FROM
MCDO
MONTH OF
FROM
PCDO FOR THE MONTH OF
Month-(26 APRIL 2017-25 MAY 2017)
INDEX
Failure Summary
6
Failure Analysis
7
Officer Inspection
8
SSE(TELE)MCDO
9
SSE(SIG)/WAT
ASTE/
Action Plan for Reduction of Signalling incidences over E Co Railway for
the year 2017-18
Unit- SSE/Sig/RGDA Month-(26 JUN 2017-25 JUL 2017)
13 Relay
Plan for Reliability improvement & Maintenance Effectiveness (PRIME) for 2017-18
9 ARC-IPS Nos
Annexure - 14
MAINTENANCE EFFORTS TO REDUCE /IMPROVE RELIABILITY
4 Nos.
7 Glued Joints DIR,MKRD,A/Cab(02 nos.)
Annexure-12
PERFORMANCE OF GM's MISSION ITEMS
1 Signal Failures nos.
2 (a) No. of Station Track Circuits nos./stn
Annex: 3.1
SIGNALLING Ann.A
S.No. Activity ( Description of work ) Total Qty Done during the month
Others 41
Lever frame
Block instrument
Track Relays (Shelf)
Line Relays (Shelf)
Point machine
BY BY
S.No. IRREGULARITY TOTAL
OFFICERS SUPERVISORS
1 Failure to exchange or signals - - NIL
2 Failure to maintain safety record
- - NIL
No.of
Date of
high Voltage Date of Date of
S. No. Station replace
reliabity stabiliser L.D.R fuse
ment
lamps
3 MVG 14 Provided
25 DWZ 5 Provided
Remarks
PRIME TARGET (2017-18) 3.1(a) FOR THE Month-(26 JUNE 2017-25 JULY 2017)
dn-2
jumbo-1
18005
dn-2
jumbo-1
58538
58502
Dn-1
dn-1
E.CO.RAILWAY
CLASS WISE FAILURE BREAK UP
UNIT-S.S.E.(SIG)/WAT
Month-(26 JUNE 2017-25 JULY 2017)
Cause of
Respon-
Branch
TOTAL
failure
S.No.
sible
1 S&T b2 1 1
c1 1 1
c2 1 1
0
0
0
2 OPTG 2.1 0
2.2 0
2.3 0
3 ENGG 3.1 1 1
3.3 1 1
3.5 0
3.6 1
4 ELECT 5.1 0
5.2 0
5 MECH 6.1 1 1
6.3 0
6 M/A 7.1 0
7.2 0
7.3 0
7.4 0
7 MISC 8.2 0
8.4 0
Bad 1
1
8 weather 9
TOTAL 5 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8
EAST COAST RAILWAY
S&T DEPARTMENT WALTAIR
TOTAL TRAIN DETENTION
TOTAL 18 5 20 31
E.CO.RAILWAY
STATEMENT SHOWING THE ANALOG AXLE COUNTER FAILURE
Failure Rectification
Date of instal-
Track section
How rectified
Axle counter
Total no. of
Opening
Dura-tion
Cause of
counter
reading
counter
Closing
reading
Station
S. No.
failure
failure
lation
used
no.
Remarks
resetting
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
E. CO. RAILWAY
S&T WALTAIR
PERFORMANCE OF NEW SIGNALLING EQUIPMENT
UNIT- SSE/SIG/JDB Month- (26 DEC-25 JAN)/2011-12
MTBF=(5/6)
MTTR=(7/6)
station
Sr. No.
