You are on page 1of 17

MUNDRA LPG TERMINAL PVT. LTD.

(MLTPL)
Adani House, Nr Mithakhali Circle, Navrangpura, Ahmedabad 380 009, Gujarat, India Tel
+91-79-25555801; Fax + 91-79-2555 6490; www.adani.com

PROJECT MUNDRA LPG TERMINAL

TITLE AGREED SPECIFICATION FOR BOILER PACKAGES

CONSULTANT PROJECTS & DEVELOPMENT INDIA LIMITED (PDIL)

EPCC CONTRACTOR SIMON INDIA LTD.

EPCC
CONTRACTOR/
CONSULTANTS
DOCUMENTNO.
MLTPL DOCUMENT
2321-E-BOP-BOI-DM-M-E-001 Rev. 0
NO.

PREPARED CHECKED APPROVED


REV. NO. DATE DESCRIPTION
Init. Sign Init. Sign Init. Sign

0 24.06.17 For Enquiry SC AKR AKR

This Document is the property of MLTPL & SIL. It should not be used, copied or reproduced without their written permission.

SIL Project No. I-30027 Page 1 of 17


Project : Mundra LPG Terminal Document No. : 2321-E-BOP-BOI-DM-M-E-001

Document Title : Agreed Specification for Boiler Packages Revision No. : 0

REVISION HISTORY

Page No. Clause No. Description of Revision Revision

This Document is the property of MLTPL & SIL. It should not be used, copied or reproduced without their written permission.

SIL Project No. I-30027 Page 2 of 17


Project : Mundra LPG Terminal Document No. : 2321-E-BOP-BOI-DM-M-E-001

Document Title : Agreed Specification for Boiler Packages Revision No. : 0

TABLE OF CONTENTS
1 INTRODUCTION

1.1 Intent

1.2 Definitions

2 SCOPE

2.1 Items to be Purchased

2.2 Scope of Supply / Work

2.3 Battery limit

2.4 Exclusions

2.5 Design Life

2.6 Unit Responsibility

2.7 Approved Vendor List

3 APPLICABLE CODES AND STANDARDS

4 ORDER OF PRECEDENCE

5 QUALITY

5.1 Inspection and Test Plan (ITP)

6 VENDORS DATA REQUIREMENT

7 SPECIAL TOOLS & TACKLES

8 SPARE PARTS

8.1 Commissioning Spares

8.2 Mandatory Spares

8.3 Spare Parts for Two Years Normal Operation

9 PACKING & PRESERVATION

10 GUARANTEES

11 SPECIAL NOTES

This Document is the property of MLTPL & SIL. It should not be used, copied or reproduced without their written permission.

SIL Project No. I-30027 Page 3 of 17


Project : Mundra LPG Terminal Document No. : 2321-E-BOP-BOI-DM-M-E-001

Document Title : Agreed Specification for Boiler Packages Revision No. : 0

12 ATTACHMENTS

This Document is the property of MLTPL & SIL. It should not be used, copied or reproduced without their written permission.

SIL Project No. I-30027 Page 4 of 17


Project : Mundra LPG Terminal Document No. : 2321-E-BOP-BOI-DM-M-E-001

Document Title : Agreed Specification for Boiler Packages Revision No. : 0

1. INTRODUCTION
ADANI is developing LPG, Propane, Butane handling and storage facility at their Port in Mundra.
ADANI has envisaged following services for set up in Import / Export terminal at Mundra,

Import of Propane / Butane in cryogenic state through jetties from ship tankers.
Receipt of product from Jetty through unloading pipeline and storing in dedicated refrigerated /
cryogenic storage tanks.
Transfer of product from storage tanks by in-tank pumps through heating train and online
blending system to get Domestic and Auto/Industrial LPG.
LPG Tanker loading facility for loading of
LPG (AUTOMOTIVE) /(INDUSTRIAL)
LPG (DOMESTIC)
PROPANE
BUTANE
When LPG business subsides, Propylene import instead of butane is envisaged, butane tank
shall be used for storing the propylene and the other tank continue to store propane, which will
be heated and loaded in road tankers.

