteners 18 oc per side, depending upon wind zone and
local conditions
flashing height
10 nominal

Wood nailer

Removable sheet metal counterflashing


Fasteners 8 oc
Fields roof membrane sheets extended 2 min above top of
cant

Alternate curb M60 RubrPoly flashing sheets extended to a min height of


bearing location 8
for heavy weight
Fields roof membrane sheets
loading conditions
Coverboard insulation
Equipment
Thermal insulation
Base of unit shall extend Side View
.5 min beyond top of curb
Roof deck
Sealing material shall be Sheet metal flashing receiver
continous on top of the curb
Install a min of 2 high domed,
1 min below top of curb capped, & gasketed fasteners
Equipment mounting curb 18 oc per side, depending upon
Flashing receiver
wind zone and local conditions
Sealing material
Fasteners
Removable sheet metal
Wood nailer
Wood nailer counterflashing

Counterflashing Fasteners 8 oc

M60 RubrPoly flashing Fields roof membrane sheets


sheets extended a min of 2 above top
flashing height
10 nominal

of cant: Not shown for clarity


Equipment mounting curb
M60 RubrPoly flashing sheets
Insulation extended to a min height of 8

Notes
1. The top wood nailer of the curb & the seal strip
shall be supplied by the curb manufacturer.

2. Attach the treated wood nailer to deck with


suitable fasteners. Fields roof membrane sheets
Coverboard insulation
3. Mechanical units shall be installed after the roof Alternate curb bearing
Thermal insulation
location for heavy
membrane and flashings have been installed.
weight loading conditions Roof deck

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD07 Roof-Top Wood Air Shaft Curb Detail

Sealing material
Wood curb
flashing height
10 nominal

Sheet metal flashing receiver


Min of 2 high domed, capped, & gasketed fasteners 18
oc per side, depending upon wind zone and local
conditions

Removable sheet metal counterflashing


Wood nailers Fasteners 8 oc
Wood cant to Fields roof membrane sheets extended 2 min above top
brace curb of cant
M60 RubrPoly flashing sheets extended to a min height
of 8
Fields roof membrane sheets
Coverboard insulation

Equipment Thermal insulation


Base of unit shall extend .5 min
Side View
Roof deck
beyond top of curb
Sealing material shall be Sealing material
continous on top of curb Sheet metal flashing receiver
1 min below top of curb Min of 2 high domed, capped, &
Flashing receiver gasketed fasteners 18 oc per
side, depending upon wind zone
Fasteners and local conditions
Wood nailer Removable sheet metal
counterflashing
Counterflashing
Fasteners 8 oc
M60 RubrPoly flashing sheets
Fields roof membrane sheets
extended a min of 2 above top
flashing height
10 nominal

of cant: Not shown for clarity


M60 RubrPoly flashing sheets
extended to a min height of 8

Notes
1. Attach wood nailer to the deck with suitable
Fields roof membrane sheets
fasteners. Wood cant to
brace curb Coverboard insulation
2. The equipment shall be set after the roof Wood nailers Thermal insulation
membrane and flashings have been installed. Roof deck

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD08 Roof Skylight Detail

Double dome skylight installed by others


Skylight frame with weep holes
Min of 2 high domed, capped, & gasketed fasteners 18 oc
per side, depending upon wind zone and local conditions
Removable sheet metal counterflashing
flashing height
10 nominal

Fasteners 8 oc
Fields roof membrane sheets extended 2 min
above top of cant
M60 RubrPoly flashing sheets to a min height of 8

Fields roof membrane sheets


Coverboard insulation
Thermal insulation
Wood nailers
and curb Roof deck
Wood cant to
brace curb

Side View
Double dome skylight installed by others
Skylight frame with weep holes
Min of 2 high domed, capped, & gasketed
fasteners 18 oc per side, depending upon
wind zone and local condition
Removable sheet metal counterflashing
Fasteners 8 oc
Fields roof membrane sheets extended a min
flashing height
10 nominal

of 2 above top of cant


M60 RubrPoly flashing sheets extended to a
min height of 8
Fields roof membrane sheets
Coverboard insulation
Thermal insulation
Note Roof deck
Wood cant to brace curb
1. Attach treated wood nailer to deck with suitable
fasteners. Wood nailers and curb

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD09 Roof-Top Chimney Pipe Detail

Temperature appropriate elastomeric sealer


Drawband or weld umbrella to stack
Insulate void for cold stack
Min of 2 high domed, capped, & gasketed
fasteners 18 oc per side, depending upon
wind zone and local condition
flashing height
10 nominal