houhs
in use
Make
1 2 3 4 5 6 7 8 9
A B A B A B A B A
1 Analog Axle Counter (MVF) CEL/UAC 6 60230 720 20 0 66.45 0 2975.5 - 3.3225
2 Analog Axle Counter (CJS) do 6 57284 720 1 0 6.73 0 56564 - 6.73
3 Analog Axle Counter (AGZ) do 5 74132 720 132 0 201.62 0 556.152 - 1.52742
4 Analog Axle Counter (TPQ) CGL/UAC 2 59492 720 10 0 11.3 0 5877.2 - 1.13
5 Analog Axle Counter (TPQ) CEL/UAC 3 59492 720 13 0 28.73 0 4520.92 - 2.21
6 Analog Axle Counter (BDXX) do 2 72720 720 7 0 14.3 0 10285.7 - 2.04286
7 Analog Axle Counter (DMK) do 10 61766 720 39 0 109.31 0 1565.28 - 2.80282
8 Analog Axle Counter (SZY) do 8 68960 720 19 0 65.25 0 3591.58 - 3.43421
9 Analog Axle Counter (KKLU) do 6 74660 720 27 0 112.34 0 2738.52 - 4.16074
10 Analog Axle Counter (GIZ) do 7 63260 720 34 0 93.88 0 1839.41 - 2.76118
11 Analog Axle Counter (KMLR) do 6 54690 720 22 0 46.52 0 2453.18 - 2.11455
12 Analog Axle Counter (BHNS) do 8 52580 720 12 0 29.05 0 4321.67 - 2.42083
13 Analog Axle Counter (KMSD) do 2 75020 720 13 0 49.88 0 5715.38 - 3.83692
14 Analog Axle Counter (DPF) CEL/2D 2 75020 720 3 0 5.75 0 24766.7 - 1.91667
WALTAIR
-25 JAN)/2011-12
MTTR=(7/6)
9
B
-
-
-
-
-
-
-
-
-
-
-
-
-
-
E. CO. RAILWAY
S&T WALTAIR
PERFORMANCE OF NEW SIGNALLING EQUIPMENT
UNIT- SSE/SIG/JDB Month- (26 DEC-25 JAN)/2011-12
MTTR=(7/6)
MTBF=(5/6)
Availability
Sr. No.
station
houhs
in use
1 2 Make
3 4 5 6 7 8 9 10
A B A B A B A B A B A B
1 Analog Axle Counter (MVF) CEL/UAC 6 23012 720 6 0 6.23 0 3835 - 1.038 - 0.999729 -
2 Analog Axle Counter (CJS) do 6 23012 720 1 0 1.78 0 23012 - 1.78 - 0.999923 -
3 Analog Axle Counter (AGZ) do 5 23012 720 1 1 0.75 0 23012 - 0.75 - 0.999967 -
4 Analog Axle Counter (TPQ) CGL/UAC 2 23012 720 2 0 3.17 0 11506 - 1.585 - 0.999862 -
5 Analog Axle Counter (TPQ) CEL/UAC 3 23012 720 6 1 22.48 0 3835 - 3.747 - 0.999024 -
6 Analog Axle Counter (BDXX) do 2 23012 720 2 0 8.58 0 11506 - 4.29 - 0.999627 -
7 Analog Axle Counter (DMK) do 10 23012 720 10 0 39.75 0 2301 - 3.975 - 0.998276 -
8 Analog Axle Counter (SZY) do 8 23012 720 6 0 26.85 0 3835 - 4.475 - 0.998835 -
9 Analog Axle Counter (KKLU) do 6 23012 720 5 0 14.04 0 4602 - 2.807 - 0.99939 -
10 Analog Axle Counter (GIZ) do 7 23012 720 2 0 5 0 11506 - 2.5 - 0.999783 -
11 Analog Axle Counter (KMLR) do 6 23012 720 4 0 8.78 0 5753 - 2.195 - 0.999619 -
12 Analog Axle Counter (BHNS) do 8 23012 720 1 0 3.11 0 23012 - 3.11 - 0.999865 -
13 Analog Axle Counter (KMSD) do 2 23012 720 1 0 4.5 0 23012 - 4.5 - 0.999804 -
14 Analog Axle Counter (DPF) CEL/2D 2 23012 720 0 0 0 0 - - - - - -
E.CO.RAILWAY
S&T WALTAIR
LED SIGNALS LAMP FOR THE YEAR 2008-09
No. of
Name
equipment Total down time
S.No. of Equip Make Total No. of hours in use No. of failures MTBF(5/6) MTTR(7/6) Availability
existing as in hours
ment
on date
5 6 7 8 9 10(8/(8+9))
1 2 3 4
A B A B A B A B A B A B
power-
1 LED 507 8123968 377208 49 3 105.29 3.08 ### 125736 2.15 1.03 0.999 0.999
tech
CTS- Up M L Starter
1 102.87 0.66 showing no light Current regulator defective.
A Cummulative till the end of the month of the year under review
B During the month
Availability= MTBF/ MTBF+MTTR
EAST COAST RAILWAY
S&T WALTAIR
DEPA PERFORMANCE FEEDBACK REPORT FOR CURRENT REGULATOR OF LED SIGNAL DIVISION
RTME
UNIT-S.S.E.(SIG)/JDB Month- (26 MAR-25 APR)2012
NT
Failures detailes
modified cr's
No. of LED
provided
installed
Sr. No. Station MAKE Remarks
Date of
Date Type of failure
Remarks
EAST COAST RAILWAY
Statement of Duration of Signal failure for 2008-09 and 2009-10 as per Signal failure r
Block
00:53 11:15
Instrument
Axc
(BPAC, 00:00 0
LVCD)
Axc
(In place of 03:10 0
Track Ckt.)