1.1 Intent
This Requisition together with the data sheets and other documents attached / referred herein, defines
the minimum requirements for design, engineering, manufacturing, assembly, inspection, testing,
painting, packing, and supply of Boilers listed in Cl. No. 2.1 below for Adani Mudra LPG Terminal.

Selected Vendor shall be totally responsible to supply all required materials and services for satisfying
the functional / operational requirements stated in this Requisition, its attachments and Annexures.

1.2 Definitions

Following definition shall apply wherever mentioned in this document

OWNER ADANI MUDRA LPG TERMINAL PVT.LTD. (ALTPL)

PMC PROJECTS & DEVELOPMENT INDIA LTD. (PDIL)

PURCHASER SIMON INDIA LIMITED (SIL)

VENDOR SINGLE POINT RESPONSIBLE MANUFACTURER OF EQUIPMENT

This Document is the property of MLTPL & SIL. It should not be used, copied or reproduced without their written permission.

SIL Project No. I-30027 Page 5 of 17


Project : Mundra LPG Terminal Document No. : 2321-E-BOP-BOI-DM-M-E-001

Document Title : Agreed Specification for Boiler Packages Revision No. : 0

2. SCOPE

2.1 Items to be Purchased

The Vendors scope of supply shall include the following Packages.

Sr.
Tag no. Description Qty
No.
Boiler Packages (along with 2 W (10 TPH each)
1 2000-BF-01 A/B/C deaerator, chimney and other +
auxiliaries and accessories) 1 S (12 TPH )

2.2 Scope of Supply / Work

2.2.1 Detailed scope of supply / work shall be as per Annexure I (Scope of Supply/Work) attached with this
requisition.

2.2.2 The scope of supply / work of Vendor shall include but not be limited to:

2.2.3 Design, Engineering, Manufacturing/Fabrication, Assembly, Inspection and Testing, Painting, Packing
and Supply of equipment & auxiliaries with spares as listed in Annexure-IV & Annexure-I (Scope of
supply) attached.

2.2.4 Supervision of erection, pre-commissioning, commissioning of the equipment (not part of base scope
of supply / work and shall be as per diem rate quoted by vendor).

2.2.5 Process and Mechanical Performance Guarantees of Boiler and associated equipment &
accessories.

2.2.6 All accessories/auxiliaries/materials, as may be required for safe and reliable start up, smooth
operation and safe shutdown as well as meeting all functional requirements.

2.2.7 Vendor data requirements as per Annexure-II attached with this requisition.

2.2.8 Training Requirements

2.2.9 Training of owners persons at site for package items to be given by vendor (not part of base scope of
supply / work and shall be as per separate quote given by vendor).

2.2.10 Mandatory spare part list


This Document is the property of MLTPL & SIL. It should not be used, copied or reproduced without their written permission.

SIL Project No. I-30027 Page 6 of 17


Project : Mundra LPG Terminal Document No. : 2321-E-BOP-BOI-DM-M-E-001

Document Title : Agreed Specification for Boiler Packages Revision No. : 0

2.2.11 Mandatory spare parts shall be provided as per Annexure-IV.

2.2.12 Any item not listed, but normally considered essential for the safe and trouble-free operation and
performance of the complete system shall also be included in the Vendors scope of supply. Boiler
Vendor shall furnish all the required items to meet the performance parameters of the individual
equipment / package / module and of the system as a whole. The individual equipment / package /
module shall be complete with all associated accessories.