Removable sheet metal counterflashing

Fasteners 8 oc

Fields roof membrane sheets extended 2


Metal or min above top of cant
gypsum liner
M60 RubrPoly flashing sheets
extended to a min height of 8
Varies Fields roof membrane sheets

Wood nailers and curb Coverboard insulation

Wood cant to brace curb Thermal insulation


Side View
Roof deck Temperature appropriate elastomeric sealer
Drawband or welded umbrella to stack
Metal or gypsum liner is required
Insulate void for cold stack
Min of 2 high domed, capped, & gasketed
fasteners 18 oc per side, depending upon
wind zone and local conditions
Removable sheet metal
counterflashing
Fasteners 8 oc
Fields roof membrane sheets
Notes extended a min of 2 above top
flashing height
10 nominal

of cant

1. This detail allows the opening to be completed M60 RubrPoly flashing sheets
extended to a min height of 8
before the stack is placed.

2. The clearance necessary between the gypsum or


metal liner and the stack, and the need for
insulation, will depend on the temperature of
the material emited through the stack.
Fields roof membrane sheets
3. Attach treated nailer to the deck with suitable Wood nailers & curb Coverboard insulation
fasteners. Wood cant to brace curb Thermal insulation

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD10 Roof-Top Plumbing Vent Pipe Detail

Form top of flashing 1 down into pipe


Soft metal pipe flashing
Plumbing vent stack
Apply M300 RubrMastic at juncture of pipe
penetration through roof membrane

6 min flange

4 min
4 min

M60 RubrPoly flashing sheets


Fields roof membrane sheets
Coverboard insulation
Thermal insulation
Roof deck
Adhere flange with M300 RubrMastic. Side View
Prime top of flange with M400 RubrPrime
before flashing with M60 RubrPoly Form top of flashing 1 down
Plumbing vent stack
Soft metal pipe flashing
Apply M300 RubrMastic at juncture of
pipe penetration through roof membrane
Adhere flange with M300 RubrMastic.
Notes Prime top of flange with M400
RubrPrime before flashing with M60
RubrPoly sheets
1. Soft metal pipe flashing:
Minimum sheet lead of 2.25 lb per sq ft or M60 RubrPoly flashing sheets
ge

Minimum sheet copper of 16 oz per sq ft


lan

Fields roof membrane sheets


nf
n

n
mi

mi

mi

2. If using copper flashing over an iron or steel Coverboard insulation


4

pipe, insert a separator sheet wrapped around Thermal insulation


pipe, to separate the copper flashing from direct Roof deck
contact with pipe so as to reduce galvanic
reaction.
3. Vent stacks and other pipes shall have a min of
12 clearance on all sides from walls, curbs, and
other projections to facilitate correct flashing &
maintenance.

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD11 Sheet Metal Pipe Enclosure Detail

Slope sheet metal enclosure for drainage


Insulate void to prevent condensation
Sheet metal or flex tube collar
Slope pipes down and away from hood
flashing height
10 nominal

Install sheet metal flashing receiver


Min of 2 high domed, capped, & gasketed fasteners 18 oc
per side, depending upon wind zone and local conditions
Removable sheet metal counterflashing
Fasteners 8 oc

Wood cant Fields roof membrane sheets extended


to brace curb 2 min above top of cant

Wood nailers and curb M60 RubrPoly flashing sheets


extended to a min height of 8
Min 4 clearance from
pipe to top of curb & min Fields roof membrane sheets
2 between pipes
Coverboard insulation
Thermal insulation
Side View
Roof deck Slope sheet metal enclosure for drainage
Insulate void to prevent condensation
Sheet metal or flex tube collar
Slope pipes down and away from hood
Min 4 clearance from pipe to top of curb
& Min 2 between pipes
Sheet metal flashing receiver
Min of 2 high domed, capped, & gasketed
fasteners 18 oc per side, depending upon
wind zone and local conditions
Removable sheet metal counterflashing
Fasteners 8 oc
flashing height
10 nominal

Fields roof membrane sheets extended a


min of 2 above top of cant
M60 RubrPoly flashing sheets to a min
Notes height of 8

Fields roof membrane sheets


1. This detail eliminates pitch pockets for
piping penetrations through the roof. Coverboard insulation
Pitch pocket installations are prohibited. Thermal insulation
Roof deck
2. Attach treated wood nailer to deck with
suitable fasteners. Wood cant to brace curb

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD12 Roof-Top Pipe Roller Support Detail

Adjust vertically and horizontally


flashing height
10 nominal

See Roof-Top Equipment Curb Detail


FD05 for curb construction

Install bolts in sealant

Notes
1. It is required that pipes & conduits be installed
in other locations other than on the roof.
However, where pipes and conduits are abso-
lutely necessary on the roof, a pipe roller support
is required.

