MCDO

FOR THE MONTH OF

FROM
MCDO
MONTH OF

FROM
PCDO FOR THE MONTH OF
Month-(26 APRIL 2017-25 MAY 2017)
INDEX

Sr. No. Description

Safety & Signaling Action Plan


1
OVERHAULING
2
HIGHLIGHT
3
Failure Break Up with Analysis
4

Total Train Detention


5

Failure Summary
6

Failure Analysis
7
Officer Inspection
8
SSE(TELE)MCDO
9

SSE(SIG)/WAT

ASTE/
Action Plan for Reduction of Signalling incidences over E Co Railway for
the year 2017-18
Unit- SSE/Sig/RGDA Month-(26 JUN 2017-25 JUL 2017)

S No. ITEM UNIT Done During this month

1 Axle counter (UAC)

1.1.1 Checking correct installation and redone (Stations) 02 stns. (KRPU-9T,MKRD-12AXT)

Replacement of trans receive coils in regular


1.1.2 NIL
periodicity (Nos.)

Channel voltage adjustment at regular interval


1.1.3 02 stns. 02(KRPU-9T,MKRD-12 AXT)
before a failure.(Stations)

2 Axle counter (SSDAC)

2.1 Checking correct installation and redone (Stations) NIL

3 NDT fuses of correct rating (Full load current + Safety Margin)

Provision/ Replacement by RDSO approved fuses


3.1 NIL
of appropriate rating.(Nos.)

8 Renewal of power supply at stations

8.1 Replacement of defective cells.(Nos.) NIL


8.2 Replacement of Battery Charger.(Nos.) NIL

9 Integrated Power Supply System

Proper functioning of Auto change over panel.


9.2
(Stations)

9.3 Functioning of all modules of IPS.(Systems) 21 Stn All 21 Stn.

12 Maintenance of Track Circuits

12.2 Cleaning of Iron dust by insulated brush.(Stations) 24 stns. KRPU Section.

Cutting of Rail Head and application of insulating


12.3 NIL
material at the end post.(Stations)

Application of insulating compound on glued joint


12.4 NIL
plates.(Stations)

Use of Insulated track lead wires (Using Jacketed


12.5 4 stn DMRT,KKGM,CJS & KDPA
wire rope).(Stations)

Use of Heat shrinkable tape/sleeves on the traction


12.6
bond below positive rail.(Stations)

Checking adequate separation between terminals


12.8 4 stn DMRT,KKGM,CJS & KDPA
in TLJB.(Stations)

13 Relay

Checking of correctness of installation & removal


13.1 4 stn DMRT,KKGM,CJS & KDPA
of deficiencies.(Stations)

Proper Crimping and soldering of contacts if


13.3 4 stn DMRT,KKGM,CJS & KDPA
required.(Stations)

Availability of appropriate voltage in the 24V DC


13.4
bus bar.(Stations)

SSE(SIG)/JDB ASTE/JDB SSE(TELE)/JDB


13.5 Connector loose to be reinserted properly.(Nos.)

SSE(SIG)/JDB ASTE/JDB SSE(TELE)/JDB


14 Cable

Meggaring of 100% main & tail cable before pre NI


14.1
for new installations.(Stations)

Meggaring of main & tail cable for existing


14.2
installations yearly.(Stations)

14.3 Replacement of defective cable

Signalling cable when IR value is less then 1Mega


14.3a
ohms or damaged.(KM)

Plan for Reliability improvement & Maintenance Effectiveness (PRIME) for 2017-18

PART-I (Inspections and Maintenance)

Sl no Items Units Achievement during the month

1 Regular Directed Maintenance at the level of


4 stn DMRT,KKGM,CJS & KDPA
JE/SSE sec every month
2 Safety Integrity Test as per SEM and for EI once Stns
every 5 years.

3 Provision & or Replacement of Glued Joints in lieu 4 Nos.


of IBJs on the main line DIR,MKRD,A/Cab(02 nos.)

4 Replacement of Old/worn-out point machines by Nos.


IRS type machines. NIL

5 Replacement of batteries Nos. NIL


6 Technical Audit/Right sizing of Power Supply and Stns
its Modules at stations undergoing
modifcations/New works
10(a) Training of Staff at IRISET & STTC -Equipment 01 Nos.
course Naresh Babu, Tech-III/PFU(03.07.17-08.07.17)

10(b) Training of Staff at IRISET & STTC -Refresher 01 Nos


course K.C. Panda, Sr. Tech/DMNJ(24.07.17-12.08.17)

11 Training to Officers at IRISET Nos

13 Relay circuits bifurcation having more than 45 Stns.


contacts (In Qseries relay based interlocking of
more than 100 routes)

PART-II (Reliability improvement works)


Achievement during the month of
Sl no Items Units
__________
Fire Alarm and detection system (More than 150
1 Nos.
routes)

2 Fall Back system Nos.

3 Signal incidences with a reduction by 10% Nos.

Expert Group for IPS(Staton),WAT DSTE-I/WAT +


4 Nos
2 SSE
5 Data logger networking - 100% Nos
Provision of Airconditioning at Relay rooms having
6 Nos
more than 100 routes
Earth leakage detectors (All
7 Nos
new/doubling/tripling/fourth line
8 ARC-SSDAC Nos

9 ARC-IPS Nos

SSE(SIG)/JDB ASTE/JDB SSE(TELE)/JDB


10 Class A,B,C & D type lightening protection Nos

Failure alarms through Datalogger SMS system for


11(a) Stns
Track feed charger

Failure alarms through atalogger SMS system for


(b) Stns
230v power supply (AT & DGs)