2.3 Battery Limit


Water Inlet of deaerator level control valve
Steam Outlet of common pressure reducing station & Inlet of deaerator pressure control valve
Blow down Outlet of blow down tank
Drain Outlet of blow down tank
Flue Gas Outlet of Chimney

Fuel
HSD Inlet of day oil tank
LPG Inlet of Vaporizer
NG Inlet of Gas train

2.4 Exclusions
The following are excluded from Vendors scope of service:

2.4.1 All civil works are excluded from Vendors scope of work. However, Vendor shall provide all the inputs
including center of gravity of all equipment & assembly, reaction forces & moments at support, weight
of the equipment (Individual Equipment and Assembly), footprint drawing, foundation bolt size,
operating space & maintenance space requirements, any unbalanced forces, any special
requirements for supporting foundation etc. required for foundation design.

2.4.2 Supply of all utilities. However supply as well as return piping to / from various points in the boiler
package shall be piped and terminated at the battery limit of the package.

2.4.3 Erection work at site.

This Document is the property of MLTPL & SIL. It should not be used, copied or reproduced without their written permission.

SIL Project No. I-30027 Page 7 of 17


Project : Mundra LPG Terminal Document No. : 2321-E-BOP-BOI-DM-M-E-001

Document Title : Agreed Specification for Boiler Packages Revision No. : 0

2.5 Design Life

Vendor to consider the minimum service life of boiler to be 20 years (excluding normal wearing parts
such as bearings, shaft seals, gaskets and O-rings) and at least 3 years of uninterrupted operation.

2.6 Unit Responsibility

2.6.1 The unit responsibility shall rest with the Boiler manufacturer, who shall also be the SPRV (Single
Point Responsibility Vendor) for the complete package with all other associated auxiliary equipment,
systems, instrumentation & controls etc.

2.6.2 Compliance with the technical requisition does not relieve vendor of the responsibility to furnish
GOODS of proper design, mechanically suited to meet the operating guarantees at the specified
service conditions.

2.7 Approved Vendor List

2.7.1 All the bought out items shall be one form the approved list of vendors and sub vendors and no
deviations shall be taken unless approved by Owner/PMC.

3. APPLICABLE CODES AND STANDARDS

3.1 Vendor shall follow the codes as per the codes mentioned below:-

Standard Description Edition

IBR Indian Boilers Regulations 1950 Amendment 2, 2015

NFPA 85 Boiler and Combustion System Hazards


2015 Edition
Code

ASME Sec VIII


Rule for Construction of Pressure Vessels 2015 Edition
Div I

HEI Latest Edition


Standard and Typical Specification for

This Document is the property of MLTPL & SIL. It should not be used, copied or reproduced without their written permission.

SIL Project No. I-30027 Page 8 of 17


Project : Mundra LPG Terminal Document No. : 2321-E-BOP-BOI-DM-M-E-001

Document Title : Agreed Specification for Boiler Packages Revision No. : 0

Tray Type Deaerators

IS 4894 Centrifugal Fans Latest Edition

ISO 5199 Feed Water Pumps Latest Edition

ASME B 31.3 Process Piping 2014 Edition

3.2 All equipment, system and services covered under this specification shall comply with all
currently applicable statutes, regulations and safety codes. Nothing in this specification shall be
construed to relieve the bidder of his responsibility.

3.3 Electrical items, instrumentation & controls, piping, etc. associated with Boiler Package shall comply
with the design requirements as given in the respective specifications.

4. ORDER OF PRECEDENCE

In Case of conflict between this requisition and other attached and /or referred specifications, the order
of precedence shall be as below:

1) Statutory National, regional or local laws.

2) Datasheet

3) Specific job requirement.

4) This Requisition

5) Project Specifications.

6) National, International codes and standards.

However, all such differences shall be brought forward to the attention of PURCHASER in writing by
vendor.

5. QUALITY

This Document is the property of MLTPL & SIL. It should not be used, copied or reproduced without their written permission.