2. This detail is designed to eliminate roof damage


due to expansion and contraction of pipes &
conduits.

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD13 Structural Roof Deck Penetration Detail

Structural member
Insulate void to prevent condensation
Welded plate sealed watertight
Min of 2 fasteners 18 oc per side, depending upon
wind zone and local conditions
flashing height
10 nominal

Removable sheet metal counterflashing.

Fasteners 8 oc

Fields roof membrane sheets extended a min of 2


above top of cant.
M60 RubrPoly flashing sheets extended to a min
height of 8.
Fields roof membrane sheets
Coverboard insulation
Thermal insulation
Roof deck

Wood cant to brace curb


Side View
Wood nailers and curb
Structural member
Insulate void to prevent condensation
Welded plate sealed watertight
Min of 2 high domed, capped, & gasketed
fasteners 18 oc per side, depending upon
wind zone and local conditions
Removable sheet metal counterflashing

Notes Fasteners 8 oc
flashing height

Fields roof membrane sheets extended a


10 nominal

min of 2 above top of cant


1. This detail eliminates pitch pockets for
structural penetrations through the roof. M60 RubrPoly flashing sheets to a min
height of 8
Pitch pockets are prohibited.
Fields roof membrane sheets
2. This curbed system allows for movement in Coverboard insulation
the structural member without damaging the
Thermal insulation
roof system membrane.
Roof deck
3. Attach treated wood nailer to deck with Wood cant to brace curb
suitable fasteners.

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD14 Metal Covered Expansion Joint Detail

Flexible vapor retarder to Sheet metal expansion joint cover


serve as insulation retainer
attached to top of curb
Drive cleat or standing seam joint
Install compressible
insulation Extend M60 RubrPoly flashing sheets
Install flexible waterproof membrane closure
flashing height
10 nominal

Min of 2 high domed, capped, & gasketed fasteners


18 oc per side, depending upon wind zone and
local conditions
Fasteners 8 oc
Bevel top of both wood curbs to drain to one side

Fields roof membrane sheets extended 2 min


above top of cant
M60 RubrPoly flashing sheets extended to a min
height of 8
Fields roof membrane sheets
Coverboard insulation
Thermal insulation
Side View
Wood nailers and curb Roof deck
Sheet metal expansion joint cover
Wood cant to brace curb
Flexible waterproof membrane closure
Bevel top of both wood curbs to drain
to one side
M60 RubrPoly flashing not
shown for clarity Fasteners 8 oc

Flexible vapor retarder to Min of 2 high domed, capped, &


serve as insulation retainer gasketed fasteners 18 oc per side,
attached to top of curb depending upon wind zone and local
conditions
Fields roof membrane sheets extended a
flashing height

min of 2 above top of cant


10 nominal

M60 RubrPoly flashing sheets to a min


height of 8
Notes
Compressible insulation

1. This detail allows for building movement in Fields roof membrane sheets
both directions. Coverboard insulation
Thermal insulation
2. Flashing requirements are the same for both
Roof deck
sides of expansion joint.
Wood cant to brace curb
3. Attach treated wood nailer to deck with Wood nailers & curb
suitable fasteners.

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD15 Premanufactured Expansion Joint Detail

Extend M60 RubrPoly Premanufactured expansion


flashing sheets joint cover
Flexible waterproof membrane closure
Flexible vapor retarder to serve as
insulation retainer
flashing height
10 nominal

Min of 2 high domed, capped, & gasketed


fasteners 18 oc per side, depending upon
wind zone and local conditions
Fasteners 8 oc
Bevel top of both wood curbs to drain to
outside.
Fields roof membrane sheets extended 2
min above top of cant.
M60 RubrPoly flashing sheets extended to
a min height of 8
Install compressible insulation
Fields roof membrane sheets
Coverboard insulation
Thermal insulation
Wood nailers and curb
Roof deck
Wood cant to brace curb Side View
Premanufactured expansion joint cover
Flexible waterproof membrane closure
M60 RubrPoly flashing
Bevel top of both wood curbs to drain
sheets not shown for clarity
to outside
Flexible vapor retarder to serve
Fasteners 8 oc
as insulation retainer attached
to top of curb Min of 2 high domed, capped, &
gasketed fasteners 18 oc per side,
depending upon wind zone and local
conditions
10 nominal flashing