Failure alarms through Datalogger SMS system for


Stns
IPS
12 Post supply check of material by RDSO Nos

Annexure - 14
MAINTENANCE EFFORTS TO REDUCE /IMPROVE RELIABILITY

1 Directed Maintenance 4 stn DMRT,KKGM,CJS & KDPA


Provision of new Signalling Cables replacing the
2 Kms.
defectilve silgnalling cable

3 Cable Meggering Stns.

4 Safety Seminars 02 Nos. At KRPU & ARK- Pre - Monsoon Precautions.


5 LED Lit Signals Aspects

6 PSC Layouts Nos.

4 Nos.
7 Glued Joints DIR,MKRD,A/Cab(02 nos.)

8 Wornout tongue rails 02 Nos. 23A & 21A @ BHJA

15 Secondary Cells Nos.

16 Battery Chargers Nos.

PERFORMANCE OF CSTE's MISSION ITEMS

6 New RKT provision Nos.


8 Provision of FRP junction boxes Nos.
9 Replacement of old worn-out & corroded location
Nos.
boxes
10 Replacement of worn-out ground connections of
point machines Nos.

SSE(SIG)/JDB ASTE/JDB SSE(TELE)/JDB


11 Replacement of worn-out L.C.Gates
Nos.
12 Provision of B&C type protection on all existing
power supply. stations

SAFETY ACTION PLAN

3 Safety Inspection by S&T officials


(a) Safety inspection at Sectional Inspector 24 Nos. KRPU-KKGM -08 stns. By SSE/Sig/KRPU & JRT-
level(Monthly ) PBVA-SMLG-08 stns by Je/Sig/ARK & MVF-CJS-08
stns. By SSE/Signal/JYP.
(b) Safety inspection at Incharge Inspector level 08 Nos. MKRD-04.07.17,SXV-08.07.17,PBV-12.07.17,CTS-
(Quarterly ) 17.07.17A/Cab-18.07.17,B/Cab-18.07.17,DIR-
19.07.17 & JYP-22/23.07.17.

(c) Safety inspection at ASTE, DSTE, Sr.DSTE's Nos.


level(Yearly )

4 Joint Inspection of S&T officials


(a) Foot Plate inspection by CSI/CLI & Nos.
CDTI( Quarterly )

(b) Points & Crossings by CSI/PWI 09 Nos. DMNJ-07.07.17,B/Cab-09.07.17,SMLG-13.07.07,KDPA-


( Quarterly ) 13.07.17,DPC-17.07.17,MKRD-15.07.17,BGUA-
20.07.17,KRPU-21.07.17,JYP-24.07.17
5 Training ( Refresher )/Seminars for Safety Category Staff
(a) Signal Supervisors (once in 4 Years ) Nos.
(c) Signal Maintainers( Once in 4 Years ) Nos.

(e) Safety Seminars


02 Nos. At KRPU & ARK- Pre - Monsoon Precautions.
(2 Nos. per month/Division )
6 Periodical Medical Examination of Safety Category Nos.
staff
7 Overhauling of Signalling Equipment
(a) Lever Frame ( All lever frames including Nos.
ground lever and elevated lever frames)
( Once in 3 year )
( b ) Block Instrument ( DLBI /TLBI -once in 7 yrs. Nos.
& SLBI - once in 10 years.)

SSE(SIG)/JDB ASTE/JDB SSE(TELE)/JDB


( c ) Shelf Type relay Track( once in 12 years ) Nos.
( d ) Shelf Type relay Line( once in 15 years ) 65 Nos. At KRPU .
( e ) Cable meggering( Once in a year ) Stns.

8 Sign-off Register-Compliance of deficiencies Items


reported

Annexure-12
PERFORMANCE OF GM's MISSION ITEMS
1 Signal Failures nos.
2 (a) No. of Station Track Circuits nos./stn

(b) Panel Interlocking / EI nos./stn

(c) RRI Installation


(d) TAWD
nos./stn
3 (a) Interlocking of Level Crossing
nos./stn
(b) Manning of L-Xing
4 (a ) Luminious Sighting Boards nos./stn

(b) Reflective indicators on L.C. gate boom nos./stn

5 ( a ) Train Indication Board nos./stn

(b) Coaching Indication Board nos./stn

(c) Computarised Auto Announcing System nos./stn

Annex: 3.1

RELIABILITY IMPROVEMENT OF SIGNALLING ACTION PLAN (2017-18)

1 Improving quality of Signallling and Power Cable RKM


laying through use of RCC ducts in large stations
and in suburban vulnerable sections
15 NDT fuses of correct rating ( Full load current + Nos.
Safety margin )

SIGNALLING Ann.A
S.No. Activity ( Description of work ) Total Qty Done during the month

3 Safety seminars 02 Nos. At KRPU & ARK- Pre - Monsoon Precautions.


4 Directed Maintenances 4 stn DMRT,KKGM,CJS & KDPA
ASISTANCE REQUIRED FROM DIV HQ

1 OS/Sr Cleark for Store Section 01 No.


Quick Budgeting & clearance of critical materials
2
(materials list attached here for ref)
03
3 Maintainer required for RUL,LLGM,SKPI station BGUA, MVF & CJS
Nos.
7 Unauthorised absent of staff more than 15 days No's

HIGH LIGHTS FOR THE Month-(26 Jun 2017-25 Jul 2017)