SIL Project No. I-30027 Page 9 of 17


Project : Mundra LPG Terminal Document No. : 2321-E-BOP-BOI-DM-M-E-001

Document Title : Agreed Specification for Boiler Packages Revision No. : 0

5.1 Inspection and Test Plan (ITP)

5.1.1 Inspection and Testing shall be in accordance with the requirements mentioned in the specifications
attached with this requisition.

5.1.2 Inspection and test specified in the ITP (attached with this requisition) shall be carried out by the
compressor & drier vendors at his works.

5.1.3 Vendor shall provide their compliance on ITPs attached with this requisition and also to submit their
detailed Inspection and Test Plan (ITP) of other items for review and approval.

5.1.4 Equipment shall be inspected by Purchaser / Purchaser nominated Third Party Inspection Agency.

5.1.5 Owner and or his consultant (PMC) may participate along with customers inspectors in any
inspection and tests.

5.1.6 Vendor shall meet all requirements of ITP (attached with this requisition).

6. VENDORS DATA REQUIREMENT

Vendor Data Requirement shall comply with Annexure-II attached with this requisition.

7. SPECIAL TOOLS & TACKLES

As per equipment manufacturers recommendations, special tools and tackles required shall be
procured along with the main equipment.

Boiler Vendor shall submit a list & supply all special tools, tackles and devices necessary for the
erection, field assembly and maintenance of the equipment as per Manufacturers recommendations.

One set of special tools & tackles per item for up to 3 nos equipment per item and 2 sets of special
tools & tackles per item for higher no. of equipment per item shall be a part of vendors scope.

8. SPARE PARTS

Vendor shall follow the following spares philosophy and supply the spares accordingly.

8.1 Commissioning Spares

This Document is the property of MLTPL & SIL. It should not be used, copied or reproduced without their written permission.

SIL Project No. I-30027 Page 10 of 17


Project : Mundra LPG Terminal Document No. : 2321-E-BOP-BOI-DM-M-E-001

Document Title : Agreed Specification for Boiler Packages Revision No. : 0

Commissioning spares (per equipment) shall form part of the supply of main equipment, as per
equipment manufacturers recommendations. Any commissioning spare consumed over and above
the recommended commissioning spares, during commissioning shall be supplied free of cost by the
equipment manufacturer.

8.2 Mandatory Spares

Mandatory spares shall be procured along with main equipment. Vendor shall supply the mandatory
spares as per Annexure IV.

8.3 Spare Parts for Two Years Normal Operation

As per manufacturers recommendations, a list of spare parts for two-year normal operation shall be
furnished by the vendor.

9. PACKING & PRESERVATION

9.1 After completion of Inspection and testing, vendor shall provide suitable protection for shipment of
equipment and storage at site.

9.2 Packaging shall be long term type suitable for outdoor storage in coastal environment for a minimum
duration of 1 year.

9.3 Machined surfaces, such as flange surface, weld bevels, thread surface, shall be coated with easily
removable rust preventive and protected with caps, plugs or plate.

9.4 Opening of pressure parts shall be covered to prevent the entrance of foreign materials.

9.5 The equipment shall be properly packed to provide adequate protection during shipment.

9.6 Detailed packing list in water-proof envelop shall be inserted in the package together with equipment.

9.7 All equipment shall have an identification plate giving salient equipment features such as make, year
of manufacture, equipment number, name of manufacturer etc.

9.8 All flanged openings shall be provided with bolted blinds along with gaskets for transportation. Metal
closures shall be provided for flanged openings and threaded openings.

9.9 All loose items shall be packed in closed wooden box

This Document is the property of MLTPL & SIL. It should not be used, copied or reproduced without their written permission.

SIL Project No. I-30027 Page 11 of 17


Project : Mundra LPG Terminal Document No. : 2321-E-BOP-BOI-DM-M-E-001

Document Title : Agreed Specification for Boiler Packages Revision No. : 0

10. GUARANTEES

Vendor shall guarantee for the following:

10.1 Vendor shall provide the performance guarantee for the capacity and pressure at the tie in point.
Discharge temperature of the steam shall also be guaranteed.