Control 11:15
00.00 00.00
66.27
Failure Summary of SSE(SIG)/ WAT Unit For the
26 JUNE 2017-25 JULY 2017)
Classification of failures
1 SIGNAL & TELECOM
A Equipment Failure
i Signal Transformer
ii HKT, 'E' Type Lock, Crank Handle
iii Lever Frame
iv Magneto Telephone
v Annunciator
vi SM Slide
B Lamp Fusing
i Filament Lamp
ii LED, HMU, CR 1
C Cable
i Indoor Wiring & Dry Soldering 1
ii Out Door cabling 1
iii Cable Termination
D Relay Failure
i Matel to Carbon
ii Matel to Matel
iii Group Relay
E Point Machine
i Point Machine
ii EPD
F Fuse Blown off
i Fuse Blown off
G Power Equipment
i IPS/UPS
ii Battery Chargers
iii DG Sets
iv AMF Panel of DG Sets
v Battery Chargers
vi Inverters
vii DC to DC Converters
H Bad Maintenance
i Out of Adjustment
ii Loose Connection
iii Jamming
iv Breakage of Part
v Dn Gradation of Electrical Power
vi Staff Working
I Track Circuit Failure
i UAC/ SSDAC/ MSDAC/ TC
ii Impedence Bond
iii AFTC
iv Track Feed Resistance
v Track Device/UAC/SSDAC/MSDAC
vi EJB/ UAC
vii Reset/UAC/SSDAC/MSACTC
J Block Instrument Failure
i Block Panel
ii UFSBI
iii BPAC - MUX
iv SGE
v TLBI
vi Token Instrument
vii UAC/SSDAC/BPAC
viii Reset UAC/SSDAC/BPAC
K Interlocking
i Electro - Mechanical
ii Relay Interlocking
iii Electronic Interlocking
L Lifting Barrier
i Mechanical
ii ELB
M Miscellinious
i Right During Testing
ii Route Held Up
iii FPL / LB
iv Mechanical Detector
v Rod/Wire/Compensator/Reverser/ Signal Machine
NA(Electronic timer Relay defective)
TOTAL (A)
Non Chargeable (B)
2 OPERATING
2.1 RIGHT BEFORE ATTENDANCE
2.2 NO INFORMATION & NONE ATTENDED
2.3 IMPROPER/ WRONG OPERATION
2.4 OBSTRUCTION IN POINTS
2.5 OTHERS
3 ENGINEERING
3.1 STAFF WORKING 1
3.2 IBJ DEFECT
3.3 GJ DEFECT 1
3.4 POOR DRAINAGE
3.5 POINT DEFECT
3.6 OTHERS 1
4 D. O. T.
4.1 DOT LINE FAULT
5 ELECTRICAL
5.1 SUPPLY FAILURE
5.2 OTHERS
6 MECHANICAL
6.1 S & T GEAR DAMAGED BY WAGON DOOR 1
6.2 TOKEN LOST
6.3 OTHERS
7 MISCREANT ACTIVITY/LAW & ORD.
7.1 DAMAGES TO S & T GEARS
7.2 THEFT TO S & T GEARS
7.3 SHORTING OF BLOCK JOINT/T.C.
7.4 OBSTRUCTION/ INTERFER TO TRANS.
7.5 OTHERS
8 MISCELLANEOUS
8.1 CATTLE RUN OVER
8.2 RATS/ LIZARDS ETC. AFFECTING GEARS
8.3 ACCIDENTS/AGITATIONS ETC.
8.4 OTHERS/NFF/MISCL
9 BAD WEATHER 2
TOTAL (B)
GRAND TOTAL (A + B) 8
MISSION ITEMS- ASSET RELIABILITY :
ASTE/ _Section for the Month of JULY 2017.