SSE(S)/WAT
Disconnection - Total- 50 No's(NB-41 ,B- 9 )
Block 9 - no's

Others 41

SSE(SIG)/JDB ASTE/JDB SSE(TELE)/JDB


OVERHAULING Annexure-6

Lever frame
Block instrument
Track Relays (Shelf)
Line Relays (Shelf)
Point machine

SSE(SIG)/JDB ASTE/JDB SSE(TELE)/JDB


E.CO.RAILWAY
S&T WALTAIR
MAJOR IRREGULARITIES NOTICED

UNIT- SSE(SIG)/JDB Month- (26 MAR-25 APR)2012

BY BY
S.No. IRREGULARITY TOTAL
OFFICERS SUPERVISORS
1 Failure to exchange or signals - - NIL
2 Failure to maintain safety record
- - NIL

3 Slack supervision - - NIL


4 Not being alert - - NIL
5 Other Irregularities - - NIL
6 Ambush check in automatic
territory - - NIL

a) No. of checks conducted - - NIL


b) No. of irregularities noticed - - NIL
7 Mock drills of turning out
ARTS/ARME - - NIL

a) No. of drills conducted) - - NIL


b) Summary of result - - NIL
E.CO.RAILWAY
S&T
PERFORMANCE OF HIGH RELIABILLITY SIGNAL LAMPS
UNIT- SSE(SIG)/JDB Month-(26 MAR-25 APR)2012

No.of
Date of
high Voltage Date of Date of
S. No. Station replace
reliabity stabiliser L.D.R fuse
ment
lamps

1 MVF NIL Provided

2 JRT NIL Provided

3 MVG 14 Provided

4 CTS NIL Provided

5 JYP NIL Provided

6 DIR NIL Provided

7 KDPA NIL Provided

8 CJS NIL Provided

9 KPRR NIL Provided

10 AGB NIL Provided

11 AGZ NIL Provided

12 NKX NIL Provided

13 JDB NIL Provided


14 KMEZ NIL Provided
LCGATE Not
15 8
308/8 provided
16 TPQ NIL Provided

17 BDXX NIL Provided

18 DMK NIL Provided

19 SZY NIL Provided

20 KMSD NIL Provided

21 KKLU NIL Provided

22 KWGN NIL Provided

23 DPF NIL Provided

24 GIZ NIL Provided

25 DWZ 5 Provided

26 KMLR NIL Provided

27 BHNS NIL Provided


28 BCHL 18 Provided
29 KRDL 9 Provided
Y
WALTAIR
BILLITY SIGNAL LAMPS
Month-(26 MAR-25 APR)2012

Remarks
PRIME TARGET (2017-18) 3.1(a) FOR THE Month-(26 JUNE 2017-25 JULY 2017)

S.No. Items Unit Achievement of the month


1 To reduce cable failures
i)Provision of ELDs and
Stns NIL
monitoring through datalogger

ii)Cable to be traced using


cable locator and provision of
Stns NIL
cable m arkera along with
updation of cable route plan

iii)Identify exposed cables and


100%
protecting them
Provision of AC in relay
2 Nos NIL
rooms/equipments rooms
i)Provision of redundancy by
3 Nos NIL
means of DAC or BPAC
ii)Segrigation of powe supply
Nos NIL
for standby SSDAC
Provision of IPS (low
4 capacty)/inveter at interlocked 01 No.
LC gates
Provising lightning prrotection
5 of class A,B,C & D on EI Stns NIL
stations
Generation of Alarm through
6 dratralogge of track feed Stns NIL
battery chargerr
4 Nos.
Provision of glued
joint/eplacement of glued
7 DIR,MKRD,A/Cab(02 nos.)
joints on age-cum condition
basis
Provision of standby/auxiliary
8 Stns NIL
relief panel
Provision of fire detection
9 Stns NIL
system
10 i)Provision of sliding boom LCs NIL
ii)Elimination of EKT/HKT from
Nos NIL
ELBs
2017-25 JULY 2017)
Cummulative
upto the month
SIGNAL INTER LOCKING FAILURE FOR THE Month-(26 JUNE 2017-25 JULY 2017)
Failure Failure
S.No. Station Date Dept Code Dur Gear of Fault Remarks
occurred Rectified

Attended and tested found that Down


Dn Statar S-8 of Route-3 is up route-2 off signal post hit by open door of
9hrs. 45
1 CJS 10.07.2017 Mech 6.1 13:00 22:45 routed on follown between R3 & up jumbo. The same all material collected
min
R2. from KRPU to CJS and re - connected and
resume for normal woking.

Attended and tested found that track lead


23AT showing occupation on panle wire broken by engg. Staff while working
2 JYP 13.07.2017 Engg 3.1 8:55 9:15 20 mins board due to Up main line statar 23 At track circuit area without any
foot back to danger. information. The same wire was re-
connected and resume for normal working.

Attended and tested founde that at home


2hrs. 25 Up R-3 home signal couldnot be
3 CTS 03.07.2017 S&T b2 21:00 23:25 signal led was defective the same was
mins taken off.
repalce and resume for normal working.