10.2 The control panel shall be used during the field performance test and major functions of the control
panel shall be checked for the specified operating modes. The detailed procedure to be prepared by
vendor.

10.3 Field performance testing of Boiler package shall be carried out for demonstration of Performance
Guarantee parameters.

10.4 Boiler shall demonstrate following Performance Guarantee parameters

Steam Capacity
Steam Pressure & Temperature
Steam quality
Fuel Gas Consumption / Efficiency
Auxiliary Power Consumption
SOx, NOx, CO in Exhaust gas
Chemical consumption.

11. SPECIAL NOTES

11.1 Vendor shall conform to Vendor Compliance Sheet attached as Annexure-III to this requisition.

11.2 Vendor to consider all the necessary auxiliary items or equipment required for the smooth and safe
operation of the complete package, even if the required items are not specified elsewhere in this
requisition.

11.3 Vendor to note that any shed required for this package should be part of vendors scope. PLC and
MCC will be in field and required pressurization system shall be in vendor scope.

11.4 Vendor to note that civil design for shed and pits, pipe supports shall be designed by considering wind
and seismic load as per IS 875 and IS 1893 respectively.

11.5 Vendor to note, any purging required for this package by vendor, will be supplied by purchaser at one
terminal point.

This Document is the property of MLTPL & SIL. It should not be used, copied or reproduced without their written permission.

SIL Project No. I-30027 Page 12 of 17


Project : Mundra LPG Terminal Document No. : 2321-E-BOP-BOI-DM-M-E-001

Document Title : Agreed Specification for Boiler Packages Revision No. : 0

11.6 Any hazard area requirement (IP Rating) for vendor cabinets will be part of vendor scope.

11.7 All pressure vessels shall confirm to ASME Sec VIII Div I 2015 edition. All pressure vessels shall be
fabricated at ASME approved vendor shop only and there is no requirement of ASME Stamp on the
pressure vessel.

11.8 Vendor to consider the provision of future boiler and shall provide a flanged connection. Vendor to
consider the future boiler to be of 12T/hr.

11.9 Vendor to consider all the material handling facilities wherever required.

11.10 Vendor to consider exhaust gas to be released at safe height of chimney.

11.11 Vendor to provide the equipment 3D model of the entire package.

This Document is the property of MLTPL & SIL. It should not be used, copied or reproduced without their written permission.

SIL Project No. I-30027 Page 13 of 17


Project : Mundra LPG Terminal Document No. : 2321-E-BOP-BOI-DM-M-E-001

Document Title : Agreed Specification for Boiler Packages Revision No. : 0

12. ATTACHMENTS

No. of
Sr. No. Document No. Rev. Title
sheets
DATA SHEETS
2321-E-BOP-GEN-DP-D-E- Rev. Utility Package Data Sheet Boiler 4
1. 036 System and Desuperheater System
A
2. H003-E-LPG-BOA-BM-D-E- Rev. Mechanical Datasheet for Boiler
001 B Package 9
3. H003-E-ENI-LGR-BE-D-E- Rev.
Data Sheet for MV switchgear
001 B 8
4. H003-E-ENI-LPC-BE-D-E- Rev. Data Sheet for MV XLPE Insulated
001 B cables 5
5. H003-E-ENI-PBS-BE-D-E- Rev. Data Sheet for Industrial Control
001 B Switch Station (CSS) 3
6. H003-E-ENI-MOT-BE-D-E- Rev.
Data Sheet for MV motor
002 B 2
7. H003-E-CNI-GEN-BI-D-E- Rev. Data sheet formats for Instrumentation
001 B Items 39
8. - - Blank QAP format 1