Fields roof membrane sheets extended a


min of 2 above top of cant
height

Compressible insulation
M60 RubrPoly flashing sheets
Notes extended to a min height of 8

Fields roof membrane sheets


1. This detail allows for building movement in
Coverboard insulation
both directions.
Thermal insulation
2. Flashing requirements are the same for both Roof deck
sides of expansion joint. Wood cant to brace curb
Wood nailers & curb
3. Attach treated wood nailer to deck with
suitable fasteners.

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD16 Roof Area Divider Detail

Sheet metal area divider cover


Min of 2 high domed, capped, & gasketed
fasteners 18 oc per side, depending upon
wind zone and local conditions
flashing height
10 nominal

Fasteners 8 oc

Bevel top of both wood curbs to drain to outside


Fields roof membrane sheets extended 2 min above
top of cant.

M60 RubrPoly flashing sheets to a min height of 8


Fields roof membrane sheets

Wood nailers and curb Coverboard insulation


Thermal insulation
Wood cant to brace curb
Roof deck

Side View
Install sheet metal area divider cover
Bevel top of both wood curbs to drain
to outside

Notes Fasteners 8 oc
Min of 2 high domed, capped, &
gasketed fasteners 18 oc per side,
1. An area divider shall be designed as a raised depending upon wind zone and local
double wood member attached to a securely conditions
flashing height
10 nominal

fastened wood base plate that is anchored to Fields roof membrane sheets extended a
the roof deck. Area dividers shall be located min of 2 above top of cant
between the roof s expansion joints at about M60 RubrPoly flashing sheets
150 to 200 intervals, depending upon extended to a min height of 8
climatic conditions. Area dividers are
Fields roof membrane sheets
prohibited from restricting the flow of water.
Coverboard insulation
2. The flashing requirements are the same for Thermal insulation
both sides of the area divider. Roof deck
Wood cant to brace curb
3. Attach the treated wood nailer to the deck
with suitable fasteners. Wood nailers & curb

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD17 Raised Metal Roof Edge Detail

f
g t ho Sheet metal counter flashing
len al
e a ch met 1/2 gap Min of 2 high domed, capped, & gasketed
r eet g
a x fo er sh shin fasteners 18 oc per side, depending upon wind
m e t fla
12 erim nter zone and local conditions
p ou
c
Fasten M60 RubrPoly
flashing sheets 8 oc Sheet metal joint cover plate in 2 beads of sealant
Fasten wood cant to
blocking

4
mi M60 RubrPoly flashing sheets extended a min of
n
4 beyond base of cant

M60 RubrPoly flashing sheets


First M60 RubrPoly flashing sheet extended
1 min below blocking

below the blocking


Fields roof membrane sheets
Coverboard insulation
Thermal insulation
Roof deck

Treated wood nailers

Continuous cleat
Side View
Sheet metal counter flashing
Fasten M60 RubrPoly flashing sheets
First M60 RubrPoly
layer a min of 8 oc
flashing sheet
extended below Min of 2 high domed, capped, &
the blocking gasketed fasteners 18 oc per side,
depending upon wind zone and local
conditions
M60 RubrPoly flashing sheets

4 M60 RubrPoly flashing sheets


minimum extended a min of 4 beyond base of
Notes cant
1 minimum below blocking

Fields roof membrane sheets


1. Attach the treated wood nailers to the wall or deck
Coverboard insulation
with suitable fasteners.
Thermal insulation
2. Wood blocking shall be slotted for venting wet filled Roof deck
decks. Wood cant to blocking
Treated wood nailers
3. This detail shall be installed only where the deck is
supported by the outside wall. Continuous cleat

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD18 Gravel Stop Metal Roof Edge Detail

Sheet metal joint cover plate a minimum 6


of
n gth 1/2 gap wide installed in 2 beads of sealant
h le tal
r eac et me
fo e
max ter sh shing
a Flange 4 min width
12 erim ter fl
e
p oun
c
3 min width
Fasteners 3 oc &
staggered
3 min width