Attended and tested found that at relay


room fuse blown off. Due to heavy rain
Bad 1hr 20 Dn advance statar showing
4 MVG 16.07.2017 9 19:20 20:40 and lighting. So the same fuse replace and
Weather mins. occupation on panel board.
resume for normal working.
Fuse- 2 Amps, Nandi Electronice.
TLBI suspended between "A" Tech-III/DMRT attended and tested found
Cabin-KRPU due to no 8AT Track that 8AT relay end positive glued joint
5 "A" Cabin 14.07.2017 Engg 3.3 8:20 9:05 45 mins.
circuit showing occupation on shorted with iron scale. The same was
panel board. removed and resume for normal working.
Tech-III/DMRT attended and tested found
TLBI suspended between DMRT- that no AT supply at panel board due to 63
Bad
6 DMRT 02.07.2017 9 15:35 16:10 35 mins. DMNJ due to no AT supply at panel Amps fuse blown off due to heavy rain
Weather
board lightening. The same was replace and
resume for normal working.
24BT, 2AT, 2T, 11AT, 22AT track Attended and tested found that cable was
2hrs. 55
7 BHJA 20.07.2017 S&T c2 16:45 19:40
mins
circuit showing occupation on defective the same was repalce and
panel board. resume for normal working.

Attended and tested found that TPR relay


1 hr 10 21NT showing occupation on panel
8 GPJ 21.07.2017 S&T c1 11:10 13:20 contact dry soildered the same was re-
min. board.
soildred and resume for normal working.
Y 2017)
Trains Follow Up
Observation
Effected Action

dn-2

jumbo-1

18005

dn-2

jumbo-1

58538

58502
Dn-1

dn-1
E.CO.RAILWAY
CLASS WISE FAILURE BREAK UP
UNIT-S.S.E.(SIG)/WAT
Month-(26 JUNE 2017-25 JULY 2017)

Cause of
Respon-
Branch

TOTAL
failure
S.No.

sible

1 S&T b2 1 1
c1 1 1
c2 1 1
0
0
0
2 OPTG 2.1 0
2.2 0
2.3 0
3 ENGG 3.1 1 1
3.3 1 1
3.5 0
3.6 1
4 ELECT 5.1 0
5.2 0
5 MECH 6.1 1 1
6.3 0
6 M/A 7.1 0
7.2 0
7.3 0
7.4 0
7 MISC 8.2 0
8.4 0
Bad 1
1
8 weather 9
TOTAL 5 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8
EAST COAST RAILWAY
S&T DEPARTMENT WALTAIR
TOTAL TRAIN DETENTION

UNIT-S.S.E.(SIG)/JDB Month-(26 OCT 2016-25 NOV 2016)

No. of Total duration of failures


No. of goods
Sl. Coching
Station trains
No. trains
detained Hours minutes
detained
1 GTLM
2 GRBL
3 GPI 1 1 0 20
4 KMX
5 DNV
6 VBL
7 SNM
8 PVP
9 GMDA 4 1 2 35
10 KNRT
11 JMPT 2 0 1 25
12 LDX
13 RGDA
14 SPRD 1 1 1 10
15 B-CAB
16 A-CAB
17 KTGA
18 SKPI 1 0 3 10
19 BLMK 1 0 0 40
20 LLGM 1 0 1 46
21 RUL 5 2 9 10
22 TKRI
23 SGRM 2 0 0 15
24 LKMR

TOTAL 18 5 20 31
E.CO.RAILWAY
STATEMENT SHOWING THE ANALOG AXLE COUNTER FAILURE

UNIT- SSE(SIG)/JDB Month- (26 DEC-25 JAN)

Failure Rectification

Date of instal-
Track section

How rectified
Axle counter

Total no. of

Opening
Dura-tion

Cause of

counter
reading

counter
Closing

reading
Station
S. No.

failure

failure
lation
used
no.

Date Time Date Time

BDXX L1AXT Bearthing 5/7/2000 - - - - - - - - 000078 -


1
track
2 do L2AXT do do - - - - - - - - 000115 -

3 DMK L1AXT do 10/4/2000 - - - - - - - - 000067 -


4 Bridge - - - - - - - - -
do 2AXT do 000061
section
Bearthing do - - - - - - - - 000169 -
5 do L3AXT
track
6 do 13/15AXT Pt.Zone 11/10/01 - - - - - - - - 000077 -
7 do 14BXT do do - - - - - - - - 000077 -
8 do 15BXT do do - - - - - - - - 000079 -
9 do 14/16AXT do do - - - - - - - - 000125 -
10 do 16BXT do do - - - - - - - - 000083 -
11 do 18AXT do do - - - - - - - - 000125 -
12 do 13BXT do do - - - - - - - - 000238 -
13 SZY 01AXT Bridge 5/2/2001 - - - - - - - 000102 -
section
14 KKLU 2 AXT Bridge do - - - - - - - - 000128
section
15
16
17
18
19
20
DEC-25 JAN)/2011-12
Reasons for

Remarks
resetting

- -

- -
- -
- -

- -

- -
- -
- -
- -
- -
- -
- -
- -
E. CO. RAILWAY
S&T WALTAIR
PERFORMANCE OF NEW SIGNALLING EQUIPMENT
UNIT- SSE/SIG/JDB Month- (26 DEC-25 JAN)/2011-12

Total down time in


Total no. of failure
Total no. of hours
No. of Equipment
exist as on date
Equipment &
Name of the

MTBF=(5/6)

MTTR=(7/6)
station
Sr. No.