SPECIFICATIONS
MECHANICAL
1. H003-E-LPG-GEN-BM- Rev. Design Basis of Static Equipment 12
N-E-001 B
2. H003-E-EQP-GEN-BM- Rev. Engineering design basis for 21
N-E-001 B mechanical package equipment
3. H003-E-LPG-BOA-BM- Rev. Specification for Boiler Package 11
N-E-001 B
4. H003-E-LPG-PRV-BM-S- Rev. Specification for pressure vessel 41
E-001 C
5. H003-E-LPG-GEN-BM- Rev. Engineering design basis for 37
N-E-002 B rotating equipment
6. H003-C-LPG-GEN-BM-S- Rev. Painting Specification 127
E-008 B
7. H003-E-LPG-GEN-BC-N- Rev. Engineering design basis for 12
E-007 B Siesmic Loads
8. H003-E-LPG-PIP-BM-S- Rev. Thermal Insulation Design 62
E-003 B
PIPING
1. H003-E-LPG-PIP-BM-N- Rev. Piping Design basis 51
E-001 B
2. H003-E-LPG-PIP-BM-S- Rev. Piping Material Specification 74

This Document is the property of MLTPL & SIL. It should not be used, copied or reproduced without their written permission.

SIL Project No. I-30027 Page 14 of 17


Project : Mundra LPG Terminal Document No. : 2321-E-BOP-BOI-DM-M-E-001

Document Title : Agreed Specification for Boiler Packages Revision No. : 0

No. of
Sr. No. Document No. Rev. Title
sheets
E-001 B
3. H003-E-LPG-PIP-BM-S- Rev. Valve Material Specification 121
E-002 B
4. H003-E-LPG-PIP-BM-N- Rev. Stress Analysis Package 30
E-002 B
ELECTRICAL
1. H003-E-ENI-GEN-BE-N- Rev. Electrical Design Basis 45
E-001 B
2. H003-E-ENI-LGR-BE-S- Rev. Engineering Specification for MV 34
E-001 B switchgear
3. H003-E-ENI-CBL-BE-S- Rev. Engineering Specification for MV 8
E-002 B XLPE Insulated cables
4. H003-E-ENI-MOT-BE-S- Rev. Engineering specification for MV 14
E-002 B Induction Motor
5. H003-E-ENI-LDB-BE-S- Rev. Engineering Specification for 11
E-001 B Distribution Boards (Industrial)
6. H003-E-ENI-LTF-BE-S- Rev. Engineering Specification for 13
E-001 B Industrial Lighting Fittings
7. H003-E-ENI-PBS-BE-S- Rev. Engineering Specification for 7
E-001 B Industrial Control Switch Station
(CSS)
8. H003-E-ENI-PSO-BE-S- Rev. Engineering Specification for 8
E-001 B Industrial Plugs, Sockets & hand
lamps
9. H003-E-ENI-CTH-BE-H- Rev. Typical Installation drawing for 23
E-001 B Power & wiring
10. H003-E-ENI-ETH-BE-H- Rev. Typical Installation drawing for 19
E-001 B Earthing & Lightning Protection
drawing
11. H003-E-ENI-ILS-BE-H-E- Rev. Typical Installation drawing for 23
001 B Lighting
12. H003-E-ENI-GEN-BE-L- Rev. Conceptual Hazardous Area Layout 3
E-001 B
INSTRUMENTATION
1. H003-E-CNI-GEN-BI-N- Rev. Instrumentation Design Basis 62
E-001 B
2. H003-E-CNI-GEN-BI-S- Rev. Specification for Instrumentation 21
E-003 B For Package
3. H003-E-CNI-GEN-BI-S- Rev. Specification for Instrument 38
E-001 B Installation
4. H003-E-CNI-CIC-BI-S-E- Rev. Specification for Instrument Signal 19

This Document is the property of MLTPL & SIL. It should not be used, copied or reproduced without their written permission.