When installing a mineral sheet as the reflective


4 surfacing, install metal flange and associated M60
mi RubrPoly sheets beneath the mineral cap
n
Sheet metal gravel stop adhered in M300
RubrMastic. Prime flange with M400 RubrPrime
before installing M60 RubrPoly sheets
1 min below blocking

M60 RubrPoly envelope sheet


Fields roof membrane sheets
Coverboard insulation
Thermal insulation
Roof deck
Treated wood nailers
One M60 RubrPoly sheet extended
below blocking
Continuous cleat Side View
Sheet metal gravel stop, installed in M300
RubrMastic. Prime flange with M400
RubrPrime before installing M60 RubrPoly
flashing sheets
Notes
M60 RubrPoly envelope sheet

1. Rigid metal flanges are prohibited from being Fasteners 3 oc staggered


installed between the roofing sheets. See Raised When installing a mineral sheet as the
Metal Roof Edge Detail FD17 for perimeter surfacing, install metal flange and associated
M60 RubrPoly flashing sheets beneath the
construction. mineral cap

2. This detail shall be installed only where the deck Fields roof membrane sheets
is supported by the outside wall. Tapered coverboard
1 min below blocking

insulation edge
3. Attach treated wood nailer to the wall with Coverboard insulation
suitable fasteners.
Thermal insulation
4. Wood blocking shall be slotted for venting wet Roof deck
filled decks. One M60 RubrPoly sheet below the
blocking
5. Frequent nailing of sheet metal flange is required
to minimize thermal movement. Continuous cleat

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD19 Post Supported Roof Deck Flashing Detail

Continuous through wall flashing installed by others


Weep holes installed by others
Tooled polyurethane sealant installed by others
Fasteners 24 oc
Sheet metal reglet
Lap 3 with bead of sealant
Lap 3 at joints
Removable sheet metal counterflashing
Secure & adhere M60 RubrPoly sheet closure to wall
2 wide clip 30 oc
M60 RubrPoly flashing sheets extended
Fasteners 8 oc
Fields roof membrane sheets extended a min of 2 above top of cant
Flexible vapor retarder with compressible insulation
M60 RubrPoly flashing sheets extended to a min height of 8: Cover
top of flashing sheets with M60 RubrPoly vapor retarder
Treated wood cant to brace curb
Fields roof membrane sheets
Coverboard insulation
Side View
Thermal insulation
Roof deck Continuous through wall flashing installed by others
Tooled polyurethane sealant installed by others
Sheet metal reglet
Fasteners 24 oc
Removable sheet metal counterflashing
Secure & adhere M60 RubrPoly sheet closure to wall
M60 RubrPoly flashing sheets extended

Notes 2 wide clip 30 oc


Fasteners 8 oc
1. This detail should be installed where there is any Fields roof membrane sheets extended a min of 2
possibility that differential movement will occur above top of cant
between the deck and a vertical surface. The wood M60 RubrPoly flashing sheets extended to a min
members should not be fastened to the wall. height of 8: Cover top of flashing sheets with M60
RubrPoly vapor retarder
2. The joints in the sheet metal counterflashing Fields roof membrane sheets
shall not be soldered. Coverboard insulation
Thermal insulation
3. Attach treated wood nailer to deck with suitable
fasteners. Roof deck
Install treated wood cant to brace curb
4. This detail is not for use with lightweight fills. Flexible vapor retarder with compressible insulation

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD20 Wall Supported Roof Deck Flashing Detail

Continuous through wall flashing installed by others


Weep holes installed by others
Tooled polyurethane sealant installed by others
Fasteners 24 oc
Sheet metal reglet
Lap 3 with bead of sealant
Lap 3 at joints
2 wide clip 30 oc
Seal top of flashing with a 3 layer application: 2 layers of M300
RubrMastic and 1 layer of P74 PolyWeb
Fasteners 8 oc
M60 RubrPoly flashing sheets extended
Prime masonry with M400 RubrPrime
Fields roof membrane sheets extended a min of 2 above top of cant

M60 RubrPoly flashing sheets extended to a min height of 8

Fields roof membrane sheets


Coverboard insulation
Thermal insulation
Roof deck Side View
Fasten treated wood cant to nailers Continuous through wall flashing installed by others
Tooled polyurethane sealant installed by others
Sheet metal reglet
Fasteners 24 oc
Removable sheet metal counterflashing
Seal top of flashing with a 3 layer application: 2 layers
of M300 RubrMastic and 1 layer of P74 PolyWeb