houhs
in use
Make
1 2 3 4 5 6 7 8 9
A B A B A B A B A
1 Analog Axle Counter (MVF) CEL/UAC 6 60230 720 20 0 66.45 0 2975.5 - 3.3225
2 Analog Axle Counter (CJS) do 6 57284 720 1 0 6.73 0 56564 - 6.73
3 Analog Axle Counter (AGZ) do 5 74132 720 132 0 201.62 0 556.152 - 1.52742
4 Analog Axle Counter (TPQ) CGL/UAC 2 59492 720 10 0 11.3 0 5877.2 - 1.13
5 Analog Axle Counter (TPQ) CEL/UAC 3 59492 720 13 0 28.73 0 4520.92 - 2.21
6 Analog Axle Counter (BDXX) do 2 72720 720 7 0 14.3 0 10285.7 - 2.04286
7 Analog Axle Counter (DMK) do 10 61766 720 39 0 109.31 0 1565.28 - 2.80282
8 Analog Axle Counter (SZY) do 8 68960 720 19 0 65.25 0 3591.58 - 3.43421
9 Analog Axle Counter (KKLU) do 6 74660 720 27 0 112.34 0 2738.52 - 4.16074
10 Analog Axle Counter (GIZ) do 7 63260 720 34 0 93.88 0 1839.41 - 2.76118
11 Analog Axle Counter (KMLR) do 6 54690 720 22 0 46.52 0 2453.18 - 2.11455
12 Analog Axle Counter (BHNS) do 8 52580 720 12 0 29.05 0 4321.67 - 2.42083
13 Analog Axle Counter (KMSD) do 2 75020 720 13 0 49.88 0 5715.38 - 3.83692
14 Analog Axle Counter (DPF) CEL/2D 2 75020 720 3 0 5.75 0 24766.7 - 1.91667
WALTAIR

-25 JAN)/2011-12
MTTR=(7/6)

9
B
-
-
-
-
-
-
-
-
-
-
-
-
-
-
E. CO. RAILWAY
S&T WALTAIR
PERFORMANCE OF NEW SIGNALLING EQUIPMENT
UNIT- SSE/SIG/JDB Month- (26 DEC-25 JAN)/2011-12

Total down time in


Total no. of failure
No. of Equipment

Total no. of hours


exist as on date
Equipment &
Name of the

MTTR=(7/6)
MTBF=(5/6)

Availability
Sr. No.

station

houhs
in use
1 2 Make
3 4 5 6 7 8 9 10
A B A B A B A B A B A B
1 Analog Axle Counter (MVF) CEL/UAC 6 23012 720 6 0 6.23 0 3835 - 1.038 - 0.999729 -
2 Analog Axle Counter (CJS) do 6 23012 720 1 0 1.78 0 23012 - 1.78 - 0.999923 -
3 Analog Axle Counter (AGZ) do 5 23012 720 1 1 0.75 0 23012 - 0.75 - 0.999967 -
4 Analog Axle Counter (TPQ) CGL/UAC 2 23012 720 2 0 3.17 0 11506 - 1.585 - 0.999862 -
5 Analog Axle Counter (TPQ) CEL/UAC 3 23012 720 6 1 22.48 0 3835 - 3.747 - 0.999024 -
6 Analog Axle Counter (BDXX) do 2 23012 720 2 0 8.58 0 11506 - 4.29 - 0.999627 -
7 Analog Axle Counter (DMK) do 10 23012 720 10 0 39.75 0 2301 - 3.975 - 0.998276 -
8 Analog Axle Counter (SZY) do 8 23012 720 6 0 26.85 0 3835 - 4.475 - 0.998835 -
9 Analog Axle Counter (KKLU) do 6 23012 720 5 0 14.04 0 4602 - 2.807 - 0.99939 -
10 Analog Axle Counter (GIZ) do 7 23012 720 2 0 5 0 11506 - 2.5 - 0.999783 -
11 Analog Axle Counter (KMLR) do 6 23012 720 4 0 8.78 0 5753 - 2.195 - 0.999619 -
12 Analog Axle Counter (BHNS) do 8 23012 720 1 0 3.11 0 23012 - 3.11 - 0.999865 -
13 Analog Axle Counter (KMSD) do 2 23012 720 1 0 4.5 0 23012 - 4.5 - 0.999804 -
14 Analog Axle Counter (DPF) CEL/2D 2 23012 720 0 0 0 0 - - - - - -
E.CO.RAILWAY
S&T WALTAIR
LED SIGNALS LAMP FOR THE YEAR 2008-09

UNIT-SSE(SIG)/JDB Month- (26 DEC-25 JAN)/2011-12

No. of
Name
equipment Total down time
S.No. of Equip Make Total No. of hours in use No. of failures MTBF(5/6) MTTR(7/6) Availability
existing as in hours
ment
on date

5 6 7 8 9 10(8/(8+9))
1 2 3 4
A B A B A B A B A B A B
power-
1 LED 507 8123968 377208 49 3 105.29 3.08 ### 125736 2.15 1.03 0.999 0.999
tech

LED SIGNALS LAMP PERFORMANCE FOR THE YEAR 2008-09

Signals No. Of failures Failure Duration


No. Of
S. No. Division Make Type Of Failures Cause of failure
aspect Semaphor
CLS A B A B
e

CTS- Up M L Starter
1 102.87 0.66 showing no light Current regulator defective.

power- KPRR- UP Advance starter


1 WAT 507 112 nil 49 2 104.79 1.92 green aspect no light. Current regulator defective.
tech

DWZ- Up Advance starter


3 105.29 0.5 normal aspect no light. Current regulator defective.