SIL Project No. I-30027 Page 15 of 17


Project : Mundra LPG Terminal Document No. : 2321-E-BOP-BOI-DM-M-E-001

Document Title : Agreed Specification for Boiler Packages Revision No. : 0

No. of
Sr. No. Document No. Rev. Title
sheets
001 B & Control
5. H003-E-CNI-TMI-BI-S-E- Rev. Specification of Temperature 11
001 B Instruments
6. H003-E-CNI-VAL-BI-S- Rev. Specification for Control and On 17
E-001- B Off valves
7. H003-E-CNI-CTH-BI-S- Rev. Specification of FRP Cable Trays 6
E-001 B and Ducts
8. H003-E-CNI-GEN-BI-S- Rev. Specification for Analyzers 11
E-002B B
9. H003-E-CNI-ETH-BI-E- Rev. Instrument Earthing Schematic 1
E-001 B
10. H003-E-CNI-GEN-BI-H- Rev. Drwg for Fabrication & Installation 39
E-001-TYP B
11. H003-E-CNI-GEN-BI-I-E- Rev. Instrument Pressure piping Hook 28
001 B Up
12. H003-E-CNI-GEN-BI-L- Rev. Typical loop Diagrams 1
E-001 B
INSPECTION
1. H003-Q-LPG-GEN-BG- Rev. ITP of Static Equipment 14
G-E-005 B
2. H003-Q-LPG-GEN-BG- Rev. ITP of Static Items
28
G-E-006 B
3. H003-Q-ENI-HGR-BE-G- Rev. Inspection & Test Plan for Rotating 7
E-015 B Equipment
4. H003-Q-ENI-HGR-BE-G- Rev. Inspection & Test Plan for HV & 7
E-015 B MV XLPE Insulated cables
5. H003-Q-ENI-HGR-BE-G- Rev. Inspection & Test Plan for 11
E-018 B Distribution Boards
6. H003-Q-ENI-LGR-BE-G- Rev. Inspection & Test Plan for MV 7
E-001 B Switchgear
7. H003-Q-ENI-PBS-BE-G- Rev. Inspection & Test Plan for 7
E-001 B Industrial Control Switch Station
(CSS)
8. H003-Q-ENI-MOT-BE-G- Rev. Inspection & Test Plan for MV 10
E-002 B Induction Motor
9. H003-Q-CNI-GEN-BI-G- Rev. Inspection and Test Plan for C&I 16
E-001 B
10. H003-Q-LPG-GEN-BM- Rev. Shop Inspection Methodology 9
E-E-002 B
11. H003-Q-LPG-GEN-BM- Rev. PMI Procedure 7
E-E-003 B

This Document is the property of MLTPL & SIL. It should not be used, copied or reproduced without their written permission.

SIL Project No. I-30027 Page 16 of 17


Project : Mundra LPG Terminal Document No. : 2321-E-BOP-BOI-DM-M-E-001

Document Title : Agreed Specification for Boiler Packages Revision No. : 0

No. of
Sr. No. Document No. Rev. Title
sheets
12. H003-Q-ENI-HGR-BE-G- Rev. Inspection & Test Plan for Rotating 7
E-015 B Equipment
13. H003-Q-ENI-HGR-BE-G- Rev. Inspection & Test Plan for HV & 7
E-015 B MV XLPE Insulated cables
GENERAL
1. H003-Q-LPG-GEN-BG- Rev. Approved Vendor List 38
D-E-001 C
2. H003-Q-LPG-GEN-BM- Rev. Spare Philosophy 30
E-E-004 B
ANNEXURES
1. ANNEXURE-I - Scope of Supply / Work 6
2. ANNEXURE-II - Vendor Data Requirement 5
3. ANNEXURE-III - Vendor Compliance Sheet 6
4. ANNEXURE-IV - Spares 4

This Document is the property of MLTPL & SIL. It should not be used, copied or reproduced without their written permission.

SIL Project No. I-30027 Page 17 of 17

You might also like