Fasteners 8 oc
2 wide clip approx. 30 oc

Notes Fields roof membrane sheets extended a min of 2 above top


of cant
M60 RubrPoly flashing sheets to a min height of 8
1. This detail shall be installed where the deck is
supported by the wall.
Fields roof membrane sheets
2. The joints in the sheet metal counterflashing Coverboard insulation
shall not be soldered.
Thermal insulation

3. A fiber cant may be adhered in ambient or hot Roof deck


asphalt in place of wood cants. Wood cant to nailers

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD21 Concrete Wall Counterflashing Detail

Exposed smooth concrete surface shall be


waterproofed by others
Sealant at wall joints installed by others shall be
compatible with counterflashing sealant
Apply polyurethane sealant & tool to facilitate water run off
Expanding shank fasteners a min of 12 oc depending upon wind
zone & local conditions
Lap 3 at joints
Sheet metal counterflashing
Compressible elastomeric tape to span irregularities
2 wide clip a min of 30 oc
Seal top of flashing with a 3 layer application: 2 layers of M300
RubrMastic and 1 layer of P74 PolyWeb
Prime concrete with M400 RubrPrime above wood nailer and
below top of counterflashing
Fasteners 8 oc
Bevel cut top of wood curb to drain
Fields roof membrane sheets extended a min of 2 above top of cant
Fasten wood cant to nailers
M60 RubrPoly flashing sheets to a min height of 8
Fields roof membrane sheets Side View
Coverboard insulation Exposed smooth concrete surface shall be waterproofed
by others
Thermal insulation
Apply polyurethane sealant & tool to facilitate water
Roof deck run off
Wood nailers Expanding shank fasteners a min of 12 oc, depending
upon wind zone & local conditions
Compressible elastomeric tape to span irregularities
Seal top of flashing with a 3 layer application: 2 layers of
M300 RubrMastic and 1 layer of P74 PolyWeb
Sheet metal counterflashing
Notes Fasteners 8 oc
2 wide clip approx. 30 oc
1. This detail shall be installed where the deck
is supported by the wall. Fields roof membrane sheets extended a min of 2
above top of cant

2. Attach the treated wood nailer to the deck M60 RubrPoly flashing sheets to a min height of 8
with suitable fasteners. Fields roof membrane sheets
Coverboard insulation
3. A fiber cant may be adhered in ambient or
Thermal insulation
hot asphalt in place of wood cants.
Roof deck
4. Counterflashing detail shall be a 2 piece Fastened wood cant to nailers
reglet and counterflashing. Bevel cut top of wood curb to drain

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com


FD22 Metal Wall Cap Flashing Detail

f Sheet metal joint cover plate min 6


ho
lengt ap .5 gap wide set in 2 beads of sealant
ch lc
for ea meta Sheet metal parapet cap
x t
ma shee
12 rapet High domed, capped, & gasketed fasteners 18 oc, depend-
pa
ing on wind zone and local conditions

Continuous membrane liner


Extend M60 RubrPoly flashing sheets
Seal top of flashing with a 3 layer application: 2 layers of
M300 RubrMastic and 1 layer of P74 PolyWeb
1 min below blocking

Install fasteners 8 oc
Install continuous beveled cedar siding tapered shim
Install treated wood nailers
Prime concrete with M400 RubrPrime
Extend Fields roof membrane sheets a min of 2 above top
of cant
Install M60 RubrPoly flashing sheets
between 8 min to 14 max height
Fields roof membrane sheets
Coverboard insulation
Thermal insulation
Wood cant fastened to nailers Roof deck Side View
Sheet metal parapet cap
Continuous membrane liner
1/2 gap
Continuous beveled cedar siding tapered shim
M60 RubrPoly flashing sheets

High domed, capped, & gasketed fasteners 18 oc


depending on wind zone and local conditions
1 min below blocking

Notes Fasteners 8 oc
Fields roof membrane sheets extended a min of 2
1. This detail shall be installed when the roof deck above top of cant

is supported by the wall. See Post Supported M60 RubrPoly flashing sheets to a min height of 8
Roof Deck Flashing Detail FD19. Fields roof membrane sheets
Coverboard insulation
2. Attach treated wood nailer to deck with suitable
Thermal insulation
fasteners.
Roof deck
3. A fiber cant may be adhered in ambient or hot Wood cant fastened to nailers
asphalt in place of wood cants. Continuous cleat

Fields Roof Systems Manual (253) or (800) 627-4098 www.fieldscorp.com