A Cummulative till the end of the month of the year under review
B During the month
Availability= MTBF/ MTBF+MTTR
EAST COAST RAILWAY
S&T WALTAIR
DEPA PERFORMANCE FEEDBACK REPORT FOR CURRENT REGULATOR OF LED SIGNAL DIVISION
RTME
UNIT-S.S.E.(SIG)/JDB Month- (26 MAR-25 APR)2012
NT
Failures detailes

modified cr's
No. of LED

provided
installed
Sr. No. Station MAKE Remarks

Date of
Date Type of failure

1 JRT Saranathi 34 3/25/2010


2 MVG Urban Engg 30 25/6/08
3 CTS GAEC 26 25/6/08
4 JYP GAEC 28 25/6/08
5 DIR GAEC 20 25/6/08
6 KDPA GAEC 30 25/6/08
7 KPRR GAEC/Saranathi 24 25/6/08
8 AGB GAEC 30 25/6/08
9 AGZ GAEC 26 25/6/08
10 NKX GAEC 39 25/6/08
11 JDB GAEC 41 25/6/08
12 KMEZ Power Tech 30 25/6/08
13 BDXX Power Tech 30 25/6/08
14 KMSD Power Tech 26 25/6/08
15 KWGN Power Tech 30 25/6/08
16 DPF Power Tech 16 25/6/08
17 DWZ Power Tech 12 25/6/08
18 BCHL Power Tech 10 25/6/08
19 KRDL Power Tech 3 25/6/08
Total 485
WALTAIR
DIVISION
MAR-25 APR)2012

Remarks
EAST COAST RAILWAY
Statement of Duration of Signal failure for 2008-09 and 2009-10 as per Signal failure r

April May June July Aug Sept Oct Nov


S&T Gear
failed 08-09 09-10 08-09 09-10 08-09 09-10 08-09 09-10 08-09 09-10 08-09 09-10 08-09 09-10 08-09 09-10

Point 16:35 04:30

Track Ckt. 00:53 19:15

Block
00:53 11:15
Instrument

Axc
(BPAC, 00:00 0
LVCD)

Axc
(In place of 03:10 0
Track Ckt.)

Sub Total 21:31 30:00


Theft/
64:35 29:15
Miscreant

Sub Total 86:06 59:15

Control 11:15

Grand Total 86:06 70:30


Signal failure register.

Dec Jan Feb Mar

08-09 09-10 08-09 09-10 08-09 09-10 08-09 09-10

4.15 15.30 0.55

3.05 1.33 8.15

33.06 25.59 13.50

00.00 00.00

1.15 1.30 2.47

41.41 44.32 25.47


31.00 22.20 16.55

31.00 22.20 16.55

66.27
Failure Summary of SSE(SIG)/ WAT Unit For the
26 JUNE 2017-25 JULY 2017)

Classification of failures
1 SIGNAL & TELECOM
A Equipment Failure
i Signal Transformer
ii HKT, 'E' Type Lock, Crank Handle
iii Lever Frame
iv Magneto Telephone
v Annunciator
vi SM Slide
B Lamp Fusing
i Filament Lamp
ii LED, HMU, CR 1
C Cable
i Indoor Wiring & Dry Soldering 1
ii Out Door cabling 1
iii Cable Termination
D Relay Failure
i Matel to Carbon
ii Matel to Matel
iii Group Relay
E Point Machine
i Point Machine
ii EPD
F Fuse Blown off
i Fuse Blown off
G Power Equipment
i IPS/UPS
ii Battery Chargers
iii DG Sets
iv AMF Panel of DG Sets
v Battery Chargers
vi Inverters
vii DC to DC Converters
H Bad Maintenance
i Out of Adjustment
ii Loose Connection
iii Jamming
iv Breakage of Part
v Dn Gradation of Electrical Power
vi Staff Working
I Track Circuit Failure
i UAC/ SSDAC/ MSDAC/ TC
ii Impedence Bond
iii AFTC
iv Track Feed Resistance
v Track Device/UAC/SSDAC/MSDAC
vi EJB/ UAC
vii Reset/UAC/SSDAC/MSACTC
J Block Instrument Failure
i Block Panel
ii UFSBI
iii BPAC - MUX
iv SGE
v TLBI
vi Token Instrument
vii UAC/SSDAC/BPAC
viii Reset UAC/SSDAC/BPAC
K Interlocking
i Electro - Mechanical
ii Relay Interlocking
iii Electronic Interlocking
L Lifting Barrier
i Mechanical
ii ELB
M Miscellinious
i Right During Testing
ii Route Held Up
iii FPL / LB
iv Mechanical Detector
v Rod/Wire/Compensator/Reverser/ Signal Machine
NA(Electronic timer Relay defective)
TOTAL (A)
Non Chargeable (B)
2 OPERATING
2.1 RIGHT BEFORE ATTENDANCE
2.2 NO INFORMATION & NONE ATTENDED
2.3 IMPROPER/ WRONG OPERATION
2.4 OBSTRUCTION IN POINTS
2.5 OTHERS
3 ENGINEERING
3.1 STAFF WORKING 1
3.2 IBJ DEFECT
3.3 GJ DEFECT 1
3.4 POOR DRAINAGE
3.5 POINT DEFECT
3.6 OTHERS 1
4 D. O. T.
4.1 DOT LINE FAULT
5 ELECTRICAL
5.1 SUPPLY FAILURE
5.2 OTHERS
6 MECHANICAL
6.1 S & T GEAR DAMAGED BY WAGON DOOR 1
6.2 TOKEN LOST
6.3 OTHERS
7 MISCREANT ACTIVITY/LAW & ORD.
7.1 DAMAGES TO S & T GEARS
7.2 THEFT TO S & T GEARS
7.3 SHORTING OF BLOCK JOINT/T.C.
7.4 OBSTRUCTION/ INTERFER TO TRANS.
7.5 OTHERS
8 MISCELLANEOUS
8.1 CATTLE RUN OVER
8.2 RATS/ LIZARDS ETC. AFFECTING GEARS
8.3 ACCIDENTS/AGITATIONS ETC.
8.4 OTHERS/NFF/MISCL
9 BAD WEATHER 2
TOTAL (B)
GRAND TOTAL (A + B) 8
MISSION ITEMS- ASSET RELIABILITY :
ASTE/ _Section for the Month of JULY 2017.