MAR'18
NOV'17
May17
OCT'17
DEC'17
Aug17
JAN'18
FEB'18
Sep17
Apr17
Jun17
Jul17
Signal failure Total
Actual of 2016-17 6 6 6 10 28
2016-17 TARGET
5 5 5 9 24
(90% of 2016-17)
Actual of 2017-18 12 8 16 8 44
Signature of the
concerned Signature of the concerned SSE/Sig/Incharge
DSTE/ASTE
PERFORMANCE REPORT OF SSDAC
Date of
Duration
S.No. STATION Block Section Commi- F/O F/R
in Hours
ssioning
1
2
PERFORMANCE REPORT OF EI
Date of
Duration in
S.No. STATION Commi- F/O F/R Failure with date a
Hours
ssioning
Date of
Duration in
S.No. STATION Commi- F/O F/R Failure with date a
Hours
ssioning
Date of
Duration in
S.No. STATION Commi- F/O F/R Failure with date a
Hours
ssioning
Annexure 10.1.7
PERFORMANCE REPORT OF EI
A B
No. of LC
1 Train Actuated Warning Device Gates
2(a) Anti Collision Device (ACD) Planned Rkms
2(b) Anti Collision Device (ACD) Planned Stns
2(c) Anti Collision Device (ACD) Survey Rkms
2(d) Anti Collision Device (ACD) Survey Stns
3(a) Train Collision Avoidance System (TCAS) Rkms
3(b) Train Collision Avoidance System (TCAS) Stns
4 Data loggers Stns
5 Audio Frequency Track Circuits Nos.
6(a) LED Signal Lamps Stns
6(b) LED Signal Lamps Aspects
7(a) Semaphore LED Signal Aspects Stns
7(b) Semaphore LED Signal Aspects Aspects
8 Integrated Power Supply (IPS) Stns
C
Annexure to PCDO to ML
Ref-2011/SIG/Inspection/1 dt. 22.07
1
LED FAILURE
TRACK CIRCUIT
LEVEL CROSSING
1
nspection/1 dt. 22.07.2011
Make Age
Main/
Make Subsidiary
Elect./Mech
Barrier
Department wise Analysis of Signal incidences for the month of
MARCH - 2005
DETAILS
, 2003 OF BLOCK FAILURES
Date of
S.NO. STATION Details of the Failure Duration
Failure
Annexure:5.1.1(2)
Preventive
Cause measures
taken by
Railways to
prevent such
Failures
PERFORMANCE OF CEL SSDAC FOR
May-17
Equpt. Card
Resetting
No. of Instruments
S.No. SECTION Type of Detection Line
2 GPT-DVD(Dn) 1 PH-Rev UP 0
3 GPT-DVD(UP) 1 PH-Rev DN 0
4 GPT-JGPM 1 PH-Rev UP 0
5 PH-Rev DN
6 PH-Rev UP
7 PH-Rev DN
8 PH-Rev UP
9 PH-Rev DN
10 PH-Rev UP
11 PH-Rev DN
12 PH-Rev UP
13 PH-Rev DN
14 PH-Rev UP
15 PH-Rev DN
16 PH-Rev UP
17 PH-Rev DN
18 PH-Rev UP
19 PH-Rev DN
20 PH-Rev UP
21 PH-Rev DN
22 PH-Rev UP
23 PH-Rev DN
24 PH-Rev UP
25 PH-Rev DN
26 PH-Rev UP
27 PH-Rev DN
28 PH-Rev UP
29 PH-Rev SL
30 PH-Rev SL
TOTAL 4 8 0
High. Temp.
May-17
Coil damaged by Unimat
Engg.
Error code
CEL SSDAC FOR THE YEAR 2017 - 18
BlockbyT/Wagon unimat
System failure
Staff working
Others
Annexure -V
0 0 0 0 0 0 0 0
Annexure -V
Total
0
0
8
_______________Railway
SIGNAL DEPARTMENT
SIGNALLING ASSETS DETAILS FOR THE MONTH OF ________________ 20_____
S.N ITEMS Assets as on 31.3.16 (Route wise)
A B C D Spl D E TOTAL
Assets at station
section (BG only)
1* Total Nos of BG
Interlocked stations
(Including Block Hut/C
class station)
1.1 Panel Interlocking (No
of stations)
1.2 Electronic Interlocking
(No.of stations)
8 Standard of
Interlocking
8.1 Standard I* of
Interlocking
8.2 Standard II * of
Interlocking
8.3 Standard III * of
Interlocking
9 Assets in Block
Sections
9.1 Automatic Block
Signalling (Route
KM.)
9.2 Intermediate Block
Signalling (No. of
block sections)
9.3 Interlocked Level
crossing Gates (Nos)
___________ 20_____
Total Sanctioned Yet to be Added in 16-17 upto
sanctione Total Routwise
d (As per quantim breakup
approved
PH-33 Other
HIGHLIGHTS FOR THE MONTH OF 26 JUNE 2017-25 JULY 2017
Unit of SSE/Signal/Koraput
Disconnection - 230
Block - 81
Other - 149