MAR'18
NOV'17
May17

OCT'17

DEC'17
Aug17

JAN'18

FEB'18
Sep17
Apr17

Jun17

Jul17
Signal failure Total

Actual of 2016-17 6 6 6 10 28

2016-17 TARGET
5 5 5 9 24
(90% of 2016-17)

Actual of 2017-18 12 8 16 8 44

Signature of the
concerned Signature of the concerned SSE/Sig/Incharge
DSTE/ASTE
PERFORMANCE REPORT OF SSDAC

Date of
Duration
S.No. STATION Block Section Commi- F/O F/R
in Hours
ssioning

1
2

PERFORMANCE REPORT OF EI

Date of
Duration in
S.No. STATION Commi- F/O F/R Failure with date a
Hours
ssioning

PERFORMANCE REPORT OF IPS

Date of
Duration in
S.No. STATION Commi- F/O F/R Failure with date a
Hours
ssioning

PERFORMANCE REPORT OF LED

Date of
Duration in
S.No. STATION Commi- F/O F/R Failure with date a
Hours
ssioning
Annexure 10.1.7

RMANCE REPORT OF SSDAC

Failure with date and cause Remarks

PERFORMANCE REPORT OF EI

Failure with date and cause Remarks

ORMANCE REPORT OF IPS

Failure with date and cause Remarks

ORMANCE REPORT OF LED

Failure with date and cause Remarks


STATUS OF SIGNALING ITEMS

S.NO. Item/Unit Done during the current month


Common Audio Visual Alarm for track feed
1 charger (Location)
Fuse monitiring and automatic change over
2 system(Location)
Shifting of starter to the boundary of Track circuit
3 ( Stn)

4 Distance signal modification as for G & SR (Stn)


Provision of RTUs / Dataloggers at IBS , ABS &
5 Mid section Interlocked LC gates.
Provision of Inverters at Mid section interlocked
6 LC gates

7 Replacement of Non standard point machine

Provision of emergency cancelasion with time


delay of 120 Second by ASM as per Correction
8 slip to IRSEM(Stn)

Provision of tokenless block instrument are BPAC


9 with block panel

Provision of MACLS by replacing semaphore


10 signals (Stn.)

Upgradation of Interlocking from standard I to


11 std. IIR (Stns.)

12 Replacement of Machenical interlocking(Stn.)


Induction of New Technology Items for the month - (26 JUNE 2017-25 J
SN Item Unit

A B
No. of LC
1 Train Actuated Warning Device Gates
2(a) Anti Collision Device (ACD) Planned Rkms
2(b) Anti Collision Device (ACD) Planned Stns
2(c) Anti Collision Device (ACD) Survey Rkms
2(d) Anti Collision Device (ACD) Survey Stns
3(a) Train Collision Avoidance System (TCAS) Rkms
3(b) Train Collision Avoidance System (TCAS) Stns
4 Data loggers Stns
5 Audio Frequency Track Circuits Nos.
6(a) LED Signal Lamps Stns
6(b) LED Signal Lamps Aspects
7(a) Semaphore LED Signal Aspects Stns
7(b) Semaphore LED Signal Aspects Aspects
8 Integrated Power Supply (IPS) Stns

9 Electronic Interlocking (EI) Stns

Single Section Digital Axle Counter


10(a) Sets
(SSDAC) for TCs

Multi Section Digital Axle Counter


10(b) Sets
(MSDAC) for TCs

11(a) Axle Counter for BPAC with SSDAC Block Sections


11(b) Axle Counter for BPAC with UAC Block Sections
12(a) Block Interface OFC & MW Single Line
12(b) Block Interface OFC & MW Double Line
13(a) Solar Panels for PI/EI/RRI(35W) Nos.
13(b) Solar Panels for PI/EI/RRI(70W) Nos.
13(c) Solar Panels for LC Gates(35W) Nos.
13(d) Solar Panels for LC Gates(70W) Nos.
Solar Panels for energisation of 25W
13(e) VHF sets installed at stns Nos.
(35W)
Solar Panels for energisation of 25W
13(f) Nos.
VHF sets installed at stns (70W)

14(a) AWS Rkms


14(b) AWS Tkms
14(c) AWS Track magnets (Nos.) Nos.
14(d) TPWS Rkms
14(e) TPWS Cab Equipment Nos.
15 2nd Distnat Signals Stns
16 Token less Block Working Block Sections
17 MACLS Stns
18 Point Machines for Thick Web Switch No. of point
19 IRS Siemens Point Machine Nos.
20(a) Auto Signalling Tkms
20(b) Auto Signalling Rkms
21 SDH Equipments Nos.
22 TMS Stns
ems for the month - (26 JUNE 2017-25 JULY 2017) 2017
Provided during current month

C
Annexure to PCDO to ML
Ref-2011/SIG/Inspection/1 dt. 22.07

(a) POINT MACHINE


Sl No Failure Code No of Failure

(b) RELAY CONTACT HIGH RESISTANCE

Sl No Failure Code No of Failure

1
LED FAILURE

Sl No Failure Code No of Failure

POWER EQUIPMENT FAILURE


Sl No Failure Code No of Failure
1

TRACK CIRCUIT

Sl No Failure Code No of Failure

LEVEL CROSSING

Sl No Failure Code No of Failure

1
nspection/1 dt. 22.07.2011

Make Age

% age of total no.


AC/Non AC Weather effect Make that make

Main/
Make Subsidiary

IPS/Non IPS Main

Due to Charger Due to battery

Elect./Mech
Barrier
Department wise Analysis of Signal incidences for the month of
MARCH - 2005
DETAILS
, 2003 OF BLOCK FAILURES

Date of
S.NO. STATION Details of the Failure Duration
Failure
Annexure:5.1.1(2)

Preventive
Cause measures
taken by
Railways to
prevent such
Failures
PERFORMANCE OF CEL SSDAC FOR

May-17

Equpt. Card
Resetting
No. of Instruments
S.No. SECTION Type of Detection Line

1 GPT-D - Cabin 1 PH-Rev DN 8

2 GPT-DVD(Dn) 1 PH-Rev UP 0

3 GPT-DVD(UP) 1 PH-Rev DN 0

4 GPT-JGPM 1 PH-Rev UP 0

5 PH-Rev DN

6 PH-Rev UP

7 PH-Rev DN

8 PH-Rev UP

9 PH-Rev DN

10 PH-Rev UP

11 PH-Rev DN

12 PH-Rev UP

13 PH-Rev DN

14 PH-Rev UP

15 PH-Rev DN

16 PH-Rev UP

17 PH-Rev DN
18 PH-Rev UP

19 PH-Rev DN

20 PH-Rev UP

21 PH-Rev DN

22 PH-Rev UP

23 PH-Rev DN

24 PH-Rev UP

25 PH-Rev DN

26 PH-Rev UP

27 PH-Rev DN

28 PH-Rev UP

29 PH-Rev SL

30 PH-Rev SL

TOTAL 4 8 0
High. Temp.

May-17
Coil damaged by Unimat
Engg.

Error code
CEL SSDAC FOR THE YEAR 2017 - 18

BlockbyT/Wagon unimat

System failure

System not reset after


initiating resett.

Staff working

Others
Annexure -V
0 0 0 0 0 0 0 0
Annexure -V
Total

0
0

8
_______________Railway
SIGNAL DEPARTMENT
SIGNALLING ASSETS DETAILS FOR THE MONTH OF ________________ 20_____
S.N ITEMS Assets as on 31.3.16 (Route wise)

A B C D Spl D E TOTAL
Assets at station
section (BG only)
1* Total Nos of BG
Interlocked stations
(Including Block Hut/C
class station)
1.1 Panel Interlocking (No
of stations)
1.2 Electronic Interlocking
(No.of stations)

1.3 Route Relay


interlocking (No of
stations)
1.4 MACL with lever
Frame/SM Slide
frame (No. of stations)

1.5 Semaphore with


Lever Frame (No. of
stations)
1.6 Semaphore with
Panel Interlcking (No.
of stations)
2 Stations with
complete Track
circuiting (No. of
stations)
2.1 Track circuiting (No. of
locations)
3 Solar Panel (No. of
stations)
4 Interlocked Gates in
stations section
4.1 LC Gate with
Telephone
5 Data Loggeres (No. of
stations)
6 Colour Light signalling
(No. of stations)

6.1 LED Signal (No. of


stations)
7 Block Proving by Axle
counter (No of block
section)
7.1 Token instruments
(No. of block sections)

8 Standard of
Interlocking
8.1 Standard I* of
Interlocking
8.2 Standard II * of
Interlocking
8.3 Standard III * of
Interlocking
9 Assets in Block
Sections
9.1 Automatic Block
Signalling (Route
KM.)
9.2 Intermediate Block
Signalling (No. of
block sections)
9.3 Interlocked Level
crossing Gates (Nos)

9.4 LC Gates with


Telephone (Nos)
9.5 Remote Terminal
Units (Nos)
10 Electric Lifting
Barriers (Nos)
* Interlocked Goods Cabins without separate Block working not covered in Items 1
ANNEXURE -I

___________ 20_____
Total Sanctioned Yet to be Added in 16-17 upto
sanctione Total Routwise
d (As per quantim breakup
approved
PH-33 Other
HIGHLIGHTS FOR THE MONTH OF 26 JUNE 2017-25 JULY 2017
Unit of SSE/Signal/Koraput

Disconnection - 230
Block - 81
Other - 149

DC-RC For The Month Of 26th Jun 2017 to 25 Jul 2017


Sr.
Station Block Other Total
No.
1 CJS 2 6 8
2 KDPA 2 11 13
3 DIR 4 4 8
4 JYP 4 12 16
5 CTS 4 7 11
6 MVG 2 3 5
7 JRT 2 4 6
8 MVF 1 4 5
9 KRPU 6 8 14
10 KRPU "A" CABIN 4 2 6
11 KRPU "B" CABIN 3 2 5
12 DMRT 4 2 6
13 DMNJ 4 9 13
14 BGUA 3 8 11
15 KKGM 4 8 12
16 SXV 4 4 8
17 PBV 3 5 8
18 MKRD 3 4 7
19 BHJA 4 4 8
20 PFU 4 4 8
21 DPC 4 4 8
22 GPJ 4 11 15
23 ARK 4 16 20
24 SMLG 2 7 9
TOTAL 81 149 230